4. Advanced Substation Protection - Andrew Urquhart - SSE

15
Advanced Substation Protection: Proving the Concept IntelliSub Europe 2013 Andrew Urquhart R&D Project Manager

description

a good protection guide

Transcript of 4. Advanced Substation Protection - Andrew Urquhart - SSE

Page 1: 4. Advanced Substation Protection - Andrew Urquhart - SSE

Advanced Substation Protection: Proving the Concept

IntelliSub Europe 2013

Andrew Urquhart

R&D Project Manager

Page 2: 4. Advanced Substation Protection - Andrew Urquhart - SSE

Overview

Background

Project

Project Development

Methodology

SSE

Results

Next Steps

Learning Benefits

Progression

Progress

Page 3: 4. Advanced Substation Protection - Andrew Urquhart - SSE

SSE

* As at 11 January 2013

• 30th largest company in the FTSE 100*

• £13.8 bn market capitalisation

• Around 19 500 employees

• Delivered a real dividend increase every year since 1999

• UK’s broadest-based energy company

• Electricity generation, transmission, distribution, supply and services

• Gas production, storage, distribution, supply and services

• Telecoms networks and data storage

• Irelands fastest-growing energy company

• Electricity generation

• Electricity and gas supply

• Street lighting maintenance

Page 4: 4. Advanced Substation Protection - Andrew Urquhart - SSE

4

• We own

• one electricity transmission

• two electricity distribution networks

• 106,000 substations

• 130,000 km of overhead lines

and underground cables

• 100+ submarine cable links

• Across one third of the UK

landmass.

• Serving 3.5Million Customers

SSEPD

Page 5: 4. Advanced Substation Protection - Andrew Urquhart - SSE

‘Determine the business case for deploying a substation

protection system when compared with current business

processes and equipment’

Aim

Page 6: 4. Advanced Substation Protection - Andrew Urquhart - SSE

Traditional Approach

MICOM P142

Feeder MGMT

Relay

3 Phase O/C and

E/F

Sensitive Earth

Fault

Auto Reclose

Alarms:

Feeders L/O

SEF Trip

Protection Fail

TCS

Metering

RTU

Trip/

Close

33/11 kV 33/11 kV

Page 7: 4. Advanced Substation Protection - Andrew Urquhart - SSE

SASensor Approach

33/11 kV 33/11 kV

BIM

CIM

VIM

CCU

VCU

Computer

Remote Location

Page 8: 4. Advanced Substation Protection - Andrew Urquhart - SSE

• Identify suitable site

• Install & commission

• Evaluate

• Protection performance

• Proactive maintenance

• Comparison with traditional approach

Methodology

Page 9: 4. Advanced Substation Protection - Andrew Urquhart - SSE

• Hardware reduction

• Quicker setup

• Remote connection

Potential Benefits

Fault Data

Load Data

Maintenance

Data

Control

Room

Maintenance

Department

Network

Planners

Page 10: 4. Advanced Substation Protection - Andrew Urquhart - SSE

Progress

June 2012

May 2013 Mar 2015

Nov 2013

Page 11: 4. Advanced Substation Protection - Andrew Urquhart - SSE

Installation

Page 12: 4. Advanced Substation Protection - Andrew Urquhart - SSE

• Remote connection security issues

• Quicker install

• RTUs non-essential

• Digitised distribution substation protection possible

Learning

Page 13: 4. Advanced Substation Protection - Andrew Urquhart - SSE

Next Steps

System Integration Active Network Management

Automation

Substation Hub

Data Focus Point Remote Connection

Algorithm Development

Sensitive Earth Fault Voltage Control

Dynamic Line Rating

Page 14: 4. Advanced Substation Protection - Andrew Urquhart - SSE

Summary

Proof of

Concept

System

Integration Smarter &

More

Economic

Network Algorithm

Assessment

Page 15: 4. Advanced Substation Protection - Andrew Urquhart - SSE

Questions?