2017 Federal Transportation · ATP: Add funds in 16/17 in ENG for $62 Total project cost remains...
Transcript of 2017 Federal Transportation · ATP: Add funds in 16/17 in ENG for $62 Total project cost remains...
LEAD AGENCY PROJECT ID PROJECT DESCRIPTION FUNDING DETAILS CHANGE REASON
Azusa, City of LAE1285 Rehabilitate Pavement on Azusa Avenue in Azusa. Project limits are from Fifth
St. to Santa Fe Ave. This project is utilizing $90 in Toll Credits for local match
requirements.
Change Project Description:
‐ add Toll Credits
Changed Project Completion Date:
‐ from "6/30/2017" to "6/30/2018"
No change in project funding
Total project cost remains the same at $360.
‐ FUND CHANGE
This project is utilizing toll credit for
local match requirements.
Project qualifies for administrative
modification per item i. revise
description without changing the
project scope.
Bell, City of LAF7634 Design work to improve conditions for pedestrians in order to increase
pedestrian safety, and to improve the pedestrian environment in order to
promote walking as a viable form of transportation, and encourage the use of
public transit.
Revise Funds Between Fiscal Years
CITY:
► Add funds in 16/17 in ENG for $184
ATP:
► Add funds in 16/17 in ENG for $62
Total project cost remains the same at $2,776.
‐ MINOR CHANGE
Move ATP funds from prior to
FY16/17. Allocation 5/1/2016.
Project qualifies for administrative
modification per item viii. Change
the program year of funds within
the current FSTIP provided MPO
has adopted EPSP.
Culver City, City
of
LA0G451 BRIDGE NO. 53C0876, HIGUERA ST, OVER BALLONA CR. BETWEEN EASTHAM
DRIVE AND JEFFERSON BLVD. REPLACE 3 LANE BRIDGE WITH A NEW 4 LANE
BRIDGE....
Changed Project Completion Date:
‐ from "12/31/2017" to "12/31/2019"
Decrease Funding
HBRR‐L:
▬ Delete funds in 16/17 in CON for $5,854
► Add funds in 17/18 in CON for $5,854
CITY:
▬ Delete funds in 16/17 in CON for $759
► Add funds in 17/18 in CON for $759
Total project cost decreased from $8,428 to $8,168.
‐ SCHEDULE INCREASE
Caltrans HBP funding program
update
Project qualifies for administrative
modification per item iv. Cost
decrease.
Hawthorne, City
of
LAF7101 PRAIRIE AVENUE MOBILITY PROJECT : (1) Widens Prairie Av interesections at
El Segundo Bl and at Rosecrans Av to construct double left‐turn pockets for
traffic flow improvement and to install Class III bike routes on both sides. (2)
Traffic signal upgrade and synchronization of 8 intersections between 118th
and Marine. (3) Installs Class III bike equipments, improves pedestrian
facilties, and upgrades ADA access ramps, new median curbs and landscaping
at intersections.
Increase Funding
STPL:
► Add funds in 18/19 in CON for $1,020
CITY:
‐ Decrease funds in 18/19 in ENG from $358 to $30
‐ Decrease funds in 18/19 in CON from $919 to $320
Total project cost increased from $5,103 to $5,196.
‐ COST INCREASE
Add STP‐L funding as local fund
Project qualifies for administrative
modification per item ii. Revise the
funding amount listed for a project
or phase limited to the lesser of
40% or $10 million.
Los Angeles
County
LAF5514 Vermont Ave Bike Lane ‐ Manchester Blvd to El Segundo Blvd. Funds are
requested to design and construct Class II bike lanes on Vermont Av (3.0
miles). Short term bicycle racks (14) are also proposed at key destinations.
Toll Credits will be used to match STPL.
Change Project Description:
‐ update Toll Credits
Revise Funds Between Fiscal Years
CO:
► Add funds in 16/17 in CON for $81
ATP:
► Add funds in 16/17 in CON for $676
Total project cost remains the same at $1,317.
‐ MINOR CHANGE
Move ATP from prior to 2017 FTIP
years. Allocation on 1/1/2017.
Project qualifies for administrative
modification per item viii. Change
the program year of funds within
the current FSTIP provided MPO
has adopted EPSP.
Los Angeles A,
City of
LAF7817 Vermont Avenue Stormwater Capture & Green Street Transit Project. Changed Project Completion Date:
‐ from "12/31/2020" to "6/30/2019"
Change Fund Source
CMAQ:
▬ Delete funds in 16/17 in CON for $1,145
CITY:
► Add funds in 16/17 in ENG for $138
▬ Delete funds in 16/17 in CON for $1,792
CITY:
► Add funds in 17/18 in CON for $1,654
LTF:
► Add funds in 16/17 in ENG for $100
LTF:
► Add funds in 17/18 in CON for $1,045
Total project cost remains the same at $2,937.
‐ FUND CHANGE
Recommended by MTA to seek
local and approved funding source
(LTF) in 2017 rather than CMAQ
funds to meet project schedule.
Project qualifies for administrative
modification per item viii. Change
the program year of funds within
the current FSTIP provided MPO
has adopted EPSP.
LOCAL HIGHWAY SYSTEM
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM
Los Angeles County MTA
Administrative Modification #17‐06
March 2017
(in $000’s)
LEAD AGENCY PROJECT ID PROJECT DESCRIPTION FUNDING DETAILS CHANGE REASON
LOCAL HIGHWAY SYSTEM
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM
Los Angeles County MTA
Administrative Modification #17‐06
March 2017
(in $000’s)
Palmdale, City of LAF7304 NORTH COUNTY ITS ‐ PALMDALE EXTENSION (Fiber from Avenue R 40th East ‐
70th East & Avenue S 55th East ‐ 60th East; New signals at R/65th East,
R/70th East and S/60th East, also include 8 CCTV's)
Change Project Description:
‐ no scope change
Changed Environmental Document:
‐ from "DRAFT ENVIRONMENTAL IMPACT REPORT" to "INITIAL
STUDY/NEGATIVE DECLARATION ‐ CEQA"
Increase Funding
CITY:
+ Increase funds in 16/17 in ENG from $60 to $100
CITY:
► Add funds in 17/18 in ENG for $50
+ Increase funds in 17/18 in ROW from $40 to $50
CITY:
+ Increase funds in 18/19 in CON from $500 to $550
Total project cost increased from $3,600 to $3,750.
‐ COST INCREASE
Updated project description
Updated project total budget to
show 80% metro funds and 20%
City funds.
Project qualifies for administrative
modification per item ii. Revise the
funding amount listed for a project
or phase limited to the lesser of
40% or $10 million.
San Gabriel Valley
Council of
Governments
LA990359 GRADE SEP XINGS SAFETY IMPR; 35‐ MI FREIGHT RAIL CORR. THRGH
SAN.GAB. VALLEY ‐ EAST. L.A. TO POMONA ALONG UPRR ALHAMBRA &L.A.
SUBDIV ‐ ITS 2318 SAFETEA #2178;1436 #1934 PPNO 2318. NOGALES(LA)
PROJECT INCLUDES WIDENING FROM 2 TRAVEL LANES TO 4 TRAVEL LANES
OF E.WALNUT DRIVE NO. EAST OF NOGALES FOR 2600 LINEAR FEET AND
WIDENING FROM 2 TRAVEL LANES TO 4 TRAVEL LANES OF GALE AVE. WEST
OF NOGALES FOR 1900 LINEAR FEET.
Revise Funds Between Phase
STPL‐R:
► Add funds in 16/17 in CON for $202
DEMOT21:
► Add funds in 16/17 in CON for $3,321
DEMOSTL:
‐ Decrease funds in 16/17 in CON from $3,521 to $72
► Add funds in 17/18 in CON for $3,883
FRA:
► Add funds in 16/17 in CON for $41
Total project cost remains the same at $1,521,708.
‐ MINOR CHANGE
Project qualifies for administrative
modification per item viii. Change
the program year of funds within
the current FSTIP provided MPO
has adopted EPSP.
Various Agencies LA11G1 Group projects for pavement resurfacing and or rehabilitation on local roads
throughout County. Projects are consistent with 40 CFR part 93.126,127,128,
exempt tables 2 & 3 categories. Pavement resurfacing, rehabilitation,
reconstruction, AC overlays, road maintenance to prevent and eliminate
hazards, no lane additions. There are projects in the grouped project listing
that contain projects with toll credits.
Increase Funding
STPL:
+ Increase funds in 16/17 in CON from $32,316 to $33,046
+ Increase funds in 17/18 in CON from $27,808 to $31,816
‐ Decrease funds in 20/21 in CON from $9,812 to $5,804
MR15:
+ Increase funds in 16/17 in CON from $1,000 to $1,146
MR20H:
+ Increase funds in 17/18 in CON from $540 to $940
Total project cost increased from $361,119 to $362,395.
‐ COST INCREASE
Project qualifies for administrative
modification per item ii. Revise the
funding amount listed for a project
or phase limited to the lesser of
40% or $10 million.
LEAD AGENCY PROJECT ID PROJECT DESCRIPTION FUNDING DETAILS CHANGE REASON
Caltrans LALS07 Route 999: Grouped Projects for Safety
Improvements ‐ SHOPP Mandates Program.
Projects are consistent with 40 CFR Part
93.126 Exempt Tables 2 and Table 3
categories ‐ Railroad/highway crossing, Safer
non‐Federal‐aid system roads, Shoulder
improvements, traffic control devices and
operating assistance other than signalization
projects, Intersection signalization projects
at individual intersections, Pavement
marking demonstration, Truck climbing
lanes outside the urbanized area
COST INCREASE:
Increase Funding
SHOPPAC:
+ Increase funds in 18/19 in CON from $77,035 to $77,438
Total project cost increased from $374,847 to $375,250.
AMEND FTIP PER SHOPP
AMENDMENT.
Project qualifies for
administrative modification
per item ii. Revise the
funding amount listed for a
project or phase limited to
the lesser of 40% or $10
million.
Caltrans LALS08 Route 999: Grouped Projects for Emergency
Repair ‐ SHOPP Emergency Response
Program. Projects are consistent with 40
CFR Part 93.126 Exempt Tables 2 categories ‐
Repair damage caused by natural disasters,
civil unrest, or terrorist acts. This applies to
damages that do not qualify for Federal
Emergency Relief funds or to damages that
qualify for federal Emergency Relief funds
but extend beyond the Federally declared
disaster period.
COST INCREASE:
Increase Funding
SHOPPAC:
► Add funds in 16/17 in CON for $1,430
SHOPPAC:
+ Increase funds in 17/18 in CON from $2,148 to $4,127
Total project cost increased from $48,474 to $51,883.
Amend FTIP per 2016
Adopted SHOPP and SHOPP
Amendments.
Project qualifies for
administrative modification
per item ii. Revise the
funding amount listed for a
project or phase limited to
the lesser of 40% or $10
million.
Administrative Modification #17‐06
March 2017
(in $000’s)
STATE HIGHWAY SYSTEM
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM
Los Angeles County MTA
LEAD AGENCY PROJECT ID PROJECT DESCRIPTION FUNDING DETAILS CHANGE REASON
Long Beach Transit LA0G024 On‐going fleet replacement (30, 40 and articulated, ADA compliant,
alternative fuel). Added TDC of $1,991 in FY 16/17 for CON to match
FTA 5339 and FTA 5307 funds and TDC of $820 in FY 17/18, &
$2,447 in FY18/19 for Cons to match FTA 5307.
Change Project Description:
‐ Update Toll Credits
Increase Funding
PTMISEA:
+ Increase funds in 16/17 in CON from $953 to $979
Total project cost increased from $113,491 to $113,517.
‐ COST INCREASE
11/14/2016: Modified FY16/17
PTMISEA as FY16 Section 5307 funds
($104,647) require a local match.
Increased by $26(000).
Project qualifies for administrative
modification per item ii. Revise the
funding amount listed for a project
or phase limited to the lesser of 40%
or $10 million.
Long Beach Transit LA0G221 The On‐going Bus Capital project includes: bus components, project
administration, facility/ maintenance improvements, information
systems equipment, safety/ security equipment, shop/ office
equipment, support vehicles and tires. Added Transit Development
Credits (TDC) for construction phase, $809 in FY 16/17, $2,316 in FY
17/18, $2,759 in FY18/19 to match 5307 funds.
Change Project Description:
‐ Update Toll Credits
Increase Funding
PC40:
+ Increase funds in 16/17 in CON from $6 to $10
5307LA:
+ Increase funds in 16/17 in CON from $4,022 to $4,045
Total project cost increased from $80,677 to $80,704.
‐ COST INCREASE
12/20/2016 Modified to include the
additional sales proceeds in FY17
5307 grant.
Project qualifies for administrative
modification per item ii. Revise the
funding amount listed for a project
or phase limited to the lesser of 40%
or $10 million.
Los Angeles County
MTA
LA0G1123 Formula Grants for the Enhanced Mobility of Seniors and Individuals
with Disabilities Program administration, as well as for operations
and capital assistance, for urbanized areas (UZA) in Los Angeles
County (UZA 2, UZA 112, and UZA 146).Toll Credits ‐ Transit (TDC)of
$2,879 (FY17), $1,061 (FY19) and $514 (FY20) will be used to match
federal funds for the CON phase.
Change Project Description:
‐ Update Toll Credits
Decrease Funding
5310:
+ Increase funds in 16/17 in CON from $20,015 to $20,875
‐ Decrease funds in 18/19 in CON from $12,685 to $11,825
LTF:
‐ Decrease funds in 16/17 in CON from $1,673 to $1,358
Total project cost decreased from $57,562 to $57,247.
‐ COST INCREASE
Revised FY16/17 amounts per the
Board action on 1/16/17 (see
attached Board Report)
Project qualifies for administrative
modification per item ii. Revise the
funding amount listed for a project
or phase limited to the lesser of 40%
or $10 million.
Norwalk, City of LA0C63 PURCHASE OF MISC OFFICE EQUIPMENT‐ (ONGOING) Increase Funding
PROPALR:
+ Increase funds in 16/17 in CON from $1 to $3
5307LA:
+ Increase funds in 16/17 in CON from $4 to $13
Total project cost increased from $109 to $120.
‐ COST INCREASE
Updated FY 16/17 funding.
Project qualifies for administrative
modification per item ii. Revise the
funding amount listed for a project
or phase limited to the lesser of 40%
or $10 million.
Norwalk, City of LA0C64 ASSOCIATED CAPITAL MAINTENANCE (ENGINES, TRANSMISSIONS,
PARTICULATE TRAPS, KITS, ETC) (ONGOING)
Decrease Funding
PROPALR:
‐ Decrease funds in 15/16 in CON from $37 to $28
+ Increase funds in 16/17 in CON from $14 to $16
5307LA:
‐ Decrease funds in 15/16 in CON from $150 to $113
+ Increase funds in 16/17 in CON from $58 to $65
Total project cost decreased from $259 to $222.
‐ COST DECREASE
Updated funding for FY 15/16 & FY
16/17
Project qualifies for administrative
modification per item iv. Cost
decrease.
Norwalk, City of LA0G057 Ongoing annual tire lease contract Decrease Funding
PROPALR:
‐ Decrease funds in 15/16 in CON from $29 to $11
PROPALR:
+ Increase funds in 16/17 in CON from $12 to $13
5307LA:
‐ Decrease funds in 15/16 in CON from $121 to $44
5307LA:
+ Increase funds in 16/17 in CON from $48 to $50
Total project cost decreased from $218 to $126.
‐ COST DECREASE
Updated funding allocations.
Project qualifies for administrative
modification per item iv. Cost
decrease.
Norwalk, City of LA0G1325 Purchase replacement bike lockers Increase Funding
PROPALR:
+ Increase funds in 16/17 in CON from $10 to $11
5307LA:
+ Increase funds in 16/17 in CON from $40 to $43
Total project cost increased from $50 to $54.
‐ COST INCREASE
Revised FY 16/17 to $43k with $11k
match based on updated agency's
LACTMA‐approved FY 2017 Section
1% allocation.
Project qualifies for administrative
modification per item ii. Revise the
funding amount listed for a project
or phase limited to the lesser of 40%
or $10 million.
TRANSIT SYSTEM
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM
Los Angeles County MTA
Administrative Modification #17‐06
March 2017
(in $000’s)
LEAD AGENCY PROJECT ID PROJECT DESCRIPTION FUNDING DETAILS CHANGE REASON
TRANSIT SYSTEM
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM
Los Angeles County MTA
Administrative Modification #17‐06
March 2017
(in $000’s)
Norwalk, City of LA0G1326 Bus replacement project ‐ purchase two (2) Compressed Natural
Gas (CNG) buses
Decrease Funding
STA‐1B:
‐ Decrease funds in 16/17 in CON from $345 to $318
5307LA:
+ Increase funds in 16/17 in CON from $1,119 to $1,124
Total project cost decreased from $1,591 to $1,569.
‐ COST DECREASE
Revised FY 16/17 funding based on
updated agency's LACTMA‐approved
FY 2017 Section 15% allocation.
Project qualifies for administrative
modification per item iv. Cost
decrease.
Santa Clarita ‐
Transit, City of
LA0G1193 Bus Replacement of 14 "2005" New Flyer CNG Buses. $1,221 of TDC
will be utilized to match FTA 5339 and FTA 5307 funds programmed
in FY16/17 for CON phase.
Change Project Description:
‐ Update Toll Credits
Increase Funding
5307SC:
+ Increase funds in 16/17 in CON from $3,618 to $3,836
5339SC:
+ Increase funds in 16/17 in CON from $922 to $1,308
Total project cost increased from $5,500 to $6,104.
‐ COST INCREASE
Increased costs for CNG 40ft bus
requires additional FTA funds.
Project qualifies for administrative
modification per item ii. Revise the
funding amount listed for a project
or phase limited to the lesser of 40%
or $10 million.
2017 Federal Transportation Improvement Program
Administrative Modification #17-06Los Angeles County MTA
Project Listing Report(in $000`s)
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE1285 Los Angeles SCAB REG0703 NCR31 L EXEMPT - 93.126 6
Description: PTC 360 Agency AZUSA
Rehabilitate Pavement on Azusa Avenue in Azusa. Project limits are from Fifth St. to Santa Fe Ave. This project is utilizing $90 in Toll Credits for local match requirements.
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 360 360 360 360LAE1285 Total 360 360 360 360
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7634 Los Angeles SCAB 7120004 NCR27 L EXEMPT - 93.126 6
Description: PTC 2,776 Agency BELL
Design work to improve conditions for pedestrians in order to increase pedestrian safety, and to improve the pedestrian environment in order to promote walking as a viable form of transportation, and encourage the use of public transit.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 2,159 2,159 2,159 2,159CITY FUNDS 184 371 555 184 371 555ACTIVE TRANSPORTATION PROGRAM
62 62 62 62
LAF7634 Total 246 2,530 2,776 246 2,530 2,776
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G451 Los Angeles SCAB LA0G451 CAX60 L NON-EXEMPT 6
Description: PTC 8,168 Agency CULVER CITY
BRIDGE NO. 53C0876, HIGUERA ST, OVER BALLONA CR. BETWEEN EASTHAM DRIVE AND JEFFERSON BLVD. REPLACE 3 LANE BRIDGE WITH A NEW 4 LANE BRIDGE....
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 151 57 759 967 208 759 967BRIDGE - LOCAL 1,166 181 5,854 7,201 1,347 5,854 7,201LA0G451 Total 1,317 238 6,613 8,168 1,555 6,613 8,168
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7101 Los Angeles SCAB 1AL04 ITS02 L TCM 6
Description: PTC 5,196 Agency HAWTHORNE
PRAIRIE AVENUE MOBILITY PROJECT : (1) Widens Prairie Av interesections at El Segundo Bl and at Rosecrans Av to construct double left-turn pockets for traffic flow improvement and to install Class III bike routes on both sides. (2) Traffic signal upgrade and synchronization of 8 intersections between 118th and Marine. (3) Installs Class III bike equipments, improves pedestrian facilties, and upgrades ADA access ramps, new median curbs and landscaping at intersections.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 1,020 1,020 1,020 1,020CITY FUNDS 30 320 350 350 350
Print Date: 3/21/2017 9:20:20 AM Page: 1 of 7
2017 Federal Transportation Improvement Program
Administrative Modification #17-06Los Angeles County MTA
Project Listing Report(in $000`s)
MEASURE R 116 14 1,107 1,237 1,237 1,237PROP "C25" FUNDS 476 2,113 2,589 2,589 2,589LAF7101 Total 622 14 4,560 5,196 5,196 5,196
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5514 Los Angeles SCAB 1O1007 NCN26 L TCM Committed 6
Description: PTC 1,317 Agency LOS ANGELES COUNTY
Vermont Ave Bike Lane - Manchester Blvd to El Segundo Blvd. Funds are requested to design and construct Class II bike lanes on Vermont Av (3.0 miles). Short term bicycle racks (14) are also proposed at key destinations. Toll Credits will be used to match STPL.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 87 87 87 87COUNTY 473 81 554 473 81 554ACTIVE TRANSPORTATION PROGRAM
676 676 676 676
LAF5514 Total 473 844 1,317 473 844 1,317
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7817 Los Angeles SCAB 1AL04 NCN46 L EXEMPT - 93.126 6
Description: PTC 2,937 Agency LOS ANGELES, CITY OF
Vermont Avenue Stormwater Capture & Green Street Transit Project.
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 138 1,654 1,792 138 1,654 1,792LOCAL TRANS FUNDS 100 1,045 1,145 100 1,045 1,145LAF7817 Total 238 2,699 2,937 238 2,699 2,937
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7304 Los Angeles MDAB 1ITS04 ITS02 L NON-EXEMPT 6
Description: PTC 3,750 Agency PALMDALE
NORTH COUNTY ITS - PALMDALE EXTENSION (Fiber from Avenue R 40th East - 70th East & Avenue S 55th East - 60th East; New signals at R/65th East, R/70th East and S/60th East, also include 8 CCTV's)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 240 160 2,600 3,000 240 160 2,600 3,000CITY FUNDS 150 50 550 750 100 100 550 750LAF7304 Total 390 210 3,150 3,750 340 260 3,150 3,750
Print Date: 3/21/2017 9:20:21 AM Page: 2 of 7
2017 Federal Transportation Improvement Program
Administrative Modification #17-06Los Angeles County MTA
Project Listing Report(in $000`s)
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA990359 Los Angeles SCAB LA990359 NCN31 L TCM Committed 6
Description: PTC 1,521,708 Agency SAN GABRIEL VALLEY COG
GRADE SEP XINGS SAFETY IMPR; 35- MI FREIGHT RAIL CORR. THRGH SAN.GAB. VALLEY - EAST. L.A. TO POMONA ALONG UPRR ALHAMBRA &L.A. SUBDIV - ITS 2318 SAFETEA #2178;1436 #1934 PPNO 2318. NOGALES(LA) PROJECT INCLUDES WIDENING FROM 2 TRAVEL LANES TO 4 TRAVEL LANES OF E.WALNUT DRIVE NO. EAST OF NOGALES FOR 2600 LINEAR FEET AND WIDENING FROM 2 TRAVEL LANES TO 4 TRAVEL LANES OF GALE AVE. WEST OF NOGALES FOR 1900 LINEAR FEET.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 6,347 6,347 6,347 6,347DEMO - ISTEA 6,936 6,936 6,936 6,936DEMO-SAFETEA-LU 3,791 34,966 3,955 42,712 38,757 72 3,883 42,712DEMO - TEA 21 29,585 39,163 79,615 148,363 145,042 3,321 148,363NAT'L CORRIDOR INFRASTRUCTURE IMP PROGRAM
68 1,813 1,881 1,881 1,881
PROJECTS OF NATIONAL AND REGIONAL SIGNIFICANCE
15,562 2,878 12,810 31,250 31,250 31,250
Section 125 - Surface Transportation Priorities
1,849 570 2,419 2,419 2,419
SURFACE TRANS PROG 4,454 12,385 30,815 47,654 47,654 47,654STP LOCAL - REGIONAL 202 202 202 202FEDERAL RAILROAD ADMINISTRATION EARMARK
1,109 1,476 2,585 2,544 41 2,585
AGENCY 30,000 30,000 30,000 30,000MEASURE R 50,100 152,400 91,500 294,000 135,000 159,000 294,000PROP "C10" FUNDS 133 137 270 270 270PROP "C25" FUNDS 22,850 44,388 234,106 301,344 291,365 9,979 301,344STATE TRANSIT ASSISTANCE - PROPOSITION 1B FUNDS
43,906 43,906 25,600 18,306 43,906
STATE PUC 25,000 25,000 25,000 25,000STATE CASH - IIP 486 556 1,042 1,042 1,042TRADE CORRIDOR PROGRAM 405,497 405,497 405,497 405,497TRAFFIC CONGESTION RELIEF 6,900 5,500 117,900 130,300 130,300 130,300LA990359 Total 133,375 302,128 1,086,205 1,521,708 1,326,904 190,921 3,883 1,521,708
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA11G1 Los Angeles SCAB 1AL04 NCR31 L EXEMPT - 93.126 6
Description: PTC 368,372 Agency VARIOUS AGENCIES
Group projects for pavement resurfacing and or rehabilitation on local roads throughout County. Projects are consistent with 40 CFR part 93.126,127,128, exempt tables 2 & 3 categories. Pavement resurfacing, rehabilitation, reconstruction, AC overlays, road maintenance to prevent and eliminate hazards, no lane additions. There are projects in the grouped project listing that contain projects with toll credits.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 609 130 44 783 783 783
Print Date: 3/21/2017 9:20:21 AM Page: 3 of 7
2017 Federal Transportation Improvement Program
Administrative Modification #17-06Los Angeles County MTA
Project Listing Report(in $000`s)
DEMO-SAFETEA-LU 1,100 1,100 500 600 1,100DEMO - TEA 21 1,491 1,491 1,491 1,4912016 EARMARK REPURPOSING 279 279 279 279SECTION 129 - SURFACE TRANSPORTATION PRIORITIES
250 250 250 250
STP LOCAL 6,885 5,996 183,060 195,941 63,005 34,152 33,876 31,541 27,563 5,804 195,941AGENCY 1,270 1,270 70 100 1,100 1,270CITY FUNDS 8,116 9,628 43,063 60,807 18,204 19,613 16,635 3,600 2,755 60,807COUNTY 10 10 10 10GENERAL FUNDS 44 6,450 6,494 2,194 1,300 1,500 1,500 6,494LOCAL TRANS FUNDS 100 100 100 100MEASURE R 180 1,988 2,168 12 956 1,200 2,168MEASURE R 15 - LOCAL RETURN 7,000 4,500 6,646 18,146 5,146 5,000 5,000 3,000 18,146MEASURE R 20H - HIGHWAY CAPITAL
45 940 985 985 985
PROP "C20" FUNDS 8,615 10,000 19,346 37,961 24,109 4,722 3,000 3,130 3,000 37,961PROP "C25" FUNDS 345 345 90 255 345PROP C"40" FUNDS 4,500 5,000 10,742 20,242 7,242 3,000 4,000 3,000 3,000 20,242PROP "A" LOCAL RETURN 7,000 7,000 6,000 20,000 5,000 5,000 5,000 5,000 20,000LA11G1 Total 42,994 42,254 283,124 368,372 115,606 75,493 72,351 53,300 45,818 5,804 368,372
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLALS07 Los Angeles Various REG0701 SHP01 999 S EXEMPT - 93.126 6
Description: PTC 375,250 Agency CALTRANS
Route 999: Grouped Projects for Safety Improvements - SHOPP Mandates Program. Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Railroad/highway crossing, Safer non-Federal-aid system roads, Shoulder improvements, traffic control devices and operating assistance other than signalization projects, Intersection signalization projects at individual intersections, Pavement marking demonstration, Truck climbing lanes outside the urbanized areaFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSHOPP - ADVANCE CONSTRUCTION
302,014 302,014 99,205 60,727 77,438 51,825 12,819 302,014
SHOPP AC-PRIOR 73,236 73,236 73,236 73,236LALS07 Total 375,250 375,250 172,441 60,727 77,438 51,825 12,819 375,250
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLALS08 Los Angeles Various REG0701 SHP01 999 S EXEMPT - 93.126 6
Description: PTC 51,883 Agency CALTRANS
Route 999: Grouped Projects for Emergency Repair - SHOPP Emergency Response Program. Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 categories - Repair damage caused by natural disasters, civil unrest, or terrorist acts. This applies to damages that do not qualify for Federal Emergency Relief funds or to damages that qualify for federal Emergency Relief funds but extend beyond the Federally declared disaster period.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSHOPP - ADVANCE CONSTRUCTION
5,557 5,557 1,430 4,127 5,557
Print Date: 3/21/2017 9:20:21 AM Page: 4 of 7
2017 Federal Transportation Improvement Program
Administrative Modification #17-06Los Angeles County MTA
Project Listing Report(in $000`s)
SHOPP AC-PRIOR 46,326 46,326 46,326 46,326LALS08 Total 51,883 51,883 47,756 4,127 51,883
ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentLA0G024 Los Angeles SCAB 1TL104 BUR17 T EXEMPT - 93.126 6
Description: PTC 113,517 Agency LONG BEACH PUBLIC TRANSPORTATION COMPANY
On-going fleet replacement (30, 40 and articulated, ADA compliant, alternative fuel). Added TDC of $1,991 in FY 16/17 for CON to match FTA 5339 and FTA 5307 funds and TDC of $820 in FY 17/18, & $2,447 in FY18/19 for Cons to match FTA 5307.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total5307LA LOS ANGELES/LONG BEACH/SANTA ANA URBANIZED AREA
76,912 76,912 51,797 8,786 4,097 12,232 76,912
CLEAN FUEL FORMULA 2,000 2,000 2,000 2,000FTA 5309(c) BUS 950 950 950 9505339LA LOS ANGELES -LONG BEACH-ANAHEIM URBANIZED AREA - BFG
1,173 1,173 1,173 1,173
MEASURE R 1,684 1,684 1,095 589 1,684PROP C"40" FUNDS 8,075 8,075 7,271 804 8,075PUBLIC TRANS MODERINAZATION IMP AND SERV. ENHANCEMENT ACCT.
16,723 16,723 15,744 979 16,723
STATE TRANSIT ASSISTANCE - PROPOSITION 1B FUNDS
6,000 6,000 6,000 6,000
LA0G024 Total 113,517 113,517 84,857 10,938 5,490 12,232 113,517
ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentLA0G221 Los Angeles SCAB 1TL204 NCR86 T EXEMPT - 93.126 6
Description: PTC 80,704 Agency LONG BEACH PUBLIC TRANSPORTATION COMPANY
The On-going Bus Capital project includes: bus components, project administration, facility/ maintenance improvements, information systems equipment, safety/ security equipment, shop/ office equipment, support vehicles and tires. Added Transit Development Credits (TDC) for construction phase, $809 in FY 16/17, $2,316 in FY 17/18, $2,759 in FY18/19 to match 5307 funds.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total5307LA LOS ANGELES/LONG BEACH/SANTA ANA URBANIZED AREA
64,156 64,156 34,737 4,045 11,578 13,796 64,156
FTA 5309(c) BUS 4,908 4,908 4,908 4,908AR-5307 ARRA - FTA 5307 8,527 8,527 8,527 8,527PROP C"40" FUNDS 3,113 3,113 3,103 10 3,113LA0G221 Total 80,704 80,704 51,275 4,055 11,578 13,796 80,704
Print Date: 3/21/2017 9:20:21 AM Page: 5 of 7
2017 Federal Transportation Improvement Program
Administrative Modification #17-06Los Angeles County MTA
Project Listing Report(in $000`s)
ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentLA0G1123 Los Angeles SCAB 1TR1014 PAO00 T EXEMPT - 93.126 6
Description: PTC 57,247 Agency LOS ANGELES COUNTY MTA
Formula Grants for the Enhanced Mobility of Seniors and Individuals with Disabilities Program administration, as well as for operations and capital assistance, for urbanized areas (UZA) in Los Angeles County (UZA 2, UZA 112, and UZA 146).Toll Credits - Transit (TDC)of $2,879 (FY17), $1,061 (FY19) and $514 (FY20) will be used to match federal funds for the CON phase.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total5310 FTA 5310 ELD AND DISABI 52,715 52,715 13,862 20,875 11,825 6,153 52,715LOCAL TRANS FUNDS 4,532 4,532 1,599 1,358 1,061 514 4,532LA0G1123 Total 57,247 57,247 15,461 22,233 12,886 6,667 57,247
ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentLA0C63 Los Angeles SCAB LA0C63 TRN06 T EXEMPT - 93.126 6
Description: PTC 120 Agency NORWALK
PURCHASE OF MISC OFFICE EQUIPMENT- (ONGOING)
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total5307LA LOS ANGELES/LONG BEACH/SANTA ANA URBANIZED AREA
96 96 83 13 96
PROP "A" LOCAL RETURN 24 24 21 3 24LA0C63 Total 120 120 104 16 120
ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentLA0C64 Los Angeles SCAB LA0C64 BUN07 T EXEMPT - 93.126 6
Description: PTC 222 Agency NORWALK
ASSOCIATED CAPITAL MAINTENANCE (ENGINES, TRANSMISSIONS, PARTICULATE TRAPS, KITS, ETC) (ONGOING)
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total5307LA LOS ANGELES/LONG BEACH/SANTA ANA URBANIZED AREA
178 178 113 65 178
PROP "A" LOCAL RETURN 44 44 28 16 44LA0C64 Total 222 222 141 81 222
ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentLA0G057 Los Angeles SCAB REG0702 BUO01 T EXEMPT - 93.126 6
Description: PTC 126 Agency NORWALK
Ongoing annual tire lease contract
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total5307LA LOS ANGELES/LONG BEACH/SANTA ANA URBANIZED AREA
100 100 50 50 100
Print Date: 3/21/2017 9:20:21 AM Page: 6 of 7
2017 Federal Transportation Improvement Program
Administrative Modification #17-06Los Angeles County MTA
Project Listing Report(in $000`s)
PROP "A" LOCAL RETURN 26 26 13 13 26LA0G057 Total 126 126 63 63 126
ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentLA0G1325 Los Angeles SCAB 7120004 NCR26 T EXEMPT - 93.126 6
Description: PTC 54 Agency NORWALK
Purchase replacement bike lockers
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total5307LA LOS ANGELES/LONG BEACH/SANTA ANA URBANIZED AREA
43 43 43 43
PROP "A" LOCAL RETURN 11 11 11 11LA0G1325 Total 54 54 54 54
ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentLA0G1326 Los Angeles SCAB 1TR1010 BUR17 T EXEMPT - 93.126 6
Description: PTC 1,569 Agency NORWALK
Bus replacement project - purchase two (2) Compressed Natural Gas (CNG) buses
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total5307LA LOS ANGELES/LONG BEACH/SANTA ANA URBANIZED AREA
1,124 1,124 1,124 1,124
PROP C"40" FUNDS 127 127 127 127STATE TRANSIT ASSISTANCE - PROPOSITION 1B FUNDS
318 318 318 318
LA0G1326 Total 1,569 1,569 1,569 1,569
ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentLA0G1193 Los Angeles SCAB 7120002 BUR17 T EXEMPT - 93.126 6
Description: PTC 6,104 Agency SANTA CLARITA
Bus Replacement of 14 2005 New Flyer CNG Buses. $1,221 of TDC will be utilized to match FTA 5339 and FTA 5307 funds programmed in FY16/17 for CON phase.
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total5307LA LOS ANGELES/LONG BEACH/SANTA ANA URBANIZED AREA
960 960 960 960
5307SC SANTA CLARITA URBANIZED AREA
3,836 3,836 3,836 3,836
5339SC SANTA CLARITA URBANIZED AREA - BFG
1,308 1,308 1,308 1,308
LA0G1193 Total 6,104 6,104 6,104 6,104Grand Total 179,655 344,844 2,076,881 2,601,380 1,596,439 533,752 167,728 180,528 104,310 18,623 2,601,380
Print Date: 3/21/2017 9:20:21 AM Page: 7 of 7
LA11G1 Backup Listing
IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 TOTAL
(2017‐
2022)
Glendale, City of Honolulu Ave Markridge Rd LA0G1314 LA11G1 17‐06 Pennsylvania Ave. Rehabilitation from Honolulu Ave to
Markridge Rd is combined roadway improvement (cold milling
and resurfacing the existing pavement with rubberized asphalt,
curb ramps modification and construction, utility adjustment
and traffic striping) and Traffic Signal Modifications at Freeway
I‐210 on‐and‐off ramps. Project will use Toll Credits.
2016 Earmark Repurposing 12/13/2022 0 0 279 0 0 0 279
0 0 279 0 0 0 279
Carson, City of Main St Figueroa St LA0G391 LA11G1 17‐00 Sepulveda Blvd Improvements, from main Street to figueroa
St, includes reconstruction of existing pavement and
reconstruction of damaged sidewalk, curb and gutter.
AGENCY 6/30/2018 0 600 0 0 0 0 600
Carson, City of Lomita Street Railroad Crossing LA0G412 LA11G1 17‐00 Wilmington Avenue Improvements from Lomita Street to
Railroad Crossing consist of reconstruction of the existing
pavement and construction of missing curb & gutter.
AGENCY 6/30/2017 100 0 0 0 0 0 100
Carson, City of Sepulveda Blvd Lomita Blvd LA0G452 LA11G1 17‐00 Figueroa Street Improvements from Sepulveda Blvd to Lomita
Blvd consist of reconstruction and rehabilitation of the existing
pavement, curb & gutter, and sidewalk.
AGENCY 6/30/2018 0 500 0 0 0 0 500
100 1,100 0 0 0 0 1,200
Alhambra, City of Garfield Ave West City Limits LSSTPL004 LA11G1 17‐02 Mission Road: Garfield Ave to West City Limits Road
rehabilitation, Install Handicapped Ramps, sidewalk, curb &
gutter, medians and street scape.
CITY 12/31/2020 0 0 875 0 0 0 875
Calabasas, City of Southern City limits Canyon Drive LA0G1313 LA11G1 17‐02 PAVEMENT REHABILITATION OF MULHOLLAND HIGHWAY
FROM SOUTHERN CITY LIMITS TO CANYON DRIVE.
CITY 8/31/2017 627 0 0 0 0 0 627
Carson, City of Citywide Citywide LA0G903 LA11G1 17‐00 Citywide Annual Overlay FY 2015/16 includes grinding the
existing roadway pavement and overlaying with rubberized
asphalt, repairing damaged sidewalk and curb & gutter, and
constructing or upgrading wheelchair ramps.
CITY 6/30/2017 750 0 0 0 0 0 750
Carson, City of Citywide Citywide LA0G904 LA11G1 17‐00 Citywide Annual Overlay FY 2016/17 includes grinding the
existing roadway pavement and overlaying with rubberized
asphalt, repairing damaged sidewalks, curb & gutter, and
constructing new wheelchair ramps or upgrading existing
wheelchair ramps.
CITY 6/1/2017 720 0 0 0 0 0 720
Covina, City of San Bernadino Road Arrow Highway LA0G1297 LA11G1 17‐02 Resurfacing of 1.02 miles on Grand Ave between San
Bernadino Rd and Arrow Hwy with 2 in of RAC, underlain by 3
in of CCPR asphalt, atop 10 in of cement stabilized based.
Project includes replacement of ADA curb ramps, sidewalk,
curb and gutter, loop replacement, and signing and striping.
The project also provides for the replacement of the existing
25,000 sf median landscaping with new drought tolerant
landscape and hardscape improvements.
CITY 4/1/2018 43 0 0 0 0 0 43
El Monte, City of Santa Anita Avenue Arden Drive LAE1138 LA11G1 17‐02 CONSTRUCT VALLEY DRAINAGE AND RESURFACING
IMPROVEMENTS: WEST OF SANTA ANITA AV‐ INCLUDING NO
CAPACITY INCREASE STREET RESURFACING.
CITY 6/30/2018 150 0 0 0 0 0 150
Glendale, City of Honolulu Ave Markridge Rd LA0G1314 LA11G1 17‐06 Pennsylvania Ave. Rehabilitation from Honolulu Ave to
Markridge Rd is combined roadway improvement (cold milling
and resurfacing the existing pavement with rubberized asphalt,
curb ramps modification and construction, utility adjustment
and traffic striping) and Traffic Signal Modifications at Freeway
I‐210 on‐and‐off ramps. Project will use Toll Credits.
CITY 12/13/2022 0 0 11 0 0 0 11
Glendale, City of Colorado Street City Boundry LA0G1034 LA11G1 17‐02 Verdugo Road Rehabilitation from Colorado Street to City's
Boundary is roadway improvement (cold milling and
resurfacing the existing pavement with rubberized asphalt,
curb modification and reconstruction, repair damaged
pavement), sewer upsizing and traffic signal modification
project (on Verdugo Rd at Acacia Ave and Maple St.) Verdugo
Rd. is an arterial street, less than a mile away from Freeways
CA‐2 and CA‐134. Project will use Toll Credit for CON of STPL.
CITY 12/31/2022 0 713 0 0 0 0 713
Inglewood, City of Centinela Ave. 64th St. LA0G1294 LA11G1 17‐02 La Brea Avenue from Florence Avenue to North City Limit.
Improvements include pavement resurfacing, reconstruction of
wheelchair ramps, sidewalks, drive approaches, curbs, gutters,
concrete medians, tree planting, traffic striping and associated
work.
CITY 9/30/2017 1,218 0 0 0 0 0 1,218
La Verne, City of Arrow Highway Foothill Boulevard LA0G197 LA11G1 17‐02 Project includes the rehabilitation of the existing pavement
along Wheeler Avenue between Arrow Highway and Foothill
Boulevard.
CITY 6/30/2018 0 520 0 0 0 0 520
Los Angeles County Metropolitan Transportation Authority (LACMTA) Transportation Improvement Program (TIP) Group Project Listing as of February 23, 2017
LA11G1 ‐ Group projects for pavement resurfacing and/or rehabilitation on local roads throughout County. Projects are consistent with 40 CFR part 93, 126, 127, 128, exempt tables 2 & 3 categories. Pavement resurfacing, rehabilitation, reconstruction, AC overlays, road maintenance to prevent and eliminate hazards, no lane additions.
There are projects in the grouped projecting listing that contain projects with toll credits.
TOTAL 2016 Earmark Repurposing
TOTAL AGENCY
Jeeseong Chung, (213) 922‐2478, [email protected] Page 1 of 7 Printed: 3/21/2017 at 9:12 AM
#17-06 LA LA11G1 Pavement Rehabilitation
LA11G1 Backup Listing
IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 TOTAL
(2017‐
2022)
Los Angeles County Metropolitan Transportation Authority (LACMTA) Transportation Improvement Program (TIP) Group Project Listing as of February 23, 2017
LA11G1 ‐ Group projects for pavement resurfacing and/or rehabilitation on local roads throughout County. Projects are consistent with 40 CFR part 93, 126, 127, 128, exempt tables 2 & 3 categories. Pavement resurfacing, rehabilitation, reconstruction, AC overlays, road maintenance to prevent and eliminate hazards, no lane additions.
There are projects in the grouped projecting listing that contain projects with toll credits.
La Verne, City of San Dimas Canyon road Fulton Road LSSTPL010 LA11G1 17‐00 Rehabilitation of pavement surface along Arrow Highway
through the City of La Verne
CITY 6/30/2017 1,257 0 0 0 0 0 1,257
Lakewood, City of Clark Avenue Downey Avenue LA0G1086 LA11G1 17‐00 Del Amo Boulevard Street Improvements from Clark Avenue to
Downey Avenue ‐ Project includes street resurfacing,
pavement repairs, concrete repairs to sidewalk, curb and
gutter, and drive approaches, curb ramps, and signing and
striping.
CITY 12/31/2016 0 0 0 0 0 0 0
Lancaster, City of 30th Street East 40th Street East LA0G1335 LA11G1 17‐02 Lancaster Boulevard, 30th to 40th Street East. Improvements
include repairing pavement sections, widening the street in
some areas, traffic signing and striping, placement of asphalt
concrete pavement overlay for full width of street, removal
and reconstruction of existing concrete curb and gutter, and
updating handicap to current ADA standards. Undergrounding
or relocation of approximately 20 power poles.
CITY 9/9/2019 0 153 0 0 0 0 153
Los Angeles County MTA NA N/A LAG1001 LA11G1 17‐02 Regionwide local highway system preservation, pavement
resurfacing, rehabilitation, AC overlays and reconstruction. No
lane additions.
CITY 12/30/2020 10,000 8,000 2,500 2,500 0 0 23,000
Palmdale, City of 55th East 790' w/o 25th East LA0G1103 LA11G1 17‐02 Pearblossom Highway Reconstruction‐ 3RD project. From
approximately 55th East to approx. 790’ west of 25th Street
East (+3 miles). Work to consist of : Multi‐phase construction
to pulverize roadway; cement treat roadway, base and re‐
pave; re‐do traffic loops and striping. Utilizing toll credits to
match STPL.
CITY 3/1/2021 4,848 0 0 0 0 0 4,848
Palmdale, City of North & South East and West LA0G1299 LA11G1 17‐02 City of Palmdale Arterial and Collector Rehabilitation and
Resurfacing Program. This will be a multiphase ongoing street
resurfacing program that will incoporate various pavement
rehabiliation and resurfacing techniques and materials. All
work will be withing the City of Palmdale Right of Way. The
Project will include 160 miles or 34 million square feet of
pavement to be resurfaced or reconstructed. No Right of Way
is reqired.
CITY 12/31/2020 0 7,249 0 0 0 0 7,249
Pomona, City of Temple Mills LA0G1256 LA11G1 17‐02 Street Rehabilitation in Exist R/W ‐ Districts Citywide. CITY 9/18/2021 0 0 56 255 0 0 311
San Marino, City of Huntington Drive 800' Northerly LA0G679 LA11G1 17‐02 Sierra Madre Blvd 800 feet northerly Huntington Boulevard.
The project consists in a AC Overlay and miscellaneous
concrete work.
CITY 1/31/2021 0 0 25 0 0 0 25
South Gate, City of Jefferson Ave South City Limit LA0G675 LA11G1 17‐02 Street improvements of Imperial Hwy from east City Limit to
LA River and Garfield Avenue from Jefferson Ave to South City
Limit. Improvements include but not limit to rehabilitation of
pavement, reconstruction of damaged curb and gutter, drive
approaches, sidewalk, ramps, etc.
CITY 2/28/2021 0 0 100 0 0 0 100
South Pasadena, City of PASADENA BRENT LA0G046 LA11G1 17‐02 MONTEREY ROAD FROM PASADENA AVE to BRENT AVE:
Roadway rehabilitation and reconstruction no lane additions.
CITY 6/30/2021 0 0 33 0 0 0 33
19,613 16,635 3,600 2,755 0 0 42,603
Los Angeles County Et. Al. LSSTPL050 LA11G1 17‐00 Avenue I Et. Al Roadway Resurfacing and Rehabilitation. CO 12/1/2017 10 0 0 0 0 0 10
10 0 0 0 0 0 10
El Monte, City of Santa Anita Avenue Arden Drive LAE1138 LA11G1 17‐02 CONSTRUCT VALLEY DRAINAGE AND RESURFACING
IMPROVEMENTS: WEST OF SANTA ANITA AV‐ INCLUDING NO
CAPACITY INCREASE STREET RESURFACING.
DEMOSTL 6/30/2018 600 0 0 0 0 0 600
600 0 0 0 0 0 600
San Dimas, City of Covina Blvd. westerly city limits LA0G1272 LA11G1 17‐02 Street Rehab improvements to Badillo St. from Covina Blvd. to
westerly city limit and Covina Hills Rd. from Via Verde to
westerly city limit. Utilizing toll credits.
GEN 12/30/2018 650 0 0 0 0 0 650
San Marino, City of St Albans Kenisgton LA0G1331 LA11G1 17‐02 16/17 PMP implementation ‐ California BLVD ‐ 100'W/o
Greenwood ave to San Marino Av:California BLVD‐Winston
Ave to Santa Anita Ave; Huntington Drive W/B ‐ Story Pl to El
Molino Place; Monterey Road ‐ St Albans to Kensignton;
Virginia Road ‐ Roasalind to Circle Drive;Avonrea Road ‐ Cul‐de‐
sac to Oak St; Cantebury Road ‐ California to Chaucer; Euston‐
Oxford to San Marino; Oak Knoll N.C.L, etc
GEN 10/1/2017 1,544 0 0 0 0 0 1,544
San Marino, City of Allen East LA0G1332 LA11G1 17‐02 Year two implementation project of the 2016 10‐year
Pavement Management Program
GEN 10/1/2018 0 1,300 0 0 0 0 1,300
San Marino, City of Huntington Drive Roanoke Rd LA0G1333 LA11G1 17‐02 Year three implementation project of the 2016 10‐year
Pavement Management Program
GEN 10/1/2019 0 0 1,500 0 0 0 1,500
San Marino, City of Santa Anita San Gabriel LA0G1334 LA11G1 17‐02 Year four implementation project of the 2016 10‐year
Pavement Management Program
GEN 10/1/2020 0 0 0 1,500 0 0 1,500
2,194 1,300 1,500 1,500 0 0 6,494
TOTAL CITY
TOTAL CO
TOTAL DEMOSTL
TOTAL GEN
Jeeseong Chung, (213) 922‐2478, [email protected] Page 2 of 7 Printed: 3/21/2017 at 9:12 AM
#17-06 LA LA11G1 Pavement Rehabilitation
LA11G1 Backup Listing
IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 TOTAL
(2017‐
2022)
Los Angeles County Metropolitan Transportation Authority (LACMTA) Transportation Improvement Program (TIP) Group Project Listing as of February 23, 2017
LA11G1 ‐ Group projects for pavement resurfacing and/or rehabilitation on local roads throughout County. Projects are consistent with 40 CFR part 93, 126, 127, 128, exempt tables 2 & 3 categories. Pavement resurfacing, rehabilitation, reconstruction, AC overlays, road maintenance to prevent and eliminate hazards, no lane additions.
There are projects in the grouped projecting listing that contain projects with toll credits.
Covina, City of San Bernadino Road Arrow Highway LA0G1297 LA11G1 17‐02 Resurfacing of 1.02 miles on Grand Ave between San
Bernadino Rd and Arrow Hwy with 2 in of RAC, underlain by 3
in of CCPR asphalt, atop 10 in of cement stabilized based.
Project includes replacement of ADA curb ramps, sidewalk,
curb and gutter, loop replacement, and signing and striping.
The project also provides for the replacement of the existing
25,000 sf median landscaping with new drought tolerant
landscape and hardscape improvements.
Measure R 4/1/2018 331 0 0 0 0 0 331
Glendale, City of Central Ave. Kenwood Ave. LA0G940 LA11G1 17‐02 This project is located in the City of Glendale on Colorado
Street ,a major thoroughfare in Glendale, from Kenilworth
Ave. to Central Ave. The project includes grinding of existing
asphalt concrete (AC) pavement; removal and replacement;
installation of traffic lane striping; and modification of traffic
signals at the Columbus Avenue intersect.
Measure R 11/15/2018 0 1,200 0 0 0 0 1,200
Walnut, City of Country Hollow Drive Lemon Avenue LA0G1337 LA11G1 17‐02 Amar Road; asphalt pavement will be rehabilitated from
Country Hollow Dr/Meadowpass Rd to Lemon Ave;
thermoplastic striping and traffic detector loops will also be
installed; ADA access ramp, damaged curb and gutter are to be
upgraded.
Measure R 6/30/2017 625 0 0 0 0 0 625
956 1,200 0 0 0 0 2,156
Los Angeles County MTA NA N/A LAG1001 LA11G1 17‐02 Regionwide local highway system preservation, pavement
resurfacing, rehabilitation, AC overlays and reconstruction. No
lane additions.
MR15 12/30/2020 5,000 5,000 3,000 3,000 0 0 16,000
Palmdale, City of North & South East and West LA0G1299 LA11G1 17‐02 City of Palmdale Arterial and Collector Rehabilitation and
Resurfacing Program. This will be a multiphase ongoing street
resurfacing program that will incoporate various pavement
rehabiliation and resurfacing techniques and materials. All
work will be withing the City of Palmdale Right of Way. The
Project will include 160 miles or 34 million square feet of
pavement to be resurfaced or reconstructed. No Right of Way
is reqired.
MR15 12/31/2020 0 2,000 0 0 0 2,000
Redondo Beach, City of Beryl St Del Amo St LAF1366 LA11G1 17‐06 Prospect Ave Resurfacing from Beryl St to Del Amo St. This
project will resurface and rehabilitate Prospect Ave within the
City limits and includes the reconstruction of ADA ramps,
sidewalk repairs, curb and gutter repairs and the replacement
of signing and striping.
MR15 6/30/2018 146 0 0 0 0 146
5,146 5,000 5,000 3,000 0 0 18,146
Glendale, City of Honolulu Ave Markridge Rd LA0G1314 LA11G1 17‐06 Pennsylvania Ave. Rehabilitation from Honolulu Ave to
Markridge Rd is combined roadway improvement (cold milling
and resurfacing the existing pavement with rubberized asphalt,
curb ramps modification and construction, utility adjustment
and traffic striping) and Traffic Signal Modifications at Freeway
I‐210 on‐and‐off ramps. Project will use Toll Credits.
MR20H 12/13/2022 0 400 0 0 0 0 400
Glendale, City of Colorado Street City Boundry LA0G1034 LA11G1 17‐02 Verdugo Road Rehabilitation from Colorado Street to City's
Boundary is roadway improvement (cold milling and
resurfacing the existing pavement with rubberized asphalt,
curb modification and reconstruction, repair damaged
pavement), sewer upsizing and traffic signal modification
project (on Verdugo Rd at Acacia Ave and Maple St.) Verdugo
Rd. is an arterial street, less than a mile away from Freeways
CA‐2 and CA‐134. Project will use Toll Credit for CON of STPL.
MR20H 12/31/2022 0 585 0 0 0 0 585
0 985 0 0 0 0 985
Covina, City of San Bernadino Road Arrow Highway LA0G1297 LA11G1 17‐02 Resurfacing of 1.02 miles on Grand Ave between San
Bernadino Rd and Arrow Hwy with 2 in of RAC, underlain by 3
in of CCPR asphalt, atop 10 in of cement stabilized based.
Project includes replacement of ADA curb ramps, sidewalk,
curb and gutter, loop replacement, and signing and striping.
The project also provides for the replacement of the existing
25,000 sf median landscaping with new drought tolerant
landscape and hardscape improvements.
PC20 4/1/2018 1,097 0 0 0 0 0 1,097
Los Angeles County MTA NA N/A LAG1001 LA11G1 17‐02 Regionwide local highway system preservation, pavement
resurfacing, rehabilitation, AC overlays and reconstruction. No
lane additions.
PC20 12/30/2020 3,000 3,000 3,000 3,000 0 0 12,000
TOTAL Measure R
TOTAL MR15
TOTAL MR20H
Jeeseong Chung, (213) 922‐2478, [email protected] Page 3 of 7 Printed: 3/21/2017 at 9:12 AM
#17-06 LA LA11G1 Pavement Rehabilitation
LA11G1 Backup Listing
IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 TOTAL
(2017‐
2022)
Los Angeles County Metropolitan Transportation Authority (LACMTA) Transportation Improvement Program (TIP) Group Project Listing as of February 23, 2017
LA11G1 ‐ Group projects for pavement resurfacing and/or rehabilitation on local roads throughout County. Projects are consistent with 40 CFR part 93, 126, 127, 128, exempt tables 2 & 3 categories. Pavement resurfacing, rehabilitation, reconstruction, AC overlays, road maintenance to prevent and eliminate hazards, no lane additions.
There are projects in the grouped projecting listing that contain projects with toll credits.
South Gate, City of Jefferson Ave South City Limit LA0G675 LA11G1 17‐02 Street improvements of Imperial Hwy from east City Limit to
LA River and Garfield Avenue from Jefferson Ave to South City
Limit. Improvements include but not limit to rehabilitation of
pavement, reconstruction of damaged curb and gutter, drive
approaches, sidewalk, ramps, etc.
PC20 2/28/2021 0 0 130 0 0 0 130
Walnut, City of Country Hollow Drive Lemon Avenue LA0G1337 LA11G1 17‐02 Amar Road; asphalt pavement will be rehabilitated from
Country Hollow Dr/Meadowpass Rd to Lemon Ave;
thermoplastic striping and traffic detector loops will also be
installed; ADA access ramp, damaged curb and gutter are to be
upgraded.
PC20 6/30/2017 625 0 0 0 0 0 625
4,722 3,000 3,130 3,000 0 0 13,852
El Monte, City of Peck Rd East City Limit LA0G953 LA11G1 17‐02 Resurfacing and curb and gutter improvements of Ramona
Boulevard between Peck Road and the East City limits (605
FWY). None capacity. Project is using $129 in Toll Credits for
CON in FY15/16.. Toll Credits ‐ Local and State Hwyof $219
will be used to match FY16 federal funds for the CON phase
PC25 10/1/2018 0 255 0 0 0 0 255
0 255 0 0 0 0 255
Los Angeles County MTA NA N/A LAG1001 LA11G1 17‐02 Regionwide local highway system preservation, pavement
resurfacing, rehabilitation, AC overlays and reconstruction. No
lane additions.
PC40 12/30/2020 3,000 4,000 3,000 3,000 0 0 13,000
3,000 4,000 3,000 3,000 0 0 13,000
Los Angeles County MTA NA N/A LAG1001 LA11G1 17‐02 Regionwide local highway system preservation, pavement
resurfacing, rehabilitation, AC overlays and reconstruction. No
lane additions.
PROPALR 12/30/2020 5,000 5,000 5,000 5,000 0 0 20,000
5,000 5,000 5,000 5,000 0 0 20,000
Alhambra, City of Garfield Ave West City Limits LSSTPL004 LA11G1 17‐02 Mission Road: Garfield Ave to West City Limits Road
rehabilitation, Install Handicapped Ramps, sidewalk, curb &
gutter, medians and street scape.
SEC129 12/31/2020 0 0 250 0 0 0 250
0 0 250 0 0 0 250
Azusa, City of Citrus Avenue Barranca Avenue LAG1002 LA11G1 17‐02 Road rehabilitation on Alosta Avenue from Citrus Avenue to
Barranca Avenue. Using Toll Credits
STPL 6/30/2021 40 620 0 0 0 0 660
Carson, City of Citywide Citywide LA0G903 LA11G1 17‐00 Citywide Annual Overlay FY 2015/16 includes grinding the
existing roadway pavement and overlaying with rubberized
asphalt, repairing damaged sidewalk and curb & gutter, and
constructing or upgrading wheelchair ramps.
STPL 6/30/2017 280 0 0 0 0 0 280
Carson, City of Citywide Citywide LA0G904 LA11G1 17‐00 Citywide Annual Overlay FY 2016/17 includes grinding the
existing roadway pavement and overlaying with rubberized
asphalt, repairing damaged sidewalks, curb & gutter, and
constructing new wheelchair ramps or upgrading existing
wheelchair ramps.
STPL 6/1/2017 280 0 0 0 0 0 280
Covina, City of San Bernadino Road Arrow Highway LA0G1297 LA11G1 17‐02 Resurfacing of 1.02 miles on Grand Ave between San
Bernadino Rd and Arrow Hwy with 2 in of RAC, underlain by 3
in of CCPR asphalt, atop 10 in of cement stabilized based.
Project includes replacement of ADA curb ramps, sidewalk,
curb and gutter, loop replacement, and signing and striping.
The project also provides for the replacement of the existing
25,000 sf median landscaping with new drought tolerant
landscape and hardscape improvements.
STPL 4/1/2018 1,605 0 0 0 0 0 1,605
El Monte, City of Peck Rd East City Limit LA0G953 LA11G1 17‐02 Resurfacing and curb and gutter improvements of Ramona
Boulevard between Peck Road and the East City limits (605
FWY). None capacity. Project is using $129 in Toll Credits for
CON in FY15/16.. Toll Credits ‐ Local and State Hwyof $219
will be used to match FY16 federal funds for the CON phase
STPL 10/1/2018 0 2,312 0 0 0 0 2,312
Gardena, City of Western Avenue Normandie Avenue LA0G1232 LA11G1 17‐02 132nd Street Improvement from Western Ave to Normandie
Ave., JN ‐ Coldmill and overlay with ARHM, signal upgrade,
concrete driveway, sidewalk, curb and gutter, ADA ramps, re‐
striping. Utilizing Toll Credits to match STPL.
STPL 12/31/2021 0 0 450 0 0 0 450
Glendale, City of Honolulu Ave Markridge Rd LA0G1314 LA11G1 17‐06 Pennsylvania Ave. Rehabilitation from Honolulu Ave to
Markridge Rd is combined roadway improvement (cold milling
and resurfacing the existing pavement with rubberized asphalt,
curb ramps modification and construction, utility adjustment
and traffic striping) and Traffic Signal Modifications at Freeway
I‐210 on‐and‐off ramps. Project will use Toll Credits.
STPL 12/13/2022 0 0 1,508 0 0 0 1,508
TOTAL SEC129
TOTAL PC20
TOTAL PC25
TOTAL PC40
TOTAL PROPALR
Jeeseong Chung, (213) 922‐2478, [email protected] Page 4 of 7 Printed: 3/21/2017 at 9:12 AM
#17-06 LA LA11G1 Pavement Rehabilitation
LA11G1 Backup Listing
IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 TOTAL
(2017‐
2022)
Los Angeles County Metropolitan Transportation Authority (LACMTA) Transportation Improvement Program (TIP) Group Project Listing as of February 23, 2017
LA11G1 ‐ Group projects for pavement resurfacing and/or rehabilitation on local roads throughout County. Projects are consistent with 40 CFR part 93, 126, 127, 128, exempt tables 2 & 3 categories. Pavement resurfacing, rehabilitation, reconstruction, AC overlays, road maintenance to prevent and eliminate hazards, no lane additions.
There are projects in the grouped projecting listing that contain projects with toll credits.
Glendale, City of Colorado Street City Boundry LA0G1034 LA11G1 17‐02 Verdugo Road Rehabilitation from Colorado Street to City's
Boundary is roadway improvement (cold milling and
resurfacing the existing pavement with rubberized asphalt,
curb modification and reconstruction, repair damaged
pavement), sewer upsizing and traffic signal modification
project (on Verdugo Rd at Acacia Ave and Maple St.) Verdugo
Rd. is an arterial street, less than a mile away from Freeways
CA‐2 and CA‐134. Project will use Toll Credit for CON of STPL.
STPL 12/31/2022 0 946 0 0 0 0 946
Glendale, City of SAN FERNANDO RD CENTRAL AVE LA0G1328 LA11G1 17‐02 REHABILITATION of COLORADO ST from San Fernando Rd to
Central Ave (principal arterial) and COLUMBUS AVE from
Broadway to Colorado St; cold mill existing pavement and
install rubberized surface course, reconstruct damaged asphalt
pavement, curb and gutters, sidewalks, driveways, reconstruct
ADA curb ramps, modify one traffic signal, install striping.
Project will use Toll Credit for CON for STPL.
STPL 12/31/2022 0 0 0 1,694 0 0 1,694
Inglewood, City of Centinela Ave. 64th St. LA0G1294 LA11G1 17‐02 La Brea Avenue from Florence Avenue to North City Limit.
Improvements include pavement resurfacing, reconstruction of
wheelchair ramps, sidewalks, drive approaches, curbs, gutters,
concrete medians, tree planting, traffic striping and associated
work.
STPL 9/30/2017 1,141 0 0 0 0 0 1,141
La Verne, City of Arrow Highway Foothill Boulevard LA0G197 LA11G1 17‐02 Project includes the rehabilitation of the existing pavement
along Wheeler Avenue between Arrow Highway and Foothill
Boulevard.
STPL 6/30/2018 0 450 0 0 0 0 450
La Verne, City of San Dimas Canyon road Fulton Road LSSTPL010 LA11G1 17‐00 Rehabilitation of pavement surface along Arrow Highway
through the City of La Verne
STPL 6/30/2017 243 0 0 0 0 0 243
Lancaster, City of 30th Street East 40th Street East LA0G1335 LA11G1 17‐02 Lancaster Boulevard, 30th to 40th Street East. Improvements
include repairing pavement sections, widening the street in
some areas, traffic signing and striping, placement of asphalt
concrete pavement overlay for full width of street, removal
and reconstruction of existing concrete curb and gutter, and
updating handicap to current ADA standards. Undergrounding
or relocation of approximately 20 power poles.
STPL 9/9/2019 0 1,180 0 0 0 0 1,180
Long Beach, City of Obispo Avenue Spring Street LA0G1264 LA11G1 17‐02 On Temple Avenue between Obispo Ave and Spring St,
pavement rehabilitation and restoration, including repair of
curb and gutter, correction of hadicapped access deficiencies,
utility cover adjustment, traffic restriping, and replacement of
damaged signal detector loops. Project using Toll Credit.
STPL 12/30/2019 0 0 1,400 0 0 0 1,400
Long Beach, City of Golden Ave Alamitos Ave LA0G837 LA11G1 17‐00 On 3rd Street from Golden to Alamitos, pavement
rehabilitation and restoration, including repair of curb and
gutter, correction of handicapped access deficiencies, utility
cover adjustment, traffic restriping, and replacement of
damaged signal detector loops.
STPL 12/31/2018 1,300 0 0 0 0 0 1,300
Los Angeles A, City of Citywide federally
classified streets
Citywide federally classified streets LA0G1288 LA11G1 17‐02 STP‐L Force Account Resurfacing Project XVI. Citywide
resurfacing and construction of ADA compliant access ramps
and truncated domes as needed by force account on federally
classified streets using STP‐L funding and Toll Credits.
STPL 6/30/2020 11,500 0 0 0 0 0 11,500
Los Angeles A, City of federally classified
streets
federally classified streets LA0G1345 LA11G1 17‐02 STPL Force Account Resurfacing Project XVII. Citywide
resurfacing and construction of ADA compliant access ramps
and truncated domes as needed by force account on federally
classified streets using STP‐L funding and Toll credits.
STPL 6/30/2019 0 11,500 0 0 0 0 11,500
Los Angeles A, City of Citywide federally
classified streets
Citywide federally classified streets LA0G1346 LA11G1 17‐02 STPL Force Account Resurfacing Project XVIII. Citywide
resurfacing and construction of ADA compliant access ramps
and truncated domes as needed by force account on federally
classified streets using STP‐L and Toll credits.
STPL 6/30/2020 0 0 11,500 0 0 0 11,500
Los Angeles A, City of Citywide federally
classified streets
Citywide federally classified streets LA0G1347 LA11G1 17‐02 STPL Force Account Resurfacing Project XIX. Citywide
resurfacing and construction of ADA compliant access ramps
and truncated domes as needed by force account on federally
classified streets using STP‐L and Toll Credits.
STPL 6/30/2021 0 0 0 11,500 0 0 11,500
Los Angeles County Et Al LA0G977 LA11G1 17‐06 Santa Fe Ave from Del Amo Blvd to 700' North of SPBG 495.6 C
Roadway resurfacing/reconstruction
STPL 9/1/2021 0 4,008 0 0 0 0 4,008
Los Angeles County Lake Ave Altadena Dr LA0G978 LA11G1 17‐02 New York Drive; rehabilitation of New York Drive from Lake
Av/120 ft w/o Altadena Dr.
STPL ‐ STP Local 9/1/2021 0 0 0 0 5,804 0 5,804
Los Angeles County Del Amo Victoria St LA0G1194 LA11G1 17‐02 Wilmington Avenue Roadway Rehabilitation ‐ Del Amo Blvd to
200' south of Victoria St.
STPL 9/1/2021 1,245 0 0 0 0 0 1,245
Jeeseong Chung, (213) 922‐2478, [email protected] Page 5 of 7 Printed: 3/21/2017 at 9:12 AM
#17-06 LA LA11G1 Pavement Rehabilitation
LA11G1 Backup Listing
IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 TOTAL
(2017‐
2022)
Los Angeles County Metropolitan Transportation Authority (LACMTA) Transportation Improvement Program (TIP) Group Project Listing as of February 23, 2017
LA11G1 ‐ Group projects for pavement resurfacing and/or rehabilitation on local roads throughout County. Projects are consistent with 40 CFR part 93, 126, 127, 128, exempt tables 2 & 3 categories. Pavement resurfacing, rehabilitation, reconstruction, AC overlays, road maintenance to prevent and eliminate hazards, no lane additions.
There are projects in the grouped projecting listing that contain projects with toll credits.
Los Angeles County New York Altadena Dr LA0G1200 LA11G1 17‐02 Allen Avenue et al.‐Resurfacing Allen New York Dr. to Altadena
Dr.; Mariposa St. ‐ Lake Av. to Maiden Ln. Using Toll Credits.
STPL 12/1/2022 1,240 0 0 0 0 0 1,240
Los Angeles County Saragosa Aeolian LA0G1270 LA11G1 17‐02 Norwalk Blvd et al ‐ Roadway improvements including
pavement and median work along Norwalk Blvd and Slauson
Avenue. Toll credit amount of $574 will be used to match STPL
in FY 17.
STPL 6/30/2022 0 0 0 5,000 0 0 5,000
Los Angeles County Via Joyce Heller Circle LA0G1271 LA11G1 17‐02 Heller Circle et al ‐ reconstruction/resurfacing, reconstruct
C&G, sidewalk, curb ramps, and LID treatments on Plum
Canyon Road from Via Joyce Dr to Heller Circle and Whites
Canyon Road from Heller Circle to 2,630 fr south of Heller
Circle. Toll credit amount of $459 will be used to match STPL in
FY17.
STPL 6/30/2019 0 0 3,402 0 0 0 3,402
Los Angeles County Norwood Pl Dewey Ave LA0G1300 LA11G1 17‐02 DEL MAR AVE, OVER ALHAMBRA WASH, BRIDGE NO. 53C0973,
0.1 MI S/O VALLEY BLVD. Rehabilitate & widen bridge (no
added lanes), upgrade bridge railings, install street lights. Toll
credits will be used for STPL and HBP funds (HBP‐ID 1104,
Project #5217(001), LA000800)
STPL 12/31/2018 800 0 0 0 0 0 800
Los Angeles County Et Al LA0G975 LA11G1 17‐02 East Los Angeles Comnmunity Roadway Improvements.
Rehabilitation and resurfacing.
STPL 12/15/2019 0 5,800 0 0 0 0 5,800
Los Angeles County Et Al LA0G976 LA11G1 17‐02 Hazard Avenue Et Al. resurfacing of Hazard Av ‐ Ceasar E
Chavez Av to City Terrace Drive, Blanchard St ‐ Gage Av to 45
W Dundas Street
STPL 9/1/2017 2,146 0 0 0 0 0 2,146
Los Angeles County 2453 w/o Munz Ranch
Road
Bouquet Canyon Road LSSTPL052 LA11G1 17‐02 Elizabeth Lake Road‐ Roadway resurfacing and rehabilitation
project. Project is using Toll Credit for construction phase in
the amount of $392
STPL 12/31/2020 3,861 0 0 0 0 0 3,861
Los Angeles County MTA NA N/A LAG1001 LA11G1 17‐02 Regionwide local highway system preservation, pavement
resurfacing, rehabilitation, AC overlays and reconstruction. No
lane additions.
STPL 12/30/2020 4,000 7,000 7,000 7,000 0 0 25,000
Montebello, City of Paramount Blvd Rose Glen LA0G1249 LA11G1 17‐02 Arroyo Drive (Astra Drive to Rose Glen Avenue))
Improvements: concrete improvements and reconstruction fo
AC pavement, existing curb & gutter, sidewalk, access ramps,
traffic signal loop detectors, traffic striping, markers and
pavement marking. Utilizing Toll Credits to match STPL.
STPL 12/1/2021 0 0 680 0 0 0 680
Palmdale, City of 55th East 790' w/o 25th East LA0G1103 LA11G1 17‐02 Pearblossom Highway Reconstruction‐ 3RD project. From
approximately 55th East to approx. 790’ west of 25th Street
East (+3 miles). Work to consist of : Multi‐phase construction
to pulverize roadway; cement treat roadway, base and re‐
pave; re‐do traffic loops and striping. Utilizing toll credits to
match STPL.
STPL 3/1/2021 0 0 2,627 0 0 0 2,627
Paramount, City of Gundry Avenue Hunsaker Avenue LA0G1341 LA11G1 17‐02 Alondra Boulevard Improvements from Gundry Avenue to
Hunsaker Avenue ‐ Project includes street resurfacing,
pavement repairs, concrete repairs to sidewalk, curb and
gutter, and drive approaches, curb ramps, signing and striping,
countdown pedestrian heads, ADA push buttons, LED street
signs, video detection, and repainting signal heads. This
project is using $80,290 Toll Credit for CON phase in FY 16/17.
STPL 12/31/2018 700 0 0 0 0 0 700
Pasadena, City of Various Various LA0G1316 LA11G1 17‐02 This project will provide resurfacing of various streets within
the City of Pasadena. Project will be using $154k in Toll Credits
in FFY 19/20.
STPL 9/30/2021 0 0 0 1,339 0 0 1,339
Pomona, City of Temple Mills LA0G1256 LA11G1 17‐02 Street Rehabilitation in Exist R/W ‐ Districts Citywide. STPL 9/18/2021 0 0 430 430 0 0 860
Redondo Beach, City of Beryl St Del Amo St LAF1366 LA11G1 17‐06 Prospect Ave Resurfacing from Beryl St to Del Amo St. This
project will resurface and rehabilitate Prospect Ave within the
City limits and includes the reconstruction of ADA ramps,
sidewalk repairs, curb and gutter repairs and the replacement
of signing and striping.
STPL 6/30/2018 730 0 0 0 0 730
San Dimas, City of Covina Blvd. westerly city limits LA0G1272 LA11G1 17‐02 Street Rehab improvements to Badillo St. from Covina Blvd. to
westerly city limit and Covina Hills Rd. from Via Verde to
westerly city limit. Utilizing toll credits.
STPL 12/30/2018 1,750 0 0 0 0 0 1,750
San Marino, City of St Albans Kenisgton LA0G1331 LA11G1 17‐02 16/17 PMP implementation ‐ California BLVD ‐ 100'W/o
Greenwood ave to San Marino Av:California BLVD‐Winston
Ave to Santa Anita Ave; Huntington Drive W/B ‐ Story Pl to El
Molino Place; Monterey Road ‐ St Albans to Kensignton;
Virginia Road ‐ Roasalind to Circle Drive;Avonrea Road ‐ Cul‐de‐
sac to Oak St; Cantebury Road ‐ California to Chaucer; Euston‐
Oxford to San Marino; Oak Knoll N.C.L, etc
STPL 10/1/2017 16 0 0 0 0 0 16
San Marino, City of Huntington Dr Longden Ave LA0G1172 LA11G1 17‐02 the project consists in the overlay of Del Mar Avenue from
Huntington Drive to Longden Avenue.
STPL ‐ STP Local 12/30/2021 0 0 660 0 0 0 660
San Marino, City of Huntington Dr Mission Dr LA0G1173 LA11G1 17‐02 The project consists in an street rehabilitation and
miscellaneous concrete work.
STPL ‐ STP Local 1/30/2022 0 0 0 511 0 0 511
Jeeseong Chung, (213) 922‐2478, [email protected] Page 6 of 7 Printed: 3/21/2017 at 9:12 AM
#17-06 LA LA11G1 Pavement Rehabilitation
LA11G1 Backup Listing
IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 TOTAL
(2017‐
2022)
Los Angeles County Metropolitan Transportation Authority (LACMTA) Transportation Improvement Program (TIP) Group Project Listing as of February 23, 2017
LA11G1 ‐ Group projects for pavement resurfacing and/or rehabilitation on local roads throughout County. Projects are consistent with 40 CFR part 93, 126, 127, 128, exempt tables 2 & 3 categories. Pavement resurfacing, rehabilitation, reconstruction, AC overlays, road maintenance to prevent and eliminate hazards, no lane additions.
There are projects in the grouped projecting listing that contain projects with toll credits.
San Marino, City of Huntington Drive 800' Northerly LA0G679 LA11G1 17‐02 Sierra Madre Blvd 800 feet northerly Huntington Boulevard.
The project consists in a AC Overlay and miscellaneous
concrete work.
STPL ‐ STP Local 1/31/2021 0 0 88 0 0 0 88
San Marino, City of Allen East LA0G1332 LA11G1 17‐02 Year two implementation project of the 2016 10‐year
Pavement Management Program
STPL 10/1/2018 0 60 0 0 0 0 60
San Marino, City of Huntington Drive Roanoke Rd LA0G1333 LA11G1 17‐02 Year three implementation project of the 2016 10‐year
Pavement Management Program
STPL 10/1/2019 0 0 60 0 0 0 60
San Marino, City of Santa Anita San Gabriel LA0G1334 LA11G1 17‐02 Year four implementation project of the 2016 10‐year
Pavement Management Program
STPL 10/1/2020 0 0 0 89 0 0 89
South Gate, City of Jefferson Ave South City Limit LA0G675 LA11G1 17‐02 Street improvements of Imperial Hwy from east City Limit to
LA River and Garfield Avenue from Jefferson Ave to South City
Limit. Improvements include but not limit to rehabilitation of
pavement, reconstruction of damaged curb and gutter, drive
approaches, sidewalk, ramps, etc.
STPL 2/28/2021 0 0 1,489 0 0 0 1,489
South Pasadena, City of PASADENA BRENT LA0G046 LA11G1 17‐02 MONTEREY ROAD FROM PASADENA AVE to BRENT AVE:
Roadway rehabilitation and reconstruction no lane additions.
STPL 6/30/2021 0 0 247 0 0 0 247
West Covina, City of Azusa Avenue Barranca Street/East City Limits LA0G1293 LA11G1 17‐02 Street rehabilitation work includes cold‐mill and overlay 2‐
inches of AC pavement, concrete repairs, upgrade curb access
ramps, striping, replace traffic loops, and adjustment sewer
and storm drain manholes. Utilizing Toll Credits
STPL 6/30/2017 1,275 0 0 0 0 0 1,275
34,152 33,876 31,541 27,563 5,804 0 132,936
FY2017 FY2018 FY2019 FY2020 FY2021 FY2022
TOTAL
(2017‐
2022)
75,493 72,351 53,300 45,818 5,804 0 252,766
TOTAL STPL
GRAND TOTAL
Jeeseong Chung, (213) 922‐2478, [email protected] Page 7 of 7 Printed: 3/21/2017 at 9:12 AM
#17-06 LA LA11G1 Pavement Rehabilitation
DISTRICT 7 - 2017 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 17-06 with federal approval date = ACTIVE) [PROJECT LISTING]
FTIP ID # ^LALS07County (All)STATUS (Multiple Items)EA (All)Doc Year 2017
3 Administrative Login To Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2017.htmFUND NAME YEAR EA5 Project Desciption FTIP Amend# Doc TOTAL COST
SHOPPAC 2016/17 28660 Route 001: In Long Beach, Signal Hill And Lakewood On Various Routes At Various Locations. Mitigate For Stormwater Quality By Installing Bio-Filtration Swales, Basins, Media Filters And Gross Solid Removal Devices, And Other Best Management Practices (Bm
17-01 16H-002 15887
28670 Route 001: In The Cities Of Los Angeles, Long Beach, Signal Hill, Lakewood, Carson, And Hawthorn On Various Routes At Various Loaction. Mitigate For Stormwater Quality By Using Best Management Practices (Bmp'S).
17-01 16H-003 29906
28990 Route 019: In Lakewood, Bellflower, Paramount And Downey, From Del Amo Boulevard To Gardendale Street. Upgrade Curb Ramps And Sidewalks To Americans With Disabilities Act (Ada) Standards.
17-01 16H-003 8111
29100 Route 014: In And Near Santa Clarita And Palmdale, From Sand Canyon Road Overcrossing To Avenue S Undercrossing. Upgrade Curb Ramps And Sidewalks To Americans With Disabilities Act (Ada) Standards.
17-01 2016 SHOPP 3003
29110 Route 101: In And Near Calabasas, Agoura Hills And West Lake Village, From Las Virgenes Road To Lindero Canyon Road; Also In And Near The Cities Of Camarillo, Oxnard, And Ventura From Pleasant Valley Road To Padre Juan Canyon Road. Upgrade To Ada Standar
17-01 16H-003 4231
29120 Route 057: In San Dimas And Glendora From Route 10 To Route 210, Also On Route 60 In And Near The Cities Of Los Angeles, Monterey Park, And Montebello. Construct Americans With Disabilities Act (Ada) Curb Ramp Improvements.
17-01 16H-002 5117
30040 Route 101: In The Cities Of Los Angeles And Calabasas, At Various Locations From Alameda Street To Mureau Road. Mitgate For Stormwater Quality By Installing Best Management Practices (Bmp'S) And Stabilizing Soil Erosion.
17-00 2016 SHOPP 32950
2016/17 Total 99205
2017/18 31230 Route 014: In And Near Santa Clarita, From North Of Sierra Highway To South Of Soledad Canyon Road, At Various Locations. Install Storm Water Mitigation Devices.
17-01 16H-003 19985
31250 Route 005: Near Gorman, From Route 138 To South Of Frazier Mountain Park Road, At Various Locations. Install Storm Water Mitigation Devices. 17-01 16H-003 15988
31260 Route 005: Near Gorman, From North Of Vista Del Lago Road To Route 138, At Various Locations. Construct Storm Water Mitigation Devices. 17-01 16H-003 12056
31280 Route 014: Near Santa Clarita And Palmdale At Various Locations, From South Of Soledad Canyon Road To South Of Mountain Spring Road. Install Storm Water Mitigation Devices.
17-01 16H-003 12698
2017/18 Total 60727
2018/19 23830 Route 110: In The City Of Los Angeles, From 120Th Street To 3Rd Street At Various Locations. Construct Gross Solid Removal Devices, Biofiltration Devices, And Detention Basin.
17-01 2016 SHOPP 15869
25940 Route 210: Near Sylmar, San Fernando And Sunland, From Route 5 To Wheatland Avenue. Construct Storm Water Treatment Best Management Practices To Reduce Trash Total Maximum Daily Load (Tmdl).
17-01 2016 SHOPP 20406
27610 Route 110: In The Cities Of Los Angeles And Carson, From L Street To 223Rd Street. Construct Storm Water Treatment Best Management Practices. 17-01 2016 SHOPP 14355
30440 Route 710: In East Los Angeles, From Route 5 To North Of Floral Drive; Also On Route 60 (Pm R2.9/R3.8), From West Of Marina Avenue Pedestrian Overcrossing To Mednick Avenue. Stabilize Soil And Erosion Control.
17-01 2016 SHOPP 4725
30490 Route 001: In Various Cities, From Calle Mayor To Ventura County Line; Also On Routes 23 And 27, At Various Locations. Construct Storm Water Treatment Best Management Practices.
17-01 2016 SHOPP 8808
30650 Route 066: In La Verne And Pomona, From Baseline Road To Towne Avenue. Construct And Upgrade Curb Ramps And Sidewalks To Comply With Ada Standards.
17-06 16H-007 6033
FTIP ID: LALS07 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Safety Improvements - Shopp Mandates Program. Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 And 3 Categories.
FTIP project listing.xlsm: D7 FTIP SUMMARY Page 1 of 3 Printed: 2/16/2017: 4:56 PM
A17-06 LA-LALS07_SI_SHOPP
DISTRICT 7 - 2017 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 17-06 with federal approval date = ACTIVE) [PROJECT LISTING]
FTIP ID # ^LALS07County (All)STATUS (Multiple Items)EA (All)Doc Year 2017
3 Administrative Login To Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2017.htmFUND NAME YEAR EA5 Project Desciption FTIP Amend# Doc TOTAL COST
FTIP ID: LALS07 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Safety Improvements - Shopp Mandates Program. Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 And 3 Categories.
SHOPPAC 2018/19 30660 Route 213: In The Cities Of Rancho Palos Verdes, Lomita And Los Angeles, From W 25Th Street To W Carson Street At Various Locations. Upgrade Curb Ramps, Sidewalks And Driveways To Meet Ada Standards. (G13 Contingency Project)
17-01 2016 SHOPP 976
30700 Route 107: In Torrance, From Route 1 To Redondo Beach Boulevard. Construct Curb Ramps And Reconstruct Driveways/Sidewalks To Meet Ada Standards. (G13 Contingency Project)
17-01 2016 SHOPP 717
31140 Route 101: In The City Of Los Angeles, From Beaudry Avenue To Hollywood Boulevard. Stabilize Soil And Erosion Control. 17-01 2016 SHOPP 487431740 Route 105: In Willowbrook And Lynwood, From Main Street To Mona Boulevard. Storm Water Mitigation Including Planting Of Vegetation And The
Installation Of Irrigation Systems. (G13 Contingency Project)17-01 2016 SHOPP 675
2018/19 Total 77438
2019/20 26080 Route 010: In The Cities Of Los Angeles, Alhambra, El Monte, Monterey Park And Rosemead, From Central Avenue To Cogswell Road; Also On Route 405 From Cherry Avenue To South Alameda Street (Pm 4.8/8.5). Construct Storm Water Treatment Best Management Prac
17-01 2016 SHOPP 32800
28830 Route 002: In Los Angeles County In Various Cities On Routes 60, 66, 164 And 210 At Various Locations. Construct And Install Storm Water TreatmentBest Management Practices.
17-01 2016 SHOPP 8866
30170 Route 210: In The Cities Of Monrovia, Duarte, Irwindale And Azusa, From Myrtle Avenue To Azusa Avenue. Stabilize Soil And Erosion Control. 17-01 2016 SHOPP 4724
31160 Route 134: In And Near Burbank, From Bob Hope Drive To Victory Boulevard/Riverside Drive. Stabilize Soil And Erosion Control. 17-01 2016 SHOPP 313431770 Route 001: In Los Angeles And Ventura Counties, On Various Routes, At Various Locations. Stabilize Soil And Erosion Control. 17-01 2016 SHOPP 2301
2019/20 Total 51825
2020/21 30660 Route 213: In The Cities Of Rancho Palos Verdes, Lomita And Los Angeles, From W 25Th Street To W Carson Street At Various Locations. Upgrade Curb Ramps, Sidewalks And Driveways To Meet Ada Standards. (G13 Contingency Project)
17-01 2016 SHOPP 4744
30700 Route 107: In Torrance, From Route 1 To Redondo Beach Boulevard. Construct Curb Ramps And Reconstruct Driveways/Sidewalks To Meet Ada Standards. (G13 Contingency Project)
17-01 2016 SHOPP 5029
31740 Route 105: In Willowbrook And Lynwood, From Main Street To Mona Boulevard. Storm Water Mitigation Including Planting Of Vegetation And The Installation Of Irrigation Systems. (G13 Contingency Project)
17-01 2016 SHOPP 3046
2020/21 Total 12819
SHOPPAC Total 302014
SHOPPAC-P 2016/17 28150 Route 101: Near Hidden Hills, From Calabasas Parkway In Los Angeles County To Hampshire Road In Ventura County. Storm Water Mitigation Through Erosion Control.
17-00 PM 53802
28820 Route 060 (Pm 0.1/3.5) & Route 005 (Pm 16.0/16.8): In Los Angeles County, In City Of Los Angeles On Route 5 Between Boyle Avenue Overcrossing To Euclid Avenue And On Route 60 Between Route 10 And Eastern Avenue Overcrossing - Storm Water Mitigation Throu
17-01 PCR 3027
28920 Route 710: In Various Cities, From North Of Rosecrans Avenue To Ford Boulevard Ramps. Storm Water Mitigation Through Erosion Control. 17-00 (blank) 5385
29080 Route 001: In Los Angeles And Long Beach, From E. Anaheim Street To Vermont Avenue. Upgrade Pedestrian Facilities. 17-00 (blank) 8800
FTIP project listing.xlsm: D7 FTIP SUMMARY Page 2 of 3 Printed: 2/16/2017: 4:56 PM
A17-06 LA-LALS07_SI_SHOPP
DISTRICT 7 - 2017 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 17-06 with federal approval date = ACTIVE) [PROJECT LISTING]
FTIP ID # ^LALS07County (All)STATUS (Multiple Items)EA (All)Doc Year 2017
3 Administrative Login To Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2017.htmFUND NAME YEAR EA5 Project Desciption FTIP Amend# Doc TOTAL COST
FTIP ID: LALS07 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Safety Improvements - Shopp Mandates Program. Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 And 3 Categories.
SHOPPAC-P 2016/17 30030 Route 057: In Diamond Bar, From Diamond Bar Boulevard To State Street; Also, On Route 210 In Irwindale, Azusa, And Glendora, From Irwindale Avenue To Route 57. Soil Stabilization At Bridge Abututment Slopes.
17-00 14H-414 2222
2016/17 Total 73236
SHOPPAC-P Total 73236
Grand Total 375250
FTIP project listing.xlsm: D7 FTIP SUMMARY Page 3 of 3 Printed: 2/16/2017: 4:56 PM
A17-06 LA-LALS07_SI_SHOPP
DISTRICT 7 - 2017 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 17-06 with federal approval date = ACTIVE) [PROJECT LISTING]
FTIP ID # ^LALS08County (All)STATUS (Multiple Items)EA (All)Doc Year 2017
3 Administrative Login To Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2017.htmFUND NAME YEAR EA5 Project Desciption FTIP Amend# Doc TOTAL COST
SHOPPAC 2016/17 1XA20 Route 014: In And Near Santa Clarita, From Lost Canyon Road Undercrossing To Spring Canyon Road Undercrossing. Remove Fire Debris And Sediment, Reconstruct Barrier Railing And Install Erosion Control Measures.
17-06 16H-007 1430
2016/17 Total 1430
2017/18 32610 Route 047: In San Pedro, At The Park And Ride Lot, Near The Eastbound Harbor Boulevard Off-Ramp. Construct Solder Pile Wall To Stabilize The Existing Eroding Slope And Repair Drainage System.
17-01 16H-002 2148
33340 Route 001: In Malibu, From Sea Vista Drive To Via Escondido Drive. Construct Tie Back Anchor System And Micro/Sheet Piles On Southbound Side Of Highway And Shoring Wall With Tie Backs On Northbound Side Of Highway To Prevent Further Landslide Distress A
17-06 16H-007 1979
2017/18 Total 4127
SHOPPAC Total 5557
SHOPPAC-P 2016/17 3X450 Route 001: In Malibu, 1 Mile North Of Topanga Canyon Road. Reconstruct Roadway Embankment, Shoulder And Repair Failed Drainage System. 17-01 PM 5040
3X870 Route 405: Near Hawthorne And Los Angeles Airport, At The Northbound Connector With Route 105. Reconstruct Distressed Pavement And Embankment.
17-00 14H-473 20056
31660 Route 001: In The City Of Malibu From Pena Canyon Bridge To 0.3 Mile North Of Pena Canyon Bridge. Reconstruct Roadway Embankment, Shoulder And Repair Failed Drainage System.
17-00 (blank) 21230
2016/17 Total 46326
SHOPPAC-P Total 46326
Grand Total 51883
FTIP ID: LALS08 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Emergency Repair - Shopp Emergency Response Program. Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 Categories - Repair Damage Caused By Natural Disasters, Civil Unrest, Or Terrorist Acts. This Applies To Damages That Do Not Qualify For Federal Emergency Relief Funds Or To Damages That Qualify For Federal Emergency Relief Funds But Extend Beyond The Federally Declared Disaster Period.
FTIP project listing.xlsm: D7 FTIP SUMMARY Page 1 of 1 Printed: 2/24/2017: 4:25 PM
A17-06 LA-LALS08_ER_SHOPP
LEAD AGENCY PROJECT PROJECT DESCRIPTION FUNDING DETAILS CHANGE REASON
Various Agencies
ORA150104 GROUPED PROJECTS FOR BICYCLE AND PEDESTRIAN FACILITIES - PROJECTS CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEOGRIES - BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON-MOTORIZED). (REGIONAL ATP FUNDED) Toll Credit for ATP-MPO.
COST INCREASE:Increase FundingCITY:▬ Delete funds in 14/15 in ENG for $60+ Increase funds in 14/15 in CON from $1,054 to $1,114▬ Delete funds in 15/16 in ENG for $6▬ Delete funds in 15/16 in ROW for $11► Add funds in 15/16 in CON for $17▬ Delete funds in 16/17 in ENG for $61▬ Delete funds in 16/17 in ROW for $61+ Increase funds in 16/17 in CON from $45 to $167► Add funds in 19/20 in CON for $70ATP-MPO:▬ Delete funds in 14/15 in ENG for $703+ Increase funds in 14/15 in CON from $160 to $863▬ Delete funds in 15/16 in ENG for $44▬ Delete funds in 15/16 in ROW for $89+ Increase funds in 15/16 in CON from $1,419 to $1,552▬ Delete funds in 16/17 in ENG for $865▬ Delete funds in 16/17 in ROW for $466+ Increase funds in 16/17 in CON from $419 to $1,750▬ Delete funds in 17/18 in ENG for $155▬ Delete funds in 17/18 in ROW for $20+ Increase funds in 17/18 in CON from $769 to $944► Add funds in 19/20 in CON for $226
Total programmed increased from $9,222 to $9,518
Added Fountain Valley project per OCTA January 2017 Board item.
Project qualifies foradministrative modification per item ii. Revise the funding amount listed for aproject limited to the lesserof 40% or $10 million.
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMOrange County Transportation Authority
Amendment #17-06
(in $000’s)Local Hwy
March, 2017
LEAD AGENCY PROJECT PROJECT DESCRIPTION FUNDING DETAILS CHANGE REASON
Orange County Transportation Authority (OCTA)
ORA081623 Fullerton Transportation Center - initial planning and conceptual engineering of the expansion for the Fullerton Transportation Center.
COST DECREASE:Decrease Funding5307-TR:- Decrease funds in 16/17 in ENG from $775 to $671
Total programmed decreased from $875 to $771
Moved $104K to Central Harbor Blvd (ORA170004) per OCTA October 2016 Board item.
Project qualifies foradministrative modification per item iv: cost decrease has no cap as long as reduction in cost does not result in deletion of a project or phase and project is fully funded.
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMOrange County Transportation Authority
Amendment #17-06
(in $000’s)Transit
March, 2017
2017 Federal Transportation Improvement Program
Administrative Modification #17-06Orange County
Project Listing Report(In $000`s)
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentORA150104 Orange SCAB REG0701 NCN25 L EXEMPT - 93.126 6
Description: PTC 9,518 Agency VARIOUS AGENCIES
GROUPED PROJECTS FOR BICYCLE AND PEDESTRIAN FACILITIES - PROJECTS CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEOGRIES - BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON-MOTORIZED). (REGIONAL ATP FUNDED) Toll Credit for ATP-MPO.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 1,426 1,426 1,131 167 8 50 70 1,426ACTIVE TRANSPORTATION PROGRAM - MPO
8,092 8,092 2,415 1,750 944 2,757 226 8,092
ORA150104 Total 9,518 9,518 3,546 1,917 952 2,807 296 9,518
ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentORA081623 Orange SCAB 2TR0704 PLN40 T EXEMPT - 93.126 6
Description: PTC 771 Agency ORANGE COUNTY TRANS AUTHORITY (OCTA)
Fullerton Transportation Center - initial planning and conceptual engineering of the expansion for the Fullerton Transportation Center.
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total5307-TR FTA 5307 (FHWA TRANSFER FUNDS)
671 671 671 671
ORANGE M - TRANSIT 100 100 100 100ORA081623 Total 771 771 771 771
Grand Total 771 9,518 10,289 3,546 2,688 952 2,807 296 10,289
Print Date: 3/13/2017 10:38:26 AM Page: 1 of 1
REGIONAL MPO ATP PROJECTSORA150104
Regional MPO ATP Projects ‐ ORA150104
ID Co Agency Project Title Fund Source Total 14‐15 15‐16 16‐17 17‐18 18‐19 19‐20 RW CON PAED PSE RW CON PAED PSE RW CON PAED PSE RW CON PAED PSE RW CON PAED PSE RW CON PAED PSE NotesDistance (Miles)
0761 ORA Santa Ana Maple Bicycle Trail Safety Enhancements Total 1,101 82 1,019 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 82 ‐ 1,019 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Trail Improvements, ramps, and cut outs 0Federal ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐ State Only FundedState ATP 1,101 82 1,019 ‐ ‐ ‐ ‐ 82 1,019Agency ‐ ‐ ‐ ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐
0728 ORA Laguna Hills La Paz Sidewalk Widening Total 540 ‐ 150 390 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 100 ‐ ‐ 50 ‐ 390 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sidewalk Construction 0.227Federal ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐ State Only FundedState ATP 478 ‐ 133 345 ‐ ‐ ‐ 89 44 345Agency 62 ‐ 17 45 ‐ ‐ ‐ 11 6 45CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐
0745 ORA Orange Co County Bicycle Loop, Segments F and H Total 525 525 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 525 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Preconstruction 0Federal ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐ State Only FundedState ATP 465 465 ‐ ‐ ‐ ‐ ‐ 465 Agency 60 60 ‐ ‐ ‐ ‐ ‐ 60 CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐
0753 ORA Santa Ana Monte Vista Elementary SRTS Enhancements Total 430 30 400 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 30 ‐ 400 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Intersection Improvements 0Federal ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐ State Only FundedState ATP 430 30 400 ‐ ‐ ‐ ‐ 30 400Agency ‐ ‐ ‐ ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐
0743 ORA Orange Co Bicycle Loop ‐ Segment D Total ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Preconstruction ‐ Federal ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐ State Only FundedState ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐Agency ‐ ‐ ‐ ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐
0720 ORA Garden Grove Harbor & Twintree HAWK Total 160 160 ‐ ‐ ‐ ‐ ‐ ‐ 160 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Crossings 0Federal ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐ State Only FundedState ATP 160 160 ‐ ‐ ‐ ‐ ‐ 160Agency ‐ ‐ ‐ ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐
0747 ORA San Clemente Concordia School Ped/Bike Improv. Total 1,180 1,180 ‐ ‐ ‐ ‐ ‐ ‐ 1,054 32 94 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Intersection Improvements 0Federal ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐ State Only FundedState ATP 126 126 ‐ ‐ ‐ ‐ ‐ 32 94Agency 1,054 1,054 ‐ ‐ ‐ ‐ ‐ 1,054CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐Local ‐ ‐ ‐ ‐ ‐ ‐ ‐
ORA La Habra La Habra Union Pacific Rail Line Bikeway Easement from Beach Boulevard to Guadalupe Park Total 527 ‐ ‐ 527 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 527 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Right of way purchase for Class I 0.5 Federal ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐ State Only FundedState ATP 466 ‐ ‐ 466 ‐ ‐ ‐ 466Agency ‐ ‐ ‐ ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐Local 61 ‐ ‐ 61 ‐ ‐ ‐ 61
ORA Garden Grove First Mile Bicycle and Pedestrian Trail Expansion on the PE ROW and Education/Encouragement Activities Total 1,941 ‐ ‐ 399 20 1,522 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 74 175 150 20 ‐ ‐ ‐ ‐ 1,522 ‐ ‐ ‐ ‐ ‐ ‐ Class I and Encouragement 0.7Federal ATP 1,891 ‐ ‐ 399 20 1,472 ‐ 74 175 150 20 1,472 Federally FundedState ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐Agency ‐ ‐ ‐ ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐Local 50 ‐ ‐ ‐ ‐ 50 ‐ 50
ORA La Habra Guadalupe Park Reconstruction Project Total 400 ‐ ‐ 400 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 290 110 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Design Only 0.5Federal ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐ State Only FundedState ATP 340 ‐ ‐ 340 ‐ ‐ ‐ 290 50Agency ‐ ‐ ‐ ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐Local 60 ‐ ‐ 60 ‐ ‐ ‐ 60
ORA San Clemente Shorecliffs Middle School Safe Routes to School Pedestrian Improvement Project Total 878 ‐ ‐ 101 777 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 101 ‐ 777 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bulb outs and crossings. SRTS ‐ Federal ATP 869 ‐ ‐ 100 769 ‐ ‐ 100 769 State Only FundedState ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐Agency ‐ ‐ ‐ ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐Local 9 ‐ ‐ 1 8 ‐ ‐ 1 8
ORA Santa Ana Safe Routes to Schools Enhancements for Sepulveda Elementary Total 310 ‐ ‐ 20 35 255 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 20 ‐ ‐ ‐ ‐ 35 ‐ 255 ‐ ‐ ‐ ‐ ‐ ‐ Bulb Outs and crossings. SRTS 0Federal ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐ State Only FundedState ATP 310 ‐ ‐ 20 35 255 ‐ 20 35 255Agency ‐ ‐ ‐ ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐Local ‐ ‐ ‐ ‐ ‐ ‐ ‐
ORA Santa Ana Lincoln Pedestrian Pathway Connectivity Total 1,230 ‐ ‐ 80 120 1,030 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 80 ‐ ‐ ‐ 120 ‐ ‐ 1,030 ‐ ‐ ‐ ‐ ‐ ‐ Pededstrian pathway between Park Ave 0.18Federal ATP 1,230 ‐ ‐ 80 120 1,030 ‐ 80 120 1,030 State Only FundedState ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐
GROUPED PROJECTS FOR BICYCLE AND PEDESTRIAN FACILITIES ‐ PROJECTS CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEOGRIES ‐ BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON‐MOTORIZED). (REGIONAL ATP FUNDED) Toll Credit for ATP‐MPO.
FY19‐20FY18‐19FY14‐15 FY15‐16 FY17‐18FY16‐17
#17-06 ORA ORA150104_REG_ATP
REGIONAL MPO ATP PROJECTSORA150104
Agency ‐ ‐ ‐ ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐Local ‐ ‐ ‐ ‐ ‐ ‐ ‐
ORA Fountain Valley Fountain Valley Pedestrian Pathway Improvement within School Zones Total 296 ‐ ‐ ‐ ‐ ‐ 296 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 296 ‐ ‐ Construct 85 curb ramps on sidewalks ‐ Federal ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐State ATP 226 ‐ ‐ ‐ ‐ ‐ 226 226 Agency ‐ ‐ ‐ ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐Local 70 ‐ ‐ ‐ ‐ ‐ 70 70
Total ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Federal ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐State ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐Agency ‐ ‐ ‐ ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐Local ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Federal ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐State ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐Agency ‐ ‐ ‐ ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐Local ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Federal ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐State ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐Agency ‐ ‐ ‐ ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐Local ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Federal ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐State ATP ‐ ‐ ‐ ‐ ‐ ‐ ‐Agency ‐ ‐ ‐ ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐Local ‐ ‐ ‐ ‐ ‐ ‐ ‐
Programming TotalsFund Source Total 14‐15 15‐16 16‐17 17‐18 18‐19 19‐20 RW CON PAED PSE RW CON PAED PSE RW CON PAED PSE RW CON PAED PSE RW CON PAED PSE RW CON PAED PSE
Federal ATP 3,990 ‐ ‐ 579 909 2,502 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 74 255 250 20 769 120 ‐ ‐ 2,502 ‐ ‐ ‐ ‐ ‐ ‐ State ATP 4,102 863 1,552 1,171 35 255 226 ‐ 160 497 206 89 1,419 ‐ 44 466 345 310 50 ‐ ‐ ‐ 35 ‐ 255 ‐ ‐ ‐ 226 ‐ ‐ Agency 1,176 1,114 17 45 ‐ ‐ ‐ ‐ 1,054 60 ‐ 11 ‐ ‐ 6 ‐ 45 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Local 250 ‐ ‐ 122 8 50 70 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 61 ‐ ‐ 61 ‐ 8 ‐ ‐ ‐ 50 ‐ ‐ ‐ 70 ‐ ‐ Total 9,518 1,977 1,569 1,917 952 2,807 296 ‐ 1,214 557 206 100 1,419 ‐ 50 527 464 565 361 20 777 120 35 ‐ 2,807 ‐ ‐ ‐ 296 ‐ ‐
FY19‐20FY18‐19FY14‐15 FY15‐16 FY17‐18FY16‐17
#17-06 ORA ORA150104_REG_ATP
Agency Project ID Title Changes Requested Amendment Reason
CALTRANS RIVLS10
GROUPED PROJECTS FOR SAFETY IMPROVEMENTS - SHOPP MOBILITY PROGRAM: PROJECTS ARE CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2&3 - RR/HWY CROSSING, SAFER NON-FED-AID SYSTEM RDS, SHOULDR IMPRVMNTS, TRAFFIC CNTRL DEVICES/OPERATING ASSIST OTHER THAN SIGNALS, INTERSCTN SIGNAL PRJCTS AT INDVL INTERSCTNS, PVMNT MARKING DEMO, TCL OUTSIDE THE UA, LIGHTING IMPRVMNTS, EMERGENCY TRUCK PULLOVERS
Cost DecreaseProject Details:- Change Total Project Cost from $9,652 to $8,711Funding Details:- SHOPP-AC fund adjustments: -- Decrease SHOPP-AC FY 2018/19 Con cost from $6,398 to $5,457 -- Total SHOPP-AC decreases from $9,652 to $8,711Total amount programmed decreases from $9,652 to $8,711
Cost Decrease per SHOPP Listing of February 2017. Revision applicable per Administrative Modification category iv. A cost decrease has no cap as long as reduction in cost does not result in deletion of a project or a phase, and the affected project phase is still fully funded.
CALTRANS RIVLS12
GROUPED PROJECTS FOR EMERGENCY REPAIR - SHOPP EMERGENCY RESPONSE PROGRAM: PROJECTS ARE CONSISTENT W/40 CFR PART 93.126 EXEMPT TABLE 2 - REPAIR DAMAGE CAUSED BY NATURAL DISASTERS, CIVIL UNREST, OR TERRORIST ACTS. APPLIES TO DAMAGES THAT DO NOT QUALIFY FOR FED EMERGENCY RELIEF FUNDS OR TO DAMAGES THAT QUALIFY FOR FED EMERGENCY RELIEF FUNDS BUT EXTEND BEYOND THE FEDERALLY DECLARED DISASTER PERIOD.
Cost IncreaseProject Details:- Change Total Project Cost from $13,122 to $13,832Funding Details:- SHOPP-AC fund adjustments: -- Add SHOPP-AC FY 2016/17 Con cost of $710 -- Total SHOPP-AC increases from $13,122 to $13,832Total amount programmed increases from $13,122 to $13,832
Cost Increase per SHOPP Listing of February 2017
Revision applicable per Administrative Modification category ii. Revise the funding amount listed for a project or a project phase. Additional funding is limited to the lesser of 40 percent of the total project cost or $10 million. Programming capacity must be available in the FSTIP/FTIP prior to programming modification and must be stated in the supporting documentation
State Highway System
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMRiverside County Transportation Commission
2017 FTIP Update - Administrative Modification No. 6March 2017
(in $000’s)
A6 - Riv Co Narrative 2-28-17.xlsx 3/7/2017 - 1:39 PM Page 1 of 1
2017 Federal Transportation Improvement Program
Administrative Modification #17-06Riverside County
Project Listing Report(in $000`s)
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentRIVLS10 Riverside SCAB 3GR104 SHP04 999 S EXEMPT - 93.126 6
Description: PTC 8,711 Agency CALTRANS
GROUPED PROJECTS FOR SAFETY IMPROVEMENTS - SHOPP MOBILITY PROGRAM: PROJECTS ARE CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2&3 - RR/HWY CROSSING, SAFER NON-FED-AID SYSTEM RDS, SHOULDR IMPRVMNTS, TRAFFIC CNTRL DEVICES/OPERATING ASSIST OTHER THAN SIGNALS, INTERSCTN SIGNAL PRJCTS AT INDVL INTERSCTNS, PVMNT MARKING DEMO, TCL OUTSIDE THE UA, LIGHTING IMPRVMNTS, EMERGENCY TRUCK PULLOVERSFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSHOPP - ADVANCE CONSTRUCTION
8,711 8,711 3,254 5,457 8,711
RIVLS10 Total 8,711 8,711 3,254 5,457 8,711
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentRIVLS12 Riverside SCAB REG0701 SHP03 999 S EXEMPT - 93.126 6
Description: PTC 13,832 Agency CALTRANS
GROUPED PROJECTS FOR EMERGENCY REPAIR - SHOPP EMERGENCY RESPONSE PROGRAM: PROJECTS ARE CONSISTENT W/40 CFR PART 93.126 EXEMPT TABLE 2 - REPAIR DAMAGE CAUSED BY NATURAL DISASTERS, CIVIL UNREST, OR TERRORIST ACTS. APPLIES TO DAMAGES THAT DO NOT QUALIFY FOR FED EMERGENCY RELIEF FUNDS OR TO DAMAGES THAT QUALIFY FOR FED EMERGENCY RELIEF FUNDS BUT EXTEND BEYOND THE FEDERALLY DECLARED DISASTER PERIOD.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSHOPP - ADVANCE CONSTRUCTION
13,832 13,832 710 13,122 13,832
RIVLS12 Total 13,832 13,832 710 13,122 13,832Grand Total 22,543 22,543 3,964 5,457 13,122 22,543
Print Date: 3/7/2017 1:42:27 PM Page: 1 of 1
Page 1 of 2
Agency County District EA Notes Project Description
Program Year
(Federal FY) Federal FundsState
FundsTotal Project
Cost
Caltrans Riverside 1C640
Update: 2016 SHOPP
Amendment #16H-000 CTC
approved 3/18/16
In and near the city of Riverside, on Route 60 from Milliken Avenue to Routes 60/91/215 Junction; also on Route 91 from Spruce Street to Routes 60/91/215 Junction. Replace transportation wireless communication system with fiber optic infrastructure.
2016/17 3,254$ -$ 3,254$
FY 2016-2017 100% SHOPP AC funded Sub-total Subtotal 3,254$ -$ 3,254$
Caltrans Riverside 1G190
Delete/Split: SHOPP
Amendment 16H-007
approved by CTC October 19-
20, 2016. See Split Eas 1G192 and SBD 1G191.
New: 2016 SHOPP
Amendment #16H-000 CTC
approved 3/18/16
On SR-91 in the cities of Corona and Riverside, from Route 15 to Adams Street; also in Upland and Rancho Cucamonga on Route 210 from Los Angeles County line to east of Etiwanda Avenue. HOV lane operational improvement.
2018/19 -$ $ - -$
Caltrans Riverside 1G192
New/Split from 1G190: SHOPP
Amendment 16H-007
approved by CTC October 19-20, 2016. Also see SBd 1G191
for split.
On SR-91 in the cities from Corona and Riverside, from Route 15/91 separator to Adams Street overcrossing. Convert existing limited access HOV lanes to continuous access HOV lanes to allow safer ingress and egress movements for HOV.
2018/19 774$ -$ 774$
RIVLS10 Exempt Grouped Projects for Safety ImprovementsSHOPP Mobility Program
2017 FTIP Administrative Modification #17-6
#17-06 RIV RIVLS10 SHOPP - Mobility
Page 2 of 2
Caltrans Riverside 1F920
Update: 2016 SHOPP
Amendment #16H-000 CTC
approved 3/18/16. Moved from RIVLS08
per HQ SHOPP list 7/27/16
On I-10 in the cities of Calimesa and Beaumont, from Cherry Valley Boulevard to 14th Street/San Timeteo Canyon Road; also on Routes 60 and 86 at various locations. Install Changeable Message Signs.
2018/19 $4,683 $ - $4,683
FY 2018-2019 100% SHOPP AC funded Sub-total Subtotal 5,457$ -$ 5,457$
Total 100% SHOPP AC funded 8,711$ -$ 8,711$
2017 FTIP Administrative Modification #17-6: Delete/Split: 1G190 into New/Split: 1G192.
#17-06 RIV RIVLS10 SHOPP - Mobility
Agency County District EA Notes Project Description
Program Year (FFY)
Federal Funds
State Funds
Total Project Cost
Caltrans Riverside 1H310
New: SHOPP Amendment
#16H-007 approved by
CTC October 19-20, 2016
On I-15 in Temecula, from 1.1 miles north of Truck Inspection Station to Temecula River Bridge. Remove fire damaged trees, reconstruct barrier railing and install erosion control measures.
2016/17 $ 710 $0 $ 710
FY 2016-2017 100% SHOPP AC funded Total
Subtotal 710$ -$ 710$
Caltrans Riverside 1G000
New: SHOPP Amendment 16H-002 approved by CTC June 29-30,
2016
US-95 near Blythe, from north of Palo Verde Dam Road to the San Bernardino County line. Restore storm eroded embankments with rock slope protection and replace culverts. A previous Emergency Opening EA 08-1F800 repaired roadway.
2019/20 13,122$ -$ 13,122$
FY 2019-2020 100% SHOPP AC funded Total
Subtotal 13,122$ -$ 13,122$
TOTAL 100% SHOPP AC funded TOTAL 13,832$ -$ 13,832$ 2017 FTIP Administrative #17-6: New: 1H310 Kerrie Hudson, Caltrans District 8 FTIP Manager
RIVLS12 Exempt Grouped Projects for Emergency Repair-SHOPP Emergency Response Program
2017 FTIP Administrative Modification #17-6
#17-06 RIV RIVLS12 SHOPP - Emergency Response
Project Detail: Funding Detail:
FONTANA 201139 CASA GRANDE AVENUE FROM LYTLE CREEK
ROAD TO MANGO AVENUE CONSTRUCT 4
LANES
Cost Increase
Project Detail:
‐ Total Project Cost increased $964 from: $10,500 to: $11,464
Funding Detail:
‐ CITY fund adjustments:
‐‐ CITY FY1718 ENG cost increased $26 from: $218 to: $244
‐‐ CITY FY1819 ROW cost increased $130 from: $1,440 to: $1,570
‐‐ CITY FY1920 CON cost increased $153 from: $1,702 to: $1,855
‐‐ Total CITY funding increased from: $3,360 to: $3,669
‐ XSBD fund adjustments:
‐‐ XSBD FY1718 ENG cost increased $54 from: $462 to: $516
‐‐ XSBD FY1819 ROW cost increased $275 from: $3,060 to: $3,335
‐‐ XSBD FY1920 CON cost increased $326 from: $3,618 to: $3,944
‐‐ Total XSBD funding increased from: $7,140 to: $7,795
‐ Total amount programmed increased $964 from: $10,500 to:
$11,464
Cost increase per Fontana.
Project qualifies for an
administrative modification per
item ii, revise the funding
amount listed for a project
phase. Additional funding is
limited to 40 percent.
MONTCLAIR 20150001 BRIDGE NO. 54C0112, CENTRAL AVE OVER UP
RR AMTRAK METROLINK, 0.2 MI HOLT AVE.
BRIDGE REHABILITATION/WIDENING, 4‐6 LANE
BRIDGE WITH SIDEWALKS.
Cost Increase
Project Detail:
‐ Total Project Cost increased $1,440 from: $13,145 to:
$14,585
Funding Detail:
‐ EARREPU fund adjustments:
‐‐ Add EARREPU FY18/19 ENG cost of: $1,440
‐‐ Total EARREPU funding is: $1,440
‐ Total amount programmed increased $1,440 from: $13,145 to:
$14,585
Added EARREPU Funds in 18/19,
description updated to include
Toll Credits. Project qualifies for
an administrative modification
per item ii, revise the funding
amount listed for a project
phase. Additional funding is
limited to 40 percent.
SAN BERNARDINO
COUNTY
TRANSPORTATION
AUTHORITY
2011150 SOUTH COAST AIR BASIN RIDESHARE
PROGRAM (Ongoing)(Toll Credits are being
used as match for CMAQ in FY16/17 $310)
Cost Decrease
Project Detail:
‐ Lead Agency changed from: SANBAG to: SAN BERNARDINO
COUNTY TRANSPORTATION AUTHORITY
‐ Total Project Cost remains: $9,571
Funding Detail:
‐ Total amount programmed remains: $9,571
Change lead agency from
SANBAG to SBCTA. Project
qualifies for an administrative
modification per item vi, change
a project lead agency
SAN BERNARDINO
COUNTY
TRANSPORTATION
AUTHORITY
2011151 MOJAVE DESERT AIR BASIN RIDESHARE
PROGRAM(Toll credits are being used as match
for CMAQ in FY16/17 $138)
Fund Source Change
Project Detail:
‐ Lead Agency changed from: SANBAG to: SAN BERNARDINO
COUNTY TRANSPORTATION AUTHORITY
‐ Total Project Cost remains: $5,046
Funding Detail:
‐ Total amount programmed remains: $5,046
Change lead agency from
SANBAG to SBCTA. Project
qualifies for an administrative
modification per item vi, change
a project lead agency
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM
San Bernardino County Transportation Authority
Amendment No. 06
March 2017
(in $000's)
LOCAL
Lead Agency RTIP TitleChanges Requested
Updated Reason
Project Detail: Funding Detail:
SAN BERNARDINO
COUNTY
TRANSPORTATION
AUTHORITY
20159906 I‐10/MONTE VISTA AVE IMPROVEMENTS:
UNDERCROSSING WIDENING 4‐6 LNS AND
RAMP IMPROVEMENTS
Lead Agency Change
Project Detail:
‐ Lead Agency changed from: SANBAG to: SAN BERNARDINO
COUNTY TRANSPORTATION AUTHORITY
‐ Total Project Cost remains: $36,730
Funding Detail:
‐ Total amount programmed remains: $36,730
Change lead agency from
SANBAG to SBCTA. Project
qualifies for an administrative
modification per item vi, change
a project lead agency
SAN BERNARDINO
COUNTY
TRANSPORTATION
AUTHORITY
Rte. 10
PM Limits
31.02 to 31.92
20131504 I‐10 @ UNIVERSITY ST INTERCHANGE:
INTERSECTION IMPROVEMENTS WITH ON/OFF
RAMP WIDENING. (No capacity
enhancements)
Lead Agency Change
Project Detail:
‐ Lead Agency changed from: SANBAG to: SAN BERNARDINO
COUNTY TRANSPORTATION AUTHORITY
‐ Total Project Cost remains: $5,100
Funding Detail:
‐ Total amount programmed remains: $5,100
Change lead agency from
SANBAG to SBCTA. Project
qualifies for an administrative
modification per item vi, change
a project lead agency
CALTRANS
Rte. 15
PM Limits
42.5 to 46
35556 IN THE CITY OF VICTORVILLE FROM 0.5 MILES
NORTH OF MOJAVE DRIVE TO 1.5 NORTH OF
EXISTING STODDARD WELLS ROAD
OVERCROSSING. RECONSTRUCT
D/E/STODDARD WELLS RD ICs. WIDEN
BRIDGES (NO NEW LANES). CONSTRUCT NEW
COLLECTOR DISTRIBUTOR RD OVER D/E/AND
BNSF RR TO PARRALLEL I‐15 NB INCLUDES ITS
OWN BRIDGE. RECONST/REALIGN EAST/WEST
FRONTAGE RDS. CONST NEW AUX LN. (REFER
TO MODELING DETAILS)(CA061)
Cost Increase
Project Detail:
‐ Total Project Cost increased $3,062 from: $119,325 to:
$122,387
Funding Detail:
‐ DEMOT21 fund adjustments:
‐‐ Delete DEMOT21 Prior CON cost of: $1,000
‐‐ Total DEMOT21 funding decreases from: $1,000 to: $0
‐ PVT fund adjustments:
‐‐ Delete PVT Prior CON cost of: $760
‐‐ Total PVT funding decreases from: $760 to: $0
‐ STC‐IPPP fund adjustments:
‐‐ STC‐IPPP Prior ROW cost increased $3,416 from: $14,667 to:
$18,083
‐‐ Total STC‐IPPP funding increased from: $30,814 to: $34,230
‐ STC‐RIPP fund adjustments:
‐‐ STC‐RIPP Prior ROW cost increased $1,406 from: $3,607 to:
$5,013
‐‐ Total STC‐RIPP funding increased from: $3,607 to: $5,013
‐ Total amount programmed increased $3,062 from: $119,325 to:
$122,387
Cost increase, funds added to IPP
prior and RIP Prior. Project
qualifies for an administrative
modification per item ii, revise
the funding amount listed for a
project phase. Additional
funding is limited to 40 percent.
SAN BERNARDINO
COUNTY
TRANSPORTATION
AUTHORITY
Rte. 60
PM Limits
1.1 to 3.55
201114 WIDENING OF CENTRAL AVENUE BRIDGE
CROSSING SR‐60 TO ACCOMODATE WIDENING
OF RAMPS AND THE DESIGNATED FREEWAY
LANES.
Lead Agency Change
Project Detail:
‐ Lead Agency changed from: SANBAG to: SAN BERNARDINO
COUNTY TRANSPORTATION AUTHORITY
‐ Total Project Cost remains: $22,226
Funding Detail:
‐ Total amount programmed remains: $22,226
Change lead agency from
SANBAG to SBCTA. Project
qualifies for an administrative
modification per item vi, change
a project lead agency
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM
San Bernardino County Transportation Authority
Amendment No. 06
March 2017
(in $000's)
STATE
Lead Agency RTIP TitleChanges Requested
Updated Reason
Project Detail: Funding Detail:
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM
San Bernardino County Transportation Authority
Amendment No. 06
March 2017
(in $000's)
STATE
Lead Agency RTIP TitleChanges Requested
Updated Reason
SAN BERNARDINO
COUNTY
TRANSPORTATION
AUTHORITY
Rte. 60
PM Limits
7.65 to 8.14
201132 SR‐60 AT ARCHIBALD AVENUE; WIDEN WB
AND EB ENTRY RAMPS (ADD 1 LANE), WIDEN
WB AND EB EXIT RAMPS (ADD LEFT TURN
LANE), ADD ADDITIONAL LEFT TURN LANE
FROM ARCHIBALD AVE TO SR‐60 ENTRY
RAMPS. (non‐capacity enhancing along
Archibald).
Lead Agency Change
Project Detail:
‐ Lead Agency changed from: SANBAG to: SAN BERNARDINO
COUNTY TRANSPORTATION AUTHORITY
‐ Total Project Cost remains: $14,563
Funding Detail:
‐ Total amount programmed remains: $14,563
Change lead agency from
SANBAG to SBCTA. Project
qualifies for an administrative
modification per item vi, change
a project lead agency
SAN BERNARDINO
COUNTY
TRANSPORTATION
AUTHORITY
Rte. 210
PM Limits
25 to 33.2
20111625 SR210 LANE ADDITION ‐ ADD 1 MIXED FLOW
LANE IN EACH DIRECTION FROM HIGHLAND
AVE. TO SAN BERNARDINO AVE (REDLANDS)
INCLUDES AUX. LANES BETWEEN BASE LINE
AND 5TH STS AND AN ACCELERATION LANE AT
5TH ST. E/B ON RAMP AND DECELRATION
LANE AT HIGHLAND AVE E/B OFF RAMP
EXTENDING TO STERLING AVENUE (Under 1/4
miles length)
Cost Increase
Project Detail:
‐ Lead Agency changed from: SANBAG to: SAN BERNARDINO
COUNTY TRANSPORTATION AUTHORITY
‐ Total Project Cost remains: $144,061
Funding Detail:
‐ Total amount programmed remains: $144,061
Change lead agency from
SANBAG to SBCTA. Project
qualifies for an administrative
modification per item vi, change
a project lead agency
SAN BERNARDINO
COUNTY
TRANSPORTATION
AUTHORITY
Rte. 210
PM Limits
28.3 to 30.3
201186 AT SR‐210/BASE LINE IC:
RECONSTRUCT/WIDEN BASE LINE BETWEEN
CHURCH AVE AND BOULDER AVE FROM 4 TO 6
THROUGH LANES AND EXTEND LEFT TURN
LANES, WIDEN RAMPS – WB EXIT 1 TO 3
LANES, WB AND EB ENTRANCES 1 TO 3 LANES
INCLUDING HOV PREFERENTIAL LANES (EA
1C970)
Lead Agency Change
Project Detail:
‐ Lead Agency changed from: SANBAG to: SAN BERNARDINO
COUNTY TRANSPORTATION AUTHORITY
‐ Total Project Cost remains: $20,908
Funding Detail:
‐ Total amount programmed remains: $20,908
Change lead agency from
SANBAG to SBCTA. Project
qualifies for an administrative
modification per item vi, change
a project lead agency
CALTRANS
Rte. 395
PM Limits
19.3 to 48
34040 CONSTRUCT A 4‐LANE EXPRESSWAY FROM 1.8
MILES SOUTH OF DESERT FLOWER ROAD
(PM19.3) TO 0.5 MILES SOUTH OF
FARMINGTON ROAD (PM 48.0)
Cost Decrease
Project Detail:
‐ Total Project Cost decreased $366,637 from: $368,000 to:
$1,363
Funding Detail:
‐‐ Delete STIP‐AC FY21/22 CON cost of: $150,580
‐‐ Total STIP‐AC funding decreases from: $340,000 to: $0
‐‐ Add STP‐RIP Prior ENG cost of: $1,363
‐‐ Delete STP‐RIP FY16/17 ENG cost of: $20,000
‐‐ Total STP‐RIP funding decreased from: $20,000 to: $1,363
‐ Total amount programmed decreased $358,637 from: $360,000
to: $1,363
Funding decreased per Caltrans.
Project qualifies for an
administrative modification per
item iv, cost decrease that does
not result in deletion of a project
or phase.
Project Detail: Funding Detail:
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM
San Bernardino County Transportation Authority
Amendment No. 06
March 2017
(in $000's)
STATE
Lead Agency RTIP TitleChanges Requested
Updated Reason
SAN BERNARDINO
COUNTY
TRANSPORTATION
AUTHORITY
Rte. 999
PM Limits
0 to 0
SBD59303 ___SET ASIDES/RESERVATIONS FOR FUTURE
SB45 ‐PLANNING, PROGRAMMING, &
MONITORING
Lead Agency Change
Project Detail:
‐ Lead Agency changed from: SANBAG to: SAN BERNARDINO
COUNTY TRANSPORTATION AUTHORITY
‐ Total Project Cost remains: $3,810
Funding Detail:
‐ Total amount programmed remains: $3,810
Change lead agency from
SANBAG to SBCTA. Project
qualifies for an administrative
modification per item vi, change
a project lead agency
Project Detail: Funding Detail:
OMNITRANS 20020806 TRANSIT ‐ FACILITIES ‐ IMPROVEMENT/UPKEEP
OF EXISTING FACILITIES
Cost Increase
Project Detail:
‐ Total Project Cost increased $2,800 from: $13,653 to:
$16,453
Funding Detail:
‐ 5307LA fund adjustments:
‐‐ 5307LA FY1617 CON cost increased $1,308 from: $748 to: $2,056
‐‐ Total 5307LA funding increased from: $4,294 to: $5,602
‐ 5307RS fund adjustments:
‐‐ 5307RS FY1617 CON cost increased $1,192 from: $1,966 to:
$3,158
‐‐ Total 5307RS funding increased from: $4,124 to: $5,316
‐ PTMISEA fund adjustments:
‐‐ PTMISEA FY1617 CON cost increased $300 from: $300 to: $600
‐‐ Total PTMISEA funding increased from: $861 to: $1,161
‐ Total amount programmed increased $2,800 (21%) from: $13,653
to: $16,453
Added funding to 16/17
amounts. Project qualifies for an
administrative modification per
item ii, revise the funding
amount listed for a project
phase. Additional funding is
limited to 40 percent.
OMNITRANS 20040211 REPLACEMENT PARATRANSIT VEHICLES
REPLACING PARATRANSIT VEHICLES ON
OMNITRANS ACCESS FLEET;08‐50;2011‐
50;2013‐15;2014‐15 vehicles
Cost Increase
Project Detail:
‐ Total Project Cost increased $1,200 from: $13,521 to:
$14,721
Funding Detail:
‐ 5307LA fund adjustments:
‐‐ 5307LA FY1617 CON cost increased $440 from: $202 to: $642
‐‐ Total 5307LA funding increased from: $2,929 to: $3,369
‐ 5307RS fund adjustments:
‐‐ 5307RS FY1617 CON cost increased $440 from: $678 to: $1,118
‐‐ Total 5307RS funding increased from: $2,756 to: $3,196
‐ PTMISEA fund adjustments:
‐‐ PTMISEA FY1617 CON cost increased $320 from: $320 to: $640
‐‐ Total PTMISEA funding increased from: $1,510 to: $1,830
‐ Total amount programmed increased $1,200 (9%) from: $13,521
to: $14,721
Added funding to 16/17
amounts. Project qualifies for an
administrative modification per
item ii, revise the funding
amount listed for a project
phase. Additional funding is
limited to 40 percent.
OMNITRANS 20060601 CAPITALIZATION OF LEASES ‐ FOR
CONTRACTORS, RADIO SITES, APC, TIRE LEASES
Cost Increase
Project Detail:
‐ Total Project Cost increased $637 from: $6,029 to: $6,666
Funding Detail:
‐ 5307LA fund adjustments:
‐‐ 5307LA FY1617 CON cost increased $252 from: $122 to: $374
‐‐ Total 5307LA funding increased from: $1,077 to: $1,329
‐ 5307RS fund adjustments:
‐‐ 5307RS FY1617 CON cost increased $252 from: $408 to: $660
‐‐ Total 5307RS funding increased from: $965 to: $1,217
‐ STA fund adjustments:
‐‐ STA FY1617 CON cost increased $133 from: $140 to: $273
‐‐ Total STA funding increased from: $406 to: $539
‐ Total amount programmed increased $637 (11%) from: $6,029 to:
$6,666
Added funding to 16/17
amounts. Project qualifies for an
administrative modification per
item ii, revise the funding
amount listed for a project
phase. Additional funding is
limited to 40 percent.
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM
San Bernardino County Transportation Authority
Amendment No. 06
March 2017
(in $000's)
TRANSIT
Lead Agency RTIP TitleChanges Requested
Updated Reason
Project Detail: Funding Detail:
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM
San Bernardino County Transportation Authority
Amendment No. 06
March 2017
(in $000's)
TRANSIT
Lead Agency RTIP TitleChanges Requested
Updated Reason
OMNITRANS 20111201 OPERATIONS OF THE ACCESS SERVICE.
(OMNITRANS WILL UTILIZE PART OF ITS
ALLOCATED FTA5307 FORMULA FUNDS TO
HELP PAY FOR THESE OPERATIONS)
Fund Source Change
Project Detail:
‐ Total Project Cost remains: $13,199
Funding Detail:
‐ 5307LA fund adjustments:
‐‐ 5307LA Prior CON cost decreased $320 from: $3,404 to: $3,084
‐‐ Total 5307LA funding decreased from: $3,772 to: $3,452
‐ 5307RS fund adjustments:
‐‐ 5307RS Prior CON cost increased $320 from: $1,395 to: $1,715
‐‐ Total 5307RS funding increased from: $2,627 to: $2,947
‐ Total amount programmed remains: $13,199
Revised SB/LA UZA amounts for
15/16. Total cost unchanged.
Project qualifies for an
administrative modification per
item viii, change the program
year of funds within the current
FSTIP/FTIP provided that the
MPO has adopted EPSP.
OMNITRANS 981111 TRANSIT ‐ ENHANCEMENTS: 1% TRANSIT
ENHANCEMENTS TO INCREASE ACCESSIBILITY
TO BUS STOPS (ongoing)
Cost Increase
Project Detail:
‐ Total Project Cost increased $200 from: $6,866 to: $7,066
Funding Detail:
‐ 5307LA fund adjustments:
‐‐ 5307LA FY1617 CON cost increased $100 from: $46 to: $146
‐‐ Total 5307LA funding increased from: $4,153 to: $4,253
‐ 5307RS fund adjustments:
‐‐ 5307RS FY1617 CON cost increased $100 from: $154 to: $254
‐‐ Total 5307RS funding increased from: $386 to: $486
‐ Total amount programmed increased $200 (3%) from: $6,866 to:
$7,066
Added funding to 16/17
amounts. Project qualifies for an
administrative modification per
item ii, revise the funding
amount listed for a project
phase. Additional funding is
limited to 40 percent.
OMNITRANS SBD31055 TRANSIT ADMINISTRATION EQUIPMENT
PURCHASE COMPUTER HARDWARE &
SOFTWARE FOR MIS
Cost Increase
Project Detail:
‐ Total Project Cost increased $2,880 from: $35,679 to:
$38,559
Funding Detail:
‐ 5307LA fund adjustments:
‐‐ 5307LA FY1617 CON cost increased $960 from: $442 to: $1,402
‐‐ Total 5307LA funding increased from: $7,390 to: $8,350
‐ 5307RS fund adjustments:
‐‐ 5307RS FY1617 CON cost increased $960 from: $1,478 to: $2,438
‐‐ Total 5307RS funding increased from: $3,561 to: $4,521
‐ PTMISEA fund adjustments:
‐‐ Add PTMISEA FY16/17 CON cost of: $960
‐‐ Total PTMISEA funding increased from: $846 to: $1,806
‐ Total amount programmed increased $2,880 (8%) from: $35,679
to: $38,559
Added funding to 16/17
amounts. Project qualifies for an
administrative modification per
item ii, revise the funding
amount listed for a project
phase. Additional funding is
limited to 40 percent.
Project Detail: Funding Detail:
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM
San Bernardino County Transportation Authority
Amendment No. 06
March 2017
(in $000's)
TRANSIT
Lead Agency RTIP TitleChanges Requested
Updated Reason
OMNITRANS SBD31084 BUS SYSTEM‐SERVICE VEHICLES, PURCHASE
SEVERAL REPLACEMENT SERVICE VEHICLES
FY15 ‐ 45
Cost Increase
Project Detail:
‐ Total Project Cost increased $630 from: $3,492 to: $4,122
Funding Detail:
‐ 5307LA fund adjustments:
‐‐ 5307LA FY1617 CON cost increased $252 from: $116 to: $368
‐‐ Total 5307LA funding increased from: $1,067 to: $1,319
‐ 5307RS fund adjustments:
‐‐ 5307RS FY1617 CON cost increased $252 from: $388 to: $640
‐‐ Total 5307RS funding increased from: $812 to: $1,064
‐ PTMISEA fund adjustments:
‐‐ PTMISEA FY1617 CON cost increased $126 from: $126 to: $252
‐‐ Total PTMISEA funding increased from: $299 to: $425
‐ Total amount programmed increased $630 (18%) from: $3,492 to:
$4,122
Added funding to 16/17
amounts. Project qualifies for an
administrative modification per
item ii, revise the funding
amount listed for a project
phase. Additional funding is
limited to 40 percent.
SAN BERNARDINO
COUNTY
TRANSPORTATION
AUTHORITY
SBD41109 METROLINK OPERATING ASSISTANCE
SOUTHERN CALIFORNIA REGIONAL RAIL
AUTHORITY (METROLINK)
Lead Agency Change
Project Detail:
‐ Lead Agency changed from: SANBAG to: SAN BERNARDINO
COUNTY TRANSPORTATION AUTHORITY
‐ Total Project Cost remains: $75,336
Funding Detail:
‐ Total amount programmed remains: $75,336
Lead Agency name change from
SANBAG to SBCTA. Project
qualifies for an administrative
modification per item vi, change
a project lead agency
SANBAG 990602 METROLINK CAPITAL MAINTENANCE
(REHABILITATION/RENOVATION OF
METROLINK TRACK, SIGNALS,
COMMUNICATIONS, STRUCTURES, FACILITIES,
SYSTEMS, AND ROLLING STOCK INCLUDING
THE PURCHASE OF REPLACEMENT
LOCOMOTIVES WITH TIER‐4
TECHNOLOGY)(Transportation Development
Credits (TDC) used to match: 5309a,
5337LA/RS FY14/15 $1,741; 5337LA/RS
FY15/16 $856; 5337LA/RS FY16/17
$566)(Ongoing)
Description Change
Project Detail:
‐ Project Description changed to:
"METROLINK CAPITAL MAINTENANCE
(REHABILITATION/RENOVATION OF METROLINK TRACK,
SIGNALS, COMMUNICATIONS, STRUCTURES, FACILITIES,
SYSTEMS, AND ROLLING STOCK INCLUDING THE PURCHASE OF
REPLACEMENT LOCOMOTIVES WITH TIER‐4
TECHNOLOGY)(Transportation Development Credits (TDC)
used to match: 5309a, 5337LA/RS FY14/15 $1,741; 5337LA/RS
FY15/16 $856; 5337LA/RS FY16/17 $1,316)(Ongoing)"
‐ Total Project Cost increased $2,600 from: $44,790 to:
$47,390
Funding Detail:
‐ 5337LA fund adjustments:
‐‐ 5337LA FY1617 CON cost increased $372 from: $318 to: $690
‐‐ Total 5337LA funding increased from: $6,910 to: $7,282
‐ 5337RS fund adjustments:
‐‐ 5337RS FY1617 CON cost increased $2,228 from: $2,346 to:
$4,574
‐‐ Total 5337RS funding increased from: $7,346 to: $9,574
‐ Total amount programmed increased $2,600 (6%) from: $44,790
to: $47,390
Addtion of 5337 LA and 5337 RS
funds. Project qualifies for an
administrative modification per
item ii, revise the funding
amount listed for a project
phase. Additional funding is
limited to 40 percent.
Project Detail: Funding Detail:
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM
San Bernardino County Transportation Authority
Amendment No. 06
March 2017
(in $000's)
TRANSIT
Lead Agency RTIP TitleChanges Requested
Updated Reason
VICTOR VALLEY TRANSIT
AUTHORITY
SBD41084 BUS SYSTEM BUS REPLACEMENT ‐ ALT FUEL: FY
12 FIXED ROUTE TRANSIT COACHES (2); 2013
PREMIUM PARATRANSIT BUSES (8); FY13/14
REGIONAL BUS RPLC(2); FY14/15 REGIONAL
BUS RPLC(5); FY15/16 BAT RPLC BUS (1) ALT
FUEL; FY 16/17 BUS RPLC BARSTOW DIVISION
(5), HESPERIA DIVISION (5).
Cost Increase
Project Detail:
‐ Total Project Cost increased $1,100 from: $21,447 to:
$22,547
Funding Detail:
‐ 5307‐OP fund adjustments:
‐‐ Delete 5307‐OP Prior CON cost of: $996
‐‐ Delete 5307‐OP FY16/17 CON cost of: $2,200
‐‐ Total 5307‐OP funding decreases from: $3,196 to: $0
‐ 5307VH fund adjustments:
‐‐ Add 5307VH Prior CON cost of: $996
‐‐ Add 5307VH FY16/17 CON cost of: $3,080
‐‐ Total 5307VH funding is: $4,076
‐ PTMISEA fund adjustments:
‐‐ PTMISEA FY1617 CON cost increased $220 from: $550 to: $770
‐‐ Total PTMISEA funding increased from: $3,580 to: $3,800
‐ Total amount programmed increased $1,100 (5%) from: $21,447
to: $22,547
Revised funding source from FTA
5307 Operating to FTA 5307 VH
UZA. Added 5307 funds and
PTMISEA funds. Project qualifies
for an administrative
modification per item ii, revise
the funding amount listed for a
project phase. Additional
funding is limited to 40 percent.
2017 Federal Transportation Improvement Program
Administrative Modification #17-06San Bernardino CountyProject Listing Report
(in $000`s)
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment201139 San Bernardino SCAB 4A04084 CAX67 L NON-EXEMPT 6
Description: PTC 11,464 Agency FONTANA
CASA GRANDE AVENUE FROM LYTLE CREEK ROAD TO MANGO AVENUE CONSTRUCT 4 LANES
Change Reason COST> Status County Approved Phase No Project Activity
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 244 1,570 1,855 3,669 244 1,570 1,855 3,669SBD CO MEASURE I 516 3,335 3,944 7,795 516 3,335 3,944 7,795201139 Total 760 4,905 5,799 11,464 760 4,905 5,799 11,464
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20150001 San Bernardino SCAB 4G07421 CAX60 L NON-EXEMPT 6
Description: PTC 14,585 Agency MONTCLAIR
BRIDGE NO. 54C0112, CENTRAL AVE OVER UP RR AMTRAK METROLINK, 0.2 MI HOLT AVE. BRIDGE REHABILITATION/WIDENING, 4-6 LANE BRIDGE WITH SIDEWALKS. Toll Credits to match EARREPU funds.Change Reason DESC CHG Status County Approved Phase Environmental Document/Pre-design Phase (PA&ED)
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total2016 EARMARK REPURPOSING 1,440 1,440 1,440 1,440CITY FUNDS 140 63 1,305 1,508 17 52 63 1,376 1,508BRIDGE - LOCAL 1,079 483 10,075 11,637 133 398 483 10,623 11,63720150001 Total 2,659 546 11,380 14,585 150 450 1,440 546 11,999 14,585
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment2011150 San Bernardino SCAB 4RL04 TDM20 L TCM Committed 6
Description: PTC 9,571 Agency SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY
SOUTH COAST AIR BASIN RIDESHARE PROGRAM (Ongoing)(Toll Credits are being used as match for CMAQ in FY16/17 $310)
Change Reason LEAD CHG Status County Approved Phase Project Open For Use But Landscaping/Other Still Pending
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 4,070 4,735 8,805 6,105 2,700 8,805SBD CO MEASURE I 466 300 766 466 150 150 7662011150 Total 4,536 5,035 9,571 6,571 2,850 150 9,571
Print Date: 3/20/2017 1:56:15 PM Page: 1 of 9
2017 Federal Transportation Improvement Program
Administrative Modification #17-06San Bernardino CountyProject Listing Report
(in $000`s)
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment2011151 San Bernardino MDAB 4RL04 TDM20 L EXEMPT - 93.126 6
Description: PTC 5,046 Agency SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY
MOJAVE DESERT AIR BASIN RIDESHARE PROGRAM(Toll credits are being used as match for CMAQ in FY16/17 $138)
Change Reason LEAD CHG Status County Approved Phase Construction/Project Implementation Begins
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 2,320 2,360 4,680 3,480 1,200 4,680SBD CO MEASURE I 266 100 366 266 50 50 3662011151 Total 2,586 2,460 5,046 3,746 1,250 50 5,046
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20159906 San Bernardino SCAB 4M07002 CAY75 10 .25 1.1 S NON-EXEMPT 6
Description: PTC 36,730 Agency SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY
I-10/MONTE VISTA AVE IMPROVEMENTS: UNDERCROSSING WIDENING 4-6 LNS AND RAMP IMPROVEMENTS
Change Reason LEAD CHG Status County Approved Phase Environmental Document/Pre-design Phase (PA&ED)
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEVELOPER FEES 669 1,666 6,517 8,852 669 8,183 8,852SBD CO MEASURE I 2,106 5,248 20,524 27,878 2,106 25,772 27,87820159906 Total 2,775 6,914 27,041 36,730 2,775 33,955 36,730
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20131504 San Bernardino SCAB 4M07003 NCRH1 10 31.02 31.92 S EXEMPT - 93.127 6
Description: PTC 5,100 Agency SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY
I-10 @ UNIVERSITY ST INTERCHANGE: INTERSECTION IMPROVEMENTS WITH ON/OFF RAMP WIDENING. (No capacity enhancements)
Change Reason LEAD CHG Status County Approved Phase Environmental Document/Pre-design Phase (PA&ED)
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEVELOPER FEES 79 47 788 914 126 788 914SBD CO MEASURE I 361 213 3,612 4,186 574 3,612 4,18620131504 Total 440 260 4,400 5,100 700 4,400 5,100
Print Date: 3/20/2017 1:56:16 PM Page: 2 of 9
2017 Federal Transportation Improvement Program
Administrative Modification #17-06San Bernardino CountyProject Listing Report
(in $000`s)
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment35556 San Bernardino MDAB 35556 CAX63 15 42.5 46 S NON-EXEMPT 6
Description: PTC 122,387 Agency CALTRANS
IN THE CITY OF VICTORVILLE FROM 0.5 MILES NORTH OF MOJAVE DRIVE TO 1.5 NORTH OF EXISTING STODDARD WELLS ROAD OVERCROSSING. RECONSTRUCT D/E/STODDARD WELLS RD ICs. WIDEN BRIDGES (NO NEW LANES). CONSTRUCT NEW COLLECTOR DISTRIBUTOR RD OVER D/E/AND BNSF RR TO PARRALLEL I-15 NB INCLUDES ITS OWN BRIDGE. RECONST/REALIGN EAST/WEST FRONTAGE RDS. CONST NEW AUX LN. (REFER TO MODELING DETAILS)(CA061)Change Reason COST> Status County Approved Phase Construction/Project Implementation Begins
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 3,637 3,637 3,637 3,637STATE CASH - IPP PRIOR 16,147 18,083 34,230 34,230 34,230STATE CASH - RIP PRIOR 5,013 5,013 5,013 5,013STIP ADVANCE CON-PIIP 55,852 55,852 55,852 55,852STIP ADVANCE CON-PRIP 23,655 23,655 23,655 23,65535556 Total 16,147 23,096 83,144 122,387 122,387 122,387
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment201114 San Bernardino SCAB 4M04050 CAX75 60 1.1 3.55 S NON-EXEMPT 6
Description: PTC 22,226 Agency SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY
WIDENING OF CENTRAL AVENUE BRIDGE CROSSING SR-60 TO ACCOMODATE WIDENING OF RAMPS AND THE DESIGNATED FREEWAY LANES.
Change Reason LEAD CHG Status County Approved Phase Engineering/Plans,Specifications and Estimates (PS&E)
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 250 100 250 600 250 100 250 600DEVELOPER FEES 3,026 677 9,654 13,357 3,026 677 9,654 13,357SBD CO MEASURE I 1,030 474 6,765 8,269 1,030 474 6,765 8,269201114 Total 4,306 1,251 16,669 22,226 4,306 1,251 16,669 22,226
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment201132 San Bernardino SCAB 4M07017 CAR88 60 7.65 8.14 S NON-EXEMPT 6
Description: PTC 14,563 Agency SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY
SR-60 AT ARCHIBALD AVENUE; WIDEN WB AND EB ENTRY RAMPS (ADD 1 LANE), WIDEN WB AND EB EXIT RAMPS (ADD LEFT TURN LANE), ADD ADDITIONAL LEFT TURN LANE FROM ARCHIBALD AVE TO SR-60 ENTRY RAMPS. (non-capacity enhancing along Archibald).Change Reason LEAD CHG Status County Approved Phase Right-Of-Way Acquisition
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEVELOPER FEES 1,210 857 7,627 9,694 573 1,494 7,627 9,694SBD CO MEASURE I 570 426 3,873 4,869 269 727 3,873 4,869201132 Total 1,780 1,283 11,500 14,563 842 1,494 727 11,500 14,563
Print Date: 3/20/2017 1:56:16 PM Page: 3 of 9
2017 Federal Transportation Improvement Program
Administrative Modification #17-06San Bernardino CountyProject Listing Report
(in $000`s)
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment20111625 San Bernardino SCAB 4M01005 CAX63 210 25 33.2 S NON-EXEMPT 6
Description: PTC 144,061 Agency SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY
SR210 LANE ADDITION - ADD 1 MIXED FLOW LANE IN EACH DIRECTION FROM HIGHLAND AVE. TO SAN BERNARDINO AVE (REDLANDS) INCLUDES AUX. LANES BETWEEN BASE LINE AND 5TH STS AND AN ACCELERATION LANE AT 5TH ST. E/B ON RAMP AND DECELRATION LANE AT HIGHLAND AVE E/B OFF RAMP EXTENDING TO STERLING AVENUE (Under 1/4 miles length)Change Reason LEAD CHG Status County Approved Phase Environmental Document/Pre-design Phase (PA&ED)
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSBD CO MEASURE I 13,142 7,387 98,532 119,061 20,529 98,532 119,061STIP Advance Cons 25,000 25,000 25,000 25,00020111625 Total 13,142 7,387 123,532 144,061 20,529 123,532 144,061
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment201186 San Bernardino SCAB REG0701 CAX62 210 28.3 30.3 S NON-REPORTABLE TCM
COMMITTED6
Description: PTC 20,908 Agency SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY
AT SR-210/BASE LINE IC: RECONSTRUCT/WIDEN BASE LINE BETWEEN CHURCH AVE AND BOULDER AVE FROM 4 TO 6 THROUGH LANES AND EXTEND LEFT TURN LANES, WIDEN RAMPS – WB EXIT 1 TO 3 LANES, WB AND EB ENTRANCES 1 TO 3 LANES INCLUDING HOV PREFERENTIAL LANES (EA 1C970)Change Reason LEAD CHG Status County Approved Phase Environmental Document/Pre-design Phase (PA&ED)
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEVELOPER FEES 1,201 1,276 6,289 8,766 2,477 6,289 8,766SBD CO MEASURE I 1,652 1,769 8,721 12,142 3,421 8,721 12,142201186 Total 2,853 3,045 15,010 20,908 5,898 15,010 20,908
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment34040 San Bernardino SCAB 34040 CAX63 395 19.3 48 S NON-EXEMPT 6
Description: PTC 1,363 Agency CALTRANS
CONSTRUCT A 4-LANE EXPRESSWAY FROM 1.8 MILES SOUTH OF DESERT FLOWER ROAD (PM19.3) TO 0.5 MILES SOUTH OF FARMINGTON ROAD (PM 48.0)
Change Reason COST< Status County Approved Phase Engineering/Plans,Specifications and Estimates (PS&E)
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSURFACE TRANS PROG - RIP 1,363 1,363 1,363 1,36334040 Total 1,363 1,363 1,363 1,363
Print Date: 3/20/2017 1:56:16 PM Page: 4 of 9
2017 Federal Transportation Improvement Program
Administrative Modification #17-06San Bernardino CountyProject Listing Report
(in $000`s)
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentSBD59303 San Bernardino SCAB SBD59303 PPM01 999 S EXEMPT - 93.126 6
Description: PTC 3,810 Agency SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY
___SET ASIDES/RESERVATIONS FOR FUTURE SB45 -PLANNING, PROGRAMMING, & MONITORING
Change Reason LEAD CHG Status County Approved Phase Environmental Document/Pre-design Phase (PA&ED)
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTIP ADVANCE CON-RIP 3,810 3,810 1,270 1,270 1,270 3,810SBD59303 Total 3,810 3,810 1,270 1,270 1,270 3,810
ProjectID County Air Basin Model RTP ID Program System Conformity Category Amendment20020806 San Bernardino SCAB 4TL104 NCR86 T EXEMPT - 93.126 6
Description: PTC 16,453 Agency OMNITRANS
TRANSIT - FACILITIES - IMPROVEMENT/UPKEEP OF EXISTING FACILITIES
Change Reason COST> Status County Approved Phase Contract Award
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total5307 FTA 5307 UZA FORMULAR 2,408 2,408 2,408 2,4085307LA LOS ANGELES/LONG BEACH/SANTA ANA URBANIZED AREA
5,602 5,602 3,546 2,056 5,602
5307RS RIVERSIDE/SAN BERNARDINO URBANIZED AREA
5,316 5,316 2,158 3,158 5,316
AGENCY 720 720 360 360 720PUBLIC TRANS MODERINAZATION IMP AND SERV. ENHANCEMENT ACCT.
1,161 1,161 561 600 1,161
STATE TRANSIT ASSIST 1,246 1,246 1,246 1,24620020806 Total 16,453 16,453 10,279 6,174 16,453
ProjectID County Air Basin Model RTP ID Program System Conformity Category Amendment20040211 San Bernardino SCAB 20040211 PAR16 T EXEMPT - 93.126 6
Description: PTC 14,721 Agency OMNITRANS
REPLACEMENT PARATRANSIT VEHICLES REPLACING PARATRANSIT VEHICLES ON OMNITRANS ACCESS FLEET;08-50;2011-50;2013-15;2014-15 vehicles
Change Reason COST> Status County Approved Phase First Vehicle Delivered
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total5307 FTA 5307 UZA FORMULAR 4,621 4,621 4,621 4,6215307LA LOS ANGELES/LONG BEACH/SANTA ANA URBANIZED AREA
3,369 3,369 2,727 642 3,369
Print Date: 3/20/2017 1:56:17 PM Page: 5 of 9
2017 Federal Transportation Improvement Program
Administrative Modification #17-06San Bernardino CountyProject Listing Report
(in $000`s)
5307RS RIVERSIDE/SAN BERNARDINO URBANIZED AREA
3,196 3,196 2,078 1,118 3,196
5310LA LOS ANGELES -LONG BEACH-ANAHEIM URBANIZED AREA - EM
187 187 187 187
5310RS RIVERSIDE-SAN BERNARDINO URBANIZED AREA - EM
250 250 250 250
PUBLIC TRANS MODERINAZATION IMP AND SERV. ENHANCEMENT ACCT.
1,830 1,830 1,190 640 1,830
STATE TRANSIT ASSIST 1,268 1,268 1,268 1,26820040211 Total 14,721 14,721 12,321 2,400 14,721
ProjectID County Air Basin Model RTP ID Program System Conformity Category Amendment20060601 San Bernardino SCAB 4OM0701 TRN06 T EXEMPT - 93.126 6
Description: PTC 6,666 Agency OMNITRANS
CAPITALIZATION OF LEASES - FOR CONTRACTORS, RADIO SITES, APC, TIRE LEASES
Change Reason COST> Status County Approved Phase Construction/Project Implementation Begins
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total5307 FTA 5307 UZA FORMULAR 2,689 2,689 2,689 2,6895307LA LOS ANGELES/LONG BEACH/SANTA ANA URBANIZED AREA
1,329 1,329 955 374 1,329
5307RS RIVERSIDE/SAN BERNARDINO URBANIZED AREA
1,217 1,217 557 660 1,217
LOCAL TRANS FUNDS 892 892 892 892STATE TRANSIT ASSIST 539 539 266 273 53920060601 Total 6,666 6,666 5,359 1,307 6,666
ProjectID County Air Basin Model RTP ID Program System Conformity Category Amendment20111201 San Bernardino SCAB 4TL104 BUO00 T EXEMPT - 93.126 6
Description: PTC 13,199 Agency OMNITRANS
OPERATIONS OF THE ACCESS SERVICE. (OMNITRANS WILL UTILIZE PART OF ITS ALLOCATED FTA5307 FORMULA FUNDS TO HELP PAY FOR THESE OPERATIONS)
Change Reason MINOR CHG Status County Approved Phase Contract Award
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total5307 FTA 5307 UZA FORMULAR 3,200 3,200 3,200 3,2005307LA LOS ANGELES/LONG BEACH/SANTA ANA URBANIZED AREA
3,452 3,452 3,084 368 3,452
5307RS RIVERSIDE/SAN BERNARDINO URBANIZED AREA
2,947 2,947 1,715 1,232 2,947
LOCAL TRANS FUNDS 3,600 3,600 2,000 1,600 3,60020111201 Total 13,199 13,199 9,999 3,200 13,199
Print Date: 3/20/2017 1:56:17 PM Page: 6 of 9
2017 Federal Transportation Improvement Program
Administrative Modification #17-06San Bernardino CountyProject Listing Report
(in $000`s)
ProjectID County Air Basin Model RTP ID Program System Conformity Category Amendment981111 San Bernardino SCAB 981111 TRRH6 T EXEMPT - 93.127 6
Description: PTC 7,066 Agency OMNITRANS
TRANSIT - ENHANCEMENTS: 1% TRANSIT ENHANCEMENTS TO INCREASE ACCESSIBILITY TO BUS STOPS (ongoing)
Change Reason COST> Status County Approved Phase Construction/Project Implementation Begins
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total5307 FTA 5307 UZA FORMULAR 774 774 774 7745307LA LOS ANGELES/LONG BEACH/SANTA ANA URBANIZED AREA
4,253 4,253 4,107 146 4,253
5307RS RIVERSIDE/SAN BERNARDINO URBANIZED AREA
486 486 232 254 486
LOCAL TRANS FUNDS 985 985 985 985PUBLIC TRANS MODERINAZATION IMP AND SERV. ENHANCEMENT ACCT.
50 50 50 50
STATE TRANSIT ASSIST 518 518 468 50 518981111 Total 7,066 7,066 6,616 450 7,066
ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentSBD31055 San Bernardino SCAB SBD31055 TRN06 T EXEMPT - 93.126 6
Description: PTC 38,559 Agency OMNITRANS
TRANSIT ADMINISTRATION EQUIPMENT PURCHASE COMPUTER HARDWARE & SOFTWARE FOR MIS
Change Reason COST> Status County Approved Phase Contract Award
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total5307 FTA 5307 UZA FORMULAR 11,699 11,699 11,699 11,6995307LA LOS ANGELES/LONG BEACH/SANTA ANA URBANIZED AREA
8,350 8,350 6,948 1,402 8,350
5307RS RIVERSIDE/SAN BERNARDINO URBANIZED AREA
4,521 4,521 2,083 2,438 4,521
AR-5307 ARRA - FTA 5307 6,776 6,776 6,776 6,776LOCAL TRANS FUNDS 1,492 1,492 1,492 1,492PUBLIC TRANS MODERINAZATION IMP AND SERV. ENHANCEMENT ACCT.
1,806 1,806 846 960 1,806
STATE TRANSIT ASSIST 3,915 3,915 3,915 3,915SBD31055 Total 38,559 38,559 33,759 4,800 38,559
Print Date: 3/20/2017 1:56:17 PM Page: 7 of 9
2017 Federal Transportation Improvement Program
Administrative Modification #17-06San Bernardino CountyProject Listing Report
(in $000`s)
ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentSBD31084 San Bernardino SCAB SBD31084 BUN07 T EXEMPT - 93.126 6
Description: PTC 4,122 Agency OMNITRANS
BUS SYSTEM-SERVICE VEHICLES, PURCHASE SEVERAL REPLACEMENT SERVICE VEHICLES FY15 - 45
Change Reason COST> Status County Approved Phase First Vehicle Delivered
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total5307 FTA 5307 UZA FORMULAR 933 933 933 9335307LA LOS ANGELES/LONG BEACH/SANTA ANA URBANIZED AREA
1,319 1,319 951 368 1,319
5307RS RIVERSIDE/SAN BERNARDINO URBANIZED AREA
1,064 1,064 424 640 1,064
PUBLIC TRANS MODERINAZATION IMP AND SERV. ENHANCEMENT ACCT.
425 425 173 252 425
STATE TRANSIT ASSIST 381 381 381 381SBD31084 Total 4,122 4,122 2,862 1,260 4,122
ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentSBD41109 San Bernardino SCAB SBD41109 RAO00 T EXEMPT - 93.126 6
Description: PTC 75,336 Agency SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY
METROLINK OPERATING ASSISTANCE SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY (METROLINK)
Change Reason LEAD CHG Status County Approved Phase Contract Award
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalLOCAL TRANS FUNDS 72,061 72,061 58,828 13,233 72,061SBD CO MEASURE I 2,000 2,000 2,000 2,000STATE TRANSIT ASSIST 1,275 1,275 1,123 152 1,275SBD41109 Total 75,336 75,336 61,951 13,385 75,336
ProjectID County Air Basin Model RTP ID Program System Conformity Category Amendment990602 San Bernardino SCAB 990602 TRR14 T EXEMPT - 93.126 6
Description: PTC 47,390 Agency SANBAG
METROLINK CAPITAL MAINTENANCE (REHABILITATION/RENOVATION OF METROLINK TRACK, SIGNALS, COMMUNICATIONS, STRUCTURES, FACILITIES, SYSTEMS, AND ROLLING STOCK INCLUDING THE PURCHASE OF REPLACEMENT LOCOMOTIVES WITH TIER-4 TECHNOLOGY)(Transportation Development Credits (TDC) used to match: 5309a, 5337LA/RS FY14/15 $1,741; 5337LA/RS FY15/16 $856; 5337LA/RS FY16/17 $1,316)(Ongoing)Change Reason DESC CHG Status County Approved Phase Construction/Project Implementation Begins
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalFTA 5309(a) GUIDEWY 25,075 25,075 25,075 25,075
Print Date: 3/20/2017 1:56:17 PM Page: 8 of 9
2017 Federal Transportation Improvement Program
Administrative Modification #17-06San Bernardino CountyProject Listing Report
(in $000`s)
5337-SGR 5337 STATE OF GOOD REPAIR
573 573 573 573
5337LA LOS ANGELES -LONG BEACH-ANAHEIM URBANIZED AREA - SGR
7,282 7,282 6,592 690 7,282
5337RS RIVERSIDE-SAN BERNARDINO URBANIZED AREA
9,574 9,574 5,000 4,574 9,574
AR-5307 ARRA - FTA 5307 2,188 2,188 2,188 2,188STATE TRANSIT ASSIST 2,698 2,698 2,698 2,698990602 Total 47,390 47,390 42,126 5,264 47,390
ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentSBD41084 San Bernardino MDAB 4TL104 BUR17 T EXEMPT - 93.126 6
Description: PTC 22,547 Agency VICTOR VALLEY TRANSIT AUTHORITY
BUS SYSTEM BUS REPLACEMENT - ALT FUEL: FY 12 FIXED ROUTE TRANSIT COACHES (2); 2013 PREMIUM PARATRANSIT BUSES (8); FY13/14 REGIONAL BUS RPLC(2); FY14/15 REGIONAL BUS RPLC(5); FY15/16 BAT RPLC BUS (1) ALT FUEL; FY 16/17 BUS RPLC BARSTOW DIVISION (5), HESPERIA DIVISION (7).Change Reason DESC CHG Status County Approved Phase Construction/Project Implementation Begins
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 11,079 11,079 5,825 2,435 2,819 11,0795307VH VICTORVILLE-HESPERIA URBANIZED AREA - FP
4,076 4,076 996 3,080 4,076
5339VH VICTORVILLE-HESPERIA URBANIZED AREA
646 646 139 507 646
ARRA - FTA 5311 204 204 204 204LOCAL TRANS FUNDS 1,805 1,805 1,805 1,805PUBLIC TRANS MODERINAZATION IMP AND SERV. ENHANCEMENT ACCT.
3,800 3,800 2,318 770 103 243 366 3,800
STATE TRANSIT ASSIST 937 937 622 315 937SBD41084 Total 22,547 22,547 11,909 6,600 103 750 3,185 22,547
Grand Total 53,347 48,687 555,839 657,873 363,673 52,154 149,828 70,689 9,530 11,999 657,873
Print Date: 3/20/2017 1:56:17 PM Page: 9 of 9
Agency Project ID Title Changes Requested Amendment Reason
CITY OF CAMARILLO VEN150614
WIDEN LAS POSAS ROAD TO EXTEND CLASS 2 BIKE LANE
500 FT NORTH FROM PLEASANT VALLEY ROAD
SCHEDULE ADVANCE
CMAQ FUNDS:-REDUCE FUNDS IN CON IN FY 17/18 BY $100 FROM $232 TO $132;-INCREASE FUNDS IN IN ENG IN FY 17/18 BY $100 FROM $75 TO $175; CITY FUNDS:-REDUCES FUNDS IN CON IN FY 17/18 BY $15 FROM $30 TO $15; -INCREASE FUNDS IN ENG IN FY 17/18 BY $15 FROM $10 TO $25;
NO CHANGE TO TOTAL COST OF PROJECT. PROJECT COST REMAINS AT $375.
SCHEDULE ADVANCED Project qualifies for an administrative modification per item viii, change the program year of funds within the current FSTIP/FTIP provided that the MPO has adopted EPSP.
CITY OF SAN BUENAVENTURA VEN150618
IN VENTURA, FIVE POINTS BICYCLE AND PEDESTRIAN
INTERSECTION IMPROVEMENTS
PROJECT START ADVANCED
CMAQ FUNDS:-ADVANCE FUNDS IN CON IN FY17/18 FOR $300 TO FY16/17; CITY FUNDS: -ADVANCE FUNDS IN CON IN FY17/18 FOR $150 TO FY16/17;
TOTAL PROJECT COST REMAINS THE SAME AT $450.
SCHEDULE ADVANCED Project qualifies for an administrative modification per item viii, change the program year of funds within the current FSTIP/FTIP provided that the MPO has adopted EPSP.
CITY OF SAN BUENAVENTURA VEN990319
CALIFORNIA ST BRIDGE OVER RT 101 PEDESTRIAN
ENHANCEMENTS
SCHEDULE ADVANCE
CITY FUNDS:-ADVANCE FUNDS IN CON IN FY18/19 FOR $30 TO FY16/17; STPL FUNDING:-ADVANCE FUNDS IN CON IN FY18/19 FOR $129 TO FY16/17;
TOTAL PROJECT COST REMAINS THE SAME AT $2,400.
SCHEDULE ADVANCED Project qualifies for an administrative modification per item viii, change the program year of funds within the current FSTIP/FTIP provided that the MPO has adopted EPSP.
Local Highways System
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMVentura County Transportation Commission
Administrative Modification #17-06March 2017(in $000’s)
Agency Project ID Title Changes Requested Amendment Reason
Local Highways System
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMVentura County Transportation Commission
Administrative Modification #17-06March 2017(in $000’s)
VARIOUS AGENCIES VEN54032
GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION-
LOCAL STREETS AND ROADS
COST INCREASE
EARMARK REPURPOSING FUNDS:-DELETE FUNDS IN CON IN FY16/17 FOR $977;-ADD FUNDS IN CON IN FY18/19 FOR $3,072; STPL FUNDS:-REDUCE FUNDS IN CON IN FY16/17 BY $200 FROM $2,263 TO $2,063; -ADD FUNDS IN CON IN FY17/18 FOR $200; TOLL CREDITS:-ADD $120 IN TOLL CREDITS FOR FY18/19;
TOTAL PROJECT COST IS INCREASED BY $2,096 FROM $17,370 TO $19,466.
COST INCREASE Project qualifies for an administrative modification per item ii, revise the funding amount listed for a project phase. Additional funding is limited to 40 percent.
VENTURA COUNTY TRANSPORTATION
COMMISSIONVEN93017 REGIONAL RIDESHARE
PROGRAM
MINOR CHANGE
TOLL CREDITS:-ADD TOLL CREDITS IN THE AMOUNT OF $51 FOR EACH YEAR IN FY16/17, FY17/18, FY18/19, AND FY19/20.
TOTAL PROJECT COST REMAINS THE SAME AT $4,589.
MINOR CHANGE Project qualifies for an administrative modification per item viii, change the program year of funds within the current FSTIP/FTIP provided that the MPO has adopted EPSP.
Agency Project ID Title Changes Requested Amendment Reason
CALTRANS VENLS02 GROUPED PROJECTS FOR PAVEMENT RESURFACING
COST DECREASE
SHOPP - ADVANCE CONSTRUCTION:-REDUCE FUNDS IN CON IN FY17/18 BY $2,500 FROM $27,841 TO $25,341; -INCREASE FUNDS IN CON IN FY19/20 BY $534 FROM $111,137 TO $111,671;
TOTAL PROJECT COST IS DECREASED BY $1,966 FROM $199,742 TO $197,776.
COST DECREASE Project qualifies for an administrative modification per item iv, cost decrease that does not result in deletion of a project or phase.
CALTRANS VENLS03GROUPED PROJECTS FOR
BRIDGE REHABILITATION AND RECONSTRUCTION
COST INCREASE
SHOPP - ADVANCE CONSTRUCTION: -INCREASE FUNDS IN CON IN FY19/20 BY $870 FROM $6,216 TO $7,086;
TOTAL PROJECT COST IS INCREASED BY $870 FROM $19,344 TO $20,214.
COST INCREASE Project qualifies for an administrative modification per item ii, revise the funding amount listed for a project phase. Additional funding is limited to 40 percent.
CALTRANS VENLS08GROUPED PROJECTS FOR SAFETY IMPROVEMENTS -
SHOPP MANDATES PROGRAM
COST INCREASE
SHOPP - ADVANCE CONSTRUCTION: -INCREASE FUNDS IN CON IN FY18/19 BY $408 FROM $7,705 TO $8,113;
TOTAL PROJECT COST IS INCREASED BY $408 FROM $33,139 TO $33,547.
COST INCREASE Project qualifies for an administrative modification per item ii, revise the funding amount listed for a project phase. Additional funding is limited to 40 percent.
State Highways System
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMVentura County Transportation Commission
Administrative Modification #17-06March 2017(in $000’s)
Agency Project ID Title Changes Requested Amendment Reason
VARIOUS AGENCIES VEN070202
GROUPED PROJECTS FOR OPER ASST. PLNG, PUR OF REPL VEH - JOBS ACCESS
REVERSE COMMUTE PROJECTS
COST INCREASE
LTF: -INCREASE FUNDS IN CON IN FY16/17 BY $50 FROM $265 TO $315; 5307 THOUSAND OAKS FUNDS: -INCREASE FUNDS IN CON IN FY16/17 BY $50 FROM $226 TO $276;
TOTAL PROJECT COST IS INCREASED BY $100 FROM $1,710 TO $1,810.
COST INCREASE Project qualifies for an administrative modification per item ii, revise the funding amount listed for a project phase. Additional funding is limited to 40 percent.
VENTURA COUNTY TRANSPORTATION
COMMISSIONVEN040405
AUTOMATIC VEHICLE LOCATOR SYSTEM UPGRADE
AND FAREBOX SYSTEM
MINOR CHANGE
TRANSPORTATION DEVELOPMENT CREDITS (TDC): - REVISE FISCAL YEAR OF TDC MATCH FROM FY17/18 TO FY18/19;
TOTAL PROJECT COST REMAINS THE SAME AT $2,786.
MINOR CHANGE Project qualifies for an administrative modification per item viii, change the program year of funds within the current FSTIP/FTIP provided that the MPO has adopted EPSP.
VENTURA COUNTY TRANSPORTATION
COMMISSIONVEN54036
VCTC INTER CITY CAPITAL LEASE/MAINTENANCE
CONTRACT
COST INCREASE
5339 OXNARD UZA FUNDS:-REDUCE FUNDS IN CON IN FY16/17 BY $166 FROM $330 TO $164; 5307 OXNARD UZA FUNDS:-ADD FUNDS IN CON IN FY16/17 FOR $317;
TOTAL PROJECT COST IS INCREASED BY $151 FROM $4,015 TO $4,166.
COST INCREASE Project qualifies for an administrative modification per item ii, revise the funding amount listed for a project phase. Additional funding is limited to 40 percent.
Transit System
2017 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMVentura County Transportation Commission
Administrative Modification #17-06March 2017(in $000’s)
2017 Federal Transportation Improvement Program
Administrative Modification #17-06Ventura County
Project Listing Report(in $000`s)
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN150614 Ventura SCCAB 5A0703 NCR26 L EXEMPT - 93.126 6
Description: PTC 375 Agency CAMARILLO
IN CAMARILLO, WIDEN LAS POSAS RD TO EXTEND CLASS 2 BIKE LANES 500FT (0.90 MILES) NORTH FROM PLEASANT VALLEY ROAD (CLOSE REMAINING GAP ON WEST SIDE OF RD)
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 175 25 132 332 332 332CITY FUNDS 25 3 15 43 43 43VEN150614 Total 200 28 147 375 375 375
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN150618 Ventura SCCAB 5AL04 NCN25 L EXEMPT - 93.126 6
Description: PTC 450 Agency SAN BUENAVENTURA
IN VENTURA, FIVE POINTS INTERSECTION IMPROVEMENTS AT THOMPSON BLVD, MAIN ST, AND TELEGRAPH RD, ADD: 2 SIGNALIZED PED CROSSINGS ON MAIN ST; 2 FLASHING BEACON CROSSINGS ON THOMPSON BLVD; BICYCLE LANES (LESS THAN 1 MILE); "GREEN" BICYCLE BOXES; AND SIDEWALK/MEDIAN MODIFICATIONS ON THOMPSON BLVDFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 300 300 300 300CITY FUNDS 150 150 150 150VEN150618 Total 450 450 450 450
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN990319 Ventura SCCAB 7120004 NCR27 L EXEMPT - 93.126 6
Description: PTC 2,400 Agency SAN BUENAVENTURA
CALIFORNIA ST BRIDGE OVER RT 101 PEDESTRIAN ENHANCEMENTS
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 558 558 429 129 558CITY FUNDS 400 232 632 602 30 632STP ENHANCE-RIP TEA 1,210 1,210 1,210 1,210VEN990319 Total 400 2,000 2,400 2,241 159 2,400
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN54032 Ventura SCCAB VEN54032 LUM02 L EXEMPT - 93.126 6
Description: PTC 19,465 Agency VARIOUS AGENCIES
GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION - LOCAL STREETS & ROADS Scope: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 categories - Pavement resurfacing and/or rehabilitation, Emergency relief (23 U.S.C. 125), Widening narrow pavements or reconstructing bridges (no add travel lanes) Toll Credits of $94 in FY16/17, $23 in FY 17/18 and $120 in FY 18/19Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total2016 EARMARK REPURPOSING 3,072 3,072 3,072 3,072STP LOCAL 12,244 12,244 4,981 2,063 200 5,000 12,244
Print Date: 3/15/2017 1:51:28 PM Page: 1 of 4
2017 Federal Transportation Improvement Program
Administrative Modification #17-06Ventura County
Project Listing Report(in $000`s)
CITY FUNDS 4,149 4,149 3,341 161 647 4,149VEN54032 Total 19,465 19,465 8,322 2,224 200 8,719 19,465
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVEN93017 Ventura SCCAB VEN93017 TDM20 L TCM 6
Description: PTC 4,589 Agency VENTURA COUNTY TRANS COMMISSION (VCTC)
REGIONAL RIDESHARE PROGRAM FOR 16/17, 17/18, 18/19 and 19/20. Toll Credits in the amount of $51 per year for FY16/17, 17/18, 18/19, and 19/20.
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 4,589 4,589 2,817 443 443 443 443 4,589VEN93017 Total 4,589 4,589 2,817 443 443 443 443 4,589
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVENLS02 Ventura SCCAB REG0701 SHP03 999 S EXEMPT - 93.126 6
Description: PTC 197,776 Agency CALTRANS
GROUPED PROJECTS LISTING FOR PAVEMENT RESURFACING AND/OR REHABILITATION ON THE STATE HIGHWAY SYSTEM - ROADWAY PRESERVATION PROJECTS (PROJECTS CONSISTENT W/40CFR PART 93.126 EXEMPT TABLES 2 & 3 CATEGORIES - PAVEMENT RESURFACING AND/OR REHABILITATON)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSHOPP - ADVANCE CONSTRUCTION
184,560 184,560 45,427 25,341 635 111,671 1,486 184,560
SHOPP AC-PRIOR 13,216 13,216 13,216 13,216VENLS02 Total 197,776 197,776 58,643 25,341 635 111,671 1,486 197,776
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVENLS03 Ventura SCCAB REG0701 SHP01 999 S EXEMPT - 93.126 6
Description: PTC 20,214 Agency CALTRANS
GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION - SHOPP PROGRAM cope: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 categories - Widening narrow pavements or reconstructing bridges (no additional travel lanes).Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSHOPP - ADVANCE CONSTRUCTION
14,603 14,603 7,517 7,086 14,603
SHOPP AC-PRIOR 5,611 5,611 5,611 5,611VENLS03 Total 20,214 20,214 5,611 7,517 7,086 20,214
Print Date: 3/15/2017 1:51:29 PM Page: 2 of 4
2017 Federal Transportation Improvement Program
Administrative Modification #17-06Ventura County
Project Listing Report(in $000`s)
ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentVENLS08 Ventura SCCAB REG0703 NCR79 999 S EXEMPT - 93.126 6
Description: PTC 33,547 Agency CALTRANS
GROUPED PROJECTS FOR SAFETY IMPROVEMENTS - SHOPP MANDATES PROGRAM (Scope: Proj consistent w/ 40 CFR Part 93.126 Exempt Tables 2 &3 cat - Rr/hwy Xing, Safer non-Fed-aid system rds, Shoulder impr, traffic control devices & oper assistance oth than signalization proj, Intersection signalization proj at individ intersections, Pavement marking demo, Truck climbing lanes outside urbanized area, LightinFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSHOPP - ADVANCE CONSTRUCTION
33,547 33,547 11,934 7,618 3,026 8,113 2,856 33,547
VENLS08 Total 33,547 33,547 11,934 7,618 3,026 8,113 2,856 33,547
ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN070202 Ventura SCCAB 5TL04 BUO00 T EXEMPT - 93.126 6
Description: PTC 1,810 Agency VARIOUS AGENCIES
GROUPED PROJECTS FOR OPER ASST, PLNG, PUR OF REPL VEH OR MIN EXP - JOBS ACCESS REVERSE COMMUTE PROJECTS (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, 127,128,EXEMPT TABLES 2&3- PURCHASE OF NEW BUSES TO REPLACE EXIST VEH OR MINOR EXP; OPER ASST TO TRANSIT AGENCIES; PLNG ACT PURS TITLS 23&49 USC)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total5307OX OXNARD URBANIZED AREA
494 494 164 110 110 110 494
5307TO THOUSAND OAKS URBANIZED AREA
411 411 276 45 45 45 411
CITY FUNDS 100 100 100 100LOCAL TRANS FUNDS 780 780 315 155 155 155 780PRIVATE FUNDS 25 25 25 25VEN070202 Total 1,810 1,810 880 310 310 310 1,810
ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN040405 Ventura SCCAB VEN040405 ITS01 T TCM 6
Description: PTC 2,786 Agency VENTURA COUNTY TRANS COMMISSION (VCTC)
AUTOMATIC VEHICLE LOCATOR SYSTEM UPGRADE AND FAREBOX SYSTEM (TDC CREDITS OF $229 IN FY 18/19.
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 2,090 2,090 90 2,000 2,0905307OX OXNARD URBANIZED AREA
450 450 225 150 75 450
5307TO THOUSAND OAKS URBANIZED AREA
90 90 60 30 90
LOCAL TRANS FUNDS 156 156 78 52 26 156VEN040405 Total 2,786 2,786 393 262 131 2,000 2,786
Print Date: 3/15/2017 1:51:29 PM Page: 3 of 4
2017 Federal Transportation Improvement Program
Administrative Modification #17-06Ventura County
Project Listing Report(in $000`s)
ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentVEN54036 Ventura SCCAB VEN54036 BUO01 T EXEMPT - 93.126 6
Description: PTC 4,166 Agency VENTURA COUNTY TRANS COMMISSION (VCTC)
IN VENTURA COUNTY VCTC INTERCITY CAPITAL LEASE/MAINTENANCE CONTRACT - TOLL CREDITS OF $412 IN 16/17 AND $206 IN EACH OF 17/18, 18/19 & 19/20
Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total5307OX OXNARD URBANIZED AREA
317 317 317 317
5339CAM CAMARILLO URBANIZED AREA - BFG
745 745 298 149 149 149 745
5339OX OXNARD URBANIZED AREA - BFG
659 659 164 165 165 165 659
5339SV SIMI VALLEY URBANIZED AREA - BFG
1,385 1,385 494 297 297 297 1,385
5339TO THOUSAND OAKS URBANIZED AREA - BFG
1,060 1,060 424 212 212 212 1,060
VEN54036 Total 4,166 4,166 1,697 823 823 823 4,166Grand Total 600 28 286,950 287,578 13,773 82,303 35,241 23,473 128,446 4,342 287,578
Print Date: 3/15/2017 1:51:29 PM Page: 4 of 4
Modified: 1/12/2017 jjMPO FTIP ID: VEN54032
CTIP ID:
Agency CountyDistrict EA (if
applicable)Project Title Project Description Program Year
Earmark
RepurposingSTPL CITY Total Project Cost Toll Credit
Moorpark Ventura Rehabilitation of Roads on the Federal Aid System
Rehabilitation of City Roads on the Federal Aid System
2016/17 $200,000 $0 $200,000 $23,000
Santa Paula Ventura Street Resurfacing at Various Locations Street Resurfacing at Various Locations 2016/17 $77,000 $0 $77,000 $9,000
Oxnard VenturaVineyard/Patterson Resurfacing - Ventura Road to Gonzales Road
Resurface Vineyard Avenue / Patterson Road from Ventura Road to Gonzales Road
2016/17 976,632.00$ $1,044,000 $135,000 $2,155,632
Camarillo Ventura Pavement Rehabilitation On System Roads
On Various Streets on the Federal-Aid System, Pavement Resurfacing including associated improvements
2016/17 $342,000 $0 $342,000 $39,000
Ojai Ventura Road Rehabilitation Road Rehabilitation at Various Locations 2016/17 $200,000 $26,000 $226,000
Port Hueneme Ventura Street Rehabilitation at Various Locations
Rehabilitation / Overlay at Various Locations Citywide
2017/18 $200,000 $0 $200,000
Fillmore VenturaPavement Rehabilitation On-System Roads Various Locations
Pavement Resurfacing at Various Locations in Fillmore
2016/17 $200,000 $0 $200,000 $23,000
County Ventura Pavement Rehabilitation On System Roads
Pavement Rehabilitation at Various Locations in County Unincorporated Area
2018/19 $5,000,000 $647,000 $5,647,000
City of Simi Valley Ventura Pavement Rehabilitation On
System Roads Road Rehabilitation at Various Locations 2016/17 2,095,367.00$ 2,095,367.00$
Total 3,071,999 7,263,000$ 808,000$ $11,142,999
Agency CountyDistrict EA (if
applicable)Project Title Project Description Program Year
Earmark
RepurposingSTPL CITY Total Project Cost Toll Credit
Prior Year's FY 14/15 and FY 15/16 totals Prior $4,981,000 $3,341,000 $8,322,000
Moorpark Ventura Rehabilitation of Roads on the Federal Aid System
Rehabilitation of City Roads on the Federal Aid System
2016/17 $200,000 $0 $200,000 $23,000
Santa Paula Ventura Street Resurfacing at Various Locations Street Resurfacing at Various Locations 2016/17 $77,000 $0 $77,000 $9,000
Oxnard VenturaVineyard/Patterson Resurfacing - Ventura Road to Gonzales Road
Resurface Vineyard Avenue / Patterson Road from Ventura Road to Gonzales Road
2016/17 976,632.00$ $1,044,000 $135,000 $2,155,632
Camarillo Ventura Pavement Rehabilitation On System Roads
On Various Streets on the Federal-Aid System, Pavement Resurfacing including associated improvements
2016/17 $342,000 $0 $342,000 $39,000
Ojai Ventura Road Rehabilitation Road Rehabilitation at Various Locations 2016/17 $200,000 $26,000 $226,000
Port Hueneme Ventura Street Rehabilitation at Various Locations
Rehabilitation / Overlay at Various Locations Citywide
2017/18 $200,000 $0 $200,000 $23,000
Fillmore VenturaPavement Rehabilitation On-System Roads Various Locations
Pavement Resurfacing at Various Locations in Fillmore
2016/17 $200,000 $0 $200,000 $23,000
County Ventura Pavement Rehabilitation On System Roads
Pavement Rehabilitation at Various Locations in County Unincorporated Area
2018/19 $5,000,000 $647,000 $5,647,000
City of Simi Valley Ventura Pavement Rehabilitation On
System Roads Road Rehabilitation at Various Locations 2016/17 2,095,367.00$ 2,095,367.00$
Total 3071999 $12,244,000 $4,149,000 $19,464,999
GROUPED PROJECT LISTING
REHABILITATION & RECONSTRUCTION PROJECTS
GROUPED PROJECT LISTING with FY14/15 and FY15/16 Totals "Prior Year" Shown
REHABILITATION & RECONSTRUCTION PROJECTS
#17-06 VEN VEN54032 Street Resurf/Rehab
DISTRICT 7 - 2017 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 17-06 with federal approval date = ACTIVE) [PROJECT LISTING]
FTIP ID # ^VENLS02County (All)STATUS (Multiple Items)EA (All)Doc Year 2017
3 Administrative Login To Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2017.htmFUND NAME YEAR EA5 Project Desciption FTIP Amend# Doc TOTAL COST
SHOPPAC 2016/17 30220 Route 126: In And Near The Cities Of Ventura And Santa Paula, From Route 101 To Haun Creek Bridge. Rehabilitate Pavement. 17-01 16H-002 1588030140 Route 126: In And Near Fillmore, From Haun Creek Bridge To Los Angeles County Line. Pavement Rehabilitation. 17-01 16H-002 2530530760 Route 118: In Moorpark And Simi Valley, From East Of Arroyo Simi Overhead To Los Angeles County Line. Pavement Rehabilitation. 17-01 16H-002 4242
2016/17 Total 45427
2017/18 30330 Route 001: Near Oxnard, From Los Angeles County Line To South Of Sycamore Canyon Road. Rehabilitate Pavement. 17-00 2016 SHOPP 563930340 Route 033: In And Near The City Of Ventura, From Route 101 To South Of Park View Drive. Rehabilitate Pavement. 17-06 16H-007 1536430350 Route 023: In Thousand Oaks, From Carlisle Road To Route 101. Rehabilitate Pavement. 17-00 2016 SHOPP 4338
2017/18 Total 25341
2018/19 31440 Route 001: In And Near Dulah And Faria, From North Of Route 101 To Hobson County Park. Restore And Rehabilitate Culverts. (G13 Contingency Project)
17-01 2016 SHOPP 635
2018/19 Total 635
2019/20 30240 Route 101: Near Sea Cliff, From Padre Juan Canyon Road Overcrossing To Punta Gorda Pedestrian Undercrossing. Rehabilitate Roadway. 17-01 2016 SHOPP 23440
30250 Route 023: In And Near Cities Of Thousand Oaks And Moorpark, From Route 101 To Route 118. Rehabilitate Pavement. 17-06 16H-009 882312019/20 Total 111671
2020/21 31440 Route 001: In And Near Dulah And Faria, From North Of Route 101 To Hobson County Park. Restore And Rehabilitate Culverts. (G13 Contingency Project)
17-01 2016 SHOPP 1486
2020/21 Total 1486
SHOPPAC Total 184560
SHOPPAC-P 2016/17 25190 Route 101: In La Conchita, From 0.6 Mile North Of Mobil Peir Undercrossing To Santa Barbra County Line. Rehabilitate Pavement. 17-00 PM 132162016/17 Total 13216
SHOPPAC-P Total 13216
Grand Total 197776
FTIP ID: VENLS02 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Pavement Resurfacing And/Or Rehabilitation - Shopp Roadway Preservation Program Scope: Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 Categories - Pavement Resurfacing And/Or Rehabilitation, Emergency Relief (23 U.S.C. 125), Widening Narrow Pavements Or Reconstructing Bridges (No Additional Travel Lanes)
FTIP project listing.xlsm: D7 FTIP SUMMARY Page 1 of 1 Printed: 2/16/2017: 4:48 PM
#17-06 VEN VENLS02 GPL Pavement Rehab
DISTRICT 7 - 2017 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 17-06 with federal approval date = ACTIVE) [PROJECT LISTING]
FTIP ID # ^VENLS03County (All)STATUS (Multiple Items)EA (All)Doc Year 2017
3 Administrative Login To Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2017.htmFUND NAME YEAR EA5 Project Desciption FTIP Amend# Doc TOTAL COST
SHOPPAC 2018/19 29130 Route 033: Near Oak View, At San Antonio Creek Bridge (Br. No. 52-0065). Scour Mitigation And Bridge Rail Upgrade. 17-01 16H-003 75172018/19 Total 7517
2019/20 29650 Route 001: Near Sea Cliff, At Willow Creek Bridge No. 52-003; Also In Ojai, On Route 33 At North Fork Matilija Bridges No. 52-0044 (Pm 15.8) And No. 52-0173 (Pm16.1). Upgrade Bridge Railings To Meet Current Standards.
17-06 16H-009 7086
2019/20 Total 7086
SHOPPAC Total 14603
SHOPPAC-P 2016/17 31060 Route 126: Near Santa Paula, South Of Route 126 And West Of Briggs Road Between Mission Rock Road And Pinkerton Road. Required Off-Site Mitigation Along The Santa Clara River For Impacts Incurred From Two Bridge Projects (Ea 07-1760U And 07-0607U).
17-01 14H-496 5611
2016/17 Total 5611
SHOPPAC-P Total 5611
Grand Total 20214
FTIP ID: VENLS03 , 999 - 0.0 / 0.0 - Route 999: Lump Sum At Various Locations In Ventura County, Bridge Preservation Projects (Projects Are Consistent With 40 Cfr Part 93.126,127,128, Exempt Tables 2 & 3)
FTIP project listing.xlsm: D7 FTIP SUMMARY Page 1 of 1 Printed: 2/16/2017: 4:52 PM
#17-06 VEN VENLS03 Bridge Rehab-Con
DISTRICT 7 - 2017 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 17-06 with federal approval date = ACTIVE) [PROJECT LISTING]
FTIP ID # ^VENLS08County (All)STATUS (Multiple Items)EA (All)Doc Year 2017
3 Administrative Login To Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2017.htmFUND NAME YEAR EA5 Project Desciption FTIP Amend# Doc TOTAL COST
SHOPPAC 2016/17 29040 Route 101: In The City Of Ventura, At Ash Street Pedestrian Overcrossing. Upgrade Pedestrian Overcrossing To Americans With Disabilities Act (Ada) Standards.
17-01 16H-002 2066
31240 Route 126: In And Near Santa Paula, From East Of Todd Road To West Of S. Hallock Drive. Storm Water Mitigation. 17-01 2016 SHOPP 98682016/17 Total 11934
2017/18 31220 Route 126: In And Near The City Of Ventura, At Various Locations From West Of Victoria Avenue To East Of Route 118. Install Storm Water Mitigation Devices.
17-01 16H-003 4501
31330 Route Var: In Various Cities, At Various Locations On Various Routes. Install Storm Water Mitigation Devices. 17-01 2016 SHOPP 31172017/18 Total 7618
2018/19 31130 Route 101: In The City Of Ventura, From South Of Seaward Avenue To Ventura River. Stabilize Soil And Erosion Control. 17-01 2016 SHOPP 252131150 Route 126: In Santa Paula, From Peck Road To Santa Paula Creek. Stabilize Soil And Install Irrigation System. (G13 Contingency Project) 17-01 2016 SHOPP 505
2018/19 Total 3026
2019/20 30670 Route 150: In And Near Cities Of Ojal And Santa Paula, From Route 33 To Route 126. Construct And Upgrade Curb Ramps And Sidewalks To Comply With Ada Standards.
17-06 16H-007 8113
2019/20 Total 8113
2020/21 31150 Route 126: In Santa Paula, From Peck Road To Santa Paula Creek. Stabilize Soil And Install Irrigation System. (G13 Contingency Project) 17-01 2016 SHOPP 28562020/21 Total 2856
SHOPPAC Total 33547
Grand Total 33547
FTIP ID: VENLS08 , 999 - 0.0 / 0.0 - Route 999: Group Proj Listing Mandates (Scope: Proj Consistent W/ 40 Cfr Part 93.126 Exempt Tables 2 &3 Cat - Rr/Hwy Xing, Safer Non-Fed-Aid System Rds, Shoulder Impr, Traffic Control Devices & Oper Assistance Oth Than Signalization Proj, Intersection Signalization Proj At Individ Intersections, Pavement Marking Demo, Truck Climbing Lanes Outside Urbanized Area, Lighting Improv, Emer Truck Pullovers)
FTIP project listing.xlsm: D7 FTIP SUMMARY Page 1 of 1 Printed: 2/16/2017: 4:49 PM
#17-06 VEN VENLS08 SHOPP Safety Improv
11/11/2015
Agency CountyDistrict-EA
(if applicable)Project Title Project Description
Program
YearSec 5307 Ox Sec 5307 TO Sec 5307 SV Sec 5307 Cam LTF PVT
Total
Project
Cost
Comments
($'s in Thousands)
Ventura County Ventura Human Services Work Transport
Operations of Specialized Transportation Service 16/17 $38 $22 $- $- $60 $- $120 Carryover
CalVans Ventura CalVans Vanpool Operating Assistance for Vanpools throughout County 16/17 $16 $9 $- $- $25 $50 Carryover
Thousand Oaks Ventura Operating Assistance Operating Assistance 16/17 $200 $200 $400 Carryover
Ventura County Ventura Human Services Work Transport
Operations of Specialized Transportation Service 16/17 $38 $22 $0 $0 $60 $0 $120
VCTC Ventura Operating Assistance Operating Assistance 16/17 $72 $23 $0 $0 $95 $0 $190
Ventura County Ventura Human Services Work Transport
Operations of Specialized Transportation Service 17/18 $38 $22 $0 $0 $60 $0 $120
VCTC Ventura Operating Assistance Operating Assistance 17/18 $72 $23 $0 $0 $95 $190
Ventura County Ventura Human Services Work Transport
Operations of Specialized Transportation Service 18/19 $38 $22 $0 $0 $60 $0 $120
VCTC Ventura JARC Projects Operating assistance for JARC projects 18/19 $72 $23 $0 $0 $95 $0 $190
Ventura County Ventura Human Services Work Transport
Operations of Specialized Transportation Service 19/20 $38 $22 $0 $0 $60 $0 $120
VCTC Ventura JARC Projects Operating assistance for JARC projects 19/20 $72 $23 $0 $0 $95 $0 $190
TOTAL $ 1,810
**Added $100 for Backup listing in the TIP - 17-04 - Metrolink Shuttle and Beach Bus
2017 FTIP VEN070202
($s in Thousands)
JARC GROUPED PROJECT LISTING
#17-06 VEN VEN070202 JARC Op Assistance