3.Scheduling Techniques for Construction Projects

download 3.Scheduling Techniques for Construction Projects

of 24

Transcript of 3.Scheduling Techniques for Construction Projects

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    1/24

    c e u ng ec n ques or

    Construction Projects

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    2/24

    The Planning process

    Doing the Planning

    Activities

    Critical path method

    Schedule Calculation

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    3/24

    - Project planning

    - The goal of planning

    The planning process

    -

    - Alternative Courses of Action

    - Selection the Course of Action

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    4/24

    Doing the schedule

    LevelI

    The Planning stages

    Activity list

    Site Foundation StructuralFrame Etc.LevelII

    Excavation Piling PileCap Etc.LevelIII

    Forms Rebars Concrete Etc.Level

    IV

    Drawing

    Fabricate Deliver aceLevelV

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    5/24

    Activities

    - Drive pile

    - xcava on

    - Cut ile head

    - Lean concrete- Footing form

    - oo ng re ar

    - Footin concrete

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    6/24

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    7/24

    CRITICAL PATH METHOD(CPM)

    The critical path method focuses

    managements attention on the

    .

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    8/24

    Schedule Calculations

    The next step in the CPM development process is to

    .

    These times are computed such that the network

    logic is not violated and the projects overall

    .

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    9/24

    ESn EFn

    Duration

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    10/24

    Schedule Calculation (Conts)

    orwar ass

    Early finishn (EF) = early startn (ES) + durationn [4.1]

    - Early Start / Early Finish

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    11/24

    Backward Pass

    8

    Figure 4.9vCalculation of early start ; use largest preceding

    early finish.

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    12/24

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    13/24

    Critical Path and Critical Activities

    1. The early start and late start times

    2. The early finish and late finish times6 C 9

    9 3 12

    6 D 8

    10 2 12

    0 A 4

    0 4 4

    4 B 6

    4 2 6

    6 E 10

    6 4 10

    10 F 12

    10 2 12

    12 H 22

    12 10 22

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    14/24

    PRECEDENCE LOGIC DIAGRAMS

    on the node scheduling method.

    The four precedence relationships are

    Finish to start FS

    Start to start (SS)

    Finish to finish(FF)

    Start to finish SF

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    15/24

    Place Strip

    Concrete

    1 day7 days

    shoring

    2 days

    .

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    16/24

    Place Strip

    1 day

    2 days= ays

    Fi ure 4.17 AON network finish to start relationshi with la

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    17/24

    continuous manner, the early start of the

    succeeding activity and late finish of the

    prece ng are ac v y can e ca cu a e

    in E . 4. n 4.1 .

    Early startn+1 = early finishn +lag [4.9]

    Late finishn = late startn+1 lag [4.10]

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    18/24

    Start to Start

    Excavate Excavate

    footing

    1 day

    footings

    1 day

    Form &p ace

    Concrete

    2 days

    Figure 4.18 AON network finish to start relationship

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    19/24

    Start to Start (conts)

    Excavate

    footing

    2days

    orm p ace

    concreteSS = 1

    Figure 4.19 AON network start to start relationship with lag

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    20/24

    The early start of the succeeding activity and late

    finish of preceding activities can be calculated byE s. 4.11 & 4.12 .

    Early startn+1 = early startn +lag [4.9]

    Late finishn = late startn+1 lag [4.10]

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    21/24

    Finish to Finish

    n+1 n

    durationn+1 [4.13]

    Late finishn

    = late startn+1

    lag [4.14]

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    22/24

    Start to finishThe start to finish relationship is not support by

    most sc e u ng so tware.

    footings

    3 da s Placeconcrete

    footings

    aysPlace rebarfootings

    ays Figure 4.20 AON network finish to start

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    23/24

    ormfootings

    FF = 2

    concrete

    footin s4 days

    Figure 4.21 AON network finish to finish relationship

    with lag

  • 7/25/2019 3.Scheduling Techniques for Construction Projects

    24/24