350-0502 - Playworld › ASTM_PDF › 350-0502_ASTM_A3.pdfReference Document: ASTM F1487-07 Unit...
Transcript of 350-0502 - Playworld › ASTM_PDF › 350-0502_ASTM_A3.pdfReference Document: ASTM F1487-07 Unit...
-
Posts
ZZCH0028 31 3.5in OD x 136in STEEL POST W/ RIVETED CAP
ZZCH0048 42 3.5in OD x 160in STEEL POST W/ RIVETED CAP
Decks & Kick Plates
ZZCH0617 13 TRIANGULAR COATED DECK ASSEMBLY
ZZCH0629 14 LONG COATED DECK ASSEMBLY
ZZUN2290 15 COATED DECK TO DECK CONNECTION KIT
ADA Items
ZZCH2027 16 TRANSFER STATION (48in DECK)
ZZUN2019 17 APPROACH STEP FOR TRANSFER STATION
Slides
ZZCH2736 18 ONE PIECE 360 PLASTIC SPIRAL SLIDE
ZZCH2806 19 24in STEP-UP BRACKET
ZZCH3126 110 GLIDE SLIDE (48in DECK)
Activity Panels
ZZCH4290 111 POST MOUNTED STEERING WHEEL
ZZCH4350 112 TIC-TAC-TOE ACTIVITY WALL
ZZCH4356 113 BALCONY
ZZCH4406 114 ACCESSIBLE DRIVING PANEL
ZZCH4570 115 PLAY SEAT
ZZCH4807 116 OVAL INSERT PANEL (DECK MOUNT)
ZZUN4280 117 TELESCOPE (PIPE WALL MOUNT FOR 4in RUNG CENTERS)
ZZUN4806 118 SHIFTING SANDS PANEL INSERT
Climbers
ZZCH6190 119 24in DECK TO DECK CLIMBER
ZZCH7410 120 DEEP RUNG ARCH CLIMBER (48in DECK)
Audible Activities
ZZCH4557 121 8in BELL (POST MOUNT)
ZZCH4559 122 10in BELL (POST MOUNT)
Additional Tool & Maintenance Kits
ZZCHGUID 123 CHALLENGER GUIDELINES
ZZUN9910 124 SURFACING WARNING LABEL KIT
ZZUN9930 125 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
ZZUN9990 126 TOOL AND ADDITIONAL PARTS KIT W/AEROSOL
Part No. Description
Design Number: 350-0502I - Bill Of Material
350-0502
Ref.No. Quantity
Tuesday, August 30, 2011 Page of1 1 www.PlayworldSystems.com
-
CertifiedZZCH00281 3.5in OD x 136in STEEL POST W/ RIVETED CAP
3 130.53 179 0 3.00 0.38 0
CertifiedZZCH00482 3.5in OD x 160in STEEL POST W/ RIVETED CAP
4 200.84 278 0 4.00 0.50 0
CertifiedZZCH06173 TRIANGULAR COATED DECK ASSEMBLY1 29.90 127 2 1.00 0.00 0
CertifiedZZCH06294 LONG COATED DECK ASSEMBLY 1 107.02 316 6 1.00 0.00 0
CertifiedZZUN22905 COATED DECK TO DECK CONNECTION KIT1 0.29 4 0 0.50 0.00 0
CertifiedZZCH20276 TRANSFER STATION (48in DECK) 1 254.26 517 3 2.50 0.09 0
CertifiedZZUN20197 APPROACH STEP FOR TRANSFER STATION1 35.83 76 1 1.00 0.04 0
CertifiedZZCH27368 ONE PIECE 360 PLASTIC SPIRAL SLIDE1 886.53 1,940 3 6.00 0.20 1
CertifiedZZCH28069 24in STEP-UP BRACKET 1 28.32 114 0 1.00 0.00 0
CertifiedZZCH312610 GLIDE SLIDE (48in DECK)1 119.73 629 3 2.00 0.03 1
CertifiedZZCH429011 POST MOUNTED STEERING WHEEL 1 7.83 53 1 0.25 0.00 1
CertifiedZZCH435012 TIC-TAC-TOE ACTIVITY WALL 1 46.02 414 2 0.50 0.00 1
CertifiedZZCH435613 BALCONY 1 71.66 224 2 1.00 0.00 1
CertifiedZZCH440614 ACCESSIBLE DRIVING PANEL 1 24.07 212 1 0.50 0.00 1
CertifiedZZCH457015 PLAY SEAT 1 37.65 294 2 0.50 0.00 1
CertifiedZZCH480716 OVAL INSERT PANEL (DECK MOUNT) 1 28.16 262 0 0.50 0.00 0
CertifiedZZUN428017 TELESCOPE (PIPE WALL MOUNT FOR 4in RUNG CENTERS)
1 12.33 63 1 0.50 0.00 1
CertifiedZZUN480618 SHIFTING SANDS PANEL INSERT 1 22.97 294 1 0.50 0.00 1
CertifiedZZCH619019 24in DECK TO DECK CLIMBER 1 41.34 155 1 1.00 0.00 1
CertifiedZZCH741020 DEEP RUNG ARCH CLIMBER (48in DECK)1 93.26 204 2 2.00 0.06 1
CertifiedZZCH455721 8in BELL (POST MOUNT) 1 5.15 46 1 0.25 0.00 1
CertifiedZZCH455922 10in BELL (POST MOUNT) 1 6.87 50 1 0.25 0.00 1
N/AZZCHGUID23 CHALLENGER GUIDELINES 1 0.00 1 0 0.25 0.00 0
CertifiedZZUN991024 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0
N/AZZUN993025 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
1 13.07 106 0 0.25 0.00 0
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-0502I - Compliance and Technical Data
350-0502
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487-07
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
Tuesday, August 30, 2011 Page of1 3 www.PlayworldSystems.com
-
N/AZZUN999026 TOOL AND ADDITIONAL PARTS KIT W/AEROSOL
1 3.46 85 0 0.25 0.00 0
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-0502I - Compliance and Technical Data
350-0502
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487-07
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
206 432 6,645 33 30.75 1.302,207.14 13Totals:
7 Metric Tons194 Kg93 Kg993.21 Kg 0.99 m3
Tuesday, August 30, 2011 Page of2 3 www.PlayworldSystems.com
-
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-0502I - Compliance and Technical Data
350-0502
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487-07
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
The lay-out for this custom playscape, design number 350-0502I, has been configured to meet the requirements of the ASTM F1487-07 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487-07 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.
The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.
The lay-out was also designed to meet the ADAAG published 23-July-2004, by the United States Access Board whe installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.
Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]
A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.
A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.
ASTM F1487-07
Americans with Disabilities Act Accessibility Guidlines (ADAAG)
Installation Times
Carbon Footprint
Pre-Consumer Recycle Content
Post-Consumer Recycle Content
Tuesday, August 30, 2011 Page of3 3 www.PlayworldSystems.com
-
0 5' 10'
-
0 5' 10'
-
3455
4064
4064
3455
3455
4064
4064
= S
PIR
AL
SLI
DE
CE
NTE
R P
OS
T FO
OTI
NG
(D
ETAI
L1)
= C
OM
PO
NE
NT
FOO
TIN
G (
DET
AIL
3)
FOO
TIN
G L
EGEN
D
= C
AN
TILE
VE
R, "
T" P
OS
T, A
ND
CO
MP
ON
ENT
POST
FO
OTI
NG
(D
ETAI
L 2)
2845
3658 GZ
(284
5mm
IND
ICA
TES
POST
LEN
GTH
)
(365
8mm
IND
ICA
TES
POST
LEN
GTH
)=
GR
OU
ND
ZE
RO
PO
ST
FOO
TIN
G (
DET
AIL
2)
(ZZC
H18
50 IN
DIC
ATES
PAR
T N
UM
BER
)
= S
UP
PO
RT
PO
ST
FOO
TIN
G (
DET
AIL
1 or
4)
-
©20
11 P
layw
orld
Sys
tem
s®, I
nc.
350-0502Catalog Pre-Design}{
350-
0502
-
Red
Blue Beige
Red
Beige -Red
Blue
Design Number: 350-0502Challengers® playscape layout perASTM F1487-07 , CPSC #325 & CSA Z614-07
Weight: .....2208 lbs (1001.55kg) Age Group: ..............5-12 YearsLength: ..........18’-02” (5,54 m) Use Zone L: .....30’-02” (9,20 m)Width: ............15’-10” (4,82 m) Use Zone W: ....27’-10” (8,48 m)Height: ...........11’-00” (3,35 m) Number of Users: ..................33Installation Time: .....31 Hours Number of Play Events: .......13
Colors Shown:
350-0502Catalog Pre-Design}{
©20
11 P
layw
orld
Sys
tem
s®, I