Operational Excellence through CTPM’s Australasian organic approach to TPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area using Setting up a New Work Area using best practice thinking Presentation by: Ross Kennedy President CTPM Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au President CTPM

Transcript of 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February...

Page 1: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

Operational Excellencethrough CTPM’s Australasian organic approach to

TPM & Lean / CIWebinar 35

9 February 2016

Setting up a New Work Area using

y

Setting up a New Work Area using best practice thinkingp g

Presentation by:

Ross KennedyPresident CTPM

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

President CTPM

Page 2: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

People before ToolsPresentation by:

Ross KennedyP id t CTPM Webinar 35President CTPM

9 February 2016

Webinar 35

Outline of Presentation

Setting up a New Work Area using best practice thinking

1. Benefits of a team based approach

g p g p g

2. Using a 9 step process to ensure best outcomes3. Role of New Equipment Management thinkingq p g g4. Role of Work Area Management or 5S thinking5 Getting the most from your Checklists

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

5. Getting the most from your Checklists

Page 3: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

1. Benefits of a team based approach

Example New Area Management Teams

New Zealand Sugar – Auckland NZ

Example New Area Management Teams

New Zealand Sugar – Auckland NZRack ‘N’ Stack Team – FG Warehouse

GF Longburn Dairy – Palmerston Nth NZT di T C l d F d P k ff ATardis Team – Cultured Foods Pack off Area

B&D Doors & Openers – Clontarf QLDSpace Cadets Team – Storage & Handling of Roller DoorsHit and Miss Team – Introduction of 3m Rule for Forklifts P d P ff T I d i f P d C d P l D

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Powder Puffs Team – Introduction of Powder Coated Panel Doors

Page 4: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

1. Benefits of a team based approach

Things to Remember about TeamsThings to Remember about Teams

• Team Size should be 4-8

• Team Leader should be the person who will benefit the• Team Leader should be the person who will benefit the most from the team being successful

• Team activities should be scoped so they can be completed within 12 weeks or less

Hence: Design TeamsInstall TeamsDesign & Install Teams

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Page 5: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

New Area Management – Design Only2. Using a 9 step process to ensure best outcomes

New Area Management – Design Onlytypically a half-day kick-off workshop plus up to 11 weekly meetings involving

1.0 - 1.5 hr meetings per week plus support activity time

1. Confirm Mandate& Boundaries

3. AnalyseCurrent Situation

9. Communicate Results& Share Learning

2. Form Team& ScopeA ti iti

4. Develop Visionof Ideal Area

Presentation & Recommendations

Activities5. Identify & Design

Possible Options 8. Finalise DesignSpecifications andAchieve Sign-off

Presentation & Approval

6. Test ProposedDesign Options

through Simulations

7. Refine and DocumentSuccessful Design

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Page 6: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

New Area Management – Design Only2. Using a 9 step process to ensure best outcomes

New Area Management – Design Onlytypically a half-day kick-off workshop plus up to 11 weekly meetings involving

1.0 - 1.5 hr meetings per week plus support activity time

1. Confirm Mandate& Boundaries

3. AnalyseCurrent Situation

9. Communicate Results& Share Learning

2. Form Team& ScopeA ti iti

4. Develop Visionof Ideal Area

Presentation & Recommendations

Activities5. Identify & Design

Possible Options 8. Finalise DesignSpecifications andAchieve Sign-off

Presentation & Approval

6. Test ProposedDesign Options

through Simulations

7. Refine and DocumentSuccessful Design

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Page 7: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

New Area Management – Install Only2. Using a 9 step process to ensure best outcomes

New Area Management – Install Onlytypically a half-day kick-off workshop plus up to 11 weekly meetings involving

1.0 - 1.5 hr meetings per week plus support activity time

1. Confirm Mandate& Boundaries

3. AnalyseCurrent Situation

9. Communicate Results& Share Learning

2. Form Team& ScopeA ti iti

4. Confirm Visionof Ideal Area

Presentation & Recommendations

Activities5. Identify Possible Enhancements &

Finalise Install Plan

8. Finalise Standards & Procedures and

Define Future Actions

Presentation & Approval

6. Pilot ProposedDesigns, Refine

and Install

7. Evaluate Results & Measure Performance

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Page 8: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

New Area Management – Design & Install2. Using a 9 step process to ensure best outcomes

New Area Management – Design & Installtypically a half-day kick-off workshop plus up to 11 weekly meetings involving

1.0 - 1.5 hr meetings per week plus support activity time

1. Confirm Mandate& Boundaries

3. AnalyseCurrent Situation

9. Communicate Results& Share Learning

2. Form Team& ScopeA ti iti

4. Develop Visionof Ideal Area

Presentation & Recommendations

Activities5. Identify & Design

Best Layout8. Finalise Standards

& Procedures and Define Future Actions

Presentation & Approval

6. Pilot ProposedDesigns, Refine and Implement

7. Evaluate Results & Measure Performance

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Page 9: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

Objectives of New Area Management3. Role of New Equipment Management thinking

Objectives of New Area Management

To apply the concepts of:

• Prevention at Source DesignPrevention at Source Design

• User Friendly Work Area

• Checklists for Learning

using Cross-functional Team(s) to design and install safeusing Cross functional Team(s) to design and install safe and effective New Area within the minimum Lead Time

Remember: the quicker we get the New Area working, the quicker we get our payback

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

the quicker we get our payback

Page 10: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

Prevention at Source3. Role of New Equipment Management thinking

Prevention at SourceFinding Problems at Earliest Possible Time

The cost of Product Defects when they are:

PreventedInternally Detected

Customer Detected

1X

Prevented

10X 100X1X 10X 100XRaw Materials

Finished GoodsCustomer Returns

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

finding problems at the earliest possible time

Page 11: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

Prevention at Source Design3. Role of New Equipment Management thinking

Prevention at Source DesignDefining and Designing to Avoid Problems / Wastes

The cost of Design Defects when they are:Detected during or

Prevented during Definition

Detected during Design

Detected during or after Implemented

Definition

1X 10X 100X1X 10X 100X

Invest in getting the definition right by involving everyone

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Invest in getting the definition right by involving everyone

Page 12: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

Prevention at Source Design approach being applied

Shipbuilder A Shipbuilder BShipbuilder AThousand man-hours

Traditional

Shipbuilder BThousand man-hours

Prevention at Definition10Traditional

Approach 20 Source DesignApproach

20 Design 7

30 Redesign 3

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

60,000 man-hours Vs 30,000 man-hours

Page 13: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

Prevention at Source Design3. Role of New Equipment Management thinking

Prevention at Source DesignDefining and Designing to Avoid Problems / Wastes

Prevention at Source Design involves getting all affected l d h l bl hparties involved at the earliest possible time to use their

collective experience to create a detailed design specification

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Page 14: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

Rack ‘n’ Stack Team PhotoThis team has over 103 years service at Chelsea

Mike Russell Richard Ray Jason Rob Jonaree David

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Design and Implement an effective plan for storing, picking & loading Equal ProductsCTPM TPM & Lean / CI Annual Forum Team Competition 2014

Page 15: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

Rack ‘n’ Stack TeamDesign and Implement an effective plan for storing, picking & loading Equal Products

• Set up work areaKey Milestones to achieve Mandate

• Confirm picking layout• Analyse order profiles• Establish new order picking processes

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Page 16: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

Prevention at Source Design3. Role of New Equipment Management thinking

Prevention at Source DesignDefining and Designing to Avoid Problems / Wastes

Prevention at Source Design involves getting all affected l d h l bl hparties involved at the earliest possible time to use their

collective experience to create a detailed design specification

The Aim is to address the situation where:

“Engineers traditionally look at Functionality as the prime objective of design and often pay limitedas the prime objective of design and often pay limited

attention to Operability, Maintainability, Standardisation and Trainability”

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Standardisation and Trainability

Page 17: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

A k th A diAsk the Audience

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Page 18: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

Role of User Friendly Work Area4. Role of Work Area Management or 5S thinking

Laying out and Organising the Work Area so that we eliminate

Role of User Friendly Work Areay g g g

Non Value Adding activities (7 Wastes) such as:1. Manual Transportation, Conveyance or Sorting products and

raw materials2. Unnecessary Movement or Waiting - Looking for things (e.g.

tools, cleaning items, raw material, etc)3. Access to services (e.g. water, compressed air, power, steam,

li h i d i f i i )lighting, drains, refrigeration, gas etc)Remember!

“a place for everything and everything in it’s place”Or

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Anything that saves Time!

Page 19: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

Spaghetti Diagram – current

GF Longburn Dairy – Palmerston Nth NZTardis Team – Cultured Foods Pack off Area

Page 20: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

Spaghetti Diagram – with improvements

Individual work stations with the days supplies (labels, tape etc)

Implementation of exclusion zones

Relocate grading function outside this area

?

GF Longburn Dairy – Palmerston Nth NZTardis Team – Cultured Foods Pack off Area

Page 21: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

Visual Controls in Work Area

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Page 22: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

Visual Controls in Work Area

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Page 23: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

Visual Controls – Changeover Trolley

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Page 24: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

5. Getting the most from your Checklists

New Area Management Checklist AnalysisReview all New Area Management Checklists that have been

New Area Management Checklist Analysis

developed by previous teams to ensure they are current and appropriate.

Checklists should cover at least:• OH&S• Environment• Traffic Flow• Storage• Ergonomics

If previous checklists don’t exist, use the samples on next pages to create your initial checklists

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Taken from Step 3 of New Area Management Team Member Manual

Page 25: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

5. Getting the most from your Checklists

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Page 26: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

Learning from Teams

• Working through problems in a group can come up with multiple solutions instead of just onemultiple solutions instead of just one

• Working through multiple solutions in a group can sometimes eliminate other problems

• Opportunities are there – just got to look for them

eliminate other problemsHit and Miss Team – Introduction of 3m Rule for Forklifts

Opportunities are there just got to look for them• Great idea generation from the team• Consultation is critical• We can develop a plan to solve the problem ....but sometimes

the first plan is not necessary the best!

• Don’t get tunnel vision on one solution

Powder Puffs Team – Introduction of Powder Coated Panel Doors

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Space Cadets Team – Storage & Handling of Roller Doors

Page 27: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

How can we help ?

New Area Management - Ed 3Team Member ManualTeam Member Manual5 or more is $80 + GST10 or more is $64 + GST

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Page 28: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

How can we help ?

Membership Benefits include:R i i f R k ‘N’• Receiving a copy of Rack ‘N’ Stack presentation and video

• Receiving a copy of this• Receiving a copy of this presentation

• Plus a lot morePlus a lot more

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au

Page 29: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

Company Membership Program

CI Community of Australasia37 Sites

Page 30: 20160206 Setting up New Area - Webinar - CTPM · PDF fileTPM & Lean / CI Webinar 35 9 February 2016 Setting up a New Work Area usingSetting up a New Work Area using ... Review all

Q ti TiQuestion TimePresentation by:Ross Kennedy

Email: ross kennedy@ctpm org au

President CTPM

Email: [email protected]: 02 4226 6184Web: www ctpm org au

Copyright 2016 CTPM – For further information please refer to: www.ctpm.org.au