Proposal · 2020. 1. 27. · Premium water sealer for all T & G. 3000 PSI fiber reinforced concrete...

12
Equine Barn LLC 213 Crescent Moon Way Canton, Ga 30114 6784042276 (BARN) Proposal Good for this date 05042015 We hereby propose to provide all the materials and labor necessary to build a 36 x60 gable style horse barn located at _________________________________ What is included in the base barn? (Equine Barn Company Style Horse Barn) Obtaining the building permits. Barn according to plans initialed by both parties. Removal of all debris generated by construction. #2 Yellow pine 2 x 6 T & G for the stall walls, stalls fronts, stall dividers, and the exterior walls of tack, feed and utility rooms. #2 PT yellow pine solid twin 4 x 6 post. #2 Yellow pine 2 x 10’s for rafter beams and horizontal beams. #2 Yellow pine 4 x 6’s for purlins. #2 SPF for wall framing. Black powder coated aluminum stall bars Sliding cross buck stall doors with black powder coated aluminum bars. Black painted chew metal in all exposed corners in every stall. Hardie Board lap siding, smooth or wood grain. Hardie Board fascia and non vented soffit exposed painted rafter tails . 29 gauge painted metal roof with 15lb felt paper and ½” planks for decking. Custom build sliding aisle doors with tempered glass. 45” x 48” stall windows with custom built saloon shutters. Single layer 2x6 T&G walls in tack / feed rooms. 3/8” BC sanded painted plywood ceilings in tack and feed rooms. Hardie / Certainteed stucco board in wash bays painted with a high gloss white paint. Drain for wash bay and 30 ft of 3” PVC buried drainpipe . Water heater (50 gal) located in tack room. Mixing valve in wash bay. Electrical to code. Each stall has wiring for fans and light fixtures with Individual switches for each stall fan and light. Installation of light fixtures. (Customer to purchase the lighting and contractor will install). Installation of plumbing fixtures. (Customer to purchase toilet and sink and contractor

Transcript of Proposal · 2020. 1. 27. · Premium water sealer for all T & G. 3000 PSI fiber reinforced concrete...

Page 1: Proposal · 2020. 1. 27. · Premium water sealer for all T & G. 3000 PSI fiber reinforced concrete for aisle, tack/feed room. 4” of rock dust (M10) for footings in stalls. 36”

Equine Barn LLC 213 Crescent Moon Way

Canton, Ga 30114 678­404­2276 (BARN)

Proposal Good for this date 05­04­2015 We hereby propose to provide all the materials and labor necessary to build a 36 x60 gable style horse barn located at _________________________________ What is included in the base barn? (Equine Barn Company Style Horse Barn)

Obtaining the building permits. Barn according to plans initialed by both parties. Removal of all debris generated by construction. #2 Yellow pine 2 x 6 T & G for the stall walls, stalls fronts, stall dividers, and the

exterior walls of tack, feed and utility rooms. #2 PT yellow pine solid twin 4 x 6 post. #2 Yellow pine 2 x 10’s for rafter beams and horizontal beams. #2 Yellow pine 4 x 6’s for purlins. #2 SPF for wall framing. Black powder coated aluminum stall bars Sliding cross buck stall doors with black powder coated aluminum bars. Black painted chew metal in all exposed corners in every stall. Hardie Board lap siding, smooth or wood grain. Hardie Board fascia and non vented soffit ­ exposed painted rafter tails . 29 gauge painted metal roof with 15lb felt paper and ½” planks for decking. Custom build sliding aisle doors with tempered glass. 45” x 48” stall windows with custom built saloon shutters. Single layer 2x6 T&G walls in tack / feed rooms. 3/8” BC sanded painted plywood ceilings in tack and feed rooms. Hardie / Certainteed stucco board in wash bays painted with a high gloss white paint. Drain for wash bay and 30 ft of 3” PVC buried drainpipe . Water heater (50 gal) located in tack room. Mixing valve in wash bay. Electrical to code. Each stall has wiring for fans and light fixtures with Individual switches for each stall

fan and light. Installation of light fixtures. (Customer to purchase the lighting and contractor will

install). Installation of plumbing fixtures. (Customer to purchase toilet and sink and contractor

Page 2: Proposal · 2020. 1. 27. · Premium water sealer for all T & G. 3000 PSI fiber reinforced concrete for aisle, tack/feed room. 4” of rock dust (M10) for footings in stalls. 36”

will install). Plumbing to code. Overhead wash wand (sprayer boom) for wash rack. Painted aluminum 6” gutters with downspouts. One coat of primer and two coats of paint for the exterior with approved color choice. Premium water sealer for all T & G. 3000 PSI fiber reinforced concrete for aisle, tack/feed room. 4” of rock dust (M­10) for footings in stalls. 36” cupola for ventilation. One frost­free water hydrant. 3.0 door for tack and feed room. One faux loft door in front.

Base Barn:

Equine Barn Co. Style Horse Barn

36 x 60 = 2160 sf

X $45.00 $97,200.00

Total base barn

$97,200.00 $97,200.00

Sheds:

Side shed with 6 x 6 post and exposed rafters

8 x 60=480 Both sides = 960 sf

x 14.25

$13,680.00

Concrete floor in shed area

1,112 sf concrete extends past the post 1 ft

X $4.25

$4,726.00

Total for sheds $18,406.00 $18,406.00

Total Barn and sheds

115,606.00

Page 3: Proposal · 2020. 1. 27. · Premium water sealer for all T & G. 3000 PSI fiber reinforced concrete for aisle, tack/feed room. 4” of rock dust (M10) for footings in stalls. 36”

Bath / mud room: framing with exterior and interior wall finish, ceiling finish, electrical, insulate wall and ceiling due to bathroom plumbing

Add bathroom under shed

$1,800.00

Under slab rough plumbing shower ­ sink ­ toilet ­ washer

$1,900.00

Above slab rough and fixture hook up

$1,200.00

Septic ­ estimated at $3,000.00 plus permit fees

Priced to be determined Handled as a change order

Total $4,900.00 $4,900.00 Extras:

Sliding door on tracks for wash

$1,200.00

Tack room window

lines up with aisle door window

$350.00

one extra cupola 36” metal cupola installed

$1,100.00

Weather vane Customer to purchase weather vane

labor only $75.00

Total $2,725.00 $2,725.00 Lodging and out of town expenses: I will need to rent an inexpensive trailer or house to use for the workers to stay in. Estimated at $700.00 per month for 3 months plus some per diem.

4 carpenters out of town expenses $3,000.00

Grand Total $126,231.00 The following are not included:

Page 4: Proposal · 2020. 1. 27. · Premium water sealer for all T & G. 3000 PSI fiber reinforced concrete for aisle, tack/feed room. 4” of rock dust (M10) for footings in stalls. 36”

Any inspection fees, building permit fees and environmental health fees. Any engineering plans or engineering letters. (if required). Any grading. Estimated at $2,500.00 handled as a change order. Any silt fence if needed or required by building dept. Cost $1.25 per linear foot. Any utilities supplied to any building; water, electrical and or any other utilities. Exterior door locks and hardware. Customer provides hardware without keys and

contractor installs. Any repair of damage to driveways or landscaping due to movement of equipment or

materials to and from the jobsite. Any added cost due to rock below the surface while digging the footers.

Total price for material, labor is $126,231.00. This price is good for 30 days from the above date. Payments will be made as follows: Note: Draws are not necessarily in the below listed order. e.g concrete may be completed before or after roof framing, siding may be completed before roof metal.

% Upon signing of this agreement. $10,000.00

Grading Grading handled as a change order. estimated at

$2,500.00

% Upon completion of all footer holes $20,000.00

% Delivery of post and beam lumber $25,000.00

% Upon completion of concrete. $8,000.00

% Upon completion of roof framing $12,000.00

% Upon completion of metal roof. $9,000.00

% Upon completion of siding. $5,000.00

% Upon completion of all doors and windows. $6,000.00

% Upon completions of exterior painting/staining $5,000.00

% Upon completion of stalls $6,000.00

% Upon completion of rough electrical $3,000.00

Page 5: Proposal · 2020. 1. 27. · Premium water sealer for all T & G. 3000 PSI fiber reinforced concrete for aisle, tack/feed room. 4” of rock dust (M10) for footings in stalls. 36”

% Upon completion of electrical $3,000.00

% Upon completion of rough plumbing $3,000.00

% Upon completion of plumbing. $3,000.00

% Upon completion of wash rack

$3,000.00

% Upon completion of tack and feed room $3,000.00

% Upon completion of final scope of the building. $2,231.00

100% Total $126,231.00

All communication shall go through Conrad Arnold. All extra work will be charged at $25 per labor hour plus any material cost. Any extra sub­contract work will be charged their normal rate plus materials and 20% of their total (ie grading). Any change orders must be approved and signed by the customer. Change orders are not connected to the contracts draw schedule. Any credits that are obtained during the project will be applied to the final invoice. _______________________________________________ Date 05­04­2015 ________________________________________________ Conrad Arnold Equine Barn LLC Date Floorplan options:

Page 6: Proposal · 2020. 1. 27. · Premium water sealer for all T & G. 3000 PSI fiber reinforced concrete for aisle, tack/feed room. 4” of rock dust (M10) for footings in stalls. 36”
Page 7: Proposal · 2020. 1. 27. · Premium water sealer for all T & G. 3000 PSI fiber reinforced concrete for aisle, tack/feed room. 4” of rock dust (M10) for footings in stalls. 36”

Elevation:

Page 8: Proposal · 2020. 1. 27. · Premium water sealer for all T & G. 3000 PSI fiber reinforced concrete for aisle, tack/feed room. 4” of rock dust (M10) for footings in stalls. 36”
Page 9: Proposal · 2020. 1. 27. · Premium water sealer for all T & G. 3000 PSI fiber reinforced concrete for aisle, tack/feed room. 4” of rock dust (M10) for footings in stalls. 36”

Stall fronts: This is included in the pricing.

Page 10: Proposal · 2020. 1. 27. · Premium water sealer for all T & G. 3000 PSI fiber reinforced concrete for aisle, tack/feed room. 4” of rock dust (M10) for footings in stalls. 36”

Upgrade to this style of stall front for $300.00 per stall extra: You can mix them

Page 11: Proposal · 2020. 1. 27. · Premium water sealer for all T & G. 3000 PSI fiber reinforced concrete for aisle, tack/feed room. 4” of rock dust (M10) for footings in stalls. 36”

Tack room finish: Includes built ­ in shelves ­ combination of 2 x 6 and 1 x 6 wall finish. Hardware not included. Customer to purchase hardware and contractor to install @ $25.00 per hour.

Page 12: Proposal · 2020. 1. 27. · Premium water sealer for all T & G. 3000 PSI fiber reinforced concrete for aisle, tack/feed room. 4” of rock dust (M10) for footings in stalls. 36”

The following are some optional upgrades:

Cupola fans with thermostats. Weathervane for cupola ($75.00 labor to install) 3/4” or 1” Rubber stall mats add $500.00 per stall. Sealed stall fans as low as $125.00 per stall. Colored and stamped concrete. Stall fronts other than our standard. Roofing material other than metal. 1 x 6 T & G on ceilings above stalls and above aisle (add $3,500.00). Automatic horse waterers. Automatic fly system. Stacked stone or brick on exterior. Any siding other than Hardie Board. Shutters and fixed window above aisle door ($600.00)