Vol. 159 • No. 11 • November 2015
Our 2015 Nuclear Top PlantAward Winners
Controlling Unwelcome Critters
Coping with Boiler Load Cycling
Coal Dust Combustion Lessons Learned
BUSINESS & TECHNOLOGY FOR THE GLOBAL GENERATION INDUSTRY SINCE 1882
Duct Burner2
H.P. Superheater4
H.P. Evaporator5
H.P. Steam Drum15
L.P. Vent Silencer16
H.P. Vent Silencer14
L.P. Steam Drum w/ Integral Deaerator17
Distribution Grid1
Observation Port3
Injection Grid7
S.C.R.8
C.O. Catalyst6
H.P. Economizer10
L.P. Superheater11
H.P. Evaporator9
L.P. Evaporator 13
DA. Pre-Heater 12
Stack18
H.P. Steam Outlet
L.P. Superheater Outlet
BEST SUITEDFOR GASTURBINES UP TO 120+ MW.
In addition to designing and manufacturing
world-class industrial boilers, Victory
Gpgti{"qhhgtu"jkijn{/ghÝekgpv"JTUIu"vjcv"ctg"ewuvqo/gpikpggtgf"hqt"jkij/Ýtg"systems, including combined heat
cpf"rqygt"*EJR+"crrnkecvkqpu0
VEO HORIZON® Gas-Turbine HRSG
• Shop assembled modular design promotes reduction in project " uejgfwng"vkog"cpf"nqygt"Ýgnf" construction costs
• Fast start-up and rapid response capabilities
•" C"ownvkvwfg"qh"Ýtkpi"uqnwvkqpu
Because of the current demand for small to
okf/uk¦g"JTUI"u{uvgou."Xkevqt{"Gpgti{" jcu"gzrcpfgf"vjgkt"gzkuvkpi"JQTK¥QP®
Icu/Vwtdkpg"JTUI"Ugtkgu"up to 120+ MW0""
Work directly with industry experts
known world-wide for providing proven
JTUI"uqnwvkqpu"hqt"ukping"wpkvu." multi-unit systems, cogen and combined
e{eng"crrnkecvkqpu0"
Call 918.274.0023.
Stop by Booth #
10302 at Power-Gen 2015 and
get a FREE Megawatt Power Selector.
VICTORYENERGY.COM - 10701 EAST 126TH STREET NORTH, COLLINSVILLE, OKLAHOMA 74021
F O L L O W A L E A D E R
CIRCLE 1 ON READER SERVICE CARD
November 2015 | POWER www.powermag.com 1
Gpgti{"qhhgtu"jkijn{/ghÝekgpv"JTUIu"vjcv"ctg"ewuvqo/gpikpggtgf"hqt"jkij/Ýtg"
cpf"rqygt"*EJR+"crrnkecvkqpu0
•
" uejgfwng"vkog"cpf"nqygt"Ýgnf"
•
•" C"ownvkvwfg"qh"Ýtkpi"uqnwvkqpu
okf/uk¦g"JTUI"u{uvgou."Xkevqt{"Gpgti{"jcu"gzrcpfgf"vjgkt"gzkuvkpi"JQTK¥QPIcu/Vwtdkpg"JTUI"Ugtkgu" 0""
JTUI"uqnwvkqpu"hqt"ukping"wpkvu."
e{eng"crrnkecvkqpu0"
Established 1882 • Vol. 159 • No. 11 November 2015
ON THE COVERPalo Verde Nuclear Generating Station,
located in the Sonoran Desert west of
Phoenix, uses 100% recycled municipal
wastewater for cooling its condensers.
The plant’s on-site treatment facility aer-
ates the reclaimed water as part of the
treatment process. Courtesy: Arizona
Public Service
SPEAKING OF POWER
Fuel Guidelines, Fuel Consumption, and Climate Change 6
GLOBAL MONITOR
New Options for Solar PV 8
India Refocuses Coal Future 9
THE BIG PICTURE: Levelized Cost of Electricity 10
Power Giants to Get Federal Funds to Develop Large-Scale Carbon Capture Pilots 12
AREVA’s Next-Gen BWR Fuel Is Tested in the U.S. 12
South Africa Puts First Large IPP Project Online 14
POWER Digest 16
FOCUS ON O&M
Smart Access Planning Enables Efficient Cooling Tower Maintenance 18
LEGAL & REGULATORY
FERC’s Enforcement Priorities After 10 Years Under the EPAct 22 By Carlos E. Gutierrez, counsel, Davis Wright Tremaine
COVER FOCUS: NUCLEAR TOP PLANTSThe fate of nuclear fleets depends on where they are located. Countries gener-
ally are following one of three paths: widespread shutdowns, ramp-up in new
builds, or diligent maintenance of existing units. Our 2015 Top Plant Award
winners in the nuclear category demonstrate how varied the experience of
these plants can be.
Central Nuclear Néstor Kirchner (Atucha II), Lima, Argentina 24The U.S. isn’t the only country to have seen work begin on a nuclear unit only
to halt for many years before being taken up again. In spite of what some-
times seemed like insurmountable odds, Atucha II represents not just new
capacity but also the revitalization of Argentina’s nuclear industry.
Palo Verde Nuclear Generating Station, Wintersburg, Arizona 28This desert-sited nuclear plant, the largest power generator in the U.S., proves
that with superior operation and maintenance, a nuclear plant can be a record-
setter even as it moves into its “second lifetime” as a relicensed plant.
12
24
CONNECT WITH POWER
If you like POWER magazine, follow us online for timely industry news and comments.
Become our fan at facebook.com/POWERmagazine
Follow us on Twitter @POWERmagazine
Join the LinkedIn POWER magazine Group and the Women in Power Generation
Group
www.powermag.com POWER | November 20152
THE FIRST
THE NEXTGENERATION OF ADVANCEDNUCLEAR PLANTS
TO INNOVATE
SPECIAL REPORT— OPERATIONS & MAINTENANCE
Wildlife and Power Plants: New Solutions for Animal Problems 32From the birds and the bees to invasive aquatic species, power plants around
the world struggle to cope safely and economically with unwelcome crea-
tures. But cope they must, because failing to stop these trespassers can result
in massive damage to plants and potential injury to people.
OPERATIONS & MAINTENANCE
Load Cycling and Boiler Metals: How to Save Your Power Plant 38As cycling former baseload units becomes the new normal, concerns about
cycling’s effects on equipment mount. You can minimize damage by under-
standing how it happens and which strategies mitigate undesired effects.
FUNDAMENTALS
Ensuring Reliable Boiler Operation Through Proper Material Analysis 42Many coal-fired units around the world are reaching middle age but still need
to run reliably. This article gives you suggestions for diagnosing and predict-
ing boiler health to ensure optimal operation for years to come.
SAFETY
Minimizing Coal Dust Combustion Hazards: Lessons from Laramie River Station 46Two coal dust combustion incidents in May 2013 resulted in injuries to two em-
ployees and damage to two units. Rather than quietly taking mitigating actions
and sweeping the experience under the rug, plant operators are sharing their
lessons learned and new best practices so others can adopt them and stay safe.
FUEL SUPPLIES
Marooned: How Island Power Systems Keep the Lights On 51Isolated and small, island power systems face unique challenges, but the so-
lutions they deploy—both in terms of technology and fuel choices—some-
times signal new options for larger, interconnected systems.
PROJECT SITING
Turning Brownfields into Greenfields: From Coal to Clean Energy 55 From a little-known Environmental Protection Agency program that assists
in giving abandoned coal mine sites second wind, to a scheme for bundling
carbon credits with coal to create a “compliant fuel,” new options for coal
country are being deployed.
NUCLEAR TECHNOLOGY
On the Nuclear Frontier: New Designs Aim to Replace LWRs 60The quest to replace light-water reactors (LWRs), which dominate today’s nu-
clear generating fleet, with cheaper-to-build reactors that promise additional
benefits continues, but the pace is slow and the challenges daunting.
COMMENTARY
Reduce Ozone When and Where It Matters Most 68By Valerie Thomas, Paul Kerl, et al., Georgia Institute of Technology
■ GE Announces Digital Power Plant as Component of the Industrial Internet
■ China to Limit Support for High-Carbon Projects, Begin Nationwide Carbon Cap-and-
Trade by 2017
■ U.S. Nuclear Plants Are Operating Better than Ever
■ Xcel to Retire Two Units at Its Largest Coal-Fired Plant
■ EPA Finalizes Steam Electric Power Plant Effluent Guidelines
■ EPA Issues Final NAAQS Ozone Rule at 70 ppb [UPDATED]
■ Georgia Power to Close All Coal Ash Ponds in Response to EPA CCR Rule
ICYMI: TIMELY NEWS POSTED EACH WEEK ON POWERMAG.COM
32
38
51
@WECNuclearWestinghouseElectric Company
THE FIRST
Our vision is to help our customers generate safer, cleaner, more reliable energy
for more people and a better planet. We’re doing just that through the AP1000®
nuclear plants under construction around the globe. When the world needed a smart
technology solution for clean air energy with a small footprint, we developed our
small modular reactor. Now we’re changing the nuclear landscape again, bringing a
bright future for nuclear power with our recently announced lead-cooled fast reactor.
This Generation V plant will compete with the lowest-cost sources of fossil fuel
generation and complement the use of renewable energy. It will capitalize on the
high-performance capabilities of what the industry calls accident-tolerant fuel. Of
course, our growing reactor portfolio features the unparalleled safety and industry-
leading technology you expect from the global nuclear leader.
Find out more about our advanced nuclear plants:
www.westinghousenuclear.com/new-plants
Wes
tingh
ouse
Ele
ctric
Com
pany
LLC
THE NEXTGENERATION OF ADVANCEDNUCLEAR PLANTS
TO INNOVATE
CIRCLE 2 ON READER SERVICE CARD
www.powermag.com POWER | November 20154
Visit POWER on the web: www.powermag.com
Subscribe online at: www.submag.com/sub/pw
POWER (ISSN 0032-5929) is published monthly by Access
Intelligence, LLC, 4 Choke Cherry Road, Second Floor, Rock-
ville, MD 20850. Periodicals Postage Paid at Rockville, MD
20850-4024 and at additional mailing offices.
POSTMASTER: Send address changes to POWER, P.O. Box
3588, Northbrook, IL 60065-3588 . Email: [email protected].
Canadian Post 40612608. Return Undeliverable Canadian
Addresses to: IMEX Global Solutions, P.O. BOX 25542, Lon-
don, ON N6C 6B2.
Subscriptions: Available at no charge only for qualified exec-
utives and engineering and supervisory personnel in electric
utilities, independent generating companies, consulting en-
gineering firms, process industries, and other manufacturing
industries. All others in the U.S. and U.S. possessions: $107
for one year, $171 for two years. In Canada: US$112 for one
year, US$188 for two years. Outside the U.S. and Canada:
US$227 for one year, US$368 for two years. Payment in full
or credit card information is required to process your order.
Subscription request must include subscriber name, title,
and company name. For new or renewal orders, call 847-501-
7541. Single copy price: $25. The publisher reserves the right
to accept or reject any order. Allow four to twelve weeks for
shipment of the first issue on subscriptions. Missing issues
must be claimed within three months for the U.S. or within
six months outside U.S.
For customer service and address changes, call 847-559-
7314 or fax 847-291-4816 or e-mail [email protected] or
write to POWER, P.O. Box 3588, Northbrook, IL 60065-3588.
Please include account number, which appears above name
on magazine mailing label or send entire label.
Photocopy Permission: For licensing and reprints of
POWER magazine content, please contact Wright’s Media at
877-652-5295 or [email protected].
General mailing address: POWER, 11000 Richmond Av-
enue, Suite 690, Houston, TX 77042.
Copyright: 2015 Access Intelligence. All rights reserved.
EDITORIAL & PRODUCTION Editor: Dr. Gail Reitenbach
Consulting Editor: Dr. Robert Peltier, PE
Associate Editor: Thomas Overton, JD
Associate Editor: Sonal Patel
Associate Editor: Aaron Larson
Senior Graphic Designer: Michele White
Production Manager: Tony Campana, [email protected]
Contributors: Basin Electric Power Cooperative, Brandon Bell, Lee Buchsbaum,
Juan Moreno Cruz, Carlos E. Gutierrez, Paul Kerl, Rama S. Koripelli,
Kennedy Maize, Athanasios Nenes, Matthew Realff, Armistead Russell,
Joel Sokol, Valerie Thomas, Wenxiang Zhang
GENERATING COMPANY ADVISORY TEAM T. Preston Gillespie, Jr., Senior Vice President-Nuclear Operations, Duke Energy
Pat McCarty, Generation Manager, Tacoma Power
Mark C. McCullough, Executive Vice President, Generation, American Electric Power
Sarah P. Orban Salati, Managing Director, New Energy Solutions, AES
ADVERTISING SALES Publisher, Sales: Matthew Grant
Southeast U.S.: Matthew Grant, 713-343-1882, [email protected]
Central & Western U.S./Western Canada: Dan Gentile, 512-918-8075, [email protected]
Eastern U.S./Eastern Canada/Latin America: Ed Mueller, 309-278-8120, [email protected]
UK/Benelux/Scandinavia/Germany/
Switzerland/Austria/Eastern Europe: Petra Trautes, +49 69 5860 4760, [email protected]
Italy/France/Spain/Portugal: Ferruccio Silvera, +39 (0) 2 284 6716, [email protected]
China: Rudy Teng, +86 13818181202, [email protected]
Japan: Katsuhiro Ishii, +81 3 5691 3335, [email protected]
India: Faredoon B. Kuka, 91 22 5570 3081/82, [email protected]
South Korea: Peter Kwon, +82 2 416 2876, +82 2 2202 9351, [email protected]
Classified Advertising
Diane Burleson, 512-337-7890, [email protected]
POWER Buyers’ Guide Sales
Diane Burleson, 512-337-7890, [email protected]
AUDIENCE DEVELOPMENT Audience Development Director: Sarah Garwood
Marketing Manager: Jessica Grier
Fulfillment Manager: George Severine
CUSTOMER SERVICE For subscriber service: [email protected], 847-763-9509
Electronic and Paper Reprints: Wright’s Media, [email protected], 877-652-5295
List Sales: Statlistics, Jen Felling, [email protected], 203-778-8700
All Other Customer Service: 713-343-1887
BUSINESS OFFICE Access Intelligence, 11000 Richmond Avenue, Suite 690, Houston, TX 77042
Senior Vice President & Group Publisher
Aerospace, Energy, Healthcare: Jennifer Schwartz
Vice President and Publisher: Michael Grossman, 713-343-1887, [email protected]
ACCESS INTELLIGENCE, LLC 4 Choke Cherry Road, 2nd Floor, Rockville, MD 20850
301-354-2000 • www.accessintel.com Chief Executive Officer: Donald A. Pazour
Chief Operating Officer: Heather Farley
Exec. Vice President & Chief Financial Officer: Ed Pinedo
Exec. Vice President, Human Resources & Administration: Macy L. Fecto
Senior Vice President & Chief Information Officer: Rob Paciorek
Senior Vice President, Customer Acquisition and Retention: Sylvia Sierra
Senior Vice President, Digital Development: Alison Johns
Vice President, Production, Digital Media & Design: Michael Kraus
Vice President, Financial Planning & Internal Audit: Steve Barber
Vice President/Corporate Controller: Gerald Stasko
2015
A World of SolutionsVisit www.CBI.com
THE TEAM YOU TRUST
As an integrated engineering, procurement and construction company,
CB&I can handle your gas-fired power generation project from start to
finish. Our portfolio of services includes engineering, procurement, pipe
and steel fabrication, construction and maintenance.
Today’s power market requires a team that can deliver with certainty.
When it comes to constructing new gas-fired power generation facilities
that are reliable and cost effective, trust CB&I’s in-depth market knowledge
and industry leading experience.
ADVANCED CLASS TURBINES
PRICE AND SCHEDULE CERTAINTY
INTEGRATED SUPPLY CHAIN SOLUTIONS
EXTENSIVE CRAFT RECRUITMENT/MANAGEMENT EXPERIENCE
Contact CB&I at +1 704 343 7500 to learn how our complete solutions
in power can benefit your next project.
2015 MEDAL RECIPIENT
En
terg
y’s 5
50
Me
ga
wa
tt Nin
em
ile 6
CC
GT
po
we
r pla
nt
22M102015HCIRCLE 3 ON READER SERVICE CARD
www.powermag.com POWER | November 20156
SPEAKING OF POWER
Fuel Guidelines, Fuel Consumption, and Climate Change
See if you can fill in the blanks: “A debate has been created after a paper was published in the BLANK Journal,
suggesting the new BLANK Guidelines . . . are biased and based on an incomplete survey of current studies.” That quote from Digital Journal, referring to the British Med-ical Journal and the U.S. Dietary Guidelines, could just as plausibly have been about a different journal and the Clean Power Plan (CPP). Arguments over revised U.S. Dietary Guidelines (due the end of this year) are getting as heated as those over greenhouse gas (GHG) regulations affecting power gen-eration. Both sets of guidelines (the offi-cial designation for the CPP) concern the fuels we consume, and the development of both raised issues of how that consumption is related to climate change.
Although most adults can choose the food they eat, they cannot, for the most part, decide what fuels are used to generate their electricity. In the U.S., utility commis-sions as well as state and federal agencies represent individuals in matters concerning what types of generation are allowed to be developed. But whenever there’s any sort of regulation, even “guidelines,” there are those who argue against the specifics—or against regulation in general. I’m not in the latter camp; the Volkswagen emissions-testing “defeat” mechanism is just the lat-est example of why we cannot simply trust the market or corporations to always do what’s safe or legal. But in some respects, the details of government guidelines may not always matter as much as critics claim.
The Sustainability IssueOne argument against the CPP is that the Environmental Protection Agency is misusing the Clean Air Act to compel GHG emissions reductions. A similar argument was raised with regard to U.S. Dietary Guidelines.
These guidelines are updated every five years, and this time around, there was discussion about whether sustainability should be a consideration in what foods were recommended. When the Dietary Guidelines Advisory Committee proposed earlier this year that Americans eat a less-resource-intensive diet, the North Ameri-can Meat Institute (NAMI) fought back,
arguing that, pound for pound, meats, though they require large amounts of land and water to grow grains for feed, deliver more nutrition and calories than grains and fruit—an argument similar to the one that fossil fuels have higher energy den-sity than wind and solar energy.
In the end, sustainability was left to other government programs and initia-tives. Had it been included, the debate would quickly have reached the boiling point, as it would have pitted the meat and dairy industries against grain and vegetable producers. That’s because dif-ferent foods require different amounts of resources and result in different environ-mental consequences, from water pollu-tion to GHG emissions. The production of all foods, even organic ones, has environ-mental effects. (The same dynamics are true of electricity sources.)
Water consumption is an obvious exam-ple. A single almond, according to NAMI, can require up to 2.8 liters of water (which sounds more dramatic than when expressed as 0.74 gallons); but that’s still less, on a per-calorie comparison basis, than what’s needed for beef production. Then there are the direct and indirect GHG emissions—from the obvious emissions of methane from cat-tle to emissions resulting from tilling fields used for vegetable and grain production.
There is, however, a significant differ-ence between establishing GHG emissions guidelines for already-regulated industries, on matters where individuals have limited power of choice, and making GHG reductions or other sustainability goals a criterion for dietary guidelines whose primary purpose is to encourage individual humans’ health. Reducing the environmental impacts of our food choices may be a worthy goal, but it’s more appropriately addressed as an educa-tional (and perhaps moral) issue.
Personal Choice Overrides GuidelinesTelling Americans what they should or should not eat is far more likely to prompt a response than guidelines shaping how fu-els are used in power generation. (Google Bloomberg soda.) For some, including chil-dren who eat school-provided meals, those
choices are already curtailed. One mother I know was aghast this fall when her eldest, just starting kindergarten, was being fed breakfast items far higher in sugar than anything she would have served at home. Yet, the school system dietician’s choices are based on U.S. Dietary Guidelines.
School menus aside, for the majority of Americans, dietary guidelines are less pow-erful than they seem. Freedom to choose what we eat can be as personally mean-ingful as one’s choice of music. Although I know individuals who actually are gluten-intolerant, and those who have food aller-gies or medical reasons for avoiding certain foods, many have adopted low-carb/high-fat or vegan or raw diets for purely personal reasons—whether they be weight loss, reli-gious beliefs, or philosophical positions.
Most days, my attitude toward dueling di-etary choices is to live and let live. In a world where millions still lack sufficient access to nutritious food, most arguments about food choices seem like shallow “First-World prob-lems.” Whatever happened to “everything in moderation”? That sounds a lot like the “all of the above” energy plans put forth by both federal and state leaders. Just one example: New Mexico’s Republican governor recently endorsed an all-of-the-above energy plan for her fossil fuel–rich state, which also is rich in solar and wind resources.
Regardless of dietary guidelines, most adults will continue to follow their own paths—from paleo to vegan to locavore. Their choices will be shaped by a stew of sci-ence, guidelines, marketing, doctor’s orders, beliefs, and taste buds. The story’s not much different for power. When given a choice—which is becoming more common with dropping prices for renewables and battery storage—consumers large and small will opt to consume specific fuels based on a mix of price, convenience, marketing, beliefs, and self-image, so it shouldn’t be surprising that increasing numbers are choosing renewables for climate-change reasons.
As for me, I’m in the omnivore, all-of-the-above camp, provided everything is in sensi-ble portions and produced as sustainably as possible. Now, it’s time for my mid-afternoon apple, almond, and chocolate break. ■—Gail Reitenbach, PhD is POWER’s editor. PCL.com/PICCo
‡W";ヴW"Iラミゲデヴ┌Iピラミ"ヮ;ヴデミWヴゲ"┘エラ"ヴWゲヮラミS"デラ"デエW"┌ミキケ┌W"Iラミゲデヴ┌Iピラミ"ミWWSゲ"ラa"IノキWミデゲ"キミ"デエW"ヮラ┘Wヴが"IラェWミWヴ;ピラミが"ラキノ";ミS"ェ;ゲが"ヮWデヴラIエWマキI;ノが";ミS"マキミキミェ"キミS┌ゲデヴキWゲく"‡W";ヴW"ヮ;ゲゲキラミ;デW";Hラ┌デ"┘エ;デ"┘W"Sラ";ミS";Hラ┌デ"IヴW;ピミェ"ゲ┌IIWゲゲa┌ノ"ラ┌デIラマWゲ"aラヴ"ラ┌ヴ"IノキWミデゲ"┘エキIエ"ノW;S"デラ"ラ┌ヴ"マ┌デ┌;ノ"ゲ┌IIWゲゲく"
‡W" ノララニ" HW┞ラミS" デエW" キママWSキ;デW" ヮヴラテWIデ" ミWWSゲ" デラ" ゲWW" デエW" HキェェWヴ" ヮキIデ┌ヴWぎ" デラ"┌ミSWヴゲデ;ミS"┞ラ┌ヴ"H┌ゲキミWゲゲ"ェラ;ノゲが"ゲエ;ヴW"┞ラ┌ヴ"┗キゲキラミ"ラa"ゲ┌IIWゲゲ";ミS"┘ラヴニ"ピヴWノWゲゲノ┞"デラ"W┝IWWS"┞ラ┌ヴ"W┝ヮWIデ;ピラミゲく
TOGETHER WE BUILD SUCCESS.
640 MW Combined Cycle Power PlantLouisville, Kentucky
PCL.com/PICCo
‡W";ヴW"Iラミゲデヴ┌Iピラミ"ヮ;ヴデミWヴゲ"┘エラ"ヴWゲヮラミS"デラ"デエW"┌ミキケ┌W"Iラミゲデヴ┌Iピラミ"ミWWSゲ"ラa"IノキWミデゲ"キミ"デエW"ヮラ┘Wヴが"IラェWミWヴ;ピラミが"ラキノ";ミS"ェ;ゲが"ヮWデヴラIエWマキI;ノが";ミS"マキミキミェ"キミS┌ゲデヴキWゲく"‡W";ヴW"ヮ;ゲゲキラミ;デW";Hラ┌デ"┘エ;デ"┘W"Sラ";ミS";Hラ┌デ"IヴW;ピミェ"ゲ┌IIWゲゲa┌ノ"ラ┌デIラマWゲ"aラヴ"ラ┌ヴ"IノキWミデゲ"┘エキIエ"ノW;S"デラ"ラ┌ヴ"マ┌デ┌;ノ"ゲ┌IIWゲゲく"
‡W" ノララニ" HW┞ラミS" デエW" キママWSキ;デW" ヮヴラテWIデ" ミWWSゲ" デラ" ゲWW" デエW" HキェェWヴ" ヮキIデ┌ヴWぎ" デラ"┌ミSWヴゲデ;ミS"┞ラ┌ヴ"H┌ゲキミWゲゲ"ェラ;ノゲが"ゲエ;ヴW"┞ラ┌ヴ"┗キゲキラミ"ラa"ゲ┌IIWゲゲ";ミS"┘ラヴニ"ピヴWノWゲゲノ┞"デラ"W┝IWWS"┞ラ┌ヴ"W┝ヮWIデ;ピラミゲく
TOGETHER WE BUILD SUCCESS.
640 MW Combined Cycle Power PlantLouisville, Kentucky
Come visit us at
booth #6847
POWER-GEN®
Las Vegas, NV
Dec. 8-10
CIRCLE 4 ON READER SERVICE CARD
www.powermag.com POWER | November 20158
New Options for Solar PV The global market for solar photovoltaic (PV) panels shows no signs of slowing down, with cumulative installed capacity expected to reach 700 GW and annual de-mand to pass 100 GW by 2020, according to GTM Research. This booming market has spurred manufacturers to introduce a va-riety of innovations intended to increase panel efficiency and reduce manufactur-ing, installation, and ancillary costs.
South Korean firm LG Electronics intro-duced a new version of its NeON PV cells at the Solar Power International (SPI) conference in Anaheim, Calif., in mid-Sep-tember. The NeOn 2 makes several breaks with traditional silicon PV cell design (Fig-ure 1). First, rather than employ the usual two- or three-ribbon approach across the cell to gather the electric charge, the NeON 2 uses an array of 12 wires.
LG says this design offers a number of advantages. First, by dividing the current among a larger number of conductors, the electrical loss through each wire is greatly reduced. Second, the use of round wires in place of flat ribbons means light entering the cell is scattered more efficiently and less is reflected out. Finally, because each cell has more conductors, microcracks and other defects that develop in the cell over
time have far less effect on output be-cause there are many more paths for the electric current.
In addition, the NeON 2 cells are bifa-cial, able to absorb light from both sides. This makes them more efficient when sun-light strikes the cells at less-than-ideal angles during morning and evening hours. LG says the 320-W, 60-cell NeON 2 pan-els are able to generate more power than conventional 72-cell panels and offer up to 3% higher efficiency than the first-generation NeON design.
Though they have garnered far fewer sales and less attention than crystalline silicon PV cells, thin-film copper-indium-gallium-selenide (CIGS) panels have main-tained a market niche (around 7% in 2015, according to research firm IHS) because of certain advantages they have over crys-talline silicon–based panels, mainly that they are lighter, thinner, more flexible, and have a reduced visual footprint.
Taiwanese CIGS manufacturer Hulk En-ergy Technology (Hulket) and Italian firm ENERGYKA Electrosystem debuted a new product at SPI that combines Hulket’s CIGS panels into a flexible multi-panel module (Figure 2). The Prometea modules are available in outputs from 100 watts to 500 W. They are foldable, portable, and can be installed with far less effort and additional equipment than crystalline sili-con PV panels.
Finally, San Jose–based Silicor Ma-terials has developed an alternative to traditional polysilicon that is produced through a proprietary metals-based pro-cess requiring two-thirds less energy but still achieving conversion efficiencies in line with traditional materials. Silicor an-nounced at SPI that it has secured $105 million in equity capital agreements to support the construction of its first com-mercial-scale manufacturing operation in Grundartangi, Iceland. The company has already secured sales commitments equal to approximately 75% of the plant’s an-nual production capacity, it said.
Silicor CEO Terry Jester told POWER that the process is based on tradition-al aluminum smelting, where silicon is viewed as an impurity. Basing their fac-tory in Iceland—where aluminum smelt-ing is a major industry due to the island’s cheap hydroelectric power—allows them to reduce costs by partnering with local aluminum companies. Unlike traditional silicon production, which relies on hydro-chloric acid and trichlorosilane, Silicor’s process requires no toxic chemicals—a major criticism that has been leveled at the solar PV industry as its footprint has grown. Jester said Silicor expects to break ground on the factory next year and begin production in 2018.
—Thomas W. Overton, JD, associate
editor1. Neon light. LG’s NeON 2 solar photo-
voltaic cells use an array of narrow wires to
gather power across the cell instead of the
traditional ribbons. Courtesy: LG Electronics2. Solar accordion. The multi-panel Prometea CIGS module (2.2 m x 1.4 m x 4 mm) is
ideal for installation in areas with difficult topography or where traditional mounting approaches
are problematic. Courtesy: Hulk Energy Technology/ENERGYKA
November 2015 | POWER www.powermag.com 9
India Refocuses Coal
Future
India, the world’s most coal-dependent nation, has over the last few months very publicly shifted its stance on coal power.
In October, the country announced its commitment for the upcoming COP21 global climate talks in Paris, pledging to improve the carbon emissions intensity of its gross domestic product (GDP) by 33% to 35% below 2005 levels by 2030. That com-pares to China’s recent pledge to reduce the intensity of its GDP by 60% to 65% during the same period. The Indian government, which introduced the plan with much fan-fare, said the target would allow India and its carbon-intensive industrial neighbor to have almost the same emission intensity levels by 2030.
Perhaps more noteworthy, however, is that India also pledged to increase the share of electricity produced by non-fos-sil fuels to an impressive 40% by 2030. While that isn’t a steep increase for the country whose current power mix in-cludes 30% renewables, including hydro, it is detrimental to its coal sector, which it depends on to produce about 60% of its power (Figure 3).
Plant Closures
The central government’s strategy to boost power capacity yet cut carbon emis-sions and utilize coal efficiently is novel: It wants to close coal plants with a to-tal generation capacity of 36 GW that are more than 25 years old and replace them with newer supercritical units. The driv-ing factor for this approach is scarcity of resources like land, water, and coal.
In a comprehensive review with states held this September, the Central Electricity Authority (CEA) pointed to
proposed supercritical coal power ca-pacity additions of 84.6 GW in its 13th Five Year Plan (2017–2022) and direct-ed utilities to explore possible options to use existing land and other facilities more efficiently. The CEA will also re-quire states to submit plans for the re-tirement, replacement, and renovation of aging plants. Several states—includ-ing Maharashtra, Haryana, Rajasthan, Gujarat, Madhya Pradesh, Tamil Nadu, and the newly created Telangana state—have already chosen to kick-
3. Coal giant. Bharat Heavy Electricals Ltd. (BHEL) this August commissioned the 500-
MW Unit 13 of the Vindhyachal Super Thermal Power Station in Vindhyanagar in Singrauli district
of Madhya Pradesh. This is the seventh 500-MW unit commissioned by BHEL at the plant.
Vindhyachal is a 4.7-GW pithead power plant. Courtesy: NTPC
CIRCLE 5 ON READER SERVICE CARD
www.powermag.com POWER | November 201510
THE BIG PICTURE: Levelized Cost of Electricity
VARIA
BLE
REN
EWA
BLE
S
Levelized cost of electricity ** ($/MWh)
0 100 200 30050 150 25025 75 125 175 225 275 325
BA
SELO
AD
350
Coal
Nuclear
Solar PV—Residential
Solar PV—Commercial
Solar PV—Utility-scale
Onshore wind
Offshore wind
375
Natural gas CCGT
The notion of a levelized cost of electricity (LCOE) has become a handy one for comparing unit costs of different technolo-
gies over their economic life, but it varies widely among countries. Those variations can typically be explained by changes
in discount rates*; fuel, carbon, or construction costs; operation and maintenance costs; and even load factors and plant
lifetimes. Source: "Projected Costs of Generating Electricity," International Energy Agency/Nuclear Energy Agency (2015). For
more, see POWER's in-depth analysis of that report at http://goo.gl/fyyJhY.
—Copy and artwork by Sonal Patel, a POWER associate editor
R
CCGT
3% discount rate
7% discount rate
10% discount rate
KEY
Notes: *Discount rate = return on capital for an investor in the absence of specific market or technology risks; data is limited mostly to Organisation for
Economic Cooperation and Development (OECD) countries. **The International Energy Agency calculates average lifetime levelized costs on the basis of the
costs for investment; operation and maintenance; fuel; carbon emissions; and decommissioning and dismantling of 181 plants in 22 countries. These include
selected OECD member countries: Austria, Belgium, Denmark, Finland, France, Germany, Hungary, Italy, Japan, South Korea, Netherlands, New Zealand,
Portugal, Slovak Republic, Spain, Switzerland, Turkey, UK, and U.S. Flags represent the highest- and lowest-cost OECD countries for each scenario.
South Korea
Japan
Portugal
UK
U.S.
Denmark
Austria
Belgium
Germany
France
ƒ4237"Dcnfqt"Gngevtke"Eqorcp{
Direct Drive
Direct drive cooling tower systems from Baldor eliminate
the need for mechanical components such as gearboxes,
jack shafts and couplings – greatly reducing cooling tower
maintenance and power consumption while increasing
system reliability. The field-proven, high torque Baldor AC
laminated motor is controlled by a purpose built ABB matched
performance adjustable speed drive to provide optimal speed,
quieter operation and lower energy use.
For new projects or retrofit applications, you can count on
Baldor for the ultimate cooling solution.
baldor.com 479-646-4711
ƒ4237"Dcnfqt"Gngevtke"Eqorcp{
The Ultimate Cooling Solution
Download a QR reader app
and scan this code for
more information.
http://esp.to/wjOcA6
CIRCLE 6 ON READER SERVICE CARD
www.powermag.com POWER | November 201512
start the replacement of older plants, seeking environmental clearances from the Ministry of Environments, Forests, and Climate Change (MoEFCC).
Strict New Environmental Rules Are ComingFinally, the government is committed to curbing air pollution from coal-fired pow-er plants.
This May, MoEFCC proposed the first-ever federal standards for sulfur dioxide (SO2), nitrogen oxides (NOx), and mercu-ry. The rule proposes to require the na-tion’s fleet of plants larger than 500 MW to meet SO2 limits of 200 milligrams per normal cubic meter (mg/Nm3), and NOx limits of 300 mg/Nm3. New plants com-missioned after 2017 will be required to have flue gas desulfurization to cut SO2 emissions to 100 mg/Nm3, and they would need to meet NOx norms of 100 mg/Nm3.
According to the Center for Science and Environment (CSE), a New Delhi–based public interest research and advocacy group, the limits would imply cuts in SO2 emissions of 80% for existing plants and about 15% in NOx emissions.
The rule would also limit mercury emis-sions (achieved via pollution controls and coal washing) to 0.03 mg/Nm3, the same as China’s. (Comparatively, the U.S. limit is 0.0017 mg/Nm3.) Then, they would substantially tighten particulate emission standards—India’s only federally mandat-ed air pollution standards—to between 50 and 150 mg/Nm3. That’s “quite relaxed compared to global norms of 30 mg/Nm3,” notes CSE, but still effective. Earlier this year, the group estimated that almost two-thirds of India’s coal fleet doesn’t meet existing limits.
And, as stringently, the rule calls for water consumption limits. Once-through cooling system–based plants would need to convert to cooling towers and cut wa-ter draw to 4 m3/MWh from the current average of around 150 m3/MWh. “New plants would need to cut water use to 2.5 m3/MWh, which is equal to the av-erage water use of Chinese plants,” says CSE. “A global best cooling tower based plant has water consumption as low at 1.6m3/MWh.”
Power Giants to Get Federal Funds to Develop Large-Scale Carbon Capture PilotsThe U.S. Department of Energy (DOE) wants GE to plan and propose a large-scale pilot
test of a carbon dioxide capture solution that uses a class of amino silicone com-pounds used to soften hair or clothing.
The agency’s National Energy Technol-ogy Laboratory (NETL) said in September it will award the company $1 million in Phase I funding to test the solution at the CO2 Technology Center at Mongstad (TCM) in Norway (Figure 4).
As GE explained, at temperatures of around 105F, the amino silicone mate-rials attach to CO2 gas. When the heat is increased by another 100 degrees F, the materials release the carbon and can then be reused to capture more. While it sounds unremarkable, the process holds a major advantage over competing ap-proaches because it does not require water. That “substantially reduces the energy required to capture the carbon,” the company said.
GE’s proposal was among six projects that will receive federal funding for large-scale pilots to reduce the cost of carbon capture and sequestration (CCS). South-ern Co. will get about $700,000 to test improvements to the CCS process using an existing 25-MW, amine-based CO2 cap-ture process at Plant Barry in Alabama. NRG Energy will get $1 million to test Inventys’ VeloxoTherm post-combustion project, which will process a 10-MW slip-stream of coal flue gas to separate CO2,
likely at NRG’s Petra Nova W.A. Parish plant near Houston (where it is already retrofitting a CCS system). The University of Illinois will also get about $1 million to capture 500 metric tons per day of CO2 with a 90% capture rate from existing coal-fired boilers at the Abbott Power Plant on its Urbana-Champaign campus, using Linde/BASF’s amine-based absorp-tion system.
Meanwhile, alongside GE, the Universi-ty of Kentucky Center for Applied Energy Research (CAER) will receive about $1 million for a pilot facility at TCM that will use micro-algae to capture carbon from power plant CO2 emissions. Alstom Power will, at the same time, conduct a three-year pilot program at TCM to implement several concepts for improving and low-ering the overall cost of Alstom’s chilled ammonia process.
Only two of the six projects will qualify for Phase II funding, the DOE expects. The Phase 2 awards for construction and ex-ecution of pilot testing are anticipated by mid-2016.
AREVA’s Next-Gen BWR Fuel Is Tested in the U.S. AREVA has installed the first-ever boil-ing water reactor (BWR) assemblies in the U.S. that features an 11x11 fuel rod ar-
4. Capture facility. The Norwegian government began developing—but then canceled in
September 2013—a full-scale carbon-capture project at the CO2 Technology Center at Mong-
stad, in Norway. The state-of-the art research facility got a boost this fall, however, when the
U.S. Department of Energy said it will grant three entities millions of dollars in federal funds to
develop large-scale pilots to reduce the cost of carbon capture. Courtesy: TCM
CIRCLE 7 ON READER SERVICE CARD
www.powermag.com POWER | November 201514
ray, the French nuclear giant revealed this September.
The new fuel design, the ATRIUM 11, has been used to produce power at two nuclear plants since April, though AREVA declined to name the reactors. However, the company told POWER that to date a total of 40 lead fuel assemblies are oper-ating in five reactors in four countries. In-cluding the two in the U.S., they have also been installed in Switzerland, Finland, and Germany since 2012.
AREVA—a company that has designed and manufactured fuel for both BWRs and pressurized water reactors (PWRs) for 40 years, but which also suffered record losses in 2014—is determined to return to profitability by refocusing on its core nuclear power business. The announcement marks a major milestone for its fledgling lead fuel assembly de-sign, which it says will provide higher intrinsic safety margins. AREVA is also developing the GAIA fuel assembly de-
sign for PWRs in parallel with the ATRI-UM 11. There is substantial interest in both designs in Europe and in the U.S., the company said.
AREVA said that the fuel design im-proves safety by reducing fuel operating temperatures and peak cladding stress under operation. “When engineers balance the uranium loading and enrichment, the economic benefit is a bonus,” said AREVA spokesperson Curtis Roberts in September. Additionally, the new design offers better operational flexibility, which is valuable for plants that have implemented power uprates or optimized capacity factor oper-ating strategies, he said.
“Since it has the same external dimen-sions, the ATRIUM 11 fuel design is installed identically to the existing fuel design oper-ating in each reactor,” Roberts explained. “The fuel burns typically for three cycles and, following each cycle, post-irradiation examinations have been completed show-ing expected performance.”
The 16 lead fuel assemblies installed at the two unnamed reactors were manufac-tured at the company’s Richland, Wash., facility (Figure 5). “The completion of these real-life tests will allow delivery (in full-scale quantities) of the ATRIUM 11 de-sign in 2017 in Europe, and 2019 in the U.S.,” said Roberts.
South Africa Puts First Large IPP Project OnlineSouth Africa reached a milestone this Sep-tember when it put online its first large-scale project owned by an independent power producer (IPP). The inauguration of the 335-MW Dedisa Peaking Power plant located in Port Elizabeth, in the Eastern Cape’s Coega Industrial Development Zone, marks a shift in the way electricity is pro-
This is where KSB puts
our Energy
Our technology. Your success.
Pumps p Valves p Service
If you operate a conventional power station, you play an
important role in meeting the world’s energy needs. KSB’s
pumps and valves are designed with state-of-the-art
technology that will improve your overall plant performance
and reliability. The latest materials technology and our
engineers’ skill and experience are at your service.
www.ksbusa.com
CIRCLE 8 ON READER SERVICE CARD
5. New nuclear fuel design. AREVA’s Ken McKeown inspects an ATRIUM
11 fuel rod assembly bundle at the compa-
ny’s fuel manufacturing facility in Richland,
Wash. Courtesy: AREVA
Design Engineering • Digital Control Systems • Flooding Analysis • Security Engineering and Design • Electrical Analysis • Risk Assessments-PRA • Seismic Engineering and AnalysisStructural Analysis • Environmental Compliance • Permitting • Siting Studies • Substations • Fire Protection and Fire Safe Shutdown Services • Buried Piping • CWA 316(b) Compliance
Power Uprate • Emergency Planning • Plant Modifications and Upgrade Support • Decommissioning Planning
Design Engineering • Digital Control Systems • Flooding Analysis • Security Engineering and Design • Electrical Analysis • Risk Assessments-PRA • Seismic Engineering and Analysis
Structural Analysis • Environmental Compliance • Permitting • Siting Studies • Substations • Fire Protection and Fire Safe Shutdown Services • Buried Piping • CWA 316(b) Compliance
Power Uprate • Emergency Planning • Plant Modifications and Upgrade Support • Decommissioning Planning
500 TownPark Lane Kennesaw, GA 30144-5509 t 770.919.1930 e [email protected]
You know our name. You know our company. Our engineering services span
the power plant industry. With 29 strategically located offices and over 1750 employees ready to work
24/7, we live our credo—Excellence – Every Project. Every Day. Our focus has helped us become one of the
largest and most respected engineering and environmental firms serving the power industry.
With long term contracts in place to support power plant operators, we have become known as the
“go to company” for resources and technical expertise. Seismic and flooding analyses are just two of the
many areas we know and are recognized as industry experts. Recently acquired TALISMAN and MARACOR
expand our capabilities in the regulatory, licensing and PRA areas.
Call or email. Find out why ENR consistently ranks us as a top design firm in the United States.
Supporting Power.
One Generation to the Next.
CIRCLE 9 ON READER SERVICE CARD
www.powermag.com POWER | November 201516
duced in the power-strapped country. The plant is owned by Dedisa Peaking
Power (a subsidiary of French firm ENGIE, formerly GDF Suez), Legend Power Solu-tions, Mitsui & Co., and The Peaker Trust. Built by Italian firms Ansaldo Energia and Fata, the plant is currently an open cycle gas turbine (OCGT) peaking facility (Figure 6) that will operate on diesel for about four hours a day. Power will be sold to Es-kom Holdings, the state-owned utility that generates 95% of South Africa’s power, un-der a 15-year power purchase agreement. “In the longer term, the project’s sponsors envisage a conversion to gas-fired, com-bined cycle facility in the framework of the Department of Energy [DOE] gas mas-ter plan. The facility is designed to allow such conversion,” Dedisa CEO Arnaud de Limburg told POWER in September.
The project got its start in 2006 as Eskom realized it would face debilitat-ing power shortages if new generation wasn’t built quickly, and it called on the government to encourage a greater role for the private sector in meeting the country’s future electricity needs. Es-kom argued that the measure would re-duce the government’s funding burden, relieve the utility’s borrowing require-ments, and introduce generation tech-nologies that it might not consider part of its core function, such as distributed generation, co-generation, and small-scale renewable projects.
The DOE relented, and in August 2011—as the country battled chronic power supply issues—it issued a request for proposals, inviting IPPs to bid in a
competitive process. The open cycle gas turbine (OCGT) program calls for 1,000 MW of IPP-built power plants, of which Dedisa is the first to begin operations.
“Being the very first IPP project in South Africa, it took several years of development before execution of con-tracts with DOE and Eskom, and reach-ing financial close in mid-2013,” said de Limburg. While the DOE and Eskom have plans for more large IPP-built projects (including for coal and combined cycle gas turbines), he noted that only one other large-scale IPP-built project is under construction in South Africa: the 670-MW Avon Peaking Power OCGT proj-ect near Durban (KwaZulu-Natal).
POWER DigestDutch Court Clears Eemshaven Coal Plant for Operation. A Dutch court on Sept. 9 rejected claims that an environ-mental license issued for RWE’s 1.6-GW Eemshaven coal-fired power plant was is-sued improperly, clearing the way for the $3.36 billion plant to begin operations at full capacity. Environmental groups have opposed the plant’s location near nature reserves. Both Germany—which will soon phase out nuclear power—and the Netherlands—whose gas fields are in decline—back the hard coal project. The project involved construction of two ultra-supercritical coal-fired units, Block A and Block B, that can start up and shut down quickly. Construction began in 2008, and the plant was scheduled to begin operat-ing in 2014.
Flamanville Sees Costs Soar to $11.8B, New Delays. French state-controlled utility Électricité de France’s (EDF’s) Flamanville reactor, which began construction in northern France in 2007, won’t come online until at least 2018, the company said. Costs for the first-of-its-kind EPR reactor have meanwhile surged from €3.3 billion (2005 values) to €8 billion ($9 billion) in 2012 and €10.5 billion ($11.8 billion) in 2015. The company said in a statement that 98% of the building civil structure has been completed as well as 60% of the elec-tromechanical work. Putting in place a new organizational structure, EDF said it would now strive to complete instal-lation of the primary circuit in the first quarter of 2016 and load fuel and start up the reactor by late 2018. Startup of the much-delayed Olkiluoto 3 EPR under construction in Finland is also slated for 2018. The world’s other two EPR projects, Taishan 1 and 2 under construction in China, could come online earlier, in 2016 and 2017. EDF is also considering build-ing two EPRs in the UK.
Rostov Unit 3 Reactor Begins Com-mercial Operation. Unit 3 of the Ros-tov nuclear power plant in Russia has been commissioned two months ahead of schedule and is now operational, said Russia’s state-owned nuclear entity Ro-satom on Sept. 24. Construction of that unit began in 2009. The nuclear plant is located on the bank of the Tsimlyansk Reservoir, about 14 km from Volgodonsk. It now comprises three units with VVER-1000 reactors. Unit 1 was put into com-mercial operation in 2001 and Unit 2 in December 2010. Unit 4, another VVER-1000, is under construction with opera-tions expected to begin in 2017.
Indonesia Kicks Off Coal Plant Con-struction, Island Electrification, Tidal Power Development. PT Bhimasena Power Indonesia—a joint venture of J-POWER, Adaro Power, and Itochu—on Aug. 28 kicked off construction of the 2-GW PLTU Batang coal-fired plant in Central Java, Indonesia. The $4 billion ultrasupercritical project is the nation’s first large-scale public-private partnership (PPP) project. The two-unit plant could come online by 2019.
Also on Aug. 28, Indonesia’s govern-ment implemented a program to put up 149 diesel gensets—a total of 67.8 MW—in 50 locations across 13 provinces to supply power to customers in outer islands and border areas. The provinc-es include Nanggroe Aceh Darussalam, North Sumatra, West Sumatra, Riau, Riau
6. IPP kickstart. The newly opened 335-MW Dedisa Peaking Power Plant in Port Elizabeth,
South Africa, is the first large-scale power project built in the country by an independent power
producer. Courtesy: Dedisa Peaking Power
November 2015 | POWER www.powermag.com 17
Islands, West Kalimantan, North Kalimantan, East Kalimantan, East Nusa Tenggara, North Sulawesi, Maluku, North Maluku, and Papua.
Meanwhile, state-owned utility PT PLN signed a memorandum of understanding with marine power projects developer SBS to develop a tidal power project in West Nusa Tenggara. The $350 million tidal stream plant, which would be Indonesia’s first com-mercial-scale project, would be built in phases beginning with an initial 12-MW pilot and eventually scaled up to 140 MW.
AGL Sells Its Share in 420-MW Australian Wind Farm. Australian power generator AGL Energy on Sept. 7 sold its 50% participating interest in the 420-MW Macarthur Wind Farm joint venture to New Zealand–based investment manage-ment firm Morrison & Co. for A$532 million. The remaining 50% interest is held by Malakoff Corp. Berhad. However, AGL said it will continue to operate and maintain the Macarthur Wind Farm on behalf of Morrison & Co. and Malakoff, and it retains the rights to all Renewable Energy Certificates and electricity output until 2038. The Macarthur Wind Farm—a 2013 POWER magazine Top Plant award winner—is located in southwest Victoria. It was constructed by Vestas and Leigh-ton Contractors with 140 Vestas V112, 3-MW turbines and was completed in January 2013. “The sale of the Macarthur Wind Farm is the first step toward AGL’s target of $1 billion in as-set divestments by the end of FY17. The sale of this asset will improve the company’s capital efficiency while retaining its BBB credit rating,” the company said.
Westinghouse to Dismantle Closed German Nuclear Plant. Westinghouse Electric Co. won a contract on Sept. 8 to dismantle the reactor pressure vessel and internals at the Philippsburg Nuclear Power Plant Unit 1 in Germany. The reac-tor operated by EnBW Kernkraft GmbH was permanently shut-tered by a German government mandate in the aftermath of the 2011 Fukushima disaster in Japan. Westinghouse’s scope in-cludes planning, equipment manufacture, and on-site segmen-tation of the reactor vessel internals and the reactor vessel, including peripheral structures. The scope for the contract will be executed by a consortium comprising NUKEM Technologies Engineering Services GmbH (NTES) and GNS Gesellschaft für Nuklear-Service mbH under the lead of Westinghouse Electric Germany GmbH. The work will be carried out under the direction of EnBW when the decommissioning license is granted by the Ministry of the Environment, Climate, and En-ergy of Baden-Württemberg.
Statkraft Opens 172-MW Hydro Plant in Peru. Norwe-gian energy group Statkraft in late August opened the 172-MW Cheves hydropower plant in Peru. The plant, 130 kilometers north of the capitol Lima in the Huaura River, consists of two aggregates and exploits a gross head of 600 meters. Based on water from the Andes, it will generate 840 GWh annually, power that will be sold on a long-term power purchase agree-ment with eight local distribution companies.
Siemens Awarded Plant Components for Maryland Gas Plant. Siemens will supply the main components for the 735-MW natural gas–fired Keys Energy Center in Maryland to SNC-Lavalin Constructors, who will act as the turnkey engineering, procurement, construction contractor for the project. Siemens will deliver two SGT6-5000F gas turbines, one SST-5000 steam turbine, two air-cooled generators SGen-1000A, and the asso-ciated turbine instrumentation and control systems. The plant, owned by Public Service Enterprise Group, is expected to come online in 2018. ■
—Sonal Patel is a POWER associate editor.
800.787.7325e-mail: [email protected] 9001 Certi�ed
For more than 25 years, Sealeze has helped design and manufacturing engineers design solutions.
Adaptive Brush Seal Solutions for
Air Preheaters
Sealeze’s patented brush-based sealing system delivers reliability and extended functional service life.
Replace seals less often
standard seals.
under deformation; reducing drag, wear and sudden failures.
More effective than other seal
sizes and surface irregularities for a continuous seal.
creating a high integrity seal. Under pressure these
High performance. Long life.
CIRCLE 10 ON READER SERVICE CARD
www.powermag.com POWER | November 201518
Smart Access Planning Enables Efficient Cooling Tower Maintenance
Two hyperbolic cooling towers rise 495 feet over Exelon Corp.’s Byron Generating Station about 110 miles west of Chicago, Ill. The towers help cool the two Westing-house pressurized water reactors that are capable of generating up to 2,346 MW at the site.
Like all classic wet transfer hyperbolic cooling towers (Figure 1), the Byron Gen-erating Station uses fill packs to increase the exposed surface area of the water, as well as to increase the air-to-water contact time. These actions increase the rate of heat transfer and the amount of heat transfer, respectively. In a film-type fill pack, water flows in a thin film over stacks of vertically oriented plastic sheets spaced about 0.75 inch apart. The sheets feature a corrugated or V-shaped pattern to further increase surface area and con-tact time.
An Upgrade Is WarrantedRecent film-fill developments have cre-ated low-clog, open, angular cross-corru-gations that allow debris and biological growth to pass through. However, this design did not exist when the towers at Byron were built. Over the years, the station’s fill packs developed excess bio-logical growth and accumulated silt. As a result, the fill packs bulked up from less than 100 pounds to more than five times their original weight.
Normally, fill packs hang 30 to 35 feet above the cold-water basin (Fig-ure 2). However, they are designed to break away and fall from their attach-ments when they get too heavy, a fea-ture that prevents damage to the tower structure.
When several of the fill packs attached to the cooling towers of the Byron Gen-erating Station became over-burdened and fell into the cold water basin, Ex-elon engineers decided to replace all of the fill packs in both towers. They also decided to replace the drift eliminators, honeycomb-like PVC components (Figure 3) that hang above the water distribu-tion system to capture and limit the quantity of water droplets contained in the air stream leaving the cooling tow-er. In all, more than 5,000 components would need replacement.
To perform the maintenance, Exelon consulted SPX Cooling Technologies Inc., its cooling tower manufacturer. The work had to be done within two three-week windows, six months apart, while the re-
actors were shut down for routine sched-uled refueling. Planning was critical. Surprises, delays, or complications would affect Exelon’s ability to deliver electricity to northern Illinois.
1. Tall order. SPX Cooling Technologies Inc. was tasked with replacing more than 5,000
components in both of Byron Generating Station’s hyperbolic cooling towers during two three-
week maintenance periods. Courtesy: David Joel Photography
2. A cool design. During operation, water flows over fill packs (shown here being lifted into
position under the water distribution nozzles using a telehandler) in a thin film, improving heat
transfer by increasing the exposed surface area of the water. Courtesy: David Joel Photography
November 2015 | POWER www.powermag.com 19
Working Quickly and SafelySPX’s first challenge was getting access to the fill packs in a way that would al-low its staff to work quickly and safely. As noted, the fill packs are above the cooling basin, which holds 8.5 feet of water. The drift eliminators are above the fill packs, with components for the water distribution located between them. The basin itself also contains a network of pipes for water circulation. During opera-tion, water falls inside the cooling tower at a rate nearly that of a thunderstorm. In short, gaining access to the fill packs and drift eliminators required extensive planning, extreme efficiency, and atten-tion to safety.
SPX has a longstanding relationship with Safway Services, an access and industrial services company based in Waukesha, Wis. Safway specializes in complex industrial environments where planning, efficiency, and safety are all critical to success.
“We know Safway has the right equip-ment, and we know they have the design (engineering) services we need for an en-vironment like this,” said Duane Krehbiel, director of MCT Services Construction at SPX and project manager for the Exelon
job. “With a job like this there’s a lot of work up front, and we know Safway will do it right.”
The Right StuffThe “right equipment” Krehbiel mentioned is Safway’s Systems Scaffold, which is en-gineered to provide fast and easy erection. To assemble it, workers hook horizontal or diagonal members (galvanized steel tub-ing) to rings on the vertical posts. Using a hammer, they drive home a wedge until a retainer pin drops and locks the member in place.
To disassemble, workers lift the retain-er pin with a Safway pry-bar hammer and loosen the wedge with a quick flick of the hammer. The design allows for 360-degree placement around the vertical post rings, and rings are spaced every 21 inches on vertical posts for easy height adjustment (Figure 4). Special compo-nent jacks, support frames, braces, and varying lengths of the horizontal mem-bers enable the scaffold to conform to sloping surfaces (such as on a boiler cav-ity), and all components can be passed through small openings.
“Cooling towers present complex ac-
3. Puzzling pieces. In addition to chang-
ing fill packs, drift eliminators, stacked here on
beams above the water distribution nozzles,
were also replaced. Courtesy: David Joel Pho-
tography
[email protected] www.vanbeest.com Member of Van Beest International
Van Beest B.V. is manufacturer and supplier of
wire rope- and chain accessories with branches
in The Netherlands, Germany, France and The USA.
We offer reliable and fast deliveries in North
America directly from our warehouse in Houston,
Texas.
Van Beest USA has the largest stock of quality
lifting equipment in the area.
Van Beest your reliable partner
STOCK IN THESTOCK IN THE
CIRCLE 11 ON READER SERVICE CARD
www.powermag.com POWER | November 201520
cess situations, and working within the time constraints of a refueling shutdown demands speed. Systems Scaffold excels in this type of environment because of its adaptability,” noted Jim Waichunas, Saf-way Tracking System coordinator for Saf-way’s Eastern Division and SPX’s liaison for the project.
To monitor every aspect of the Exelon
project, Waichunas used the Safway Track-ing System, a proprietary software pro-gram that manages all of the resources for a project.
“The Safway Tracking System provides a clear picture of costs and bottlenecks and helps us to stay on top of other key performance indicators in real time,” said Waichunas.
Planning Leads to SuccessWith an outage of three weeks, Safway wanted to give SPX workers as much time as possible to perform their task. The plan involved building four sections of scaffold that would start on the outer ring of the tower and work toward the inside of the parabolic curve. When completed, each section of scaffold would measure about 21 feet wide, 90 feet long, and 45 feet high so the SPX crew could reach the drift eliminators. After the SPX crew finished work on one section, the Safway team would dismantle the scaffold and move it laterally to reach a new area (picture clock hands sweeping around the dial).
“The eight-and-a-half-feet of water in the cold water basin and the constant ‘rainstorm’ inside the parabolic curve pre-sented the biggest challenges to sched-uling,” said Waichunas. “Exelon couldn’t drain the basin or stop the cooling water spray until the outage began.”
Two weeks prior to the scheduled out-age, Exelon brought in divers. Directed by the Safway team, the divers erected the Systems Scaffold base (standard screw jacks and wood blocking) and one level of scaffolding underwater.
“It required good planning because there was a pretty strong current moving through the water,” Waichunas recalled.
With the base in place, the Safway crew erected as much scaffold as they could in the outer ring of the cooling tower, work-ing up to the edge of the rainstorm. Once the reactor outage began, the Safway team quickly built the scaffold up to full height and the SPX personnel took over.
Krehbiel said SPX and Safway had worked out a “Plan B” to allow work in wet areas with a partial shutdown of the spray system if the job went longer than three weeks. As it turned out, they didn’t need it. With demonstrated success, the Safway and SPX teams completed work on the second tower about six months later using a similar schedule.
In both cases the SPX team accom-plished its mission in the allotted three weeks with no major incidents (Figure 5). Once the maintenance was complete, the Safway crew finished removing the scaf-folding—about a two-week job.
“The take-down was actually done in phases, because our crew dismantled sections of scaffolding where the re-placement of materials was finished,” Waichunas, said. “Systems Scaffold is also simple to take down, which makes things more efficient.” ■
—Edited by Aaron Larson, a POWER associate editor.
4. Versatile construction. Post rings on Safway’s Systems Scaffold allow quick assem-
bly and offer a variety of orientation options to meet diverse project needs. Courtesy: David Joel
Photography
5. Finishing touches. The final drift eliminators are placed into position. Drift eliminators
are the last component that air and water vapor pass across before rising through the shell and
out the top of the tower. Courtesy: David Joel Photography
CIRCLE 12 ON READER SERVICE CARD
www.powermag.com POWER | November 201522
FERC’s Enforcement
Priorities After 10 Years
Under the EPActCarlos E. Gutierrez
On August 8, 2005, the Energy Policy Act of 2005 (EPAct) was signed into law. It remains, arguably, the last signifi-cant piece of energy legislation to be enacted in the U.S.
The changes wrought by EPAct are far-reaching and controver-sial, and for the gas and electric industry, perhaps no change has been more significant than the law’s transformation of the Federal Energy Regulatory Commission (FERC) into a formidable enforcement agency.
EPAct endowed FERC with authority to impose civil penalties of up to $1 million, per day, per violation under the Federal Power Act (FPA), the Natural Gas Act, and the Natural Gas Policy Act, and FERC has aggressively staked out its enforcement territory. Since 2007, the Commission has imposed over $642 million in civil penalties and ordered disgorgement of more than $300 mil-lion in profits. Two areas attracting a significant amount of FERC’s attention over the past decade include market manipulation and protection of the electric grid from cyberattacks.
Market ManipulationIn July 2013, FERC entered into a consent agreement requiring JP Morgan to pay a $285 million civil penalty and disgorge $125 million in profits for allegedly making bids in the electric mar-kets administered by the California Independent System Operator (CAISO) and the Midcontinent Independent System Operator that were designed to create artificial conditions that forced those ISOs to pay JP Morgan outside the market at premium rates.
In the Hunter case in 2013, FERC had a civil penalty for alleged market manipulation rejected by the D.C. Circuit for encroaching on futures markets found to be subject to the Commodity Futures Trading Commission’s exclusive jurisdiction.
In four other cases, FERC’s role as the adjudicator of market manipulation is under assault as the defendants have elected to force FERC to file suit in federal district court, where there is to be de novo review under FPA Section 31(d)(3). These cases include challenges to:
■ A July 2013 order in which FERC required Barclays to pay $435 million in civil penalties and $34.9 million in disgorged profits for allegedly engaging in certain physical market trades for the sole purpose of benefitting its financial swap positions.
■ An August 2013 order in which FERC required Competitive En-ergy Services to pay a civil penalty of $7.5 million for alleg-edly devising and implementing a fraudulent scheme whereby one of its demand response service provider clients inflated its baseline energy usage in order to capture demand-response revenues from artificial load reductions.
■ A May 2015 order in which FERC imposed civil penalties of $30 million on Powhatan Energy Fund and others for allegedly placing round-trip up-to-congestion bids in order to profit from the distribution of transmission line–loss credits.
■ A May 2015 order in which FERC required Maxim Power Corp. to
pay a civil penalty of $5 million for allegedly falsely reporting to ISO New England that it was burning oil rather than cheaper natural gas and thereby collecting inflated make-whole pay-ments from the ISO.
In each of these cases, FERC is taking the position that the de novo review provided for under FPA Section 31(d)(3) means simply that the court should decide the case based on the re-cord that was before FERC without according any deference to FERC’s decision, while the defendants are generally claiming that de novo review means that the case is to be re-adjudicated at the district court level with full rights to discovery and to introduce evidence. If the courts adopt Barclays’ interpretation of what de novo review means in this context, this could prove to be an effective avenue to rein in FERC’s aggressive enforce-ment tactics.
CybersecurityFERC has made “serious violations” of North American Electric Reliability Corp. (NERC) standards a major enforcement priority. FERC and the electric industry have given considerable atten-tion to the development and refinement of Critical Infrastructure Protection reliability standards (CIP Standards) that are intended to protect the electric grid from cyberattacks. Frequent changes to CIP Standards reflect an effort to keep up with the increas-ingly innovative ways that hackers can exploit a vulnerable bulk electric system and inflict substantial damage on the American economy.
In the last two years alone, FERC has conditionally accepted Version 5 of the CIP Standards and then conditionally accepted seven modified Version 6 standards. In its most recent proposed rulemaking regarding CIP Standards, FERC has further directed NERC to develop a new (or modified) CIP Standard that will ad-dress supply chain vulnerability to targeted malware and inevita-bly introduce new Version 7 standards. This proposal marks only the third time FERC has used its EPAct authority to require NERC to propose a new standard, highlighting the careful attention FERC has devoted to cybersecurity threats. This concern with cy-bersecurity may be well placed, as a recent report by Lloyd’s and the University of Cambridge Centre for Risk Studies estimates that a large-scale cyberattack on the U.S. grid could cost the economy over $100 billion.
FERC seems to relish its role as an enforcement force in the electric industry under EPAct. It remains to be seen, though, whether its authority will be curtailed by the courts or whether an industry burdened with high compliance costs and exposure will push back enough to spawn the next major piece of energy legislation in the U.S. ■
—Carlos E. Gutierrez ([email protected]) is counsel in Davis Wright Tremaine’s Energy practice group in the firm’s New
York, N.Y., office.
CIRCLE 13 ON READER SERVICE CARD
www.powermag.com POWER | November 201524
TOP PLANTS
Central Nuclear Néstor Kirchner (Atucha II), Lima, ArgentinaOwner/operator: Nucleoeléctrica Argentina S.A.
As with many other nations in the de-
veloping world, Argentina has seen
the course of its nuclear power pro-
gram rise and fall with the country’s eco-
nomic and political fortunes. Argentina first
turned to nuclear power in the 1960s, and
the country’s first nuclear reactor, Atucha I,
entered commercial operation in 1974 at a
site near Lima on the banks of the Parana
River about 100 kilometers (km) northwest
of Buenos Aires.
Atucha I is a 357-MW pressurized heavy-
water reactor (PHWR) built by German firm
Kraftwerk Union (KWU), which at the time
was a joint venture composed of the nuclear
business units of Siemens and AEG. In the
1970s, the military government decided to
bring four more nuclear reactors online be-
tween 1987 and 1997. Siemens, which had
by then bought out AEG’s shares in KWU,
submitted a design for a second, 745-MW
PHWR at the Atucha site.
As originally intended, Atucha II was to
be built by a joint venture between KWU and
the Argentine Atomic Energy Commission
(Comisión Nacional de Energía Atómica,
CNEA), using a Siemens-KWU design that
was essentially a larger version of Atucha I.
Intermittent ProgressConstruction began in 1981, but ongoing
weaknesses in the Argentine economy meant
that funds for the project were limited. Fol-
lowing the overthrow of the military govern-
ment and the return to democratic elections
in 1983, construction slowed even further as
national attention was pulled away by more
pressing issues.
Between 1983 and 1994, the project pro-
ceeded in fits and starts as funds became
available. Construction on some of the main
buildings advanced, and materials were
stockpiled on site. Though more significant
progress was made between 1991 and 1994
as more funds were allocated, the project
was finally halted in 1994 with the plant
about 81% complete. The main buildings
had been erected, but very little electrome-
chanical work had been completed.
In 1994, a new entity, Nucleoeléctrica Ar-
gentina (NA), was set up to take over nuclear
development from CNEA. But ongoing chal-
lenges in the national economy meant there
were insufficient resources to complete Atu-
cha II at the time.
In the intervening years, the site lay idle
as the workforce dispersed and the local
construction and engineering expertise that
would be necessary to complete the plant
waned. Siemens finally withdrew from the
project in 2000. Meanwhile, a skeleton staff
of about 150 worked to preserve 40,000 tons
of materials—comprising 85,000 separate
items—that were stored at the site and other
locations.
During the late 1990s, Argentina’s econ-
omy continued to contract as a result of in-
ternal and external factors, culminating in
an economic crisis that began in 1998 and
reached its worst in late 2001, when the gov-
ernment defaulted on its public debt and riots
wracked major cities for weeks. Not until
the election of Néstor Kirchner in 2003 and
major changes in economic policies were en-
acted did the nation begin to recover.
Begun with grand ambitions in the early 1980s, the second unit at Argentina’s Atu-cha site ran smack into the country’s economic crises in the following decade. But a determined crew brought the project to completion after a 13-year hiatus through a focus on rebuilding the nation’s nuclear labor force.
Thomas W. Overton, JD
Courtesy: Nucleoeléctrica Argentina S.A.
• • •
• • •
Indeck Group of CompaniesIndeck Keystone Energy LLC • Indeck Power Equipment Co. • Indeck Boiler Corp. • Indeck Energy Services Inc.
(814) 464-1200 • 24-HR Parts: (800) 322-5995 • www.indeck-keystone.com • [email protected]
CIRCLE 14 ON READER SERVICE CARD
TOP PLANTS
www.powermag.com POWER | November 201526
Back in BusinessBy 2006, Argentina was finally back on its
feet and experiencing economic growth.
That August, the government announced a
$3.5 billion plan to revitalize the country’s
nuclear sector, which included $600 million
for completing Atucha II. Argentina’s desire
to increase the share of nuclear in the power
mix and reduce dependence on imported fos-
sil fuels—especially natural gas—lay behind
the decision.
But restarting the project after more than a
decade was a significant challenge for a va-
riety of reasons. NA, which would serve as
the architect-engineer and design authority,
needed to close out the original contract with
Siemens-KWU and obtain the intellectual
property rights for the design in order to fin-
ish the work. More significantly, it needed to
rebuild the local workforce.
NA formed cooperative agreements with
Argentine companies and institutions as
well as foreign organizations such as the
International Atomic Energy Agency, Sie-
mens, and AREVA. To staff the project,
available personnel who had worked on the
plant originally were called back, and new
engineers, technicians, and construction
workers were recruited and trained along-
side the veterans. Construction resumed in
November 2006.
Because so many new workers with so
many different skills needed to be brought
in, a special committee was formed to iden-
tify all specific labor needs and determine
how they would be filled. In addition, con-
struction tasks were broken down into four
levels of expertise—from construction of
the pressure vessel and primary piping, re-
quiring the highest qualifications, down to
basic construction tasks—to ensure labor
resources were allocated most efficiently.
NA worked directly with the local
unions and contractors to structure the
construction contracts and develop a suffi-
ciently flexible process to support on-the-
job training. Among other achievements,
more than 1,400 new welders were trained
and qualified as part of the project. Per-
sonnel on site rose from a few hundred to
more than 5,000 within two years, peaking
at nearly 7,500 in 2010.
Another challenge was refurbishing the
partially finished plant so that construc-
tion could resume safely and effectively.
The communications and data processing
networks had to be updated to support new
standards (Figure 1). Temporary power, wa-
ter, security, and sewage systems, as well as
other temporary facilities that had lain idle
for more than a decade, had to be cleaned
up, reconditioned, and integrated with new
facilities to support construction.
Electromechanical construction re-
sumed in mid-2007. The heavy-water de-
sign required 600 metric tons of heavy
water, which was produced at the coun-
try’s indigenous heavy water production
plant in Arroyito. Production of heavy wa-
ter was completed in June 2012. Primary
system pressure testing was conducted in
early 2013, and fuel and heavy water were
loaded into the reactor later that year. First
criticality was achieved in June 2014, and
100% power was achieved for the first time
that November.
Ultimately, more than 43 million construc-
tion man-hours, of which 99% were local,
would be expended in completing the plant.
Native ExpertiseAtucha II, now named for former president
Kirchner, was declared commercially opera-
tional by his widow, current President Cris-
tina Fernández de Kirchner on February 19,
2015. In opening the plant, she hailed the
work done by Argentine firms and labor in
completing the project.
“To those who some days ago were doubt-
ful of the agreements we went to sign in order
to make our economy grow and attract new
investments, I want to say that all the work
for this nuclear plant was done by Argentine
people, Argentine brains, Argentine labour,
because, you know something? We, the Ar-
gentine people have begun once again to go
down a path that we had abandoned,” Kirch-
ner said.
“In the nineties, Argentina—partly, it is
fair to say, because of external pressure—
abandoned its role as the most important
nuclear actor in Latin America. Today, we
are reclaiming that role by fully opening
this plant.”
The success in completing Atucha II has
indeed given renewed momentum to Argen-
tina’s nuclear sector.
Two more units are planned at the site,
with construction tentatively slated to begin
in 2016 and 2017. The country has signed co-
operation agreements with Russia and China
for future nuclear development, including
possible reactor construction.
Finally, Argentina is arguably furthest
along with small modular reactor develop-
ment, with its 25-MW CAREM design—
nearing completion at the Atucha site and set
to begin testing next year. (For more on CA-
REM, see “Small Modular Reactors Speak-
ing in Foreign Tongues” in the January 2015
issue.) ■
—Thomas W. Overton, JD is a POWER
associate editor.
POWER POINTS
Winning Attributes
Restarted and completed the
project after repeated economic
challenges forced a decade-long
interruption
Rebuilt the national nuclear labor
force by training thousands of
new engineers, technicians, and
construction workers
1. Upgraded. When the Atucha II project was restarted in 2006, one key task was updating
the unfinished instrumentation and controls systems to modern standards. Courtesy: Nucle-
oeléctrica Argentina S.A.
12
12
nuscalepower.com
NuScale Power
© 2015 NuScale Power, LLC. All Rights Reserved.
NuScale Power has created a new kind of nuclear power plant: one that is safe, reliable, and
economical. The innovative design incorporates all of the components for steam generation and
heat exchange into a single integrated unit, the NuScale Power Module™ (NPM). Using up to
12 of these 50MWe (gross) NPMs, a NuScale nuclear power plant can provide 600 MWe (gross)
of safe, carbon-free, electrical generation. The compact design of the NPM allows it to be built and
assembled in a U.S. factory, then shipped to a prepared site for easy deployment. The design
eliminates many costly, complex systems while cutting-edge manufacturing cuts time and cost
of production. The result: a power source that is simultaneously safe, reliable, scalable, carbon-free,
and economical. Innovation: the Element of Nu™.
CIRCLE 15 ON READER SERVICE CARD
www.powermag.com POWER | November 201528
TOP PLANTS
Palo Verde Nuclear Generating Station, Wintersburg, Arizona
Palo Verde Nuclear Generating Station
(Palo Verde), located on 4,000 acres
deep in the Arizona desert about 50
miles west of Phoenix, serves the electricity
needs of approximately four million people
in Arizona (about 35% of its power needs),
Southern California, New Mexico, and far
west Texas. The plant, which began construc-
tion in 1976 and was completed in 1988 at
a cost of $5.9 billion, features three units
with—unlike most nuclear plants—very lit-
tle common infrastructure between the units.
Palo Verde has long been the largest U.S.
nuclear power plant as measured by power
generation.
Steam is produced by Combustion Engi-
neering System 80 pressurized water reactors
in a 2 x 4 configuration—four main reactor
cooling pumps circulate 111,000 gpm of pri-
mary coolant through two steam generators.
The reactors were originally licensed to oper-
ate in 1985, 1986, and 1987, and each was
initially rated at 3,990 MWt. The General
Electric generators remain the largest 60 Hz
generators in worldwide service at a nuclear
power plant.
Since 2005, the U.S. Nuclear Regula-
tory Commission (NRC) has approved in-
creases in the net generating capacity of
each unit to 1,311, 1,314, and 1,312 MW,
respectively, as a result of plant upgrades.
Operating license extensions for each of
the three units were approved in 2011, ex-
tending plant operation until 2045, 2046,
and 2047, respectively.
“Our mission is to safely and efficiently
generate electricity for the long term,” said
Randy Edington, executive vice president
and chief nuclear officer for Arizona Public
Service Co. (APS), which operates the plant
for the group of owners (listed at the top).
“We have worked very hard to demonstrate to
the NRC through extensive inspections and
audits that Palo Verde is prepared to operate
for an additional 20 years.”
The plant employs about 3,000 workers
and has an annual economic impact of more
than $1.8 billion in Arizona, according to
APS.
Rising Capacity FactorsNuclear power plant capacity factors are ris-
ing across the industry. The Nuclear Energy
Institute (NEI) reported that the average ca-
pacity factor of all U.S. nuclear power plants
in June was 96.4%, the highest that it has
been in six years (it was 91.7% in 2014). In
fact, 90 of the 99 operating nuclear reactors
averaged 90% or higher, and 62 operated at
100% or higher in June.
According to Platts’ Megawatt Daily
June 22 report, in 2014, Palo Verde Unit 3
generated more electricity than any single
unit in the U.S., producing 12.2 million
MWh, exceeded only by EDF’s 1,560-MW
Chooz-B2 reactor in France for worldwide
honors. However, Palo Verde’s 1,312-MW
Unit 3 posted a higher annual capacity
factor of 97.5%, compared to 94.1% at
Chooz-B2.
Palo Verde Unit 3 continued the plant’s
history of outstanding operations by du-
plicating Unit 2’s achievement the year
before. In 2013, Unit 2 reported a 94.8%
capacity factor, the highest of all plants in
the world top 10 rankings, while Unit 1
was ranked third in the U.S. and seventh
in the world.
Generating large amounts of electricity
has been in the plant’s DNA since it began
operation. All three Palo Verde units are
individually ranked among the top six pro-
ducers in the U.S., according to industry
data. “We take pride in regularly generat-
The nearly 4-GW, three-unit Palo Verde Nuclear Generating Station remains the larg-est generator of electricity in the U.S. for the 23rd consecutive year, producing more than 30 million MWh in 2014, for the 10th time (the only plant in the U.S. to do so), all while using only treated wastewater for cooling.
Dr. Robert Peltier, PE
Courtesy: Arizona Public Service
Owners/operator: Arizona Public Service Co. (APS, 29.1%), Salt River Project (17.5%), Southern
California Edison Co. (15.8%), El Paso Electric Co. (15.8%), PNM Resources (10.2%), Southern
California Public Power Authority (5.9%), and the Los Angeles Department of Water & Power
(5.7%) / APS
•••
www.structint.com
ENGINEERING STRENGTH
Scan the QR Code for more information www.structint.com/power
( 8 7 7 - 4 S I - P O W E R )8 7 7 - 4 7 4 - 7 6 9 3
Structural Integrity’s engineering strength comes in many forms -- from our team of over 200 engineering and technical experts, to applying our knowledge at many power plants and pipelines in the industry, to 30+ years of experience serving our clients.
You can also look to us in the following areas for our ability to link theory and practice:• Knowledge of power plants, codes, and how things work.• High quality, hard work, and responsiveness.• Custom, integrated equipment, software and solutions.
Call us today to put our engineering strength to the test.
www.structint.com
CIRCLE 16 ON READER SERVICE CARD
TOP PLANTS
www.powermag.com POWER | November 201530
ing more electricity than any other power
plant in the country, ensuring that people
across Arizona and the Southwest can con-
tinue to enjoy reliable, low-cost electric-
ity,” said Edington.
For Palo Verde, 2014 was its 23rd con-
secutive year as the largest power generator
in the U.S., producing 32.3 million MWh
and breaking its own record of 31.9 mil-
lion MWh set in 2012. Palo Verde is the
only generating station of any technology
to produce 30 million MWh in a single
year, an achievement that it accomplished
in 2014 for the 10th time, and in six of the
past 10 years.
More RecordsThe Palo Verde staff is also well-practiced
in the art and science of conducting short
refueling outages and can turn around a unit
in record time. In the spring of 2013, the
staff completed its first sub-30 day refuel-
ing outage in plant history with a plant re-
cord-setting 29 days, 18 hours for Unit 1. In
spring 2014, the staff bettered that record by
refueling Unit 2 in 28 days, 22 hours. “This
refueling outage is another example of the
world-class performance we have come to
expect from Palo Verde, where safety re-
mains our highest priority,” Edington said.
At Palo Verde, the units are on an 18-month
refueling cycle, with two refuelings sched-
uled each year—one in the spring and an-
other in the fall.
In aggregate, the three units have been
running very well. From April 28 until Oct.
5, 2013, a period of 160 days, all three
units operated, the second-longest continu-
ous run in plant history. The long run ended
when Unit 3 was brought offline in order to
begin a planned refueling and maintenance
outage, although Units 1 and 2 continued
to operate at 100%. During 2012, Unit 2
recorded the best performance in plant his-
tory with 518 consecutive days of opera-
tion, ending Oct. 5, 2012. Each of the three
units has a recent continuous run exceeding
500 days.
Using Recycled WaterPalo Verde is the only U.S. nuclear power
plant that is not located next to an ocean or
other large body of water. It instead sits in
the middle of Arizona’s Sonoran Desert. Palo
Verde was the first nuclear power plant in the
world and remains the largest in the U.S. to
use recycled municipal wastewater for con-
denser and other plant cooling needs (Figure
1).
APS concluded a landmark 40-year
agreement in 2010 with the five cities in
the greater Phoenix metropolitan area to
provide an annual allotment of up to 26
billion gallons of treated municipal efflu-
ent to Palo Verde through 2050. The ter-
tiary treated effluent originates from the
91st Avenue Wastewater Treatment plant in
west Phoenix and is piped to Palo Verde,
where it is further treated to meet the water
quality standards established by the plant.
The agreement was negotiated over sev-
eral years and replaces the original water
pact signed in 1973. Water deliveries un-
der terms of that agreement began in 1982,
when Unit 1 began operations, and was
scheduled to expire in 2027. “Palo Verde
provides substantial environmental ben-
efits since it does not emit any greenhouse
gases and because it makes the most effi-
cient use of our limited water resources,”
said Edington. The pact also solves a prob-
lem faced by many municipalities—how to
dispose of a potentially valuable byproduct
that increases as the population grows.
Grey water effluent provided to Palo Verde
is produced in three steps: solids removal,
primary treatment to remove any remain-
ing solids, and then secondary treatment in
which biological or percolating filters break
down organic material and purify the liquid.
The treated effluent flows 28 miles downhill
and then is pumped another 8 miles to the
plant site, where it enters the Palo Verde Wa-
ter Reclamation Facility. There the effluent
is further treated before it is stored in a 760
million-gallon lined reservoir that covers 80
surface acres.
The closed loop condenser/cooling tower
circuit uses water from this reservoir for
plant cooling. Three mechanical forced-draft
cooling towers are used for condenser cool-
ing, one for each unit. The towers operate at
25 cycles of concentration, which produces a
blowdown stream whose salinity approaches
that of seawater. Once this concentration is
reached, the water is discharged to evapora-
tion ponds. Because of the corrosive nature
of the effluent, the three-pressure, three-shell
surface condensers were originally upgraded
to titanium and the tube sheets are fabricated
out of aluminum bronze with mechanically
expanded tube joints. Mechanical scrapers
are used to keep the tubes clean. The Marley
condensers continue to provide reliable ser-
vice using tertiary treatment grey water after
almost 30 years of service. ■
—Dr. Robert Peltier, PE is POWER’s consulting editor.
1. Water reuse. The Palo Verde Nuclear Generating Station uses 100% recycled municipal
wastewater from Phoenix and surrounding cities for condenser cooling. Shown are aeration
ponds that are part of the plant’s water reclamation and treatment facility. Courtesy: Arizona
Public Service
POWER POINTS
Winning Attributes
Only nuclear power plant in the
world to generate more than 30
million MWh in a year, and held
that record in 2014 for the 10th
time
Uses only treated wastewater for
all plant cooling, thereby saving
precious resources in its desert
surroundings
Refueling outages consistently
require fewer than 30 days• •
26461
Monday, December 7 • 7:30 a.m. – 5:00 p.m. • Mirage Las Vegas
powermagconference.com
Hosted by the editors of POWER magazine
Navigating Legal Implications of Power Industry Regulations
PRESENTS
7:30-9:15 Continental breakfast and opening keynote
Avi S. Garbow, General Counsel, U.S. Environmental Protection Agency
9:15-10:30 The Compliance Context: Regulations & Environmental Groups
10:45-12:00 The Clean Power Plan: Uncertain Future,
Certain Pain
12:00-1:00 Lunch and keynote
Robert Meyers, Senior Counsel, Crowell & Moring; former head of the Of�ce of Air and Radiation, U.S. Environmental Protection Agency
1:30-3:30 Surviving the Environmental Compliance Minefield: CCR, ELG, Ozone, 316(b), MATS 2.0, & More
3:45-5:00 Networking reception
If you are involved in power plants’ �nancial, legal, or operational decisions
about compliance with environmental regulations, this is a conference for YOU.
Pre-register online at powermagconference.com.
YOU’RE INVITED
CONFERENCE AGENDA Among the notable speakers, you’ll hear from: » Counsel for one of the parties in Massachusetts v. EPA, the Supreme Court case that opened the door to greenhouse gas regulation by the Environmental Protection Agency
» The former EPA attorney who oversaw the agency’s response to the court’s ruling in Massachusetts v. EPA
» Experts in everything from permitting to emissions trading
» Plus—the current EPA General
Counsel
These experts have represented industry, regulatory bodies, and citizen groups and are prepared to share their insights on the current bundle of regulatory concerns.
You won’t find more energy and environmental legal firepower in one place anywhere else!
www.powermag.com POWER | November 201532
OPERATIONS & MAINTENANCE
Wildlife and Power Plants: New
Solutions for Animal ProblemsSome critters may be cute, but when jellyfish gum up power plant cooling sys-
tems; birds, rats, snakes, or squirrels cause electrical shorts; or invasive mol-lusk species obstruct hydropower plant pipes, losses can be steep. Here’s how some power plant operators are dealing with their critter troubles.
Aaron Larson and Sonal Patel
There are countless cases of wildlife
entering power plant areas where
they don’t belong. Unlike trained
workers, the animals can’t read warning
signs and often end up learning the hard
way about the danger lurking in high-
voltage systems. The result isn’t just bad
for the critter; it can be bad for the plant,
resulting in equipment damage and un-
planned outage time.
Not every power plant must deal with
the exact same pests. Pigeons, mice, rats,
and raccoons are fairly common throughout
North America, but other parts of the world
have other vermin. Snakes—some of which
are very dangerous—pose problems for some
plants, and even insects, such as termites and
carpenter ants, can cause significant damage
not just to buildings, but also inside panels
and equipment. It used to be that jellyfish
and mollusks were found mainly at plants
utilizing ocean water for cooling, but now
freshwater species have spread to many areas
throughout the U.S.
Keeping Unwanted Guests OutDamage caused to electrical equipment as
the result of animal intrusion can cost a lot
to repair, not to mention the cost associated
with lost production. Karl Mosbacher, busi-
ness development manager for Roxtec Inc.’s
U.S. Power group, recalled one instance
where a squirrel caused $300,000 worth
of damage when it triggered a power surge
that affected an Indiana community center’s
heating and air conditioning system and
some parts of its boiler system. Rats and
mice are also regular troublemakers due to
their propensity for gnawing on cable and
wire insulation.
In order to prevent such damage, it is impor-
tant to seal building and equipment penetra-
tions to keep pests out. Mosbacher said some
materials, such as metal and concrete, are less
susceptible to infestation than others, but over
time, deterioration, inadequate alterations, and
poorly completed repairs can create openings,
allowing infiltration of unwanted pests.
A good understanding of pest behavior
and vulnerable areas is important. Mos-
bacher noted that some products and materi-
als commonly used to seal openings, such as
neoprene and spray-in foam, are not rodent-
proof. On the other hand, he said Roxtec’s
uniquely designed sealing solutions are ca-
pable of preventing a wide variety of pests
from entering facilities.
According to Mosbacher, the Roxtec seals
(Figure 1) not only protect against rodents
and pests, but also against water, gas, fire,
dust, electromagnetic interference, and ex-
plosion. They are adaptable to cables of dif-
ferent sizes, which simplifies maintenance
and upgrades.
Animals and power plant substations
don’t mix particularly well either. Raccoons,
squirrels, and even snakes can end up in ar-
eas where they shouldn’t be, triggering bad
outcomes for the utility, as well as for the
animal (Figure 2). In some cases, the result is
a simple conductor failure, but a strong flash-
over can result in shattered bushings or even
complete transformer meltdowns.
TE Connectivity is another company that
has developed a wide range of covers, iso-
lators, and insulation products designed to
protect systems from animals. The solutions
include bushing covers (Figure 3), conduc-
tor covers, squirrel guards (Figure 4), bus
1. Sealing out trouble. These seals, installed at a facility in Mexico, prevent rodents,
water, and other hazards from entering buildings through cable and pipe penetrations. Courtesy:
Roxtec Inc.
November 2015 | POWER www.powermag.com 33
OPERATIONS & MAINTENANCE
support covers, raptor covers, and heat-
shrink tubes and tapes. The company esti-
mates that the overall risk factor can be cut
as much as 80% by incorporating its mitiga-
tion products.
Feathered Friends?Pigeons are a fairly common pest at power
plants. They may seem like more of a nui-
sance, but these birds are not as innocent as
they may appear. It’s no secret that harbor-
ing a flock of pigeons will create a house-
keeping problem, but Erick Wolf, CEO of
Innolytics LLC, believes that pigeons are
also a safety risk.
Bird feces can create slip and fall hazards
on concrete walkways and steel deck grating.
In addition, the birds can spook personnel
who may not be expecting them when transit-
ing through areas where the birds have taken
refuge. The surprise could result in a fall or
the ill-advised placement of a hand on a piece
of equipment.
There are also some health risks. Accord-
ing to New York City’s Department of Health
and Mental Hygiene—which sees its fair
share of pigeon problems—three human dis-
eases are known to be associated with pigeon
droppings: histoplasmosis, cryptococcosis,
and psittacosis. People with compromised
immune systems are most at risk from expo-
sure to droppings, but anyone cleaning up af-
ter pigeons should wear protective clothing,
such as disposable coveralls, boots, gloves,
and respirators.
Netting, bird spikes, electrical track or
wire systems, flight diverters, guards, and au-
dio and visual repellents are available for bird
control through a variety of companies such
as Bird B Gone, Bird-X, and BirdBusters.
Jack Wagner, president of BirdBusters, said
that there are more than 80 of his company’s
Bird Wailers installed in electrical substa-
tions throughout Alberta alone. The units
incorporate up to 34 natural sounds, such as
target bird alarm and distress calls, together
with the calls of predators like hawks, owls,
and others indigenous to the area. In Alberta,
a master unit and two speakers at each site
have been effective in controlling ravens for
more than 15 years.
Birth ControlWhen it comes to pigeons, Wolf said it is
very hard to completely rid a site of the birds.
He suggested that the cost to do so is usually
a limiting factor.
“The closer you get to zero, the more it
costs,” Wolf said. “Cost is one thing, but na-
ture abhors a vacuum, so driving things to
zero is not necessarily a good thing.”
In other words, once you eliminate a flock,
the site may remain free of pigeons for a pe-
riod of time, but eventually a new flock will
move in. Wolf said the birds are in search
of three things: food/water, harborage, and
warmth. Power plants are a prime location
for at least two of those items.
In addition to the options offered by
BirdBusters and others, Innolytics created a
product called OvoControl for gaining con-
trol of a plant’s pigeon population. For lack
of a better term, OvoControl is birth control
for pigeons.
Pigeons are sexually mature at six
months of age. The birds have two eggs per
clutch and up to six clutches per year, so
it is a rapidly reproducing species. Pigeons
typically only live for two to three years,
however, so the use of contraceptive tech-
nology is an effective control measure, ac-
2. Raccoons can’t read warning signs. This little critter crossed some wires that it
shouldn’t have. Courtesy: TE Connectivity
3. You’re covered. Bushing and conductor covers can prevent animals and others from
touching things they shouldn’t. Courtesy: TE Connectivity
www.powermag.com POWER | November 201534
OPERATIONS & MAINTENANCE
cording to Wolf.
The OvoControl system is set up to au-
tomatically dispense food for the pigeons,
which includes the birth control additive.
The feeders are capable of holding more
than 120 pounds of bait, which is enough
to last several months for an average flock
size. The system activates automatically us-
ing a digital timer.
“Keeping a portion of the flock at the
facility serves the purpose of keeping other
flocks from moving in. As long as there is a
base of pigeons, there is not another flock of
pigeons moving in,” Wolf said.
According to Wolf, after a few seasons,
most customers get down to about 5% to
10% of the starting population. The cost for
OvoControl averages about $400 per month
during the first year, about $200 per month
the second year, and roughly $100 per month
thereafter. Palo Verde Nuclear Generating
Station (profiled in this issue as a Top Plant
Award winner) initiated use of OvoControl
in November 2010 with three feeders and
experienced at least an 80% reduction in its
pigeon population.
Vapor IrritantBirdBuffer offers another option. According
to Jim Beaumont, national account manager
for the company, BirdBuffer machines create
small vapor particles from an oil-based fluid
made up of 20% methyl anthranilate (MA).
MA is an extract fluid—made from the skin
of grapes—that has been used in bird control
systems for more than 40 years.
MA causes an avian-specific pain sensa-
tion in a bird’s trigeminal nerve, located in
their sub-mucous membrane. The pressure
is in the center of their face and results in
a mace- or pepper spray–like reaction. Hu-
mans experience a pleasant grape-scented
fragrance, while birds experience a facial
pressure, tearing of the eyes, and temporary
pain, creating an immediate desire to leave
the area.
The machine (Figure 5) distributes the
vapor on a two-stage timing strategy that is
designed to confuse birds and control the
amount of fluid being used. The strategy
trains birds to avoid areas. Birds cannot see
the vapor or identify the source, but they
sense pain when they fly through the tar-
get area. As they are trained to associate
pain with the location, they learn to avoid
the area. The process can take from three
weeks to three months to gain control, de-
pending on the type of bird and its history
with the location.
“Birds will never habituate or become
accustomed to the vapor—it always works,
unless a mother bird has a nest with eggs
or fledglings,” Beaumont said. “Birds will
suffer any pain to protect their young, just
like us.”
Beaumont said maintenance could be
done in about 15 minutes each month, which
includes refilling the reservoir with about 1
gallon of fluid, changing filters, and wiping
off any vapor blowback that may have col-
lected on the machine. Utility companies that
have used the BirdBuffer system include Pa-
cific Gas & Electric (PG&E), NRG Energy,
Nebraska Public Power District, and Lower
Colorado River Authority. An all-weather
machine costs $8,995, but BirdBuffer also
offers a covered-area model for $5,495 and
rental or leasing options. The fluid costs
$175 per gallon.
Attack of the BlobScientists have been scratching their heads
as to exactly why we periodically see sud-
den, rapid increases in the population, or
“blooms,” of that ubiquitous ocean-dwell-
er, the jellyfish. But they are certain that
there might be a mechanism at work that
involves warmer ocean temperatures and
environmental changes. And for the pow-
er sector, that’s bad news, because when
it happens—as it has dozens of times to
power plants around the world that draw
in ocean water for cooling systems—it
can be expensive.
The squishy creatures have gummed
up intake structures in the U.S., Canada,
Scotland, Sweden, Japan, Australia, and
France. In 2011, EDF Energy’s Torness
nuclear power plant in Scotland was forced
to shut down twice in one week because
cooling waters were inundated with jelly-
fish. It cost the plant about $1.5 million a
day in lost revenues. The same year, jel-
lies caused similar issues at the Shimane
nuclear plant in Japan and at Israel Electric
Corp.’s Orot Rabin coal-fired plant on the
Mediterranean coast.
It turns out that jellyfish blooms aren’t the
only clogging sea creatures to worry about.
Power plant operators also struggle to keep
5. A machine for all seasons. The
Q3 BirdBuffer model, shown here, can be
installed outdoors, while the lower-priced TD
model is designed for covered areas. Cour-
tesy: BirdBuffer
4. A well-rounded solution. Bus insulator squirrel guards—the circular, fan-shaped
protectors above the workers—are installed in this substation along with bushing covers and
other protectors. Courtesy: TE Connectivity
Sign up at powermag.com
Content YOU Control
myPOWER
my
Keeping up with the latest industry news just got easier. POWER
magazine is proud to announce myPOWER, a dashboard that allows
you to select content that’s relevant to your interests. Start setting
your preferences for a personalized dashboard of the latest industry
news and product information that interests YOU.
www.powermag.com POWER | November 201536
OPERATIONS & MAINTENANCE
salps—small jellyfish-like creatures often
seen as long gelatinous chains—at bay. In
2012, PG&E had to temporarily shut down
Unit 2 of the Diablo Canyon nuclear plant
in California (Unit 1 was already offline
for refueling at the time) after salps rapidly
clogged intake screens, even though the
screens roll in a circular fashion to allow
them to be cleaned.
Several solutions have been put forth
worldwide to deal with the spineless
swarms, but many have been unsuccess-
ful. Experts conclude that relying on de-
bris filters and safety protocols may be the
soundest approach to the unpredictable
problem.
South Korean researchers, meanwhile,
have developed a robotic jellyfish extermi-
nator that seeks out and then shreds up to
900 kg of jellyfish per hour. An innovative,
less-grisly solution used at Diablo Canyon,
and reportedly at the Ringhals Power Plant in
Sweden, is a “bubble curtain.”
“When needed, a device underwater re-
leases a sheet of bubbles in front of the in-
take structure. This curtain of bubbles helps
displace the sea salps,” PG&E’s Blair Jones
told POWER. The solution is actually recom-
mended by the National Marine Fisheries
Service as a safe and effective method to di-
vert aquatic creatures away from underwater
construction sites. (For more detail and a dia-
gram of this sort of system, see “CWA 316(b)
Update: Fish Guidance and Protection” in the
October 2011 issue.)
Torness spokesperson Lindsey Ingram
underscored how low the risk of a jelly-
fish-spawned shutdown is, but she added
that plant water intakes at all of EDF’s
nuclear plants are designed to deal with
jellyfish issues safely. EDF is “exploring
the use of equipment to improve resil-
ience of the filtration system, for example,
screen-washing facilities, design, measur-
ing equipment, and visuals to monitor
the performance of the equipment where
needed,” she said.
Along with evaluating (in cooperation
with external research groups) the drivers
that lead to the increase in large jellyfish
blooms, the company’s UK research and
development team is modeling the cooling
water intake area to show what happens un-
der various conditions. That will help the
company “predict when this phenomenon is
more likely to happen and if it is likely to
pose any risk to our sites. In this way addi-
tional measures can be implemented on site
in order to safely mitigate any risks,” Ingram
said. (For another sort of unwelcome bloom
and examples of positive plant-animal inter-
actions, see the sidebars.)
Invasive MusselsPerhaps the most insidious of power plant
pests are the fingernail-sized quagga (Fig-
ure 6) and zebra mussels. The invasive
species originating from the Black and
Caspian Sea region have caused millions
of dollars in damage in the Great Lakes re-
gion, where they were discovered in 1988.
Now, they are making their way through
U.S. waterways. Their discovery at Lake
Mead in 2007, and subsequent colonization
of Lake Powell and parts of Central Arizo-
na Project’s water-delivery system has put
the U.S. Bureau of Reclamation (USBR),
Salt River Project, and other Western pow-
er generators on high alert.
It’s because, as the USBR says, they can
cause steep losses through increased op-
eration and maintenance costs as well as
interruption in water delivery and power
generation functions. Depending on levels
of infestation and facility operating condi-
tions, mussel-related impacts stem from
“fouling” (live mussel attachment) and
“clogging” (due to fouling or release of
mussel shell debris) that may occur in a
number of water delivery and hydropower
systems, says the USBR, which is part of
the Department of the Interior and also the
second-largest hydropower producer in the
U.S. “This includes intakes and penstocks,
gates and valves, bypasses and air vents,
cooling water systems, raw water fire pro-
tection systems, service and domestic water
systems, instrumentation, and drainage, and
unwatering systems.”
A Green Attack: Algae Blooms
Problems with cooling water intake sys-
tems can also be caused by marine grass
and other aquatic life. Operators of reactors
in the Great Lakes region, for example, are
concerned with the proliferation of Clado-
phora, a taxonomic grouping that includes
species of green algae. Fertilizer runoff was
blamed for Cladophora blooms in the 1960s
and 1970s, but blooms have reappeared re-
cently, despite restrictions on phosphorus.
The resurgence of Cladophora has been
particularly costly and cumbersome to op-
erators of nuclear plants on Lake Ontario.
In 2005, algae buildup clogged cooling
water intakes and forced Ontario Power
Generation (OPG) to temporarily shut
down Units 5, 6, and 8 at Pickering B, and
Unit 1 at the Darlington generating sta-
tion was taken offline later that year for
similar reasons. In 2007, an algae event
prompted another shutdown at Picker-
ing—and, later, of Entergy Corp.’s FitzPat-
rick nuclear plant in New York for nearly a
week. OPG said that between 1995—when
the algae began to clog water intakes—
and 2005, the company lost C$30 million
in revenue from those and related Clado-
phora events.
Beyond calling for more vigilance re-
garding how much phosphorus enters the
lake from agricultural and wastewater
runoff, OPG has installed—with mixed
success—a vertical mesh barrier anchored
to the lake bottom near the end of the
water-intake canal to block the flow of the
dense green mass.
6. Musseling in. Quagga mussels, invasive freshwater mollusks that originated in the
Black and Caspian Sea region in Eurasia, have plagued the Great Lakes since the late 1980s but
were also discovered at Lake Mead, Nev., in 2007. Courtesy: Ruth Lake Community Services
District
November 2015 | POWER www.powermag.com 37
OPERATIONS & MAINTENANCE
The attention on this problem has been
good. Many entities have been battling the
critters using traditional chemical control
options—aqueous application of chlorine,
in particular—as well as physical removal
and mechanical controls; however, they
complain that these increase corrosion
initiated by the invasive mussels. But new
solutions are emerging. Marrone Bio In-
novations in 2007, for instance, developed
Zequanox, an environmentally compatible
molluscicide that does not corrode equip-
ment and does not require detoxification
before water discharge. The newly com-
mercialized product is based on research
conducted by a consortium of New York
State’s power generators and the State
Field Research Laboratory in 1991, which
found a naturally occurring, harmless
North American strain of bacteria that is
lethal to the mussels.
While Zequanox sounds promising, the
USBR isn’t stopping there. It continues to
research mussel-resistant coatings, UV light
treatment for quagga mussel larvae, and new
ways to detect mussels early.
The Insect ThreatThough minuscule, insects can’t be ruled
out when it comes to making an impact on
power plants. Carpenter ant and termite in-
festations can be a nightmare, and swarms
of bees and wasps can pose dangers to op-
erators. Even seasonal swarms can be dev-
astating: In 1984, mayflies caused a power
transformer to short out, disconnecting the
La Crosse nuclear plant in Wisconsin from
the grid.
In the Gulf Coast states, meanwhile,
the Rasberry crazy ant—native to Brazil—
has been causing alarm. The ants—named
for their rapid, erratic movement—have
a reputation for swarming into electrical
equipment, chewing through insulation, and
causing overheating, mechanical failures,
and short circuits. Around Houston, they
have plagued NASA and shut down units
in at least three chemical plants (Figure 7).
Tom Rasberry, an exterminator from Pearl-
and, Texas, who first noticed them in 2002
and has since dedicated years to studying
them, says they are spreading at an alarm-
ing rate.
Because they tend to wander in aimless
movements instead of a straight trail, they
are difficult to locate and treat. Exterminators
recommend spraying nonrepellent insecticide
such as Taurus SC or FUSE around infested
perimeters, setting up ant baits, sealing all
possible entry points, and trimming vegeta-
tion away from structures. ■
—Aaron Larson and Sonal Patel are
POWER associate editors.
Power Plants as Animal Nurturers
The spotlight is often on the detrimental
impact of power plants on flora and fau-
na, but power plants can be refuges for
an assortment of endangered or threat-
ened creatures.
American Crocodiles at Turkey
Point. The imperiled American crocodile
has been thriving in a swamp surrounding
Florida Power and Light’s (FPL’s) Turkey
Point nuclear power plant in southern Mi-
ami-Dade County. The utility has its own
on-staff crocodilian expert who monitors
nesting sites and tags hatchlings before
moving them to a more suitable habitat.
Recent reports indicate, however, that
the number of crocodile nests and hatch-
lings in the plant’s 168-mile looping
network of cooling canals have dropped
markedly, owing to waters that have be-
come too hot and salty from rising tem-
peratures and sparse rainfall.
Manatees at Big Bend. In 1986,
Tampa Electric Co.’s 1.7-MW coal-fired Big
Bend Power Plant began seeing manatees
aggregating in large numbers in a canal
where saltwater withdrawn from Tampa
Bay to cool Unit 4 is discharged (Figure
8). When the waters in Tampa Bay dip be-
low 68F, the shallow canal also attracts
stingrays and other aquatic wildlife. To-
day, Big Bend’s discharge canal is a state
and federally designated manatee sanctu-
ary that protects the endangered aquatic
relative of the elephant.
According to environmental group
Defenders of Wildlife, manatees should
rely on warm-water springs or other
natural areas for refuge in the winter
months, but around 60% of the mana-
tee population has become dependent
on artificial sources of warm water at
power plants. If these plants are shut
down or experience equipment failure,
“it could mean death for many of these
manatees,” it says.
8. Winter getaway. Between No-
vember 1 and April 15, hundreds of man-
atees can be seen in a discharge canal at
Tampa Electric Co.’s (TECO) Manatee View-
ing Center. Last year, TECO also installed a
40-foot observation tower as part of the
50-acre site’s looped nature trail that gives
visitors a view of three Florida habitats.
Courtesy: TECO
7. Electrical consumption. Rasberry crazy ants were first discovered in a Houston
suburb in 2002, but they are spreading at an alarming rate. They are known to overcome elec-
tronics and cause failures. This image shows the ants in a relay at a chemical plant. Courtesy:
Rasberry’s Pest Professionals
www.powermag.com POWER | November 201538
OPERATIONS & MAINTENANCE
Load Cycling and Boiler Metals: How to Save Your Power PlantAs many coal-fired power plants designed for baseload service are asked to cycle,
unforeseen stresses have been introduced to boiler pressure parts. Under-standing the effects and implementing mitigation strategies could prevent premature component failure and keep facilities operating reliably.
Rama S. Koripelli, PhD
On August 3, 2015, the U.S. Environ-
mental Protection Agency finalized the
Clean Power Plan, which calls for cuts
in carbon pollution from existing power plants.
This rule, coupled with low natural gas prices,
could result in natural gas–fired facilities be-
ing used more frequently for baseload power
and coal-fired plants being cycled, more than
ever before, to meet grid requirements.
The majority of coal-fired units were de-
signed and constructed as baseload units, with-
out any anticipation of significant load changes.
But combustion turbines and heat recovery
steam generators offer higher thermal efficien-
cies (about 60%) than coal-fired boilers (the
best steam plants may operate at a maximum
efficiency of about 40%), which is also contrib-
uting to a change in dispatch tendencies.
Although coal-fired power plants are still
in high demand, alternative sources are very
attractive from an environmental point of
view. Increasing variable renewable energy
resources, such as solar and wind power,
are placing additional pressure on coal-fired
plants to load follow. However, load cycling
in coal-fired plants causes negative long-term
and short-term effects on equipment reliabil-
ity and availability.
Load Cycling and Its EffectsLoad cycling may include low-load condi-
tions, hot startup, warm startup, and/or cold
startup. Just as the term suggests, a low-load
condition occurs when output is reduced and
the unit is operated at a minimum load with-
out being shut down. When a unit is cycled
on and off daily, it usually undergoes a hot
startup. Warm startups generally occur in
units that operate for four to five days contin-
uously and then shut down during weekends,
while a cold startup follows an extended
maintenance shutdown (usually the plant
will have implemented a layup procedure for
these lengthy upkeep periods).
Following are the most common undesirable
effects of these sorts of cycling operations.
Creep Fatigue. Utility boilers are con-
structed using different materials and thick-
nesses. These materials expand and contract
at different rates. In addition to creep dam-
age, high-temperature components, such as
superheaters and reheaters, experience ther-
mal and mechanical fatigue. The cumulative
effect is known as creep fatigue.
The resulting damage is much more se-
vere than standalone creep or fatigue dam-
age. Under cyclic loading, tube-to-header
welds develop cracking due to a combination
of fatigue stresses and hoop stresses. Fatigue
stresses can result from relative movement
between the components, specifically dur-
ing warm-up or cool-down, or when load
changes occur due to transient stresses. Fa-
tigue stresses can also be present as a result
of inadequate tube leg flexibility, defective
supports/attachments, or rigid attachments
on the pressure parts.
Ligament Cracking. Individual high-tem-
perature superheat (SH) and reheat (RH) tubes
may operate at different temperatures because
of variations in heat distribution, slagging, foul-
ing, and misalignment. Therefore, steam enters
into the header at different temperatures.
Load cycling exacerbates the temperature
difference between the individual tubes, be-
cause the firing rate is adjusted during load
changes to maintain pressure and temperature.
During load increase, the boiler is temporarily
overfired, and the condition reverses when load
is reduced. This causes transient thermal shocks
to the header, resulting in ligament cracking.
High-Temperature Circuit Thermal Fa-
tigue. In addition to these thermal stresses,
the external stresses associated with header
expansion and contraction can cause damage
to cycling units, resulting in fatigue cracks at
the attachments. An additional fatigue com-
ponent can exist wherever components are
joined via welding, because different parts
expand and contract at different rates. Al-
though the fatigue component is within the
endurance limit, it will affect the creep prop-
erties of the components.
Over-Tempering. Creep-strength-enhanced
ferritic steels (CSEFs), like T91 and T23, are
very popular in modern power plants because
they offer higher allowable stresses and supe-
rior creep properties than their ancestor grade
steels, such as T22 and T11. However, there
are some inherent long-term maintenance is-
sues with the CSEF steels. The use of CSEFs
in heavy-cycling units, specifically in reheat
circuits, significantly affects the superior prop-
erties obtained through precise heat treatment,
resulting in premature failures.
Dissimilar-Metal Welds. Dissimilar-
metal welds (DMWs) are very frequently
used in high-temperature circuits to facilitate
material transitions. Load swings produce
significant transient thermal and differential
stresses on the DMWs. These welds are not
only subjected to creep but also are suscepti-
ble to creep fatigue failure. Load cycling sig-
nificantly reduces the useful life of a DMW.
Condensate in Low Points. Conden-
sate usually collects in the remote sections
of SH and RH circuits, resulting in two ma-
jor issues: thermal fatigue and short-term
overheating. The temperature difference that
exists between the headers and steam can
produce thermal fatigue cracking and liga-
ment cracking. Warm startups produce sig-
nificant thermal fatigue damage because the
1. Condensate in loops. This image
shows several secondary superheater tubes
that failed due to short-term overheating after
only eight months of service. Courtesy: David
N. French Metallurgists
November 2015 | POWER www.powermag.com 39
OPERATIONS & MAINTENANCE
temperature difference is usually higher.
Rapid startup conditions may lead to short-
term overheating failures, because conden-
sate in system low points can cause increased
metal temperatures downstream (Figure 1).
The tensile strength of the steel decreases
significantly once it is beyond design temper-
atures. Also, rapid startups and shutdowns, as
well as load changes, can cause exfoliation of
the inner diameter oxide scale. If the exfolia-
tion is excessive, it may lead to pluggage of
bends or erosion damage in the turbine.
Low-Temperature Circuit Thermal Fa-
tigue. In low-temperature regions of the boiler,
load cycling also causes thermal fatigue crack-
ing in economizer inlet headers or tubes, lower
furnace wall tubes or headers, and steam drum
internals. This fatigue cracking primarily oc-
curs from the ingress of relatively colder water
into hot boiler components or vice versa.
Corrosion Fatigue. Load cycling exacer-
bates corrosion fatigue on waterwall tubes be-
cause the differential stresses on waterwall tubes
are higher during startups and load swings.
Corrosion fatigue is not only a reliability issue,
but it also is a safety concern because failures
usually occur on the cold side of the boiler.
Conditions necessary for corrosion fatigue
to occur include either having the boiler wa-
ter oxygen concentration too high or the pH
outside of the control range at the same time
that stresses are high enough to break the
magnetite layer (Figure 2). Corrosion fatigue
occurs when operating or residual stresses
break the protective magnetite (Fe3O4) layer,
exposing the bare steel to the corrosive envi-
ronment (Figure 3). These stresses are high-
est during transient periods.
Caustic Gouging. Caustic gouging is a
well-known issue in natural circulation units,
specifically during low-load conditions. In
natural circulation units, the coolant flow is
biased to certain tubes because it operates on
the density difference between the hot and
cold fluids. Low-load conditions and load
swings play a major role in caustic gouging
because constantly changing conditions re-
sult in repetitive upsets to coolant flow. The
flow upsets cause caustic to concentrate at
the edges of steam bubbles. Caustic concen-
trations remove the protective layer of iron
oxide, resulting in tube wastage (Figure 4).
Phosphate Hideout. Phosphate hideout,
one of several forms of underdeposit corro-
sion, usually occurs when units are operating
with phosphate-based treatment. Phosphate
hideout causes ionic phosphate to disappear
or absorb during high-heat-input conditions,
but it returns or dissolves into boiler water
when the heat input is reduced. Phosphate
hideout promotes acid phosphate corrosion.
Hideout becomes evident during load swings
or startups while changing heat input. Dirty
boilers are susceptible to phosphate hideout
and acid phosphate corrosion.
Mitigation StrategiesThere will always be some adverse effects
on equipment reliability due to a low-load
condition, hot startup, warm startup, or cold
startup. Each of these conditions will affect
2. Corrosion fatigue. This cutaway
view shows a tube that experienced corrosion
fatigue in the transition bend near the lower
slope of a plant that cycled daily. Courtesy:
David N. French Metallurgists
3. Taking a closer look. This micro-
scopic view shows a tube surface that has
begun to crack as a result of corrosion fatigue.
Courtesy: David N. French Metallurgists
Running an e� cient plant requires the best
use of your resources. And that doesn’t
happen when your sta� is manually
resetting sample � ow every time the plant
cycles.
The NEW Sentry® AutoVREL � ow controller
is a turnkey solution that automatically
controls sample � ow at the push of a
button, eliminating the need for continual adjustment
of � ows in a cycling plant.
The Sentry AutoVREL helps you improve e� ciency, cost-e� ectively.
Learn more at sentry-equip.com/products/AutoVREL.
Take control.Save time and resources with easy sample automation.
CIRCLE 17 ON READER SERVICE CARD
4. Caustic gouging. This cutaway view
shows a tube that experienced caustic attack in
a cyclone inlet roof tube. The plant commenced
load cycling about one year prior to this failure.
Courtesy: David N. French Metallurgists
www.powermag.com POWER | November 201540
OPERATIONS & MAINTENANCE
the integrity of pressure parts one way or an-
other. It has been observed across the board
that warm startups cause the most damage
to equipment, because the temperature dif-
ference is higher and there is greater suscep-
tibility to air in-leakage than what is found
during other cycling conditions.
Following are some useful strategies for
mitigating equipment damage.
Add More Tube Flexibility. Fatigue
stresses often occur as a result of inadequate
tube leg flexibility between tube penetrations
and the header, and also from rigid attach-
ments on the tube. More flexibility and bet-
ter attachment design will reduce the fatigue
stresses. Sometimes header relocation may
be required to provide more flexibility.
Use Slip-Type Attachments. Many
older units were designed with rigid attach-
ments. Slip-type attachments should be used
in place of rigid attachments to accommodate
differential thermal expansion.
Redesign for Symmetrical and Widely
Spaced Tube Penetrations. Several older
plants were designed with closely spaced, un-
symmetrical tube penetrations, which are sus-
ceptible to ligament cracking. It is well known
that evenly spaced, larger ligaments are less
susceptible to creep fatigue damage (Figure 5).
Redesign of tube-hole penetrations and
tube-to-header weld configuration, especially
eliminating the lack-of-fusion notch at the end
of the tube penetration, can also increase creep
fatigue resistance. The inclusion of a smooth
chamfer at the inner diameter of the header
bore hole reduces stress concentration (Figure
6), improving creep fatigue resistance.
Make Periodic Inspections. The majority
of piping-related problems are associated with
hangers and support systems. Good attachment
design is vital to minimizing creep fatigue. Peri-
odically inspecting attachments and correcting
deficiencies will reduce fatigue-related issues.
Terminations of attachments should taper to the
surface to reduce localized stress concentra-
tions. Lack of penetration in attachment welds
can result in hot spots where heat is unable to
effectively dissipate or can increase stress con-
centrations. Good weld design and adherence
to welding procedures is essential.
Lower Ramp Rates. Transient stresses
due to load cycling affect the useful life of
a DMW. Transient stresses can be reduced
with slower startups.
Use Nickel-Based Filler Metals. A
DMW can be made with or without filler
metal, which will have a finite life. DMWs
made with EPRI P87 or Inconel filler metal
are expected to have a longer life than those
With CIRCOR Energy General & Severe Service Control Valves
I amIN CONTROL
From turbine bypass systems to balance of plant applications,
CIRCOR Energy offers a comprehensive portfolio of general
service to highly engineered severe service control valve
solutions that enable you to immediately improve efficiencies
and reduce long term maintenance costs.
Reliable, durable and engineered for performance, when it
comes to achieving plant productivity, think CIRCOR Energy.
Contact us today and we’ll show you how you can be in total control.
Continuously Improving
Flow Control. Worldwide.
www.circorenergy.com/controlvalves
Leslie Controls Schroedahl RTK
CIRCLE 18 ON READER SERVICE CARD
Small ligament
Large ligament
Present Upgrade lower ligament stress
5. Bigger is better. Larger ligaments
are less susceptible to creep fatigue damage.
Source: David N. French Metallurgists
Large lack of fusion notch
Chamfer
Present Upgrade lower stress
Smaller lack of fusion notch
6. Design changes. Elimination of the
lack-of-fusion notch at the end of tube pen-
etrations and including a smooth chamfer at
the inner diameter of the header bore hole
can improve creep fatigue resistance. Source:
David N. French Metallurgists
November 2015 | POWER www.powermag.com 41
OPERATIONS & MAINTENANCE
without filler metals. A DMW made using
nickel-based filler metal lessens the effects
of the thermal expansion differences between
stainless steel and ferritic steel.
Relocate DMWs. Stresses and temperatures
are the critical factors in the lifespan of a DMW;
performance can be improved by controlling
these factors. The weld joint can be relocated to
a position where it is exposed to lower tempera-
tures. Frequent inspection and maintenance of
tube hangers, supports, and spacers can be per-
formed to reduce secondary loads.
Bake Tubes. Condensate in high-temper-
ature circuits creates major problems during
startup periods. The tubes should be baked
for long enough to evaporate the condensate
before increasing the heat input. Reduce the
thermal gradient between the fluid and metal
during startup periods. Although load cycling
plays a major role in thermal fatigue, once
the component reaches equilibrium, thermal
fatigue will not be a significant factor.
Use Rifled Tubing. The use of rifled tub-
ing in areas susceptible to underdeposit corro-
sion can provide better flow mixing to avoid
potential corrosion issues. Load cycling sig-
nificantly increases the susceptibility of water-
wall tubes to corrosion fatigue. Fast startups
increase transient stresses because different
parts expand and contract at different rates,
breaking protective oxides and exposing bare
tubes to the corrosive environment.
Improve Welding Techniques. Pad welds
should be avoided in regions susceptible to
corrosion fatigue. The residual stresses from
welding exacerbate corrosion fatigue. Addi-
tionally, poor weld profiles should be elimi-
nated to reduce stress concentration. Lack of
penetration in attachment welds can increase
metal temperatures and stress concentration.
Maintain Proper Water Chemistry. It is
critical to ensure that water chemistry is with-
in range for pH and oxygen content, especial-
ly during startups or load shifts, to reduce the
risk of corrosion fatigue. Boiler cleanliness
must be maintained to reduce the risk associ-
ated with phosphate hideout. Use trisodium
phosphates in place of mono- or disodium
phosphates to bump phosphate readings. The
addition of trisodium phosphates does not
cause acid phosphate corrosion, but the addi-
tion of mono- and disodium phosphates can
promote acid phosphate corrosion.
Avoid heavy blowdowns, which will signifi-
cantly affect sodium phosphate ratios and ag-
gravate the situation in units susceptible to acid
phosphate corrosion. Perform periodic deposit
weight density testing to know how dirty the
boiler is. Boiler cleanliness will significantly re-
duce a majority of waterside issues. ■
—Rama S. Koripelli, PhD ([email protected]) is technical director
for David N. French Metallurgists
©2014 Marrone Bio Innovations, Inc. Zequanox is a product and registered trademark of
Marrone Bio Innovations, Inc. U.S. Patent No. 6,194,194; Canada Patent No. 2,225,436.
?slessum tog
GET ZEQUANOX®.
Highly e�ective, bio-based aquatic molluscicide for controlling
invasive zebra and quagga mussels.
1-877-664-4476
www.zequanox.com
Safe for workers
Short application times
No detox needed upon
discharge
Nonvolatile/Noncorrosive
No equipment to procure
or maintain
Environmentally friendly
Chlorine and other chemical treatments, and the risks that go
along with them, can now be a thing of the past. With Zequanox
you bene�t from powerful mussel control without risking
downtime, employee injury, equipment damage, or regulatory
penalty.
Contact us today and let us design a Zequanox treatment program
to meet your speci�c mussel control needs.
Approved by the U.S. EPA and the Health Canada PMRA
CIRCLE 19 ON READER SERVICE CARD
www.powermag.com POWER | November 201542
FUNDAMENTALS
Ensuring Reliable Boiler Operation Through Proper Material AnalysisCreeped out and fatigued—that’s the state of many coal-fired boilers these
days. Understanding failure mechanisms and suitable testing methods for identifying potential trouble can help you find problems before the problems find you.
Brandon Bell, PE
Even as the current regulatory environ-
ment pushes new power generation
to utilize natural gas over other fuel
sources, a significant amount of existing
coal-fired generation remains in operation.
A majority of these coal-fired power plants
have been in existence for a long time—the
average age is near 40 years. Keeping these
plants online and running efficiently pres-
ents a challenge, but with programs in place
to effectively monitor equipment condition
and replace critical parts at optimal times,
these units can continue reliable operation
for years to come.
Modes of FailureFor long-term operation of coal-fired steam
generators, creep and thermal fatigue are the
two damage mechanisms that typically affect
boiler integrity. Boilers can also be damaged
by chemical imbalances in water or flue gas
chemistry, but generally those problems can
be corrected in a short period of time.
Thermal Fatigue. Thermal fatigue is ex-
perienced from cyclic stresses caused by tem-
perature gradients that vary over time. Steam
generators experience the greatest amount of
thermal fatigue during startup and shutdown
activities.
In high-temperature boiler tubes, lo-
calized high-stress areas will plastically
deform until the stress is relieved. This
deformation process, while providing tem-
porary relief to components at elevated
temperatures, also introduces new stresses
in these same components as the system
cools—with material unable to return to its
original position.
Boiler designers anticipate a planned
number of startup and shutdown cycles
and design the boiler to handle these sce-
narios. However, excessive cycling of a
steam generator, either as a result of being
dispatched too frequently or being brought
down in unplanned, forced outages (due
to poor equipment reliability) will pre-
maturely push the boiler past its original
design life. The excessive cycling will ul-
timately lead to thermal fatigue cracking
of boiler tube elements. Typically, thermal
fatigue occurs at weldments or points of
configurational change.
Creep. The second significant mechanism
of steam generator tube failures is creep.
Creep is a progressive, permanent deforma-
tion of a material under stress at high tem-
peratures.
When materials are manufactured, mi-
crovoids form within the material structure.
Over time these microvoids begin to propa-
gate and interconnect, forming cracks within
the material. The deformation occurs plasti-
cally and causes a thinning of the material,
which results in higher stresses and an in-
creasing creep rate. This phenomenon can
occur in materials experiencing high stresses,
but still at levels below the yield strength of
the material.
Creep occurs in three defined stages dur-
ing the life of a material. The first stage is
commonly referred to as primary creep. Dur-
ing this stage the strain rate is high, but it
rapidly slows with time as a result of work
hardening. This first stage of creep is rela-
tively short-lived and results in no significant
changes to the material structure.
The next phase of creep is the secondary,
or steady state, phase. The material will expe-
rience secondary creep for the majority of its
lifespan. This stage is defined by a relatively
constant strain rate, where work hardening is
balanced by its recovery rate.
The final stage of creep, the tertiary phase,
is defined by rapid elongation over time. This
rapid elongation will accelerate until failure
of the material occurs.
Predicting LifespanThere are mathematical approaches to calcu-
lating the useful life of a material versus time
and temperature. General Electric engineers
developed one method in the 1950s that can
be used to extrapolate experimental data for
creep and rupture strength of materials. It’s
known as the Larson-Miller Parameter and is
expressed as:
P = T x (C + log t) x 10-3
where:
T is the absolute temperature of the mate-
rial during operation
t is the number of hours in service
C is a constant (typically a value of 20),
and
P is the Larson-Miller Parameter
1. Out with the old. This main steam
header developed ligament cracks from many
years of operation and thermal cycling. It had
reached its end of service life and required re-
placement. Courtesy: Brandon Bell, PE
November 2015 | POWER www.powermag.com 43
FUNDAMENTALS
Thermal fatigue cracking tends to be a
localized phenomenon that can be identified
using conventional nondestructive examina-
tion methods. Once thermal fatigue crack-
ing is identified, welding can easily repair
it. Creep damage typically is identified us-
ing metallographic examination methods.
If a material has been identified to be in the
tertiary stage of creep, simple repairs are not
possible, and replacement of the material is
required (Figures 1 and 2).
Analyzing Boiler MaterialsTo avoid forced outages resulting from ther-
mal fatigue and creep, nondestructive exami-
nation techniques can be used to determine
the state of materials (Figure 3). When used
effectively, these techniques are able to track
the progression of either thermal fatigue or
creep, which helps plants plan in advance for
replacement of components rather than wait-
ing for material failure and then scrambling
to correct the problem. Some commonly
used nondestructive examination techniques
follow.
Liquid Penetration. A common non-
destructive examination technique used for
detecting surface cracking on a material is
called liquid penetration. This technique
is very versatile, as it does not require spe-
cific material properties for the metal being
tested.
Prior to the material being tested, it must
be cleaned of any contaminants and allowed
to dry. A low-tension liquid with a visible
dye is then applied to the surface of the mate-
rial, at which point the capillary effect will
draw the liquid into any discontinuities in the
metal. Any excess liquid is removed from the
surface prior to inspection.
Under a white or fluorescent light, the ma-
terial is inspected for the presence of the liquid
penetrant. The presence of the liquid penetrant
indicates voids in the surface material, either
from cracking or porosity of welds.
2. In with the new. Installing this replacement steam header will extend the plant’s op-
eration for years to come. Courtesy: Brandon Bell, PE
For more information, call Wright’s Media at 877.652.5295
or visit our website at www.wrightsmedia.com
Logo Licensing | ReprintsEprints | Plaques
Leverage branded content from Power Magazine to
create a more powerful and sophisticated statement
about your product, service, or company in your
next marketing campaign. Contact Wright’s Media
to �nd out more about how we can customize your
acknowledgements and recognitions to enhance your
marketing strategies.
Content Licensing for Every Marketing Strategy
Marketing solutions �t for:
• Outdoor
• Direct Mail
• Print Advertising
• Tradeshow/POP Displays
• Social Media
• Radio & Television
Register Today
“Sustainable and Economical
CCUS Options”
For more information or to register for CMTC 2015 go to:
http://fscarbonmanagement.org/cmtc/2015
November 17-19, 2015
Sugar Land Marriott Town Square
Sugar Land, TX
www.powermag.com POWER | November 201544
FUNDAMENTALS
Ultrasonic Testing. Ultrasonic testing
(UT) is a powerful tool that is used to detect
and evaluate flaws in a material and character-
ize the material flaws. It also can be used to
measure thicknesses of materials. UT testers
make use of three basic components: a pulser-
receiver, a transducer, and a display device.
This technology generates a high-fre-
quency ultrasonic wave that is transmitted
through the material being tested. When
the sound wave is generated at the surface
of the material using the pulser, it quickly
propagates through the material structure at
a known velocity. If the sound wave encoun-
ters a discontinuity in the grain structure of
the material, a portion of the initial sound
wave is reflected back to the receiver. The
sound wave will continue until it reaches the
opposing boundary of the material and the
remaining sound energy is reflected back to
the receiver.
The receiver captures the intensity and
intervals at which the initial sound wave is
reflected. This data can be processed into
a graphical result on the display device.
Readings are displayed in real time—pro-
viding the user with instantaneous results.
With the sound wave processed, a techni-
cian or engineer can evaluate any flaws
found in the material structure while as-
sessing overall material thickness through-
out.
Determining the thickness of the material
in service is critical to calculating the materi-
al’s ability to resist stress. The minimum wall
thickness for a material can be calculated us-
ing a variety of material properties and op-
erating conditions. The calculation uses the
following relationship:
tm = PD / 2 x ( SE + Py ) + A
where:
tm is the minimum wall thickness
P is the internal design pressure
D is the outside diameter of the pipe
SE is the maximum allowable stress of the
material at the design temperature
y is a coefficient (based upon material
properties and design temperature), and
A is any additional thickness (for example,
an allowance for corrosion/erosion)
Comparing the actual wall thickness to the
minimum wall thickness will identify if the
element needs to be replaced as a result of
loss of material.
Phased Array Ultrasonic Testing. An
offshoot of standard UT testing is the phased
array ultrasonic testing (PAUT) method. Also
a nondestructive examination technique, the
PAUT method makes use of multiple probes
that emit high-frequency ultrasonic waves.
The introduction of the sound wave is
time-delayed from element to element in or-
der to produce a focal point to be analyzed.
The timing of the sound waves can be varied
in order to “sweep” the material and scan
for imperfections. As with UT, the results
are viewed in real time, allowing the user
to locate and identify material flaws instan-
taneously.
Magnetic Particle Testing. Magnetic
particle testing (MT) is a nondestructive
examination method used to identify linear
flaws at or near the surface of a material.
With the MT technique, the material being
tested is magnetized, which produces flux
lines along the surface of the material.
Flaws or discontinuities in the material
distort the flux lines, causing the magne-
tism to leak out. Dissipation of the flux lines
creates regions of magnetic polarity. When
magnetic particles are applied to the surface
of the material, they visibly pool together in
these areas of high polarity and highlight ar-
eas with flaws or discontinuities.
Alternately, this test can be performed
by using wet magnetic particles mixed with
fluorescent dyes, similar to that of liquid
penetration inspections. Compared to dry
particles, the use of wet particles provides for
a more effective media to fill into cracks and
fissures found in the material. When viewed
under a black light, the use of a fluorescent
dye will clearly highlight material cracking
to the inspector.
The MT technique is quick, simple, and
yields real-time results for cracking as a re-
sult of creep. However, the test method is
limited only to materials that are ferromag-
netic. After completion of the test, the mate-
rial will need to be demagnetized, typically
using an alternating current coil.
Replication Metallography. In order to
view the grain structure of a material at high
4. Clean as a whistle. This pipe’s surface has been cleaned thoroughly for inspection of
a critical weld. Courtesy: Brandon Bell, PE
3. Visible defects. No special nondestructive examination techniques were needed here.
A simple visual inspection revealed that several pressure part supports were either damaged or
missing and needed repair. Courtesy: Brandon Bell, PE
November 2015 | POWER www.powermag.com 45
FUNDAMENTALS
magnification, a nondestructive examination
technique called replication metallography
can be used. It provides a mirrored image of
a material’s structure.
In order to provide this level of detail, the
material to be tested needs to be cleared of
any contaminants and polished to a smooth
mirror-like finish. This can be a time-con-
suming and laborious process, as manual
techniques are typically required to clear
scale and rust from the installed material
(Figure 4).
After the material has been cleaned and
polished, a chemical etchant is applied to the
surface that allows the grain structure to be
revealed. The chemical used, and duration
of application (to reveal the material’s grain
structure), will be chosen based on the mate-
rial being tested.
A replicating material will then be ap-
plied to the material surface to embed the
grain structure into the replicating material.
Once the material dries, it can be removed
and sent for microscopic observation. The
replicating material will now reveal the
grain structure of the material without com-
promising the integrity of the material itself.
The process will give insight into only the
grain structure at the surface of the mate-
rial and is used on base metals and critical
welds alike.
High-Energy Pipe SurveillanceIn addition to employing nondestructive ex-
amination techniques, conducting surveys of
a plant’s high-energy piping systems should
be a routine occurrence. High-energy piping
systems typically include main steam, hot
reheat, cold reheat, boiler feedwater, and
turbine extraction piping systems. High-
energy piping surveys analyze stress and
strain on the piping and support system.
This is critical for extended plant operation,
because the survey can detail areas of con-
cern that can be corrected prior to a material
or pipe support failure.
As these high-energy systems operate
over time, hanger adjustments are sometimes
made that change the dynamics of the system.
Additionally, poor initial designs, changes
in modes of operation, or plant preferences
can result in the addition or removal of key
pipe support elements. Because high-energy
piping expands and contracts considerably
during startup and shutdown cycles, if such
changes are not properly implemented, the
system will grow, bend, or cycle in an unde-
sirable way.
In order to effectively evaluate these high-
energy systems, they need to be observed in
the two extreme states of operation. Docu-
menting the hanger positions in both hot
(full-load operation) and cold (zero-load
cold plant) conditions allows engineers to
model the stress and strain of the system.
This modeling can then be compared against
the original design and evaluated for proper
support and growth allowance. The results
will dictate if adjustments to hangers are re-
quired or if new support hardware is neces-
sary to bring the system back into allowable
stress ranges.
Although it may be challenging to contin-
ually inspect and document the material con-
dition of steam-generating equipment and
high-energy piping, the payback will come
in the form of increased equipment reliabil-
ity and availability. Shutdowns as a result of
forced outages are costly, due to the likeli-
hood of expedited material purchases and
uncertain availability of skilled craft labor.
Establishing programs to track and plan for
repairs will lead to fewer forced outages and
longer plant life. ■
—Brandon Bell, PE ([email protected]) is lead project manager for power
projects at Valdes Engineering Co.
Cora
lynne &
Associa
tes +
27 (
011)
849 3
142
• Optimum material flow• Up to 80% decrease in material degradation• Reduced dust and noise levels• Virtually maintenance free• Greatly reduced spillage• Significant reduction in belt damage
ABSOLUTE
MATERIAL FLOW
CONTROL
ABSOLUTE MATERIAL FLOW CONTROL
Phone: 800-425-2356
Email: [email protected]
CIRCLE 20 ON READER SERVICE CARD
www.powermag.com POWER | November 201546
SAFETY
Minimizing Coal Dust Combustion Hazards: Lessons from Laramie River StationCoal dust combustion events injured employees and damaged equipment at
Laramie River Station in May 2013. Any dust-filled facility could consider implementing some of the plant’s corrective actions to reduce the risk of experiencing a similar incident.
Basin Electric Power Cooperative
When Laramie River Station (LRS),
near Wheatland, Wyo., was built
nearly 35 years ago, it was state-
of-the-art. Constructed by the Missouri Basin
Power Project (MBPP), the plant has three
570-MW coal-based units: Unit 1 began op-
erating in 1980, Unit 2 in 1981, and Unit 3
in 1982.
The MBPP is made up of six organiza-
tions: Basin Electric Power Cooperative
(BEPC), Tri-State Generation and Transmis-
sion Association, Western Minnesota Munic-
ipal Power Agency, Lincoln Electric System,
Heartland Consumers Power District, and
Wyoming Municipal Power Agency. BEPC
is the plant’s operator.
LRS includes a coal system consisting
of 23 conveyors with nearly 25,000 feet of
conveyor belt, 16 dust collectors, 25 feed-
ers, 21 main plant silos and pulverizers,
three coal yard silos, and a rotary dumper.
The entire coal supply system extends more
than one mile.
It’s a massive system and one that has
had consistent and constructive maintenance
throughout its history. However, events at LRS
in the spring of 2013 caused BEPC to evaluate
and make changes to how the coal system was
inspected and operated thereafter.
Developing a TeamOn two separate occasions in May 2013, coal
dust combusted within the system, resulting
in injuries to three employees and forcing re-
pairs to Units 1 and 2. BEPC employees and
plant management reacted quickly to ensure
similar incidents would never occur again.
That summer, representatives from the Op-
erations, Maintenance, Planning, and Safety
and Engineering departments met to form the
LRS Coal System Focus Team.
“These team representatives were people
from throughout the employee ranks with the
ability to effect real, positive change,” said
Brian Larson, LRS plant manager.
During its first meeting, the focus team
declared that its mission was to improve coal
system safety and reliability using a combi-
nation of technology and cleaning to meet
respirable dust level requirements prescribed
by the Combustible Dust National Emphasis
Program (NEP).
“The team realized it would take a combi-
nation of major capital projects, maintenance
technique refinements, and operation proce-
dure adjustments,” Larson said. “There was
no ‘silver bullet.’”
During the second meeting, the team split
up the coal system into eight areas and con-
ducted a criticality analysis using 11 differ-
ent criteria, including generation impact, risk
exposure, dusting (Figure 1), and reliability.
The plant’s cascades/main plant silos area
became the team’s primary focus.
Through the first eight months, the focus
team worked to gain the knowledge needed
to make an impact on the LRS coal system.
To support the focus team’s work and share
knowledge, BEPC formed the “Co-op Wide
Dust Team.” This team consisted of person-
nel from all of BEPC’s coal-based facilities—
LRS, Dry Fork Station, Antelope Valley
Station, Leland Olds Station, and subsidiary
Dakota Gasification Co.’s Great Plains Syn-
fuels Plant. The team met quarterly, rotating
between the different facilities to study and
learn the different coal systems, share knowl-
edge, and cultivate ideas.
In February 2014, BEPC contracted
CoalTech Consultants Inc. to conduct an as-
sessment of the LRS coal system. The focus
team also joined the Powder River Basin
Coal Users’ Group (PRBCUG) and sent a
few members to the PRBCUG annual meet-
ing in 2014 to collect more information.
With the initial analysis complete and the
broad knowledge gained by studying coal
systems used throughout the BEPC fleet and
elsewhere, the time had come to implement
some changes.
Upgrading Main Plant Cascades and SilosTo prevent coal dust combustion within a
bunker, the coal system focus team deter-
mined that the plant would benefit by adding
the following:
■ An internal bunker carbon monoxide (CO)
monitoring system to identify undesired
combustion in its early stages.
■ A fixed internal fire suppression system
to suppress undesired combustion with no
risk exposure.
■ A fixed internal wash-down system to
prevent offline combustion events in an
empty bunker.
BEPC engineers tackled the CO monitor-
ing project by investigating an air-sampling
1. Gauging dust levels. A surface film
thickness gauge is used to measure coal dust
accumulation and ensure that levels meet
National Environmental Policy Act standards.
Courtesy: Basin Electric Power Cooperative
Wエ;デ Sラ ┞ラ┌ ェWデ ┘エWミ デ┘ラ ラa デエW HキェェWゲデ ミ;マWゲ キミ キミS┌ゲデヴキ;ノ ゲWヴ┗キIWゲ テラキミ aラヴIWゲい TエW HWゲデ IラマHキミ;デキラミ ラa ;IIWゲゲが ゲI;aaラノSキミェが Iラ;デキミェゲ ;ミS キミゲ┌ノ;デキラミ W┝ヮWヴデキゲWねゲラ ┞ラ┌ I;ミ ┘ラヴニ マラヴW ゲ;aWノ┞が マラヴW ヮヴラS┌Iデキ┗Wノ┞ ;ミS ;デ デエW ノラ┘Wゲデ デラデ;ノ キミゲデ;ノノWS Iラゲデく MラHノW┞ IミS┌ゲデヴキ;ノ SWヴ┗キIWゲが デエW ノ;ヴェWゲデ キミSWヮWミSWミデノ┞ ラ┘ミWS Iラ;デキミェゲ Iラマヮ;ミ┞ キミ デエW UくSくが キゲ ミラ┘ ; マWマHWヴ ラa デエW S;a┘;┞ Gヴラ┌ヮ a;マキノ┞く OミW Iラマヮ;ミ┞ キゲ ミラ┘ ┞ラ┌ヴ IラマヮノWデW ゲラ┌ヴIW aラヴ マ┌ノデキゲWヴ┗キIW ゲラノ┌デキラミゲねキデげゲ TエW Sマ;ヴデ W;┞イ デラ ┘ラヴニく
┘┘┘くゲ;a┘;┞ェヴラ┌ヮくIラマふΒヰヰぶ ヵヵΒどヴΑΑヲ
CIRCLE 27 ON READER SERVICE CARD
www.powermag.com POWER | November 201548
SAFETY
CO monitoring system rather than the con-
ventional in-situ CO monitors. The team felt
that if air within the bunkers could be drawn
to a monitoring system outside of a combus-
tible dust area, using equipment concentrated
in a group of panels, safety would be im-
proved and reliability increased.
To accomplish this, BEPC engineers
designed a system that draws air from the
cascade rooms and silos to a group of moni-
toring panels mounted on the outside of the
cascade walls (Figure 2). After successful
initial trials, construction was started to mir-
ror the design in the Unit 1 and Unit 2 cas-
cades, as well as in the coal yard silos. Data
from the system is monitored by both plant
operations and the Wheatland Volunteer Fire
Department to observe CO trends, allowing
more informed decisions to be made.
“The CO monitors will be an early detec-
tion that will help us respond more quickly,”
said Kevin Brown, LRS planner and Wheat-
land volunteer firefighter.
With state-of-the-art combustion detection
in place, the team’s focus switched to sup-
pression and prevention. Employees designed
a fixed internal washdown and suppression
system that can be used to either wash down
a bunker that is being taken out of service or
suppress a combustion event detected by the
CO-monitoring system.
Minimizing Dust CreationAfter addressing the likely root cause of the
LRS coal dust combustion incidents, the
team shifted its focus to dust creation and
collection. The coal system focus team pur-
sued two technologies to accomplish this:
foam suppression and controlled flow trans-
fer points.
A foam suppression system was installed
in the crusher house in an effort to reduce
dust creation at subsequent transfer points.
As part of the system, a chemical solution is
mixed with compressed air to create a shav-
ing cream–like substance (Figure 3) that is
injected into the crusher feeders. Data are
still being gathered to measure the foam’s ef-
fect on respirable dust levels, but preliminary
results are promising.
The coal system focus team decided to re-
place the chutes and implement a controlled
flow design. The goals of the chute project
were to:
■ Replace older coal chutes
■ Minimize coal dust creation
■ Facilitate the transfer of coal (minimize
plugging)
■ Decrease dust collection volumes
■ Minimize wear on conveyors through cen-
tral coal loading
■ Reduce coal spillage
To achieve these goals, a team of BEPC
engineers developed a technical scope to re-
place 10 different transfer points in the LRS
coal system. One objective was to match
the velocity of the coal stream to that of the
receiving belt at the chute discharge point,
minimizing the induced airflow traveling
through the transfer point. After the modifi-
cations were completed, studies showed that
the newly installed chutes reduced respirable
dust levels in all of the conveyer transfer ar-
2. Safely out of harm’s way. CO monitoring panels are mounted outside of the cas-
cade walls, but draw air from the cascade rooms and silos. Courtesy: Basin Electric Power
Cooperative
3. No, it’s not shaving cream. Adding a GE Betz foam suppression system was just
one step Laramie River Station took to reduce the amount of coal dust generated at the plant.
Courtesy: Basin Electric Power Cooperative
November 2015 | POWER www.powermag.com 49
SAFETY
eas—one by more than 75% (Table 1).
Not only did the changes decrease dust levels, but the chutes also
improved conveyor capacity by more centrally loading the coal. The
new chutes plug less frequently, reducing coal spillage and eliminat-
ing the need for one of the existing dust collectors while also being
easier to maintain.
“This project would not have been as successful without the dil-
igence and patience of the Plant Techniques personnel. They were
able to accomplish incredible things in very short hot-work periods,”
Larson said. “The new transfer points met all the goals, and Laramie
River Station plans to install more in the coming years.”
Improving Dust CollectionAlthough controlled flow chutes and foam suppression reduced dust
creation, the focus team still saw the need to address dust collection,
both through baghouses and washdown. Nearly all of LRS’s exist-
ing baghouses were indoors and lacked internal fire suppression. For-
tunately, an already-completed major dust collection improvement
served as the basis for all other coal yard baghouse modifications.
In 2011, a new Air-Cure dust collector was installed at the rotary
car dumper to pneumatically convey the dust almost one mile through
a 6-inch line to the main plant silos. With this design, the vast major-
ity of dust collected at the dumper is only handled once before it is
fed into the pulverizers.
The focus team decided to replace four of the coal yard dust col-
lectors with modern, fully equipped Air-Cure baghouses that dis-
charge the dust into the pneumatic line. This project will put a stop
to handling the same dust at different transfer points and decrease
dust levels throughout the system. Project construction is planned for
completion in 2016.
Regardless of the dust control equipment, dust cleanup through
washdown is still an essential facet of a clean coal system. Current-
ly, coal yard personnel perform all washdown activities manually at
LRS. To address this, the focus team developed a three-year plan to
install an automated washdown system throughout the coal system.
The project is scheduled in three phases beginning in 2016 with com-
pletion expected in 2018. Drainage modifications are under way in
the main plant cascades and other areas to accommodate the higher
effluent volumes generated by the new system.
Automatic washdown will allow rapid cleaning in tight time win-
dows, permitting the coal yard to direct its manpower to other ac-
PIPING SYSTEMS FOR POWER PLANTS––––––
With its own fabrication in Germany in-cluding an own clean hall, piping systems are constructed and prefabricated to the highest quality standards. Engineering, prefabrication, construction and commis-sioning of piping systems are ef ectively and ei ciently performed all over the world.
Bili nger Piping Technologies is interna-tionally active and present in Europe with its subsidiary and sisters companies but also within the CIS, GCC, RSA and Asia.
––––––
BILFINGER PIPING TECHNOLOGIES GMBH
xxx/qjqjoh/cjmバ!ohfs/dpn
CIRCLE 21 ON READER SERVICE CARD
Chute location
Average
before chute
replacement
(mg/m3)
Average
after chute
replacement
(mg/m3)
Percent
improvement
Conveyor 3 to 5 5.5 2.2 59%
Conveyor 3 to 6 5.5 1.3 77%
Conveyor 4 to 5 5.5 2.5 54%
Conveyor 4 to 6 5.5 1.8 68%
Conveyor 5 to 7 4.8 2.3 53%
Conveyor 6 to 8 4.8 2.6 46%
Crusher 1 to 9 NM 0.4 NA
Crusher 1 to 18a NM 0.4 NA
Crusher 2 to 10 NM 0.4 NA
Crusher 2 to 19 NM 0.6 NA
Notes: NA = not applicable, NM = not measured.
Table 1. Dust levels in controlled flow chutes. This
table shows controlled flow chute dust level improvements at the tail
end of receiving conveyors. Source: Basin Electric Power Cooperative
www.powermag.com POWER | November 201550
SAFETY
tivities. Additionally, it will keep the coal
system well within NEP dust accumulation
standards, which will reduce the chance of
another coal dust combustion incident.
People and ProceduresWhen all is said and done, people following
proper procedures are what make everything
work and what keep everyone safe. The fo-
cus team recognized the importance of the
human element and the need for a refined
operating approach, new procedures, and ad-
ditional training for all BEPC employees and
local emergency response personnel.
The LRS coal system is remotely oper-
ated from the main plant control room, but
the focus team worked with both main plant
and coal yard personnel to refine operations.
The coal yard and main plant coal system
operator rounds were completely over-
hauled with records now populating a new
database for better trending. Infrared cam-
eras, dust accumulation measurement, and
more thorough bearing temperature data
collection were added to the rounds. These
new parameters help to catch heat sources
before they become a combustion hazard
and aid in documenting the efficacy of the
washdown schedule.
Many new procedures have been devel-
oped to minimize the risk of another event.
An operational modification identified by
the focus team is to run the coal system
conveyors at full load, which reduces wear
on components and reduces spill frequency
and dust generation. A major effort to re-
store and add belt scales is under way and
expected to be completed by the end of
2015. This is expected to provide control
room operators with more accurate tonnage
information to ensure the system is running
at its optimal capacity.
To decrease the chance of coal dust com-
bustion in bunkers, employees developed an
online and offline main plant silo unloading
procedure. The online procedure calls for
unloading one silo in each unit every day to
flush out stagnant coal that can accumulate
at the profile change. This means that every
bunker is unloaded once per week to encour-
age first-in first-out coal storage throughout
the system.
The offline procedure sets timelines for
how long coal can sit in an offline silo. Re-
claimed coal has a higher chance of sponta-
neous combustion due to its higher oxidation
levels as a result of being exposed to atmo-
spheric elements for longer periods of time,
so the times vary depending on whether the
coal in the bunker came straight from a train
or if it was reclaimed from a stockpile.
Workaround procedures have been de-
veloped for coal system equipment failures.
The procedures focus on calling LRS and
emergency response personnel to come to-
gether and agree upon any workarounds
that may be required to continue operating
the coal system. This procedure ensures ev-
eryone stops, assesses all the hazards, and
comes up with the best possible solution to
any problem.
Finally, the plant’s Emergency Action Plan
was updated to ensure the well-equipped
Wheatland Volunteer Fire Department (Fig-
ure 4) is the first responder to all PRB coal
combustion events. This is a natural fit, as
eight members of the fire department are also
current LRS employees, making them very
familiar with the plant.
Training and Other InitiativesTraining has been critical to the improve-
ment in safety and operation of the LRS coal
system. LRS employees now undergo annual
general PRB coal awareness training, and
BEPC and the Wheatland Volunteer Fire De-
partment have collaborated on joint training
that addresses the unique hazards present at
the plant.
“Laramie River Station has types of haz-
ards we don’t usually deal with,” said Bob
Glasson, Wheatland Volunteer Fire Depart-
ment training captain. “Basin Electric provid-
ed us with training for coal dust combustion
and specialized equipment that has helped us
more effectively fight fires at the plant.”
Employees at LRS are also taking part in
BEPC’s “Our Power, My Safety” process,
which consists of a series of safety initiatives
intended to spur continuous improvement of
working conditions and keep safety top-of-
mind for employees at both work and home.
Continuous Improvement (CI) initiative
#1, improved worksite inspections, has been
rolled out at all BEPC facilities, and CI ini-
tiative #2, improved safety communications,
has been rolled out at LRS and several other
BEPC facilities. CI initiative #3, employee
education, will roll out in fall 2016.
BEPC’s management understands that it is
imperative to make proactive changes by in-
vesting in capital projects, improving main-
tenance and operation techniques, updating
procedures, encouraging teamwork, and
conducting suitable training to help mitigate
hazards. Collaboration is encouraged within
facilities, as well as between companies and
coal experts.
“I am proud that we have done so much
in the last 28 months,” Larson said. “I feel
confident that within the next three years,
through the efforts of many, we will have a
world-class coal system.” ■
—Article submitted by Basin Electric Power Cooperative.
4. Ready for duty. The Wheatland Volunteer Fire Department is designated as the first
responder to all coal combustion events. Pictured here from the left are Kevin Brown, Bob Glas-
son, Barry Sishc, and Scott Scheller. Courtesy: Basin Electric Power Cooperative
November 2015 | POWER www.powermag.com 51
FUEL SUPPLIES
Marooned: How Island Power Systems Keep the Lights On Largely dependent on imported fuel oil, many island systems must grapple
with soaring electricity costs and reliability issues, in part because they are isolated and they don’t benefit from economies of scale. But some nations are seeking alternatives.
Sonal Patel
It’s the same story all over the world. To
fuel their economies and support grow-
ing populations, geographically iso-
lated islands big and small procured fuel
oil generators and developed a dependence
on diesel delivery barges while crude was
relatively stable. But as oil prices soared—
hitting a record high in July 2008—nations
like the Marshall Islands, the Bahamas, Ja-
maica, and Mauritius were forced to declare
economic emergencies or admit that their
vulnerability to oil price and currency ex-
change fluctuations could prove economi-
cally devastating.
Fuel imports are generally blamed for
the exorbitant prices many islanders pay for
power, but experts also point to size—which
limits economies of scale—and the islands’
geographic isolation.
The U.S. territories face higher energy
costs than the rest of the nation, for exam-
ple. In those territories, the average resi-
dential rate for electricity is about $0.37/
kWh—about three times higher than the U.S.
national average cost of electricity. Com-
paratively, the Caribbean regional average is
$0.33/kWh, while Pacific island nations pay
between $0.28/kWh (Palau) and $0.48/kWh
(the Federated States of Micronesia).
Larger islands, which boast high elec-
trification rates, are often plagued by more
complex energy needs, as in Puerto Rico’s
case (see sidebar, “Drowning in Debt: Puerto
Rico’s Story”).
Renewables: An Obvious Choice, but Not Without ChallengesTo combat the high cost of electricity, a num-
ber of island nations or territories are seek-
ing alternatives. Because they are blessed
with solar, wind, biomass, and marine re-
sources but bereft of fossil fuels, making re-
newables a key component in island nation
power profiles would seem a given. There is
tremendous interest in adopting renewables.
Drowning in Debt: Puerto Rico’s Story
Puerto Rico is a striking example of an
island that almost went underwater finan-
cially because its electric utility was over-
loaded with debt stemming from high-cost
oil and old equipment.
Despite electricity rates that are more
than two times the national average
and higher than any U.S. state (except
Hawaii), the Puerto Rico Electric Power
Authority (PREPA) has racked up a $9 bil-
lion debt.
Experts say the situation stems from
years of negative cash flows that have
been made worse by the global recession
and the territory’s own fiscal crisis, which
can be attributed to a population and
economic decline. PREPA’s deficits are also
due in large part to its aging, outdated
generation facilities, poor customer bill
collection, and power theft. An inability
to access capital markets has, meanwhile,
rendered it unable to continue buying fuel
for its five main power plants (Figure 1).
On a bigger plane, the uncertainty sur-
rounding the high level of debt held by
PREPA (and other government entities)
has stalled much-needed private invest-
ment in the U.S. territory.
But things may be looking up. In Sep-
tember, PREPA reached an agreement with
a bondholder group to reduce its debt, as
a significant step toward restructuring.
Governor Alejandro Garcia Padilla hailed
the agreement as another measure to get
the liquidity needed to invest in the is-
land’s antiquated generation plants.
PREPA is also moving to save $200 mil-
lion to $400 million annually by stream-
lining fuel sourcing and by improving
customer service and safety.
One measure will see Siemens Energy
create a comprehensive, integrated re-
source plan (IRP) that addresses genera-
tion, transmission and distribution, and
fuel options.
Meanwhile, as a U.S. territory, Puerto
Rico still needs to comply with federal
environmental mandates. Eight of its 14
units subject to the Mercury and Air Tox-
ics Standards (MATS) comply with the rule,
but the territory’s environmental quality
board recently denied a requested one-
year extension for four units at the Palo
Seco and the San Juan plants. Puerto Rico
now plans to replace those units with
more efficient ones but notes that doing
so will require significant capital.
1. Pouring oil on troubled wa-ters. The Puerto Rico Electric Power
Authority (PREPA) produces power for its
1.4 million inhabitants on the main island
and on the adjacent Vieques and Culebra
islands. About 68% of its power, from
five main power plants, is oil-based; 15%
comes from liquefied natural gas; 15% is
from coal; and about 2% is from hydro. The
602-MW Palo Seco plant (shown here) was
built between 1960 and 1970 and burns
No. 6 fuel oil. Courtesy: PREPA
www.powermag.com POWER | November 201552
FUEL SUPPLIES
However, a number of obstacles limit their
widespread use.
The foremost reason is cost. Guam, for in-
stance, uses a hefty chunk of gross domestic
product to import fuel for transportation and
power needs and must rely on assistance to
build new projects. But as Esther Kia’aina,
assistant secretary for the Department of En-
ergy’s Insular Areas office, told lawmakers at
a congressional hearing this July, high-prior-
ity projects slated for some U.S. territories
must be supplemented with funding from the
Office of Insular Affairs’ capital improve-
ment program and technical assistance pro-
grams, and these “are already stretched thin.”
Notable federally funded projects include a
$1.8 million project to install a 1.2-MW solar
power system by the American Samoa Power
Authority and a $2 million wind turbine pilot
project in Guam.
Sometimes, renewables are kept at bay to
protect another sector. Hawaii, which spends
$5 billion on oil for its energy needs and suf-
fers the highest energy costs among the 50
states, first moved to integrate renewables
when the price of oil during the Arab oil em-
bargo in the early 1970s made dependence
on oil an economic liability. However, it took
more than 30 years for plans to become ac-
tionable policies.
“There was considerable inertia from Ha-
waii’s historic reliance and interdependence
on petroleum as the predominant fuel in all
sectors,” said Mark Glick, who is the state
energy administrator for the Department of
Business, Economic Development, and Tour-
ism. “This was due to the knowledge that
downward pressure on petroleum demand
in Hawaii’s small energy market would ad-
versely affect the delicate product balance
of the two local refiners supplying jet fuel,
gasoline, diesel, and low-sulfur fuel oil.”
The urgency for more energy security cre-
ated momentum for change. Today, Hawaii
has pledged to produce 30% of its power with
renewables by 2020, 70% by 2040, and 100%
by 2045. As of January 2015, the renewable
portfolio had topped 21%, way ahead of the
interim target of 15% (Figure 2).
Grid stability concerns also bar some
islands from installing larger-scale renew-
able projects. As some experts point out,
many island networks are aging, making
them prone to high system losses, and
the generating assets they depend on may
have been installed more than two decades
ago. The U.S. Department of Energy’s
March-released “Islands Playbook”—an
action-oriented guide (available at http://
goo.gl/CIq8OL) to successfully complete
a transition to an energy system that elim-
inates dependence on imported fuels—
recommends getting help from experts
to overcome integration challenges. That
document also highlights Hawaii’s prog-
ress on the distributed generation front
and regards its island system as a unique
laboratory for new solutions.
Hawaii leads the nation in the adoption
of distributed solar. While the national aver-
age is less than 1%, Oahu leads with 12%,
Maui has 10%, Hawaii Island has 9%, and
Kauai has 7.3%. “The result of this unprec-
edented growth in solar is that one-third, or
136 of Hawaiian Electric Co.’s 416 circuits
in Oahu are said to exceed 120% of daytime
minimum load, with 10% exceeding 250%,”
Glick said. “At 250%, that means that on any
given day, there is 2.5 times the amount of
electrical generation capacity on a circuit at
certain times of the day than the minimum
load requirements.”
Remember, Glick said, Hawaii’s grid is
isolated, which makes the rates of renewable
penetration even more impressive. “Conse-
quently, often at the firm prodding of the Ha-
waii Public Utilities Commission and other
energy stakeholders, Hawaii’s utilities have
had to act in real time to propose, deploy, and
confirm solutions for integrating such high
levels of renewables.”
Strategies deployed by the Hawaiian Elec-
tric Co. include testing and working on speci-
fications of “fast trip” inverter functionality to
avoid transient overvoltage events; computer
modeling each individual distribution circuit
to determine proactively the distributed gen-
eration resource’s “hosting capacity”; and
working with inverter manufacturers to bring
to market advanced inverter functionality to
manage voltage levels. “Planning of systemic
change,” energy efficiency, and demand re-
sponse are all also playing crucial roles with
respect to integration of more renewable en-
ergy, Glick noted.
Mulling the LNG OptionDiversification of island power portfolios
may also be achieved with the integration of
natural gas, the U.S. Energy Information Ad-
ministration (EIA) has suggested.
Liquefied natural gas (LNG), the EIA
noted in an August 2014 article, has not been
an option for many islands because it is typi-
cally shipped in bulk carriers in quantities
far too large for island economies to absorb.
And, LNG requires expensive regasification
and distribution infrastructure. However,
the development of standardized cryogenic
shipping containers means small amounts of
LNG can now be trucked, railed, and shipped
like other cargo. Once received by ship, the
LNG can be connected to portable regasifica-
tion units adjacent to electric power plants or
industrial facilities.
Puerto Rico and Hawaii are separately
testing the economics of small-scale LNG
imports, evaluating whether LNG prices jus-
tify switching away from diesel and residual
fuel oils.
But though the concept seemingly has the
backing of international financial institutions
like the International Development Bank, ex-
perts warn it has a glaring disadvantage: LNG
is currently slightly less expensive than diesel,
but it is much more price volatile. Also, LNG
prices are set regionally and are sensitive to
volumes under contract. That would mean
some islands may not be able to secure smaller
amounts of LNG at competitive prices.
Propane Power Sparks InterestFor a couple of islands, at least, propane has
2. Going renewable all the way. In 2014, 21% of the power used by customers of
Hawaiian electric companies came from renewable energy resources, including wind, solid
waste, geothermal, hydro, solar, and biofuel energy. The state wants to produce 100% of its
power from renewables by 2045. Source: POWER/Gail Reitenbach
November 2015 | POWER www.powermag.com 53
FUEL SUPPLIES
proven the best alternative.
While the U.S. Virgin Islands is typically
recognized for its pristine white sands and
azure waters, the group of Caribbean islets
has become an energy trailblazer, particu-
larly among the U.S. territories.
In September 2011, wholly dependent on
fuel oil to generate power, and at the mercy
of wide fluctuations in fuel oil prices (in
2003, the price per barrel was about $22,
but by 2014 it was about $131), the U.S.
Virgin Islands, along with other U.S. terri-
tories, drew up an energy roadmap. Its goal:
Reduce dependence on fuel oil by 60% by
2025.
Within four years, the Virgin Islands Water
and Power Authority (WAPA) had achieved a
20% reduction in fossil fuel energy consump-
tion by implementing several renewable en-
ergy and energy efficiency initiatives. These
include 8.2 MW of solar through partner-
ships with Toshiba International Corp. and
Mainstreet Power Co. At least 9 MW of new
solar is in the pipeline, along with a 7-MW
anaerobic digester facility that will be built
by Tibbar Energy. The efforts have pushed
down residential power rates from $0.51/
kWh to about $0.33/kWh today.
However, it was WAPA’s deal with Swiss-
based, Dutch-owned multinational com-
pany VITOL Group in the summer of 2013
to convert all of its combustion turbines to
burn lower-cost and cleaner-burning lique-
fied petroleum gas (LPG) along with No. 2
fuel oil that has seemingly sparked the most
interest. The ambitious conversion of seven
General Electric turbines requires the instal-
lation of 18 propane storage tanks (Figure
3) along with infrastructure adjustments to
enable the safe transportation of LPG ves-
sels. It is expected to reduce WAPA’s fuel
costs by 30%.
According to WAPA Executive Director
Hugo V. Hodge Jr., the project has not been
without its challenges. Costs have increased
from $87 million to $150 million, owing to
a number of factors. During early phases of
the project, for example, adverse weather
posed delays, while undocumented soil
conditions and other underground obstacles
“presented unforeseen challenges,” he said
in a recent statement.
In spite of cost increases, the project has
become a model for the Caribbean region.
“For most Caribbean islands, converting to
the use of propane as the primary fuel source
for power generation represents the best,
near-term option to significantly reduce the
cost of fuel . . . while ensuring widespread
economic benefits,” Hodge said. “The entire
region is looking at WAPA’s project intently
to see how the model can be adapted in their
respective areas.”
The concept is making waves stateside,
too. Capstone Turbine Corp. in December
2011 installed 23 propane microturbines
on Catalina Island, 26 miles off the south-
The Most Compact Transformer RelaySEL-787-3/-4: Flexible, sensitive, and secure protection.
Now, a single platform gives you the protection you need in a form factor that fits most space- constrained applications.
• Protects up to four-terminal differential applications for maximum flexibility.
• Accommodates up to three restricted earth fault elements to detect more internal faults.
• Includes dual-slope differential protection with harmonic blocking and restraint for sensitive and secure operation.
Find out how the SEL-787-3/-4 is all the differential transformer protection you need.
Visit www.selinc.com/787-pm11.
7.56 in (192 mm)
5.67 in (144 mm)
CIRCLE 22 ON READER SERVICE CARD
3. Propelled by propane. The U.S. Vir-
gin Islands, which was wholly dependent on
fuel oil just a few years ago, is moving to use
propane as the primary fuel source for power
generation. This image shows eight propane
storage tanks, which will eventually hold effec-
tive supply for about 19 days (10,400 cubic me-
ters), positioned for permanent installation on
St. Croix Island. Courtesy: U.S. Virgin Islands
Water and Power Authority
www.powermag.com POWER | November 201554
FUEL SUPPLIES
ern California coast. “What the Capstone
microturbines are doing for Southern Cali-
fornia Edison on Catalina Island is allowing
us to meet the island electrical demand and
frequency moment by moment, perfectly,”
said Ronald Hite, a Southern California
Edison district manager. What prompted the
switch from historically used diesel inter-
nal combustion engines are new air quality
standards, Hite explained. The new stan-
dards would have required the company to
install selective catalytic reduction (SCR)
units on the diesel engines, which then lim-
ited their output. “We needed to bring in
some form of generation that is quickly and
easily dispatched in small increments,” he
said. Propane is brought to the island twice
a week by barge that fills the storage tanks;
the propane is vaporized before it is fed to
the microturbines, Hite added.
Cleaner Diesel EnginesWhile change is clearly afoot on the island
scene (see sidebar, “Beyone Diesel”), diesel en-
gines aren’t going to fade into oblivion anytime
soon. They are the generator of choice for larger
installations.
Wärtsilä recently made a deal to extend
the six-unit Pockwood Pond Power Generat-
ing Station in the British Virgin Islands with
two gensets running on light fuel oil. When
completed in late 2016, the 50-MW plant
located on the main island of Tortola will
supply 100% of the British Virgin Island’s
electricity, including for its 11 islets (via sub-
marine cables).
Meanwhile, MAN Diesel & Turbo in June
2015 officially inaugurated a 210-MW engine-
operated power plant on the Caribbean island of
Guadeloupe for French utility EDF (Figure 4).
Since 2008, MAN Diesel has commis-
sioned similar plants (though on a smaller
18.5-MW scale) on La Réunion, Corsica,
and Martinique islands for EDF. The newly
inaugurated Point Jarry plant on Guadeloupe
Island isn’t your run-of-the-mill diesel in-
stallation, noted Dr. Hermann Kröger, head
of MAN’s power plants business unit, in a
statement. “The plant achieves a technical
and environmental standard that is seldom
seen in the field of diesel power stations,” he
said. “SCR catalytic converter technology
and urea injection deliver significantly re-
duced toxic emissions, while the dedicated
seawater desalination plant allows 700,000
tonnes of valuable drinking water to be
saved every year.”
Significantly, the plant will provide base-
load power to the island that is remarkably
outfitted with renewable installations. Wind,
geothermal, solar, and bagasse produce about
17% of the island’s total power. French law
requires EDF to buy power from any inter-
connected renewable generator, but owing
to concerns about grid stability and the vari-
ability of renewable sources, it restricts the
amount of wind and solar supplying the grid
at any given instant. For EDF, having backup
power is imperative. ■
—Sonal Patel is a POWER associate
editor.
Beyond Diesel
Here are some more innovative ways is-
landers are generating power while reject-
ing costly diesel imports:
■ Remote villages in the Pacific island na-
tions of Timor-Leste and the Solomon
Islands are using locally harvested and
processed coconut oil to fuel two Cat-
erpillar Olympian generators supplied
by Australian specialized Cat engine
dealer Energy Power Systems Australia
in 2013. Developers say a small system
can provide power with an average us-
age of only three coconuts per kWh—
with virtually no emissions.
■ The 11-MW Kaféate wind farm on the
Pacific island of New Caledonia has 42
Vergnet anti-cyclone wind turbines. In
the event of a cyclone, the tower can
be tilted and attached to the ground in
order to protect the turbine.
■ Kodiak Island (Figure 5) in southern
Alaska this May began producing 99.7%
of its power using only wind and hydro,
eliminating imports of about 3 million
gallons of diesel a year. The 28-MW is-
land system uses two 1.5-MW battery
systems to help manage intermitten-
cies. Plans are under way for a crane
upgrade at the port and for installation
of an ABB integrated commercial fly-
wheel technology to enable the addi-
tion of more renewable energy from an
expansion at the 9-MW wind farm.
■ Since 2009, the Réunion Island Univer-
sity, the Réunion Island Local Authori-
ties, and DCNS have worked toward the
deployment of ocean thermal energy
conversion (OTEC) technology in tropi-
cal regions by constructing a non-ex-
perimental OTEC plant in Réunion.
5. Microgrid. Kodiak Island, off Alaska’s
south coast, is the second-largest island in
the U.S. The Kodiak Electric Association, an
electric cooperative owned by the island’s
15,000 residents, has shunned costly die-
sel imports and designed a system that
uses only wind, hydro, and battery storage.
Courtesy: ABB
4. State-of-the-art diesel power. The 210-MW Pointe Jarry power station handed
over to French utility EDF by MAN Diesel & Turbo on the Caribbean Island of Guadeloupe this
June comprises a dozen 18V48/60 engines. It replaces a 30-year-old plant—cutting fuel con-
sumption by 15% and nitrogen oxide emissions by 85%—and is large enough to cover 45% of
the island’s energy needs. Courtesy: MAN Diesel & Turbo
November 2015 | POWER www.powermag.com 55
PROJECT SITING
Turning Brownfields into Greenfields: From Coal to Clean Energy As the coal industry declines in many places around the world, can the mines
it leaves behind be repurposed for cleaner energy projects that benefit multiple stakeholders, including local economies? Several existing and planned projects demonstrate that there may be multiple paths toward that transition.
Lee Buchsbaum
No question, the coal industry in Ap-
palachia, the rest of the U.S., and
much of the developed world is go-
ing through massive structural changes. As
mines close and regulators and citizens take
stock of their legacy, people are wondering
what’s next for the coalfields. Beyond at-
tempting to restore scarred lands to their
“approximate original contours,” as required
by U.S. federal law, there may be another ap-
proach, one that could provide lasting value
to mining companies, landowners, residents,
and other stakeholders.
Thousands of acres of once-abandoned
mines are now wildlife preserves or slow-
ly reviving parklands, but can mined land
be put to economic use? With the help of
a relatively new and little-known Environ-
mental Protection Agency (EPA) initiative,
“RE-Powering America’s Land,” transi-
tional assistance for taking brownfields to
greenfields is now available. Borrowing
from lessons learned at sites across the U.S.
and Europe, the EPA is trying to jumpstart
new clean energy projects at abandoned and
closing mines throughout economically dis-
tressed coal country.
Meanwhile, as the timeline for President
Obama’s Clean Power Plan (CPP) moves
forward, the distress in Appalachia might be
leading to new experiments in carbon credit
bundling, which could provide a model for
coal burners on how to generate electricity
while staying beneath limits set by the CPP.
Front and center is a proposal by the non-
profit Virginia Conservation Legacy Fund
Inc. to purchase thousands of acres of for-
mer mined lands from the now-bankrupt Pa-
triot Coal, along with several active mines,
and plant millions of trees as carbon offsets
to be sold along with future coal production.
The scheme, approved by the West Virginia
Department of Environmental Protection on
October 6, would also jump-start remedia-
tion and reclamation on dozens of old mine
sites throughout the East while keeping hun-
dreds of coal miners employed. The agree-
ment remains subject to bankruptcy court
approval, expected by the end of October.
The Greening of Lignite in GermanyWorldwide, there already are numerous ex-
amples of solar and wind power installations
on former mine lands, especially in Germany,
which earlier this century began decarboniz-
ing its economy.
One of the first brownfield to green-
field redevelopments, the Leipziger Solar
Power Plant, was installed upon 49 acres
of a former lignite mine site in Espenhain,
Germany. Initially, the 5-MW photovoltaic
power plant was made up of 33,500 solar
modules feeding directly into the German
electricity grid. The project, which has op-
erated since 2004, was initiated and devel-
oped by the energy company GEOSOL for
$26.5 million. The Espenhain site, located
near Leipzig, was a former settling area
for lignite or “brown coal” ash and dust.
Based on this prior use and the amount of
contamination at the settling area, the site
did not offer many traditional reuse or re-
development options. However, a solar
energy plant was an option, but only after
on-site contamination was remediated. At
the Espenhain site, the lignite waste had to
first be buried under a foot of soil before
custom-built supports for the solar panels
could be installed.
A similar project nearby is the 3.4-MW
Borna Solar Plant, installed at a cost of $28
million on the site of a factory that had pro-
duced lignite briquettes (Figure 1).
Building upon the success of these and
similar conversions, in 2012 a consortium of
Chinese and German firms converted part of
another former lignite strip mine into a so-
lar power plant. Working with the German
firm Energiebauern, the Chinese company
JinkoSolar supplied 5.7 MW of solar mod-
ules to the new 11.6-MW solar power station
in Starkenberg, Thuringia. Constructed by
Energiebauern, the solar power station is lo-
cated on an abandoned strip mine in the south
of Starkenberg and is the largest project of its
kind in that German state.
1. From coal to sol. Borna Solar PV Park
generates 3.5 million kWh annually on a site
in Germany previously used to manufacture
lignite briquettes. Source: GEOSOL/EPA
www.powermag.com POWER | November 201556
PROJECT SITING
Huge Potential for RE-Powering AmericaThroughout the U.S., according to the Gov-
ernment Accountability Office, there are be-
tween 80,000 and 250,000 similar abandoned
mine lands (AMLs) pock-marking the land-
scape. AMLs include abandoned mines and
the areas adjacent to or affected by the mines.
Because of safety or environmental concerns,
the majority of these sites have never been
considered for any type of reuse and have re-
mained idle.
AML sites are often in rural or remote
areas that may not be well-suited for more
traditional commercial or industrial reuse op-
portunities. Quite a few are “pre-law” sites
not subject to the Surface Mining Control
and Reclamation Act of 1977 and/or are not
former coal mines. Because of this, the land
often sits fallow or has become de facto na-
ture or hunting preserves. And few companies
or entities would ever seriously consider tak-
ing on the remediation costs associated with
redevelopment. Indeed, the land essentially
becomes a ward of the state, often leaching
toxins into the environment with little over-
sight. Struggling agencies barely have the
resources to adequately clean up these areas.
And now, following the disaster at the Gold
King Mine in southwestern Colorado earlier
this year, you can bet any group currently in-
volved in remediation work is reevaluating
its plans.
But if stakeholders are able to think out-
side the box and look forward, there are
some real benefits inherent in transform-
ing these blighted areas. Many of these
sites can take advantage of local renewable
resource attributes to produce power while
returning the land to productive use. As
part of its RE-Powering America initiative,
the EPA has identified renewable energy
development at mining sites as a priority
for the agency’s reuse-related activities at
contaminated sites. The initiative identifies
brownfields, Resource Conservation and
Recovery Act, Superfund, and mining sites
for their wind, solar, and biomass devel-
opment potential and provides other use-
ful resources for communities, developers,
industry, state and local governments, or
anyone interested in reusing these sites for
renewable energy development. The EPA
supports the reuse of former mine lands
through the Superfund Redevelopment
Initiative (SRI).
Working in collaboration with the Na-
tional Renewable Energy Laboratory, the
RE-Powering Initiative has propelled renew-
able energy development on contaminated
lands from merely an intriguing notion to an
ever-increasing portfolio of viable projects.
According to the EPA, since the initiative’s
inception in 2008, more than 150 renewable
energy installations on 144 contaminated
lands, landfills, and mine sites have been
established throughout 35 states and terri-
tories, representing a combined 1,046 MW
of capacity—not a huge amount of power,
but not bad for a relatively obscure project
within a very thinly stretched agency.
Of course, the EPA doesn’t site renewable
energy projects but directly and indirectly
supports cleanup of contaminated properties
where such sites could be developed. Reme-
diating contaminated sites and determining
their eventual reuses results from the efforts
of a diverse set of stakeholders including
communities, developers, states, tribes, local
government, and the financial community.
Siting AdvantagesAs noted above, AMLs often are excellent
locations for solar energy and wind produc-
tion facilities. Many abandoned mining sites
are located in the western and southwestern
U.S., in areas that have abundant available
sunlight (300+ days a year). However, states
like Pennsylvania are also demonstrating
2. Where the wind blows and the antelope roam. A 66-turbine wind farm rated
at 99 MW near Glenrock, Wyo., now generates renewable energy where the Dave Johnston
Coal Mine once sat (see next figure). Courtesy: PacifiCorp
November 2015 | POWER www.powermag.com 57
PROJECT SITING
the viability of renewables facilities on the
East Coast.
Additionally, utility-scale solar energy
projects require access to large, open sites,
and the size of many AMLs means that large
solar arrays can be accommodated at a single
property.
Precisely because of their history as indus-
trial sites, many AMLs are located near exist-
ing infrastructure, including roads and power
transmission lines, which can reduce project
costs. However, many are also situated in re-
mote areas with limited electricity infrastruc-
ture; those sites are well suited for using solar
energy for onsite cleanup and reclamation
activities, such as to power a groundwater
pump and treatment system.
U.S. Examples of Repurposed SitesTo be fair, several power producers moved
ahead long before the EPA did to engage in
green power redevelopment. One of the first
projects was a large windfarm installed by
PacifiCorp in 2008. Today, 66 wind turbines
near the hamlet of Glenrock, Wyo., with a
nameplate capacity of 99 MW, generate re-
newable power on land that Warren Buffet’s
Berkshire Hathaway–owned PacifiCorp re-
tired and reclaimed from surface coal mining
operations (Figure 2). Perhaps the first wind
facility in the West to recycle fossil fuel–pro-
ducing land for green energy generation, the
300 acres upon which the Glenrock turbines
stand were part of the 14,000-acre Dave
Johnston Mine (Figure 3) that produced 104
million tons of subbituminous coal between
1958 and 2000. The surface mine operation
fueled PacifiCorp’s neighboring Dave John-
ston Plant—still one of the largest coal-fired
power plants in the West.
Back East, from 2000 through 2004 the
Tennessee Valley Authority installed 18 wind
turbines on a former strip mine in Tennessee.
The Buffalo Mountain project, visible for
miles, supplies clean energy to roughly 3,400
homes annually.
Around the same time as Buffalo Moun-
tain went into service, to the north, the Cas-
selman Wind Power Project in Somerset
County, Pennsylvania, started generating
upon another closed surface mine (Figure
4). Eight of Casselman’s 23 wind turbines sit
atop a reclaimed strip mine. Developed and
owned by Iberdrola Renewables, collectively
the wind power project can generate up to
34.5 MW. In addition, the former mining site
hosts the wind farm’s operation center, col-
lector transformer, and interconnection facil-
ity. While the project spans approximately
2,000 acres, the actual footprint is less than
2% of the total acreage.
On the solar side, with help from the EPA’s
initiative, a 43-acre solar farm is now gen-
erating power at a former Superfund site in
Indiana, making it the nation’s largest solar
farm yet built on a Superfund site. Made up
of 36,000 solar panels, the Maywood Solar
Farm started producing power last year. The
EPA touts it as one of 85 renewable energy
projects that the agency has helped install
on Superfund sites, landfills, and old mining
sites nationwide. In this case, the solar farm
is on the site of a former coal tar refinery
plant, which dealt with hazardous chemicals
until its closing in 1972. In the 1980s offi-
cials found that the groundwater underneath
the site was contaminated with benzene and
ammonia; afterwards, the area was desig-
nated a Superfund site. “This innovative so-
lar project demonstrates that Superfund sites
can be redeveloped,” EPA Regional Admin-
istrator Susan Hedman said in a statement.
“The Maywood Solar Farm project has trans-
formed a site with a long history of contami-
nation into a source of renewable energy.” At
the end of the day, it’s a great step forward
upon an otherwise nearly dead landscape.
Tree-Hugger Plan Promises to Protect Coal Mining, Miners, and EnvironmentLong the sickest man in the room, Patriot
Coal has gone through bankruptcy proceed-
ings twice in the past two years. Perhaps
designed to fail from the outset (see “The
Shifting Fates of Coal Markets, Coal Mining,
and Coal Power” in the October issue), the
metallurgical coal boom that started before
the 2008 recession boosted the company’s
fortunes as investors financed expansions to
tap met coal reserves. With the collapse of all
coal prices, Patriot has been on the proverbial
down-bound train ever since.
In June, Patriot agreed to sell the majority
of its remaining mines to Blackhawk Min-
ing. However, a smaller chunk of Patriot’s
coal-producing assets—including several
operating mines, millions of dollars of envi-
ronmental liabilities, and dozens of old mine
permits—may be transferred to a newly cre-
ated subsidiary of the nonprofit Virginia
Conservation Legacy Fund (VCLF) as part
of a scheme to plant hundreds of thousands
of trees and bundle carbon credits into the
sales of several million tons of new coal
production.
As noted earlier, the plan has received en-
vironmental department approval but awaits
bankruptcy court approval. As envisioned
by CEO Tom Clarke and the rest of VCLF’s
management team, planting trees and reaping
the carbon credits may be one path forward
for all coal companies—many of which are
3. Dave Johnston Coal Mine, 1993. Source: Office of Surface Mining
Reclamation and Enforcement, U.S. Depart-
ment of the Interior
4. Still providing energy. Roughly a third of the Casselman Wind Power Project tur-
bines in Somerset County, Penn., sit atop a former surface coal mine. Courtesy: Iberdrola Re-
newables
www.powermag.com POWER | November 201558
PROJECT SITING
also huge landholders with millions of trees
on their property.
Through its affiliate, ERP Compliant
Fuels LLC (ERP), VCLF, its manage-
ment, and other shareholders have sought
and been granted provisional regulatory
approval to receive 153 mining permits
from Patriot while purchasing other re-
lated equipment, processing facilities, and
collateral. VCLF’s goal is to help restore
Appalachian communities through active
mining, land reclamation, and water qual-
ity improvement. ERP will also assume
all of Patriot’s Workers Compensation and
state black lung obligations, estimated to
be as much as $109 million. ERP proposes
to grant significant equity ownership of the
new company to the United Mine Workers
of America to support their pension and re-
tiree health benefits.
With the acquired Patriot assets, ERP
would operate the established Federal Min-
ing Complex in northern West Virginia,
which has the capacity to produce over 4
million tons of thermal coal annually. It
will also take over the Corridor G facility
in southern West Virginia. VCLF says it will
reclaim land and improve water quality in
West Virginia, Ohio, Illinois, Kentucky,
Pennsylvania, and Indiana.
Can Trees Save Coal?VCLF is committed to the so-called “forestry
reclamation approach,” creating economic
opportunities for Appalachian communities.
Here’s how it works. VCLF supporter Green-
Trees from The Plains, Virginia, has planted
more than 36 million trees on over 100,000
acres of land in the Mississippi Alluvial Del-
ta, sequestering over 12 million metric tons
of carbon dioxide (CO2) and, thus, creating
saleable carbon credits. GreenTrees accounts
for over 90% of the reforestation carbon
credits registered to date by the American
Carbon Registry. ERP intends to sell “com-
pliant fuels,” which bundle carbon credits
with coal sales to produce a “compliance
instrument,” effectively reducing CO2 emis-
sions. The compliant fuels market is expect-
ed to increase under the recent EPA emission
standards required by the CPP.
As part of the acquisition, ERP will main-
tain 683 jobs in West Virginia through the
operation of the Federal mine and its forestry
reclamation activities. VCLF already con-
trols over 30,000 acres of conservation land,
including the Natural Bridge of Virginia, and
provides “environmental management ser-
vices” at 459 coal mining and water quality
sites in five states.
VCLF/ERP would also potentially as-
sume liability of more than $400 million in
connection with Patriot’s workers’ compen-
sation, state black lung, and environmental
obligations. In addition, VCLF/ERP would
assume or replace surety bonds supporting
reclamation and related liabilities associ-
ated with the purchased assets. “In VCLF,
we have found an experienced partner who
will responsibly manage our remaining as-
sets consistent with the highest environmen-
tal standards and we believe this proposed
transaction is in the best interest of Patriot
and its stakeholders,” Patriot Coal President
and CEO Bob Bennett said.
VCLF’s Clarke—who billed the court’s
initial agreement as a landmark achievement
for the fund, Appalachia, and the entire coal
industry—stated that VCLF expected to
maintain employment in West Virginia at
current levels and expand as it invests up
to $176 million in land reclamation, refor-
estation, and water-quality improvements.
“Continued mining at [the Federal Min-
ing Complex] will allow us to launch our
‘compliant fuel’ program, which bundles
reforestation carbon credits with coal sales,
effectively reducing CO2 emissions, as re-
quired under the new emission standards,”
Clarke outlined.
According to a rather skeptical report
published by InsideClimate News, to off-
set the carbon emissions from burning
coal, Clarke plans to plant trees both on
the mine property and elsewhere in Appa-
lachia. (Note that Clarke’s plan isn’t the
only effort to plant trees on former mining
sites; see Figure 5.) He will then bundle
the carbon credits from planting trees with
the coal and sell it to utilities for a profit.
“We inset the carbon with the coal and so
when the train arrives at the power station,
it also has cancelled [carbon credit] certifi-
cates,” said Clarke. “We’re creating a new
product.” The carbon credits are supposed
to account for about 30% of the emissions
from burning the coal.
Seemingly controversial and outland-
ish, Clarke’s plan isn’t altogether new.
Renewable energy credits are sometimes
sold bundled with the underlying energy
source. But what’s radically unique is that
it comes from someone who claims to be
a climate activist who also wants to keep
coal mines open.
Clarke contends that environmental
groups have to be directly involved in the
coal market. By selling coal and doing it in
a way that reduces carbon emissions, it will
push the market to use cleaner fuel sources,
he said. “We’ve got to do everything,” Clarke
5. A new beginning. Seedlings such
as this one on a former coal mining site near
Hazard, Ky., are among 100,000 bee-friendly
native Appalachian trees planted on 500
acres since 2008 in coordination with the Ap-
palachian Regional Reforestation Initiative to
produce pollen and nectar favorable for estab-
lishing a honeybee industry in Eastern Ken-
tucky. Courtesy: The Lane Report
Clarke’s plan isn’t altogether new. Re-newable energy credits are sometimes sold bundled with the underlying energy source. But what’s radically unique is that it comes from someone who claims to be a climate activist who also wants to keep coal mines open.
November 2015 | POWER www.powermag.com 59
PROJECT SITING
insisted. “We’ve got to push all of the solu-
tions simultaneously . . . We have to take bold
risks.” The plan will also keep jobs in the
region and help the Appalachian economy
slowly transition away from coal dependency
while helping push the area toward more of a
restoration economy.
Innovation or Smoke and Mirrors?Environmentalists are confused by Clarke
and his intentions. Earlier this year, he
became involved with another troubled
mining giant, Southern Coal. Led by the
billionaire Jim Justice, who is running for
West Virginia’s governorship, Southern
is facing millions of dollars in fines for
health, safety, and environmental viola-
tions, as well as lawsuits by former em-
ployees alleging they had been unfairly
fired. Clarke initially mounted a very pub-
lic campaign against the company but later
decided to join Justice’s company as an
unpaid consultant to create a compliance
strategy. The success of this new partner-
ship is still questionable, as are Clarke’s
loyalties, apparently.
Another significant question is whether
utilities can actually use Clarke’s coal to ful-
fill their requirements under the CPP. If the
EPA disallows a compliance strategy based
on attaching carbon credits to fossil fuels,
utilities would lose any incentive to purchase
coal from Clarke.
“Approval of this ‘compliant fuel’ strat-
egy is likely to be a difficult challenge,” said
Ken Colburn, head of U.S. operations at the
Regulatory Assistance Project, a nonprofit
that provides technical assistance on energy
and environment issues. The regulations re-
quire utilities to reduce emissions from pow-
er plants. Offsetting emissions elsewhere by
planting trees won’t meet the requirements of
the rule, Colburn said. “The trees would be
reducing the amount of carbon in the atmo-
sphere, but not the amount emitted from the
power sector,” he explained. That said, be-
cause individual states can create their own
CPP compliance plans, it’s possible West
Virginia and other coal-dependent states can
create a carve-out exemption favorable to
these types of credits.
In defense of this plan, Clarke said his
group is already in talks with a Virginia-
based power station that emits about 6
million tons of CO2 a year. If a deal is fi-
nalized, Clarke’s group will offset about 2
million tons of CO2 by planting hundreds of
millions of trees.
“Whether environmental groups realize it
or not, this is a major way to help solve this
issue,” said Chandler Van Voorhis, managing
partner of GreenTrees. “It’s a powerful way
to deal with carbon emissions.” But it will
likely meet resistance from environmental
groups that see defeating coal as a top prior-
ity. “The Sierra Club doesn’t like it because
they want power companies to invest in solar
and wind,” Clarke said. “We believe coal is
still going to play a role.”
Beyond whatever happens with Patriot,
Clarke and the VCLF have substantial land
holdings and partners with holdings of their
own. Between them, they control a slew of
wild and planted forests whose CO2 seques-
tering ability can already be monetized. For
an estimated 10% increase in cost, VCLF’s
new coal production would come bundled
with credits, equal to about 30% of the com-
bustion emissions, already paid for. “The
tree is the answer, it really is the answer,”
Clarke said. ■
—Lee Buchsbaum (www.lmbphotography.com), a former editor and contributor to
Coal Age, Mining, and EnergyBiz, has covered coal and other industrial subjects
for nearly 20 years and is a seasoned industrial photographer.
UDI Who’s Who at
Electric Power PlantsFor more detailed information and a list of all available data,
visit us online at UDIDATA.COM or contact the UDI Editorial
team at [email protected].
The 2014 UDI Who’s Who Directory covers more
than 4,500 U.S. and Canadian generating plants.
The directory provides:
• Nearly 8,100 plant management and support contact names, titles, and primary job functions.
• Basic plant operating statistics for more than 1,500 power stations, including:
Generation (MWh)
Availability (%)
Heat rate
Capacity Factor (%)
• Power plant design characteristics
Choose which purchase option that best suits your needs:
• Hardcopy Book
• Enhanced Directory PDF (CD-ROM)
• Mailing List (CD-ROM), Enhanced Directory PDF & Hardcopy Book
www.powermag.com POWER | November 201560
NUCLEAR TECHNOLOGY
On the Nuclear Frontier: New Designs Aim to Replace LWRsGeneration III nuclear reactors have not shown much ability to overcome the
weaknesses of conventional Gen-II light-water reactor technology, offering at best evolutionary approaches. Is there room for a more revolutionary approach? Many parties are exploring new technologies, but it’s impos-sible to tell which, if any, will succeed.
Kennedy Maize
Last August, Andy Revkin, The New York
Times’s “Dot Earth” blogger, waxed en-
thusiastic about a new fusion reactor de-
sign from a team of students and researchers
at the Massachusetts Institute of Technology
(MIT). Revkin reported (based mostly on the
MIT press release) that the team had come
up with a plan for a “demonstration-scale fu-
sion energy power plant that could actually
produce a fusion energy machine that is af-
fordable, robust, compact.”
MIT claimed that the new design takes the
long-disappointing “tokomak” donut-shaped
fusion reactor and shrinks it with new ma-
terials. This would allow the use of a much
higher magnetic flux to contain the super-
hot plasma needed to fuse hydrogen atoms,
which would produce heat far exceeding
any conventional fission reactors, yet with a
much smaller footprint. The hype suggested
a 10-year time frame.
Despite the credulous coverage of MIT’s
dream machine, there are important skeptics,
many of whom note that fusion is a tech-
nology whose horizon has receded despite
years of research and billions of dollars of
government investment. Robert Hirsch, who
ran the fusion program for the Atomic En-
ergy Commission (AEC, the predecessor
of the Nuclear Regulatory Commission)
and the Energy Research and Development
Administration in the 1970s, told POWER,
“Higher magnetic field tokamaks have
been around since the early 1970s, but high
magnetic fields contain high stored energy,
which can be released when [superconduct-
ing] magnets quench, which the regulators
will be very sensitive to.” Magnet quench-
ing—abrupt termination of the magnetic
field—can result in destructive forces inside
the machine and considerable damage.
The MIT reactor design, which MIT is
calling the ARC (Figure 1), hits all the proper
notes to attract attention: small, modular, and
efficient. But it’s just one of a number of “new”
(actually mostly old but previously discarded)
reactor models various engineers and entre-
preneurs are advancing as the solutions to the
well-known woes of conventional, large-scale
light-water reactors (LWRs).
A Nuclear Gen-XCall them “Gen-Next” reactors, as they do
away with the conventional numerical no-
menclature of Gen-I (small, early plants
such as Indian Point I in New York, now long
closed), Gen-II (most of the large plants or-
dered in the 1970s and operating today), and
Gen-III (today’s designs, such as the West-
inghouse AP1000 and AREVA’s EPR, under
construction but not yet operating). Gen-IV,
the industry’s label for advances over Gen-
III designs, implies more of the same, while
Gen-Next implies radically different ap-
proaches, with much promise and plenty of
risk (see sidebar).
Earlier conventional reactor designs are
being phased out. The Gen-Is are gone.
Many Gen-IIs are nearing retirement. But
Gen-IIIs have not met stated goals for plants
that are cheaper and easier to build, feature
much greater standardization, and offer
modular construction advantages over the
prior generation.
Investment portfolio manager Henry Hewitt
wrote in Greentech Media recently that Gen-
III reactors “have been a disappointment.”
None are currently operational, and many of
the plants under construction have seen delays
and budget overruns—some of them huge, as
with the EPR. The latest World Nuclear Indus-
try Status Report (a publication that is skepti-
cal of nuclear power) attributes these delays,
including those at the four Westinghouse units
under construction in the U.S., to “design is-
sues, shortage of skilled labor, quality control
issues, supply chain issues, poor planning ei-
ther by the utility and/or equipment suppliers,
and shortage of finance.”
Those looking to nuclear power as a long-
term component of a plan to limit carbon di-
oxide emissions have for more than a decade
been examining and touting new generations
of nuclear concepts that escape the limits of
the LWR (see “Nuclear Industry Pursues
New Fuel Designs and Technologies” in the
March 2015 issue). These new technologies
include designs that rely on thermal (slow)
neutrons, fast neutron breeder reactors,
various cooling approaches, higher-temper-
ature machines that are more efficient, and
the ability to burn spent nuclear fuel from
those conventional LWRs, which look to be
around for a very long time.
Salt of the EarthThe most recent leader of the Gen-Next hit
parade is the molten salt reactor. As is the
case with the small, modular fusion project,
a revival of this design is also under way at
MIT. Nuclear scientists Leslie Dewan and
Mark Massie are designing what they call
the “Waste-Annihilating Molten Salt Reac-
tor” (Figure 3). Starting with designs origi-
nated at Oak Ridge National Laboratory in
the 1950s and 1960s, Dewan and Massie are
developing plans for a liquid-fueled reactor
that overcomes some of the problems with
the 7.5-MW Oak Ridge plant that operated
from 1966 until 1969, when the money ran
out. Their design also addresses important
current problems with LWR plants.
MIT’s Dewan and Massie have formed a
1. Pocket powerhouse? This fusion re-
actor design from the Massachusetts Institute
of Technology (MIT) promises larger power
through a smaller footprint. Courtesy: MIT
November 2015 | POWER www.powermag.com 61
NUCLEAR TECHNOLOGY
company, Transatomic Power, to commercialize
their concepts. They have raised $6 million in
venture capital so far. Unlike the old Oak Ridge
reactor—championed by nuclear power found-
ing father Alvin Weinberg (1915–2006)—their
design does not use fast neutrons in order to
breed plutonium. It is a thermal device, with the
fuel in suspension in the coolant, a key feature
of Weinberg’s Oak Ridge machine. According
to their website (transatomicpower.com), the
fuel can be either “fresh” (unenriched) uranium
or spent fuel, unlike the 33%-enriched ura-
nium in the Oak Ridge prototype. The devel-
opers claim that the “main technical change”
they have made from the Oak Ridge days “is
to change the moderator and fuel salt used in
previous molten salt reactors to a zirconium hy-
dride moderator, with a LiF [lithium fluoride]-
based fuel salt.”
This machine, according to its MIT devel-
opers, can run on spent fuel, can burn up as
much as 96% of the energy in the fuel, and
should provide exceptional safety. It avoids
the intense radiation damage from fast neu-
trons. If the plant loses all of its electric
power, a phenomenon known as “station
blackout” (such as what occurred at Fuku-
shima), the fuel drains into a tank and freezes
solid. There can be no meltdown.
But there are tough challenges to overcome,
particularly handling the highly corrosive
molten salt, which carries the fuel, serves as
the moderator, and cools the reactor. Licens-
ing will be a problem in the U.S. because of
the novelty of the design. The reactors could
require on-site chemical plants to deal with the
coolant and fuel mixture. Nor are the econom-
ics of the technology at all clear.
The WaveIn 2006, multi-billionaire Microsoft founder
Bill Gates and former Microsoft chief strate-
gist Nathan Myhrvold concluded that raising
living standards globally—including provid-
ing access to electric power to all—requires
the private sector to step into the action. They
founded Intellectual Ventures, located in Bel-
levue, Wash., to come up with ideas for re-
ducing global poverty. Two years later, they
spun off a new company, TerraPower, to fo-
cus on a new approach to an old, largely un-
successful, nuclear technology: fast breeder
reactors, which generate electricity while
producing more plutonium fuel than they
consume from natural uranium and fast (un-
moderated) neutrons.
TerraPower’s wrinkle on breeders was
called the “traveling wave reactor” (TWR)
first proposed in the 1950s, according to the
Alvin Weinberg Foundation. It was a sodi-
um-cooled fast breeder design to burn the
plutonium it breeds internally from conven-
tional spent reactor fuel, without the need for
plutonium reprocessing. That’s a big techni-
cal, economic, and environmental advantage.
Nuclear reprocessing is fraught with prob-
lems, including diversion of plutonium from
civilian reactor fuel into atomic weapons.
An article in MIT’s Technology Review
reported, “As it runs, the core in a traveling-
wave reactor gradually converts nonfissile
material into the fuel it needs.” Another de-
scription, from ZDNet, likened it to a candle,
burning from one end to the other.
The technology got a lot of hype. New York
Times reporter Matthew Wald (who wrote the
Technology Review article and now works for
the Nuclear Energy Institute), wrote that Ter-
raPower’s idea could answer the quest “for a
new kind of nuclear reactor that would be fu-
eled by today’s nuclear waste, supply all the
electricity in the United States for the next
800 years and, possibly, cut the risk of nucle-
ar weapons proliferation around the world.”
It was an intriguing concept. But Terra-
Power soon abandoned the traveling wave
in the face of an engineering conundrum.
The reactor’s liquid sodium cooling system
had to follow the wave, a very tricky task.
Instead, TerraPower changed the design so
the uranium-plutonium conversion does not
move. “It’s just the practical considerations
associated with making the most of every
neutron, and the engineers’ love of keep-
ing the cooling system in one place and not
chasing the wave,” TerraPower’s CEO John
Gilleland told Weinberg Foundation blogger
Mark Halper. TerraPower continues to call its
machine the traveling wave reactor, although
now it’s more of a standing wave. The com-
pany says it hopes to achieve startup of a
600-MW prototype TWR in the mid-2020s.
TerraPower’s move away from its origi-
nal technology recognized the problems with
liquid sodium coolant. While it has excellent
heat transfer properties, it also has a tendency
to leak and come into contact with air and wa-
ter. When that happens, it can spontaneously
ignite in a wild reaction. That’s a real prob-
The Fabulous Flying Fusion Machine
Last summer, a team of Boeing engineers
got a U.S. patent for a laser-fusion-powered
aircraft engine. The conceptual design (Pat-
ent No. US 9,068,562 B1) has high-power
lasers aimed at a target of deuterium and
tritium, a simplified concept similar to the
much larger research on laser fusion under
way at the Department of Energy’s National
Ignition Facility at Lawrence Livermore Na-
tional Laboratory in California.
In the Boeing patent, the lasers cause
the hydrogen isotopes to fuse into he-
lium, producing a thermonuclear explo-
sion (Figure 2). As described by Business
Insider, the helium and hydrogen by-
products shoot out of the back of the
engine at enormous pressure, yielding
thrust. The inside of the “thrust cham-
ber,” coated in natural uranium (mostly
U238), reacts with the neutrons from the
thermonuclear reaction, generating im-
mense heat.
Coolant flowing along the outside of
the combustion chamber captures the heat
and is sent through a turbine generator to
produce electricity to power the engine’s
lasers. According to the patent application,
the engine could power rockets, missiles,
and spacecraft.
Fusion expert Robert Hirsch was dismis-
sive of the design. He told POWER that
Lawrence Livermore “seems to have failed
to ignite pellets, and a laser to do the
suggested job at the needed energies isn’t
even on anyone’s drawing board, as far as
I know. But you never know, so you sub-
mit a patent.”
“As of now, the engine lives only in pat-
ent documents,” notes Business Insider.
2. A flying reactor? Boeing engineers
have received a patent for this concept for
a fusion-powered jet engine. Courtesy:
Boeing
3. Salty prospect. Experimental reac-
tors using molten salt as a coolant and fuel
carrier have been around since the 1960s, but
new designs hope to overcome past prob-
lems. Courtesy: Transatomic Power
www.powermag.com POWER | November 201562
NUCLEAR TECHNOLOGY
lem, because sodium fires are very difficult to fight. They create caustic
fumes, release explosive hydrogen, and can’t be quenched with water or
CO2. Breeders in operation in the world so far have had serious sodium
coolant problems.
TerraPower has broadened its interests in Gen-Next nuclear, in-
cluding looking at molten salt reactors.
On Sept. 22, the company announced a memorandum of under-
standing with China National Nuclear Corp. (CNNC). A press release
sent to POWER said that “The two companies plan to work together to
complete the traveling wave reactor (TWR) design and commercial-
ize TWR technology. Cooperation between TerraPower and CNNC
will speed technology development, promote clean energy growth,
and enable global economic growth in both countries” (Figure 4).
AstridBreeder reactors remain the nuclear Holy Grail for many plant devel-
opers, despite the mixed record of earlier generations, because they
offer an endless supply of fuel generated by transmuting uranium into
plutonium. Among various projects, the most advanced appears to be
Astrid (Advanced Sodium Technological Reactor for Industrial Dem-
onstration), a sodium-cooled fast breeder project led by the French
government’s energy research agency CEA, working with AREVA,
Electricité de France, and Toshiba.
Japan and France, countries with few indigenous energy resources,
have long seen breeder reactors and plutonium reprocessing as the
path to greater energy independence. But the breeder programs in both
countries have had problems. France’s Superphenix reactor closed in
1998 after serious engineering problems with the liquid sodium cool-
4. Traveling wave reactor design traveling the world. In September, Bellevue, Wash.–based TerraPower announced it had
signed a memorandum of understanding with China National Nuclear
Corp. to complete the design and commercialize the new form of nu-
clear technology. Courtesy: TerraPower
GET 0% FINANCING FOR 84 MONTHS OR GET A BIG CASH DISCOUNT*
WE MANUFACTURE WE INSTALL
WE SAVE YOU MONEYIDEAL WORKSPACES FOR THE POWER INDUSTRY
Hybrid Buildings Foundation SolutionsFabric Structures
*RESTRICTIONS APPLY
ClearSpan.com/ADPO1.866.643.1010
CIRCLE 23 ON READER SERVICE CARD
Statement of Ownership, Management, and Circulation (Requester Publications Only) 1. Publication Title: POWER 2. Publication Number: 0032-5929 3. Filing Date: 9/30/15 4. Issue Frequency: Monthly 5. Number of Issues Published Annually: 12 6. Annual Sub-scription Price &107. Complete Mailing Address of Known OfÞce of Publication: Access Intelligence, 4 Choke Cherry Road, 2nd Floor, Rockville, MD 20850-4024 Contact: George Severine Telephone: 301-354-1706 8. Complete Mailing Address of Headquarters or General Business OfÞce Publisher: Access Intelligence, NNC, 4 Choke Cherry Road, 2nd Floor, Rock-ville, MD 20850-4024 9. Full Names and Complete Mailing Addresses of Publisher, Editor, and Managing Editor: Publisher: Matt Grant, 4 Choke Cherry Road, 2nd Floor, Rockville, MD 20850-4024 Editor: Gail Reitenbach, 4 Choke Cherry Road, 2nd Floor, Rockville, MD 20850-4024 10. Owner if the publication is owned by a corporation, give the name and ad-dress of the corporation immediately followed by the names and addresses of all stockholders owning or holding 1 percent or more of the total amount of stock: Veronis Suhler Stevenson, 55 East 52nd Street, 33rd Floor, New York, NY 10055 11. Known Bondholders, Mortgagees, and Other Security Holders Owning or Holding 1 Percent or More of Total Amount of Bonds, Mortgages, or other Securities: None 12. Non-proÞt organi¦ation: not applicable. 13. Publica-tion: POWER 14. Issue Date for Circulation Data: September 2015. Average No. of No. Copies of 15. Extent and Nature of Circulation: Copies Each Issue Single issue During Preceding Nearest to 12 Months Filing Datea. Total Number of Copies (Net press run) 45,585 46,093b. Negitimate Paid and/or Requested Distribution (1) Outside County Paid/Requested Mail Subscriptions 40,073 40,480 (2) Inside County Paid/Requested Mail Subscriptions 0 0 (3) Sales Through Dealers and Carriers, Street Vendors, 2,479 2,195 and Other Paid or Requested Distribution Outside USPS (4) Requested Copies Distributed by Other Mail Classes 0 0c. Total Paid and/or Requested Circulation 42,552 42,675d. Nonrequested Distribution (By Mail and Outside the Mail) (1) Outside County Nonrequested Copies 1,208 1,193 (2) Inside-County Nonrequested Copies 0 0 (3) Nonrequested Copies Distributed Through the USPS by Other Classes of Mail 0 0 (4) Nonrequested Copies Distributed Outside the Mail (Include Pickup Stands, Trade Shows, Showrooms, and Other Sources) 851 756e. Total Norequested Distribution 2,059 1,949f. Total Distribution (Sum of 15c and 15e) 44,611 44,624g. Copies not Distributed (OfÞce, Returns, Spoilage, Unused) 974 1,469 h. Total (Sum of 15f and g) 45,585 46,093i. Percent Paid and/or Requested Circulation 95.38% 95.63%16. Electronic Copies Distribution: None Reported17. Publication of Statement of Ownership for a Requester Publication is required and will be printed in the November 2015 issue of this publication18. Signature of FulÞmment Manager: George Severine Date: 9/30/15 PS Form 3526-R, July 2014
November 2015 | POWER www.powermag.com 63
NUCLEAR TECHNOLOGY
ant. Japan’s Monju reactor also closed after
similar problems, including a nasty coolant
fire and a utility and government cover-up.
Last May, the governments of France and
Japan announced they would move forward
with Astrid, aimed at developing a demon-
stration breeder burning spent nuclear fuel
at CEA’s Marcoule site near Avignon on the
Rhone River. In 2011, France put up $900
million to fund Astrid through 2017. Ja-
pan Prime Minister Shinzo Abe and French
President Francois Holland signed a joint
agreement to “intensify their civilian nuclear
research,” while both countries were restruc-
turing their nuclear programs. Japan is still
recovering from the Fukushima disaster,
which led to the shutdown of all of the coun-
try’s nukes, now slowly coming back into
service. France, meanwhile, is aiming to re-
duce its dependence on nuclear, from 75% of
its electricity production down to 50%.
According to the World Nuclear Associa-
tion, “Astrid is envisaged as a 600 MWe pro-
totype of a commercial series of 1500 MWe
[sodium fast reactors] which is likely to be de-
ployed from about 2050 to utilise the half mil-
lion tonnes of [depleted uranium] that France
will have by then and also burn the plutonium
in used MOX fuel. Astrid will have high fuel
burnup, including minor actinides in the fuel
elements, and while the MOX fuel will be
broadly similar to that in PWRs [pressurized
water reactors], it will have 25-35% plutoni-
um. It will use an intermediate sodium coolant
loop, and the tertiary coolant is nitrogen with
Brayton cycle.” CEA says a final decision
on whether to build the Astrid prototype will
come in 2019. As is the case with all advanced
nuclear technologies, the economics of com-
mercial plants are entirely unknown.
Hot, Hot, HotOne weakness of LWRs is the low quality of
their steam, which reduces the efficiency of
the plant. Typical steam outlet temperatures
for PWRs are under 400C, which compares
unfavorably to modern ultrasupercritical
coal-fired plants that operate with steam tem-
peratures above 600C.
Very-high-temperature nuclear reactors
with outlet temperatures around 1,000C are
possible and have actually been demonstrated,
although not commercially in the U.S. The
AEC and the Philadelphia Electric Co. teamed
up on a high-temperature gas reactor (HTGR),
a 40-MW graphite-moderated, helium-cooled
design originated by General Atomics in the
1950s. The unit located at the company’s
Peach Bottom site operated well from 1967 to
1974, with a lifetime capacity factor of 75%.
As a result, Public Service Co. of Colo-
rado, with AEC financial backing, ordered a
300-MW HTGR based on a scale-up of Peach
Bottom—the Fort St. Vrain plant. But that
plant operated poorly from the day it opened
in 1979 until it shut down just a decade later.
Both Peach Bottom and Fort St. Vrain used
large prism-shaped fuel blocks of enriched
uranium surrounded by a graphite moderator.
Since then, much time, effort, and money
have gone into attempts to revive HTGRs,
mostly focused on a General Atomics design
that uses billiard ball–sized “pebbles” con-
sisting of many 9-mm uranium fuel spheres
embedded in graphite (the moderator), sur-
rounded by a ceramic coating. These are
known as “pebble bed reactors.”
According to noted nuclear engineer An-
drew Kadak, an HTGR is fundamentally dif-
ferent from LWRs. The differences include
higher thermal efficiencies, an inert and
noncorrosive helium coolant, lower water
requirements, the use of gas turbine technol-
ogy, and a less-complicated design, because
there is no emergency core cooling system
like those required in LWRs.
Philadelphia Electric, before it was ac-
quired by Exelon Corp. in the early 2000s,
spent some $20 million for a 12% share in a
joint venture with South Africa’s state-owned
Eskom utility to develop a commercial 110-
MW pebble bed HTGR, aimed both at South
African and U.S. markets. After Chicago-
based Exelon took over, spending on the
project stopped in 2002. Eskom continued
work but dropped it in 2010, citing “run-away
costs and technical problems.” According to
Kadak, among the disadvantages of HTGRs
are the poor operating history, “little helium
turbine experience,” and “licensing hurdles
due to different designs.”
Yet industry interest in the HTGR concept
remains. A consortium of New York utilities,
the New York State Energy Research and De-
velopment Agency, National Grid, and South
Africa’s Pebble Bed Modular Reactor Co. in
2013 pitched the design into the U.S. Depart-
ment of Energy’s (DOE’s) second-round com-
petition for financial support for small, modular
reactors (SMRs). That bid was unsuccessful,
losing out to NuScale’s more conventional
LWR-based SMR technology. NuScale is now
negotiating with the DOE over terms and con-
ditions for a cooperative funding agreement.
Nuclear reactor designers have produced a
wide variety of fascinating concepts for alter-
natives to the light-water technology that is the
world’s go-to choice for atomic energy. But
these exotic designs, no matter how elegant, ex-
ist mostly on paper and may not be practical or
economic. For now, LWRs rule the real world. ■
—Kennedy Maize is a frequent contribu-tor to POWER.
T R A I N I N G 0 F I E L D S U P P O R T 0 T E C H N I C A L E X P E R T I S E
appliedbolting.com
1 800 552 19991 802 460 3100
Call for details.
0 No Feeler Gage Required
0 Weatherproof
0 Self-Marking
0 Inspection on Your
Schedule
GET YOUR BOLTING PROGRAM UP TO SPEED
Dura Squirt®DTIs
the best way to bolt!
CIRCLE 24 ON READER SERVICE CARD
www.powermag.com POWER | November 201564
GRADIENT LENS CORPORATION MANUFACTURERS OVER 80 MODELS OF PATENTED HAWKEYE® RIGID, FLEXIBLE, AND VIDEO BORESCOPES
Hawkeye’s offer world-class image quality, overnight delivery, and prices one-half to one-third that of comparable borescopes! Our newest, portable V2 articulating video borescopes display high-quality inspection images on portable video monitors. Any of our rigid or flexible borescopes can also be connected to our Luxxor Portable Video Camera. We sell more industrial borescopes than any other manufacturer. www.gradientlens.com. 800-536-0790.
READER SERVICE NUMBER 25
to subscribe to the e-letter, please visitwww.powermag.com/e-letter-signup
26032
’s premium product showcase for the latest products and technologies in the power generation industry.
November 2015 | POWER www.powermag.com 65
Opportunities in Operations and Maintenance,
Project Engineering and Project Management,
Business and Project Development,
First-line Supervision to Executive Level Positions.
Employer pays fee. Send resumes to:
POWER PROFESSIONALS
P.O. Box 87875Vancouver, WA 98687-7875
email: [email protected]
(360) 260-0979 l (360) 253-5292www.powerindustrycareers.com
POWER PLANT BUYERS’ MART
READER SERVICE NUMBER 202
As the largest inde-pendent operator ofpower facilities inthe industry, we’vecome to be viewedas an employer ofchoice.
As such, we strive to attractand retain employees of
choice by offering highly competitive compensation packages, including an education assistance program that encourages our people to grow along with the company. eoe
FILENAME: NAES_POWERMAGAZINE_PRINT_2015
Cost per Issue
1st - 3rd issues (Mar, Apr, May) $675.00 per issue4th - 6th issues (June, July, Aug) $550.00 per issue6th - 12th issues (Sept - Feb ‘16) $525.00 per issue
or 12 Issues $510.00 per issue
AD 1 AD 2
For more info, visit: www.naes.com/careers As the largest independentoperator of power facilities in the industry, we’ve come tobe viewed as an employer of choice. As such, we strive toattract and retain employees of choice by offering highlycompetitive compensation packages, including an education assistance program that encourages our people to grow along with the company. eoe
For more info, visit: www.naes.com/careers For more info, visit:
www.naes.com/careers
PUBLICATION: POWER MAGAZINESCHEDULE: SEE OPTIONS BELOW
24 / 7 EMERGENCY SERVICE
BOILERS20,000 - 400,000 #/Hr.
DIESEL & TURBINE GENERATORS50 - 25,000 KW
GEARS & TURBINES25 - 4000 HP
WE STOCK LARGE INVENTORIES OF:Air Pre-Heaters • Economizers • DeaeratorsPumps • Motors • Fuel Oil Heating & Pump Sets
Valves • Tubes • Controls • CompressorsPulverizers • Rental Boilers & Generators
847-541-5600 FAX: 847-541-1279WEB SITE: www.wabashpower.com
FOR SALE/RENT
444 Carpenter Avenue, Wheeling, IL 60090
POWER
EQUIPMENT CO.wabash
READER SERVICE NUMBER 201
READER SERVICE NUMBER 203
CONDENSER OR GENERATOR AIR COOLER TUBE PLUGSTHE CONKLIN SHERMAN COMPANY, INC.
Easy to install, saves time and money.
ADJUSTABLE PLUGS-all rubber with brass insert. Expand it, install it, reverse action for tight fi t.
PUSH PULL PLUGS-are all rubber, simply push it in. Sizes 0.530 O.D. to 2.035 O.D.
Tel:(203)881-0190•Fax:(203)881-0178E-mail:[email protected]•www.conklin-sherman.com
OVER ONE MILLION PLUGS SOLD READER SERVICE NUMBER 204
NEED CABLE? FROM STOCKCopper Power to 69KV; Bare ACSR & AAC Conductor
Underground UD-P & URD, Substation Control – Shielded and Non-shielded, Interlock Armor to 35KV, Thermocouple
BASIC WIRE & CABLEFax (773) 539-3500 Ph. (800) 227-4292
E-Mail: [email protected] SITE: www.basicwire.com
READER SERVICE NUMBER 200
READER SERVICE NUMBER 205
www.powermag.com POWER | August 201566 www.powermag.com POWER | November 201566
READER SERVICE NUMBER 210
George H. BodmanPres. / Technical Advisor
Offi ce 1-800-286-6069
Offi ce (281) 359-4006
PO Box 5758 E-mail: [email protected]
Kingwood, TX 77325-5758 Fax (281) 359-4225
GEORGE H. BODMAN, INC. Chemical cleaning advisory services for
boilers and balance of plant systems
BoilerCleaningDoctor.com
READER SERVICE NUMBER 209
CONDENSER & HEAT EXCHANGER TOOLSCLEANERS, PLUGS, BRUSHES
John R Robinson Inc. PH # 800-726-1026
e-mail: [email protected]
Tom Haarala [email protected] Bradley [email protected]
Layup DesiccantDehumidification & Filtration Unitsfor long term layupof power generationequipment. For over35 years of drying solutions contact:
READER SERVICE NUMBER 208
GAS TURBINES FOR SALE
• LM6000 • FRAME 9E • FRAME 5
• LM2500• FT4• OTHERS
50/60Hz, nat gas or liq fuel,installation and service available
Available for Immediate Shipment
www.ethosenergygroup.com/gasturbines
Tel: +1 713.812.2305
READER SERVICE NUMBER 206
PRODUCT Showcase
READER SERVICE NUMBER 211
READER SERVICE NUMBER 211
READER SERVICE NUMBER 207
Silo and Bin Cleaning Services and Equipment
Call 800-322-6653 or visit www.molemaster.com
To Advertise in POWER Classifi eds
CONTACT:
Diane Burleson
PHONE:
512-337-7890
FAX:
512-213-4855
POWER PLANT BUYERS’ MART
POWER
Subscribe today: [email protected]
ADVERTISERS’ INDEXEnter reader service numbers on the FREE Product Information Source card in this issue.
November 2015 | POWER www.powermag.com 67
Apollo Valves …… . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 . . . . . . . .12 www.apollovalves.com
Applied Bolting Technology …… . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63 . . . . . . . .24 www.appliedbolting.com
AREVA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 . . . . . . . . 7 www.us.areva.com
Baldor Electric. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 . . . . . . . . 6 www.baldor.com
Bilfinger Piping Technologies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49 . . . . . . . .21 www.piping.bilfinger.com
CB&I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 . . . . . . . . 3 www.cbi.com
CIRCOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40 . . . . . . . .18 www.circorenergy.com
Clear Span . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62 . . . . . . . .23 www.clearspan.com
Enercon. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 . . . . . . . . 9 www.enercon.com
Gradient Lens . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64 . . . . . . . .25 www.gradientlens.com
Indeck Power Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 . . . . . . . .14 www.indeck.com
KSB . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 . . . . . . . . 8 www.ksbusa.com
Lifting Gear Hire . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 . . . . . . . . 5 www.lgh-usa.com
MD&A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cover 4 . . . . .26 www.mdaturbines.com
NuScale Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 . . . . . . . .15 www.nuscalepower.com
Paharpur. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 . . . . . . . .13 www.paharpur.com
PCL Industrial . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 . . . . . . . . 4 www.pcl.com
Power Techniques . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45 . . . . . . . .20 www.webachutes.com
Safway Services ……. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47 . . . . . . . .27 www.safway.com
Schweitzer Engineering . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53 . . . . . . . .22 www.selinc.com
Sealeze . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 . . . . . . . .10 www.sealeze.com
Sentry Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39 . . . . . . . .17 www.sentry-equip.com
Structural Integrity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 . . . . . . . .16 www.structint.com
Van Beest . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 . . . . . . . .11 www.vanbeest.com
Victory Energy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cover 2 . . . . . 1 www.victoryenergy.com
Westinghouse . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 . . . . . . . . 2 www.westinghousenuclear.com
Zequanox . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 . . . . . . . .19 www.zequanox.com
Page
Reader
Service
NumberPage
Reader
Service
Number
Valerie Thomas Paul Kerl
www.powermag.com POWER | November 201568
COMMENTARY
Reduce Ozone When and
Where It Matters Most
Just as we were drafting this commentary, the U.S. Environ-mental Protection Agency (EPA) issued a new ground-level ozone rule, tightening the standard from 75 to 70 ppb. The
projected human health and environmental benefits are substan-tial. Yet there has been significant concern about tightening the ozone standards because of compliance cost.
As it happens, our research team at the Georgia Institute of Technology recently developed a new way to help meet air qual-ity standards that might reduce the costs of meeting the new ozone rule. Our method is not an end-of-pipe air pollution con-trol technology. Rather, we take advantage of the fact that ozone concentrations vary substantially by day and by hour, depending on the emissions from local and regional sources as well as on atmospheric chemistry and atmospheric conditions such as tem-perature and mixing. Emissions from a specific hour of the day can have a disproportionately large—or minimal—impact on the pollution that forms, owing to the synergy with emissions from other hours combined with the effects of changing winds, atmo-spheric mixing, and sunlight.
What’s interesting about this is that for a power plant operat-ing at full capacity, on some days and at some times the resulting human health impacts may be low, whereas on other days—even similar days at the same time—health impacts can be elevated.
Basically, our method, which we call APOM (for Air Pollution Optimization Model), targets high-impact times, reducing health impacts at a lower cost. During low-impact time periods, the op-erations of power plants do not need to change, minimizing the impact on electricity generation cost. During high-impact times, some generation is either shifted to power plants that will have less effect on ozone concentrations in highly populated regions at that specific time, or generation is reduced using demand management. Because this method can be used when its ben-efits are greatest, and because it is managed entirely through power system operations, without purchase of pollution control equipment, it can reduce ozone levels at lower cost. (See www.apom.gatech.edu for more details and an animation.)
Why Hasn’t This Been Done Before?Power systems use computer models to control the operations of their power plants throughout the day, determining the level at which each power plant should operate as the day progress-es. Our method allows a simplified air quality impact model to be included as part of a power system’s operation model. The simplified “reduced form” air quality model is based on a very comprehensive model, called CMAQ, used by the scientific com-munity, government agencies (including the EPA), and stake-holders worldwide to simulate and study air pollution formation and forecast air quality. CMAQ does a great job, but it is too slow and complex to run the thousands of times needed for APOM.
Using a technique developed by our team called DDM-3D, we can determine from one CMAQ simulation how air quality across a region responds to emissions from power plants and other targeted sources, without repeating CMAQ simulations for
each emissions scenario. This leads to a reduced form model that responds almost exactly like CMAQ to changes in emissions, but instead of taking days to run, takes less than a second.
New Method Still Under DevelopmentIn our first demonstration of this technique, we focused on reduc-ing health impacts in the state of Georgia by using mathematical optimization to quickly sift through a huge number of possible electricity generating patterns. By considering many ways to ad-just power plant operations as the day goes on, balancing ozone impacts with power plant operation costs on an hourly basis every day, the APOM method was able to search out and find low-cost ways to improve air quality and human health.
More needs to be done before this method is ready for broad operational deployment. Also, although our case study demon-stration was done for an electricity generation system, the same method could be applied to industrial sources, transportation sources, and residential sources of ozone-producing emissions.
There are examples of similar approaches that have successfully been incorporated in the operation of electricity systems. One is the use of congestion pricing. When the transmission system is congested, the operator chooses alternative (often more expen-sive) generating units to relieve system congestion in a given region. These prices differ in terms of time and space. Pricing air quality in the same way is now a possibility with this approach.
Facilitating a Broader Mix of GenerationThe key advantage of this approach is that it can find low-cost ways to improve air quality. A second advantage is that it can be applied soon, for existing facilities. While pollution control equipment or replacement of emission sources may be the best approach, the APOM approach can be applied quickly. It can also be applied anywhere in the world. In locations with significant air quality challenges, this approach can provide benefits before pollution control technology can become widespread. A third advantage is that the APOM approach can allow different kinds of emission sources to work together, using market-based ap-proaches, to reduce ozone levels at least cost.
The heart of the APOM approach is to find the lowest cost ways to change operations when it matters most—times when ozone concentrations would be highest. This approach can work with high-emitting sources and, in fact, could allow high-emitting sources to continue operating while contributing to meeting the new air quality standards. Because of this, reliance on the APOM approach is unlikely to be able to substitute for improved tech-nology that will reduce emissions permanently and comprehen-sively. Yet, it can be an opportunity for electricity generators, industrial facilities, and other sources to remain in operation and meet emissions limits at lower costs than they have expected. ■
—Valerie Thomas, Paul Kerl, Juan Moreno Cruz, Athanasios Nenes, Matthew Realff, Armistead Russell, and Joel Sokol are
at the Georgia Institute of Technology; Wenxiang Zhang now works at Trinity Consultants. hdrinc.com
When foresight meets insight, you’re in business.New EPA regulations mean important decisions lie ahead. We’re helping utilities nationwide find practical compliance solutions by breaking down options and stepping through the process holistically. We have the experience and capability to guide you to your best possible outcomes.
hdrinc.com
When foresight meets insight, you’re in business.New EPA regulations mean important decisions lie ahead. We’re helping utilities nationwide find practical compliance solutions by breaking down options and stepping through the process holistically. We have the experience and capability to guide you to your best possible outcomes.
PARTS | SERVICES | REPAIRS
Outage Services Division- Alignment 19 British American Blvd. | Latham, NY 12110
ph. 518-399-3616 | www.MDAturbines.com
Also Experts in:
MD&A’s Topless Alignment® Service eliminates the time consuming and expensive
process of reassembling a steam turbine for “Tops-On” alignment measurements, saving
hundreds of man-hours labor per turbine section. Our Alignment engineers bring both
a depth and breadth of experience to the turbine deck, which contributes to the overall
value we provide as your alignment contractor. Scan QR code for more information.
• Outage Planning• Technical Direction
• Remaining Life Analysis• Steampath Audits
• Vibration Analysis
• Turbine Overhauls