Special Reminders
Dear Exhibitors,
Very appreciate your participation in the Exhibition of the Intelligent Transport Systems (ITS).
Please pay attention to the following special reminders.
I. Please carefully read this "Exhibitor Manual”, particularly its terms of fire and
construction safety, and pay attention to the schedules to timely submit relevant materials.
II. If any dispute arises between an Exhibitor and its designated construction company or
service providers, the dispute shall be resolved outside of the hall so as not to impact smooth
conduct of the exhibition. If not and the exhibition is impacted, the Organizers have the right to
ask Policemen to force the exhibitor and service provider out of the hall, and temporarily stop
the Exhibitor’s exhibition; any consequences arising whereof shall be fully borne by the Exhibitor.
Ⅲ. The rubbish and discarded items produced in the exhibition hall shall be cleaned away
from the hall and the surroundings. Demolition of special booths shall stick to the principle: One
who set up the special booth shall be responsible of its demolition. The deposit for safety and
cleanness can only be refundable 48-72 hours after the exhibition is closed, the booth is
dismantled and moved-out, and the Expo Center and the Construction Contractor of the
Organizers had confirmed the surrounding environment.
Ⅳ. An Exhibitor with special booth shall, for the image of its own booth and the overall
environment of the exhibition, be sure to keep well the sides, rear, and the top of the booth
during installation and decoration, keeping it looking graceful and beautiful, and is not allowed to
show its company's name, LOGO and advertising etc. on a side of a booth of other exhibitors.
Otherwise, the Organizers is entitled to impose on the construction company a penalty between
RMB1,000 and RMB2,000 which would be deducted from the deposit.
Ⅴ. Exhibitors shall notify their designated construction companies to prepare a power
distribution box, as the Level-1 electrical box of the hall cannot be directly available for them.
VI. In the stages of move-in and move-out, any person entering the exhibition hall shall wear
a helmet, otherwise no access is allowed. If the height of a construction work is above 2.5 meters,
the construction workers shall take adequate safety measures. Workers working in night are
required to wear reflective vests.
VII. Height Limit on Special Booth: 6M.
Ⅷ. An Exhibitor with special booth shall be a month earlier to designate a construction
company, and notify the construction company to submit the drawing by March 20 to the
Construction Contractor of the Organizers so as to make timely rectifications (if any).
Ⅸ. Exhibitors are strongly recommended to lease exhibition articles at the service point
designated by the Organizers, instead of conducting deals with black-market leasers.
Ⅹ. If any safety risks are detected by the Expo Center, the Organizers and Firefighters during
inspection, any exhibitor shall make rectification immediately, instead of refusing with any reason.
Otherwise, the Expo Center is entitled the right to power off the booth and to shut it down. The
power will only be resupplied and the closure be removed when the Exhibitor and its
construction company ensure to take a rectification.
XI. It is strongly recommended that Exhibitors and their construction companies buy
Personal Accident Insurance for their staffs.
XII. The exhibitors shall control the volume not to exceed 60 decibels when they engage in
3
3
activities. If not and the sound impacts neighboring exhibitors, the Organizers are entitled to
terminate their activities within the booth.
For the sake of safety, Please be sure to comply with the provisions of the Expo Center and
the Organizers, obey their instructions, and actively cooperate when problems arise. Thank you
for your supports.
Wish all exhibitors to successfully achieve the desired effect! Way to Go!
Location
Hall 2, Nanjing International Expo Center at the No. 300, Middle Jiangdong Road, Nanjing, Jiangsu
Province
Duration of the Exhibition
Exhibition Dates: April 27, 2015 - April 29 (Monday to Wednesday)
Time for Exhibition Preparation, Move-in and Move-out
1) Time for Booth Preparation (For SPECIAL BOOTH constructed on Bare Space): Exhibits
arrangement by the Construction Company and the Exhibitor
09: 00-17:00, April 25, 2015
09: 00-20: 00, April 26, 2015
2) Time for Booth Preparation (For STANDARD BOOTH): exhibits arrangement by the exhibitors
09: 00-20: 00, April 26, 2015
3) Time for Move-out
14: 00-24: 00, April 29, 2015
4) Overtime Payment during the Exhibition Preparation (paid on-site)
If an exhibitor has to work longer hours, please go to the service point of the Contractor of
the Organizers to handle the overtime work formalities before 16 p.m. of the day. The access of
the overtime workers to the Site shall be with a Pass for Overtime. Otherwise, no overtime works
will be schedule by the Organizers. Overtime costs (including security costs) shall be borne by the
exhibitor or its construction contractor.
List of Overtime Charges:
Category Item Price
(RMB)
Deposit
(RMB) Unit
Uploading in
advance
Uploading in advance,
limited to daytime,
do not allow to set up
500 Hour·point
To apply before
16:00 at the day for
overtime work
between: 17: 00-22:
00
Application for
Overtime work 8 Square meter .hour
4
4
To apply before
16:00 at the day for
overtime work after
22: 00
Application for
Overtime work 12 Square meter .hour
To apply after 16:00
at the day for
overtime work
between: 17: 00-22:
00
Application for
Overtime work 12 Square meter .hour
To apply after 16:00
at the day for
overtime work after
22: 00
Application for
Overtime work 15 Square meter .hour
To apply for
overtime work
before 22: 00
Application at the
last day of the booth
preparation period
15 Square meter .hour
To apply for
overtime work after
22: 00
Application at the
last day of the booth
preparation period
30 Square meter .hour
Note: 1.the application for overtime works of unloading and construction in advance of the
exhibit preparation period is limited to daytime;
2.In overtime work application, goods unloading in advance of the exhibit preparation
period shall be approved by the Organizers;
3.In overtime work application, the application for goods uploading in advance of the
exhibit preparation period shall be based on a single booth, and the area of each
special booth shall not be unbundled or split for application.
(According to the requirements of the Expo Center, the fees for a booth with an area less
than 100 M2 will be calculated based on 100 M2, while the fees for a booth more than 100 M2 will
be calculated based on the actual floor area of the booth)
5) Overtime during Move-out (paid on-site)
By the requirement of the Expo Center, during the day of move-out (April 29), the
dismantling shall be completed before 24:00. If any exhibitor or its contractor is unable to
complete the dismantling work, it shall apply to the on-site service point of the Contractor of the
Organizers for the overtime work of dismantling. Overtime costs shall be borne by the exhibitor
or its contractor.
Fees: 24: 00-- : RMB15 / square meter / hour
(According to the requirements of the Expo Center, the fees for a booth with an area less
than 100 M2 will be calculated based on 100 M2, while the fees for a booth more than 100 M2 will
be calculated based on the actual floor area of the booth)
If an exhibitor or its Construction Contractor fails to bring the exhibits and decoration
materials out of the hall on time, and does not go to the service point to handle the relevant
overtime formalities, the Construction Contractor of the Organizers will be entitled to deduct the
overtime fees accordingly from the construction deposit of the exhibitor.
5
5
If an exhibitor or its Construction Contractor fails to bring the exhibits and decoration
materials out the hall on time, and there is no any persons to make cleanup of the booth, the
Contractor of the Organizers will be entitled to send cleaning staff to move it out, and all of the
construction deposit can be deducted.
Hall Location
Nanjing International Expo Center, Jiangsu Province
Address: No. 300, Middle Jiangdong Road, Jianye District, Nanjing Postal Code: 210019
Map of the Hall Location
Cards and Passes for the Exhibition
1) Category and Description of the Card/Pass of the Exhibition:
① Exhibitor Card: Used by Staff of Exhibitors for venue access.
Exhibitors with standard booth 9 M2 will be granted 3 cards for free;
Exhibitor with a 54 M2 bare area for booth construction will be granted 8 cards for free;
81 M2 booth area for 10 cards for free;
108 M2 booth area for 12 cards for free;
135 M2 booth area for15 cards for free.
② Card for Booth Installation:(ditto) Used by exhibitors with bare area for booth
construction. (Beyond the granted cards, the extra cards will be charged RMB10 Yuan per card as
6
6
the cost of production).
③Guest Card: Used by specially invited guests which can be used for Forum participation
(the exact number of the cards to be granted will be based on the number of forms filled).
④ Work Card: Used by the staff of the Exhibition.
⑤ Cards for Correspondent: Used by invited media, reporters or the Express reporter of the
expo.
⑥ Vehicle Cards: Used for vehicles for exhibition move-in and move-out. It is the certificate
for vehicles transporting the shelves and exhibits to and from the exhibition area during the
preparation and dismantling periods. (A charge of RMB 10 Yuan per card is imposed).
2) Cards Management &Requirements:
① When the Exhibitors come for registration, they shall hold the original Booth
Confirmation Letter (or a copy stamped) and business cards to the Registration Desk for
collection of relevant cards;
② During the exhibition to be allowed for access, all persons are required to wear relevant
cards in the chest, and kindly accept identification checks by the guards. No lending, sale or
alternation of the cards is allowed. If any violation is found, the offender will be held accountable;
③ The Vehicle Cards are used for trucks in according to certain standards. It functions both
for preparation move-in period and dismantling move-out period. Please keep it properly till
finishing of the move-out, the loss of the card will cause inconvenience.
3) Application and Use of the Cards for Booth Installation
To prevent irrelevant persons from entering and ensure a well-ordered exhibition
preparation at the site, a registration system of the Card for Booth Installation, with which the
real names of the construction workers will be registered, is hereby implemented:
① To apply for the card, the Construction Registration Form (Form F4) and staff ID card shall be prepared and submitted. The person responsible for the construction and all
construction workers shall be listed on the Construction Registration Form.
② The card is used by a specific person, and no lending or exchange is allowed. If a holder’s
card is obtained by criminals resulting in losses of the show, the person shall bear joint liabilities.
③ Persons who come in and out of the hall during the full range of the Exhibition shall
wear the card.
Officially Designated Freight Forwarder
Company Name: Jiangsu Sinotrans Limited Liability Company
Address: No. 100 Jianning Road, Nanjing
Contact: Cao Zhe
Tel: 86-25-85513064
Booth Construction Company Recommended by the Organizers
Nanjing Sidex Exhibition Services Co., Ltd.
Address: Tower AB of Riyue Building, No. 2, South Taiping Road, Qinhuai District, Nanjing,
Jiangsu Province
Tel: 025-84650011-8056 15951838352
Fax: 025-84650052-8003
Email: [email protected]
Contact: Liu Xinnan
7
7
Specifications and Facilities of the Exhibition Hall
Exhibition Hall Hall 2
Main Entrance 7 Mx5 M
Hall Dimensions 162Mx72M
Limit Height for
Structures
Hall height limit: 6M. If a booth would reach a height more than 6M, the
Exhibitor shall obtain an official written approval from the Expo Center.
Ground Bearing 3T / M2
Power Supply Three-phase five-wire, 380V / 220V / 50 Hz, and double loop lines fully
available.
Power 2800 kilowatts / Hall
Water Supply
Equipments
Tap caliber: 20cm; draining caliber: 50cm; pressure: 0.32 MPa. Each box is
equipped with one tapping connection and one draining outlet.
Hall Lighting 200 LX
Air Conditioning Air vents north-south; the air outlet is about 8.4 meters above the ground
Fire Equipment Warm detectors, smoke detectors, active infrared intrusion detectors, flame
detectors, and a manual alarm button, an intelligent, high-flow water gun
sprinkler systems, and a fire hydrant. There is start buttons for hose and
pump in the hydrants, and at the important engine rooms and places, there
are gaseous extinguishing agent of ammonium phosphate.
Telephone Lines for local, domestic and overseas
Broadband For each hall, there are in place 340 data ports with the maximum
transmission speed of l00 M; over 340 voice ports; 16 single and multimode
fiber ports with maximum transmission speed of I000M; and wireless
network is available for all of the halls.
8
8
Special Note
The Booth Installation &Decoration Terms and the Forms are provided for convenience of the
exhibitors to arrange their exhibition booth setup. Please complete all the forms and return them
back to the Organizer’s Contractor before the deadline, to ensure they can be timely processed.
For application for furniture and appliances, a surcharge of 20% will be imposed if the application
is later than the deadline, and a surcharge of 50% will be imposed if the application is made at
the site.
Standard Booth (exhibitors) Form Deadline
F 1 Lintel Board (F1 Shall be returned) April 10, 2015
F2 Positions of Allocated and Leased Facilities (F2
Shall be returned)
April 10, 2015
F3 Application for Leasing Exhibition Appliances (F3
Shall be returned if any)
April 10, 2015
F6 Power Application (including the electrical box) (F6
Shall be returned if you need)
April 10, 2015
F7 Phone application (F7 Shall be returned if you
required)
April 10, 2015
Special Booth Form Deadline
F-1 Job Responsibility of Safety for Special Booth March 20, 2015
F-2 Declare for Reservation for Special Booth March 20, 2015
F-3 Reservation List of Water/Electricity(一) March 20, 2015
F-4 Reservation List of Water/Electricity(二) March 20, 2015
F-5 Position of Electricity for Booth/Air Compression/Plumbing/Network March 20, 2015
F-6 Reservation List of Communication/Network March 20, 2015
F-7 Construction Registration Form March 20, 2015
Please complete the forms and email or fax back to the Contractor of the Organizers before the
deadline:
Nanjing Sidex Exhibition Services Co., Ltd.
Address: Tower AB of Riyue Building on 29 floors, No. 2, South Taiping Road, Qinhuai District,
Nanjing, Jiangsu Province
Tel: 025-84650011-8056
Fax: 025-84650052-8003
E-m ail: [email protected]
Contact: Liu Xinnan
Bank: Daxinggong Branch, Bank of Nanjing
Account Number: 01211420030000023
9
9
Standard Booth Description
Standard configurations for each standard booth (External dimensions: 3 m x3 m; internal
dimensions: 2.97 m x2.97 m) show as follows:
Company Signs (lintel board): Name of the exhibitor (in Chinese and English) and the booth No.;
Booth Walls: An aluminum frame, with one side as the company signboard and the other three as
walls;
Furniture: a desk, two folding chairs, and a waste paper basket;
Electric Appliances: two 100W spotlights.
Notes:
1) A booth with an area less than 18 square meters will receive only standard booth configuration of furniture and appliances that are available to a booth with 9 square meters.
Only those booths with an exhibition area that is a multiple of 9 square meters are qualified
to receive furniture and appliances in a quantity that is corresponding to the multiple.
2) If an exhibitor ordered two or more consecutive standard booths, the construction contractor of the Organizers will remove the walls placed between two booths, unless the
exhibitor specifically requests otherwise;
3) No nails or any device may be nailed on walls, aluminum frames, floors, ceilings, pillars and fire sprinklers in the hall. If any violation is found, a penalty for compensation will be
imposed.
4) Connection or increase of electric wires or lamps without permission is forbidden. The power socket received through application shall not be used for booth lighting; as its maximum
capacity is within 500W, no electrical equipment beyond the capacity is allowed to be used
with the socket. It is strictly prohibited to secretly bring in sockets for use without
permission.
5) For all electrical facilities and equipments configured and installed on standard booths, the exhibitor shall not remove or shift them at will, and further, not bring them out of the
exhibition hall.
6) Lighting equipments (such as: TV, recorders and refrigerators, etc.) to be brought in by exhibitors shall be subject to the approval of the Contractor of the Organizer, and the use of
electrical appliances that are of not compliance is prohibited within a booth.
7) If an exhibitor wants to rent articles that are not listed on the Forms, please inquire directly to the Contractor of the Organizers.
8) Exhibitors shall be responsible for maintaining undamaged the booth facilities and leased items; if not, they shall be held for responsibilities and liabilities to compensate damages.
10
10
Attachment: Configuration for Standard Booth
Be sure to send the Form back to the Contractor of the Organizers by April 10, 2015
Lintel Board (Booth No.), F1:
Please fill in your company name in Chinese (no more than twenty characters) and in English (no
more than forty letters) in the following lattices.
Simplified Chinese (please keep the writing clear; it is recommended to provide in electronic
version)
11
11
English (please keep the writing clear; it is recommended to provide in electronic version)
Note: If the application is overdue after the deadline, a surcharge of 20% will be imposed, and a
surcharge of 50% will be imposed if the application is made onsite.
Exhibition Service Provider:
Nanjing Sidex Exhibition Services Co., Ltd.
Address: Tower AB of Riyue Building, No. 2, South Taiping Road, Qinhuai District, Nanjing, Jiangsu
Province
Tel: 025-84650011-8056 15951838352
Fax: 025-84650052-8003
E-mail:[email protected]
Contact: Liu Xinnan
Bank: Daxinggong Sub-Branch of the Bank of Nanjing
Account Number: 01211420030000023
Name of the Exhibiting Company:
Address: Postal Code:
Contacts: Title (Mr./Mrs.):
Tel: Fax: E-mail:
Seal and Signature:
Be sure to send the Form back to the Contractor of the Organizers by April 10, 2015
Allocation and rent facilities location F2 booth:
Please mark on the following booth floor plan the positions of booth changes, leased facilities
(exhibition tools, and water and electricity equipments, etc.) and leased boards (specify height),
including basic and additional facilities of your company. If the booth you ordered is in a corner,
please indicate on the following figure whether walls are needed.
12
12
Floor Plan (ratio: 1 blank space = 1m2)
Note:
If an Exhibitor fails to submit this Figure, the Contractor of the Organizers will install on its behalf
in proper positions. If the Exhibitor wants to change positions of the aforementioned facilities
and equipments, it will be subject to an extra fee.
All rented sockets are used only for non-lighting purpose. If an exhibitor or its construction
contractor self-prepares lighting equipments for decoration purposes, it shall consult the
Contractor of the Organizers for the installation and connection of the lighting equipments, and
bear related expenses.
Exhibitors shall submit the facilities marked on the Figure together with relevant Forms before
the deadline that will make valid the application.
All payments for the items an exhibitor applied shall be made no later than the date of March 23.
The Contractor of the Organizers will only arrange items that have been paid.
If the application is overdue after the deadline, a surcharge of 20% will be imposed, and a
surcharge of 50% will be imposed if the application is made onsite.
Exhibition Service Provider:
Nanjing Sidex Exhibition Services Co., Ltd.
Address: Address: Tower AB of Riyue Building, No. 2, South Taiping Road, Qinhuai District,
Nanjing, Jiangsu Province
Tel: 025-84650011-8056
Fax: 025-84650052-8003
E-mail:[email protected]
Contact: Liu Xinnan
Bank: Daxinggong Sub-Branch of the Bank of Nanjing
Account Number: 01211420030000023
Name of the Exhibiting Company
Address: Postal Code:
Contacts(Mr./Mrs.): Title:
13
13
Tel: Fax: E-mail:
Seal and Signature:
Be sure to watch in this March 20, 2015 back to the General Assembly contractors
Application for Leasing Exhibition Tools F3 Booth No.:
Categ
ory Name of Items
UNIT
PRICE
Deposit
(RMB) Unit Quantity
Table
and
Chair
Consulting-use Table (974 ×
474 × 760 ㎜) 100 150
Piece/Exh
ibition
Period
Glass-made Round Table
(diameter: 80cm) 100 150
Piece/Exh
ibition
Period
Negotiation Table (65 × 65 ×
70cm) 80 200
Piece/Exh
ibition
Period
Folding Long Table (120 × 48
× 76cm) 80 200
Piece/Exh
ibition
Period
Cloth for Folding long table
(dark blue) 50 100 / extension
Bar chair 100 150 / extension
50 100
Piece/Exh
ibition
Period
Chair 100 150
Piece/Exh
ibition
Period
Exhibition chair 40 100
Piece/Exh
ibition
Period
Conference Chair 50 150
Piece/Exh
ibition
Period
Shelv
es
With a cabinet and locker (104
× 55 × 76cm) 170 300 set /
extension
170 300
Piece/Exh
ibition
Period
Glass-made display cabinets
(120 × 45 × 100cm) 270 300
Piece/Exh
ibition
Period
Low Flat Showcase (90 × 45 ×
70cm) 220 250
Piece/Exh
ibition
Period
14
14
Middle-height Flat Showcase
(90 × 35 × 160cm) 300 350
Piece/Exh
ibition
Period
High Slant Showcase (90 × 35 ×
180cm) 320 500
Piece/Exh
ibition
Period
High Flat Showcase (90 × 35 ×
180cm) 320 500 Group /
extension
320 500
Piece/Exh
ibition
Period
Podium 220 350 podium/da
y
Data frame (500 × 1200 mm) 50 100
Piece/Exh
ibition
Period
Platform Plate (900 × 300 mm) 70 150
Piece/Exh
ibition
Period
Video multimedia quotation No.:
Name STANDARD(mm) UNIT PRICE
Duration of the
Exhibition for 3
Days
Notes
P4 500x500 450
(Square/Day)
600
(Square/Exhibition
Period)
P5 488x488 400
(Square/Day)
550( Square /
Exhibition Period )
P10 color
curtain screen 500x1000
350
(Square/Day)
500( Square /
Exhibition Period )
Plasma display
panel TV 42" 450(Piece/Day)
600( Piece /
Exhibition Period )
1210X645X96
(mm)
Plasma display
panel TV 50 "
650( Piece
/Day)
750( Piece /
Exhibition Period )
1225X790X86
(mm)
Plasma display
panel TV 60 "
1800( Piece
/Day)
2000( Piece /
Exhibition Period )
1548X988X98.5
(mm)
The LCD
Splicing Screen
46"
(4pieces*4pi 20000(Set)
15
15
Note:
1、 For the placement of exhibition appliances and articles leased by the Exhibitor, please indicate them on the
Form F2. Exhibitors shall submit the Form F2 before the deadline that will make valid the application.
2、 If an Exhibitor fails to submit the F2, the Contractor of the Organizers will install on its behalf in a proper
location. If the Exhibitor wants to change positions of the aforementioned equipments, it will be subject to
an extra fee. For the pattern of the exhibition appliances, please see the following page.
3、 Exhibitors shall make payments for all applications. Please transfer or remit the money no later than March
23. Please do not transfer in a personal name, name of the exhibitor on the invoice the Contractor of the
Organizers issues will be the name of the company which remitted the money, and the Contractor of the
Organizers will only arrange items that have been paid.
Note to a special VAT invoice: with the national regulations on tax reform which implements the policy to replace
the business tax with a value-added tax, if a special VAT invoice is needed and in order to save time, the company
will issue the invoice in advance. Please submit relevant materials before the deadline specified by the
Organizers:
1) A copy of the business license (scanned copy); 2) a copy of the national tax registration certificate that qualifies
a general taxpayer(a scanned copy); 3) business address, telephone, opening bank and Bank account
Note: The above information is only required for the first time of invoice billing. If failed to provide the above
information, the Organizer can only issue an ordinary VAT invoice.
4、 All standard booth facilities are not allowed to be replaced. If there is a need to replace, it will be subject to
service charge.
5、 If the application is overdue after the deadline, a surcharge of 20% will be imposed, and a surcharge of 50%
will be imposed if the application is made onsite.
eces)
The LCD
Splicing Screen
46"
(3pieces*3pi
eces) 13000(Set)
Linear Array
Acoustic 1.1*3
9000(Duration of
the Exhibition for 3
Days)
Used in huge
booth or stage
mostly
( Brand:Italy
RAF、Sound
Power:500W )
Ordinary
Acoustics
3000(Duration of
the Exhibition for 3
Days)
One pair
(Brand:Italy
RAF、Sound
Power:400W)
16
16
Exhibition Service Provider:
Nanjing Sidex Exhibition Services Co., Ltd.
Address: Tower AB of Riyue Building, No. 2, South Taiping Road, Qinhuai District, Nanjing, Jiangsu
Province
Tel: 025-84650011-8056 15951838352
Fax: 025-84650062-8003
E-mail:[email protected]
Contact: Liu Xinnan
Bank: Daxinggong Sub-Branch of the Bank of Nanjing
Account Number: 01211420030000023
Name of the Exhibiting Company
Address: Postal Code:
Contacts(Mr./Mrs.): Title:
Tel: Fax: E-mail:
Standard for the Management Fees and Construction Deposit for Special Booth
To ensure a smoothly conduced exhibition, the Organizers will charge special booth exhibitors the
construction management fees and collect construction deposit from them. We hope to get your
understanding and supports.
1. Charge Standard for Construction of Special Booth at Bare Space: RMB 25 / square meter
2. Charge of the Construction Deposit:
Booth area (m2) Deposit for Construction (RMB)
Below 200 m2 (including 200 m2) 20,000
200 m2 to 400 m2 (including 400 m2) 40,000
More than 400 m2 60,000
For booths that require to use water, an additional deposits for water security that is RMB10,000
Yuan will be charged.
Category Item Name Price (RMB) Deposit
(RMB) Unit
Special
Booth
Managemen
t
Management Fees for Special
booth decoration and
construction
25 ㎡• exhibition
period
Deposit for Clearing of the
Special Booth (Capped at
RMB20,000 / per booth)
100 ㎡• exhibition
period
Cards for Special 30 Piece
17
17
Decoration and
Construction
Vehicle Cards 150 Piece
Hanging Point (limit to
100Kg of static load) 2,500
point / exhibition
period (limit to
the period before
the move-in)
Notes on Payment of the Construction Deposit:
1. An exhibitors or its commissioned contractor shall transfer the money to the account of the Contractor of
the Organizers prior to March 23, 2015; at the site, no checks or cash will be accepted. The account information
of the Contractor of the Organizers show as follows:
Opening bank: Daxinggong Sub-Branch of the Bank of Nanjing
Name of the company: Nanjing Sidex Exhibition Services Ltd.
Account Number: 01211420030000023
2. When in money remittance or transfer, the exhibitor or its commissioned construction contractor shall use
its own bank account for the transfer or remittance, and shall mark the exhibitor name and booth number on the
summary column or on the postscript bar;
3. Please not use a check or cash to deposit into the account of the Contractor of the Organizers, lest a
site-access delay arises due to that the Contractor of the Organizers would be unable to identify and confirm the
exhibitor who has paid the money.
Note on Construction Deposit Refund:
1. Please transfer the money to the account designated by Contractor of the Organizers by March 23, 2015
by using your company account and indicating your company name and booth number. The construction deposit
will be refunded to the original account within 30 days after closing of the exhibition.
2. Provided that an exhibitor and its commissioned contractor have not involved in any circumstances that
would cause the deposit to be deducted, the deposit will be refunded without interest to the exhibitor’s original
bank account through which the deposit has been paid to the organizers. In case that an exhibitor and its
commissioned contractor have involved in circumstances that caused part of the deposits to be deducted, the
remaining deposit will be refunded without interest to the exhibitor original bank account through which the
deposit has been paid to the organizers. Please donot change the account information during. If changes are
made, please timely notify the Contractor of the Organizers; otherwise, the Contractor will not undertake the
responsibility for later refund of the deposit.
3. Disclaimer of the Contractor of the Organizers: If an exhibitor fails to remit or transfer in accordance with
the above-mentioned "Note on Construction Deposit Refund”, the Contractor of the Organizers will be unable to
conduct routine duties and provide related services, and the exhibitor and its contractor shall bear entire
responsibilities for all the consequences arising.
The Construction Permit and the Card for Booth Installation shall be applied at the registration service point
based on the construction deposit data, the "Construction Registration Form", and the staff ID(Please prepare
and fill in the "Construction Registration Form" before registration). The contents of the "Construction
Registration Form” shall be completed truly and completely, and the person in charge of the construction and the
list of all construction workers shall be set out in detail.
18
18
Application for Electricity, Water, and Gas (including an electric box)
F6 Booth No.:
Cate
gory Name of Item
UNIT
PRICE(
RMB)
Depo
sit
(Yua
n)
Unit
Qua
nti
ty
Notes
Spec
ial
Use
Electricity consumption
during the exhibit
preparation(220V / 16A)
400
connections
/ exhibition
preparation
period
1.Including power uses
in the periods of exhibit
preparation, move-in,
exhibition, and
move-out.
2.The cable is limited
for 30 meters. If longer
than 30 meters, a
surcharge will be
separately imposed
(RMB 25 Yuan / m,
63A-100A; RMB25 Yuan
/ m, 150A; RMB40 Yuan
/ m, 200A; RMB50 Yuan
/ m, 250A ; RMB70
Yuan / m, 300A and
above;)
3.If an exhibitor will use
of electricity 24-hour a
day during the
exhibition, it shall apply
to the Expo Center 10
days earlier, and after
approval, the charge
will be doubled than
the original price.
Electricity consumption
during the exhibition
preparation period
500
connections
/ exhibition
preparation
period
use of electricity in
24-hour a day(220V/16A) 600 1000
connections
/ exhibition
period
use of electricity in
24-hour a day(380V/16A) 1000 1000
connections
/ exhibition
period
Electricity consumption
when equipments are
placed in stages of
move-in and move-out
400 connections/
hour
Elec
tric
ity
Cons
umpt
ion
duri
ng
the
Exhi
biti
on
(1)
Electricity Consumption
during the Exhibition
(220V/16A)
400 1000
point /
exhibition
period
Electricity Consumption
during the Exhibition
(380V/16A)
600 1000
connections
/ exhibition
period
Electricity Consumption
during the Exhibition
(380V/25A)
1000 1000
connections
/ exhibition
period
Electricity Consumption
during the Exhibition
(380V/32A)
1400 1000
connections
/ exhibition
period
Electricity Consumption
during the Exhibition
(380V/50A)
2000 1000
connections
/ exhibition
period
Electricity Consumption
during the Exhibition
(380V/60A)
2600 1000
connections
/ exhibition
period
19
19
Elec
tric
ity
Cons
umpt
ion
duri
ng
the
Exhi
biti
on
(2)
Electricity Consumption
during the Exhibition
(380V/100A)
3400 1000
point /
exhibition
period
Electricity Consumption
during the Exhibition
(380V/150A1)
6000 1000
connections
/ exhibition
period
Electricity Consumption
during the Exhibition
(380V/200A)
8000 1000
point /
exhibition
period
Electricity Consumption
during the Exhibition
(380V/300A)
13000 1000
connections
/ exhibition
period
Electricity Consumption
during the Exhibition
(380V/400A)
17000 1000
connections
/ exhibition
period
Note:
1. If the application is overdue after the deadline, a surcharge of 20% will be imposed, and a
surcharge of 50% will be imposed if the application is made onsite.
2. Exhibitors who apply the power supply shall lease an electrical box from the Expo Center. All of
electrical boxes that exhibitors leased shall be installed to the booth by an electrician designated
by the Organizers; while the work of electrical connections connected to the electrical box (within
the booth) shall be made by the exhibitor itself, and be supervised by the distribution personnel
of the Expo Center.
3. On the closing day, exhibitors shall designate a person to stay at the booths to wait for
collections of electrical boxes by the power distribution personnel of the Expo Center, and with
the signature of the personnel of the Expo Center and the deposit slip labeled with a reclaiming
mark, go to on-site service point to refund the deposit.
4. Exhibitors who leased a bare space shall fill out the F4, and submit them with detailed
decoration drawings before the deadline that will make valid the application.
5. All electrical boxes that have been applied and leased can’t be returnable. If a replacement is
made onsite, it shall be subject to a surcharge of 50%.
Exhibition Service Provider:
Nanjing Sidex Exhibition Services Co., Ltd.
Address: Address: Tower AB of Riyue Building, No. 2, South Taiping Road, Qinhuai District,
Nanjing, Jiangsu Province
Tel: 025-84650011-805615951838352
Fax: 025-84650062-8003
E-mail:[email protected]
Contact: Liu Xinnan
Bank: Daxinggong Sub-Branch of the Bank of Nanjing
Account Number: 01211420030000023
20
20
Name of the Exhibiting Company
Address: Postal Code:
Contacts(Mr./Mrs.): Title:
Tel: Fax: E-mail:
Compensations for Exhibition Facilities Damages (including the main materials,
auxiliary materials and labor costs)
Seria
l No. Name Specification Units UNIT PRICE
1
Portable
Distribution
Box
Compensation for
Damage of Portable
Distribution Box
32A / 380V with a 4-m
cable 2530
2
Compensation for
Damage of Portable
Distribution Box
32A / 380V with a 7-m
cable 2750
3
Compensation for
Damage of Portable
Distribution Box
32A / 380V with a 15-m
cable 3300
4
Compensation for
Damage of Portable
Distribution Box
63A / 380V with a 15-m
cable 4950
5
Compensation for
Damage of Portable
Distribution Box
125A/ 380 V 11000
6
Compensation for
Damage of Portable
Distribution Box
16A / 220V with a 19-m
cable 1650
7
Compensation for
Damage of Portable
Distribution Box
16A / 380V with a 10-m
cable 1760
8
Compensation for
Damage of Portable
Distribution Box
32A / 380V with a 10-m
cable 2200
9
Compensation for
Damage of Portable
Distribution Box
63A / 380V with a 10-m
cable 4400
10
Compensation for
Damage of Portable
Distribution Box
100A/ 380 V 1650
11 Compensation for
Damage of Portable 200A/ 380 V 2750
21
21
Distribution Box
12
Compensation for
Damage of Portable
Distribution Box
300A/ 380 V 3850
13
Compensation for
Damage of Portable
Distribution Box
400A/ 380 V 3850
14
Power cable
Compensation for
Damage of Power cable ZR-YC 3*35+2*10 (M) 220
15 Compensation for
Damage of Power cable ZR-YC 3*6+2*4 (M) 55
16 Compensation for
Damage of Power cable ZR-YC 3*35+2*6 (M) 220
17 Compensation for
Damage of Power cable ZR-YC 3*16+2*6 (M) 55
18 Compensation for
Damage of Power cable YJV-0.6/1KV-4*35+1*16 (M) 165
19 Compensation for
Damage of Power cable YJV-0.6/1KV-4*95+1*50 (M) 330
20
Others
Equipments
and Settings
Compensation for
Damage of Touch screen 17600
21
Compensation for
Damage of Evacuation
Strobe Light
Floor Lamp 550
22
Compensation for
Damage of Evacuation
Strobe Light
Wall Lamp 440
23
Compensation for
Damage of Intelligent
Water-gun Nozzle
33000
24
Compensation for
Damage of Fire
Extinguisher
220
25
Compensation for
Damage of 6W
Wall-hanging Speaker
550
26
Compensation for
Damage of 30W
Box-shaped Speaker
1100
27
Compensation for
Damage of Audible and
Visual Alarm
550
28 Compensation for 550
22
22
Damage of Heat Detector
29
Compensation for
Damage of Smoke
Detector
550
30
Others
Equipments
and Settings
Compensation for
Nailing Ground (nails) 2200
31 Compensation for
Ground Contamination
(Square
meters) 110 - 550
32 Compensation for
Damage of Steel Door 1000*2400 (door) 3300
33
Compensation for
Damage of Aluminum
Composite Panel
(Square
meters) 1320
34
Compensation for
Damage of Glass Curtain
Wall
1000*3000 piece 6600
35 Compensation for Door
Broken 1000*3200 (door) 2200
36
Compensation for
Damage of Concrete Wall
Panel
1000*2400 5500
37 Compensation for Booth
Panel Punching 165
38 Compensation for
Damage of Section Bar Damage (M) 220
39 Compensation for
Damage of Locker Loss or Damage 11
40 Other Compensations
Can be
accumulativ
e
55
Be sure to send the Form back to the Contractor of the Organizers by March20, 2015
Price List of telephone and network F7 Booth No.:
Name of Items UNIT
PRICE
Deposit
(RMB)
UNIT
Reservation of
communication/network
Interoffice phone
(Including phone fare)
45 50 Line/Day
Domestic direct dialing
(Including phone fare)
75 100 Line/Day
23
23
International Direct Dialing
(International Direct
Dialing count in addition)
75 800 Line/Day
Broadband
1 MB Dynamic 200 Line/Day
2 MB Dynamic 250 Line/Day
4 MB Dynamic 300 Line/Day
10 MB Dynamic 600 Line/Day
1 MB Static 250 Line/Day
2 MB Static 350 Line/Day
4 MB Static 400 Line/Day
10 MB Static 1000 Line/Day
Be sure to send the Form back to the Contractor of the Organizers by March 20, 2015
24
24
Forms of Construction for Special Booth(F1-F7)
F-1Job Responsibility of Safety for Special Booth
Name of the Exhibition:2015The Fourteenth Session of the Nanjing Asia Pacific
Intelligent Traffic System
Booth No. Booth area ㎡ Booth height m Contact
Construction Corporate
representative
Security in
charge Telephone Site electrician Telephone
The figure data
□Booth renderings □Electrical plan □Electric box drawing □Building business license copy □Construction drawing □Electrician operation certificate copy Notes:1、The figure data should include all the papers, if lack of any paper ,the Organizer have the right not to deal with the figure.
2、Construction drawings need to mark the length、width and height.
3、Electric plan need to mark the type of lamps and lanterns, also their power and number. 4、Apply for electricity during exhibition must use form F3-3 and F3-4,mark the Electricity box in form F3-5 as well. 5、Business license copy、electrician operation process copy must be clear. The electrician
need to be on duty during exhibition.; 6、All workers for construction need to attach their identity card copy。
Booth structure characteri
stics
□The steel structure □The wooden structure □The Aluminum profile structure
□Using glass in booth □Fabrics on booth(elastic fabric is forbidden) □Structure on the second floor
Means of
escape
□Wooden material have done fire prevention measure □Fabrics material have done
fire prevention measure(elastic fabric is forbidden)
□Fire equipment on site □Sound and safe construction
□Have electrician be on duty during exhibition □Glasses been toughening treatment
□Two-layer structure been signed by National 1st Class Registered Structural Engineer
Attach to the license and certificate copy of this National 1st Class Registered Structural
Engineer
25
25
展馆管理
规定摘编
1、The structure of booth is not allowed to be covered and occupied the fire-fighting equipment 、distribution box and fire engine access 2、All the structure orthographic projection area of booth must within area of their own booth. 3、Electric saw and electric planer are forbidden in the exhibition hall. Oil painting especially using spray gun is forbidden. 4、All the special booth need to do fire resistance treatment.; 5、Take care of valuables, small things do not place at will. The laptop need to be locked. 6、Smoking is forbidden. 7、All members need carry cards for in and out 8、Inflammable and explosive things are forbidden. 9、Do not alter the structure of the booth without authorization. Painting on board ground is forbidden; cut aluminum product and board also forbidden 10、The organizer have the right to deal with special circumstance with special limit. 11、Other details please refer to the manual at Service counter.
安全
责任书
Our company has known rules in 《FCLPRC》《Large mass activities safety management regulation》《law on safety in production》and read《The pavilion use rules》《The safety management regulations》《Construction safety responsibility pledges on special booth》《The pavilion fire prevention regulations》.We promise: During construction and remove, we will do as the mandatory rules and standards of engineering construction, abide by rules of exhibition hall,abide by the management. Make sure that structure of booth is secure and meet Nanjing fire control requirements .If any violation or accidents occurred, the casualties and damage of fire,construction will be at our own risk, also pay the loss of Nanjing International Expo Center.
Seal of the Construction Company: (seal)
Signature of the Person in Charge:
Date:
26
26
F-2Declare for Reservation for Special Booth
Special
This service will declare from
March 15 2015
Information of Exhibitor(Contractor)
Name of
Exhibition
2015The Fourteenth Session of the Nanjing
Asia Pacific Intelligent Traffic System
Please send F-1、F-2、F-3、F-4、F-5、F-6、F-7 back together and transfer
the money
Exhibitor
Address
Nanjing Sidex Exhibition Services Booth No. Booth area ㎡
Tower AB of Riyue Building, No. 2, South
Taiping Road, Qinhuai District, Nanjing,
Jiangsu Province
Exhibitor in
charge
Telephone
E-mail Pan Tin [email protected] Fax
Contractor
Contractor
in charge
Telephone
Items/ Specification Unit Price Deposit Quantity Total
Management Fees for Special booth decoration and construction
25
Deposit for the Special Booth 100RMB/㎡
27
27
Hand extinguisher
hand extinguisher
For free
Cards for Special Decoration and Construction
30
Vehicle Cards 150
Hanging Point (limit to 100Kg of static load)
2500
The temporary power during exhibition preparation
Refer to F-4 Reservation List of Water/Electricity(一)
Please mark the facilities in
F-5
Electricity during exhibition Refer to F-4 Reservation List of
Water/Electricity(二)
Plumbing Refer to F-4 Reservation List of
Water/Electricity(一)
Air Compression Refer to F-4 Reservation List of
Water/Electricity(一)
Total RMB;Charge in fact RMB,Deposit
RMB(Deposit will return if things are all right)
28
28
F-3Reservation List of Water/Electricity(一)
Exhibition Preparation
Special
This service will declare from March
15 2015
Information of Exhibitor(Contractor)
Name of
Exhibition
2015The Fourteenth Session of the
Nanjing Asia Pacific Intelligent Traffic
System
Please send F-1、F-2、F-3、F-4、F-5、F-6、F-7 back together and transfer
the money
Exhibitor
Address
Nanjing Sidex Exhibition Services Ltd. Booth No.
Tower AB of Riyue Building, No. 2, South
Taiping Road, Qinhuai District, Nanjing,
Jiangsu Province
Exhibitor in
charge
Telephone
E-mail: Pan Tin [email protected] Fax
Contractor
Contractor
in charge
Telephone
Items/Specification Unit
Price(RMB/)
Deposit(R
MB) Quantity Total(RMB0
29
29
Exhibition preparation period
(220V/16A) 400
Exhibition preparation period
(380V/16A) 500
Use of electricity in 24-hour a day
(220V/16A) 600 1000
Use of electricity in 24-hour a day
(380V/16A) 1000 1000
Electricity consumption when
equipments are placed in stages of
move-in and move-out
400
Electricity Consumption during the
Exhibition Refer to Reservation List of Water/Electricity(二)
Total RMB;Charge in fact RMB,Deposit RMB(Deposit
will return if things are all right)
30
30
F-4 Reservation List of Water/Electricity(二)
During the Exhibition
Special
This service will declare from March
15 2015
Information of Exhibitor(Contractor)
Name of
Exhibition
2015The Fourteenth Session of the
Nanjing Asia Pacific Intelligent Traffic
System
Please send F-1、F-2、F-3、F-4、F-5、F-6、F-7 back together and transfer
the money
Exhibitor
Address
Nanjing Sidex Exhibition Services Ltd. Booth No.
Tower AB of Riyue Building, No. 2, South
Taiping Road, Qinhuai District, Nanjing,
Jiangsu Province
Exhibitor in
charge
Telephone
E-mail: Pan Tin [email protected] Fax
Contractor
Contractor
in charge
Telephone
31
31
Items/Specification
Unit
Price(RMB/exhib
ition period)
Deposit(R
MB) Quantity Total(RMB)
Electricity Consumption during the
Exhibition (220V/16A)) 400 1000
Electricity Consumption during the
Exhibition (380V/16A) 600 1000
Electricity Consumption during the
Exhibition(380V/25A) 1000 1000
Electricity Consumption during the
Exhibition(380V/32A) 1400 1000
Electricity Consumption during the
Exhibition(380V/50A) 2000 1000
Electricity Consumption during the
Exhibition(380V/60A) 2600 1000
Electricity Consumption during the
Exhibition(380V/100A) 3400 1000
Electricity Consumption during the
Exhibition(380V/150A) 6000 1000
Electricity Consumption during the
Exhibition(380V/200A) 8000 1000
Electricity Consumption during the
Exhibition(380V/300A) 13000 1000
Electricity Consumption during the
Exhibition(380V/400A) 17000 1000
temporary electricity and water,
compressed air during exhibit
preparation
Refer to Reservation List of Water/Electricity(一)
32
32
Total RMB;Charge in fact RMB,Deposit RMB(Deposit
will return if things are all right)
F-5 Position of Electricity for Booth/Air
Compression/Plumbing/Network
Special
This service will declare from March
15 2015
Information of Exhibitor(Contractor)
Name of
Exhibition
2015The Fourteenth Session of the
Nanjing Asia Pacific Intelligent Traffic
System
Please send F-1、F-2、F-3、F-4、F-5、F-6、F-7 back together and transfer
the money
Exhibitor
Address
33
33
Nanjing Sidex Exhibition Services Ltd. Booth No.
Tower AB of Riyue Building, No. 2, South
Taiping Road, Qinhuai District, Nanjing,
Jiangsu Province
Exhibitor in
charge
Telephone
E-mail: Pan Tin [email protected] Fax
Contractor
Contractor
in charge
Telephone
Layout plan,Each cell is 1m×1m(Beyond this please attach other paper)
Above adjoining booth No.:
Below adjoining booth No.:
Legend: Lighting distributing cabinet: Power distributing cabinet Broadband
network
34
34
Plumbing air compression
F-6 Reservation List of Communication/Network
Special Information of Exhibitor(Contractor)
35
35
This service will declare from March
15 2015 Name of
Exhibition
2015The Fourteenth Session of the
Nanjing Asia Pacific Intelligent Traffic
System
Please send F-1、F-2、F-3、F-4、F-5、F-6、F-7 back together and transfer
the money
Exhibitor
Address
Nanjing Sidex Exhibition Services Ltd. Booth No.
Tower AB of Riyue Building, No. 2, South
Taiping Road, Qinhuai District, Nanjing,
Jiangsu Province
Exhibitor in
charge
Telephone
E-mail: Pan Tin [email protected] Fax
Contractor
Contractor
in charge
Telephone
Num
ber Items/Specification
Unit price
(RMB/line﹒day)
Depo
sit Line×Day Total(RMB)
G01 Interoffice phone(Including phone fare can contact in pos)
45 50
G02 Domestic direct dialing(Including phone fare)
75 100
G03 International Direct Dialing
(International Direct Dialing count in addition)
75 800
G04 Booth network(Dynamic IP bandwidth 1M)
200 50
G05 Booth network(Dynamic IP bandwidth 2M)
250 50
G06 Booth network(Dynamic IP bandwidth 4M)
300 50
G07 Booth network(Dynamic IP bandwidth 10M)
600 50
G08 Booth network(Static IPbandwidth1M)
250 50
G09 Booth network(Static IP bandwidth 2M)
350 50
G10 Booth network(Static IP bandwidth 4M)
400 50
36
36
G11 Booth network(Static IP bandwidth 10M)
1000 50
Total RMB;Charge in fact RMB,Deposit RMB(Deposit
will return if things are all right)
F-7Construction Registration Form
Booth No.:
Construction Company:
Person in Charge of the Construction Site:
ID number of the Person in Charge of the Booth Construction Site:
Mobile Phone:
37
37
List of Construction Personnel:
Name Gender ID Number Name Gender ID Number
The Construction Company shall review and select electrician-permit holders to participate in the
electric construction, commit and abide by the regulations and requirements of the Organizers
and the Expo Center on fire protection, power use and safety, and actively cooperate with the
Organizers to implement works and the requirements, to ensure a smooth preparatory work of
the exhibition. If any problem arises during the stages of move-in, exhibition and move-out, the
Construction Company shall bear all responsibilities and liabilities whereof.
Signature of the Person in Charge:
Seal of the Construction Company: (seal)
Date: __ __ 2015
Be sure to send the Forms back to the Contractor of the Organizers by March 20, 2015
Template of the Drawings of Special Booth Design for Application
380-v Drawing Template
38
38
39
39
40
40
Template of the Drawings of Special Booth Design for Application
220-v Drawing Template
41
41
42
42
Sinotrans Jiangsu Logistics Co., Ltd. 100 Jianning Rd., Nanjing, China Tel: 86-25-85513064 E-mail: [email protected]
SHOW 2015
SHIPPING GUIDELINE
The organizer has appointed SINOTRANS JIANGSU LOGISTICS CO., LTD as the official freight forwarder and on-site contractor for the above-mentioned exhibition. Since the exhibits import in PRC, the official forwarder will go through Customs formalities for exhibitors. But on some occasions, the presence of exhibitors will be required. Full information and instruction are enclosed herein to help you ensure the correct dispatch of goods and associated documents to this show. Kindly read these carefully and comply with the instructions accordingly.
When making forwarding arrangement of exhibits, the exhibitors are requested to note that only the official freight forwarder, who is appointed by the organizer, is entitled to handle the exhibits after they have arrived in PRC.
We must emphasize the importance of adhering to the shipping instructions. Failure in compliance will cause unnecessary delay in clearance in PRC and additional expenses.
For information, please address all your correspondence concern the Exhibition Freight Forwarding matters to:
SINOTRANS JIANGSU LOGISTICS CO., LTD
100 Jianning Road, Nanjing 210015,CChhiinnaa TTeell:: 8866--2255--8855551133006644 FFaaxx:: 8866--2255--8855661177114422 AAttttnn:: MMrr.. CCaaoo ZZhhee EEmmaaiill:: ccaaoozz@@jjss--ssiinnoottrraannss..ccoomm
SHIPPING INSTRUCTION Cargo routing
1. The direct shipments to Nanjing from abroad by sea-freight (FCL, LCL) or airfreight. 2. Transshipment via our overseas freight agent in your area by sea-freight or airfreight.
43
43
3. Amongst the various routings, transit via our agents is highly recommended as this allows the close control and smooth flow of exhibits into Nanjing. 4. Due to the complicated procedures in Customs clearance and picking up for cargo, exhibitors are strongly advised not to arrange LCL (less-than-container-load) shipment to Nanjing. 5. DIRECT ARRIVAL IN NANJING, For this routing, all cargo must be shipped prepaid and shipping documents must be specified as follows:
Destination: NANJING Port or NANJING Airport
Shipment Consignee :
Sea SINOTRANS JIANGSU LOGISTICS CO., LTD
100 Jianning Road, Nanjing 210015,, CChhiinnaa
TTeell:: 8866--2255--8855551133006644 FFaaxx:: 8866--2255--8855661177114422
AAttttnn:: MMrr.. CCaaoo ZZhhee
Air SINOTRANS AIR TRANSPORTATION DEVELOPMENTJIANGSU CO., LTD
JIANGSU BRANCH
9-1 DA MING Road, Nanjing 210022,, CChhiinnaa
TTeell:: 8866--2255--8855551133006644 FFaaxx:: 8866--2255--8855661177114422
AAttttnn:: MMrr.. CCaaoo ZZhhee
CARGO DEADLINES
Direct arrive in Nanjing port Before 12 / 04 /2015
Direct arrive in Nanjing Airport Before 12 / 04 /2015
Exhibits arriving after our deadlines will incur a 30% late arrival surcharge.
EXHIBITION DOCUMENTS
Once shipments have been made, please advice SINOTRANS by faxes/emails. Please fax or
e-mail a copy of the B/L or AWB
Please courier one set of original B/L to SINOTRANS no later than three days before vessel is due to arrive. Or if you arrange telex release, please fax the copy of B/L to SINOTRANS and notify SINOTRANS in paper.
44
44
All the wooden packaging of the exhibition goods from overseas must be IPPC stamped. LIST OF EXHIBITS The Chinese Customs Authorities approve this form and as such is the only invoice format accepted for exhibition cargo. Every exhibitor must submit this form to us without exception. A detailed and accurate description of exhibits, in clouding major components and serial numbers must be declared on the list, (particularly in the case of televisions, computer and high-tech equipment). Catalogues, display materials, gift and foodstuffs must also be specified with exact quantities and values. Please complete these documents in English and send them to SINOTRANS no later than 10 days prior to the arrival of your shipments in China. The cost of translating invoices into Chinese will be billed to you together with the freight and handling charges. PACKING & MARKING Exhibitors shall be responsible for the consequences of improper packing. The following marking must be painted on two opposite sides of each case 2015:
Exhibitor Stand No. Net Weight kg Gross Weight kg Dimensions: L x W x H (cm)
UNPACKING/REPACKING ON-SITE We shall assist you in physical unpacking and installation of exhibits, however exhibitors must supervise and be responsible for these operations. For this purpose, a representative of the company must be available on-site during the move-in period. Similarly, during exhibition closing, exhibitors must also supervise the dismantling and re-packing of exhibits, especially for delicate or heavy equipment. INSURANCE
As the official tariff is complied on volume of weight basis and has no correlation with the value of exhibits, naturally no insurance has been covered in our charges and we undertake work at owner’s risk. Therefore exhibitors should arrange a proper round-trip all risk insurance policy for their exhibits.
45
45
EXHIBITION CLOSING PROCEDURES
The following documents will be distributed to exhibitors before closing. 1. A copy of the List of Exhibits previously submitted to Customs; 2. A form of Instruction for Disposal of Exhibits 3. Exhibitors are requested to declare on their List of Exhibits form the following information.
- sold; - to be returned ( port of destination/mode of transport ); - consumed; - given away; - abandoned
Please pay special attention to the following Customs’ regulations: - Declaration of the contents in each package must be correct; - Items other than those declared exhibits are absolutely not allowed to be returned together with exhibits. Violation of these regulations will result in confiscation and heavy fines imposed by the
Chinese Customs.
PAYMENT TERMS & CONDITIONS OF BUSINESS
Companies using SINOTRANS or its appointed agents will be invoiced by them for all services. Companies shipping other than by our offices or agents are advised that full payment must be received by us either on-site at the exhibition before the close of the show. Our bank details are as follows:
Our Name: SINOTRANS JIANGSU LOGISTICS CO., LTD. Bank Name: Bank of China Jiangsu Br., Xiaguan Sub. Account No. 466358640142 SWFIT:BKCH CN BJ 940
SERVICE RATE(CNY) A/Basic services
Document services 500/Shipper
Customs clearance 500/Shipper
Quarantine declaration 350/Shipper
Customs inspection 500/Shipper
B/Entering exhibition site
By Sea
46
46
From Nanjing Port to exhibition booth(including cargo picking up and put goods to exhibition site. Unpacking and storage fee.)
450/m3,(min. 3m3) Min. 25m3/20ft container 50m3/40ft container
Storage at Nanjing Port, THC, fuel surcharge and handling charge; LCL charges
According to the actual pay
transferring from port to warehouse 1600/20ft or 40ft container LCL 700/Bill Lading
By Air
From Nanjing Port to Expo booth(including cargo picking up and put goods to exhibition site. Unpacking and storage fee. )
5/kg,(min 100kgs)
Airport pick up the goods fee Storage fee at Nanjing Airport HAWB handling fee
According to the actual pay
Transferring from airport to warehouse 500/AWB
C/Exportexhibition site
From Expo booth to warehouse by sea 400/m3,(min. 3m3)
From Expo booth to warehouse by air 4/kg,(min 100kgs)
D/Storage
Sea import 5/m3/day,(min. 1m3)
Air import 0.15/kg/day
E/Return
Document services 500/Shipper
Customs clearance 500/Shipper
Quarantine declaration 350/Shipper
Customs inspection 500/Shipper
transferring from warehouse to port 1600/20ft or 40ft container LCL 700/Bill Lading
Transferring from warehouse to airport 500/AWB
Bill of lading fee 170/AWB
Air freight or sea freight To be quoted if necessary
47
47
Overseas remittance process and account number
Overseas remittance path
Receiving U.S. Dollars in China can be easy and simple. Please request the remitter to instruct
his/her bank to use the following payment route:
Amount: USD______
U.S. Intermediary Bank: JPMORGAN CHASE BANK, N.A.
NEW YORK
SWIFT BIC: CHASUS33XX
Customer’s Bank in China: BANK OF NANJING
SWIFT BIC: NJCBCNBN
Customer(beneficiary):______
Account Number
_____
(Name)
_______
(Address)
_______
(Telephone)
Thank you for banking with BANK OF NANJING
48
48
Receiving USD Dollars in China can be easy and simple. Please request the remitter to instruct
his/her bank to use the following payment route:
Amount: USD_______
USD Intermediary Bank: WACHOVIA BANK N.A,
NEW YORK INTERNATIONAL BRANCH
SWIFT BIC: PNBPUS3NNYC
Customer’s Bank in China: BANK OF NANJING
SWIFT BIC: NJCBCNBN
Customer(beneficiary):______
Account Number
_____
(Name)
_______
(Address)
_______
(Telephone)
Thank you for banking with BANK OF NANJING
External account:
Nanjing Sidex Exhibition Services Co., Ltd.
Opening bank:Daxinggong Sub-Branch of the Bank of Nanjing
Accounts number:01211420030000023