3. ISO by PGC 7th June 11

download 3. ISO by PGC  7th June 11

of 38

Transcript of 3. ISO by PGC 7th June 11

  • 8/6/2019 3. ISO by PGC 7th June 11

    1/38

    ISO - CertificationA need of the day

    P G ChavanRetd. Chief Engineer (Generation)

    M.S.E.B.

    7th June 2011

  • 8/6/2019 3. ISO by PGC 7th June 11

    2/38

    2

    What is ISO ?

    ISO is International Organization forStandardization which is a worldwide

    federation of National Standard Bodies( ISO member bodies).

    ISO collaborates closely with

    International Electro-technicalCommission (IEC) on all matters ofelectro technical standardization.

  • 8/6/2019 3. ISO by PGC 7th June 11

    3/38

    3

    About ISO ISO (International Organization for

    Standardization) is a global network of156 national standards institutes from

    countries large and small, industrializedand developing, in all regions of theworld.

    It has a current portfolio of some 16500standards for business, government and

    society. ISO's standards make up a complete

    offering for all three dimensions ofsustainable development - economic,environmental and social.

  • 8/6/2019 3. ISO by PGC 7th June 11

    4/38

    4

    Introduction

    It is possible to develop and use thequality management system in any fieldwith the introduction ofISO 9000 series ofstandards.

    It helps to measure effectiveness ofquality management system in anyorganization irrespective of its size &fields of business.

    The objective of the ISO 9000 series isto provide a mechanism for the following:

  • 8/6/2019 3. ISO by PGC 7th June 11

    5/38

    ISO Provides for

    5

    Determining & fulfilling customerneeds.

    Preventing errors wherever possible.

    Taking corrective actions forimproving process.

    Meeting of customers needsconsistently at lowest cost.

  • 8/6/2019 3. ISO by PGC 7th June 11

    6/38

    ISO

    6

    Any organization, implementing oropting for ISO certification should have aquality policy.

    Further it should have quality objectivesdefined consistent with policy & to achievethe objectives there should be a definedprocedure for every activity.

    The procedures are then practiced &continuously audited to reach the perfectionby practice.

  • 8/6/2019 3. ISO by PGC 7th June 11

    7/38

    Quality Control

    The quality control can be divided in fouractivities.

    1. Plan :Recognize an opportunity and plan

    a change. Establish policy, objectives,standardize working procedures & trainemployees.

    2. Do : Carryout the work according toplan.

    3. Check :Review the work, analyze theresults and identify things learnt. Verify

    compliance with plan. 7

  • 8/6/2019 3. ISO by PGC 7th June 11

    8/38

    8

    Quality Control

    4.Act -- Take action based onwhat is learned in the check step.

    If the change did not work, go

    through the cycle again with adifferent plan. If it is successful,incorporate the same into widerscope. Use it to plan newimprovements, beginning thecycle again. In case of noncompliance take corrective actions

    to remove root cause.

  • 8/6/2019 3. ISO by PGC 7th June 11

    9/38

  • 8/6/2019 3. ISO by PGC 7th June 11

    10/38

    10

    Deming Circle/PDCA Cycle

    The plandocheckact cycle is afour-step model.

  • 8/6/2019 3. ISO by PGC 7th June 11

    11/38

  • 8/6/2019 3. ISO by PGC 7th June 11

    12/38

    12

    Case Study for R.S. DivisionPune

    R.S. Dn. Pune is mainly associatedwith providing bulk electricitysupply to urban areas of Pune &

    Pimpri Chinchwad town through1.220 kV Ring Main2.132 kV Ring Mainconsisting of 17 Nos. of EHV Sub

    Stations having more than 50 Nos.of power transformers having totaltransformation capacity to the tuneof 2200 MVA at various voltage

    levels.

  • 8/6/2019 3. ISO by PGC 7th June 11

    13/38

    Action plan for ISO 9001 2000Certification

    13

    Once it is decided to go in for ISOcertification it is necessary to have theaction plan for the same. The action

    plan normally comprises of,

    1.Training in ISO awareness.

    2.Formulating of policy & objectives.3.Preparation of procedure to achieve

    above.

  • 8/6/2019 3. ISO by PGC 7th June 11

    14/38

    14

    Action plan for ISO 9001 2000Certification

    4. Preparation of work instructionsconsistent with the procedures

    5. Preparation of quality manualsuitable for purpose.

    6. Training of employees indocumented systems. (internally &externally.)

  • 8/6/2019 3. ISO by PGC 7th June 11

    15/38

    Action plan for ISO 9001 2000Certification

    15

    7. Implementation of procedure laid down.

    8. First Internal Audit.

    9. Initiation of corrective action on NCRs ofaudit findings.

    10.Conducting of management review meeting

    ( after every internal audit ).

    11.Second internal audit after taking correctiveaction of first audit.

  • 8/6/2019 3. ISO by PGC 7th June 11

    16/38

    16

    Action plan for ISO 9001 2000Certification

    12.Initiation of corrective action onNCRs of audit

    13.Pre-assessment audit bycertification body on sample basis.

    14.Corrective action of pre-assessmentfindings.

    15.Final audit by certification body.

  • 8/6/2019 3. ISO by PGC 7th June 11

    17/38

  • 8/6/2019 3. ISO by PGC 7th June 11

    18/38

    Competency Mapping

    18

    After any field / classroomtraining is imparted to theemployee, proper record isrequired to be maintained byorganization. This is known ascompetency mapping.

    Training is a continuous processto be repeated periodically forobtaining best results.

  • 8/6/2019 3. ISO by PGC 7th June 11

    19/38

    19

    QUALITY OBJECTIVES

    The quality objectives of R.S. Dn, Puneare reproduced below.

    To maintain energy losses below 3 %

    every month. To maintain system availability above98%.

    To reduce the failure of key

    equipments below 2%. To ensure safety of operations. For

    this target will be Zero Accident.

  • 8/6/2019 3. ISO by PGC 7th June 11

    20/38

    20

    QUALITY OBJECTIVES

    To enhance competency ofemployees. Target will be 3 Nos. oftrainings per year per employee.

    To enhance customer satisfaction by5% per year.

    To improve work environment.Housekeeping will be maintainedabove 85%.

  • 8/6/2019 3. ISO by PGC 7th June 11

    21/38

    21

    QUALITY OBJECTIVES

    To modernize the systemequipments. R&M Schemes will beexecuted as per target of H.O.

    To ensure compliance with standardof performance in GAD & Accounts

    sections.

  • 8/6/2019 3. ISO by PGC 7th June 11

    22/38

    22

    IMPLEMENTATION PROCESS OF CERTIFICATION

    1] Appointment OfMR(management representative)

    2] Preparation of Action plan

    3] Awareness training to SSI[sub station in charge] for ISO

    Concept4] Standardization of procedures

  • 8/6/2019 3. ISO by PGC 7th June 11

    23/38

    23

    Standardization of procedures

    1] MR 01 for document & data control2] MR 02 for control of record3] MR 03 for internal quality audit4] MR 04 for continual improvement corrective

    & preventive action5] PU 01 for purchasing6] TR 01 for Training7] CR 01 for customer relation8] OP 01 for operation in substation9] MT 01 for maintenance of sub station

    equipment10] ST 01 for store11] TE 01 for Testing

  • 8/6/2019 3. ISO by PGC 7th June 11

    24/38

    24

    5] Standardization of work

    instructions

    1] MR 01 WI 01 for document codification

    2] MR 01 WI 02 for data control

    3] MR 02 WI 01 for disposal of record

    4] MT 01 WI 01 for battery maintenance

    5] MT 01 WI 02 for outage activity

    6] OP 01 WI 01 for Safety

  • 8/6/2019 3. ISO by PGC 7th June 11

    25/38

    25

    Standardization of work instructions

    6] Awareness Training for procedures& work instructions to S/S In charges& subsequently to operating staff.

    7] Implementation of working as perprocedure & work instruction inDivision Office & in all substations.

    8] Reviewing of effectiveness ofworking status in the sub station dueto standard procedures

  • 8/6/2019 3. ISO by PGC 7th June 11

    26/38

    26

    CALLIBRATION & TESTING OFEQUIPMENTS

    Testing division checks accuracy ofenergy meters to ensure that the

    accuracy of energy meter is withinprescribed limit & energy meterswhich are not within this limit arereplaced. Testing division is

    requested to check other equipments& protective system etc. as perscheduled program periodically.

  • 8/6/2019 3. ISO by PGC 7th June 11

    27/38

    27

    Customer Satisfaction

    EHV consumers & O&M Divisions ofMSEDCL are the customer ofMSETCL.

    Customer satisfaction report inprescribed form is to be obtainedonce in a year.

    To be analyzed & corrective actionsto be taken accordingly.

    Any remark given by customer in

    feed back to be replied suitably.

  • 8/6/2019 3. ISO by PGC 7th June 11

    28/38

  • 8/6/2019 3. ISO by PGC 7th June 11

    29/38

    29

    Improvements

    Implementation of house keepingprocedure in substation for easymovement of operating staff in controlroom & switchyard.

    Arrangement of stores in systematic wayfor immediate & traceability of spares &T&P.

    Identification of scrap material &

    crediting it to stores. Arranging the records in sub station &office for quick retrieval.

  • 8/6/2019 3. ISO by PGC 7th June 11

    30/38

    Improvements

    30

    Up-keeping of yard by paintingstructures/equipments & improvements inyard lighting.

    Identification & improvement of projectfor continual improvement.

    Implementation of vermin proofing ofmarshalling boxes in switchyard by use ofsynthetic resins / wire mesh / adhesives &H.D. polymers.

  • 8/6/2019 3. ISO by PGC 7th June 11

    31/38

    31

    Advantages of ISO

    Create a more efficient, effective operation

    Increase customer satisfaction andretention (of the same)

    Reduce audits (by following proceduresproperly)

    Enhance marketing

    Improve employee motivation, awarenessand morale

  • 8/6/2019 3. ISO by PGC 7th June 11

    32/38

    32

    Advantages of ISO

    Implementation of ISO proceduresenhance the team work & co-ordinationamongst the employees leading to

    improved work culture. It helps in maintaining the industrial peacedue to timely redressal of employeesgrievances.

    It further helps in improvement ofmindsetof employees for better working.

  • 8/6/2019 3. ISO by PGC 7th June 11

    33/38

    33

    Continuation of ISO certification

    Awarded for three years with a surveillanceaudit every year for continuation ofcertificate.

    Receipt & continuation of ISO certificateneeds.

    ( i ) Hard work of employees

    ( ii ) Continuous & sincere efforts ofemployees

    ( iii ) Management Support

  • 8/6/2019 3. ISO by PGC 7th June 11

    34/38

    34

    Management Review Meetings

    Required to be conducted twice in a year.

    All NCRs during internal audits to bereported by MR & discussed in the

    meeting.

    Internal auditors are required to pass theexamination.

    Auditors should audit the Sub Station asper pre decided check points with specificclauses of ISO e.g. for documentationclause 4.

  • 8/6/2019 3. ISO by PGC 7th June 11

    35/38

    35

    Management Support

    Financial Support

    i) Budgetary

    ii) Cash flow

    Support of spares / equipments.

    Qualified & competent manpower

    Policy matter for adoption of latesttechnologies considering fastgrowth.

  • 8/6/2019 3. ISO by PGC 7th June 11

    36/38

    36

    BEFORE ISO

    AFTER ISO

    BACK

  • 8/6/2019 3. ISO by PGC 7th June 11

    37/38

    37

    PHOTOGRAPHS OF

    220 KV KHADKI S/S.

    SWITCHYARD

    TAKEN ON 27/8/2005

    EVEN AFTERHEAVY

    MONSOON THERE IS

    NO GRASS BECAUSE

    OF WEED CONTROL

    BACK

  • 8/6/2019 3. ISO by PGC 7th June 11

    38/38Thank you

    38