350-1836 Equipment Manufacturer · 3. Footings need special consideration: a. Footings are...
Transcript of 350-1836 Equipment Manufacturer · 3. Footings need special consideration: a. Footings are...
Equipment Manufacturer350-1836
Equipment Manufacturer350-1836
0.5 1.0
05'
Meters2.0 3.0
10'
TRANSFER
STATION
W/ STEP
36"
0,92M
72"
1,83M
36"
0,92M
72"
1,83M
72"
1,83M
GLIDE
SLIDE
LEG
LIFT
360°
NUVO
SPIRAL
SLIDE
ACTIVITY PANEL
W/ FOUR THE
WIN INSERT
TOWER
CLIMBER
36" (915mm) RISE
90° CLOUDWALK
ACCESS
GATES
(Qty. 2)
ROCKBLOCKS
DECK ACCESS
SUPPORT
(24" to 36" deck)
(0,61M to 0,92M deck)
ROCKBLOCKS
90° WALL
(84" to 60")
(2,13M to 1,53M)
ROCKBLOCKS
DECK ACCESS
SUPPORT
(12" to 24" deck)
(0,31M to 0,61M deck)
6' HORIZONTAL
LOOP LADDER
W/ ACCESS
LADDER
OVAL PANEL
W/ SHIFTING
SANDS INSERT
(deck)
POST MOUNT
DRUM (ground)
6'-2"
[1.89M]
6'
[1.84M]
6'-1"
[1.85M]
6'-2"
[1.89M]
6'-2"
[1.89M]
6'-3"
[1.90M]
6'-1"
[1.85M]
POST
MOUNT
WHEEL
ANYWHERE
SEAT
34'-10"
[10.64M]
34'
[10.37M]
SHADE
HAT
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 8
4
8
3
3
4
3
4
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
350-
1836
C
AT
AL
OG
P
RE
-D
ES
IG
N
350-1836 1/4"=1'-0"
M. MERTZ
27-JUN-18
22'7'' x 21'9'' x 18'0" 6,88M x 6,63M x 5,49M
34'10'' x 34'0'' 10,64M x 10,37M
898 SqFt.83,42 SqM.
111 Ft.33,83M
8 Ft.2,44M
40 5-12
11
0.5 1.0
05'
Meters2.0 3.0
10'
36"
0,92M
72"
1,83M
36"
0,92M
72"
1,83M
72"
1,83M
6'-2"
[1.89M]
6'
[1.84M]
6'-1"
[1.85M]
6'-2"
[1.89M]
6'-2"
[1.89M]
6'-3"
[1.90M]
6'-1"
[1.85M]
34'-10"
[10.64M]
34'
[10.37M]
9
10
11
13
14
16
18
19
20
21
23
22
24
25
27
12
15
17
19
26
28
29
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 8
4
8
3
3
4
3
4
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
350-
1836
C
AT
AL
OG
P
RE
-D
ES
IG
N
350-1836 1/4"=1'-0"
M. MERTZ
27-JUN-18
22'7'' x 21'9'' x 18'0" 6,88M x 6,63M x 5,49M
34'10'' x 34'0'' 10,64M x 10,37M
898 SqFt.83,42 SqM.
111 Ft.33,83M
8 Ft.2,44M
40 5-12
11
DATE:
SCALE:
DRAWN BY:
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4) INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2) INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
(112"
(144"
1
6
0
"
TRANSFER
STATION
TRANSFER
STATION
1
3
6
"
1
3
6
"
1
2
4
"
1
3
6
"
1
3
6
"
1
2
4
"
1
2
4
"
36"
36"
36"
36"
36"36"
72"
36"36"
147"
9" 17" 9"
34"
34"
16"
24"
6"
159"
83"
TRANSFER
STATION
W/ STEP
GLIDE
SLIDE
360° NUVO
SPIRAL
SLIDE
TOWER
CLIMBER
36" (915mm) RISE
90° CLOUDWALK
ROCKBLOCKS
CONFIGURATION
6' HORIZONTAL
LOOP LADDER
W/ ACCESS
LADDER
36"
18"
36"
24"
42"
16"
19"
18"
2"
32"
93"
18"
51"
15"
3"
14"
122"
153"
31"
18"
1
9
6
"
1
9
6
"
1
9
6
"
1
9
6
"
SHADE HAT
SEE FOOTING DETAIL #8
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
FOOTING LEGEND
1
1
2
"
1
8
5
0
Z
Z
C
H
1
4
4
"
G
Z
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4)(112" INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2)(144" INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
350-
1836
C
AT
AL
OG
P
RE
-D
ES
IG
N
350-1836 1/4"=1'-0"
M. MERTZ
27-JUN-18
1. Consult the local code authority for permitting requirements prior to order.Stamped engineering drawings are available for a fee if required.
2. A crane will be needed for the installation of free-standing shade (>20' x 20').Ensure site is crane accessible. See dealer sheets on crane and tools.
3. Footings need special consideration:a. Footings are substancial. See installtion instructions for specifications.b. A seven day cure time is required.c. Must be located at least 72" from other equipment unless subterranean.d. Anchor bolts must be embedded accurately to ensure proper assembly.
4. A height clearance of 84" must be maintained over existing equipment.Consult your Customer Satisfaction Representative prior to ordering free-standingshade not previously quoted."
Please review all installation instructions for your specific shade model(s) on the BBS.
Thank You,
Megan MertzPlayground Designer1.800.233.8404Playworld Systems, Inc.
Tuesday, November 05, 2019
PLAYWORLD SYSTEMS, INCSales and Marketing 1000 BUFFALO ROAD LEWISBURG, PA 17837 Phone: 1-570-522-9800 Fax: 1-570-522-0268
Re: Shade Hat footing concrete volume for drawing 350-1836
Project: 350-1836
Dear Sales and Marketing,
This design contains shade product. Please note the following as applicable:
Hat Shade
Posts supporting the hat shade will require deeper than usual footings. To assist with your installation cost
estimations, please note the following:
4.00 posts in this drawing will require a combined total of 2.09 cubic yards of concrete per a 150 mph wind speed factor.
The amount of concrete noted is limited to the posts which support the hat shade only. It does not include any concrete needed to install the remaining posts in this design.
Consult the local stipulations for the proposed installation site to ensure the hat shade meets or exceeds these requirements (wind speed, etc.) prior to placing the order.
Free Standing Shade
Page of1 1Tuesday, November 05, 2019 www.PlayworldSystems.com
Posts
ZZCH0018 31 3.5in OD x 124in STEEL POST W/RIVETED CAP
ZZCH0028 42 3.5in OD x 136in STEEL POST W/ RIVETED CAP
ZZCH0048 13 3.5in OD x 160in STEEL POST W/ RIVETED CAP
ZZCH0246 44 3.5in OD x 196in SWAGED STEEL POST
ZZCH0368 45 3ft POST EXTENSION FOOTER & CLAMP SUPPORT
Decks & Kick Plates
ZZCH0616 26 SQUARE COATED DECK ASSEMBLY
ZZCH0617 27 TRIANGULAR COATED DECK ASSEMBLY
ZZUN2290 28 COATED DECK TO DECK CONNECTION KIT
ADA Items
ZZCH2007 19 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)
ZZUN2019 110 APPROACH STEP FOR TRANSFER STATION
Slides
ZZCH2696 111 GLIDE SLIDE (72in DECK)
ZZCH3537 112 SLIDE- NUVO 360 SPIRAL SLIDE
Activity Panels
ZZCH4290 113 POST MOUNTED STEERING WHEEL
ZZCH4578 114 ANYWHERE SEAT
ZZCH4671 115 CH PANEL FRAME- DECK LEVEL
ZZCH4807 116 OVAL INSERT PANEL (DECK MOUNT)
ZZUN4676 117 FOUR-THE-WIN INSERT
ZZUN4806 118 SHIFTING SANDS PANEL INSERT
Barriers
ZZCH4288 219 ACCESS GATE
Climbers
ZZCH6459 120 DECK TO DECK CLOUD WALK (36in RISE LEFT)
ZZCH7168 121 6ft TOWER CLIMBER
ZZUN0166 122 ROCKBLOCKS DECK ACCESS SUPPORT (12in - 24in DECK)
ZZUN0167 123 ROCKBLOCKS DECK ACCESS SUPPORT (36in - 48in DECK)
ZZUN8358 124 ROCKBLOCKS 90 DEGREE WALL (84in to 60in)
Overhead Events
ZZCH5770 125 LEG LIFT
ZZCH5780 126 6ft HORIZONTAL LOOP LADDER
ZZCH5970 127 OVERHEAD EVENT ACCESS LADDER (36in DECK)
Audible Activities
ZZCH4649 128 POST MOUNT DRUM
Roofs & Arches
ZZCH9716 129 SQUARE HAT SHADE (CH)
Additional Tool & Maintenance Kits
ZZUN1471 130 INSTALLER HARDWARE KIT
ZZUN9910 131 SURFACING WARNING LABEL KIT
ZZUN9930 132 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
Part No. Description
Design Number: 350-1836 - Bill Of Material
350-1836
Ref.No. Quantity
Tuesday, November 05, 2019 Page of1 2 Playworld.com
ZZXXGNGUID 133 GENERAL INSTALLERS GUIDE
Part No. Description
Design Number: 350-1836 - Bill Of Material
350-1836
Ref.No. Quantity
Tuesday, November 05, 2019 Page of2 2 Playworld.com
CertifiedZZCH00181 3.5in OD x 124in STEEL POST W/RIVETED CAP
3 116.73 161 0 3.00 0.38 0
CertifiedZZCH00282 3.5in OD x 136in STEEL POST W/ RIVETED CAP
4 174.04 234 0 4.00 0.50 0
CertifiedZZCH00483 3.5in OD x 160in STEEL POST W/ RIVETED CAP
1 50.21 68 0 1.00 0.13 0
CertifiedZZCH02464 3.5in OD x 196in SWAGED STEEL POST4 258.84 317 0 2.00 0.50 0
CertifiedZZCH03685 3ft POST EXTENSION FOOTER & CLAMP SUPPORT
4 72.20 93 0 1.00 0.00 0
CertifiedZZCH06166 SQUARE COATED DECK ASSEMBLY 2 109.72 348 6 2.00 0.00 0
CertifiedZZCH06177 TRIANGULAR COATED DECK ASSEMBLY2 59.80 240 4 2.00 0.00 0
CertifiedZZUN22908 COATED DECK TO DECK CONNECTION KIT2 0.58 8 0 1.00 0.00 0
CertifiedZZCH20079 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)
1 148.40 310 2 2.00 0.09 0
CertifiedZZUN201910 APPROACH STEP FOR TRANSFER STATION1 35.83 72 1 1.00 0.04 0
CertifiedZZCH269611 GLIDE SLIDE (72in DECK) 1 151.63 653 2 1.50 0.03 1
CertifiedZZCH353712 SLIDE- NUVO 360 SPIRAL SLIDE 1 650.00 1,417 2 6.00 0.15 1
CertifiedZZCH429013 POST MOUNTED STEERING WHEEL 1 7.83 44 1 0.25 0.00 1
CertifiedZZCH457814 ANYWHERE SEAT 1 31.10 90 1 0.25 0.00 1
CertifiedZZCH467115 CH PANEL FRAME- DECK LEVEL 1 32.87 163 0 1.00 0.00 0
CertifiedZZCH480716 OVAL INSERT PANEL (DECK MOUNT) 1 28.16 211 0 0.50 0.00 0
CertifiedZZUN467617 FOUR-THE-WIN INSERT 1 15.08 278 2 0.25 0.00 1
CertifiedZZUN480618 SHIFTING SANDS PANEL INSERT 1 22.97 256 1 0.50 0.00 1
CertifiedZZCH428819 ACCESS GATE 2 34.68 131 0 1.00 0.00 0
CertifiedZZCH645920 DECK TO DECK CLOUD WALK (36in RISE LEFT)
1 285.85 981 3 1
CertifiedZZCH716821 6ft TOWER CLIMBER 1 100.77 242 2 2.00 0.06 1
CertifiedZZUN016622 ROCKBLOCKS DECK ACCESS SUPPORT (12in - 24in DECK)
1 36.42 52 1 1.00 0.13 1
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-1836 - Compliance and Technical Data
350-1836
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
Tuesday, November 05, 2019 Page of1 3 Playworld.com
CertifiedZZUN016723 ROCKBLOCKS DECK ACCESS SUPPORT (36in - 48in DECK)
1 43.86 70 1 1.00 0.13 1
CertifiedZZUN835824 ROCKBLOCKS 90 DEGREE WALL (84in to 60in)
1 119.07 824 4 0.50 0.00 1
CertifiedZZCH577025 LEG LIFT 1 6.76 30 1 0.50 0.00 1
CertifiedZZCH578026 6ft HORIZONTAL LOOP LADDER 1 55.72 124 4 1.00 0.00 1
CertifiedZZCH597027 OVERHEAD EVENT ACCESS LADDER (36in DECK)
1 25.12 71 1 1.50 0.06 0
CertifiedZZCH464928 POST MOUNT DRUM 1 12.78 167 1 0.50 0.00 1
CertifiedZZCH971629 SQUARE HAT SHADE (CH) 1 362.58 3,021 0 9.00 0.00 0
N/AZZUN147130 INSTALLER HARDWARE KIT 1 57
CertifiedZZUN991031 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0
N/AZZUN993032 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
1 90
N/AZZXXGNGUID33 GENERAL INSTALLERS GUIDE 1 1
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-1836 - Compliance and Technical Data
350-1836
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
389 805 10,820 40 47.50 2.193,049.65 14Totals:
11 Metric Tons362 Kg175 Kg1,372.34 Kg 1.66 m3
Tuesday, November 05, 2019 Page of2 3 Playworld.com
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-1836 - Compliance and Technical Data
350-1836
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
The lay-out for this custom playscape, design number 350-1836, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.
The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.
The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.
Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]
A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.
A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.
ASTM F1487
2010 ADA Standards for Accessible Design
Installation Times
Carbon Footprint
Pre-Consumer Recycle Content
Post-Consumer Recycle Content
Tuesday, November 05, 2019 Page of3 3 Playworld.com