    Jishu-Hozen

    Shigeru Tsujita

    TQM TPM Consultant

    1.InitialPhase Cleaning

  • 7/31/2019 3. Jishu Hozen Step 1

    2/27

    Individual workers

    Protecting their own equipment

  • 7/31/2019 3. Jishu Hozen Step 1

    3/27

    Step-by step Implementation of Jishu-Hozen

    1.Initial

    Phase Cleaning

    2.Countermeasures for Sources of Problems and difficult locations

    3.Establishing Tentative Standards for Jishu-Hozen

    4.Overall Inspection

    5.Autonomous Inspection

    6.Standardization

    7.Autonomous Management

  • 7/31/2019 3. Jishu Hozen Step 1

    4/27

    Cleaning is Inspection

  • 7/31/2019 3. Jishu Hozen Step 1

    5/27

  • 7/31/2019 3. Jishu Hozen Step 1

    6/27

  • 7/31/2019 3. Jishu Hozen Step 1

    7/27

    TPM

    Jishu-Hozen Step No.

    Equipment name:Control No.:

    Date of detection:

    Detector:

    Tags attached on defects uncovered

    TPM

    Jishu-Hozen Step No.

    Equipment name:Control No.:

    Date of detection:

    Detector:

    Description of defects

    1 2 3 4 5

    Description of defects

    1 2 3 4 5

  • 7/31/2019 3. Jishu Hozen Step 1

    8/27

  • 7/31/2019 3. Jishu Hozen Step 1

    9/27

  • 7/31/2019 3. Jishu Hozen Step 1

    10/27

  • 7/31/2019 3. Jishu Hozen Step 1

    11/27

  • 7/31/2019 3. Jishu Hozen Step 1

    12/27

  • 7/31/2019 3. Jishu Hozen Step 1

    13/27

    Lubrication System

    Water mixed

    Some grease nipples disappeared No oil level gauge

    Wiring System

    -Unfixed

    -Wiring in contact with one another

    Motor,Pump

  • 7/31/2019 3. Jishu Hozen Step 1

    14/27

    Preparation

    Tools(Spanner, screw driver, pliers, hex.-head wrench,

    Tags(White, pink) flashlight camera

    glasses mask glove Cap or helmet

    Indicator for switch

    ladder Grease gun oiler

    White board Water or drink

    Waste cloth Brush

    Cleaning liquid Cleaning spray

    spatula

    Vac.cleaner

  • 7/31/2019 3. Jishu Hozen Step 1

    15/27

    Make group

    Leader

    Team for each parts

    Person in charge of camera

    Person in charge of tag

  • 7/31/2019 3. Jishu Hozen Step 1

    16/27

    Decide Area for 1st Step

  • 7/31/2019 3. Jishu Hozen Step 1

    17/27

    Safety Check

    Start cleaning

  • 7/31/2019 3. Jishu Hozen Step 1

    18/27

    Cleaning

    From upper place to lower place

    Take out covers (Marking)

    Dont wash by water for electric box

    Dont put oil at V-belt

  • 7/31/2019 3. Jishu Hozen Step 1

    19/27

    Check bolt tightening

    Lubrication

    Tag

    Remove tags

    Record by amera

    Make One point lesson

    Tag map

  • 7/31/2019 3. Jishu Hozen Step 1

    20/27

    Operation trial

  • 7/31/2019 3. Jishu Hozen Step 1

    21/27

    Tag list

    One point lesson

    Kaizen(Improvement) sheet

    meeting

  • 7/31/2019 3. Jishu Hozen Step 1

    22/27

  • 7/31/2019 3. Jishu Hozen Step 1

    23/27

  • 7/31/2019 3. Jishu Hozen Step 1

    24/27

    TCL

    O P i t L

  • 7/31/2019 3. Jishu Hozen Step 1

    25/27

    One-Point Lesson

    No.

    Date of

    Preparation

    Prepared

    by

    Leader

    Executed

    Date

    TeacherStudent

    Section Admin

    Actual

  • 7/31/2019 3. Jishu Hozen Step 1

    26/27

  • 7/31/2019 3. Jishu Hozen Step 1

    27/27