3G Opti Training

13
3G OPTI CRASH COURSE 3G Optimization Essentials

Transcript of 3G Opti Training

Page 1: 3G Opti Training

3G OPTI CRASH COURSE

3G Optimization Essentials

Page 2: 3G Opti Training

04/11/23 2

BASIC CONCEPT

2G - GSM 3G - WCDMA

Frequency

FDD

Frequency

FDD

Code

CDMA

Code

CDMA

time

frequency

time

frequency

Time

TDD

Time

TDD

Maxis’ WCDMA frequencies*:f1 10662 (DL) / 9712 (UL) - primaryf2 10637 (DL) / 9687 (UL)f3 10686 (DL) / 9736 (UL)

frequency

structure Network Element:

MSC

SGSNRNC

NodeB

NodeB

NodeB

iubiuCS

iuPSUE

UEuu

* Note: Exception in JB where f1, f2 and f3 are different

For CS

For PS

Bandwidth = 5MHzbandwidth

Chip rate = 3.84 Mchip/schip rate

Frame length = 10 msframe

Maxis’ GSM frequencies:900MHz, 1800MHz

frequency

Bandwidth = 200kHzbandwidth

Page 3: 3G Opti Training

04/11/23 3

CODES

SC: 1SC: 1

SC: 17SC: 17

Scrambling Code:• Using pseudo noise (PN) codes• Used to differentiate cells in the downlink (DL)• Range is 0 - 512

SC

SC: 9, Service: CS CallDL Channelization code: C128,5

Spreading factor: 128User bit rate: 12.2 kbps

SC: 9, Service: PS DownloadDL Channelization code: C8,2

Spreading Factor: 8User bit rate: 384 kbps

Channelization Code:• Using Orthogonal Variable Spreading Factor

(OVSF) codes• Fully orthogonal, i.e. do not interfere with

each other• Used to separate different users/cell• Limited codes per cell• Once a code is chosen, any codes on the

same branch above or below the used code cannot be used (refer diagram below)

SF

SC: 418SC: 418

C8,2C16,3

C32,5

C32,6

C64,9

C64,10

C64,11

C64,11

used

Spreading Factor User DL Bit Rate (kbps) User UL Bit Rate (kbps)

8 384 128

16 128 64

32 64 32

64 32 16

128 16 8

SC: 9SC: 9

Page 4: 3G Opti Training

04/11/23 4

HANDOVER (1)

2GCell12G

Cell1

3GCell1

f1

3GCell1

f1

IRA

T

Ded

icat

ed o

r id

le (

rese

lect

ion)

Idle

(re

sele

ctio

n)

3GCell2

f1

3GCell2

f1

SOFT HANDOVERActive Set:Up to 3 cells in soft handover (sHO), i.e. 3 AS. This means a UE can be served by up to 3 cells at the same time. Note that 3 AS equals to using 3 cells’ resources at the same time.

AS

Things to defineMotorola: inter_rat_enabled, 2g>3g neighbours1

Ericsson: qsi, 2g>3g neighbours

Parameter

1 Can be checked with the file Motorola Dump Formatter.xls in \\sgbsvc112\share06\04_3G MSEP\02 Cell Dumps\2 Can be checked with the file 3G Ericsson Dump Compiler v1.5.xls or 3G Siemens Dump Compiler v2.0.xls in \\sgbsvc112\

share06\04_3G MSEP\02 Cell Dumps\

Monitored Neigbour / Detected NeighbourMonitored Neighbour (MN): Neighbour already

defined2, can be added as an AS if criterion is metDetected Neighbour (DN): Neighbour not defined in the

neighbour list, need to be added TWO-WAY if it is a valid missing neighbour. A DN whose RSCP is too close to the strongest server and not added as a neighbour will become an interferer.

MN/DN

Add

Don’t Add

SOFT HANDOVER

IRAT

Dedicated

TEMS Snapshot

3GCell3

f2

3GCell3

f2H

AR

D H

AN

DO

VE

R

Dedicated

Inter-frequency HO

Intra-frequency HO

HA

RD

HA

ND

OV

ER

Page 5: 3G Opti Training

04/11/23 5

HANDOVER(2)

Event 1a - A Primary CPICH enters the Reporting Range

e1a

Event 1b -A Primary CPICH leaves the Reporting Range

e1b

Event 1c - A non-active primary CPICH becomes better than an Active Primary CPICH

e1c

Event 1d - Change of Best Cell e1d

Event 2d - The estimated quality of the currently used frequency is below a certain Threshold

e2d

Event 2f - The estimated quality of the currently used frequency is above a certain threshold

e2f

Event 3a - The Estimated Quality of the Currently Used UTRAN Frequency is below a Certain Threshold and the Estimated Quality of the Other System is above a Certain Threshold

e3a

Parameter Meas. Q Eric NSN

e1a Ec/No 3 3

e1b Ec/No 5 6

e1c Ec/No 1 2

e1d Ec/No 7.5 4

e2d rscp -104 -102

e2f rscp -101 -97

e3a rscp -95 -100

Maxis default values

Page 6: 3G Opti Training

04/11/23 6

OPTIMIZATION

TEMS Snapshot

RSCP = COVERAGEIt is equivalent to RxLev in GSM

Coverage

Ec/No = QUALITYIt is equivalent to RxQual in GSM. Very important to optimize network to have good quality (>-12dB)

Quality

OPTIMIZATION CONCEPT• To have best Ec/No (not necessarily RSCP) by

minimizing other cell’s interference. This means optimizing a cell’s coverage with balancing between RSCP and Ec/No.

• Ideally, at one point in time, you should have only 1AS only. But for practicality, it should be less than 3 cells (including best server) within 6dB of the best server’s RSCP (above example would have 4 cells)

3G Opti METHODS OF OPTIMIZATION• Tilting of overshooting site• Power down of overshooting site with max tilts• Neighbour addition of DN’s• Reengineering, e.g. antenna swing

Methods

Common Pilot ChannelUse for channel estimation reference at the terminal; scrambled with cell specific primary SC; DL channel with a fixed rate of 30 kbps or SF256

CPICH

Page 7: 3G Opti Training

04/11/23 7

RESOURCES & CAPACITY

NODE BNODE B

E1 CAPACITYType: Site-levelNote: This resource is for signaling and traffic between Node B and RNC (highest priority among all resources mentioned here).Congestion Resolution: E1 upgrade

IUB

CHANNEL ELEMENTType: Site-level Note: This resource shared between sectors within one NodeB. It is used to process different type of services, e.g. CS, PS, HSDPA, 1 CE = 1 Voice CallCongestion Resolution: Channel card activation or addition

CE/CHC

POWERType: Cell-levelNote: Output power on the downlink is shared between UE’s.for their respective trafficCongestion Resolution: Power upgrade or 2nd Carrier

POWER

CODEType: Cell-levelNote: This is referring to the channelization/OVSF code resource which is one per service (more codes for HSDPA)Congestion Resolution: 2nd Carrier

CODE

RNCRNC

Page 8: 3G Opti Training

04/11/23 8

PERFORMANCE

Echelon• Statistic viewer for Ericsson performance counter• Updated weekly• Located in \\sgbsvc112\share06\04_3G MSEP\18 Statistics\• Key statistics to look at:

• RRC Drop Rate• RRC Establishment Success Rate• RAB Drop Rate – CS & PS• RAB Establishment Success Rate – CS & PS• Fail After Admin - congestion monitoring• Throughput • Soft Handover and IRAT HO• RSSI – interference• TCP – power used• No. of ADCH users – number of HS

Ericsson Sentinel• Statistic viewer for NSN performance counter• Cell stats located in Viewer and Graph worksheet• Updated daily• Located in \\sgbsvc112\share06\04_3G MSEP\18 Statistics\• Key statistics to look at:

• RRC Drop Rate• RRC Establishment Success Rate• RRC Fail Cause - congestion detection• RAB Drop Rate – CS & PS• RAB Establishment Success Rate – CS & PS• Admission Reject• Soft Handover & IRAT HO• RTWP – interference• TCP – power used• HS Establishment Success Rate

NSN

Page 9: 3G Opti Training

04/11/23 9

RRC DROP RATE

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

27-1

1

04-1

2

11-1

2

18-1

2

25-1

2

01-0

1

08-0

1

15-0

1

22-0

1

29-0

1

05-0

2

12-0

2

19-0

2

DR

OP

RA

TE

(%

)

0

5,000

10,000

15,000

20,000

25,000

Cell DCH Disc Normal Cell DCH Disc Abnormal RRC Signaling Drop Rate (%)

RRC DROP RATE

0.00

20.00

40.00

60.00

80.00

100.00

120.00

27-1

1

04-1

2

11-1

2

18-1

2

25-1

2

01-0

1

08-0

1

15-0

1

22-0

1

29-0

1

05-0

2

12-0

2

19-0

2

DR

OP

RA

TE

(%

)

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

Cell DCH Disc Normal Cell DCH Disc Abnormal RRC Signaling Drop Rate (%)

ECHELON FOR BIS (1)

NORMALNORMAL ABNORMALABNORMAL

RRC SETUP SUCCESS RATE

90.00

92.00

94.00

96.00

98.00

100.00

27

-11

04

-12

11

-12

18

-12

25

-12

01

-01

08

-01

15

-01

22

-01

29

-01

05

-02

12

-02

19

-02

SU

CC

ES

S R

AT

E (

%)

0

5,000

10,000

15,000

20,000

25,000

30,000

AT

TE

MP

TS

RRC Connect Req Ps RRC Connect Req Cs Access Signaling SR (%)RRC Setup SR CS (%) RRC Setup SR PS (%)

RRC SETUP SUCCESS RATE

90.00

92.00

94.00

96.00

98.00

100.00

27-1

1

04-1

2

11-1

2

18-1

2

25-1

2

01-0

1

08-0

1

15-0

1

22-0

1

29-0

1

05-0

2

12-0

2

19-0

2

SU

CC

ES

S R

AT

E (

%)

0

10,000

20,000

30,000

40,000

50,000

60,000

AT

TE

MP

TS

RRC Connect Req Ps RRC Connect Req Cs Access Signaling SR (%)RRC Setup SR CS (%) RRC Setup SR PS (%)

ADMIN FAIL

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

27-1

1

04-1

2

11-1

2

18-1

2

25-1

2

01-0

1

08-0

1

15-0

1

22-0

1

29-0

1

05-0

2

12-0

2

19-0

2

RE

JEC

T C

OU

NT

S

Req Denied Adm Failed After Adm

Need to check reason at:\\sgbsvc112\share06\02_3G Radio Planning\06 3G KPI

Statistics\3G Weekly Stats\

Need to check reason at:\\sgbsvc112\share06\02_3G Radio Planning\06 3G KPI

Statistics\3G Weekly Stats\

IUB OR CE CONGESTIONIUB OR CE CONGESTION

Page 10: 3G Opti Training

04/11/23 10

PS: RAB DROP RATE

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

27

-11

04

-12

11

-12

18

-12

25

-12

01

-01

08

-01

15

-01

22

-01

29

-01

05

-02

12

-02

19

-02

DR

OP

RA

TE

(%

)

0

500

1,000

1,500

2,000

2,500

AT

TE

MP

TS

Normal RAB Release Packet System RAB Release Packet RAB Drop PS (%)

CS: RAB ESTABLISHMENT SUCCESS RATE

80.00

82.00

84.00

86.00

88.00

90.00

92.00

94.00

96.00

98.00

100.00

27-1

1

04-1

2

11-1

2

18-1

2

25-1

2

01-0

1

08-0

1

15-0

1

22-0

1

29-0

1

05-0

2

12-0

2

19-0

2

SU

CC

ES

S R

AT

E (

%)

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

AT

TE

MP

TS

RAB Est Attempt Speech RAB Est Attempt CS64

RAB Est SR Speech (%) RAB Est SR CS64 (%)

ECHELON FOR BIS (2)

NORMALNORMAL ABNORMALABNORMAL

CS: RAB DROP RATE

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

27-1

1

04-1

2

11-1

2

18-1

2

25-1

2

01-0

1

08-0

1

15-0

1

22-0

1

29-0

1

05-0

2

12-0

2

19-0

2

DR

OP

RA

TE

(%

)

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

AT

TE

MP

TS

Normal RAB Release Speech System RAB Release Speech Normal RAB Release Cs64System RAB Release Cs64 RAB Drop CS (%) RAB Drop Speech (%)RAB Drop CS64 (%)

RAB ESTABLISH FAIL CAUSE

0

50

100

150

200

250

300

350

27-1

1

04-1

2

11-1

2

18-1

2

25-1

2

01-0

1

08-0

1

15-0

1

22-0

1

29-0

1

05-0

2

12-0

2

19-0

2

NO

. OF

FA

ILS

Failed RAB Est Attempt: Exceed Conn Limit Failed RAB Est Attempt: Lack DL ASE

Failed RAB Est Attempt: Lack DL Chnl Code Failed RAB Est Attempt: Lack DL Power

Failed RAB Est Attempt: Lack UL ASE

PS: RAB ESTABLISHMENT SUCCESS RATE

80.00

82.00

84.00

86.00

88.00

90.00

92.00

94.00

96.00

98.00

100.00

27

-11

04

-12

11

-12

18

-12

25

-12

01

-01

08

-01

15

-01

22

-01

29

-01

05

-02

12

-02

19

-02

SU

CC

ES

S R

AT

E (

%)

0

500

1,000

1,500

2,000

2,500

3,000

3,500

AT

TE

MP

TS

RAB Est Attempt Ps Interactive RAB Est SR Ps Interactive (%)

INSUFFICIENT DL POWERINSUFFICIENT DL POWER

ADMIN FAIL

0

500

1000

1500

2000

2500

3000

3500

27-1

1

04-1

2

11-1

2

18-1

2

25-1

2

01-0

1

08-0

1

15-0

1

22-0

1

29-0

1

05-0

2

12-0

2

19-0

2

RE

JE

CT

CO

UN

TS

Req Denied Adm Failed After Adm

REQUEST DENIED ADMISSIONREQUEST DENIED ADMISSION

LINKEDLINKED

CS: RAB DROP RATE

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

27-1

1

04-1

2

11-1

2

18-1

2

25-1

2

01-0

1

08-0

1

15-0

1

22-0

1

29-0

1

05-0

2

12-0

2

19-0

2

DR

OP

RA

TE

(%

)

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

AT

TE

MP

TS

Normal RAB Release Speech System RAB Release Speech Normal RAB Release Cs64System RAB Release Cs64 RAB Drop CS (%) RAB Drop Speech (%)RAB Drop CS64 (%)

RADIO DROP RATE

0

1

2

3

4

5

6

7

27-1

1

04-1

2

11-1

2

18-1

2

25-1

2

01-0

1

08-0

1

15-0

1

22-0

1

29-0

1

05-0

2

12-0

2

19-0

2

DR

OP

RA

TE

(%

)

0

100

200

300

400

500

600

700

800

900

1,000

AT

TE

MP

TS

Sys Rel Speech Neighbr Sys Rel Speech SoHo Sys Rel Speech UL Synch

Sys Rel Speech Radio Drop Rate (%)

MISSING NEIGHBOURMISSING NEIGHBOUR

PS: RAB DROP RATE

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

45.00

27

-11

04

-12

11

-12

18

-12

25

-12

01

-01

08

-01

15

-01

22

-01

29

-01

05

-02

12

-02

19

-02

DR

OP

RA

TE

(%

)

0

500

1,000

1,500

2,000

2,500

3,000

AT

TE

MP

TS

Normal RAB Release Packet System RAB Release Packet RAB Drop PS (%)

Page 11: 3G Opti Training

04/11/23 11

SENTINEL FOR BIS (1)

RRC DROP RATE

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

01

-01

08

-01

15

-01

22

-01

29

-01

05

-02

12

-02

19

-02

Dro

pR

ate

(%

)

0

5,000

10,000

15,000

20,000

25,000

Att

em

pts

RRC Attempt RRC Drop Rate

RRC ESTABLISHMENT SUCCESS RATE

80.00

82.00

84.00

86.00

88.00

90.00

92.00

94.00

96.00

98.00

100.00

01

-01

08

-01

15

-01

22

-01

29

-01

05

-02

12

-02

19

-02

Su

cc

es

s R

ate

(%

)

0

5,000

10,000

15,000

20,000

25,000

Att

em

pts

RRC Attempt RRC Est SR Conv RRC Est SR PSIB

RRC DROP RATE

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

01-0

1

08-0

1

15-0

1

22-0

1

29-0

1

05-0

2

12-0

2

19-0

2

Dro

pR

ate

(%

)

0

5,000

10,000

15,000

20,000

25,000

Att

emp

ts

RRC Attempt RRC Drop Rate

RRC FAIL CAUSE

0

500

1,000

1,500

2,000

2,500

01

-01

03

-01

05

-01

07

-01

09

-01

11

-01

13

-01

15

-01

17

-01

19

-01

21

-01

23

-01

25

-01

27

-01

29

-01

31

-01

02

-02

04

-02

06

-02

08

-02

10

-02

12

-02

14

-02

16

-02

18

-02

20

-02

22

-02

24

-02

No

. of

Fai

ls

NodeB Pwr Unavail CHC Unavail NodeB Processor OverLoad NodeB HW FailOther Reason In NodeB M2C UnAvail DHT Unavail NBAP Protocol ErrorCode Unavail ALCAP ProtErr RRC Prot Err NBAP Timeout

ALCAP Timeout M2C HW Fail DHT HW Fail RNC int Fn ErrIub unavail CC Reject AC Reject Restrict Reject

IUB CONGESTIONIUB CONGESTION

RRC ESTABLISHMENT SUCCESS RATE

80.00

82.00

84.00

86.00

88.00

90.00

92.00

94.00

96.00

98.00

100.00

01

-01

08

-01

15

-01

22

-01

29

-01

05

-02

12

-02

19

-02

Su

cc

es

s R

ate

(%

)

0

5,000

10,000

15,000

20,000

25,000

Att

em

pts

RRC Attempt RRC Est SR Conv RRC Est SR PSIB

RRC FAIL CAUSE

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

01-0

1

03-0

1

05-0

1

07-0

1

09-0

1

11-0

1

13-0

1

15-0

1

17-0

1

19-0

1

21-0

1

23-0

1

25-0

1

27-0

1

29-0

1

31-0

1

02-0

2

04-0

2

06-0

2

08-0

2

10-0

2

12-0

2

14-0

2

16-0

2

18-0

2

20-0

2

22-0

2

24-0

2

No

. of

Fai

ls

NodeB Pwr Unavail CHC Unavail NodeB Processor OverLoad NodeB HW FailOther Reason In NodeB M2C UnAvail DHT Unavail NBAP Protocol ErrorCode Unavail ALCAP ProtErr RRC Prot Err NBAP Timeout

ALCAP Timeout M2C HW Fail DHT HW Fail RNC int Fn ErrIub unavail CC Reject AC Reject Restrict Reject

CHC CONGESTIONCHC CONGESTION

AC REJECT

0

50

100

150

200

250

300

350

400

450

01

-01

03

-01

05

-01

07

-01

09

-01

11

-01

13

-01

15

-01

17

-01

19

-01

21

-01

23

-01

25

-01

27

-01

29

-01

31

-01

02

-02

04

-02

06

-02

08

-02

10

-02

12

-02

14

-02

16

-02

18

-02

20

-02

22

-02

24

-02

No

. of

Re

jec

t

Cell Rstr Max UL Load Max DL Load Code Alloc Fail CC Ongoing Other

NORMALNORMAL ABNORMALABNORMAL

RRC FAIL CAUSE

0

100

200

300

400

500

600

01-0

1

03-0

1

05-0

1

07-0

1

09-0

1

11-0

1

13-0

1

15-0

1

17-0

1

19-0

1

21-0

1

23-0

1

25-0

1

27-0

1

29-0

1

31-0

1

02-0

2

04-0

2

06-0

2

08-0

2

10-0

2

12-0

2

14-0

2

16-0

2

18-0

2

20-0

2

22-0

2

24-0

2

No

. of

Fai

lsNodeB Pwr Unavail CHC Unavail NodeB Processor OverLoad NodeB HW FailOther Reason In NodeB M2C UnAvail DHT Unavail NBAP Protocol ErrorCode Unavail ALCAP ProtErr RRC Prot Err NBAP Timeout

ALCAP Timeout M2C HW Fail DHT HW Fail RNC int Fn ErrIub unavail CC Reject AC Reject Restrict Reject

E1 ISSUEE1 ISSUE

CODE CONGESTIONCODE CONGESTION

Page 12: 3G Opti Training

04/11/23 12

SENTINEL FOR BIS (2)

CS: RAB DROP RATE

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

1.80

2.00

01

-01

03

-01

05

-01

07

-01

09

-01

11

-01

13

-01

15

-01

17

-01

19

-01

21

-01

23

-01

25

-01

27

-01

29

-01

31

-01

02

-02

04

-02

06

-02

08

-02

10

-02

12

-02

14

-02

16

-02

18

-02

20

-02

22

-02

24

-02

Dro

pR

ate

(%

)

0

200

400

600

800

1,000

1,200

1,400

1,600

Att

em

pts

RAB Rel CN Origin CS RAB DR

CS: RAB ESTABLISHMENT SUCCESS RATE

86.00

88.00

90.00

92.00

94.00

96.00

98.00

100.00

01

-01

08

-01

15

-01

22

-01

29

-01

05

-02

12

-02

19

-02

Su

cc

es

sR

ate

(%

)

0

200

400

600

800

1,000

1,200

1,400

1,600

Att

em

pts

CS Est Att (AMR) CS Est Att (CS64)

CS RAB Est SR (AMR) CS RAB Est SR (CS64)

PS: RAB DROP RATE

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

01

-01

08

-01

15

-01

22

-01

29

-01

05

-02

12

-02

19

-02

Dro

pR

ate

(%

)

0

500

1,000

1,500

2,000

2,500

3,000

Att

em

pts

RAB Rel CN Origin PS RAB DR

PS: RAB ESTABLISHMENT SUCCESS RATE

92.00

93.00

94.00

95.00

96.00

97.00

98.00

99.00

100.00

01-0

1

08-0

1

15-0

1

22-0

1

29-0

1

05-0

2

12-0

2

19-0

2

Su

cces

sRat

e (%

)

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

Att

emp

ts

CS Est Att (PSIB) CS RAB Est SR (PSIB)

HANDOVER SUCCESS RATE

88.00

90.00

92.00

94.00

96.00

98.00

100.00

01-0

1

08-0

1

15-0

1

22-0

1

29-0

1

05-0

2

12-0

2

19-0

2

Su

cces

sRat

e (%

)

InterRat SR BranchAdd SR

CS: RAB DROP RATE

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

1.80

2.00

01-0

1

03-0

1

05-0

1

07-0

1

09-0

1

11-0

1

13-0

1

15-0

1

17-0

1

19-0

1

21-0

1

23-0

1

25-0

1

27-0

1

29-0

1

31-0

1

02-0

2

04-0

2

06-0

2

08-0

2

10-0

2

12-0

2

14-0

2

16-0

2

18-0

2

20-0

2

22-0

2

24-0

2

Dro

pR

ate

(%)

0

500

1,000

1,500

2,000

2,500

Att

emp

ts

RAB Rel CN Origin CS RAB DR

CS: RAB ESTABLISHMENT SUCCESS RATE

86.00

88.00

90.00

92.00

94.00

96.00

98.00

100.00

01-0

1

08-0

1

15-0

1

22-0

1

29-0

1

05-0

2

12-0

2

19-0

2

Su

cces

sRat

e (%

)

0

500

1,000

1,500

2,000

2,500

Att

emp

ts

CS Est Att (AMR) CS Est Att (CS64)

CS RAB Est SR (AMR) CS RAB Est SR (CS64)

PS: RAB DROP RATE

0.00

2.00

4.00

6.00

8.00

10.00

12.00

01-0

1

08-0

1

15-0

1

22-0

1

29-0

1

05-0

2

12-0

2

19-0

2

Dro

pR

ate

(%)

0

100

200

300

400

500

600

700

800

Att

emp

ts

RAB Rel CN Origin PS RAB DR

NORMALNORMAL ABNORMALABNORMAL

Page 13: 3G Opti Training

04/11/23 13

MAPINFO TOOL: RF3G

Installation Note:

1. Copy latest version from \\sgbsvc112\share06\04_3G MSEP\09 Tools\

2. Open a dummy .tab file3. Go to Tools>Tool Manager4. Click Add Tool and locate

your RF3G folder5. Tick Loaded and Autoload6. Select MSEP3G>Setup RF3G7. Key in your RF3G folder (you

can ignore the Coverage option for now)

Installation Note:

1. Copy latest version from \\sgbsvc112\share06\04_3G MSEP\09 Tools\

2. Open a dummy .tab file3. Go to Tools>Tool Manager4. Click Add Tool and locate

your RF3G folder5. Tick Loaded and Autoload6. Select MSEP3G>Setup RF3G7. Key in your RF3G folder (you

can ignore the Coverage option for now)

Creating Sectors:

1. Use the sample excel template given

2. You can combine 2G and 3G together.

3. Compulsory info must be filled in the template for both system is SITE_LRD, UtranCell, CI, PSC, Latitude, Longitude, Azimuth and System.

(note: make sure UtranCell’s format is XXXXXX_X)

4. Open the excel inside MapInfo & use the first row as header

5. Select MSEP3G>Select Import Window & choose the relevant tab file containing the sectors info

6. Press OK unless you want to change the cell size (recommend 150 for KV)

7. The result is dark purple is 3G and light purple is 2G cells

Creating Sectors:

1. Use the sample excel template given

2. You can combine 2G and 3G together.

3. Compulsory info must be filled in the template for both system is SITE_LRD, UtranCell, CI, PSC, Latitude, Longitude, Azimuth and System.

(note: make sure UtranCell’s format is XXXXXX_X)

4. Open the excel inside MapInfo & use the first row as header

5. Select MSEP3G>Select Import Window & choose the relevant tab file containing the sectors info

6. Press OK unless you want to change the cell size (recommend 150 for KV)

7. The result is dark purple is 3G and light purple is 2G cells

Checking Coverage:

1. Open the coverage file2. Select MSEP3G>Setup RF3G3. Select the relevant tab file in

the Coverage Tab4. Press CTRL-W and enter your

scrambling code (SC)

Checking Coverage:

1. Open the coverage file2. Select MSEP3G>Setup RF3G3. Select the relevant tab file in

the Coverage Tab4. Press CTRL-W and enter your

scrambling code (SC)

Thematic Setup:

1. Go to the RF3G folder and locate the Audit Thematics folder

2. Follow the instructions given inside to create the necessary thematics that will be used later

3. You will have to restart your MapInfo (some system need a complete PC/laptop restart)

4. Check if these thematics exists by starting MapInfo, and press F9, go to Ranges and check if you see Region Ranges RSCP

Thematic Setup:

1. Go to the RF3G folder and locate the Audit Thematics folder

2. Follow the instructions given inside to create the necessary thematics that will be used later

3. You will have to restart your MapInfo (some system need a complete PC/laptop restart)

4. Check if these thematics exists by starting MapInfo, and press F9, go to Ranges and check if you see Region Ranges RSCP