    1

    3GPP CWTS workshop3GPP CWTS workshop

    Beijing, 28 January 2003Beijing, 28 January 2003

    Presentation 1:Presentation 1:

    A Phased Approach to StandardizationA Phased Approach to Standardization

    John M MeredithJohn M Meredith

    3GPP Specifications Manager3GPP Specifications Manager

    ETSI Mobile Competence CentreETSI Mobile Competence Centre

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    2/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    2

    A reminderA reminder -- What does 3GPP do?What does 3GPP do?

    3GPP p

    repares and maintains specifications for the3GPP prepares and maintains specifications for thefollowing technologies:following technologies:

    GSMGSM

    GPRSGPRS

    EDGEEDGE

    WCDMAWCDMA FDDFDD (Frequency Division Duplex)(Frequency Division Duplex)

    WCDMAWCDMA TDDTDD (Time Division Duplex(Time Division Duplex in both High Chipin both High ChipRate and Low Chip Rate (TDSCDMA)Rate and Low Chip Rate (TDSCDMA)

    modes)modes)

    And other modulation schemes currently under considerationAnd other modulation schemes currently under consideration

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    3/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    3

    The paths to 3GPP technologiesThe paths to 3GPP technologies

    Circuit

    Switched

    Voice & low-speed dataPacket

    Switched

    Voice & medium-speed dataIP (option)

    Voice & high-speed data

    Paths from other technologies, e.g. IS-136, PDC

    EDGE

    DS

    TC

    IMT-2000

    FamilyGSMW-CDMAFDD 3.84 Mcps

    TDD 1.28 Mcps(aka: TD-SCDMA)

    SC

    GPRS

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    4/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    4

    3GPP Releases3GPP Releases

    Sp

    ecifications are grouped into ReleasesSpecifications are grouped into Releases

    A mobile system can be constructed based on the set of allA mobile system can be constructed based on the set of allspecifications which comprise a given Release.specifications which comprise a given Release.

    A Release differs from the previous Release by having addedA Release differs from the previous Release by having addedfunctionality introduced as a result of ongoing standardizationfunctionality introduced as a result of ongoing standardizationwork.work.

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    5/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    5

    Evolution from GSM to 3GEvolution from GSM to 3G

    1992 1993 1994 1996 1997 1998 1999 2000 2001 20021995

    GSM 3G

    Phase 1 Rel '96 Rel '97Phase 2

    2003

    Rel '98 Rel '99 Rel-4 Rel-5

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    6/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    6

    Feature 1 spec Feature 2 spec Feature 3 spec

    Traditional systems analysis and project managementTraditional systems analysis and project management

    techniques break the idea down into progressively moretechniques break the idea down into progressively more

    manageable elements.manageable elements.

    Until it is possible to identify individual component specifications.Until it is possible to identify individual component specifications.

    Project ManagementProject Management

    andand

    the Change Control cycle the Change Control cycle

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    7/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    7

    The rapporteur issues theThe rapporteur issues the

    specification as version 0.0.0specification as version 0.0.0

    Release field

    Technical field

    Editorial fieldThe Editorial field of the version number is incremented eachThe Editorial field of the version number is incremented eachtime an editorial change is made to the document.time an editorial change is made to the document.

    It is reset to zero every time the Technical field is updated.It is reset to zero every time the Technical field is updated.

    The Technical field of the version number is incremented each time aThe Technical field of the version number is incremented each time atechnical change is made to the document.technical change is made to the document.

    It is reset to zero every time the Release field is updated.It is reset to zero every time the Release field is updated.

    The Release field of the version number is incremented each timeThe Release field of the version number is incremented each timemajor new functionality is made to the system (rather than to themajor new functionality is made to the system (rather than to theindividual document).individual document).

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    8/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    8

    The drafting processThe drafting process

    The initial draft is discussed in theThe initial draft is discussed in the

    working group.working group.

    v0.0.0

    v0.1.0

    And a new draft is produced,And a new draft is produced,

    bearing technical changes.bearing technical changes.

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    9/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    9

    v0.1.0 v0.2.0 v0.3.0

    The process is iterative, until The process is iterative, until

    The drafting processThe drafting process

    v0.8.0

    the working group is happy the working group is happy

    with the draft.with the draft.

    v1.0.0

    Draft 1.0.0 is presentedDraft 1.0.0 is presented for informationfor information to the plenaryto the plenary

    TSG (Technical Body).TSG (Technical Body).

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    10/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    10

    v1.0.0 v1.1.0 v1.2.0

    The document returns to the workingThe document returns to the working

    group, and drafting continues until group, and drafting continues until

    The drafting processThe drafting process

    v1.5.0

    the working group believes the draft the working group believes the draft

    to be stable enough to come underto be stable enough to come under

    formal change control.formal change control.v2.0.0

    Draft 2.0.0 is presentedDraft 2.0.0 is presented for approvalfor approval to the plenary TSGto the plenary TSG

    (Technical Body).(Technical Body).

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    11/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    11

    v2.0.0 v2.1.0 v2.2.0

    If the TSG does not approve the draft, itIf the TSG does not approve the draft, it

    may return to the working group for furthermay return to the working group for further

    refinement. This is exceptional.refinement. This is exceptional.

    The drafting processThe drafting process

    v3.0.0

    v2.3.0

    When the draft is approved to come under change control, it is upgradedWhen the draft is approved to come under change control, it is upgraded

    to version 3.0.0to version 3.0.0 (assuming Release 1999(assuming Release 1999 see later)see later)..

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    12/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    12

    The system is composedThe system is composedof a coherent set ofof a coherent set of

    related specifications.related specifications.

    Change controlChange control

    It is still possible to develop the standard further,It is still possible to develop the standard further,

    to add the missing parts, and to correct errorsto add the missing parts, and to correct errors

    and omissions as the overall system becomesand omissions as the overall system becomes

    better defined.better defined.

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    13/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    13

    Consider an individual standard Consider an individual standard

    v3.0.0

    If the responsible working group wishes to make a change toIf the responsible working group wishes to make a change to

    it,it, however smallhowever small, ,

    Change controlChange control

    the working group must raise a Change Request. the working group must raise a Change Request.

    The CR consists of a coverThe CR consists of a coverpage page

    and an extract from the and an extract from the

    specification underspecification under

    consideration showing, usingconsideration showing, usingrevision marks,revision marks, all additionsall additions

    and deletionsand deletions..

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    14/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    14

    For example, a CR to TS 23.456 may be twice revised during the course ofFor example, a CR to TS 23.456 may be twice revised during the course of

    discussions in the WG before it is agreed.discussions in the WG before it is agreed.

    CR 4

    to 23.456

    CR 4 rev 1

    to 23.456

    CR 4 rev 2

    to 23.456

    Change controlChange control

    Several iterations of a CR may be required until the WG is happy with it.Several iterations of a CR may be required until the WG is happy with it.

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    15/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    15

    CR 4 rev 2

    to 23.456

    CR 5 rev 1

    to 23.456

    CR 6

    to 23.456

    All CRs against a given specification (or a given work item) are gatheredAll CRs against a given specification (or a given work item) are gathered

    together by the Support Team* prior to each TSG plenary. A single temp doctogether by the Support Team* prior to each TSG plenary. A single temp doc

    is created, with a cover page introducing each individual CR.is created, with a cover page introducing each individual CR.

    * In practice, by* In practice, bythe Secretary ofthe Secretary of

    the WGthe WGresponsible forresponsible for

    the spec.the spec.

    Change controlChange control

    The TSG examines each CR and approves or rejects each. Some CRs mayThe TSG examines each CR and approves or rejects each. Some CRs may

    be reworked during the TSG meeting and rebe reworked during the TSG meeting and re--presented (with a new revisionpresented (with a new revision

    number).number).

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    16/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    16

    CR 4 rev 2

    to 23.456

    CR 5 rev 1

    to 23.456

    The Support Team (MCC)The Support Team (MCC)

    incorporates the approved CRsincorporates the approved CRsinto the base specification into the base specification

    v3.0.0 v3.1.0

    Change controlChange control

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    17/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    17

    v3.1.0 v3.2.0 v3.3.0

    The controlled revision of specifications can continue in theThe controlled revision of specifications can continue in the

    same manner, with CRs being produced and approved. CRssame manner, with CRs being produced and approved. CRs

    allow full traceability of the changes wrought on a documentallow full traceability of the changes wrought on a documentsince its original approval.since its original approval.

    Change controlChange control

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    18/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    18

    Using the Change Control mechanism described, it is always possibleUsing the Change Control mechanism described, it is always possible

    to:to:

    See the differences from one version of a spec to the next.See the differences from one version of a spec to the next.

    If necessary, backIf necessary, back--track by detrack by de--implementing Change Requests whichimplementing Change Requests which

    prove to be flawed.prove to be flawed.

    Know exactly what set of specifications a system is to be built to.Know exactly what set of specifications a system is to be built to.

    Change controlChange control

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    19/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    19

    The initial system isThe initial system is

    composed of a coherentcomposed of a coherent

    set of related standards.set of related standards.

    All these standards have version numbers ofAll these standards have version numbers of

    the formthe form 33.y.z and are known as.y.z and are known as

    Release1999.Release1999.

    Eventually, the functionality of Release 1999Eventually, the functionality of Release 1999

    became stable. The Release was frozen.became stable. The Release was frozen.

    Change controlChange control

    Once frozen, no more functionality may be added to a ReleaseOnce frozen, no more functionality may be added to a Release(or, therefore, to its component specifications). Only(or, therefore, to its component specifications). Only essentialessential

    correctionscorrections are permitted.are permitted.

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    20/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    20

    It is now possible to add further functionality inIt is now possible to add further functionality in

    carefully designed features forming part of a newcarefully designed features forming part of a newRelease.Release.

    Feature 1 spec Feature 2 spec Feature 3 spec

    Change controlChange control

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    21/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    21

    it is possible to raise Change Requests to each it is possible to raise Change Requests to each

    specification to include the new functionality.specification to include the new functionality.

    v3.3.0

    Change controlChange control

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    22/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    22

    v3.3.0 v4.0.0 v4.1.0

    The addition of the new features to the system implies anThe addition of the new features to the system implies an

    upgrade to the next Release of the entire systemupgrade to the next Release of the entire system

    specification.specification.

    Change controlChange control

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    23/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    23

    New functionality may equally result in an entirelyNew functionality may equally result in an entirely

    new specification rather than a change to annew specification rather than a change to anexisting one.existing one.

    v0.0.0v1.0.0 2.0.0 v4.0.0

    Change controlChange control

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    24/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    24

    Release 1999 Release 4

    The result, in due course, is two complete sets of specifications: one forThe result, in due course, is two complete sets of specifications: one for

    each Release.each Release.

    Implementors (operators and equipment vendors) can choose whichImplementors (operators and equipment vendors) can choose which

    Release to build their systems to. Generally, newer Releases will beRelease to build their systems to. Generally, newer Releases will be

    richer in features, but less tried and tested.richer in features, but less tried and tested.

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    25/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    25

    A disadvantage of the release approach A disadvantage of the release approach

    Release 1999 Release 4

    An error discovered here An error discovered here

    may require not one CR but may require not one CR but

    twotwo to fix it to fix it

    because the same error may because the same error may

    have been inherited from thehave been inherited from the

    earlier Release!earlier Release!

    Note that maintaining severalNote that maintaining several

    parallel releases of the sameparallel releases of the same

    specification implies very wellspecification implies very well

    defined procedures and highlydefined procedures and highly

    disciplined handling !!disciplined handling !!

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    26/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    26

    A change control system along the lines described has enabled the GSMA change control system along the lines described has enabled the GSMspecifications to have undergone six controlled release, and has allowedspecifications to have undergone six controlled release, and has allowed

    a smooth transition from second generation digital mobile communicationsa smooth transition from second generation digital mobile communications

    to third generation, reto third generation, re--using as many of the basic elements as possible.using as many of the basic elements as possible.

    This mechanism requires meticulous project planning and controlThis mechanism requires meticulous project planning and control

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    27/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    27

    3GPP Releases3GPP Releases

    Release '99Release '99 functionally frozen December 1999. Thefunctionally frozen December 1999. Thebasis for early 3G deployment in Japan, Islebasis for early 3G deployment in Japan, Isle

    of Man, Monaco, and many more inof Man, Monaco, and many more in

    preparation.preparation.

    Release 4Release 4 functionally frozen March 2001.functionally frozen March 2001. Defines theDefines thelow chip rate TDD mode of particular interestlow chip rate TDD mode of particular interest

    to China, but with high potential in otherto China, but with high potential in other

    markets.markets. Release 5Release 5 functionally frozen March/June 2002functionally frozen March/June 2002

    Release 6Release 6 expected to be functionally frozen in lateexpected to be functionally frozen in late20032003

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    28/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    28

    Active project managementActive project management

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    29/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    29

    The 3GPP work plan can be consulted at:The 3GPP work plan can be consulted at:

    http://www.3gpp.org/ftp/Information/WORK_PLAN/http://www.3gpp.org/ftp/Information/WORK_PLAN/

    Active project managementActive project management

    3G Release 99 contained more or less the same functionality as GSM3G Release 99 contained more or less the same functionality as GSM

    R99, but of course using the new UTRA radio access network technologyR99, but of course using the new UTRA radio access network technology

    (W(W--CDMA).CDMA).

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    30/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    30

    Release 4Release 4

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    31/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    31

    Release 5Release 5

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    32/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    32

    Release 6Release 6

  • 8/8/2019 3GPP CWTS Workshop 01 Phased Approach

    33/33

    Click to edit Master text stylesClick to edit Master text styles

    Second levelSecond level

    Third levelThird level

    Fourth levelFourth level

    Fifth levelFifth level

    33