PERMIT APPLICATION Apex Regional Landfill Submitted To: Republic DUMPco Inc. 770 East Sahara Avenue Las Vegas, Nevada 89104 Submitted By: Golder Associates Inc. 1000 Enterprise Way Suite 190 Roseville, CA 95678 USA June 2013 Project No. 103-97145 Permit Application

Transcript of 2014 Apex Operations Plan-web Site-1

Page 1: 2014 Apex Operations Plan-web Site-1

PERMIT APPLICATION

Apex Regional Landfill

Submitted To: Republic DUMPco Inc. 770 East Sahara Avenue Las Vegas, Nevada 89104 Submitted By: Golder Associates Inc. 1000 Enterprise Way Suite 190 Roseville, CA 95678 USA

June 2013 Project No. 103-97145

Perm

it Ap

plic

atio

n

Page 2: 2014 Apex Operations Plan-web Site-1

Table of Contents

Tab Subsection

1 General 1.1 Application form 1.2 Not used 1.3 Not used 1.4 Southern Nevada District Board of Health Permit to Operate a

Solid Waste Management Facility

2 Ownership And Lease Agreement

2.1 Property Ownership 2.2 Lease Agreement (Not Applicable)

3 Approvals 3.1 Business License 3.2 Fictitious Firm Name Approval 3.3 Business Entity Approval 3.4 Certificate Of Occupancy 3.5 Land Use Approval 3.6 Air Control Approval 3.7 Fire Control Approval 3.8 Pollution Control Approval 3.9 Flood Control Approval 3.10 Industrial Waste Discharge Permit 3.11 Stormwater Discharge Permit

3.12 Permit to Operate a Public Water System 4 Design Report 5 Operating Plan 6 Closure 7 Financial Responsibility 7.1 Costs Estimate 7.2 Financial Assurance 8 Plans 8.1 Sign Location Plan 8.2 Waste Management Area Plans 8.3 Reserved 8.4 Emergency Escape Plan 8.5 Employee Facilities Plan 8.6 Equipment Storage And Maintenance Plans 8.7 Access Roads Plan 8.8 Buffer Zones Plan 8.9 Landscape Drawings Plan (not used) 8.10 Traffic Routing Plan 8.11 Process Flow Diagram 8.12 Reserved 8.13 Stormwater Flow Plan 9 Photographs 9.1 Aerial-View Photographs

9.2 Street-View Photographs 9.3 Other Photographs (not used)

10 Miscellaneous 10.1 Directions To The Facility 10.2 Equipment List 10.3 Volume-To-Weight Conversion Factors (not used) 10.4 Exemption From Landfill Location Restrictions 10.5 Zoning Maps 10.6 Other Documents

Page 3: 2014 Apex Operations Plan-web Site-1

10.7 Special Waste Management, Policies and Procedures Manual 10.8 Asbestos Acceptance and Disposal Procedures 10.9 Sludge Acceptance and Disposal Procedures 10.10 Radiation Monitoring Procedure 10.11 Special Waste Handling Procedures 10.12 Litter Control Plan 10.13 Sulfur Analytical Data

10.14 Operations and Maintenance Manual for the Apex

Bioremediation Facility And Liquid Solidification Area 10.15 Greenhouse Gas Monitoring Plan 10.16 Quality Assurance Project Plan for Continuous H2S Monitoring 10.17 Slope Variance

11 Waste Characterization Not Applicable 12 Initial Volumetric Survey 13 Last Volumetric Survey 14 Plans For Landfill Covers 15 Plans For Landfill Gas Control 16 Plans For Leachate Control 16.1 Base Grading Plans 16.2 1994 Alternative Liner Design 16.3 Operations and Maintenance Manual for On-site Tank Storage 16.4 Leachate Management Plan 17 Plans For Water Monitoring 17.1 Well Locations and Boring Logs 17.2 Groundwater Monitoring Plan

Page 4: 2014 Apex Operations Plan-web Site-1

1 GENERAL

Page 5: 2014 Apex Operations Plan-web Site-1

1.1 APPLICATION FORM

Page 6: 2014 Apex Operations Plan-web Site-1
Page 7: 2014 Apex Operations Plan-web Site-1
Page 8: 2014 Apex Operations Plan-web Site-1

1.2

NOT USED

Page 9: 2014 Apex Operations Plan-web Site-1

1.3

NOT USED

Page 10: 2014 Apex Operations Plan-web Site-1

1.4

SOUTHERN NEVADA DISTRICT BOARD OF HEALTH PERMIT TO OPERATE A SOLID WASTE MANAGEMENT FACILITY

Page 11: 2014 Apex Operations Plan-web Site-1
Page 12: 2014 Apex Operations Plan-web Site-1

_X_Ciasa I Di~poaal Site - • ., ..... , U4.17CIIl

2. ow,_ and l..aqal o-r~prlan or rn. Foalllry:

Silver State Disposal Servrce, Inc.

T18S, R64E, Sections 7 and 8

5. P~trmitt~td D11aign Param11tera:

Disposal Area (In acres) Disposal Capacity On cubic yards)

6. Solid Waste Permitted for Disposal:

Clesa If Dlapoeal Sit11 --._IOIN4CU&.I7l

Silver State Disposai.Service, Inc. Mr. Tom Isola, Vice President 770 East Sahara Avenue Las Vegas, NV 89104

LF002-G3X-01

Cl11as Ill Disposal Sits --a-. 11~1! """'17tl5 •

4. Nama Md..Molllrq Mdr- ol Op.<arar PI dlll..-ant lrom p.<mln .. l:

Disposal Urban Maintenance Processing Company, Inc ..

D.U.M.P. Co. 770 East Sahara A venue Las Vegas, .NV 89104

1015 Maximum Elevation (feat AMSLJ: 2900 784,000,000. Maximum Depth (feet AMSL):

_x_ Municipal Solid Waste S.C. 94/NAC 444.6S1

J_ Industrial Waste Sec. 112JNAC 444.686

2170

_X_ Special Wastes S..O. 106/NAC 444.848 Jt::e: Wfl~~ 444.ss2

Specific Industrial end special wastes permitted for diapossl: As Identified in Sac. 92/NAC 444.595. No restrictions, as provided for within thoaa specified regulations.

7. Prohibitions: No .hl!l:ardous wastes. No liquids. Liquid septsge and other non-hazardous liquid wastes era solidified prior to disposal.

8. The following documents as approved by the Clark County Health District also describe and/or restrict the operation of this facility and are incorporated as conditions of this permit: a. Permit application of Solid Waste Disposal Operation, May 25, 1 993. b. Clark County Health District letter, 0. Ravenholt, M.D., August 25, 1993. c. Clark County Health District l11rter, C. A. Schmutt, Environmental H11alth Director, AprilS, 1994.

9. The following conditions are also incorporetad as a part of this permit:

The Class I disposal site is to be operated in compliance with the approved Operations Plan, known as Vector Engineering, Inc., Job #935015.00, Rev. 1, October 1993. Said plan will be amended and chang11d as n11cesaary to enaur11 continuad compliance with State and Health District Regulations.

10. Findings: The capacity of this disposal site is expected to provide adequata service to the' community untii ______ ,:.2""0;:8=4!'.....-----

IIATE

1 1. This permit is approved bas11d o~ the information givan in the permit application, and subsequent amendments approved by the Clark County Health District. This permit may be modifiad by the District if tho statutes or r11gulations upon which th11 issuance of the p11rmit is based change, or if a modification is otherwise necessary to protect public health and safety and the environment. Any discr11panciea &etween information contein11d in the p11nnit application and the actual construction and op11ration of tho facility may be gtounds for r11vocation of this p11rmit and approprieta enforcement action. The pennitteo must Inform the District of any deviation from or change in the information in the application which may affect the permittee's ability to comply with applicable ragulations or conditions of the

" RBrmit. This permit may be r11voked if written notice is given by th11 District and compliance with p11rmit conditions and applicable statutes Jd regulations is not maintained.

Signature of Approving Authority: Name and Title of Approving Authority: Clare A. Schmutz, R.S. Environmental Health Director

Datil of P11rmit:

November 8, 1994

Page 13: 2014 Apex Operations Plan-web Site-1

1. CLASS OF DISPOSAL SITE:

Cless I Disposal Site --s-. 8D/AAC UA..S70S

2. Owner and Logal o..,crlptlon of tho FacUlty:

Silver State Disposal Services, Inc.

T1 BS, R64E, Sections 7 & 18

5. Permitted Design Parameters:

Class II Disposal Site --. s- 00/IIA.C UL.571

.3. N•mo end Malllna Addrcu of Pormln:ca:

Silver $ta:te .Disposal .Ser.vices, .Inc. Mr. Tom Isola, Vice President 770 East Sahara Avenue Las Vegas, NV 89104

X Class Ill Disposal Site ---GI/AAC "'-5715

4. Name •nd-M•IIIno Addro:u of Opentor Of dlff«ent from pormlnoo)'

Environmental Technologies of Nevada, Inc.

Johnnie Isola, General Manager 770 East Sahara Avenue Las Vegas, NV 89104

Disposal Area (in acres) 218 Maximum Elevation (feet AMSL): 2900

Disposal Capacity (in cubic yards) 81 ,000,000. Maximum Depth (feet AMSL): 2350

6. Solid Waste Permitted for Disposal: Municipal Solid Waste _X_ Industrial Waste -- Soc. 94/NAC 444.691 Soc. 92/NAC 444.686

X Special Wastes -- Soc.106/NAC444.846

~~~ ,m~~ 444.862

Specific Industrial and special wastes permitted for disposal: As defined in Sec. 92/NAC 444.585. Bio-Ramediation site is NDEP permitted.

7. Prohibitions: No hazardous wastes No liquids into the landfill.

8. The following documents as approved by the Clark County Health District also describe and/or restrict the operation of this facilitY and era incorporated as conditions of this permit: · a. Permit Application of Solid Waste Disposal Operation, May 25, 1993. b. Clark County Health District letter, 0. Ravanholt, M.D., August 25, 1993, c. NDEP authorization to discharge permit #TNEV 9201.7 (Temporary expired May 15, 1994. Permanent permit is pending).

9. The following conditions era also incorporated aa a part of this permit: Tho bio-ramadiation operation wm continue as permitted by the Nevada Division of Environmental Control, Bureau of Water Pollution Control.

10. Findings: . Ths capacity of this disposal site is expected to provide adequate service to the community until _____ --'2::,:..,14::::7,:-____ _

DATC

11. Thia permit is approved based on the information given in the permit application, and subsequent amendments approved by the Clark County Health Distril:t. This permit may be modified by the District if the statutes or regulations upon which the issuance of the permit is based change, or if

0a modification is otherwise necessary to protect public health end eafety and the environment. Any discrepancies

between information contained in the permit application and the actual construction and operation of the facility may be grounds for .revocation of this pe~mit and appropriate enforcement action. The permittee must inform the District of any deviation from or change in the informetion in the application which may affect the permittee's ability to comply with applicable regulations or conditions of the permit. This permit may be revoked if written notice is given by the District and compliance with permit conditions and applicable statutes B_Qd regulations; is not maintainBd.

Signature of Approving Authority: Name and Title of Approving Authority: Clare A. Schmutz, R.S. Environmental Health Director

Date of Permit:

November 8, 1994

Page 14: 2014 Apex Operations Plan-web Site-1

2 OWNERSHIP AND LEASE

Page 15: 2014 Apex Operations Plan-web Site-1

2.1 PROPERTY OWNERSHIP

Page 16: 2014 Apex Operations Plan-web Site-1

Owner

REPUBLIC DUMPCO INC

REPUBLIC DUMPCO INC

REPUBLIC DUMPCO INC

REPUBLIC DUMPCO INC

REPUBLIC DUMPCO INC

REPUBLIC DUMPCO INC

REPUBLIC DUMPCO INC

REPUBLIC DUMPCO INC

REPUBLIC DUMPCO INC

REPUBLIC DUMPCO INC

REPUBLIC DUMPCO INC

REPUBLIC DUMPCO INC

REPUBLIC DUMPCO INC

REPUBLIC DUMPCO INC

REPUBLIC MTGE LL C

REPUBLIC MUSICANA L L C

REPUBLIC MUSICANA LL C

REPUBLIC SILVER STATE DISPOSAL

REPUBLIC SILVER STATE DISPOSAL

REPUBLIC SILVER STATE DISPOSAL

REPUBLIC SILVER STATE DISPOSAL

REPUBLIC SILVER STATE DISPOSAL

REPUBLIC SILVER STATE DISPOSAL

REPUBLIC SILVER STATE DISPOSAL

REPUBLIC SILVER STATE DISPOSAL

Owner Name Search Results

Click on the associated button to map the selection.

Owner2 Address

0

0

13550 N lAS VEGAS BLVD

0

0

0

0

13550 N lAS VEGAS BLVD

0

0

0

0

0

0

2829 SOFT HORIZON WY

0

2800 PALOMINO LN

333 W GOWAN RD

0

315 W CHEYENNE AVE

209 W CHEYENNE AVE

0

0

0

0

·. jljext25Records ».·I

http://gisgate.co.clark.nv.us/openweb/asp/owner.asp

Page 1 of 1

Parcel#

1, 171v;3· 1,30ao···DO.-. :.·.8 f ... · .v .. H... . I

I . -. :~ . . . - ..

. -~iJ:3.:~f~~ctiQQ4 ..

I I

8/21/2007

Page 17: 2014 Apex Operations Plan-web Site-1

Affix R P T.T $6,087.50

GRANT, BARGAIN, SALE DEED

THIS INDENTURE WITNESSETH: That

Silver State Disposal Service, Inc., a Nevada corporation, successor by merger to Disposal Urban Maintenance Processing Co., Inc .. a Nevada corporation, Silver State Disposal Service, Inc., a Nevada corporation and Environmental Technologies of Nevada, Inc.

in consideration and other valuable consideration, the receipt of which is hereby acknowledged. do hereby Grant, Bargain, Sell and Convey to

Republic Dumpco,lnc., a Nevada corporation

all that real property situated in the County of Clark, State of Nevada, bounded and described as follows:

See Exhibit A attached hereto and made a part hereof.

"" APN 540-270-039, 540-270-041, 540-270-042, 540-270-043, 540-270-044, 540-280-034, 540-280-035, 540-290-026, 540-290-028, 540-290-029, 540-290-030, 540-290-033,540-290-025,540-290-027

Subject to: 1. Taxes for the current fiscal year, paid current. 2. Conditions, covenants, restrictions, reservations, rights, rights of way and easements

now of record, if any.

Together with all and singular the tenements, hereditaments and appurtenances thereunto belonging or in anywise appertaining.

Witness my/our hand(s) this _ __::2=-.7_2. __ day of

Silver State Disposal Service, Inc., a Nevada corporation

By: Joseph L. kooea, Prestdent

Anstett

Environmental Technologies of Nevada, inc

By:c::;;::

Thomas A. Isola, ·President

STATE OF NEVADA

COUNTY OF Clark ) ss.

.)

On this __________________________ ___

appeared before me, a Notary Public,

Joseph l. Anstett coi

Th:rras A. Isola

personally known or proven to me to be the person whose name is subscribed to the above instrument. who acknowledged that he executed

the .instru~· ent for the *rposes therein

contained. ) '·f-t.' al c /) •

. [).; J - ':t_l,.,t:...P L

Notary Public

My commission expires:

1-ktaryPublv;· Sta!&OINoe\la:rla COUNTY OF Cl.AFll<

CAI10t.t A. FOElXER "'"""'""''-'<n>k~.l"'

Escrcv: No. 97902808

When recorded, mail to:

Republic Silver State Disposal, Inc.

770 East Sctmo Avm..e Las Vff)3S, tN ~

Page 18: 2014 Apex Operations Plan-web Site-1

PARCEL 10:

Government Lot Eleven (II) in Section 13, Township 18 South, Range 63 East M.D.B.&M., Clark County, Nevada.

PARCEL 11:

South Half(S 1/2) of the South Half(S l/2) of the Southeast Quarter {SE J/4) and the South Half(S 1/2) of the Southeast Quarter (SE l/4) of the Southwest Quarter (SW 114) of Section 7, Township 18 South, Range 64 East, M.D.B.&M., Clark County, Nevada. ,..

PARCEL 12:

Government Lots Five (5), Six (6), Twelve (12), Thirteen (13) and Fourteen (14) and the North Half(N l/2) of the Southeast Quarter (SE l/4) ofthe Northwest Quarter (NW 1/4) and the Northeast Quarter (NE 1/4) of the Northwest Quarter (NW 1/4) of Section 18, Township 18 South, Range 64 East, M.D.B.&M., Clark County, Nevada.

PARCEL i3:

Government Lots Six (6), Seven (7), Eight (8) and Nine (9) in Section !9, Township 18 South, Range 64 East, M.D.B.&M., Clark County, Nevada.

PARCEL 14:

Resurvey Tract 37, also known as KELLY PLACER MINfNG CLAIM all lying in Sections !8 and 19, Township l& South, Range 64 East.

TOGETHER WITH all rights held by Grantor (if any) to prospect for, mine and remove all valuable minerals found in subject property.

RESERVING THEREFROM all interest in oil, gas and other hydrocarbonous substances, without the right of surface entry.

Page 19: 2014 Apex Operations Plan-web Site-1

Exhibit A

£ARCEL l:

Government Lots One (I), Two (2), Ten (10), Twelve {12), Thirteen (13), and Twenty­Five (25) in Section 13, Township 18 South, Range 63 East, M.D.B.&M., Clark County, Nevada.

PARCEL2:

Southeast Quarter (SE l/4) in the Southeast Quarter (SE l/4) in Section I 3, Township l8 South, Range 63 East, M.D.B.&M., Clark County, Nevada.

PARCEL. J;

Government Lots One (I), Two (2), Eight (8), Nine (9), Ten (lO) and Fourteen ( 14) in Section 24, Township I& South, Range 63 East, M.D.B.&M., Clark County, Nevada.

PARCEL 4:

East Half(E 1/2) and the East Half(E 1/2) of the Southwest Quarter (SW 1/4) of Section 24, Township 18 South, Range 63 East, M.D.B.&M., Clark County, Nevada.

PARCEL 5:

Government lots Seven (7) through Eleven (II) inclusive and Government Lot 15 in Section· I 8, Township 18 South, Range 64 East, Clark County, Nevada.

PARCEL 6;

The North Half (N l/2) of the Northeast Quarter (NE l/4) and the South Half (S 1/2) of the Southeast Quarter (SE 1/4) of the Northwest Quarter (NW l/4) of Section 18, Township 18 South, Range 64 East M.D.B.&M., Clark County, Nevada.

PARCEL 7:

Government Lots Five (5), Ten (I 0), Eleven (11 ), and Twelve (12) in Section 19, Township I 8 South, Range 64 East, M.D.B.&M., Clark County, Nevada.

PARCEL 8:

The East Half (E l/2) of the Northeast Quarter (NE l/4 ), the East Half (E l/2) of the Southwest Quarter (SW l/4) and the Southeast Quarter (SE 1/4) of Section l9, Township 18 South, Range 64 East, M.D.B.&M., Clark County, Nevada.

PARCEL9:

The North Ha!f(N l/2) of Section 20, Township 18 South, Range 64 East, M.D.B.&M., Clark County, Nevada.

Page 20: 2014 Apex Operations Plan-web Site-1

OUIICLI\IM D! I D

Dated this -=.?.1__ day ot A uJ r.d r , 199 _:z_

For ) and other valuable consideration, receipt of which is ad<noN!edged, ·, ENVIRONMENTAL TECHNOlOGIES OF NEVADA, INC., a Nevada corporation, the

undersigned, does hereby REMISE, RELEASE, am FOREVER QUITCLAJM to: REPUBUC ENVIRONMENTAL TECHNOlOGIES, INC., A NEVADA CORPORATION, allot its right,

. .- title and interest in the foi!ONing described real property in the State of Nevada, County of Clarlc

WATER RIGHTS KN0\1\N AS DIVISION OF WATER RESOURCES PERMIT NUMBERS

53322 ANNUAL DUTY OF 68.5 ACRE FEET 59237 ANNUAL DlJfY OF 68.5 ACRE FEET 60023 ANNUAL DUTY OF 68.5 ACRE FEET 60024 ANNUAL DUTY OF 68.5 ACRE FEET, AND 61041 ANNUAL DUTY OF 194.0 ACRE FEET.

AS REGISTERED IN THE OFFICE OF THE STATE ENGINEERS OF THE STATE OF NEVADA

IN \MTNESS \M-!EREOF, IM/e hereunto set my hand/oor hands this Q day of cfrcJv J C , 199_2

EI'MRONMENTAL TECHNOLCGIES OF NEVADA, INC., a Nevada corporation

B ~ Sig

ffoc.wj 6. _IlcJc;__ Print Narre

Its 8 e > r'd<tlf f-

CCXJNTY cr C loc\: ) ) SS.

en ttisfl__ctay of ~r::f . 199l ~ly a~ed t:clOfe:a No\ary Pta:Xic

~ly knoM1 to rre to be the person vkose narre(s) is subscribed to the above instrurrent v.hl ackncJIMedgej that _he_ executed the instn..rrent.

WTNESS my hard ard official seal

Signatue

Print NaTe

MAJL TO 'PE>\)....\)\1 c.. Env ,rcr\IN:'1'\k<-l Tt'Ch!''-'U}f-.s,

/IC: f. SoJ,o..ro ~ LJs, Ve'ff"j /v v 8CJ tuf

If applical:Xe rrail tax staterrents to:

SPACE BELON1H!S UNE Fffi REcc::RCERS USE. OOLY

Page 21: 2014 Apex Operations Plan-web Site-1

I

/

''·'·'·''• ·.·. -...

. ·~·;

l}

\, ) ss. OF C\O\~ )

,.. known to me to be the person whose name(s)

•.• ....,,.nt\&>1'1 to the above instrument who acknowledged ·--- executed the instrument.

MAIL TO:

If applicable mail tax statements to:

SPACE BELOW THIS LINE FOR RECORDERS USE ONLY

Page 22: 2014 Apex Operations Plan-web Site-1

\._ ------QUITCLAIM DEED

Dated this )l day of G_uws'f '199_}

For } and other valuable consideration, receipt of which is acknowledged,

SILVER STATE DISPOSAL SERVICE, INC., as successor by merger to DISPOSAL URBAN MAINTENANCE PROCESSING CO., INC., a Nevada corporation, also known as DUMPCO, Inc.,

does hereby REMISE, RELEASE, and FOREVER QUITCLAIM to:

REPUBLIC DUMPCO, INC., a Nevada corporation

the following described real property in the State of Nevada, County of Clark:

SECONDARY WATER RlGHTS KNOWN ~ DIVISION OF WATER RESOURCES PERMIT NO. 52099-Sl FOR 100 ACRE FEET PER YEAR.

As registered in the office the State Engineers for the State of Nevada.

IN WITNESS WHEREOF, lf\Ne hereunto set my hand/our hands thisdl day of Clu_cyxs[, 199l SILVER STATE DISPOSAL SERVICE, INC.,

a Ne~v a corporation

by Signa re Signature

JostOI\ L-a t'\~)it:# Print Name ' Print Name

irs \\- fsicle J-

-------~-------------~------------

Page 23: 2014 Apex Operations Plan-web Site-1

\ .. ---·-STATE OF NEVADA

) ss. COUNTY OF (_ \C-( t

On this~ day of a1J.~(':} , 199~ personally appeared before e, a Notary Public

jC>Seph L. Or6'kf+

personally known to rm! to be the person whose name(sl is subscribed to the above instrument who

RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO:

If applicable mail tax statements to:

acknowledged that __ he __ executed the instrument. SPACE BELOW THIS LINE FOR RECORDERS USE ONLY

WITNESS my hand and official seal

NOTARY PUBLIC

158l,.OI.LA (C7B0ll.DOC) r:YM26197 10:41 am

Page 24: 2014 Apex Operations Plan-web Site-1

\ ... ·---OUITCLAIM DLLD

,199.l_

For $ and other valuable e:onsideratioo, receipt of which is ac:kncmledged,

SILVER STATE DISPO&'J.. SERv1CE, INC., as successor 1:¥ merger to DISPOSAL URBAN MAlNTENAt-Kl: PROCESSING CO., INC., a Nevada oxporation, also knoNn as C'UJPCO, Inc.,

does hereby ReviSE. RElEASE, and FOREVER OOTCI.AJM to:

REPUBliC DlJPIPCO, INC., a Nevada corporation

the follo.ving described real property In the State of Nevada, County of aaoc

SECONDARY.WA 1ER RIGHI'S KNOWN AS DMSION OF WA1ER RESOURCES PERMIT NO. 49177 S-2 FOR (!3.44 ACRE FEET PER YEAR) 0.02 cfs SECOND FEET.

As registered in the office of the State Fnginetts for the State of Nevada

S I A IE U' NEVNJll:

personally knc:H.n to rre to be the pefSOI1 v.flose !'lal"lle(s) is Sl..bsaibed to the atx:Ne instn.rrent .....t.o ac:l<noMedged that _he_ executed the instrurent

V\4TNESS IT¥ hand ard offidal sea!

N<YFUBUC .

I~Rl~Ot I./\ IC/Pill' fl(lC'I

I REcrntlNG RBXJES I ED BY MD V\flEN RECCf([EJ MAJL TQ

If appic;at:je rrail tax s!aterreris to:

SPACE BELONTHlS UNE FCR RECORDERS USE CNLY

Page 25: 2014 Apex Operations Plan-web Site-1

N-51810

WHEREAS

9 'b~ 14tmt~ l)tlt~~ Qf $1mertta tEo aU to wf)om tf)en pre•tnts lball tomt, 6rtttin(l:

!:11Gt d T C) ,' b ~' n +-j CF c? LA-Rl<

2() I e , (!_ f Q r' I< L v A-f v rq 1 o J

County of Clark, a political subdivision of the State of Nevada

is entitled to a patent pursuant to the Act of July 31, 1989 (103 Stat. 168), for the following described lands:

Mount Diablo Meridian, Nevada

T. 18 S., R. 63 E., sec. 13, lots 1, 2, 10, 12,

13, 25, SE~SE~; sec. 24, lots 1, 2, 8, 9, 10,

14, E~, E~SW\.

T. 18 S., R. 64 E., sec. 18, lots 7 to 11, inclusive,

lot 15, N~NE~, S~SE\NW\; sec. 19, lots 5, 10, 11, 12, E~NE\,

E~SW\, SE\; sec. 20, N~.

containing 1,716.64 acres; and

NOW KNOW YE, that there is, therefore, granted by the UNITED STATES, unto the County of Clark, a political subdivision of the State of Nevada, the lands described above; TO HAVE AND TO HOLD the lands with all the rights, privileges, immunities and appurtenances of whatsoever nature, thereunto belonging unto the County of Clark, a political subdivision of the State of Nevada, its successors and assigns, forever; and

EXCEPTING AND RESERVING TO THE UNITED STATES:

I. A right-of-way thereon for ditches or canals constructed by the authority of the United States. Act of August 30, 1890 (43 u.s.c. 945).

2. All the oil and gas mineral deposits in the lands so patented, and to it, its permittees, licensees and lessees, the right to prospect for, mine and remove the minerals owned by the United States under applicable law and such regulations as the Secretary of the Interior may prescribe. This reservation includes necessary access and exit rights and the right to conduct all necessary and incidental activities including, without limitation, all drilling operations~ storage and transportation facilities deemed reasonably necessary.

Parent Sumber 27·98-0027

9/6- :; '~ v-c r r-- 1 54 o -J- \' o-cou; APN# f-br--hc;ns 0-f 5ctO- J(f()- OU7; o \ '?:>. o I q, 0 ~ 0

Page 26: 2014 Apex Operations Plan-web Site-1

I

N-51810

• "' • q ;,.;: (I 6 3 0 0 T\ ~~ 4 '

,.) v ·~..: .... ,J

Unless otherwise provided by separate agreement with the surface owner, permittees, licensees and lessees of the United States shall reclaim disturbed areas to the extent prescribed by regulations issued by the Secretary of the Interior.

All causes of action brought to enforce the rights of the surface owner under the regulations above referred to shall be instituted against permittees, licensees and lessees of the United States; and the United States shall not be liable for the acts or omissions of its permittees, licensees and lessees.

SUBJECT TO:

1. Those rights for highway purposes granted to the State of Nevada, Department of Transportation, its successors or assigns, by right-of­way No. CC-018337, pursuant to the Act of November 9, 1921 (42 Stat. 216), as to lots 1, 10, 12 and 25 of sec. 13, and lots 1, 8, 9, 14, and the W~NE~ and E~SW~ of sec. 24, T. 18 s., R. 63 E., MDM.

2. Those rights for highway purposes g~~ated to the State of Nevada, Department of Transportation, its successors or assigns, by right-of­way No. Nev-057852, pursuant to the Act of August 27, 1958 (23 U.S.C. 317), as to lots 2 and 13 of sec. 13. and lots 2 and 10 of sec. 24, T. 18 S., R. 63 E., MDM.

3. Those rights for railroad purposes granted to the Los Angeles and Salt Lake Railroad Company, its successors or assigns, by right-of­way No. CC-0360, pursuant to the Act of March 3, 1875 (43 u.s.c. 934-939), as to lots 12, 25, and the SE\SE\ of sec. 13, and lots I, 8, 9, 14, and the W~NE~ and E~SW~ of sec. 24, T. 18 s., R. 63 E., MDM; and lots 7, 8, 11, and the N~NE~ and S~SE~NW\ of sec. 18, T. 18 S., R. 64 E., MDM.

4. Those rights for material site purposes granted to the State of Nevada, Department of Transportation, its successors or assigns, by right-of-way No. Nev-058486, pursuant to the Act of August 27, 1958 (23 u.s.c. 317), as to lots land 2 of sec. 24, T. 18 s., R. 63 E., MDM.

5~ Those rights for powerline purposes granted to Nevada Power Company, its successors or assigns, by right-of-way No. N-51925, pursuant to the Act of October 21, 1976 (43 u.s.c. 1761), as to lots 2 and 10 of sec. 13~ T. 18 s., R. 63 E., MDM; and lots 10 and 11 of sec. 18, T. 18 S., R. 64 E., MDM.

2''i- ~3- 0027 Phi~ttf iiU. ---~"""""-==~ ..... --------.......

Page 27: 2014 Apex Operations Plan-web Site-1

Form 1860-10 (Aprill988)

• 9 ..,__·: 'r u ' !) ..

~;

0 " n .. t4 ·:J u '·"\

N-51810

6. Those rights for access road purposes granted to Silver State Disposal~ Inc~, its successors or assigns, by right-of-way No. N-52047, pursuant to the Act of October 21, 1976 (43 u.s.c. 1761), as to lots 12, 25, and the SE~SE~ of sec. 13, T. 18 S., R. 63 E., ~IDM; and lot 11 of sec. 18, T. 18 S., R. 64 E., MDM.

7. Those rights for communication line purposes granted to Central Telephone Company, its successors or assigns, by right-of-way No. N-52539, pursuant to the Act of October 21, 1976 (43 u.s.c. 1761), as to lots 12 and 13 of sec. 13, T. 18 S., R. 63 E., MDM; and lots 10 and 11 of sec. 18, T. 18 s., R. 64 E., MDM.

~fl'URN TO: ~HWADA TITLEQQ.

; ~- - .. ., . ~., ·.

,2 7-9 3- 0 0 2 7 Patent Number---------

f:-; TES1tMOJ'Y WHEREOF, the undersigned authorized officer of the Bureau of Land Management, in accordance with the provisions of the Act of June 17. 1948 (62 Stat. 476), has, in the name of the United States. caused these lett erg to be made Patent. and the Seal of the Bureau to be hereunto affixed.

GIVEN under my hand, in r.as Vegas, Nevada the TWENTY-NINTH day of JUNE in the year of our Lord one thous.nd nine hundred andNINETY-THREE

tnd of the Independence of the United States the two hundred and SEVENTEENTH

. Chief, Branch of lands and Minerals Operatior~s

Page 28: 2014 Apex Operations Plan-web Site-1

:.~ :

· .. · .. ··

-. ~ {•.

.. : .. ;:

.. _., .

. .. -~>~~:>~-~~-:·:~:~~-~<>t .. y •

·' :~ ...... ~ ...... ~=-- .... "!:~ ; . 4

. ::.. ··.~

. ·-: ~~::x :- ~,:.

Page 29: 2014 Apex Operations Plan-web Site-1

~cr- 9 r""l s -; 0 0 ........ ~ £1 I., ., ; v u ,) •--' ,:;...,

GRANT, BARGAIN, SALE DEED

THIS INDENTIJRE wlTN~SSETH, That County of Clark, a political subdivision, for a valuable

consideration, the receipt of which is hereby acknowledged, do hereby Grant, Bargain, Sell and Convey to

Silver State Disposal Service, Inc., all that real property situated in the County of Clark, State of Nevada,

bounded and described as follows:

See Exhibit "A" attached hereto and by this reference made a part hereof

portions of APN: 540-290-007, 540-290-013, 540-290-019,540..290-020, 540-270-018, and 540-280...006 RPTT: Exempt 2

SUBJECT TO:

1. Taxes for the current fiscal year, not delinquent, including personal property taxes of any former owner, if any:

2. Restrictions, conditions, reservations, rights, rights of way and easements now of record, if any, or any that actually exist on the property.

TOGETHER WITH all singular the tenements, hereditaments and appurtenances thereunto belonging or

in anywise .<\ppertaining.

IN WITNESS WHEREOF, this instrument bas been executed this~ day of _-'1}'"-'u..=n~e:::-___ __, 1993.

DEED.DOC

Page 30: 2014 Apex Operations Plan-web Site-1

deed Page2 9

County of Clark, a political subdivision

STATEOFNEVADA} }SS

County of Clark }

(l.!> this.;{~ of fi!Md.r , 19~ before me a Notary Public personally appeared 3) o fi )--sfitL£:SaJC- personally known to me (or proved to me on the basis of satisfactory evidence) to be the person whose name is subscribed to this instrument and acknowledged that he (she or they) executed it.

8

ESTHER M. FINE NOTARY PUBLIC- NEVADA

COUNTY OF CLARK My Appt. Expires March 6, 1997

Recorded at the Request of: l'<~vada Title Company Escrcw No: 93-o¥~1R9tt ~n?t:.

Mail tax bill to and When recorded mail to:

DEED. DOC

Page 31: 2014 Apex Operations Plan-web Site-1

EXHIBIT "A"

PARCEL I:

Government Lots One (1), Two (2), Ten (10), Twelve {12), Thirteen (13), and Twenty­five (25) in Section 13, Township 18 South, Range 63 East, M.D.B.& M.

PARCEL II:

Southeast Quarter (SE 1/4) of the Southeast Quarter (SE 1/4) of Section 13, Township 18 South, Range 63 East, M.D .B.& M.

PARCEL Ill:

Government Lots One (1), Two (2), Eight (8), Nine (9), Ten (IO), and Fourteen (14) in Section 24, Township 18 South, Range 63 East, M.D.B.& M.

PARCEL IV: Ca. l... AND1?ft'--

East one-half (E 1/2) ){ the East half (E 1/2) of the Southwest Quarter (SW 1/4) in Section 24, Township 18, Range 63 East, M.D.B.& M.

PARCELV: 7~-A~O f2'JS'

· Government lots Seven (7) through Eleven (11) inclusive )( Government Lot 1 5 in Section 18, Township 18 South, Range 64 East

PARCEL VI:

The North one-half (N 1/2) of the Northeast Quarter (NE 1/4) and the South half (S 1/2) of the Southeast Quarter (SE 1/4) of the Northwest Quarter (NW l/4) of Section 18, Township 18 South, Range 64 East, M.D.B.& M.

Page 32: 2014 Apex Operations Plan-web Site-1

9 J o 6 3 o o n s 4 2

PARCEL VII:

Government Lots Five (5), Ten (10) , Eleven (ll), and Twelve (12) in Section 19, Township 18 South, Range 64 East, M.D.B.& M.

P A.&~CEL VIII:

The East half (E 1/2) of the Northeast Quarter (NE 114) , the East half (E 1/2) of the Southwest Quarter (SW 1/4) and the Southeast Quarter (SE 1/4) of Section 19, Township 18 South, Range 64 East. M.D.B. & M.

PARCEL IX

The North one half(N l/2) of Section 20, Township 18 South, Range 64 East, M.D.B.& M.

RE.TURN 10: NE.V AIDA 1'J1LE CO,

Page 33: 2014 Apex Operations Plan-web Site-1

2.2 LEASE AGREEMENT (NOT APPLICABLE)

Page 34: 2014 Apex Operations Plan-web Site-1

3

APPROVALS

Page 35: 2014 Apex Operations Plan-web Site-1

3.1 BUSINESS LICENSE

Page 36: 2014 Apex Operations Plan-web Site-1
Page 37: 2014 Apex Operations Plan-web Site-1

3.2 FICTITIOUS NAME APPROVAL

(NOT USED)

Page 38: 2014 Apex Operations Plan-web Site-1

3.3 BUSINESS ENTITY APPROVAL

Page 39: 2014 Apex Operations Plan-web Site-1

REPUBLIC DUMPCO, INC.

I JJJew Search J 4.._._.._:..i.>;_.~~j f ~late~) .:~ ·~=

B~slne$s Entity Information

lltatus: Active File Date: OE!/0511997

Type: Domestic CorJioratlon Ent~ N!Jmb!ilr: 016814-1997

Qualifi!i!Jg State: NV List Qf Offic~rs Du!i!: 08/31/201~

Msm~g~d B:l: ExQiration Date:

NV By~in~ss ID: NV19971237190 Busin!i!§§ Li~nse ExQ: 08(31/2013

Additional Information

Central Index Key I Registered Agent Information

Name: THE CORPORATION TRUST COMPANY OF Address 1: 311 S DIVISION ST NEVADA

Address 2: City: CARSON CITY

State: NV Zip Code; 89703

Phone: Fax:

Mailing Address Mailing Address 1: 2:

Mailing City: Mailing State: NV

Mailing Zip Code:

Agent Type: Commercial Registered Agent - Corporation

Jurisdiction: NEVADA Status: Active

View all busines§ entities under this regi§tered agent

Financial Information

No Par Sh!i!r~ CQ!.!Dt 0 C!i!(;!ltal Amount: $10.00

P§r Share Count: 1,000 P51r §hsu~ Valy~; $.01

Officers EJ Include Inactive Officers

President- JEFF D ANDf:tEWS

Address 1: 6800 KOLL CENTER PARKWAY, SUITE 320 Address 2:

City: PLEASANTON State: CA

Zip Code: 94566 Countty: USA

Status: Active Emall:

Director - CHARLI;S F SERJANNI

Address 1: 18500 NORTH ALUEDWAY Address 2:

Page 40: 2014 Apex Operations Plan-web Site-1

City,~ PHp_~NIX State: AZ r -

tJSA Zip Code: JI5Q54 Cotmtry:

Status: ActiVe Em~il:

Treasurer~ 'EDWARD A LANG Iii Ad~rl[!ss 1: 18500 NORTH ALLIED WAY Addre$52:

Clty: .PHOENIX State: AZ

Zip Code: 85Q54 Count~)': USA

Status: Active Email:

Director- EPVVA~O A JAN~ til Address 1: 18500 NORTH A\.LIED Y(AY Ac;ldress2:

City: PHO~~IX State: /(Z.

Zip Code: 85054 Colintry: USA

Status: Active Email:

Director· BRJAN A ~AlES

Address 1: 18500 NORTH ALLIED WAY ~dd~ss2:

City; PHOENIX state: AZ

Zip Code: 85054 Country: USA

Status: Active E:mall:

Secre~ry ~ eiLEEN B SCHULER

A~dress 1: 18500 NORl'H ALLIED WAY Address2:

City: PHOENIX State: AZ

Zip Code: 85054 Country: USA

Status: Active Email:

ActioO$\Amendments

Click h~ to vfeyt 17 §Clion§\amendmen!§ associatest with this comean~ -Drscla1m~r

Page 41: 2014 Apex Operations Plan-web Site-1

REPUBLIC SILVER STATE DISPOSAL, INC. SilverF_Iume

NEVAPA'S 8USrNE5S PORTAl.

~ .. A I I ·Galculate}rees J ~ .... II; .... ~..,

Business Entity Information

Status: Active File Date: 0710911997

Type: Domestic Corporation ~ntl~ N!.!mb~r: 01~710~1997

Quelifving State: NV !..i:zt of Offi~rs_ Du~: 07/31/201a - --

Msn§ged 12~: ExuirefiQo Det~;

NV BU§iO!i!§§ IQ: N¥19971216531 ~y§iQi~~ L~g![!Se Exg: P7/31120~3 -

Additional Information

Central Index Key I Registered Agent Information

Name: THE CORPORATION TRUST COMPANY OF Address 1: 311 S DIVISION ST NEVADA

Address 2: City: CA~SQN CITY

State: NV Zip Code: 89703

Phone: Fax:

Mailing Address Mailing Address 1: 2:

Mailin~ City: Mailing State: NV

Mailing Zip Code:

Agent Type; Commercial Registered Agent • Corporation

Jurisdiction; NEVADA Status: Active

View all bu§ioes~ entitle§ under this [egistered agenl

Financial Information

NQ Per Shar!;! ~ount: 0 Cagjtel8moynj: $10.00

Per Share ~ount: 1,000 Per Share Valu~: $.01

Officers lCJ Include Inactive Officers

P~ldent- JJ:FF D ANDREWS

Address 1: 6800 KOLL CENTER PARKWAY, SUITE 320 Address 2:

City: PLEASANTON State: CA

Zip Code: 94566 Country: USA

Status: Ac~e E:mail:

Director ·CHARLES F SERIANNI

Address 1: 18500 NORTH ALLIED WAY Address 2:

Page 42: 2014 Apex Operations Plan-web Site-1

Ctty: PHOENIX state! AZ

Zip C.ode: ~505~ Country; USA

S~atus: Active Email:

DlreclQf '": EDWARD A LANG ill ·-·-

Addres$1! 18500 NORTH ALLIED WAY Ad~ress2:

Oity: PliO~NlX State: AZ -Zip God~; 85054 Country: USA

Status: A~tlve Email:

Treasurer - EDWAR.D A LANG Ill

Address 1: 1850b NORTH ALLieD WAY Address2;

City: PHOENIX S~ate; A!-Zip C()de: §50 54 .Country: USA

Status: Active Email:

Director .. BRIAN A BAL~S

Addre~s 1: 1850Q NORTH ALliED WAY Address2:

City: PHOENIX State: AZ

~lpCode: B50S4 Country: USA

Status: Active Email:

Secretary - EILEEN B SCHUI;.ER

Address1: 18500 NORTH ALLIED WAY Address 2:

City: PHOENIX State: AZ

Zip Code: 85054 Co1,1ntry: USA

Status: Active Email:

Actions\Amendments

Click here to view 20 actlons\amendments i!Ssoclated with thl~ comean~ -D1scla1mer

Page 43: 2014 Apex Operations Plan-web Site-1

3.4 CERTIFICATE OF OCCUPANCY

Page 44: 2014 Apex Operations Plan-web Site-1

.~ t

•J .. J

CLARK COUNTY BUU..DING DEPARTMENT .SODS. GIUNDCENTRALPARKWAY-L.48YEGAS, NEVADA 8915.S-3530 (702)455-3000

CERTIFICATE OF OCCUPANCY

Permit#:

Site Address :

Project Name:

Tenant Name :

OwnerName:

Contractor Name :

Contractor A!}dr.:

Ctr.Phone:

94-5808

13550 N LAS VEGAS BLVD

APEX MAINTENANCE FACILITY

APEX MAINTENANCE FACILITY

SILVER STATE Dif:lln~M. SERVICE

SILVER STATE DII

P 0 BOX 98508,

(702) 735-5151

Principal Design Professional : GEORGE RO

Construction Type: II-N 0CCUJ

Sq. Ft.: 22279

Application Type :

Buil~ .. ·-·

REPAIR GARAGE-NEW

Tenant#:

Description of Work VEHICULAR MAINTENANCE SHOP AND OFFICE

NOTICE TO APPLICANT

0032028

of Units:

12/21/95

0

This is to certify that the building or structure dcscn'bed above has been inspected and is in compliance with the. approved scope of work and requirements of the Clark County Code.

ROBERT D. WEBE1tDIREctOR

This Certificate must be posted and maintained within the building or structure referenced above.

A1ly construction to be done beyond the final building inspection date, above, requires a new building permit.

RIY· 15/95

Page 45: 2014 Apex Operations Plan-web Site-1

3.5 LAND USE APPROVAL

Page 46: 2014 Apex Operations Plan-web Site-1

September 22, 11193

SDvli' S1aiB Disposal Selvica, lllc. ~ Geo'i;b RC)IJEirs 710 E. Sahl1ta A\'enll8 lB3 Vegas, NV 89104

Department of Comprehensive Planning

Zoning OMston R.S.JC seRYCeS et..a.J:IN3I

4Qt 6CUTH FO..Fmi STFEE'I" LAS VEGAS. NeVAO.a. EIB'ID1

(702! 4S543'I4

REFERENCE: ZC.1254-93, Vc-1255-93, UC..12&6-93 & WT·125'f-sll3

. . Time limits to commence, complete or ravlew this approval apply only ID lhls spedflc eppllcalion. A propelty may bava SBWII'alllf¥'0\led applicalions on it, each of which will have Its tJWn Bllplrat!on dala. It Is ltle applic8nl'S responsibility 1D keep each appl1c:alfM c:unent.

CONDirTONS: SubJect tO nO.Jasotutron oi lriteni. and 818ft.prepirina 8ii 0~ '" alfopt tho zoning; inotille ofnco triiRer llhall tili COIUtl'Ucted and Installed 10 Cleric County Building Coda COniiiiliiclhJ standdnb; • fl9o Vast re.Vfaw ·on IN uae pen:ofl and vatlanC83; tha uiUI perib1t lliiltt the .ilrelf .waween:t-:15 and .tht. mQurQJna 10 Jba bon'oW pit, tlia on-preniliea at(ih; lila 8l:&Ja atraclc/cashJar, :and aDJ:Urlty offlcea; apptrcant tq coordinate sil6uHiy J!J'OVJBlonrs bf ll1e ana wUh .. lha t. Y.:.lletJo. Ponce Dept. and their Involvement IIi .the de31gns.lif the aecorJty_eyateme and: personnel trained for I'IICUifty on tile .sne: Uiilfonn FJre .C«Sde and Building J:Ode. requlteme~ related to tw.'JUdo~ rria1erfale,-h6ndllng bf facJrtmla and. d01111n of :tacrudea: aonta -.tucly and comP.IIanee: diaJhage &. trilfDc studies. tmd campllilnce;:Havada Dept.. of Trantportallo_n aiJP~:nd of the ttartJc flllldy; paved all weather tegaJ access; no obJecUon to wetvfng tho rtg~­of·wa)' dedtoaUOh aUbJet:t:t.o providing a public accon easement to the ano and HY!! year r4vfaw or the dedication waiver. draJnsge and 1n\fllc tmJcttea .to be updalad n~ , flvtt )'Gbra; U'8fflc. stu~ to .be. approved prior to occupancy of any structures; complJ with all local, Slate; .aruS fa<feraJ regulatrona: comply with all Jand division requlramentl for any lease ot propeJ1y, and PubTTo Workll recotnmends denJeJ or tht Mtllaek reduction. on perimeter aecUon linea and center section nne aatbacka on the east. north and south property linea; preor or ownerahlp to be aubm11ted to the Zonlng Division prior to the opening of lh& landnll In October 1993; grading permit raqutrad lor roads, bulldlngl, anti the Initial gralflng atartup.

CONTD

I

I l I

Page 47: 2014 Apex Operations Plan-web Site-1

' ·.? ';-

' '•

'

,_ ."';'~.

' -

-

:: ~ '! ,. I'•~ - ; ;;: -.

oat! C.unty

,- ',

' .

' '-

~-J ' -~ -· Department of

Comprehensive Planning Zorung DMsSon

R..BJC:SER\ICES~ ...at SOUiliJ'Ct.Fmol S1'F&Er

LAS veGAS.IE\&ADI\ Ee!D'I paas~

ZQ-1264-931 VC..1265-93, UQ-1266-93 & WT·1267·93 September 22. 199'3 Page 2

PLEASE BE AWARE lHAT: . . . · 1 • ,UI condiUo~ Of approval ancl aD applicable atate sta111teu end fOcal Cll'1flnancU

must be aatiStled prior to r ... rding-• map or -bsuasice ot ·• building permit, ceruncirta or OCc:Upaney ar -~tislitai'a-~; lliftlcbellar .. toqulrOd. 2. lll_. naw C61UtJiii:Uon. te(IUJ. - ta.a buUcDn; peniiHs. _In acco~ v,llb IQ Unlfonq

BuUdlftg Coda as edoptedi .by CJm1i: County and 8Ubmlsalon Df 1!1 plot and gra.dlng plali jl{epared by a regrn.recr proresilo·nal dvU engineer ~~~ proPertJ n..-. b~~~~ localfo~ topography and .iiuch otber data u raqulrOd by lhil SulldJng bepartmeat.. .. . . . .

3. lll typea . of. ifevliiOplilont. ei:cept lingle fUllly raaldlnUal. mm provldo laiK!Scaplng of thil types ~~ and Jn the foca!Joos speclltod In tho aartt County DeSign llanual and Plant Lbt. · ·

4. uoblJe boniea and/or 11111ni.dacturid rioiJsln;: niqulrit- tiulldlrig permlta before tbq are mov8d iuld JnBriectlori lot tha Na,vsda Sifillj: Seil litfor to cceupancy.

5 • Approval of lhJtl.lljSpJrcatJDh MH• not conatitUIA approval of a Uquor or Gallllng n~nse or 8111 Clhlr Count)' Issued permit. lfcensa or epptOVIIL . .

6 • The, Board o.f Couoty CoJDmlsalon~ an""or the PJannfng Commlalon have no ~orfty to IJl@Jrt. promise or CQIIIIIIlt water aervlee. AppraV'8f Df UJia application doaa not constitute any commitment tor water urvlce or any com111Hm11nt for priority status tor future water aervfce.

. ' "

..

.. -

Page 48: 2014 Apex Operations Plan-web Site-1

.,

\

)

SILVER STATE' DISPOSAL SERVICE, IIIC : PUBliC HEAF!mO EIIYIR'OIILUWTALI 'TECHNOlOGIES OF. NEVADA ·

Pro)a:ct! DnorlpUon; .

La cellon :

A municipal .and lndualllal waste landtlll wllh' accenory. usn. on· apprQJdmalely 2560 lacrea.

East alii a rot• lnteralale :15, north end eouth ·ol lh11 lnlereocllon •OI• U.S. HlghWJ~V! 93 : and lnlarslele rt5, In •ApaKJ ·

Zona. Chanoa· · FROIAt 11.·2 (lndUalrlii•W"hout :Owelllngt Zone (a portion · · under resolution or In lent 1o· M·3 (Htsvy lndustllBI): . Zone);

Use Permll

Vnrtunoo·

Wal11ar

Loge I Deacrlpllon

APN

TO: M·3 (Hoavy lndu&trlnl) rZona; ·

1. Slora~:~e : :of ·liquid: .and, solid • hu~rdous wasta• • materials In contalnars,·tanh ::and 10onlalnmenlrcolla; 2. Short-tarm alo"ge :ol· oonlelnerlzed 1(boggad •and · boxad) unadlcal W8910l' ' 3. Storoga 'Of' cr1mlnellevldanco:ln locked boJee;: : 4. lnclnerotlon · facilities lor hRzardous : wute~ r non·hazerdouo. Industrial 111111 Jntdlcal waste; s. lodustrtll: .w11111 landlln· for ·final :dlspoeel of pt~tanllelly, harm lui waste rlhalt has not bean dollnad: aa1 hozatdous: by : Fedora!, Stale or tout agencies:• • 6. commenclal ! labonatory, Jor• lho phy1tcal charactnl1E8llon ' and chemical. enalyals of hsurclous rmalallata.end• waalo :products; 7, L.ndllll lor tho ·dlapoetiiOt · municipal nlhiJwaata (rutdenllah andt commerota.IIWllale, anlm11la, palhologlaal . . weste1t conatrucllon damollllon dabrta• and1111m111r tllerno); 1 8, AdmlnlltmllOO 8lld .managements olllce llc:llllleaz : 9. SJorage ;ot health end aalety equlpmarn;• 1 0. Gocurlty olllcu; 11 . Vehlcta melnlananco• andr reluollngl lsollfll•s; · 12. Storage :and 1p11klng 10~ 11\Uill<l and oqulpmenl; · t 3. Flre and :tmergtncy nuponao elallont : . 14. Wosar rasu11o1r• 15. Scali ahac:klcashtlff wllh :lngreas/JJgTeoe ! ecalta; t • 18. On·ptomlaoal algn~go 1(at 1·15· ontranco) maltlmum cl 1000 ~ aquar.1r feet:· 17. lnduatrllll llquldattanlc aroa: : . 18, Incidental .amploysa areas; · 19. Borrow· pll • .

1. To allow a ztrD nJbtok Item a Range 11ne,rSactlon ·llnt, anel: cente~ Soctlcn llno whoro 1 75 !coli ~O•Iooh :and 1411 foot · eetbuok :le: raq~!red; .maptcllvuly, :z. To ~tablleh and malnsatm mobne flomu -end 1mabRe1 olllto • , uanefll•lor a•ourltV 'lind omployao haUling end •ollleoa; 3. Walva the at~ olul of Jive tendo~plng ~a~nt ta :1~ strut• . :rGntaga; 4'. Walvo• tho requtrtmenltfot• a·walhonolcaed trlllh area;

1. Welva the ·requlromantllor underground •ulliiUn t(alaCIJical); :z. Welvo the .right ot :way dadlcallon rtqulramonltl 1 :

On SaeUonll! 18; ~9 and' a portion :ol: StCIIonll7•1nli 120,:' Townshlp·18 :Soulh,: Rang• 64• E1alotnd 1port1ona ol. Sectlona: SS and 24r Towmhlp 18 South; Range 1U c&al, (oxact tegat on lito).

540·270·01 B· ptn., 640·.280·006 pin, s•o·d0~07 ptn,. 540·· 1911· 013., 019; 025~ and1 020: ptn.

STAAOAROCO.~DmONSIZC!

1. Appurnl ollhla tppl'a~on\dl up~• In IWII ,..,, uoltu COfiC':IUCt'on oi iW1 p<ajt c:l'n dtMii>td In !loa tppllcato~ and · • shown ont~o plti\SIIl cr>C!IDiolll ·and all conaillons oltppowtl ~ ... btu lttiolltd. • •

2. 'Ill• oJODtrl'( ........ nlU>\oiUCUtf a R••oiUiiOIIo( lnttnlard ~· ~9-~AII Eutmtrlllnd HoiSt Ablltmlllllgrnn.nt. n lht propany "'loc•t•d v.ilhln ona rnll• olllllr-nduy Ill p<Mic "'"'"1191 •utiNim laolty. 1n Odat lllt.nllnl 1!0111 bt ntcut•d: ·

• conlinued •

. ... ~-

Page 49: 2014 Apex Operations Plan-web Site-1

-~\ )"

. . . - . . . SILVER ST'AT~ OISPOSlU. SERVICE. ltlC.' EIIVIRONMENTAL TECKliOLOOIES OF ·nEVADA·

MASTER:PEAN:.

OWNl:R:.

APPUCANT:

CORRESPOI\!DEI'fT:

FINDIN(/S.

APP~CJIIAcS:

PROTESTll:

APEX· INDUSTRIAl.

sa1111r Stall! Disposal Service; lneJEnvilonmenllll Tlltllnolooin ol Navade,llno; •

Samo.

Sllvll State OlsponJ Sarv!co,lnc •• cJO GiotSte 1\ogelS · 770 liaatS&Il&r;aAvenuo 1

Las Vog~. NV 89104

Pravlousl!'fiPPIO~.for 155 acros~lnlerlor of lhls s~o) ••

49a

Page 50: 2014 Apex Operations Plan-web Site-1

•• :. • • ! ••• ''~··· •• -a ~.~.. •• ~.._,,.-=.,. .... ,._;

~ None

JN/BINGHAM ~

DON 8aii..ESINGER ~-

PAIJL;J.. aiFIISTENSEN lHAUA M. DONDERO YVONNE ATKINSON GJcrES KAREN HAYES BRUCE L WOODBURY

Commissioner Christensenreturnea to the meeting.

ZC-l264-93;.VC~l26S-93; uc~l266=93:i wr-1267-93 SILYER~S~A~E DISPOSAL SEB.r.ICE;. INC./ BNVIRONHEN~AL !rECBNOLOGIES OF NEVADA, INC.

-···---- ... SUBJECT MATTBRt In the maeter of the 'ATTACBBD 8esctibeB epplication of Silver State Disposal service Inc./Environmental Technologies of Nevada. Inc. fo~ a zone change1 use permit, variances and va!ve~s:

REPRBSENTATIVB(S): Present

SPBAKER(S): Present

PRE-FINAL ACTION: Staff introancea: the item ana advised that the.main concern has been ~he viev from tbe.highvay; especially th~ ~o~thbouna . traffic on I-lS;.ana ~ecbmmehded tbe uses.from the.use permit limit.the.area betveen I-15 ana the mountatbs to the borrow pit• the on-premises Sign, the SCale 8h8C~/ caebier and s&curity officee, vhich vill keep most of the other uses behind the mountain ahd screen £rom viev from the highvay~ the applicant has submitted a phasing plan vbich shows this area to be the last phase of the landfill ana this has the pg~ential to be the moat visible from_the higbvay and should be the.last to.be use~_and any deviation trom that s~ould require appro~l.from ~he ~ooro; the request cp~forma to.tb~ pl~n and etaff recomm~nded approval, spbject to no Resolution of Int~nt ~Qd.st~ff preparing an ordinance to adopt tb~ 'oningJ that the mobile Office trailer Should be conet~eted ~nd installed to Clark County Building COde Commercial Standards: a two~yeara review on the perma­nent va~iancea: the use pe~it to limit the area between I-15 and the mountains to the bOrrow pit, the on-premises sign, the scale shack/cashier, and security offices: the applicant to coordinate the security 'provisions

-continuea-

Dlla: 9/8/93. 1'1;9: 61 ' · • ....

Page 51: 2014 Apex Operations Plan-web Site-1

fiJoaJ ofW~ ~ CLARK COUNTY, NEVADA

JAY BINGHAM ~

DON SCHLESINGER Continued - Page 2

AbMnC: None

.. zc-l264-93, . vc~1265~93, OC-1266-93 S ~~-1267-93 SrLVER STA~E DISPOSAL SERVICE!, INC./ ENVIRONHEN~AL 'rECBNOLOGIBS O!? NEVADA, INC. -continued-

Min 111M

~

PAUL J. CHRISTENSEN THA1JA M. DONDERO YVONNE .lm(]NSOPI GAlES KAREN HAYES BRUCE L WOODBURY

of . the site wit~ th~ Las Vegas Metr opolitan PO~ice Depart~ent aoo thei~ tPVQlvement in ebe designs of the security eystem~ ana . per~onnel trained for sacority on .tbe site: Dniform Fire Code and Building Code require­ments related to hazardous m~ter1als, handling of facilities ana design of faeilitiesf boils study and compliance; drainage and traffie studies and compliances Nevada Department of ~Fansportation approval of the traffic stqdy; paved all weather legal access; no objection,to \laiv~ng the righ~-of-way dedica­tion, subJect to providing a pn~~ic access easement to th~ site and a t\lo-y~ar reviev of the dedic,tio~ vaiver; ~rainage and traffic stuaieo . to be. ~p~~ted every t~o years: . traffi c study to be approved .prior_to the . occupancy of. any structures' compliaoca vitb all . local , stete,.&na fddetal tegulations: compliance with all land division tegoiremeot~ . for any lease of property, proo£ :6£ o~nersh1p to be submitted to the zoning Olvieion prior to the opening of the landfill in October, 1993 ; grading permit reguired for roads, buildings, ana the initial grading startup: and Public WorkS recom~ended denial of the setback reduction on perimeter section lines and center section line setbaeke on the east, no~th and south prope~ty lines.

Legal counsel for the applicant addressed ~he Soard ~ith several concerns ~ including the two-yea~ review of tbe use permit and varianc~St the tvo-year reviev of the drainage ana traffi~ studies: the grading permit requirement; and the ·vacianee. for , t~e setbacks .

-continued-

,· .

Dar. 9/8/93 ..

Page 52: 2014 Apex Operations Plan-web Site-1

.· : ..

. ..... _. .: ~·n ... .

Rb~of~~~ JAVBINGHAM ~- ·

CLARK COUNTY, NEVADA

Continued - Page 3

AbMnl: None

ZC-1264-93 1 VC-1265-93, DC-1266-93 & WT-1267-93 SILVER STATE DISPOSAL SBRVICB, INC./ ENVIRONMENTAL !L'ECBNOLOGrBS OF NEVADA, INC. -continued-

Mlnuw

DON SCHI..EBINGER VbOialr!r.all

PAUL J. CHmSTENSEN TliAUA M. DONPEFIO YVONNE ATKINSON GATES KAREN HAYES BRUCE L WOOOBUAV

Discusaioh was held and clarification was provided by staff regarding the various areas cf concern.

It was moved by Commissioner Schlesinger and carried by Jnanimous vote that thG application be approved, subject to the foregoing conditions as recommended by staff, with the exception of a five year review on the use permit and variances; traftic and drainage studies to be updated every five yearsJ five year ~eview of tbe dedication waiver; and subject to the ~TTACBBD conditions.

o~~~e:

• • .:.:1 ..

Page 53: 2014 Apex Operations Plan-web Site-1

-

AEPLVTO AiTENnONOF

DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, SACRAMENTO

CORPS OF ENGINEERS 1325 J STREET

SACRAMENTO, CALIFORNIA 95814·2922

April 10, 2007

Regulatory Branch (2007 -461-SG)

Wood Rodgers 9900 Covington Cross Drive, Suite # 102 Las Vegas, Nevada 89144

Gentlemen:

This concerns your transmittal dated March 19, 2007 providing your request for a jurisdictional determination of a parcel of land within Sections 13 and 14, Township 18 S, Range 63E and Sections 7, 18, 19 and 20 in Clark County, approximately 15 miles northeast of Las Vegas, Nevada. This parcel was previously determined non­jurisdictional by this office in 1993 ( 199300587).

Based on the information provided, and based also on a subsequent field verification by this office, we determined that the parcel falls within an isolated basin and does not have a nexus to interstate commerce. Therefore, a Department of the Army permit is not required for the development of this site.

This determination is valid for five years from the date of this letter, unless new information warrants revision of the determination before the expiration date. A Notification of Administrative Appeal Options and Process and Request for Appeal Form is enclosed. If you wish to appeal this approved jurisdictional determination, please follow the procedures on the form. You should provide a copy of this letter and notice to all other affected parties, including any individual who has an identifiable and substantial legal interest in the property. Please refer to number 2007-461-SG in any correspondence concerning this project. If you have any questions, please contact me at our St. George Regulatory Field Office, 321 North Mall Drive, Suite L-101, St. George, Utah 84790 or telephone number 435-986-3979. Our website is www.spk.usace.army.mil/regulatory.html.

Sincerely,

Chief, St. George Regulatory Office 321 North Mall Drive, Suite L-101 St. George, Utah 84790

Page 54: 2014 Apex Operations Plan-web Site-1

I.n~: ;rou_()'WJtlg .................. ~your and options regarding ail e appeal above

uv"''''""''~'·'~ f\'dqitJiQll.~li.~~Q!@fLtlon may be found at http://usace.anny.tttiVinet/functions/cw/cecwo/reg or 331. '

A: INITIAL PROFFERED PERMIT: You may accept or object to the permit

• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the DISTRICT Engineer for frnal authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Pennit or acceptance of the LOP means that you accept the permit in its entirety and waive all rights to appeal the pemut, including its terms and conditions, and approvedjmisdictional determinations associated with the permit.

• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the DISTRICT Engineer. Your objections must be received by the DISTRICT Engineer within 60 days of the date of this notice, or you will forfeit yow­right to appeal the permit in the future. Upon receipt of your letter, the DISTRICT Engineer will evaluate your objections and may: (a) modify the pemlit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the DISTRICT Engineer will send you a proffered permit for your reconsideration, as indicated in Section B below.

B: PROFFERED PERMIT: You may accept or appeal the pennit

• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the DISTRICT Engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety and waive all rights to appeal the permit, including its terms and conditions, and approved jutisdictional determinations associated with the permit.

• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain ter~ and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the DIVISION Engineer. This form must be received by the DIVISION Engineer within 60 days of the date of this notice.

C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the DIVISION Engineer. This form must be received by the DIVISION Engineer within 60 days of the date of this notice.

D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new infonnation.

• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice means that you accept the approved JD in its entirety and waive all rights to appeal the approved JD.

• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the DIVISION Engineer. The appeal form must be received by the DIVISION Engineer within 60 days of the date of this notice.

E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may rovide new information for further consideration by the Corps to reevaluate the JD.

Page 55: 2014 Apex Operations Plan-web Site-1

SECTION fl '<-~QVBSTF.ORAPPBAL .or ·oBJECTIONS TOAN lNITIAL PROF.J{B~D PE:R.NIIT. · -~·· ·:. REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.)

ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clanfy the location of information that is already in the administrative record.

?OINT OF CONTACT FO.~IQJd.E.Syt~NS.~~~INF,,OR.MATION: .. ' .. ~, If you have questions regarding this decision and/or the appeal If you only have questions regarding the appeal process you may process you may contact: also c:;ontact:

US Army Engineer District, Sacramento Chief, Intermountain Regulatory Section 533 West 2600 South, Suite 150 Bountiful, UT 84010

(801) 295-8380

Doug Pomeroy, Administrative Appeal Review Officer Army Engineer Division, South Pacific, CESPD-DM-0 333 Market Street, San Francisco, CA 94105 (415-977-8035)

(NOTE: This is also the address to which an appeal addressed to the DIVISION Engineer would be mailed.)

RIGHT OF ENTRY: Your sig~ature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations ofthe project sjte during the course of the appeal process. You will be provided a 15-day notice of any site investigation and will have the opportunity to participate in all site investigations.

Date: Telephone number:

Signature of appellant or agent.

Page 56: 2014 Apex Operations Plan-web Site-1

~ oooz

n, )

z ~us Q~

086£

/. ' I ;

~ <( 0 z :::> 0 m w

~ z ~ 0

Page 57: 2014 Apex Operations Plan-web Site-1

US Army Corps ofEngineers Intermountain Regulatory Section

Approved:

OMBNo.:

Exolres:

19 August 2002

0710·0012

31 Auaust2005 533 West 2600 South, Suite 150 1hl Public rlpOr Bountiful ,UT 84010-7744

per llspGIISI, lnduding lltliP lor r1vltwilg lnatrvcllonl, 111rding 11l1tlng d111 IIIII'CU, gathlrlng IIIli makltllning 1111 datanttdld.llld ~ingllldr .llmtta or 1ny olhu Uptel of 11111 coBecdon of lnf011111Uon, Including IIIQGIIIklns for redudng lhls bllll111, to Dtputmant al Dtfense, Wnhlngton Hu, ll2), 1215 Jtlluson D1wf1 Highwey, Slllll 1204, Arlington, VA 22202-4302. llapondlllts ahould b11W1r1 ~l,notwitluhnding 1ny olllu provision ollaw, no puson lhlll bllllbjtctlo 111Y penthy for f1ifq to coqlly wtth 1 caU.cUon ollnftrmatlan U h doll not dlsplly 1 ~UirtnUy n&d DMB ~ontrol n11111b11. PLEASE DO NJIT RETURN YOUR APPUCATION TO THE ABOVE ADilRESS. RETURN COMPLETED APPUCATIDN TO THE ADDRESS SHOWN ON THE APPUCATION INSTRUCTION SHEET.

U.S. ARMY CORPS OF ENGINEERS CUSTOMER SERVICE SURVEY· REGULATORY PROGRAM

We at the U.S. Army Corps of Enginears Regulatory Branch Btl convnlllad to improving service to our CUIIDRIIrl and would Ukalo know how wll WI have bun doing. Who 111 our customers? You are our custom•rslf you submitted a permit application, requested a jurisdictional determination or wetland delineation, or achoduled 1 pre-application meeting with us. Other customffs Include those of you who receive our Public Notice and/or commented on a particular proJect or our work In general, because of your Interest In the Regulatory Program. To Identify how we can better serve you, we need your help. Please take the time to nn out this brief survey and mall It back to us. Your honest opinions wm help us determine areas In which we need to Improve. For each question, please Indicate the level of service you received by marking the appropriate number on a scale rrom 1·5, with 1 being low ldisaatlsfied) end 5 being high Ivory aallsfied). If the question does not apply to you, simply mark N/A. Thank you for your time and comments! Response to this survey Is VOLUNTARY. If you choose not to respond, It will not affect any current or future dealings you may have with tha USACE In any way.

lOW HIGH l FOR APPliCANTS & OTHERS REQUIRING AUTHORIZATIONS SATISFACTION SATISFACTION

1 2 3 4 5 NA I. Do you think you recaivad vour Caras oarmil decision In 1 r111onabla amount of time?

2. Do you think you racalved your Corps lurlsdictlonal detarminatlon In 1 r~uonabla amount of I 2 3 4 6 NA lime?

3. If we recomrnended/raqulred project changaslmodiflcatlons to reduca impacts, did wa clmly 1 2 3 4 5 NA explain the rmons whv?

4. If we rmnvnanded/raquirld projucl changeslmodlfications I 2 3 4 6 NA to reduce impacls, an! Jha changn s11m reasonable to you?

1 2 3 4 5 NA 5. If we deniad your permit, did wa durlv exolain the reasons wily? 6. For anlorcamanl casu, did our offica clurly end profasslonaUy explain the basis for the enforcamanteclion (~ •• what work we believe you performed without 1 2 3 4 6 NA au t?

' 1 2 3 4 6 NA 7. For enforcamanl casas, did our office include options for resolution? II FnR "OTHFR"

1. For pennluad actions, wu th1 pannltafftclivaln achieving appropriata protaction/millgallon for 1 2 3 4 5 NA imllacls to aquatic rasourcas?

2. For anforcementacllons, did the Corp• raquire epproprlate compansallon/rntoretion for 1 2 3 4 5 NA impacts to aquatic ruourcea? . Ill FOR APPliCANTS & "OTHER" CUSTOMERS

I 2 3 4 5 NA

1. Did lha Coros raormntalivt eel professionally and lraal you with courtesy?

2. Did Jha Corps provide aulficianllnfonnation 10 allow you lo complall an application form. 1 2 3 4 6 NA

convnant on a oubDc notlca, or otherwlsaavaluala our work?

1 2 3 4 5 NA

3. Did we raspond lo your lellara and lalaphono calls In a raasonabla amounl of time?

4. Did the Corps raprtsenlativa anawar your quastlons clearly, giving you eccuralainformation 1 2 3 4 5 NA aboul our Reoulatorv Pr1111ram?

5. What is your OVERALL rating of !hi level of s~rvlca provldld by lht Corps of Engineers 1 2 3 4 5 NA Revulatorv Pr1111ram?

Not1: DATA FROM THIS QUESTIONNAIRE WILL BE USED BY THE DISTRICT TO IMPROVE SERVICE. ALSO, INFORMATION WILL BE TABULATED NATIONALLY BY SERVICE AREA. RESPONDENTS WILL NOT BE IDENTIFIED BY NAME OR ORGANIZATION FOR ANY REPORT DERIVED FROM THIS SURVEY.

ENG FORM 5065, Feb 97 IProponant: CECW·DRl

Page 58: 2014 Apex Operations Plan-web Site-1

PLEASE COMPlETE THE FOllOWING QUESTIONS BY GIVING US ANY COMMENTS DR SUGGESTIONS FOR HOW W£ CAN IMPROVE.

Plaasa Indicate the nature of your business Pf applicable, check more than anal:

- Property developer - Flood/Water Control District - Sand & Gravel _ Public Agency Applicant _ Civic or Trade Organization

- Member of Legislature _ Federal/Slate/Local 01/iclal _ Conservation Organization

- Other (d~scrlbe}:

- Consullant _ farming/Ranching

- Pubfic Agency - PersonaUPrivata Project _ Adjacent Property Owner

What Service(sl Did You Saek From the Corps? ljl ,pp/lcabls. check mora than onal:

- General Information Pra·application Consultation

- Nationwide general permit

_ Jurisdictional/wetland determination - Resolution of violation/non-compliance

Regulatory Program presentation

- law Office - Silviculture

Mining Media Native American

Regional or programmallc general permit Standard Individual permit

Commented on Public Notice/permit application Other (describe}:

Letter of Permission

Which Carps office (District, OMt/Qn, H1111qu1rtm, othlf I did you deal with7

Name of person you contacted In our office (optional}:

Do you have any comments or suggestions on the Regulatory Program?

Information about you (optional}:

Namemtle:

Address:

Telephone (include area codal:

May we contact you? YES _ NO_

PRIVACY ACT STATEMENT

Authorities: The gavammant Performance and Results Act of 1993 and Executive Order lEO) 12862, "Setting Customer Service Standards", dated September 11, 1993, Purpose: To determine the quality of aervlcea our customers expect, as wellaa their 1atlafectlon with USACE'a exl1tlng services. Information provided on this form will be used In evaluating the performance of the Corps Regulatory Program. Routine Uses: This information may be shared with the Office of Management and Budget, members of Congress, and other federal, state, and local government

(Reverse of EnD Form 60651

·l

Page 59: 2014 Apex Operations Plan-web Site-1

3.6 AIR CONTROL APPROVAL

Page 60: 2014 Apex Operations Plan-web Site-1

CLARK COUNTY DEPARTMENT OF AIR QUALITY AND

ENVIRONMENTAL MANAGEMENT 500 South Grand Central Parkway, Box 555210, Las Vegas, Nevada 89155

Part 70 Operating Permit Source: 395

Issued in accordance with the Clark County Air Quality Regulations (AQR)

ISSUED TO: REPUBLIC SERVICES, REPUBLIC DUMPCO, INC.

SOURCE LOCATION: Republic Dumpco, Inc. Apex Waste Management Center East of Interstate 15/US 93 Junction Apex Valley, Nevada T18S, R64E, Sections 18 and 19 T18S, R63E, section 24 Hydrographic Basins Number: 216/217

NATURE OF BUSINESS: SIC Code 4953: Refuse System SIC Code 1442: Construction Sand and Gravel NAICS: 562212: Solid Waste Landfill

COMPANY ADDRESS: 770 East Sahara Avenue Las Vegas, Nevada 89104

NAICS: 212321: Construction Sand and Gravel Mining

RESPONSIBLE OFFICIAL: Name: Todd Whittle Title: Area Environmental Manager Phone: (702) 599-5537 Fax Number: (702) 599-5585

Permit Issuance Date: December 31, 201 0 Expiration Date: December 30, 2015 Permit Revision Date: November 9, 2011

ISSUED BY: CLARK COUNTY DEPARTMENT OF AIR QUALITY AND ENVIRONMENTAL MANAGEMENT

JM~ Tina Gingras Assistant Director, Clark County DAQEM

Page 61: 2014 Apex Operations Plan-web Site-1

EXECUTIVE SUMMARY

PART 70 OPERATING PERMIT Source: 395

Page 2 of 41

Republic Services - Republic Dumpco, Inc. (Republic) operates under SIC Codes 4953 - Refuse System and 1442 - Construction Sand and Gravel and NAICS Codes 562212 - Solid Waste Landfill and 212321 -Construction Sand and Gravel Mining. Republic is located in Apex, East of interstate 15/US 93 Junction. The legal description of the source's location is as follows: portions of T18S, R64E, Section 18 and 19 and T18S, R63E, Section 24 in Apex Valley, Clark County, Apex, Nevada. Republic is situated in Hydrographic Areas 216 and 217 (Apex Valley: Garnet Valley and North Hidden Valley). Apex Valley is designated as nonattainment area for 8-hour ozone (regulated through NOx and VOC) and is PSD for PM1o, CO, S02.

Republic is a major source for PM10, NOx, SOx. HAP and H2S and minor source for CO and VOC. Republic has served as the primary municipal solid waste landfill for Clark County since October of 1993. The types of material the landfill accepts includes municipal solid waste, petroleum contaminated soil, asbestos, construction debris, sewage sludge, septic waste, medical waste and dead animal waste. Republic has a gas capture and collection system with an internal combustion enclosed combustor (Callidus Flare) capable of burning at 29.40 MMBtu/hr or 1,000 cubic foot per minute (EU: W07). The landfill gas capture and collection system is designed to capture approximately 75 percent of the landfill gas generated, leaving approximately 25 percent as fugitive emissions. This Part 70 Operating Permit is issued based on the Authority to Construct application (AQR12.4.3.2.b) submitted on December 14, 2010, and supplemental information submitted on March 21, 2011. This is a minor revision to the Part 70 Operating Permit.

The following table summarizes the source PTE for each regulated air pollutant for all emission units addressed by this Part 70 Operating Permit:

Source-Wide PTE (tons per year)

PM1o PM2.& NOx co SOx

Non-fugitive PTE 268.84 14.22 145.91 94.65 189.32

Landfill Fugitive Emissions 0.00 0.00 0.00 0.00 0.00

Major Source Thresholds 100 100 100 100 100 .. Not a source-w1de em1ss1on hm1t, values are used for determ1mng the source status.

2Ten (1 0) tons for any individual HAP or 25 tons for combination of all HAPs. 3H2S major threshold per AQR 12.2.19 (amended 10/07/04).

voc HAP TCS (H2S)

27.94 3.20 0.00

32.89 32.16 147.27

100 10/252 13

Pursuant to AQR 12.5.2.7 (AQR 19.4.2), all terms and conditions in Sections I through IV, and the attachments in this operating permit are federally enforceable unless explicitly denoted otherwise.

Permit Issuance: November 9, 2011

Page 62: 2014 Apex Operations Plan-web Site-1

TABLE OF CONTENTS

PART 70 OPERATING PERMIT Source: 395

Page 3 of 41

I. ACRONYMS ................................•..................................................................................... 4

II. GENERAL CONDITIONS ..........................................................................................•...... 6 A. General Requirements .............. ............................................................................. 6 B. Modification, Revision, Renewal Requirements ..................................................... 7 C. Reporting/Notificati.ons/Providing Information Requirements ................................ 8 D. Compliance Requirements .................................................................................... 9 E. Performance Testing Requirements .................................................................... 10

Ill. EMISSION UNITS AND APPLICABLE REQUIREMENTS ............................................. 11 A. Emission Units ..................................................................................................... 11 B. Emission Limitations and Standards .................................................................... 16

1. Emission Limits ................................................................. ....................... 16 2. Operational Limits .......................................................... .......................... 19 3. Emission Controls .. ............... .......................................... ......................... 21

C. Monitoring ......... .......... ....... ........ .... ......................................... ............................. 27 D. Testing ... ................................. ....... .. ..... ............................................................... 31 E. Record Keeping ................................................................................................... 34 F. Reporting ................................................................................... .......................... 38 G. Mitigation ............................................................................................................. 39

IV. OTHER REQUIREMENTS .............................................................................................. 39

ATTACHMENT 1 ........................................................................................................................ 40

Permit Issuance: November 9, 2011

Page 63: 2014 Apex Operations Plan-web Site-1

I. ACRONYMS

T bl 11 A a e .. : cron ms Acronym Term

AQR Clark County Air Quality Regulations AIL Air to Liquid Ratio ATC Authority to Construct bhp Brake Horse Power oc Degrees Celsius

CAAA Clean Air Act, as amended CARB California Air Resources Board CEMS Continuous Emissions Monitoring System CFR United States Code of Federal Regulations co Carbon Monoxide

PART 70 OPERATING PERMIT Source: 395

Page 4 of41

DAQEM Clark County Department of Air Quality & Environmental Management EPA United States Environmental Protection Agency EF Emission Factor EO Executive Order EU Emission Unit

EVR Enhanced Vapor Recovery OF D~rees Fahrenheit

GOO Gasoline Dispensing Operation GPM Gallons per Minute HAP Hazardous Air Pollutant HP Horse Power H2S Hydrogen Sulfide kW kilowatt

LANDGem Landfill Gas Emissions Model LFG Landfill Gas m"/yr Cubic meter per year Mg/yr Megagram per year

MMBtu Millions of British Thermal Units MMscf Million Standard Cubic Foot

MIN Model Number MSWL Municipal Solid Waste Landfill NAICS North American Industry Classification System NMOC Non-Methane Organic Compounds

NOx Nitrogen Oxides NRS Nevada Revised Statutes OP Operating Permit

PM2.s Particulate Matter less than 2.5 microns PM,o Particulate Matter less than 1 0 microns ppm Parts per Million

ppmvd Parts per Million, Volumetric Dry PTE Potential to Emit

QAIAC Quality Assurance/Quality Control RMP Risk Management Plan sec Source Classification Codes scf Standard Cubic Feet

scfm Standard Cubic Feet per minute SIC Standard Industrial Classification SIP State Implementation Plan S/N Serial Number SOx Sulfur Oxides

Permit Issuance: November 9, 2011

Page 64: 2014 Apex Operations Plan-web Site-1

Acronym SSM Startup, Shutdown, and Malfunction TCS Toxic Chemical Substance tpy Tons per Year

TRS Total Reduced Sulfur VEE Visible Emission Evaluation VMT Vehicle Miles Traveled voc Volatile Organic Compound

Permit Issuance: November 9, 2011

Term

PART 70 OPERATING PERMIT Source: 395

Page 5 of 41

Page 65: 2014 Apex Operations Plan-web Site-1

II. GENERAL CONDITIONS

A. General Requirements

PART 70 OPERATING PERMIT Source: 395

Page 6 of 41

1. The Permittee must comply with all conditions of the Part 70 Operating Permit. Any permit noncompliance may constitute a violation of the AQRs, Nevada law, and the Act, and is grounds for any of the following: enforcement action; permit termination; revocation and re-issuance; revision; or denial of a permit renewal application. [AQR 12.5.2.6(g)(1)]

2. If any term or condition of this permit becomes invalid as a result of a challenge to a portion of this permit, the other terms and conditions of this permit shall not be affected and shall remain valid. [AQR 12.5.2.6(f)]

3. The Permittee shall pay all permit fees pursuant to AQR Section 18. [AQR 12.5.2.6(h)]

4. The permit does not convey any property rights of any sort, or any exclusive privilege. [AQR 12.5.2.6(g)(4)]

5. The Permittee shall not hinder, obstruct, delay, resist, interfere with, or attempt to interfere with the Control Officer, or any individual to whom authority has been duly delegated for the performance of any duty by the AQR. [AQR 5.1.1]

6. The Permittee shall allow the Control officer, or an authorized representative, upon presentation of credentials and other documents as may be required by law, to enter the Permittee's premises where a Part 70 source is located or emissions related activity is conducted and to: [AQR 12.5.2.B(b)]

a. Have access to and copy any records that must be kept under the conditions of the permit;

b. Inspect any facilities, equipment (including monitoring and air pollution control equipment), practices, or operations regulated or required under the permit;

c. Sample or monitor substances or parameters for the purpose of assuring compliance with the permit or applicable requirements; and

d. Document alleged violations using devices such as cameras or video equipment.

7. The Permittee owning, operating, or in control of any equipment or property who shall cause, permit, or participate in, any violation of the AQR shall be individually and collectively liable to any penalty or punishment imposed by and under the AQR. [AQR 8.1]

8. Any Permittee who fails to submit any relevant facts or who has submitted incorrect information in a permit application shall, upon becoming aware of such failure or incorrect submittal, promptly submit such supplementary facts or corrected information. [AQR 12.5.2.2]

Permit Issuance: November 9, 2011

Page 66: 2014 Apex Operations Plan-web Site-1

B. Modification, Revision, Renewal Requirements

PART 70 OPERATING PERMIT Source: 395 Page7of41

1. No person shall begin actual construction of a New Part 70 source, or modify or reconstruct an existing Part 70 source that falls within the preconstruction review applicability criteria, without first obtaining an Authority to Construct Permit from the Control Officer [AQR 12.4. 1. 1 (a)]

2. The permit may be revised, revoked, reopened and reissued, or terminated for cause. The filing of a request by the Permittee for a permit revision, revocation, reissuance, or termination, or of a notification of planned changes or anticipated noncompliance does not stay any permit condition. [AQR 12.5.2.6(g)(3)]

3. A permit, permit revision, or renewal may be approved only if all of the following conditions have been met: [AQR 12.5.2.10(a)]

a. The Control Officer has received a complete application for a permit, permit revision, or permit renewal, except that a complete application need not be received before a Part 70 general permit is issued pursuant to Section 12.5.2.20;

b. Except for revisions qualifying as administrative or minor permit revisions under Section 12.5.2.13 or paragraphs (a) and (b) of Section 12.5.2.14, the Control Officer has complied with the applicable requirements for public participation in Section 12.5.2.17;

c. The Control Officer has complied with the requirements for notifying and responding to EPA and affected states under paragraph (b) of Section 12.5.2.18;

d. The conditions of the permit provide for compliance with all applicable requirements and the requirements of Section 12.5; and

e. EPA has received a copy of the proposed permit or permit revision and any notices required under paragraphs (a) and (b) of Section 12.5.2.18, and has not objected to issuance of the permit under paragraph (c) of Section 12.5.2.18 within the time period specified therein.

4. The Permittee shall not build, erect, install or use any article, machine, equipment or process, the use of which conceals an emission, which would otherwise constitute a violation of an applicable requirement. [AQR 80.1 and 40 CFR 60.12]

5. No permit revisions shall be required under any approved economic incentives, marketable permits, emissions trading and other similar programs or processes for changes that are provided for in the permit. [AQR 12.5.2.6(i)]

6. Permit expiration terminates the Permittee's right to operate unless a timely and complete renewal application has been submitted. [AQR 12.5.2.11(b)]

7. For purposes of permit renewal, a timely application is a complete application that is submitted at least six (6) months and not greater than eighteen (18) months prior to the date of permit expiration. If a source submits a timely application under this provision, it may continue operating under its current Part 70 Operating Permit until

Permltlssuance: November 9, 2011

Page 67: 2014 Apex Operations Plan-web Site-1

PART 70 OPERATING PERMIT Source: 395 Page 8 of 41

final action is taken on its application for a renewed Part 70 Operating Permit. [AQR 12.5.2.1 (a)(2)]

C. Reporting/Notifications/Providing Information Requirements

1. The Permittee shall submit all compliance certifications to the Control Officer. [AQR 12.5.2.8(e)(4)]

2. Any application form, report, or compliance certification submitted pursuant to the permit or AQRs shall contain certification by a responsible official of truth, accuracy, and completeness. This certification and any other certification required under AQR 12.5 shall state that, based on information and belief formed after reasonable inquiry, the statements and information in the document are true, accurate, and complete. [AQR 12.5.2.6(1)]

3. The Permittee shall furnish to the Control Officer, within a reasonable time, any information that the Control Officer may request in writing to determine whether cause exists for revising, revoking and reissuing, or terminating the permit, or to determine compliance with the permit. Upon request, the Permittee shall also furnish to the Control Officer copies of records required to be kept by the permit or, for information claimed to be confidential, the Permittee may furnish such records directly to the Administrator along with a claim of confidentiality. [AQR 12.5.2.6(g)(5)]

4. Upon request of the Control Officer, the Permittee shall provide such information or analyses as will disclose the nature, extent, quantity or degree of air contaminants which are or may be discharged by such source, and type or nature of control equipment in use, and the Control Officer may require such disclosures be certified by a professional engineer registered in the state. In addition to such report, the Control Officer may designate an authorized agent to make an independent study and report as to the nature, extent, quantity or degree of any air contaminants which are or may be discharged from the source. An authorized agent so designated is authorized to inspect any article, machine, equipment, or other contrivance necessary to make the inspection and report. [AQR 4.4]

5. The Permittee shall submit annual emissions inventory reports based on the following: [AQR 18.6.1]

a. The annual emissions inventory must be submitted to DAQEM by March 31 of each calendar year; and

b. The report shall include the emission factors and calculations used to determine the emissions from each permitted emission unit, even when an emission unit is not operated.

6. The Permittee shall make all production, emission and monitoring calculations available to the Control Officer for inspection within 30 days from the end of each month. [AQR12.5.2.8]

7. The Permittee who has been issued a permit under Section 12.5 shall post such permit in a location which is clearly visible and accessible to the facility's employees and representatives of the department. [AQR 12.5.2.6(m)}

Permit Issuance: November 9, 2011

Page 68: 2014 Apex Operations Plan-web Site-1

D. Compliance Requirements

PART 70 OPERA TJNG PERMIT Source: 395

Page 9 of 41

1. The Permittee shall not use as a defense in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this permit. [AQR 12.5.2.6(g)(2)]

2. Any person who violates any provision of AQR, including, but not limited to, any application requirement; any permit condition; any fee or filing requirement; any duty to allow or carry out inspection, entry or monitoring activities or any requirements by DAQEM is guilty of a civil offense and shall pay civil penalty levied by the Air Pollution Control Hearing Board and/or the Hearing Officer of not more than $10,000. Each day of violation constitutes a separate offense. [AQR 9.1]

3. Any person aggrieved by an order issued pursuant to AQR Section 9 is entitled to review as provided in Chapter 233B of NRS. [AQR 9.12]

4. The Permittee of any stationary source or emission unit that fails to demonstrate compliance with the emissions standards or limitations shall submit a compliance plan to the Control Officer pursuant to AQR Section 10. [AQR 10.1]

5. The Permittee shall comply with the requirements of 40 CFR 61, Subpart M, of the National Emission Standard for Asbestos for all demolition and renovation projects. [AQR 13.1(b)(B)]

6. Permittee shall submit compliance certification with terms and conditions contained in the Operating Permit, including emission limitations, standards, or work practices, as follows: [AQR 12.5.2.B(e)]

a. the Permittee shall submit compliance certifications annually in writing to the Control Officer (500 Grand Central Parkway, Box 555210, Las Vegas, NV 89155) and the Administrator at USEPA Region IX (Director, Air and Taxies Divisions, 75 Hawthorne St., San Francisco, CA 94105). A compliance certification for each year will be due on January 3oth of the following year;

b. annual submission of compliance certification, or more frequently if specified in the applicable requirement or by the Control Officer;

c. a means for monitoring the compliance of the source with its emission limitations, standards, and work practices;

d. compliance certification shall include all of the following: i. the identification of each term or condition of the permit that is the basis of

the certification;

ii. the identification of the methods or other means used by the owner or operator for determining the compliance status with each term and condition during the certification period;

iii. the status of compliance with the terms and conditions of the permit for the period covered by the certification, including whether compliance during the period was continuous or intermittent;

Permit Issuance: November 9, 2011

Page 69: 2014 Apex Operations Plan-web Site-1

PART 70 OPERATING PERMIT Source: 395

Page 10 of 41

iv. such other facts as the Control Officer may require to determine the compliance status of the source.

7. The Permittee shall report to the Control Officer (500 Grand Central Parkway, Box 555210, Las Vegas, NV 89155) any upset, breakdown, malfunction, emergency or deviation which cause emissions of regulated air pollutants in excess of any limits set by regulation or by this permit. The report shall be in two parts as specified below: [AQR 12.5.2.6(d)(4)(B) and AQR 25.6.1]

a. within twenty-four (24) hours of the time the Permittee learns of the event, the report shall be communicated by phone (702) 455-5942, fax (702) 383-9994, or email.

b. within seventy-two (72) hours of the notification required by paragraph (a) above, the detailed written report containing the information required by AQR Section 25.6.3 shall be submitted.

8. The Permittee shall report to the Control Officer deviations that do not result in excess emissions, with the quarterly reports. Such reports shall include the probable cause of deviations and any corrective actions or preventative measures taken. [AQR 12.5.2.6(d)(4)(8)]

E. Performance Testing Requirements

1. Upon request of the Control Officer, the Permittee shall test or have tests performed to determine the emissions of air contaminants from any source whenever the Control Officer has reason to believe that an emission in excess of that allowed by the DAQEM regulations is occurring. The Control Officer may specify testing methods to be used in accordance with good professional practice. The Control Officer may observe the testing. All tests shall be conducted by reputable, qualified personnel. [AQR 4.5]

2. Upon request of the Control Officer, the Permittee shall provide necessary holes in stacks or ducts and such other safe and proper sampling and testing facilities, exclusive of instruments and sensing devices, as may be necessary for proper determination of the emission of air contaminants. [AQR 4.6]

3. The Permittee shall submit for approval a performance testing protocol which contains testing, reporting, and notification schedules, test protocols, and anticipated test dates to the Control Officer (500 Grand Central Parkway, Box 555210, Las Vegas, NV 89155) not less than 45 nor more than 90 days prior to the anticipated date of the performance test [AQR 12.5.2.8], unless othetWise specified for stationary RICE in Section 111-D of this permit.

4. The Permittee shall submit to EPA for approval any alternative test methods that are not already approved by EPA. [40 CFR 60.8(b)]

5. The Permittee shall submit a report describing the results of each performance test to the Control Officer within 60 days from the end of the performance test. [AQR 12.5.2.8}

Permit Issuance: November 9, 2011

Page 70: 2014 Apex Operations Plan-web Site-1

Ill. EMISSION UNITS AND APPLICABLE REQUIREMENTS

PART 70 OPERATING PERMIT Source: 395

Page 11 of 41

[NSR ATC/OP Modification 4, Revision 1, Section IV-A (12/03/08), NSR ATC Modification 5, Revision 0, Section IV-A-1 (12/31/10), NSR ATC Modification 6, Revision 0, Section IV-A (02/27/09), Modification 8, Revision 1, Section IV-A, (05/13/10) and 12.4.3.2(b)/12.5.2.14(a)]

A. Emission Units

1. The stationary source covered by this Part 70 OP consists of the emission units and associated appurtenances summarized in Tables 111-A-1 and 111-A-2. [AQR 12.5.2.3/19.2.1 and 19.3.3.3]

T bl Ill A 1 L. t f E a e - - IS 0 miSSIOn U 'ts f th A t PI t nl or e ~ggrega e an

EU Description Rating

Make Model# Serial# (tph)

Primary Plant A01 Mining/Excavation 4,825 A02 Grizzly 1 1,650

Grizzly to Primary Crusher 1 A04 Primary Crusher 1 600 Crush Boss HSI400 6356511

Primary Crusher 1 to Belt 1

A07 2 Belt System (Drop from 1,650 Grizzly and Belt 1 to Belt 2)

A08 Grizzly 2 600 Grizzly 2 to Primary Crusher 2

A09 Primary Crusher 2 600 Crush Boss HSI400 6356536 Primary Crusher 2 to Belt 3 3 Belt System (Grizzly to Belt 2, Belt 3 to Belt 4 and Belt 4 to 1,650

A12 Belt 5)

2 Belt Transfers (Belt 2 to Belt 2,500

5 and Belt 5 to Stacker S1)

A16 Stacker S1 2,500 7 Belt System (Belt Feeders 6, 7 and 8 to Belt 9, Belt 9 to Belt

A17 10, Belt 10 to Belt 11, Belt 11 to 2,500 Belt 12 and Belt 12 to Stacker S2)

A22 Stacker S2 2,500 Gabion Plant

A23 Belt 12 to Belt 13 (From

415 Primary Plant) Belt 13 to Gabion Screen SC1 Gabion Screen SC 1

A25 Gabion Screen SC1 to Belt 14 415 Telsmith 6x16TD 275M101C1607

Gabion Screen SC 1 to Belt 15 Gabion Screen SC 1 to Belt 16

A27 Belt 14 210 A28 Stacker S3 210 A30 Belt 15 105 A31 Stacker S4 105

Permit Issuance: November 9, 2011

Page 71: 2014 Apex Operations Plan-web Site-1

EU Description

A33 Belt 16 A34 Stacker SS

Secondary Plant

A35 Belt Feeder 17 to Belt 18

Belt 18 to Triple Deck Screens SC2 and SC3 Triple Deck Screen SC2

A37 Screen SC2 to Belt 19 Screen SC2 to Belt 21 Screen SC2 to Belt 26 Screen SC2 to Belt 31 Triple Deck Screen SC3

A38 Screen SC3 to Belt 21 Screen SC3 to Belt 32

2 Belt System (Belt 19 to Belt A40 20 and Belt 20 to Stacker S6)

Belt 32 to Belt 20 A42 Stacker S6

2 Belt System (Belt 21 to Belt

A44 22 and Belt 22 to Stacker S7) Additional Transfer from SC3 (via Belt 21) Included

A46 Stacker S7

A47 2 Belt Feeders to Belt 25

A49 2 Belt System (Belt 26 to Belt 27 and Belt 27 to Stacker S8)

A51 Stacker S8

A52 2 Belt Feeders to Belt 30

Belt 31 to HSI 1 Crusher A 58 HSI1 Crusher

HSI 1 Crusher to Belt 33 A60 Recirculation Belt 33

Sand Plant Belt 25 to VSI Crusher 1

A62 Belt 35 to VSI Crusher 1 VSI Crusher 1 VSI Crusher 1 to Belt 34 Belt 34 to Screen SC4

A65 Screen SC4 Screen SC4 to Belt 35 Screen SC4 to Belt 39 3 Belt System (Belt 36 to Belt

A69 37, Belt 37 to Belt 38 and Belt 38 to Stacker S9)

A72 Stacker S9

Permit Issuance: November 9, 2011

Rating Make

(tph)

105 105

1,525

900 JCI

900 JCI

900

900 900

300

300

500

500

500

500

600 Crush Boss

200 CEMCO

300 JCI

210

210

PART 70 OPERATING PERMIT Source: 395

Page 12 of 41

Model# Serial#

6x20 TO SAD1554A

6x20TD 96H02B32

HSI400 101400

70 AVE0195170

6x20TD 96HOSD32

Page 72: 2014 Apex Operations Plan-web Site-1

EU Description

3 Belt System (Belt 39 to Belt A74 40, Belt 40 to Belt 41 and Belt

41 to Stacker S10)

A77 Stacker S10 Cone Plant

Belt 30 to Cone Crusher 1 A79 Cone Crusher 1

Cone Crusher 1 to Belt 42 Belt 42 to Screens SCS and SC6

A82 Triple Deck Screen SCS Screen SCS to Belt 43 Screen SCS to Belt 49 Screen SCS to Belt 51

A83 Triple Deck Screen SC6 Screen SC6 to Belt 45

ASS 2 Belt System (Belt 43 to Belt 44 and Belt 44 to Stacker S11)

A87 Stacker S11 4 Belt System (Belt 45 to Belt

A89 46, Belt 46 to Belt 47, Belt 47 to Belt 48 and Belt 48 to Stacker S12)

A93 Stacker S12

A95 2 Belt System (Belt 49 to Belt 50 and Belt 50 to Belt 30) 4 Belt System (Belt 51 to Belt 52, Belt 52 to Belt 53, Belt 53 to

A98 Belt 54 and Belt 54 to Stacker S13) Belt 53 to Belt 55

A102 Stacker S13 Belt 55 to VSI Crusher 2

A104a VSI Crusher 2 VSI Crusher 2 to Belt 39

Wash Plant A106 Belt Feeder 56 to Belt 57

Belt 57 to Screens SC7 and sea

A108 Triple Deck Screen SC7 Screen SC7 to Sand Screw 1 Screen SC7 to Belt 61 Triple Deck Screen SCB

A109 Screen SCB to Sand Screw 2

Screen SCB to Belt 60 Screen SCB to Belt 61

A112 Sand Screw 1 to Belt 58 A113 Sand Screw 2 to Belt 58

Permit Issuance: November 9, 2011

Rating Make

(tph)

200

200

300 Nordberg

450 JCI

450 JCI

210

210

300

300

250

450

150 450

150 CEMCO

1,200

605 JCI

605 Cedar Rapids

70 70

PART 70 OPERATING PERMIT Source: 395

Page 13 of 41

Model# Serial#

HP300 30310657

6x20TD 99H03K32

7x20TD 43J0491

80 ADEV0399180V

6x20TD 96H01B32

TSS 6203-54400

32

Page 73: 2014 Apex Operations Plan-web Site-1

EU Description Rating

Make (tph)

A114 2 Belt System (Belt 58 to Belt

140 59 and Belt 59 to Stacker S14)

A116 Stacker S14 140 A118 Belt 60 to Stacker S15 550 A119 Stacker S15 550

2 Belt System (Belt 61 to Belt A122 62 and Belt 62 to Storage 415

Hopper) A124 Storage Hopper to Belt 63 415 A125 Belt 63 to Rock Truck 415 A126 Rock Truck Dumping 415 Landfill Cover Plant

A127 Blasting 24,200 tr/hr

A128 Grizzly 3 1,800 Grizzly 3 to Primary Crusher 2

A130 Primary Crusher 2 400 Crush Boss Primary Crusher 2 to Belt 64 Grizzly 3 to Belt 64 1,400

A133 2 Belt System (Belt 64 to Belt 1,800 65 and Belt 65 to Belt 66)

Belt 66 to Screen SC9 Belt 75 to Screen SC9 Screen SC9

Cedar A136 Screen SC9 to Belt 67 1,800

Screen SC9 to Belt 70 Rapids

Screen SC9 to Belt 72 Screen SC9 to Belt 74 3 Belt System (Belt 67 to Belt

A138 68, Belt 68 to Belt 69 and Belt 1,000 69 to Stacker S16)

A141 Stacker S16 1,000

A143 2 Belt System (Belt 70 to Belt 500 71 and Belt 71 to Stacker S17)

A145 StackerS17 500

A147 2 Belt System (Belt 72 to Belt

300 73 and Belt 73 to Stacker S18)

A149 Stacker S18 300 Belt 7 4 to Cone Crusher 2

A151 Cone Crusher 2 200 Svedala Cone Crusher 2 to Belt 75

Table 111-A-2· List of Emission Units for the MSWL EU Description Rating Make

H01 Haul Road, Paved (2.0 miles Round 1,237,592 Trip) VMT/yr

H02 Haul Road, Unpaved 321,920 VMT/vr

Pennlt Issuance: November 9, 2011

PART 70 OPERATING PERMIT Source: 395

Page 14 of41

Model# Serial#

400 400504

8x20 TO 46531

S-3000 03JA08802

Model# Serial#

Page 74: 2014 Apex Operations Plan-web Site-1

EU Description Rating Soil Treatment Bulk Material Unloading Stationary Grizzly Deck

W01 Material Transfer to Soil Treatment 20,000 tpy Cell Soil Transfer from Soil Treatment Cell

W02 Soil Treatment Waste Processing 20,000 tpy Industrial Waste Cover Material

W03 Dumping 435,000 tpy Transfer to Face Cover Material

W04 Industrial Waste VOC from Landfill 200,000 tpy Gas

W05 Cover Materi"'l Handing for Waste 1,090,951 tpy Placement

W06 1-2,500 aboveground gasoline

61,771 gal/yr storage tank, Regular

W07 Enclosed Combustion LFG Flare 29.4 MMBtu/hr

W08 Waste Placement 13,008,600 tpy

W09 Stockpiles: Active/Inactive (cover

123.11 acres material)

W100 Fugitive Emissions from Landfill

N/A (based on 2006 Estimates) W200 Diesel Generator: DOM 1994 2,593 hp W201 Diesel Generator: DOM 1996 2,593 hp W203 Diesel Generator: DOM 1998 1,072 hp W204 Diesel Generator: DOM 1998 1,108 hp

W205 Diesel Tipper Engine: DOM Pre-

150 hp 2006

W206 Diesel Generator: DOM Pre-2006 188 bhp W207 Diesel Generator: DOM Pre-2006 188 bhp

W208 Diesel Generator: DOM Pre-2006 77 bhp

W209 Diesel Generator: DOM Pre-2006 315 hp

W213 Diesel Engine DOM 2006 115 hp

W214 Diesel Generator 186kW Diesel Engine, DOM: 2009 or later 250 hp

W215 Diesel Generator 186kW Diesel Engine, DOM: 2009 or later 250 hp

W216 Diesel Generator 133kW Diesel Engine, DOM: 2011 175 hp

W217 Diesel Generator 133kW Diesel Engine, DOM: 2011 175 hp

Permit Issuance: November 9, 2011

Make

Callidus

CAT CAT CAT CAT

CAT

Cummins Cummins

lsuzu

CAT

John Deere

Cummins

Cummins

John Deere

John Deere

PART 70 OPERATING PERMIT Source: 395

Page 15 of 41

Model# Serial#

G8844

3516 5SJ00130 3516 7RN00440

3412CDITA 2WJ02059 3412CDITA 2WJ01887

3208 35601941

6CT8.3-G2 F99093314 6CT8.3-G2 F99093315

QD145 3647886 "6BD1"

3406 90U16559

4045HF275 PE4045H672 600

125DSGAB D110207218

125DSGAB TBD

4045 TBD

4045 TBD

Page 75: 2014 Apex Operations Plan-web Site-1

B. Emission Limitations and Standards

1. Emission Limits

Aggregate Plant

PART 70 OPERATING PERMIT Source: 395

Page 16 of41

a. The Permittee shall not allow actual emissions from each em1ss1on unit at the aggregate plant to exceed the PTE listed in Table 111-B-1 in any consecutive 12-month period. [NSR ATCIOP Modification 4, Revision 1, Section /V-B (12103108), NSR ATC Modification 5, Revision 0, Section /V-B-2 (12131110), NSR ATC Modification 6, Revision 0, Section /V-B, (02127109), Modification 8, Revision 1, Section /V-A-2, (05113110)]

Table 111-8·1: PTE Aggregate Plant (tons per year) EU PM,o EU PM,o EU PM1o

A01 0.32 A46 0.03 A106 0.12 A02 0.03 A47 0.07 A108 0.01 A04 0.04 A49 0.09 A109 0.01 A07 0.18 AS1 o.os A112 0.01 A08 0.02 AS2 0.09 A113 0.01 A09 0.04 ASS 0.02 A114 0.01 A12 0.46 A60 o.os A116 0.01 A16 0.16 A62 0.02 A11S 0.01 A17 1.13 A65 O.S9 A119 0.01 A22 0.16 A69 0.03 A122 0.01 A23 0.02 A72 0.01 A124 0.01 A2S 0.37 A74 0.07 A12S 0.01 A27 0.01 A77 0.02 A126 0.01 A2S 0.01 A79 0.02 A12S 0.02 A30 0.01 AS2 0.74 A130 0.01 A31 0.01 AS3 0.74 A133 0.19 A33 0.01 ASS 0.03 A136 1.11 A34 0.01 AS7 0.01 A13S 0.14 A3S 0.14 A89 0.14 A141 o.os A37 1.22 A93 0.03 A143 o.os A3S 1.22 A9S o.os A14S 0.02 A40 0.21 A9S 0.1S A147 0.02 A42 0.07 A102 0.03 A149 0.01 A44 0.10 A104a 0.01 A151 0.01

b. The Permittee shall not discharge into the atmosphere, from any emission unit at the aggregate plant, any air contaminant in excess of an average of 20 percent opacity for a period of more than 6 consecutive minutes, unless otherwise required by this permit. [AQR 26.1.1]

c. The Permittee shall not discharge into the atmosphere fugitive dust emissions from screens, conveyors and transfer points that commenced construction, modification or reconstruction afterApril22, 2008 (EUs: A02, A07, ADS, A12, A16, A17, A22, A23, A25, A27, A28, A30, A31, A33, A34, A35, A37, A38, A40, A42, A44, A46, A47, A49, A51, A52, A60,A65,A69, A72,A74,A77,A82,A83,A85,A87, A89,A93,A95,A98,A102, A106, A128, A133, A136, A138, A141, A143, A145, A147 and A149) in excess of an average of 7.0 percent opacity for a period of more than 6 consecutive minutes. [40 CFR 60, Subpart 000]

Permit Issuance: November 9, 2011

Page 76: 2014 Apex Operations Plan-web Site-1

PART 70 OPERATING PERMIT Source: 395

Page 17 of41

d. The Permittee shall not discharge into the atmosphere fugitive dust emissions from crushers that commenced construction, modification or reconstruction after April 22, 2008 (Eus: A04, A09, A58, A62, A79, A104a, A130 and A151) in excess of an average of 12.0 percent opacity for a period of more than 6 consecutive minutes. [40 CFR 60, Subpart 000]

e. The Permittee shall not discharge into the atmosphere visible emissions from emission units specified in this document as either an enclosed or wet process (Eus: A 108, A 109, A112, A113, A114, A116, A118, A119, A122, A124, A125 and A126). [NSR ATC Modification 5, Revision 0, Condition IV-A-2(e) (12131110)]

f. The Permittee shall not allow actual stack emissions from each baghouse for emission units that commenced construction, modification or reconstruction after April 22, 2008, to exceed the concentration rates listed in Table 111-B-2. [40 CFR 60, Subpart 000]

g. The Permittee shall not allow actual emissions from each emission unit to exceed the mass emission rates listed in Table 111-B-2. [NSR ATC Modification 5, Revision 0, Section JV-A-2(g) (12131/10)]

T bl Ill 8 2 E . I R t a e - . . m1ss on a esan dC t ti oncen ra ons A t PI t ~ggrega e an

EU PM1o Mass Emission Rate PM Stack Emission Concentrations (pounds per hour) (g/dscm) (gr/dscf)

A04 0.01 0.032 0.014 A09 0.01 0.032 0.014 A 58 0.01 0.032 0.014 A62 0.01 0.032 0.014 A79 0.01 0.032 0.014

A104a 0.01 0.032 0.014 A130 0.01 0.032 0.014 A151 0.01 0.032 0.014

Blasting

h. The Permittee shall not allow actual emissions from blasting operations (EU: A 127) to exceed the PTE listed in Table 111-B-3 in any consecutive 12-month period. [NSR ATCIOP Modification 4, Revision 1, Section /V-B (12103/08), NSR ATC Modification 5, Revision 0, Section IV-A (12131110), NSR ATC Modification 6, Revision 0, Section /V-B, (02127/09), Modification 8, Revision 1, Section /V-A-2, (05113110)]

Table 111-B-3: PTE Blastin

MSWL

EU co A127 29.11

i. The Permittee shall not allow actual emissions from each emission unit to exceed the PTE listed in Table 111-B-4 in any consecutive 12-month period. [NSR ATCIOP Modification 4, Revision 1, Section /V-B (12103108), NSR ATC Modification 5, Revision 0, Section IV-A (12131110), NSR ATC Modification 6, Revision 0, Section /V­B, (02127109), Modification 8, Revision 1, Section IV-A-2, (05113110) and 12.4.3.2(b)/12.5.2.14(a)]

Permit Issuance: November 9, 2011

Page 77: 2014 Apex Operations Plan-web Site-1

Table 111-B-4: PTE MSWL (tons per year) EU PM1o PM2.5 NOx H01 93.69 0.00 0.00 H02 121.85 0.00 0.00 W01 0.26 0.00 0.00 W02 0.00 0.00 0.00 W03 2.18 0.00 0.00 W04 0.00 0.00 0.00 was 3.97 0.00 0.00 W06 0.00 0.00 0.00 W07 8.37 8.37 4.89 woe 1.04 0.00 0.00 W09 3.58 0.00 0.00

W200 0.02 0.02 2.77 W201 1.38 1.38 37.54 W203 0.50 0.50 15.23 W204 0.29 0.29 9.93 W205 0.55 0.55 7.83 W206 0.20 0.20 5.47 W207 0.20 0.20 5.47 W208 0.01 0.01 0.07 W209 0.02 0.02 0.30 W213 0.24 0.24 4.31 W214 0.36 0.36 7.24 W215 0.36 0.36 7.24 W216 0.25 0.25 4.41 W217 0.25 0.25 4.41

co SOx 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.27 169.98 0.00 0.00 0.00 0.00 0.25 0.02

20.90 1.11 2.44 0.33 1.67 0.22 1.69 1.09 0.45 0.14 0.45 0.14 0.02 0.01 0.06 0.01 4.14 1.03 6.28 2.24 6.28 2.24 2.02 1.57 2.02 1.57

PART 70 OPERATING PERMIT Source: 395

Page 18 of 41

voc HAP 0.00 0.00 0.00 0.00 0.00 0.00 2.78 0.00 0.00 0.00 0.19 0.00 0.00 0.00 0.40 0.10 0.26 0.09 0.00 0.00 0.00 0.00 0.08 0.03 3.54 1.53 0.40 0.45 0.26 0.30 0.67 0.13 0.14 0.20 0.14 0.20 0.01 0.01 0.03 0.01 0.32 0.02 2.75 0.05 2.75 0.05 1.93 0.03 1.93 0.03

j. The Permittee shall not allow actual fugitive emissions from the landfill (EU: W100) to exceed the PTE listed in Table 111-8-5 in any consecutive 12-month period. [NSR A TCIOP Modification 4, Revision 1, Section IV-B (11104108), NSR A TC Modification 5, Revision 0, Section /V-B (12131110), NSR ATC Modification 6, Revision 0, Section /V-B, (02127109), Modification 8, Revision 1, Section /V-A-2, (05113/10)]

Table 111-B-5: PTE MSWL Fugitive Emissions (tons per year)

EU Description Pollutant Maximum Emissions

tons/year

Fugitive Emissions from Landfill (based VOC (including HAP} 32.89

W100 HAP (Not including H2S} 32.16 on 2006 Estimates}

TCS (only H2S} 147.27

k. The Permittee shall not allow actual emissions from the flare (EU: W07) to exceed the emission rates and concentrations listed in Tables 111-8-6. [NSR A TC Modification 4, Revision 1, Section IV-A(10) (11104108)]

Table 111-B-6: Emission Rates MSWL (pounds per hour) EU PM1o PMz.s NO a co SO,. voc HAP

W07 1.91 1.91 1.12 0.06 38.81 0.06 0.01

Permit Issuance: November 9, 2011

Page 78: 2014 Apex Operations Plan-web Site-1

PART 70 OPERATING PERMIT Source: 395

Page 19 of 41

I. The Permittee shall maintain paved haul roads so not to discharge into the atmosphere fugitive dust emissions in excess of an average opacity of 20 percent for a period of more than 6 consecutive minutes (EU: H01). [AQR 26.1.1]

m. The Permittee shall maintain the unpaved haul roads so not to discharge into the atmosphere fugitive dust emissions in excess of an average opacity of 20 percent for a period of more than 6 consecutive minutes (EU: H02). [AQR 26.1.1]

n. The Permittee shall not discharge into the atmosphere, from any emission unit at the MSWL, any air contaminant in excess of an average of 20 percent opacity for a period of more than 6 consecutive minutes, unless otherwise required by this permit. [AQR 26.1.1]

o. The Permittee shall calculate fugitive emissions from the landfill on the assumption that 25 percent of the LFG generated is not captured by the capture and collection system. Recalculation of the fugitive emissions from the landfill shall be carried out, based on the actual amount of refuse in place; every five years (estimated fugitive emissions were calculated in 2006). [AQR 12.5.2.6(a)IAQR 19.4.1.1]

p. As of May 3, 2013, the Permittee shall comply with the applicable emission limitations and operating limitations of 40 CFR 63 Subpart ZZll at all times (EUs: W200, W201, W203 through W209). [40 CFR 63.6605(a)]

q. The Permittee shall not discharge into the atmosphere emissions from the diesel engines (EU: W214, W215, W216 and W217) in excess of 4.0 g/kW-hr of NMHC+NOx, 3.5 g/kW-hr of CO or 0.20 g/kW-hr of PM. [40 CFR 60.4204(b)}

r. The Permittee shall not discharge into the air emissions from the diesel engine (EU: W213) in excess of 9.2 g/kW-hr of NOx. [40 CFR 60.4204(b)].

2. Operational Limits Aggregate Plant

a. The Permittee shall limit the amount of material processed at the aggregate plant to the production rates listed in Table 111-B-7. [NSR ATC Modification 5, Revision 0, Condition IV-A-3(a)(1213111 0)]

T bl Ill 8 7 M . a e - - ax1mum All owa e ro bl p d uct1on Th h t roug11pu s

EU Description Plant tons/year

A01 Mining/ Excavation Primary Plant 7,000,000 A25 Gabion Screen Gabion Plant 1,000,000 A37 Triple Deck Screen SC2 Secondary Plant 3,300,000 A38 Triple Deck Screen SC3 Secondary Plant 3,300,000 A62 VSI Crusher Sand Plant 1,600,000 A79 Cone Crusher 1 Cone Plant 2,000,000

A108 Triple Deck Screen SC7 Wash Plant 3,500,000 A109 Triple Deck Screen SCB Wash Plant 3,500,000 A130 Primary Crusher 2 Landfill Cover Plant 1,000,000 A136 Screen SC9 Landfill Cover Plant 3,000,000

b. The Permittee shall limit the total amount of surface area blasted to 1,733,886 W in any consecutive 12-month period. [NSR A TC Modification 5, Revision 0, Condition IV-A-3(b) (12131110)]

Permit Issuance: November 9, 2011

Page 79: 2014 Apex Operations Plan-web Site-1

MSWL

PART 70 OPERATING PERMIT Source: 395

Page 20 of 41

c. The Permittee shall limit the total vehicles miles traveled (VMT) on paved roads to 1,237,592 miles traveled in any consecutive 12-month period (EU: H01). [NSR ATC Modification 5, Revision 0, Condition /V-A-3(c) (12131/10)]

d. The Permittee shall limit the total vehicles miles traveled (VMT) on unpaved roads to 321,920 miles traveled in any consecutive 12-month period (EU: H02). [NSR ATC Modification 5, Revision 0, Condition IV-A-3(d) (12131110)]

e. The Permittee shall limit the Soil Treatment Operation to 20,000 tons of treated material in any consecutive 12-month period (EU: W01 and W02). [NSR ATCIOP Modification 4, Revision 1, Condition /V-A-6 (11/04/08)]

f. The Permittee shall limit the Industrial Waste Facility cover material to a total of 435,000 tons in any consecutive 12-month period (EU: W03). [NSR ATC!OP]

g. The Permittee shall limit the Industrial Waste Facility placement to 200,000 tons of treated material in any consecutive 12-month period (EU: W04). [NSR ATCIOP Modification 4, Revision 1, Condition /V-A-7 (11104!08)]The Permittee shall not accept waste containing more than one (1) percent biodegradable waste at the Industrial Waste facility.EU: W04). [NSR ATCIOP Modification 4, Revision 1, Condition /V-B-30 (11104108)]

h. The Permittee shall limit the Cover Material Handling for waste placement to a total of 1,090,951 tons in any consecutive 12-month period (EU: W05). [AQR 12.5.2.6(a)IAQR 19.4.1.1]

i. The Permittee shall limit the throughput of gasoline products through the fuel storage tank to a total of 61,771 gallons in any consecutive 12-month period (EU: W06). [NSR A TC Modification 8, Revision 1, Conditions IV-A-3(a and b) (0511311 0)]

j . The Permittee shall limit the actual flow of landfill gas through EU: W07 so as to not exceed the rated flow of 1,000 standard cubic feet per minute (scfm), unless the Permittee receives approval from DAQEM for a higher flow rate by demonstrating that exceeding the maximum flow rate does not result in any emissions greater than those listed in Tables 111-B-4 and 111-B-6. [NSR ATC/OP Modification 4, Revision 1, Condition IV-A-10 (11104108)]

k. The Permittee shall limit the throughput for the Waste Placement to 13,008,600 tons in any consecutive 12-month period (EU: W08). [NSR ATC, Modification 5, Revision 0, Condition /V-A-3(e) (12131110)]

I. The Permittee shall limit the total area of stockpiles to not more than 77.03 acres of active stockpiles and 46.08 acres of inactive stockpiles (EU: W09). [NSR A TC, Modification 5, Revision 0, Condition IV-A-3(f) (12131110)]

m. The Permittee shall limit the operation of the generator (EU: W200) to a total of 100 hours in any consecutive 12-month period. [NSR A TC Modification 5, Revision 0, Condition /V-A-3(g) (12131/10)]

n. The Permittee shall limit the operation of the generator (EU: W201) to a total of 3,200 hours in any consecutive 12-month period. [NSR A TC Modification 5, Revision 0, Condition) IV-A-3(h) (12131110)}

o. The Permittee shall limit the operation of the generator (EU: W203) to a total of 2,500 hours in any consecutive 12-month period. [NSR A TC Modification 5, Revision 0, Condition IV-A-3(i) (12131110)]

p. The Permittee shall limit the operation of the generator (EU: W204) to a total of 1,400 hours in any consecutive 12-month period. [NSR ATC Modification 5, Revision 0, Condition /V-A-3(j) (12131110)]

q. The Permittee shall limit the operation of the Tipper Engine (EU: W205) to a total of 4,380 hours in any consecutive 12-month period. [NSR ATC Modification 5, Revision 0, Condition IV-A-3(k) (12131110)]

Permit Issuance: November 9, 2011

Page 80: 2014 Apex Operations Plan-web Site-1

PART 70 OPERATING PERMIT Source: 395

Page 21 of 41

r. The Permittee shall limit the operation of each well generator (EUs: W206 and W207) to a total of 4,387 hours per generator in any consecutive 12-month period. [NSR A TC Modification 5, Revision 0, Condition IV-A-3(/J (1213111 OJ]

s. The Permittee shall limit the operation of the generator (EU: W208) to a total of 100 hours in any consecutive 12-month period. [NSR A TC Modification 5, Revision 0, Condition IV-A-3(mJ (12131110J]

t. The Permittee shall limit the operation of the generator (EU: W209) to a total of 75 hours in any consecutive 12-month period. [NSR A TC Modification 5, Revision 0, Condition IV-A-3(nJ (12131/10J)

3. Emission Controls

Aggregate Plant

a. The Permittee shall apply wet suppression to maintain moisture content and control emissions within allowable limits at the aggregate plant. Each mineral processing emission unit that is not connected to bag house controls or part of the wet process shall incorporate an effective water spray system that is maintained in good operating condition at all times. [AQR 41.1. 1]

b. The Permittee shall not cause or allow fugitive dust to become airborne without taking reasonable precautions and shall not cause or allow the discharge of fugitive dust in excess of 100 yards from the point of origin or beyond the lot line of the property on which the emissions originate, whichever is less. [AQR 41.1.1.1(aJ]

c. The Permittee shall use baghouses to control particulate emissions at all times the processing equipment is operating (EUs: A04, A09, A58, A62, A79, A104a, A130 and A151). [NSR ATC Modification 5, Revision 0, Condition IV-B-3 (12131110J)

d. The Permittee shall maintain each of the baghouses in good operating condition to achieve a particulate control efficiency of 99.0 percent (EUs: A04, A09, A58, A62, A79, A104a, A130 and A151). [NSR ATC Modification 5, Revision 0, Condition IV-B-4 (12131/10JJ

e. The Permittee shall maintain an effective seal around each of the baghouses and the pressure drop across each baghouse shall be maintained within the limits specified in Table 111-B-3. [NSR A TC Modification 5, Revision 0, Condition IV-B-5 (12131 11 OJ}

f. The Permittee shall operate baghouses for individual emission units as indicated in Table 111-B-8. [NSR A TC Modification 5, Revision 0, Condition IV-B-6 (12131 11 OJ]

T bl Ill 8 S a e -8- : ummary o fA 0 C dd- n ontro Devtces For A ~ggregate p recessing Pressure

EU Device Type Drop Manufacturer Model# Serial# Pollutant (ln/HzO)

A04 and Baghouse 2.0-6.0 Donaldson Torit CPV-12 2797228 PM,o A09

ASS Bag house 2.0-8.0 SiloAir- DCC VS20KS3 98-1296/01 PM,o

A62 Baghouse 2.0 - 8.0 SiloAir- DCC VS20KS3 98-1296/02 PM1o A79 and

Bag house 2.0-8.0 PneumaFil 85168 643 PM,o A104a A130 Bag house 2.0-8.0 Donaldson Torit CPV-12 2797229 PM10

A151 Bag house 2.0-8.0 SiloAir- DCC VS20KS3 99-1141/01 PM,o

Permit Issuance: November 9, 2011

Page 81: 2014 Apex Operations Plan-web Site-1

MSWL

PART 70 OPERATING PERMIT Source: 395

Page 22 of 41

g. The Permittee shall maintain a minimum of 1.5 percent moisture in the contaminated soil prior to unloading from the truck at the Soil Treatment facility (EU: W01 and W02). [NSR A TC!OP Modification 4, Revision 1, Condition /V-B-29 (11104/08)]

h. The Permittee shall maintain a minimum of two (2) percent moisture during soil transfer operations at the Soil Treatment facility (EU: W01 and W02). [NSR A TCIOP Modification 4, Revision 1, Condition IV-B-29 (11104/08)]

i. The Permittee shall maintain at least 2.5 percent moisture content in materials less than 0.25 inch in diameter for the cover material transfer operations (EU: W05). [NSR ATCIOP Modification 4, Revision 1, Condition /V-B-28 (11/04/08)]

j. The Permittee shall perform the applicable requirements contained in 40 CFR 63 Subpart CCCCCC for the GOO (EU: W06), as follows: [NSR A TC Modification 8, Revision 1, Condition /V-B-1 (0511311 0) and 40 CFR 63, Subpart 63. 11116]

i. The permittee shall not allow gasoline to be handled in a manner that would result in vapor releases to the atmosphere for extended periods of time. Preventative measures to be taken include, but are not limited to, the following:

ii. Minimize gasoline spills;

iii. Clean up spills as expeditiously as practicable;

iv. Cover all open gasoline containers and all gasoline storage tank fill-pipes with a gasketed seal when not in use;

v. Minimize gasoline sent to open waste collection systems that collect and transport gasoline to reclamation and recycling devices, such as oiVwater separators.

k. The permittee shall not allow gasoline to be handled in a manner that would result in vapor releases to the atmosphere for extended periods of time. Preventative measures to be taken include, but are not limited to, the following: [40 CFR 63, Subpart 63.11117]

i. Comply with the requirements in 0); and

ii. Only load gasoline into storage tanks a using submerged filling where the greatest distance from the bottom of the storage tank to the point of opening of the fill tube is:

iii. No more than 12 inches for submerged fill pipes installed on or before November 9, 2006; or

iv. No more than 6 inches for submerged fill pipes installed after November 9, 2006.

I. The Permittee shall apply the following control requirements to the Phase I Vapor Recovery system (EU: W06) [NSR ATC Modification 8, Revision 1, Condition /V-B-2 (05113110)]

i. The OPW Phase I Vapor Recovery System shall be constructed in accordance with the "Two-Point Phase I Vapor Recovery System" drawing, and shall use components specified in the current CARB EO G-70-142 series.

Permit Issuance: November 9, 2011

Page 82: 2014 Apex Operations Plan-web Site-1

PART 70 OPERATING PERMIT Source: 395

Page 23 of 41

ii. The highest point of discharge from a submerged fill-pipe shall be no more than 6.0 inches from the tank bottom.

iii. Pursuant to AQR Section 12 (amended 10/07/04); all Phase I vapor recovery equipment shall be installed and operated in accordance with the manufacturer's specifications and certification requirements.

iv. All Phase I vapor recovery equipment shall be maintained to be leak free, vapor tight, and in good working order.

v. All Phase I vapor recovery equipment shall have a CARS-certified device, which prevents loosening or over tightening of the Phase I product adaptor.

vi. Each system that has a pressure/vacuum vent valve installed must also meet the standards as outlined in the current CARB EO G-70-142 series.

m. The Permittee shall operate the LFG collection system such that all collected gases are vented to the control system designed and operated in compliance with 40 CFR 60.752(b)(2)(iii) [40 CFR 60. 753(e)J.

n. The Permittee shall operate the enclosed combustor (Callidus Flare) (EU: W07) to either reduce NMOC by 98 weight percent or reduce the outlet NMOC concentration to less than 20 parts per million (ppm) by volume, dry basis as hexane at 3 percent oxygen. [40 CFR 60. 752(b)(2)(iii)(B)]

o. The Permittee shall not be subject to the requirements in 111-B-3(1) if the collected gas from the MSWL is routed to a treatment system that processes the collected gas for subsequent sale or use. All emissions from any atmospheric vent from the gas treatment system shall be subject to the requirements of 40 CFR 60.752(b)(2)(iii)(A) or (8). [40 CFR 60. 752(b)(2J(iii)(C)]

p. The Permittee shall operate the LFG collection system such that gas is collected from each area, cell, or group of cells in the MSWL in which solid waste has been in place for: [40 CFR 60. 753(a)(1)]

i. 5 years or more if active; or

ii. 2 years or more if closed or at final grade.

q. The Permittee shall operate the LFG collection system with negative pressure at the wellheads except under the following conditions: [40 CFR 60. 753(b)]

i. a fire or increased temperature;

ii. use of a geomembrane or synthetic cover. The Permittee shall develop acceptable limits in the design plan; or

iii. a decommissioned well. A well may experience a static positive pressure after shutdown to accommodate for declining flows. All design changes shall be approved by the Control Officer.

r. The Permittee shall operate each interior wellhead in the collection system with a landfill gas temperature less than 55° C and with a nitrogen level less than 20 percent or an oxygen level less than 5 percent. The Permittee may establish a higher operating temperature, nitrogen, or oxygen value at a particular well if there is supporting data that the elevated parameter does not cause fire or significantly inhibit anaerobic decomposition by killing methanogens, upon obtaining written authorization from the Control Officer. [40 CFR 60. 753(c)]

s. The Permittee shall operate the collection system so that the methane concentration is less than 500 parts per million above background at the surface of the landfill. [40 CFR 60. 753(d)}

Permit Issuance: November 9, 2011

Page 83: 2014 Apex Operations Plan-web Site-1

PART 70 OPERATING PERMIT Source: 395

Page 24 of 41

t. In the event the collection or control system is inoperable, the Permittee shall shut down the gas mover system and close all valves in the collection and control system that contributes to the venting of gas to the atmosphere within 1 hour. [40 CFR 60. 753(e)]

u. The Permittee shall operate the enclosed combustor (Callidus Flare) (EU: W07) with the flame present at all times when the collected gas is routed to the system. [40 CFR 60. 753(f)]

v. If the operational requirements in Conditions 111-8-3-q through t are not met, the Permittee shall initiate the following corrective actions: [40 CFR 60. 753(g)]

i. Action shall be initiated to correct the exceedance within 5 calendar days of the initial exceedance or insufficient air flow measurement; and

ii. If correction of the exceedance, or the negative pressure cannot be achieved, without excess air infiltration within 15 calendar days of the first measurement, the gas collection system shall be expanded to correct the exceedance within 120 days of the initial exceedance.

w. The Permittee shall operate the enclosed combustor (Callidus Flare) at a minimum temperature of 1 ,500° F, or at a temperature corresponding to the maximum control of LFG obtained from the most recent performance test (EU: W07). [40 CFR 60. 752(b)(2)(iii)(8)(2)]

x. The Permittee shall route all collected gas from the MSWL to the control system which shall maintain a 98 percent NMOC control efficiency, at all times. [NSR A TC/OP Modification 4, Revision 1, Condition /V-8-33 (11 104108)]

y. The Permittee shall install additional control system(s) for S02 emissions from the enclosed combustor (Callidus Flare) (EU: W07) when the LFG flow exceeds 1,000 scfm or the heat rate of LFG exceeds 29.4 MMBtu/hour unless the Permittee receives approval from the Control Officer for a different flow rate by demonstrating that exceeding 1,000 scfm or 29.4 MMBtulhour does not result in any emission rate greater than those listed in Table 111-B-2. [NSR A TCIOP Modification 4, Revision 1, Condition IV-8-45 (11/04/08)]

z. Except during periods of start-up, shut-down or malfunction, the Permittee shall apply controls specified in this section. Periods of start-up, shut-down and malfunction shall not exceed five (5) days for the collection system and shall not exceed one (1) hour for treatment and control devices. [40 CFR 60. 755(e)]

aa. The Permittee shall maintain a copy of the approved SSM plan dated 01/16/04 on site. Any changes that need to be made to the SSM plan must be submitted to the Control Officer for review and approval prior to making the change. [40 CFR 63.1960]

bb. At all times, including periods of startup, shutdown, and malfunction, the Permittee shall under all conditions, maintain and operate the source in a manner consistent with good air pollution control practice for minimizing emissions as required by 40 CFR 63.6. Determination of whether acceptable operation and maintenance procedures are being used shall be based on information available to the Control Officer which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and inspection of the source. [40 CFR 63. 1960]

cc. The Permittee shall not cap or remove the collection and control system until all of the following conditions are met: [40 CFR 60. 752(b)(2)(v)]

Permit Issuance: November 9, 2011

Page 84: 2014 Apex Operations Plan-web Site-1

PART 70 OPERATING PERMIT Source: 395

Page 25 of 41

i. The landfill shall be a closed landfill as defined in 40 CFR 60.751. A closure report shall be submitted to the Control Officer as provided in 40 CFR 60.757(d);

ii. The collection and control system shall have been in operation a minimum of 15 years; and

iii. Following the procedures specified in 40 CFR 60.754(b), the calculated NMOC gas produced by the landfill shall be less than 50 megagrams per year on three successive test dates. The test dates shall be not less than 90 days apart, and no more than 180 days apart.

dd. The Permittee shall operate the three generator IC engines with turbochargers (EUs: W200, W203, W204). [NSR A TCIOP Modification 4, Revision 1, Condition /V-B-48 (11/04/08)]

ee. The Permittee shall operate the generator IC engine with a turbocharger and aftercooler (EU: W201). [NSR ATCIOP Modification 4, Revision 1, Condition IV-B-48 (11104108)]

ff. The Permittee shall operate the tipper IC engines with turbochargers and aftercoolers (EUs: W206 and W207). [NSR ATCIOP Modification 4, Revision 1, Condition IV-B-48 (11104108)]

gg. As of May 3, 2013, the Permittee shall minimize all RICE engines' time spent at idle during startup and minimize all engines' startup time to a period needed for appropriate and safe loading of the engine, not to exceed 30 minutes, after which time the emission standards are applicable to all time other than start up (EUs: W205 through W209). [40 CFR 63.6625(h)]

hh. As of May 3, 2013, the Permittee shall only use diesel fuel in each engine with a maximum sulfur content of 15 ppm and either a minimum cetane index of 40 or a maximum aromatic content of 35 percent by volume (EUs: W200, W201, W203, W204, and W209). [40 CFR 63.6604]

ii. As of May 3, 2013, the Permittee shall comply with the following emission limitations for the four Caterpillar diesel powered IC engines (EUs: W200, W201, W203, and W204): [40 CFR 63.6600(d)]

i. limit the concentration of co in the exhaust to 23 pphwd or less at 15 percent oxygen; or

ii. reduce the CO emission by 70 percent or more from the currently permitted emission limits.

jj. As of May 3, 2013, the Permittee shall limit the concentration of CO in the exhaust to 230 ppmvd or less 15 percent oxygen for the diesel powered IC engines (EUs: W205 through W207 inclusive). [40 CFR 63.6600(d)]

kk. As of May 3, 2013, the Permittee shall comply with the following work and management practices the lsuzu diesel powered IC engine (EU: W208): [40 CFR 63.6600(d)J

i. change the oil and filter every 1,000 hours of operation or annually, whichever comes first;

ii. inspect the air filter every 1,000 hours of operation or annually whichever comes first; and

iii. inspect all belts and hoses ever 500 hours of operation or annually whichever comes first.

Permit Issuance: November 9, 2011

Page 85: 2014 Apex Operations Plan-web Site-1

PART 70 OPERATING PERMIT Source: 395

Page 26 of 41

II. As of May 3, 2013, the Permittee shall comply with the following emission limitations for the Caterpillar diesel powered IC engine (EU: W209): [40 CFR 63.6600(d)]

i. limit the concentration of CO in the exhaust to 49 ppmvd or less at 15 percent oxygen; or

ii. reduce the CO emissions by 70 percent or more from the currently permitted emission limit.

mm. As of May 3, 2013, the Permittee shall comply with either condition (EUs: W201, W203 through W209 inclusive): {40 CFR 63.6625(g)]

i. Install a closed crankcase ventilation system that prevents crankcase emission from being emitted to the atmosphere; or

ii. Install an open crankcase filtration emission control system that reduces emissions from the crankcase by filtering the exhaust stream to remove oil mist, particulates, and metals.

a. the Permittee shall follow manufacturer's specified maintenance requirements for operating and maintaining the open crankcase ventilation system and replace the crankcase filters as specified.

nn. As of May 3, 2013, the Permittee shall operate and maintain the stationary RICE and after-treatment control device (if any) according to the manufacturer's emission­related written instruction or develop their own maintenance plan which must provide to the extent practicable for the maintenance and operation of the engine in a manner consistent with good air pollution control practice for minimizing emissions (EUs: W200, W201, W203, W204 through W209). {40 CFR 63.6625(e)]

oo. As of May 3, 2013, the Permittee shall at all times operate and maintain the reciprocating IC engines, including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions. The general duty to minimize emissions does not require the Permittee to make any further efforts to reduce emissions if levels required by this standard have been achieved. Determination of whether such operation and maintenance procedures are being used will be based on information available to the Administrator which may include, but is not limited to, monitoring results, review of operation and maintenance procedures, review of operation and maintenance records, and inspection of the source (EUs: W200, W201, W203, W204 through W209). {40 CFR 63.6605(b)}

pp. The Permittee shall use only diesel fuel with a maximum sulfur content of 15 ppm and either a minimum cetane index of 40 or a maximum aromatic content of 35 percent by volume in the diesel engines (EUs: W213, W214, W215, W216 and W217). {40 CFR 60.4207(a)]

qq. The Permittee shall operate in such a manner that odors will not cause a nuisance. [AQR 43) (Local enforceability only)

rr. The Permittee shall comply with the control requirements contained in this section. If there is inconsistency between standards or requirements, the most stringent standard or requirement shall apply. [AQR 12.5.2.6(a)]

Pennlt Issuance: November 9, 2011

Page 86: 2014 Apex Operations Plan-web Site-1

PART 70 OPERATING PERMIT Source: 395

Page 27 of 41

C. Monitoring

Aggregate Plant

1. This source is required to comply with the monitoring requirements in 40 CFR 60, Subpart 000. [NSR ATC Modification 5, Revision 0, Condition IV-C-1-Aggregate Plant (12131110]

2. The Permittee shall perform at least one visual emissions observation on each emission unit in the aggregate plant each day. Daily visual observations shall include the aggregate plants, which include control device stacks, (EUs: A01, A02, A04, A07, A08, A09, A12, A16,A17,A22,A23,A25,A27,A28,A30,A31,A33,A34,A35,A37,A38,A40,A42,A44, A46,A47,A49,A51,A52,A58,A60,A62,A65,A69,A72,A74,A77,A79,A82,A83,A85, A87, A89, A93, A95, A98, A102, A104a, A106, A127, A128, A130, A133, A136, A138, A141, A143, A145, A147, A149 and A151) while operating, to demonstrate compliance with the opacity limits. If visible emissions that appear to exceed the opacity limit(s) are observed, the opacity of emissions shall be visually determined in accordance with 40 CFR 60 Appendix A: Reference Method 9. Corrective actions shall be taken to minimize any emissions as soon as practicable {AQR 26.1]

3. The Permittee shall inspect the water spray system daily and investigate and correct any problems before resuming operations [NSR A TC Modification 5, Revision 0, Condition /V-C-3-Aggregate Plant (12131110)]

4. The Permittee shall conduct daily monitoring of the pressure drop across each baghouse cell with the installation and operation of a pressure differential (Magnahelic) gauge per manufacturer's specifications. [NSR A TC Modification 5, Revision 0, Condition IV-C-4-Aggregate Plant (12131110)}

5. The Permittee shall visually inspect the baghouse interior at least monthly for air leaks. Defective baghouse compartments shall be sealed off and repairs completed within 5 working days of the discovery of the malfunction. Should the malfunction cause the baghouse to be ineffective in controlling particulate emissions, the processing of material shall cease until such repairs to the baghouse are completed. [NSR A TC Modification 5, Revision 0, Condition IV-C-5-Aggregate Plant (12131110)]

6. The Permittee shall have a standard operating procedures (SOP) manual for baghouses. The procedures specified in the manual for maintenance shall, at a minimum, include a preventative maintenance schedule that is consistent with the baghouse manufacturer's instructions for routine and long-term maintenance. [NSR A TC Modification 5, Revision 0, Condition IV-C-6-Aggregate Plant (12131110)]

MSWL

7. The Permittee shall perform at least one visual emissions observation on each emission unit in the MSWL each day. Daily visual observations shall include the haul roads, waste processing, cover material, LFG flare, waste placement, stockpiles and generator engines (EUs: H01, H02, W01, W02, W03, W05, W07, W08, W09, W200, W201, W203, W204, W205, W207, W208, W209, W214, W215, W216 and W217) while operating, to demonstrate compliance with the opacity limits. If visible emissions that appear to exceed the opacity limit(s) are observed, the opacity of emissions shall be visually determined in accordance with 40 CFR 60 Appendix A: Reference Method 9. Corrective actions shall be taken to minimize any emissions as soon as practicable. [AQR 26.1]

8. The Permittee shall demonstrate compliance with the minimum moisture content by conducting and recording bi-weekly sampling and analysis of materials less than 0.25 inch

Permit Issuance: November 9, 2011

Page 87: 2014 Apex Operations Plan-web Site-1

PART 70 OPERATING PERMIT Source: 395

Page 28 of 41

in diameter in accordance with ASTM Standard C 566-89: Standard Test Method for Total Moisture Content of Aggregate by Drying (EU: W02). [NSR ATC!OP Modification 4, Revision 1, Condition /V-E-4 (11104108))

9. The Permittee shall demonstrate compliance with the annual maximum VOC emission specified in this permit for the Soil Treatment facility by recording the amount and VOC content of contaminated soil received on a daily basis. The Permittee shall calculate the total VOC emission using "Chemdat8" emission factor, for every consecutive 12-month period (EU: W02). [NSR ATCIOP Modification 4, Revision 1, Condition /V-E-10 (11104108)]

10. The Permittee shall demonstrate compliance annually with the maximum allowable biodegradable waste (one (1) percent of the total allowed waste of 200,000 tons/year) at the Industrial Waste facility by monitoring and recording percentage of biodegradable wastes dumped at the Industrial Waste facility (EU: W03). [NSR A TCIOP Modification 4, Revision 1, Condition /V-E-11 (11/04/08)]

11. The Permittee shall demonstrate compliance with the NMOC emission rate for the Industrial Waste facility by calculating the NMOC emission rate on an annual basis to ensure that the rate does not trigger the requirements in 40 CFR 60, Subpart WWW, using the procedures specified in 40 CFR 60.754 (EU: W03 and W04). [NSR ATCIOP Modification 4, Revision 1, Condition /V-E-12 (11104!08)]

12. If the actual or calculated NMOC emission rate is greater than 50 megagrams per year the Permittee shall install a collection system and control system per 40 CFR Subpart WWW.CEU: W04) [NSR ATCIOP Modification 4 Revision 1, Condition /V-B-30, 111041080]

13. The Permittee shall conduct daily inspections of the GOO equipment to ensure that the equipment is maintained and operated in a vapor tight and leak free manner, pursuant to the manufacturer's specifications (EU: W06). [NSR ATC Modification 8, Revision 1, Condition /V-C-1 (0511311 0)]

Surface Methane Monitoring CEU: W100)

14. The Permittee shall monitor, on a quarterly basis, surface concentrations of methane using an organic vapor analyzer, flame ionization detector or other portable monitor meeting the following specifications: [40 CFR 60. 755(c)(1)]

a. the portable analyzer shall meet the instrument specification provided in 40 CFR 60 Appendix A: Method 21, Section 3, except the "methane" shall replace references to VOC;

b. the calibration gas shall be methane, diluted to a nominal concentration of 500 parts per million in air;

c. the instrument evaluation procedures of 40 CFR 60 Appendix A: Method 21, Section 4.4 shall be used to meet the performance evaluation requirements in Section 3.1.3; and

d. the calibration procedures provided in 40 CFR 60 Appendix A: Method 21, Section 4.2 shall be followed immediately before commencing a surface monitoring survey.

15. The Permittee shall monitor surface concentrations of methane on a quarterly basis around the perimeter of the collection area of the MSWL and along a pattern that traverses the landfill at 30 meter intervals and where visual observations indicate elevated concentrations of landfill gas, such as distressed vegetation and cracks or seeps in the cover. The Permittee may establish an alternative traversing pattern that ensures equivalent coverage. [40 CFR 60. 753(d)]

Permit Issuance: November 9, 2011

Page 88: 2014 Apex Operations Plan-web Site-1

PART 70 OPERATING PERMIT Source: 395

Page 29 of41

16. The Permittee shall develop a surface monitoring design plan that includes a topographical map with the monitoring route and the rationale for any site-specific deviations from the 30 meter intervals. This plan must be submitted to the Control Officer for review within 180 days of issuance of this permit and available during inspection. [40 CFR 60. 753(d) and AQR 12.5.3.6/AQR 19.4.1.1]

17. The Permittee shall determine the methane background concentration by moving the probe inlet upwind and downwind outside the boundary of the landfill at a distance of at least 30 meters from the perimeter wells. [40 CFR 60. 755(c)(2)}

18. The Permittee shall perform quarterly surface emission monitoring in accordance with 40 CFR 60 Appendix A: Method 21, Section 4.3.1, except that the probe inlet shall be placed within 5 to 1 0 centimeters of the ground. [40 CFR 60. 755(c)(3)]

19. The Permittee shall record any reading of 500 ppm or more of methane above background at any location as a monitored exceedance and shall take the following actions. As long as the following actions are taken, the exceedance is not a violation of the operation requirements of 40 CFR 60.753(d). [40 CFR 60. 755(c)(4)]

a. The Permittee shall mark and record the location of each monitored exceedance.

b. The Permittee shall perform cover maintenance or make adjustments to the vacuum of the adjacent wells to increase the gas collection in the vicinity of each exceedance and shall re-monitor the location within 1 0 calendar days of detection of the exceedance.

c. If the re-monitoring of the location shows a second exceedance, the Permittee shall take additional corrective action and shall monitor the location again within 1 0 days of the second exceedance. If the re-monitoring shows a third exceedance for the same location, the Permittee shall take the action specified in Condition 111-C-18-(e) and no further monitoring of that location is required until the action specified in Condition 111-C-18-(e) has been taken.

d. Any location that initially showed an exceedance but has a methane concentration less than 500 ppm above background at the 1 0-day re-monitoring specified in Condition 111-C-18-(b) and (c) shall be re-monitored 1 month from the initial exceedance. If the 1-month re-monitoring shows a concentration less than 500 ppm above background, no further monitoring of that location is required until the next quarterly monitoring period. If the 1-month re-monitoring shows as exceedance, the actions specified in Condition III-C-18(c) and (e) shall be taken.

e. For any location where monitored methane concentration equals or exceeds 500 ppm above background 3 times within a quarterly period, the Permittee shall install a new well or other collection device within 120 calendar days of the initial exceedance. An alternative remedy to the exceedance, such as upgrading the blower, header pipes or control device, and a corresponding timeline for installation may be submitted to the Administrator for approval.

20. The Permittee shall implement a program to monitor for cover integrity and implement cover repairs as necessary on a monthly basis. [40 CFR 60. 755(c)(5)]

Post Construction Ambient Air Monitoring

21. The Permittee shall monitor ambient air for PM1o and H2S. Placement and operation of the monitors shall be consistent with the relevant provision of 40 CFR 53. The Permittee shall submit quarterly reports of the data collected from the existing Anderson Beta Gauge PM 10

analyzer or equivalent unit. The Permittee is required to install an H2S monitor that satisfies EPA requirements and guidelines. Quarterly reports of H2S monitoring shall be

Permit Issuance: November 9, 2011

Page 89: 2014 Apex Operations Plan-web Site-1

PART 70 OPERATING PERMIT Source: 395

Page 30 of41

submitted to Control Officer. [NSR ATCIOP Modification 4, Revision 1, Condition IV-D (11104/08))

LFG Collection and Control System Monitoring

22. The Permittee shall install a sampling port and a thermometer, other temperature measuring device or an access port for temperature measurements at each wellhe;:~d of the active gas collection system and: [40 CFR 60. 756(a)(1) through (3)]

a. measure the gauge pressure in the gas collection header on a monthly basis as provided in 40 CFR 60.755(a)(3);

b. monitor nitrogen or oxygen concentration in the landfill gas on a monthly basis using Method 3C as provided in 40 CFR 60.755(a)(5); and

c. monitor temperature of the landfill gas on a monthly basis as provided in 40 CFR 60. 755(a)(5).

23. The Permittee shall measure the gauge pressure in the gas collection header at each individual well monthly. If a positive pressure exists, the Permittee shall initiate action to correct the exceedance within 5 calendar days, except for the three conditions allowed under 40 CFR 60.753(b). If negative pressure cannot be achieved without excess air infiltration within 15 calendar days of the first measurement, the gas collection system shall be expanded to correct the exceedance within 120 days of the initial measurement of positive pressure. Any attempted corrective measure shall not cause exceedance of other operational or performance standards. An alternative timeline for correcting the exceedance may be submitted to the Control Officer for approval. [40 CFR 60. 755(a)(3)­(5)]

LFG Control Enclosed Combustor (Callidus Flare) Monitoring (EU: W07l

24. The Permittee shall calibrate, maintain and operate according to the manufacturer's specifications the following equipment on the enclosed combustor (Callidus Flare):

a. A temperature monitoring device equipped with a continuous recorder and having a minimum accuracy of ±1 percent of the temperature being measured expressed in degrees Celsius or ±0.5 degrees Celsius, whichever is greater. [40 CFR 60. 756(b)]

b. A device that records flow to or bypass of the control device. The Permittee shall either: [40 CFR 60. 756(b)]

i. install, calibrate, and maintain a gas flow rate measuring device that shall record the flow to the control device at least every 15 minutes; or

ii. secure the bypass line valve in the closed position with a car-seal or a lock­and-key type configuration. A visual inspection of the seal or closure mechanism shall be performed at least once every month to ensure that the value is maintained in the closed position and that the gas flow is not diverted through the bypass line.

c. A continuous emission monitoring system (CEMS), if the Permittee calculates an exceedance of any emission limit for the enclosed combustor (Callidus Flare) using continuous monitoring of the LFG flow rate and the enclosed combustor (Callidus Flare) operating temperature within 180 days. [NSR A TCIOP Modification 4, Revision 1, Condition /V-E-15 (11/04/08)]

Permit Issuance: November 9, 2011

Page 90: 2014 Apex Operations Plan-web Site-1

PART 70 OPERATING PERMIT Source: 395

Page 31 of41

25. The Permittee, after the installation of a collection and control system, shall calculate the NMOC emission rate for purposes of determining when the system can be removed as provided in 40 CFR 60.752(b)(2)(v), using the equation in 40 CFR 60.754(b). [40 CFR 60.754(b)]

a. The Permittee shall use the flow rate of landfill gas by measuring the total landfill gas flow rate at the common header pipe that leads to the control device using a gas flow measuring device calibrated according to the provisions in 40 CFR 60 Appendix A: Method 2E, Section 4.

b. The Permittee shall determine the average NMOC concentration by collecting and analyzing landfill gas samples, from the common header pipe before the gas moving or condensate removal equipment, using the procedures in 40 CFR 60 Appendix A: Method 25C or Method 18.

c. The Permittee may use another method to determine landfill gas flow rate and NMOC concentration if the method has been approved by the Administrator.

Diesel Engines Monitoring

26. The Permittee shall install non-resettable hour meters on the reciprocating IC engines (EUs: W200, W201, W203, W204through W209). [12.5.2.6(a)]

27. The Permittee shall ensure compliance with the provisions of 40 CFR 60, Subpart 1111 contained within this document by demonstrating all of the following: [40 CFR 60.424211 (b)]

a. operation of the diesel engines (EUs: W213, W214, W215, W216 and W217) according to the manufacturer's written instructions or procedures developed by the Permittee that are approved by the engine manufacturer; and

b. the keeping of records of engine manufacturer data indicating compliance with the emission standards.

D. Testing

Aggregate Plant

1. Compliance with the opacity standards of this permit shall be demonstrated, in part, through performance testing in accordance with 40 CFR 60 Reference Method 9 (Standards for Opacity). [NSR ATC Modification 5, Revision 0, Condition IV-D-1-Aggregate Plant (12131110)]

2. The Permittee shall conduct performance testing for opacity standards on all emission units in the aggregate plant except mining and blasting (EUs: A02, A04, A07, AOB, A09, A12, A16,A17, A22, A23,A25,A27, A28, A30, A31, A33,A34,A35,A37, A38, A40,A42,A44, A46,A47, A49,A51,A52, A58, A60,A62, A65, A69,A72,A74,A77, A79, A82,A83,A85, A87, A89, A93, A95, A98, A102, A104a, A106, A128, A130, A133, A136, A138, A141, A143, A145, A147, A149 and A151) according to the following conditions: [NSR ATC Modification 5, Revision 0, Condition IV-D-2-Aggregate Plant (12131/10)]

a. The Permittee is required to comply with the performance testing requirements of 40 CFR 60, Subpart 000.

b. Subsequent performance testing shall be conducted every five years.

3. Compliance with the mass emission standards of this permit and concentration standards in 40 CFR 60, Subpart 000 shall be demonstrated through performance testing in accordance with 40 CFR 60 Reference Method 5 or 17. [40 CFR 60.675(b)(1)]

Permit Issuance: November 9, 2011

Page 91: 2014 Apex Operations Plan-web Site-1

PART 70 OPERATING PERMIT Source: 395

Page 32 of 41

4. The Permittee shall conduct performance testing on the baghouse stack exhaust points (EUs: A04, A09, A58, A62, A79, A104a, A130 and A151) according to the following conditions: [NSR ATC Modification 5, Revision 0, Condition IV-D-4-Aggregate Plant (12131110)]

a. The Permittee is required to comply with the performance testing requirements of 40 CFR 60, Subpart 000.

b. Subsequent performance testing shall be conducted every five years.

5. Subsequent performance testing shall be conducted every five years on or before the anniversary date of the initial performance test in accordance with Table 111-0-1. [NSR ATC Modification 5, Revision 0, Condition IV-D-5-Aggregate Plant (12131110)]

TABLE Ill D 1 P rf - - . e ormance T tF es requency

MSWL

6.

7.

Emission Units Description Test Method Pollutant Frequency

A02, A04, A07, A08, A09, A12, A16, A17, A22, A23, A25, A27, A28, A30, A31, A33, A34, A35, A37, A38, A40, A42, A44, A46, A47, A49, A51, A52, A58, A60,

Aggregate Initially and A62,A65,A69,A72,A74, EPA Method 9 Opacity A77, A79, A82, A83, A85,

Plant every 5 years

A87, A89, A93, A95, A98, A102, A104a, A106, A128, A130, A133, A136, A138, A141 I A143, A145, A147,

A149 and A151 A04, A09, A58, A62, A79, Process A EPA Method 5 PM Initially and A104a, A130 and A151 Crushers or Method 17 every 5 years

The Permittee shall conduct vapor recovery system testing using the following procedures on the GOO equipment (EU: W06) pursuant to AQR Subsection 12.8.1 (amended 10/07/04). [NSR ATC Modification 8, Revision 1, Condition IV-D-1 (05/13110)]

The Permittee shall follow the general performance testing requirements for the GOO equipment (EU: W06). [NSR ATC Modification 8, Revision 1, Condition IV-D-2 (05/13110)]

a. Each vapor recovery system test shall be conducted in accordance with the applicable GARB Test Procedure that is required by the GARB EO.

b. The source shall give a 7-day written prior notice of the date of the test to the Control Officer.

c. Any prior approved scheduled vapor recovery system test cannot be canceled and/or rescheduled except with the prior approval of the Control Officer.

d. Within 7 days from the end of an initial or annual vapor recovery system test, the source shall submit a report containing the results of such test to the Control Officer

e. The report shall have, as the first page of text or within the body of the test report form, a signed Certification of Performance Test Result.

Permit Issuance: November 9, 2011

Page 92: 2014 Apex Operations Plan-web Site-1

PART 70 OPERATING PERMIT Source: 395

Page 33 of 41

f. If the source fails a performance test, the Control Officer shall be notified within 24 hours or by 12:00 p.m. (Noon) of OAQEM's next business day, whichever is soonest. Repairs to correct the defects shall be made and a retest scheduled with the Control Officer. The retest shall be scheduled within 10 calendar days of the failed test. If the repairs and retest cannot be accomplished within 1 0 calendar days, the source must submit the reasons and a proposed date for retesting in writing to the Control Officer for approval.

g. The source shall conduct performance tests listed in Table 111-0-2:

T bl Ill D 2 R . d P rf a e - . : eqUire e ormance T tC "t . es n enon Description CARB Test Procedure Standard

Pressure decay/leak: vapor control system TP-201.3

Initial: 2" we including nozzles and underground tanks Final: Reference Value

8. The Permittee shall conduct an annual test on the Vapor Recovery System for the GOO equipment (EU: W06) on a frequency as follows: [NSR ATC Modification 8, Revision 1, Condition /V-0-4 (05113110)]

a. Testing shall be accomplished prior to the anniversary date of the previous performance test that the source passed.

b. Pursuant to AQR Section 4, the Control Officer may require additional testing.

9. The Permittee shall implement changes to the GOO equipment (EU: W06) existing vapor recovery system if any performance test results indicate such changes are necessary to maintain compliance with Modification 8, Revision 1 A TC. [NSR A TC Modification 8, Revision 1, Condition /V-0-5 (05113110))

10. The Permittee shall demonstrate compliance annually with the 40 CFR 60 Subpart WNW reduction efficiency of 98 weight-percent or the outlet concentration level of 20 ppmv for the enclosed combustor (Callidus flare) in accordance with 40 CFR 60 Appendix A: Method 25, 25C, or 18. Method 3 or 3A shall be used to determine oxygen for correcting the NMOC concentration as hexane to 3 percent. In cases where the outlet concentration is less than 50 ppm NMOC as carbon (8 ppm as hexane), Method 25A should be used in place of Method 25. If using Method 18, the minimum list of compounds to be tested shall be those published in the most recent Compilation of Air Pollutant Emission Factors (AP-42) (EU: W07). [40 CFR 60. 754(d)]

11 . The Permittee shall demonstrate annual compliance with the flare opacity standard of 20 percent by performing a 40 CFR 60 Appendix A: Method 9 in accordance with AQR Section 26 (EU: W07). [NSR ATCIOP Modification 4, Revision 1, Condition /V-E-2 (11/04108)]

12. As of May 3, 2013, the Permittee shall performance test the IC engines per the requirements of 40 CFR 63.6610 and 63.6620 (EUs: VV200, W201, W203 and W204). [40 CFR 63.6610 and 63. 6620]

13. As of May 3, 2013, the Permittee shall performance test the IC engines per the requirements in 40 CFR 63.6612 (EUs: W205 through W209 inclusive). [40 CFR 63.6612]

14. As of May 3, 2013, the Permittee shall perform subsequent testing every 8,760 hours or every three years, whichever comes first (EUs: W200, W201, W203 and W204). [40 CFR 63.6615]

15. As of May 3, 2013, if the Permittee elects to reduce the CO emission of IC engines by 70 percent of the permitted emission limit according to the emissions limitations specified in

Permit Issuance: November 9, 2011

Page 93: 2014 Apex Operations Plan-web Site-1

PART 70 OPERATING PERMIT Source: 395

Page 34 of 41

Section 111-B-3, the Permittee shall follow the methods for calculating the percent reduction according to the procedures detailed in 40 CFR 63.6620(e)(1) (EUs: W200, W201, W203 and W204). [40 CFR 63.6620]

16. As of May 3, 2013, if the Permittee selects to comply with the emission limitation to reduce CO as specified in Conditions III-B-3(hh) through (kk), without the use of an oxidative catalyst, the Permittee shall petition the Administrator for operating limitations to be established during the initial performance test and continuously monitored thereafter; or for approval of no operating limitations. The Permittee shall not conduct the initial performance test until after the petition has been approved by the Control Officer. [40 CFR 63.6620(f)]

17. As of May 3, 2013, the Permittee shall submit a Notification of Intent to conduct a performance test and a test protocol to the Control Officer, at least 60 days before the performance test is scheduled to begin as required in 40 CFR 63.7(b)(1) (EUs: W200, W201, W203, W204 through W209 inclusive). [40 CFR 63.6645(f)]

18. As of May 3, 2013, the Permittee shall conduct initial performance tests in Table 111-0-3 within 180 days after the compliance date that is specified for the stationary RICE in 40 CFR 63.6595 and according to the provisions in 40 CFR 63.7(a)(2) (EUs: W200, W201, W203, W204 through W209 inclusive). [40 CFR 63.6610(a) and 63.6612]

T bl Ill D 3 P rf a e - - e ormance T t M th d f EU W200 201 203 d 204 th es e o s or s: I 1 an hW209 roug1 Reference EPA Test Method

40 CFR Part 60 Appendix A Method 10, or ASTM Method 06522-00 40 CFR Part 63 Appendix A Method 320, or ASTM 06348-03

E. Record Keeping

Aggregate Plant

1. The Permittee shall comply with all applicable record keeping requirements of 40 CFR 60, Subpart 000 and any other applicable regulations. [AQR 19.4.1.3(b)/12.5.2.6(d)(2)]

2. The Permittee shall maintain records on site that include at a minimum: [AQR 19.4.1.3(b)/12.5.2.6(d)(2)]

a. monthly and 12-month rolling total throughput for EUs: A01, A25, A36, A38, A62, A79, A108, A109, A130 and A136;

b. daily and 12-month rolling total amount of surface area blasted (EU: A127);

c. daily inspections of water spray systems;

d. daily baghouse pressure differential (EUs: A108, A109, A112, A113, A114, A116, A118, A119, A122, A124, A125, and A126);

e. monthly inspection and maintenance of baghouses;

f. dates and time when visible emission observations are taken and the steps taken to make any necessary corrections to bring opacity into compliance; and

g. performance test results.

Penn It Issuance: November 9, 2011

Page 94: 2014 Apex Operations Plan-web Site-1

MSWL

PART 70 OPERATING PERMIT Source: 395

Page 35 of41

3. The Permittee shall maintain records on site that include at a minimum: [AQR 19.4.1.3(b)/12.5.2.6(d)(2)]

a. 12-month rolling total amount of Vehicle Miles Traveled on the Paved and Unpaved Haul Roads (EUs: H01 and H02);

b. monthly and 12-month rolling total amount of material treated at the Soil Treatment facility (EUs: W01 and W02);

c. monthly and 12-month rolling total amount of material treated at the Industrial Waste facility (EUs: W03 and W04);

d. annual NMOC emission rate from the Industrial Waste facility calculated using the procedures specified in 40 CFR 60.754(a) to demonstrate that the Industrial Waste facility does not trigger the requirements per 40 CFR 60 Subpart WWW;

e. annual acceptance rate for the MSWL with the current amount of solid waste in-place, and the year-by-year acceptance rate per 40 CFR 60.758(a);

f. monthly and 12-month rolling total amount of cover material used (EU: W05);

g. monthly and 12-month rolling total amount of gasoline in gallons (EU: W06);

h. results of the quarterly surface concentration monitoring for methane (EU: W1 00);

i. results of the quarterly background concentration monitoring for methane (EU: W100);

j. reading and location of each surface monitoring exceedances during the surface concentration monitoring for methane (EU: W100);

k. corrective actions taken and re-monitoring of any surface monitoring exceedance (EU: W100);

I. monthly measurements of the gauge pressure in the gas collection header;

m. monthly concentration of nitrogen and oxygen in the landfill gas;

n. monthly temperature of the landfill gas;

o. corrective actions taken if any exceedances were observed during the monthly wellhead monitoring for pressure, temperature or nitrogen/oxygen concentration;

p. monthly landfill cover integrity and repairs implemented;

q. quarterly calculated average of the hourly and rolling 12-month total LFG flow (in cubic feet or cubic meters) through the gas collection and control system;

r. monthly estimates of enclosed combustor (Callidus Flare) (EU: W07) emissions and a 12-month rolling total to be recorded;

s. a quarterly summary of the hours of operation of the enclosed combustor (Callidus Flare) (EU: W07);

t. continuous monitoring records of the combustion flare temperature (EU: W07);

u. calculated quarterly average of the flow rate and heat input to the enclosed combustor (Callidus Flare) (EU: W07) in MMBtu per hour and in 12-month rolling total;

v. a quarterly summary describing the deviations, if any, per the SSM plan in the capture and control system;

w. the magnitude and duration of malfunctions, excess emissions, monitoring system downtimes, corrective actions taken, etc. during the enclosed combustor (Callidus Flare) operation, as required by 40 CFR 60.7;

Permit Issuance: November 9, 2011

Page 95: 2014 Apex Operations Plan-web Site-1

PART 70 OPERATING PERMIT Source: 395

Page 36 of 41

x. monthly and 12-month rolling total amount of waste placement (EU: WOB);

y. 12-month rolling total hours of operation for the diesel engines (EUs: W200, W201, and W203 through W209)

z. sulfur content of diesel fuel used for diesel engines (EUs: W200, W201, W203, W204, W205, W206, W207, W208, W209, W213, W214, W215, W216 and W217);

aa. cetane index or aromatic content (in percent by volume) of diesel fuel combusted in (EUs: W213, 214, W215, W216 and W217);

bb. The Permittee shall submit the reports listed in Table 7 of 40 CFR Part 63 Subpart ZZZZ., as applicable and according to the requirements specified in 63.6650 by May 3, 2013 (EUs: W200, W201, W203 through W209 inclusive);

cc. vapor recovery system test results; and

dd. performance test results.

Permit Issuance: November 9, 2011

Page 96: 2014 Apex Operations Plan-web Site-1

PART 70 OPERATING PERMIT Source: 395

Page 37 of 41

4. The Permittee shall maintain records on site: i.e. daily self-inspection records, daily logs, etc., or a copy thereof, for the Phase I, that at minimum shall contain the following information (EU: W06): [NSR ATC Modification 8, Revision 1 Condition /V-E-4 (05113110)]

a. a record of any maintenance on any part of the Phase I equipment, including a general description of the maintenance;

b. the date and time the equipment was taken out-of-service;

c. the date of repair or replacement;

d. a general description of the part location (e.g., pump, tank, nozzle number, etc.)

e. a description of the problem; and

f. the results of the daily inspections.

5. The Permittee shall maintain records for reports that include: [40 CFR 60. 757(f)]

a. value and length of time for exceedance of applicable parameters monitored under 40 CFR 60.756(a), (b), (c), and (d);

b. description and duration of all periods when the gas stream is diverted from the control device through a bypass line or the indication of bypass flow as specified under 40 CFR 60.756;

c. description and duration of all periods when the control device was not operating for a period exceeding 1 hour and length of time the control device was not operating;

d. all periods when the collection system was not operating in excess of 5 days;

e. the location of each exceedance of the 500 parts per million methane concentration as provided in 40 CFR 60. 753(d) and the concentration recorded at each location for which an exceedance was recorded in the previous month;

f. the date of installation and the location of each well or collection system expansion added pursuant to paragraphs (a)(3), (b), and (c)(4) of 40 CFR 60.755.

6. All inspections, visible emission checks, and testing required under monitoring, logs, reports, and records shall include at least the date and time, the name of the person performing the action, the results or findings, and the type of corrective action taken (if required). [AQR 12.5.2.6(d)IAQR 19.41.3(b)]

7. Records and data required by this Operating Permit to be maintained by Permittee may, at the Permittee's expense, be audited at any time by a third party selected by the Control Officer. [AQR 4.4 and AQR 12.5.2.8/AQR 19.4.3.2]

8. Should this stationary source, as defined in 40 CFR 68.3, become subject to the accidental release prevention regulation in Part 68, then the Permittee shall submit an RMP by the date specified in Section 68.1 0 and shall certify compliance with the requirements of Part 68 as part of the annual compliance certification as required by 40 CFR 70 or 71. [AQR 12.5.2.6(d)/AQR 19.4.1.3]

9. All records and logs, or a copy thereof, shall be kept on-site for a minimum of five (5) years from the date the measurement was taken or data was entered and shall be made available to DAQEM upon request. [AQR 12.5.2.6(d)IAQR 19.4.1.3(b)]

10. The Control Officer reserves the right to require additional requirements concerning records and record keeping for this source. [AQR 12.5.2.6(d)IAQR 19.4.1.3(b)]

Permit Issuance: November 9, 2011

Page 97: 2014 Apex Operations Plan-web Site-1

F. Reporting

PART 70 OPERATING PERMIT Source: 395

Page 38 of41

1. All report submissions shall be addressed to the attention of the Control Officer. [AQR 12.5.2.8(e)(4), 21.4 and 22.4]

2. All reports shall contain the following: [AQR 12.5.2.6(d)/AQR 19.4.1.3(c)]

a. a certification statement on the first page, i.e., "I certify that, based on information and belief formed after reasonable inquiry, the statements contained in this document are true, accurate and complete." (A sample form is available from DAQEM); and

b. a certification signature from a responsible official of the company and the date certification.

3. The Permittee shall include deviations specified in 40 CFR 63.1965 in its quarterly and annual reports. Specified deviations include periods when:

a. a deviation occurs when the control device operating parameter boundaries described in 40 CFR 60.758(c)(1) of Subpart WWW are exceeded; and

b. a deviation occurs when 1 hour or more of the hours during the 3-hour block averaging period does not constitute a valid hour of data. A valid hour of data must have measured values for at least three 15-minute monitoring periods within the hour.

4. The Permittee shall submit quarterly reports to the Control Officer in accordance with the following requirements: [AQR 12.5.2.6(d)IAQR 19.4.1.3(c)]

a. The report shall include the items listed in Conditions 111-E-2-a and b, Conditions 111-E-3-a though bb, and Condition 111-E-5.

b. The report shall include summaries of any permit deviations, their probable cause and corrective or preventative actions taken.

c. The report shall be based on a calendar quarter, which includes partial calendar quarters.

d. e. The report shall be received by DAQEM within 30 calendar days after the reporting

period.

5. The Permittee shall submit annual emissions inventory reports based on the following: [AQR 18.6.1]

a. The annual emissions inventory shall be submitted to DAQEM no later than March 31 after the reporting year.

b. The annual emissions inventory report shall include the emission factors and calculations used to determine the emissions from each permitted emission unit, even when an emission unit is not operated.

6. Regardless of the date of issuance of this Operating Permit, the source shall comply with the schedule for report submissions outlined in Table 111-F-1:

T bl Ill F 1 R ' d S b . . D t f V . a e .. : equ1re U miSSIOn a es or arlO US R rts epo Required Report Applicable Period Due Date

Quarterly Report for 1st Calendar Quarter January, February, April 30 each year March Quarterly Report for 2"a Calendar Quarter April, May, June July 30 each year

Quarterly Report for 3rd Calendar Quarter July, August, October 30 each year September

Permit Issuance: November 9, 2011

Page 98: 2014 Apex Operations Plan-web Site-1

Required Report Applicable Period Quarterly Report for 4'" Calendar Quarter, October, November, Any additional annual records required. December

Annual Compliance Certification Report 12 Months

Annual Emission Inventory Report Calendar Year

Excess Emission Notification As Required

Excess Emission Report As Required

Deviation Report As Required

Performance Testing As Required

PART 70 OPERATING PERMIT Source: 395

Page 39 of41

Due Date1

January 30 each year

30 days after the Operating Permit issuance anniversary date March 31 each year Within 24 hours of the time the Permittee first learns of the excess emissions Within 72 hours of the Excess Emission Notification Along with quarterly and semi-annual reports Within 60 days from the end of the test

1 Each report shall be received by DAQEM on or before the due date listed. If the due date falls on a Saturday, Sunday or a Federal or Nevada holiday, then the submittal is due on the next regularly scheduled business day.

7. The Control Officer reserves the right to require additional reports and reporting to verify compliance with permit emission limits, applicable permit requirements, and requirements of applicable federal regulations. [AQR 4.4 and AQR 12.5.2.6(d)IAQR 19.4.1.3(c)]

G. Mitigation

1. The source has no federal offset requirements. [AQR 59.1.1]

IV. OTHER REQUIREMENTS

1. The Permittee shall not use, sell, or offer for sale any fluid as a substitute material for any motor vehicle, residential, commercial, or industrial air conditioning system, refrigerator freezer unit, or other cooling or heating device designated to use a CFC or HCFC compound as a working fluid, unless such fluid has been approved for sale in such use by the Administrator. The Permittee shall keep record of all paperwork relevant to the applicable requirements of 40 CFR 82 on site. [40 CFR 82]

Permit Issuance: November 9, 2011

Page 99: 2014 Apex Operations Plan-web Site-1

ATTACHMENT 1 APPLICABLE REGULATIONS

PART 70 OPERATING PERMIT Source: 395

Page 40 of 41

REQUIREMENTS SPECIFICALLY IDENTIFIED AS APPLICABLE:

1. NRS, Chapter 4458. 2. Applicable AQR Sections:

Citation Title AQR Section 0 Definitions AQR Section 4 Control Officer AQR Section 5 Interference with Control Officer AQR Section 8 Persons Liable for Penalties - Punishment: Defense AQR Section 9 Civil Penalties AQR Section 1 0 Compliance Schedule AQR Section 11 Ambient Air Quality Standards AQR Section 12 Preconstruction Review for New or Modified Stationary Sources Through June 30, 2010 AQR Section 12.5 Part 70 Operating Permit Requirements AQR Section 13.2(b)(62) National Emission Standards for Hazardous Air Pollutants: AQR Section 13.2(b)(85) NESHAP-AQR Section 13.2(b)(109) Subpart AAAA: Municipal Solid Waste Landfills

Subpart ZZZZ: Stationary Reciprocating Internal Combustion Engines Subpart CCCCCC: Gasoline Dispensing Facilities

AQR Section 14.1.74 Standards of Performance for New Stationary Sources (NSPS) -AQR Section 14.1.82 Subpart 000: Nonmetallic Mineral Processing Plants AQR Section 14.1.90 Subpart WWW: Municipal Solid Waste Landfill

Subpart 1111: Stationary Compression Ignition Internal Combustion Engines

AQR Section 18 Permit and Technical Service Fees AQR Section 19 40 CFR Part 70 Operating Permits Through June 30, 2010 AQR Section 24 Sampling and Testing- Records and Reports Through June 30, 2010 AQR Section 25 Affirmative Defense for Excess Emissions due to Malfunctions,

Startup and Shutdown AQR Section 26 Emissions of Visible Air Contaminants AQR Section 28 Fuel Burning Equipment AQR Section 29 Sulfur Contents of Fuel Oil AQR Section 40 Prohibition of Nuisance Conditions AQR Section 41 Fugitive Dust AQR Section 42 Open Burning AQR Section 43 Odors in the Ambient Air AQR Section 55 Preconstruction review for New or Modified Stationary Sources in Through June 30, 2010 the 8-Hour Ozone Nonattainment Area

Permit Issuance: NovemberS, 2011

Page 100: 2014 Apex Operations Plan-web Site-1

Citation AQR Section 60 AQR Section 70 AQR Section 80

Evaporation and Leakage Emergency Procedures Circumvention

Title

PART 70 OPERATING PERMIT Source: 395

Page 41 of 41

3. CAAA, Authority: 42 U.S.C. 7401, et seq. 4. Applicable 40 CFR Subsections:

Citation Title 40 CFR 52.21 Prevention of Significant Deterioration (PSD) 40 CFR 52.1470 SIP Rules 40 CFR 60 Appendix A, Method 9 or equivalent (Opacity) 40 CFR 60, Subpart A Standards of Performance for New Stationary Sources (NSPS) -

General Provisions 40 CFR 60, Subpart 000 Standards of Performance for New Stationary Sources (NSPS) -

Nonmetallic Mineral Processing Plants 40 CFR 60, Subpart WWW Standards of Performance for New Stationary Sources (NSPS) -

Municipal Solid Waste Landfill 40 CFR 60, Subpart 1111 Standards of Performance for New Stationary Sources (NSPS) -

Compression Ignition Internal Combustion Engines 40 CFR 63, Subpart AAAA National Emission Standards for Hazardous Air Pollutants:

Municipal Solid Waste Landfill 40 CFR 63, Subpart ZZZZ National Emission Standards for Hazardous Air Pollutants:

Stationary Reciprocating Internal Combustion Engines 40 CFR 68 Risk Management Plan 40 CFR 70 Federally Mandated Operating Permits 40 CFR 82 Protection of Stratospheric Ozone

Permit Issuance: November 9, 2011

Page 101: 2014 Apex Operations Plan-web Site-1

\ I / .·•

( _; ...• (_Health m~r;tcr--" ---11'/e'r~ ,n 't'c:Jr N:ai~hborho·:r~

July 1, 2001

Mr. Alan Gaddy Republic Services of Southern Nevada 770 East Sahara Avenue Las Vegas, Nevada 89104

Dear Mr. Gaddy:

Li 1.-fC..\ 1..{ [) I - t)i.\ l \

cl q '1~ 0 (-a 3 -~)

v ·.:rr "; I ) ~

0~ \.;~\08

RE: Requesting Approval to use Leachate for Dust Control at the Apex Class I Landfill

After reviewing your request and the infonnation provided to the Clark County Health District by the Nevada Department of Environmental Protection the Health District is approving your request to use leachate for dust control over the lined portions of the Class I landfill. The leachate can only be applied to the top of existing cover material on lined portions of the landfill to help stabilize the dust and enhance the desert pavement effect. Any run-off from the application of the leachate must be controlled and diverted from areas where liners do not exist on the landfill property. Also, no leachate run-off can leave the confmes of the landfill. If this occurs, you will be subject to enforcement under Chapter 444. If you have any questions, please give me a call at 383-1274.

Respectfully,

Glenn Savage Environmental Health Supervisor Clark County Health District

Page 102: 2014 Apex Operations Plan-web Site-1

•'

.,

llispnsallttrhan J})[aintenantt __ Jrnctssing <lln ... 1 lnt ...

April21,2001

Mr. Glenn Savage Clark County Health District Environmental Health Division 625 Shadow Lane Las Vegas, NV 89127

Dear Mr. Savage:

RE: Apex Regional Waste Management Center Use of Leachate as Dust Control Over Lined Portions

As we discussed in the past, the Clark County Health District requested Republic to obtain the Nevada Division of Environmental Protection's (NDEP) opinion on the use of leachate for dust control over lined portions of the landfill. Therefore, in a March 12, 2001, correspondence to the NDEP, Republic requested approval for the use of leachate as dust control over lined portions of Lhe landfill.

Please find enclosed with this correspondence a copy.of.NDEP,' s May 11. 2001, response to Republic's request. NDEP has approved the use ofleachate for dust control over lined portions of the landfill. As such, Republic submitts this correspondence as a revision to the Operations Plan to allow for the use ofleachate as dust control over lined p011ions of the landfill.

lfyou have any questions, please give me a call at 644-4210 ext. 224.

Respectfully,

. .-lc~"Gc~ Tom Gardner Regulatory Manager

Enclosure: NDEP's May 11, 2001, Conespondence.

770 East Sahara Avenue • P.O. Box 98508 • Las Vegas, Nevada 89193-8508 • Telephone 735-5151 ·Fax (702) 735-1986

Page 103: 2014 Apex Operations Plan-web Site-1

3.7 FIRE CONTROL APPROVAL

Page 104: 2014 Apex Operations Plan-web Site-1
Page 105: 2014 Apex Operations Plan-web Site-1

Clark County Fire Deparlment PERMIT

576 E Flamingo Rd • Las Vegas, NV 89119 • (702) 465-7316

IMf-l QRTAN f . Always usc the permit number below when requestino inspections or information rcoarclinn til iS pc1111it.

PERMIT NUMBER PHONE SYSTEM NUMBER 78-5645220 FFCL 02 14403654 PROJECT NAME: REPUBLIC DUMPCO INC SUB PROJECT NAME: APEX REG! EVENT NAME: PARCEL NO: 103-13-000-006 SITE ADDRESS: 13550 N PROPERTY OWNER:

ISSUE DATE 12/20/12

EXPIR. DATE 12/19/13

63-18-13

~' CONTRACTOR:

' ~ ·' '·

PERMIT CATEGORY: PERMIT: FD APP TYPE: FD

lrthe permit category above Is rem~wabl~pr approved permH conditions.

This Permit Is Issued and accepted on condition that all applicable ordinances and regulations now adopted, or that hereafter be adopted, shall be compDed with, and on the addJUonal condJUon that the permittee shall comply with any and all further rules and regulations whloh the Clark County Fire Prevention Division shall, from time to Ume Impose. This Permit does not take the place of any license required by law and Is not transferable. Any alterallons to the fire protection systems, or changes In the use/occupancy or ownership of premises, shall void this Permit and require a new plan.

COMMENTS/ 12/18/12 s requirements of the following: (1) feet from storage. ( flame or smoking wi transfer. (3)Weeds, gras materials shall be kept containers. (4)Provide.spill in storage area. {5)Storage of flammable exceed 120 g~llons when class 1-B flammable 1 are stored in an approved flammable liquids storage cabinet as per plans.(6)Safety devices on flammable liquids containers, equipment and systems shall not be tampered with or made ineffective. (7)Tanks more than 100 gal capacity must provide proper signage-NFPA 704 placards for hazardous material type. (B)Provide spill, drainage control, and ventilation per IMC in storage area. {9)Permit to utilize existing 2,000 gals gasoline, 47,000 gals diesel, & (2) 4,000 gals oils tanks stored in six double wall steel A/G tanks******Note: Must submit new plans and inventory list including combustible liquids class III-B (antifreeze, zep parts cleaners, & multi grade oil) for 2013 permit.

34

Page 106: 2014 Apex Operations Plan-web Site-1

' i i

I I I ' j

1 J

l ! I I ! I

~ . ':' ~

Clark County Fire Deparlment PERMIT

675 E Flamingo Rd • Las Vegas, NV 89119 • (702) 455-7316

IMPORTANT: Always use lhn permit number below when requesting inspections or infornwtion rnn<11'Clinn this permit.

PHONE SYSTEM NUMBER 14403662

PERMIT NUMBER 78-5647220 FHWO 03 PROJECT NAME: REPUBLIC SUB PROJECT NAME: APEX EVENT NAME:

ISSUE DATE 12/20/12

EXPIR. DATE 12/19/13

DUMPCO INC REG

PARCEL NO: 103-13-000-006 SITE ADDRESS: 13550 N

63-18-13

PROPERTY OWNER: CONTRACTOR: PERMIT CATEGORY: PERMIT: FD HOT APP TYPE: FD

lfthe permit category above Is ran,Bw~•hl• approved permit conditions.

This Permit Is Issued and aocepted on condition that all appilcable ordinances and regulations now adopted, or that hereafter be adopted, shall be compiled with, and on the addiUona.l condition th~t the permittee shaD comply with any and all further rules and regulaUona which the Clark County Fire Prevention Division shall, from time to time Impose. This Permit ~oes not take the place of any license required by law and Ia not transferable. Any alterellone to the flre protection systems, or changes In the use/occupancy or ownership or premises, shall void thla Permlt and require a new plan.

COMMENTS/ 12/18/12 Permi on file with thi with Chapter 26, not limited to the conducted in rooms or dust, or combustible st 2)Portable welding east 20 ft from combustible mater al ts).3)A minimum 2-A, 20B:C rated fire charged water hose w/ nozzle shall be located of the welding operation. 4)Hazard signs shall be posted to warn others before they enter the welding area. S)A fire watch, in accordance with section 2604.2 shall be provided during hot-work activities and shall continue for a minimum of 30 minutes after the conclusion of the work. The chief is authorized to extend t"he fire watch based on the hazards or work being performed. 6)Have all welders maintain a completed (signed) hot work operation/fire watch procedure safety sign-off sheet on site as desc~ibeg i~ company procedures.****Hot work will be conducted at the main warehouse and throughout the property for P.M. work. See 78-5648220 for compress gas permit.

plans

Page 107: 2014 Apex Operations Plan-web Site-1

3.8 POLLUTION CONTROL APPROVAL

Page 108: 2014 Apex Operations Plan-web Site-1

L. H. DODGION .4dministra/or

Administration: (702) 687-4670 Fax 687-5856

Air Quality Mining Regulation and Reclamation Water Ouallly Planning Water Pollution Control

STATE OF NEVADA BOB MILLER

Goul!mor

DEPARTMENT OF CONSERVATION AND NATURAL RESOURCES

DIVISION OF ENVIRONMENTAL PROTECTION

Tom Gardner Environmental Technologies 770 East Sahara Ave. Las Vegas, NV 89104

Capitol Complex

333 W. Nye Lane

Carson City, Nevada 89710

February 23, 1994

Ref: Stormwater Permits, Silver State Disposal Services, Apex,

Dear Mr. Gardner:

Nevada

PETER G. MORROS Dirl!c/or

Fax (702) 885-0868 TOO 687-4678

Waste Managemenl Corrective Actions Federal Facilities

Thank you for your letter dated December 16, 1993. After reviewing the information supplied by your office the staff of the Storm water Program concur that your sites do not require a stormwater permit at this time. We have therefore removed Apex Soil Treatment, Apex Transfer Station, and Apex Landfill from the general stormwater permit.

Thank you for your interest in the Storm water Program. If you have any further question feel free to call me at (702) 687-4670 extension 3153.

KB:ns cc: John Nelson

Sincerely,

-:iacCt 6~ Kathi Brandmueller, E.I.T. Bureau of Water Pollution Control

Page 109: 2014 Apex Operations Plan-web Site-1

3.9 FLOOD CONTROL APPROVAL

Page 110: 2014 Apex Operations Plan-web Site-1

REPLY TO ATTENTION OF

DEPARTMENT OF THE ARMY

U.S. ARMY ENGINEER DISTRICT, SACRAMENTO

CORPS OF ENGINEERS

1326 J STREET

SACRAMENTO CA 95814-2922

February 17,2010

Regulatory Division SPK-2007-00461

Rob Tidwell Republic Services 770 East Sahara A venue Las Vegas, Nevada 89193

Dear Mr. Tidwell:

This letter is in response to your December 18, 2009 request for revalidation for a non-jurisdictional determination on the Apex Waste Management Facility. The project is located in Sections 18, 19, and 20, Township 18 South, Range 64 East, and Sections 13 and 24, Township 18 South, Range 63 East, Mount Diablo Base and Meridian, Apex, Clark County, Nevada. The project area is part of a dry lake playa that drains internally and is considered a closed basin.

Based on the information you have provided, past jurisdictional determinations, and previous site visits to the closed basin, we have determined that the proposed work is exempt from Section 404 of the Clean Water Act. Therefore, a Department of the Army Permit is not required for this work. 1bis verification is valid for five years from the date of this letter.

Our disclaimer of jurisdiction is only for this activity as it pertains to Section 404 of the Federal Clean Water Act and does not refer to, nor affect jurisdiction over any waters present on site. Other Federal, State, and local laws may apply to your activities. Therefore, in addition to contacting other Federal and local agencies, you should also contact state regulatory authorities to determine whether your activities may require other authorizations or permits.

We appreciate your feedback. At your earliest convenience, please tell us how we are doing by completing the customer survey on our website under Customer Service Survey.

Please refer to identification number SPK-2007-00461 in any correspondence concerning this project. If you have any questions, please contact Patricia Mcqueary at 321 North Mall Drive, Suite L-101, St. George, Utah 84790, email [email protected], or telephone 435-986-3979.

lfncFY Patricia L. McQueary Chief, St. George Regulatory Office

Page 111: 2014 Apex Operations Plan-web Site-1

- •

REPLY TO ATTENTION OF

DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, SACRAMENTO

CORPS OF ENGINEERS 1325 J STREET

SACRAMENTO, CALIFORNIA 95814-2922

AprillO, 2007

Regulatory Branch (2007 -461-SG)

Wood Rodgers 9900 Covington Cross Drive, Suite #102 Las Vegas, Nevada 89144

Gentlemen:

This concerns your transmittal dated March 19, 2007 providing your request for a jurisdictional determination of a parcel of land within Sections 13 and 14, Township 18 S, Range 63E and Sections 7, 18, 19 and 20 in Clark County, approximately 15 miles northeast of Las Vegas, Nevada. This parcel was previously determined non­jurisdictional by this office in 1993 (199300587).

Based on the information provided, and based also on a subsequent field verification by this office, we determined that the parcel falls within an isolated basin and does not have a nexus to interstate commerce. Therefore, a Department of the Army permit is not required for the development of this site.

This determination is valid for five years from the date of this letter, unless new infonnation warrants revision of the determination before the expiration date. A Notification of Administrative Appeal Options and Process and Request for Appeal Fonn is enclosed. Ifyou wish to appeal this approved jurisdictional determination, please follow the procedures on the fonn. You should provide a copy of this letter and notice to all other affected parties, including any individual who has an identifiable and substantial legal interest in the property. Please refer to number 2007-461-SG in any correspondence concerning this project. If you have any questions, please contact me at our St. George Regulatory Field Office, 321 North Mall Drive, Suite L-1 01, St. George, Utah 84790 or telephone number 435-986-3979. Our website is www.spk.usace.army.mil/regulatory.html.

Sincerely,

Chief, St. George Regulatory Office 321 North Mall Drive, Suite L-101 St. George, Utah 84790

Page 112: 2014 Apex Operations Plan-web Site-1

n"''u""'"" Ju ... uuJL1..,..., your rights and options regarding an appeal the above ~E'-!·,~O?~~~~}··-n.u.un.~vu.cu information may be"found at http://usace.army.mil/inet/functions/cw/cecwo/reg or

at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.

• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the DISTRICT Engineer for fmal autholization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety and waive all rights to appeal the pemlit, including its terms and conditions, and approved jutisdictional determinations associated with the permit.

• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the DISTRICT Engineer. Your objections must be received by the DISTRICT Engineer within GO days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the DISTRICT Engineer will evaluate your objections and may: (a) modify the petmit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the DISTRICT Engineer will send you a proffered permit for your reconsideration, as indicated in Section B below.

B: PROFFERED PERMIT: You may accept or appeal the permit

• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the DISTRICT Engineer for final authorization. If you received a Letter of Permission (LOP}, you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.

• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain teqns and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the DIVISION Engineer. This form must be received by the DIVISION Engineer within 60 days of the date of this notice.

C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the DIVISION Engineer. This form must be received by the DMSION Engineer within 60 days of the date of this notice.

D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information.

• ACCEPT: You do not need to notify the Corps to accept an approvedJD. Failure to notify the Corps within 60 days of the date of this notice means that you accept the approved JD in its entirety and waive all rights to appeal the approved JD.

• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the DIVISION Engineer. The appeal form must be received by the DIVISION Engineer within 60 days of the date of this notice.

E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may rovide new information for further consideration by the Corps to reevaluate the JD.

Page 113: 2014 Apex Operations Plan-web Site-1

.SECTiON II . .lj'{EQ1JfjS_T1FOR .APP-EAL b~ Oa~CTIONS TO $'@~mllW.~}~l(PFf~l§gl}>J.~~toolw7W~TI'l REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the deCision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.)

ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, _you rna)' pJovide additional information to clarify the location of information that is already in the administrative record.

POINT OF CONtACt FOR QUESTIONS OR INFORMATION: ~·· If you have questions regarding this decision and/or the appeal If you only have questions regarding the appeal process you may process you may contact: also c;ontact:

US Army Engineer District, Sacramento Chief, Inte1mountain Regulatory Section 533 West 2600 South, Suite 150 Bountiful, UT 84010

(801) 295-8380

Doug Pomeroy, Administrative Appeal Review Officer Army Engineer Division, South Pacific, CESPD-DM-0 333 Market Street, San Francisco, CA 94105 (415-977-8035)

(NOTE: This is also the address to which an appeal addressed to the DIVISION Engineer would be mailed.)

RIGHT OF ENTRY: Your sig~ature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15-day notice of any site invest!&&tion and will have the opportunity to participate in all site investigations.

Date: Telephone number:

Signature of appellant or agent.

Page 114: 2014 Apex Operations Plan-web Site-1

~ <( 0 z :::> 0 m w

~ z -~ 0

-LL

0

Page 115: 2014 Apex Operations Plan-web Site-1

~ I

US Army Corps ofEngineers Intermountain Regulatory Section

Approved: OMBNo.: Ex aires:

19 August 2002 0710·0012

31 Auoust 2005 533 West 2600 South, Suite 150 Tilt l'ullk rljllll ,. nljiOAA, lndud"IIIQ lk1;p lor reviewing fnsti'IICIIIIIII, IUICiinQ ulatlag diiiiiii.ICII, g•lhlrlnt and malataining lh• dittlllldtd.tnd ~tilgllldr Bountiful ,UT 84010-7744 .limite 11 eny olhlr tspect olthlt colftcdan ollnfarmaUo~~o Including auggntlans far redudng lhlt burd111, to lllplrlmlnt ol Dtlanu, Wulllngton Hu, li2L 1215 J11f111011 Davia lf!Qhwey, SUIII1204, AJ9not011o VA 22202-4302. RupondaniJ should biiWJII tJ:!t.notwilhsllndlng any alllat provision olllw, no per1011 sllaU b llllilactto tnY pwlty lor ftiTIIO to C9fr~Jiy Willi I colecdan Ill lnflllllllian 1111 dou not dlaplly 1 curnndy nlid DMB contralllllmhtt. PLEASE DD NJIT RETURN YOUR mUCATION TO THE ABOVE ADDRESS. RETURN CDMPL£TED APPUCATION TO THE ADDRESS SHOWN ON THE AI'I'UCATION INSTRUCTION SHEET.

U.S. ARMY CORPS OF ENGINEERS CUSTOMER SERVICE SURVEY· REGULATORY PROGRAM

W1 at th1 U.S. Army Corps of EnglnHJJ Regulatory Br1nch 111 convnltlld to inprovlng sarvlce to our CUIIOIIIIII 1nd would liklto know haw w11l WI heva hen doing. Who 111 our custonurs? You 111

our custom•rs If you submlned a permit application, requested a jurisdictional detorminatlon or wetland delineation, or scheduled e pre-application meeting with us. Other custom"' Include those of you who receive our Public Notlco and/or commented on a particular project or our work In general, because of your Interest In the Regulatory Program. To Identify how we can bener 11rve you, we need your help. Please taka the time to fill out this brief survey and mail It back to us. Your honest opinions wm help us determine areas In which we need to Improve. For each queatlon, please Indicate the level olnrvlce you received by marking the appropriate number on 1 scale from 1·6, with 1 baing low ldissatlsfiedl end 6 baing high Ivery Jatlafied). If the question does not apply to you, almply mark N/A. Thank you for yourtlma end comments! Response to this survey Is VOLUNTARY. If you choose not to respond, It will not affect any current or future dealings you may have with the USACE In any way.

lOW HIGH L FOR APPLICANTS & OTHERS REQUIRING AUTHORIZATIONS SATISFACTION SATISFACTION

.. 1 2 3 4 6 NA I. Do vou think vou recaived vour Caras oermlt daclslan In 1 reuonablt amount of tlma?

2. Da you think you rmlvad your Carps Jurlsdictlollll dallrmination In a reasonable 1moun1 of 1 2 3 4 6 NA lima?

3. If war~convnendedlraqulnd projlct changn/modifitldons to raducalmpacu, did we cllarly 1 2 3 4 6 NA exolaln the reasons whv?

4. If wt reconvnendedlraqulrad project changu(modiflcations 1 2 3 4 6 NA lo redutllmpacts, did the chanaes sum reasonable to you?

1 2 3 4 5 NA 5. If we denied vour Dtrmit. aid we durlv mlain the rauons why? 0. For enforca1111nt casu, did our offiCI durly and profusionally uplaln thl buis for the enforcamanllction ly., what work we believe you performed without 1 2 3 4 5 NA auth ·•• ,j

, 1 2 3 4 5 NA

7. For 1nforcs1111nt mas, did our oflie~lnduda options for ruolutlon7 11 trne MnTUtrfiM

1. For ptrmltled actions, was tha parmlttfflctiveln achieving appropriall prolecdon(mitigatlon for I 2 3 4 5 NA inoacts to aquatic rasourcu?

2. For anforcamlntaclions, aid tha Corps JIQUUI approprlata compansalion(rastoration for 1 2 3 4 5 NA inpacts to IQUalic riSOUICIS7 . 11/. FOR APPLICANTS & ·oTHER• CUSTOMERS

1 2 3 4 5 NA

1. Did the CorDS reorenntative act orof1ssionallv •nd trut you with courtuv7

2. Did thl Corps provide sufficientlnfonnation Ia allow you to complata 1n ljlplicetion farm. 1 2 3 4 5 NA co1111111nt on • oubllc natltl or otherwl11tvaluat1 our work?

1 2 3 4 5 NA 3. Did WI ruoond to vour lellars and telephone calls In 1 raasonabla amount of tine?

4. Did the Corps representative enswet your quutlons clearly,giYing you accurata ill ormation I 2 3 4 5 NA about our Reaulatorv Proaram?

5. Whet Is your OVERALL rating of tht level of urvlc1 provided by the Corps of Englnaers 1 2 3 4 5 NA Raaulatorv Proar11111

Not1: DATA FROM THIS QUESTIONNAIRE WILL BE USED BY THE DISTRICT TO IMPROVE SERVICE. ALSO, INFORMATION WILL BE TABULATED NATIONALLY BY SERVICE AREA. RESPONDENTS WILL NOT BE IDENTIFIED BY NAME OR ORGANIZATION FOR ANY REPORT DERIVED FROM THIS SURVEY,

ENG FORM 5066, Feb 97 IPropontnt: CECW·DRJ

Page 116: 2014 Apex Operations Plan-web Site-1

I I

I I

I ~'r ... ,.

PLEASE COMPLETE THE FOLLOWING DUESTIONS BY GIVING US ANY COMMENTS OR SUGGESTIONS FOR HOW WE CAN IMPROVE.

Plaaselndicate the nature of your business Ill applicable, check more than anal:

- Property developer _ Flood/Water Control District _ Consultant

- Sand & Gravel - Public Agency Appficant _ Civic or Trade Organizalion

- Member of Lagislalure _ Federal/Slate/Local Official _ Conservation Organization

- Other ldtscrlbeJ:

_ Farming/Ranching

- Public Agency - PersonaVPrivate Projecl - Adjacent Properly Owner

What Servica(s) Did You Seek From the Corps? Pf 11ppfi~11bltJ, check motll th11n oneJ:

- General Information - Pre·application Consultation

_ Jurisdictional/wetland delerminalion - Resolulion of violalion/non·complianca

Regulalory Program presentalion

- Law Office - Silviculture

Mining Media Native American

- Nationwide general permit Regional or progranvnatic general permit Standard Individual permit

Conunented on Pubflc Notice/permit appUcation Other {describe);

Le1ter of Permission

Which Carps ollice (Dimiet, DM1/on, Hudg111rt111, otlrlfJ did you deal with?

Name of person you contacted In our office {optionlll};

Do you have any comments or suggestions on tho Regulatory Program?

Information about you (option11/J:

Namemtle:

Address:

Talephana (incfuds llft!ll codtJ}:

May wa cont.ct you7 YES NO_

PRIVACY ACT STATEMENT

Authorltiea: The government Performance and Results Act of 1993 and Executive Order IE0112B62, "Setting Customer Service Standards·, dated September 11, 1993. Purpose: To determine the quality of services our customers expect, as well as their 1atlsfaction with USACE's existing services. Information provided on this form will be used In evaluating the performance of the Corps Regulatory Program. Routine Uses: This information may be shared with the Office of Management and Budget, members of Congress, and other federal, state, and local government

!Reverse of En a Form 5066)

...

Page 117: 2014 Apex Operations Plan-web Site-1
Page 118: 2014 Apex Operations Plan-web Site-1
Page 119: 2014 Apex Operations Plan-web Site-1
Page 120: 2014 Apex Operations Plan-web Site-1
Page 121: 2014 Apex Operations Plan-web Site-1
Page 122: 2014 Apex Operations Plan-web Site-1
Page 123: 2014 Apex Operations Plan-web Site-1
Page 124: 2014 Apex Operations Plan-web Site-1
Page 125: 2014 Apex Operations Plan-web Site-1
Page 126: 2014 Apex Operations Plan-web Site-1
Page 127: 2014 Apex Operations Plan-web Site-1
Page 128: 2014 Apex Operations Plan-web Site-1
Page 129: 2014 Apex Operations Plan-web Site-1
Page 130: 2014 Apex Operations Plan-web Site-1
Page 131: 2014 Apex Operations Plan-web Site-1
Page 132: 2014 Apex Operations Plan-web Site-1
Page 133: 2014 Apex Operations Plan-web Site-1
Page 134: 2014 Apex Operations Plan-web Site-1
Page 135: 2014 Apex Operations Plan-web Site-1
Page 136: 2014 Apex Operations Plan-web Site-1
Page 137: 2014 Apex Operations Plan-web Site-1
Page 138: 2014 Apex Operations Plan-web Site-1
Page 139: 2014 Apex Operations Plan-web Site-1
Page 140: 2014 Apex Operations Plan-web Site-1
Page 141: 2014 Apex Operations Plan-web Site-1
Page 142: 2014 Apex Operations Plan-web Site-1
Page 143: 2014 Apex Operations Plan-web Site-1
Page 144: 2014 Apex Operations Plan-web Site-1
Page 145: 2014 Apex Operations Plan-web Site-1
Page 146: 2014 Apex Operations Plan-web Site-1

JIM GIBBONS Gouemor

STATE OF NEVADA

DEPARTMENT OF CONSERVATION AND NATURAL RESOURCES

DIVISION OF WATER RESOURCES

Alan Gaudy Republic Services 707 East Sahara A venue Las Vegas, Nevada 89104

901 S. Stewart Street, Suite 2002

Carson City, Nevada 89701

(775) 684-2800 • Fax (775) 684-2811

http://water.nv.gov

March 20, 2008

AllEN BlAGG! Director

TRACY TAYLOR, P.E. Stote Engineer

Re: Apex Regional Landfill Detention Basins 1, 2 and 3 Dams, J-608, J-609 and Js-136

Dear Mr. Gaddy:

Please find enclosed approved application J-608 for the constmction of the Apex Regional Landfill Detention Basin 1 Dam with suppm1ing documents bearing the endorsement of the State Engineer. Please review attachment "A" of the authorization for due dates and additional submittal items taking particular note of terms (3)- (8).

Application J-609 has been partially reviewed and will be held in abeyance until such a time as the final design plans and specifications have been developed. Subsequently, the plans and specifications for the Apex Regional Landfill Detention Basin 2 Dam are not approved at this time and no safety of darns permit has been issued for J-609. Please advise this office at your earliest convenience as to the status of the Basin 2 Dam. Your $500.00 filing fee will be retained until such a time as the remaining information has been submitted or you choose to withdraw the application.

Construction of the Apex Regional Landfill Detention Basin 3 Dam is herewith tentatively authorized under Js-136. This authorization is based upon the information submitted by letter dated March 12, 2008. Please prepare a "Notice of Construction" pursuant to Nevada Administrative Code 535.200. Please find enclosed a blank notice form for your convenience. This tentative authorization will expire in sixty (60) days.

Page 147: 2014 Apex Operations Plan-web Site-1

Page 2 March 20, 2008 Apex Regional Landfill Detention Basins 1, 2 and 3 Dams, J-608, J-609 and Js-136

You are responsible for periodic inspection of all embankments and impoundments on your property. Please report any slumps, sloughs, seeps or unusual observations to the State Engineer immediately.

Should you have any questions, please call the undersigned at (775) 684-2843.

MJA/sg

Enclosures

Sincerely,

r~1:!d,:~~ Staff Engineer III

cc: Randall Wall, P.E., Shaw Environmental, Inc. DCNR NDEP Bureau of Water PoJlution Control Southern Nevada Branch Office

Page 148: 2014 Apex Operations Plan-web Site-1

I I I I I f

I

--I I

• ..

• I

I I ; '

-I I

I I

~', sHaw~ Shaw Environmental, Inc.

Michael J. Anderson, PE Department of Conservation and Natural Resources Division of Water Resources 901 S. Stewart Street, Suite 2002 Carson City, NV 8970 l

l ,' i. /1· ~

I ' • ) .• c;, ...

Shaw Environmental, Inc. 1326 North Market Boulevard Sacramento, California 95834

Tel: (916) 928-3300 Fax: (916) 565-4356

February 27, 2008 Project 125282

APPl~OVED J.. ~¢~ -t7J-

this.:2a day r::f /:{e.tc;M..20¢.!o

Re: Submittal of Revised Dam Application for Review by th\-~+P"'!''Ifai'VP"':P'!!Iri'!!l""l~'i'!Mf"i"i'i'l!i'fTT"----­of Conservation and Natural Resources, Division of Water Resources for the Apex Regional Landfill

Dear Mr. Anderson:

On December 6, 2007, Shaw Environmental, Inc. (Shaw) on the behalf of Republic Services of Southern Nevada submitted an application for the permitting of two retention basins proposed for construction at the Apex Regional Landfill located in Clark County, Nevada . According to the Division of Water Resources classification, both basins classify as dams. The applications have been reviewed by the Division of Water Resources (DWR). On February 1, 2008 an email from DWR was received by Mr. Alan Gaddy of Republic Services. The email included several comments and questions related the application submitted.

The two basins proposed for permitting at this time have been designated Basin No. 1 (DWR tracking no. J608) and Basin No. 2 (DWR tracking no. 1609). Basin No. 1 is located adjacent to the next landfill module to be constructed at the site, MA-9. Basin No.2 is located next to the subsequent landfill module to be constructed at the site, MA-11. Currently only final construction plans for Basin No. 1 have been competed and submitted for review. Shaw and Republic Services recognize that the Basin No. 2 final design must be completed and approved by DWR prior to a permit for this basin being issued. Therefore, Republic Services is only pursuing the permitting of Basin No. 1 at this time with the intention of pursing the Basin No. 2 permit within the near future.

Provided below are responses to the comments received in the email that pertain to Basin No. 1. The DWR comments are presented in italics followed by the Shaw response.

Z:\WINWORD\APEX\Dam pennitting\DWR Response lencr REV2.doc

Page 149: 2014 Apex Operations Plan-web Site-1

NV ___ _ J ------NOTICE OF CONSTRUCTION, RECONSTRUCTION OR ALTERATION

OF ADAM NAC 535.200

Nameofdam: _________________________________________________________ ___

Location of dam: M.D.B.& M. or at a point from which the

-----------corner of(said) section M.D.B.& M. bears------------

a distance of feet in the county of _____________________ ___

Name of source of water:. _________________________________________________ __

Water right (claim/pennit/certilico.te} under which water will be diverted/stored:--------------------

Date on which work on the dam is to commence (may not be less than 30 days from the submittal dull:): ----------

Dam length: _______ ft. Dam height: ________ .ft. Dam volume:-------~ d3•

Capacity of reservoir to be created at spillway crest _____ acre-feet; & at dam crest: ____ a.cre-feet.

Description of proposed work: ------------------------------------------------

Name, address and telephone number of individual

completing application ( agent I owner):

Tel:--------------

Signature of individual completing application: ------------------------date: ____ _ Additional sheets may be attached for submittal of water right, owner or project information.

Application must be accompanied by plans as described by NAC 535.200(1 k). pg. 1/2

Page 150: 2014 Apex Operations Plan-web Site-1

NV ___ _,__ J ------Name, address and telephone nwnber of the

operator of the dam:

Name, address and telephone number of each owner

of the dam:

Name, address and telephone number of each

professional engineer in responsible charge of work

in connection with the dam:

Additional sheets may be attached for submittal of water right, owner or project infonnation. Application must be accompanied by plans as described by NAC 535.200(1k). pg. 2/2

Page 151: 2014 Apex Operations Plan-web Site-1

STATE OF NEVADA DEPARTMENT OF CONSERVATION AND NATURAL RESOURCES

DIVISION WATER RESOURCES ~ 0 ~~

Application No. ::f- 0g$g Filed \kC · ( <. 1 ~c;::.. ~ APPLICANT MUST NOT FU..L IN ABOVE BLANKS

APPLICATION FOR APPROVAL OF THE PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION, RECONSTRUCTION OR ALTERATION OF A DAM

This Application Involves in No Way the Right to Appropriate Water To secure the right to approprlnte wnter, application should be made to the Stnte Engineer

on forms which will be furnished upon request.

1 Randall Wall of Shaw Environmental, Inc. '--------~N~~~aT.fa~w~~~M----------------------

__.,1""3c.::2~6~N .... --""M=a""r..:.:k:.:ec.:t.......:;B=l-=-v-=d-=-....... --=S=a-=c-=-r-=a~m=e.:.:n.:t-=o ..... , --=C.:.:A'------"-9:.5.:::.8.::.3...:.4 ___ , here by make application for the approval of the

Plans and specification of the construction Coaslnlelloo, rccooslnlctioo, aher~~tlon

of MA-9 dam. Nameofdam

The owner of the proposed dam is _____ R_e_._p_u_b_l_i_c __ S_e_r_v_i_c_e_s __ rr.:=:::--=-=:::=------------------------Name of owner

of 707 East Sahara Avenue, Las Vegas State of Nevada Ad~s

If the owner is a corporation, give name and address of president and secretary --

Jim O'Connor, 110 SE 6th Street, Fort Laud~rdRle, FL 33301

David Barclay, 110 SE 6th Street. Fort Lauderdale, FL 33301

The applicant is acting for the owner in the legal capacity of ___ _.o.A...,g.,..en......,._t ________ ~=....-:::==-'1':::':~=-----------Ageat, L~:!~sec, Truslec, elc.

Location of Dam

1. The source of water to be stored is __ --<Tu ...... n...,..n.,..a..,.-m_,e.,.,d~==,.,_--which is a tributary of-----------,=::-------Name or Slrr:mt or UDdeiJ:I'OUDd Slleam

and the proposed dam to be located within the SW Y.., sw Y..,Sec. ____ 2~0 ________________ ___

T. 18 S. , R. 64 E., M.D.B.&M. in __ C_l_a_r_k'-------County, Nevada.

Description and Dimensions of Dam (If for an alteration, the data given below is for the altered dam)

2. Type of dam Earth/Rock COacrcle arcb or paV1ty, Uiill, rociCtiD, etc.

3. Length of crest __ 3_6_5 ________ ft.

4. Height stream bed to spillway crest __ 3_8 _________ ft. 5. Height foundation to spillway crest ____ 4_0 ____ ft.

6. Freeboard _2_,...,=~=-=- ft. 7. Thickness at top __ 5_0 ___ ft. 8. Thickness at bottom --'-33;;...0 _____ ft. Spillway crest to lap

9. Slope upstream* 5. 5% 10. Slope downstream* 2% .This information to be suppUCd for eiii1li or rockfill dams. _--=.:..::._. __

11. Upstream facing ·=~R:-:o.,;:c,.,;;kT:=-.---.-­concrcte or roCk paVID&, elc.

12. Amount of material in dam_--=.6.::..5J..'.::.OO.::..O=.-=::==-----c.u. yds. 13. Estimated Cost $--'3~2::..::5::...;,E-:O:..:O:..:O::..__ _____ _ AppiOltllllaiC

14. Spillwaydata __ N~/~A.::._ _____________ ~~~~--------------------Type. Capacity, elc:.

15. Outlet data _...:.N:..~.I.=..:A'---------------.:::=-=-==:-:::=--------------------­type. apadty, elc.

16. Elevation of crest of dam 2 , 56 0 above datum Approxnn:lla elcvadoo to be ,Pveo i(lnlc elevation ootavailible ---------------------

17. Area of reservoir at spill way level __ ~N.~.../...,A.__ ______ acres. 18. Capacity of reservoir __.2..,8...,.'-'1.__ ______ .ac. ft.

$500 filing fee must accompany this application

Page 152: 2014 Apex Operations Plan-web Site-1

General Information

19. State the purpose ofthe dam Retention ~~~~D~ive~n~.o~no~nr~;~st~o~~~~o~ni=y;-.s~~m~ge~~~ana~,~~n~•on~;a~.~bn~ss~to~ms~e,,n~ooa~co~n~~c~.~~~---------------

21. Engineers Randall Wall Name and addren of Engmem prepanng pbils

Shaw Environmental. Inc.

1326 N. Market Blvd.

Sacramento. CA 95834

(916) 565-4320

22. If the proposed dam is to be built under Federal supervision, state what department has jurisdiction

N/A

23. The maps, plans and specifications accompanying this appli~on are ~~Jtereo~ j/.

(signedJ '-z.'5Zeu ~· App IClllll

this_.!...,;//..___ __ day of L?Et-.

APPROVAL OF APPLICATION NO 4- Cc:,cpf3::> PLANS AND SPECIFICATIONS

,INCLUDING

This Is to Certify That Application No. ::(- ~ ¢ 6 , including plans and specifications

for the A 0.e..,; ~tDv..ct-~ Lo.v<:S':d Q\~.,.At~ t;o-">'V-..1 o~ A~ HA- '1 dam

has been examined and the same is hereby approved, subject to the following conditions:

D-3888 CR446

n \l ' ,, ,, :yvc...x... '7&-e o...trca.c.k~'t A.

.2().,..~ Witness my hand and seal this--"'"'---- day

of tk.tvV-- , 20~ ~~ ~ ...__ .~,{_' L( State Ensineer {

FILE IN TRIPLICATE

Page 153: 2014 Apex Operations Plan-web Site-1

J-608 Page 1

ATTACHl\1ENT ''A'' Permit terms for the construction of Apex Regional Landrtll Detention Basin 1 Dam.

1) If construction has not commenced within one (1) year of this approval, the permit will become void and

a new application must be made prior to initiating construction.

2) A Nevada licensed civil engineer shall make periodic inspections during construction to ensure

conformance to the approved plans and specifications.

3) Upon completion of construction but no later than March 20, 2009, the engineer shall submit to the State

Engineer a Report of Completion of Work (Report).

4) The Report must include the statutory $10.00 filing fee, signed verification from the engineer that the

structure was completed in substflntial conformance to the plans and specifications as approved, and a

summary of the results of all earth compaction, concrete strength and material tests. Actions taken in

response to any failed tests shall be described in the Report.

5) Record drawings (as-built) must have the section comer to which the reference point is tied identified by

standard land division practices.

6) Upon satisfactory review of the Report, the State Engineer will issue an Approval to Impound. Water

may not be impounded behind the structure prior to receipt of the Approval to Impound.

7) Records must be kept of water impounded to include, without limit, date and time of observation, water

surface elevation, drain discharge rate, general embankment condition. Such observations to be made

daily when water is present in the impoundment.

8) The drain pipe may require extension prior to constructing the adjacent fill pad. Notice must be made to

the State Engineer 30 days prior to initiating drain pipe abandonment. The notice must include flow

observations, reservoir elevations, and proposed abandonment design.

9) This office, its officials or employees assume no liability for the information, data or conclusions

presented by the consulting engineer. Therefore no warranty, either expressed or implied, has been made

in conduct of this review.

10) This approval does not waive the necessity of obtaining other required permits from any applicable

Federal, State or local agencies.

Page 154: 2014 Apex Operations Plan-web Site-1

1/23113 UntiUed Page

Legend

IOJ-Yecr Aooa zo~

LOMilS

~ Adde<J

O Removed

StnJCIUTe

Selected Parcel Pcrcet

lj

·+-• . -· !:

The District makes no warranties concerning the accumcy of this data.

This parcel IS NOT in a 1 00-year flood zone.

Parcel 10420000001

Owner REPUBUC DUMPCO INC

Address 0

Entity ClarkCounty

Contact 702-455-0489

Flood Zone This parcel IS NOT in a 100-yeor flood zone.

guslfront.ccrrcd.org/ParcellnFioodZone/PrlniMap.aspl(?p=10420000001&o=REPUBLIC+DUMPCO+INC&a=O++&e=Ciarlt+-Count}'&c=702-455-0489&f=&s==&... 111

Page 155: 2014 Apex Operations Plan-web Site-1

1123113 UntlUed Page

legend

loo-Yeor FlOOd zo~

LOMII.s

I38J Ad<lecl

12e oved

s ructure

Selected Parcel Parcel

The District makes no warranties concerning the accuracy of this data.

This parcel IS NOT in a I 00-year flood zone.

Parcel 10313000003

Owner REPUBUC DUMPCO INC

Address 0

Entity Clark County

Contact 702-455-0489

Flood Zone This parcel IS NOT in a 100-yearflood zone.

..., 0 ' I

guslfronlccrrcd.org/ParcellnFioodZoneJPrlniMap.aspi?p=10313000003&o=REPUBLIC+DUMPCO+INC&a=O++&e=Ciarkt-Count)6.c=702-455-D489&f=&s:&... 1/1

Page 156: 2014 Apex Operations Plan-web Site-1

1/23113 UntJUed Page

Legend

100-YeorRood zong

LOMIIS

B8l AddiKI

D Removed

StruCI\Jfe

set ted Parcel Parcel

II

·+-• _ .. t:

The District makes no warranties concerning the accurocy ofthis data.

This parcel IS NOT in a 1 00-year flood zone.

Parcel 10313000005

Owner REPUBUC DUMPCO INC

Address 0

Entity Clark County

Contact 702-455-0489

Flood Zone This parcel IS NOT in a 100-year flood zone.

gustfront.ccrfcd.org/ParcellnFioodZone/PrintMap.aspx?p=10313000005&o=REPUBLIC+DUMPCO+INC&a=O++&e=Cisrltt-COI.Ilt)&c=702-455-0489&f=&s=&... 111

Page 157: 2014 Apex Operations Plan-web Site-1

1123/13 ••'"'•11""1 Page

Legend

>-Yttor FIOOCI ZC"

t Structure

&cllt<l Parcel ] Poroet

I·J I

.-\~ :

The District makes no warranttes concerning the accuracy thiS oata.

This pare ellS NOT in a 1 00-year flood zone.

Parcel 10313000006

Owner REPUBUC DUMPCO INC

Address 13550 lAS VEGAS

Fntity ClarkCounty

Contact 702-455-0489

Flood Zone This parcel IS NOT in a 100-yearflood zone.

gustfront.ccrfcd.org/ParcellnFioodZone/PrlnlMap.aspl(?p=10313000006&o=REPUBUC+DUMPCO+INC&a=13550+LAS+VEGAS&e=CiarktCou~c=702·45... 1/1

Page 158: 2014 Apex Operations Plan-web Site-1

1fl3113 Untitled Page

legend

t.0M115

~ Atlded

O ~moved

~4~111~m;~m (..-f struclure

Selecte-e Parcel CJ Pcroet

I~

, . . J -:I·~!:

·:-

The District makes no warranties concerning the accuracy of this data.

This parcel IS NOT in a 100-year flood zone.

Parcel 10313000008

Owner REPUBUC DUMPCO INC

Address 0

Entity Clark County

Contact 702-455-0489

Flood Zone This parcel IS NOT in a 100-year flood zone.

guslfront.ccrfcd.org/ParcellnFioodZone/PrlntMap.asp)(?p=10313000008&o=REPUBLIC+DUMPCO+JNC&a=Ot+&e=Ciarkt-Count}&c=702-455-0489&f=&s=&... 1/1

Page 159: 2014 Apex Operations Plan-web Site-1

1f23113 Untitled Page

lOMR$

~ Added

D Removed

... i Slruc:lure

Selecte-d Parcel Porcl!f

The District makes no warranties concemmg the accuracy ofthis data.

This parcel IS NOT in a 1 00-year flood zone.

Parcel I 0324000004

Owner REPUBUC DUMPCO INC

Address 0

Entity Clark County

Contact 702-455-0489

Flood Zone This parcel IS NOT in a 100-year flood wne.

gustfront.ccrfcd.org/ParcellnFioodZone/PrinlMap.asplGp=10324000004&o=REPUBLIC+OUMPCO+INC&a=G++&e=Ciarkt-COU11t}&c=702-455-0489&f=&s=&... 111

Page 160: 2014 Apex Operations Plan-web Site-1

1/23113 Untitled Page

Leg

100-Yeor

LOMRs

B8l Add

D ~m Struclure

serecrea Parcel Poroet

The District makes no warranties concerning the accuracy of this data.

This parcei1S NOT In a 1 00-year flood zone.

Parcel 10407000003

Owner REPUBUC DUMPCO INC

Address 0

Entity Clark County

Contact 702-455-0489

Flood Zone This parcel IS NOT in a 100-year flood zone.

guslfronlccrfcd.org/ParcellnFioociZone/Prln!Map.aspX?p=10407000003&o=REPUBLIC+DUMPCO+INC&a=O++&e=Ciark+County&c=702-455-0489&f=&s=&... 1/1

Page 161: 2014 Apex Operations Plan-web Site-1

1/23113

nd Y c r rioo<'ll 'd

k

Ad

ll'efT'~e

S 'l. •UTi!

tea Perc "O!'tli!l

The Distnct makes no warranties concerning the accuracy of this data.

This parcel IS NOT in a 1 00-year flood zone.

Parcel 10407000005

Owner REPUBUC DUMPCO INC

Address 0

Entity ClarkCounty

Contact 702-455-0489

Flood Zone This parcel IS NOT in a 1 00-year flood zone.

guslfronlccrfcd.orgiParcellnFioodZooe/PrlniMap.aspx?p=10407000005&o=REPUBLIC+DUMPCO+INC&a=O++&e=Ciarkt-County&c=702-455-0489&f=&s=&... 111

Page 162: 2014 Apex Operations Plan-web Site-1

1123113 Untitled Page

legen<:l

IOO.YeorAood lorw

Parcel

The District makes no warranties concerning the accuracy of this data.

This parcel IS NOT in a 1 00-year flood zone.

Parcel 10418000001

Owner REPUBUC DUMPCO INC

Address 13550 LAS VEGAS

Entity Clark County

Contact 702-455-0489

Flood Zone This parcel IS NOT in a 100-year flood zone.

gustfronl.ccrfcd.org/ParcellnFJoodZone/PrlniMap.aspx?p=10418000001&o=REPUBLIC+DUMPCO+INC&a=13550+LAS+VEGAS&e=Ciark+Counl}&c=702-45... 1/1

Page 163: 2014 Apex Operations Plan-web Site-1

z...,

The District makes no warranties concerning the accuracy t 1 dat,

This parcel IS NOT in a 1 00-year flood zone.

Parcel 10418000002

Owner REPUBUC DUMPCO INC

Address 13550 LAS VEGAS

Entity Clark County

Contact 702-455-0489

Flood Zone This parcel IS NOT in a 100-year flood rone.

gustrronlccrfcd.org/ParcellnFioodZone/PrintMap.aspll?p=10418000002&o=REPUBLIC+DUMPCO+INC&a=13550+LAS+VEGAS&e=Ciarkt-Count}&c=702-45... 1/1

Page 164: 2014 Apex Operations Plan-web Site-1

1!23113 'P-.gr

legend

,,IL Ad<:lOO

I ~ mi.)VC<j

'ilflJCIIJI'

_cre-el Pore 1 Po~~

The DJStnct make J warranues conceM.ng the JCCuracy 01 ~n tS aata

This parcel IS NOT in a 1 00-year '>d :zrmc.

Parcel 10418000003

Owner REPUBUC DUM J INC

Address 0

Entity Clark County

Contact 702-455-0489

Flood Zone This parcel IS IT m a .00-yeai 1l1h)d zone.

gustfronlccrfcd.org/ParcellnFioodZone/PrintMap.asplOp=10418000003&o=REPUBLIC+DUMPCO+INC&a=O++&e=Ciarkt-Counl}&=702-4S0489&f=&s=&... 111

Page 165: 2014 Apex Operations Plan-web Site-1

1123/13 UnliUed Page

legend

too-Year flOOd zone

LOMIU

~Added

0 ~moved

structure

selected Parcel Porcet

tl

·+-= . _ .. -

The Dtstnct makes no warranties concerning the accumcy ofthis data.

This parcel IS NOT in n 1 00-year flood zone.

Parcel 10419000001

Owner REPUBUC DUMPCO INC

Address 0

Entity Clark County

Contact 702-455-0489

Flood Zone This parcel IS NOT in a 100-year flood zone.

gustrronlccrfcd.org/ParcellnFioodZoneiPrin!Map.asp1(7p=10419000001&o=REPUBLIC+DUMPCO+INC&a::::O++&e=CiarktCOlJ11t}&c::::702-45S-0489&f=&s=&... 1/1

Page 166: 2014 Apex Operations Plan-web Site-1

IJiliiUW ..-age

legend

100-YecrRooaZone

LOMI'ls

5,3 AcJde<l

Remove<!

S 1\JCI\Jre

selecte-d Perce Pcrcet

.

+ The District makes no warranties concerning the accumcy of this data.

This parcel IS NOT in a 1 00-year nood zone.

Parcel 10419000002

Owner REPUBUC DUMPCO INC

Address 0

Entity Clark County

Contact 702-455-0489

Flood Zone This parcel IS NOT in a 100-year flood zone.

gustfronlccrfcd.org/PercellnFioodZone/PriniMap.asplOp=10419000002&o=REPUBLIC+DUMPCO+INC&a=O++&e=Ciark+COUTlt)&c=702-4$-0489&f::&s=&... 111

Page 167: 2014 Apex Operations Plan-web Site-1

1fl3113

Home I Table of Contents

(;larK (.;ountyKegtom!l t-Jooa ~,;amra~ UJStrJct- t-ICXXJ Lone f\PPIIcauon

RegionB:l Flood Control District

legend

100-TeorfiOOd lone

LOMIZS

~ Aaded

D Removed

Structure

selected Parcel Porcet

II

·+-,\ ..... = :

View Printer-Friendly Map

Clark County, NV

(quick lookup)

The District makes no warranties concerning lhe accuracy ofthis data. View Disclaimer

This parcel IS NOT in n 1 00-year flood zone.

Parcel 10419000003

Owner

Address

Entity

Contact

Flood Zone

FIRM Panel

LOMR

This parcel IS NOT in a 100-year flood zone.

View FIRM Panel Index 0 This parcel is not affected by a LOMR

Enter a different address or parcel number

Copyright© 2003-2006 Clark County Regional Flood Control District. All Rights Reserved.

g uslfront.ccrfcd.org/ParcellnFioodZone/default.aspx

..,

111

Page 168: 2014 Apex Operations Plan-web Site-1

3.10 INDUSTRIAL WASTE DISCHARGE PERMIT

Page 169: 2014 Apex Operations Plan-web Site-1

Permit No. NEV93011

NEVADA DIVISION OF ENVIRONMENTAL PROTECTION

AUTHORIZATION TO DISCHARGE

In compliance with Chapter 445A of the Nevada Revised Statutes,

Republic Environmental Technologies 770 E. Sahara A venue Las Vegas, Nevada 89104

is, according to the requirements of this permit, authorized to discharge 1) hydrocarbon­contaminated soils; 2) non-hazardous hydrocarbon contaminated liquids; and 3) non-hazardous non-petroleum based liquid waste, to lined and unlined ponds, for management and treatment with on-site soils and materials for approved disposal into the Apex Landfill.

Apex Bioremediation Facility and Liquids Solidification Area Apex Landfill 13550 N. US Highway 93 Approximately 19 miles northeast of the City of Las Vegas Las Vegas, Clark County, Nevada 89124 Township 18 South, Range 64 East, Sections 18

Latitude: 36° 23' 15" Longitude: 114° 52' 14"

in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, and III hereof.

This permit became effective on: December 16, 2010.

Major modification to this permit effective on: March 27, 2012

This permit and the authorization to discharge shall expire at 12:01 AM December 15,2015.

Signed this DD day of MMM, 2012

Michele~ . Reid, ES III Bureau .o'¥Water Pollution Control

P;II!WPC\IIWPC l'crmi,.\IIIV •Old NF.V1NF.V93011 RI!PUDIJC: ENVITECII\1011 M•J Mod lOll Liquids Sotidificootion\NEV9.1011 R<puhli< En• ira. fc<h rr:RMrr MojMod I'INAI.(mrJ.doc

Page 170: 2014 Apex Operations Plan-web Site-1

PART I

Permit NEV93011 Page 2 oflS

I.A. EFFLUENT LIMITATIONS, MONITORING REQUIREMENTS AND CONDITIONS

I. A. I. During the period beginning on the effective date of this permit, and lasting until the permit expires, the Permittee is auth01ized to accept and treat non-hazardous petroleum contaminated soil/water along with non-hazardous petroleum and non­petroleum based liquids at the Apex Bioremediation Facility (ABF) in accordance with the conditions of this permit. Treated material shall be disposed in the Apex Landfill, in accordance with governing county, state, and federal requirements. The permittee is also authorized to treat non-hazardous non-petroleum liquids with on-site soils and landfill approved materials (i.e. wood chips, sawdust and auto fluff) at the Liquid Solidification Area (LSA), for disposal in the Apex Landfill in accordance with governing county, state, and federal requirements.

T bl I A 1 1 a e . • • a B' 1oreme 1at1on ac11ty: d' . F T P etro eum c ontammate d S 'I 01 s

Discharge Monitoring Requirements

Parameter Limitations Sample Measurement Sample Locations Frequency Type

Maximum TPH concentration Treatment in treated soil and soil-water 100 Cell Each Batch Composite mixtures (mg/kg)

Maximum volume of material Treatment within each treatment cell 2300 Cell Each Batch Estimate (cubic yards)

Maximum weight of material 45,000 - Each Load Scale within containment area (tons)

Total weight of in-state waste MaR - Each Load Scale accepted per month (tons)

Total weight of out-of-state waste accepted per month MaR - Each Load Scale (tons)

Presence of liquid in leak Leak MaR Detection Weekly Inspection detection system (Yes/No) Pipe

Volume fluid removed from Leak Leak Detection System MaR Detection Weekly Discrete (gallons/ acre/ day) Pipe

Containment area Inspections MaR Containment Weekly Inspection Area

Page 171: 2014 Apex Operations Plan-web Site-1

.I Permit NEV93011

Page3 of15

Table I.A.1.1 b Bioremediation Facility: Non-Hazardous Liquids and Petroleum C . d L' ontammate tqu id s

Discharge Monitoring Requirements

Parameter Limitations Sample Measurement Sample Locations Frequency Type

Maximum TPH concentration MftR Treatment Each Load or Analysis Record in liquid waste (mg/L) Cell Profile Record

GRO Concentration in Uquld MftR Treatment Each Load or Analysis Record Waste (mg/L) Cell Profile Record

Dally Max (gallons) Acceptance Calculate Est (Bioremediation Facility and Soil 499,000 Each Load Solidification Area combined) Area Load measure

Month Total (gallons) MftR . Each Load Est measure

Total gallons of in-state liquid MftR Each Load Calculate Est waste accepted per month

. Load measure

Total gallons of out-of-state Calculate Est Liquid waste accepted per MftR . Each Load Load measure month

Presence of liquid in leak Leak MftR Detection Weekly Inspection detection system (Yes/No) Pipe

Volume fluid removed from Leak Leak Detection System MftR Detection Weekly Discrete (gallons/ acre/ day) Pipe

Containment area inspections MftR Containment Weekly Inspection Area

Page 172: 2014 Apex Operations Plan-web Site-1

Permit NEV93011 Page 4 of IS

Table I.A.1.2 Liquid Waste Solidification Area: Non-Hazardous and Non-Petroleum Liquids

Accept Liquid Waste

Process Area

Remove

Conditioned Soil

Parameter Discharge Monitoring Requirements Limitations

Daily Sample Measurement Sample Type Locations Frequency

TPH Concentration 0.0 M&.R Liquid Each load or Analysis Record

Acceptance profile record

pH M&.R Liquid Each load or Analysis Record

Acceptance profile record

Liquid Month Total (gallons) M&.R Acceptance Each load Est measure

Dally Max(gauons) Liquid (Bioremediation Facility 499,000 Daily Calc Est Load measure and Soil Solidification Acceptance

Area combined) Containment Area

M&.R Containment Weekly Inspection Inspections Area

Free Liquids M&.R Conditioned Each Removal Paint Filter Test Soil Event

a. Hazardous Waste: Screen and accept only non-hazardous loads (rejection I.A.l8). Only non-hazardous and non-petroleum based liquids may be accepted at the LSA. Liquids having incidental TPH shall be sent to the ABF for treatment. All waste shall be screened for hazardous characteristics per applicable state and federal requirements. Identify the source of all liquids accepted and maintain a records management program for tracking per the Division approved Operations and Maintenance (O&M) manual. No out of state waste shall be accepted without prior notification to the Southern Nevada Health Authority. Out of state waste shall be tracked through the process to final disposition.

1. For the purpose of liquid solidification and conditioned soils placement management, TPH concentrations known by the Permittee or generator to be originating from non-petroleum sources such as fat, grease, and cooking oils are waived from TPH analysis and TPH limitations of this permit, since such liquids are known to produce false positive petroleum based TPH values. Such TPH waived liquids being accepted by the Permittee are tallied as a portion of the total daily maximum volume of liquids allowed to be received by the Permittee.

b. Waste Load Information: The Permittee shall collect and maintain the following information for each waste load accepted: receiving date, weight and/or volume, truck identification, transporter, source of waste pre-

Page 173: 2014 Apex Operations Plan-web Site-1

Permit NEV93011 PageS oflS

acceptance and pre-treatment analytical data, manifests, out of state letters of non-hazard, and generator declarations of non-hazard.

c. Leak Detection System: The leak detection system must be inspected weekly. Any liquid found in the leak detection system shall be removed. Incidence of leakage, volumes removed, and final disposition, shall be reported to show that the system is maintained and managed as described in the Division approved O&M manual.

d. Paint Filter Test: (EPA method 9095B) shall be conducted, in accordance with the Division approved O&M, to verify that the solidification treatment of soils and liquids has resulted in a solid waste and does not contain any free liquids.

e. Containment Areas

i. The containment areas shall be inspected weekly, at a minimum, for erosion, deterioration, or malfunction of containment structures. If the containment is breached, acceptance of material shall cease, the Division shall be notified by 5:00pm of the following business day, and a repair plan shall be submitted to the Division for approval.

ii. A summary of the weekly inspections shall be reported.

iii. The containment areas shall contain the 25-yr 24-hr storm and withstand the 100-yr 24-hr flood at their respective operating locations.

f. Spills: Any spills resulting from transfer operations and truck and container wash water shall be retained within the containment areas.

I.A.2. Groundwater Monitoring

Table I.A.2. Monitoring Requirements for Well MWS

Parameter Sample Frequency Sample Type Maximum

Depth to Groundwater Monitor & Annual (collected 4th Qtr. field measurement (feet) Report each year)

Groundwater Elevation Monitor & Annual (collected 4th Qtr. Calculate (Feet AMSL) Report each year)

Monitor & Annual TPH 1, mg/l (collected 4th Qtr. Discrete Report each year)

Volatile Organics2, IJg/l Monitor & Annual (collected Discrete Report 4th Qtr. each year)

l. EPA Method ROISR. ruu runge, Cli-C40. 2. F.PA Method 8260D,lo tnclude MTnE.

Page 174: 2014 Apex Operations Plan-web Site-1

Permit NEV93011 Page 6 oflS

I.A.3. Schedule of Compliance: The Permittee shall implement and comply with the provisions of the schedule of compliance after approval by the Division, including in said implementation and compliance, any additions or modifications which the Division may make in approving the schedule of compliance.

a. The Permittee shall achieve compliance with the effluent limitations upon issuance of the permit.

b. On or prior to May 27,2012 (60 days), the Permittee shall submit 2 copies of the cufl'ent updated O&M manual for the bioremediation and liquid waste solidification activities for review and approval by the Division. The submitted O&M sections shall include any change made to the O&M manual needed to comply with this permit since the last Division approved edition. Two (2) copies of the O&M manual shall be submitted for review and approval to the following address:

Department of Conservation and Natural Resources Division of Environmental Protection Bureau of Water Pollution Control 901 S. Stewart Street, Suite 4001 Carson City, Nevada 89701

c. Prior to initiating any change to an approved O&M manual or approved system plan, in accordance with permit Part I.A.9 or Part I.A.lO, a revision requesting such change must be prepared and submitted to the Division for approval. The Petmittee, or designated representative, shall adequately address all comments and concerns relating to the Division's review of a revised O&M manual or system plan.

I.A.4. The Permittee shall remit an annual review and services fee in accordance with NAC 445A.232 starting July 1, 2012 and every year thereafter until the permit is terminated.

I.A.5. There shall be no objectionable odors from the ABF or LSA.

I.A.6. There shall be no discharge of substances that would cause the groundwater to violate drinking water standards.

I.A.?. There shall be no discharge from the ABF or LSA except as authorized by this permit.

I.A.8. The ABF and LSA shall be restricted from public access.

I.A.9. The ABF and LSA shall be constructed in conformance with plans approved by the Division. The plans must be approved by the Division prior to the start of construction and must by stamped by a Professional Engineer registered in the state of Nevada. All changes to any approved plans must be stamped by a Professional

Page 175: 2014 Apex Operations Plan-web Site-1

Permit NEV93011 Page7 ofl5

Engineer registered in the state of Nevada and re-approved by the Division prior to implementation.

I.A.IO. The facility shall be operated in accordance with a Division approved Operations and Maintenance (O&M) manual. The Permittee shall maintain and revise, as necessary, the O&M manual, keeping all information required by I. A and I.B of the pennit current. No operation or maintenance change outside the scope of the approved O&M manual shall be initiated by the Permittee until the pertinent section or sections of the O&M manual have been revised, submitted to and approved by the Division.

I.A.ll. The Pennittee shall develop and implement Best Management Practices (BMPs) for the facilities to include, at a minimum, "good housekeeping" measures. Best Management Practices shall be incorporated into a specific section of the O&M Manual.

I.A.12. The containment structures shall contain any spills or loss of liquids within the process facility and/or receiving pad during transfer operations. Any wash down waters shall be contained in accordance with procedures in the O&M Manual.

I.A.13. All wastes shall remain within the containment areas until analyses, as per the procedures in the O&M Manual, have shown that treated materials meet the permit approved requirements.

I.A.14. The Permittee shall provide safety training to appropriate facility personnel describing the possible hazards and proper hygiene of working with and around liquid waste. The Pennittee shall provide the Safety Training manual to the Division upon Division request.

I.A.l5. Liquid waste is prohibited from running off the Permittee's property and from running or being discharged into any surface drainage. Solidification shall be conducted in accordance with management practices which prevent fluid from running off the facility property. On-site processing of liquids being solidified with native soil and approved materials shall be conducted in a manner such that liquids and conditioned soils remain fully contained on site.

I.A.l6. Liquid waste shall be solidified and removed in a timely manner to minimize possible migration of fluid from the designated solidification areas. All final liquid processed soils/materials must be used as cover material placement over Apex Landfi11, or comingled for disposal at Apex Landfill. The Permittee shall manage materials generated by solidification of liquids having an incidental TPH concentration in accordance with the solidification process described in the Division approved O&M Manual.

I.A.l7. The designated LSA on the property may be changed during this permit cycle to other approved areas on the property by notification to the Division in accordance with pennit Part I.A.9. The designated areas shall be adequately described in the O&M Manual by latitude and longitude coordinates. The perimeter of these areas shall be field identified for operational control and to aid site inspection by the Division.

Page 176: 2014 Apex Operations Plan-web Site-1

Permit NEV93011 Page 8 oflS

I.A.l8. Waste loads determined to be hazardous waste shaH be prohibited from off-loading at the facility. Waste loads screened at the facility that are determined to be hazardous waste shall be rejected, and the Division and appropriate local agencies will be notified within 24 hours of the occurrence. The notification shall include information surrounding the rejection, and the waste characterization of the load.

I.B. MONITORING AND REPORTING

I.B.l. Samples and measurements taken as required herein shall be representative of the volume and nature of the monitored discharge. Analyses shall be performed by a State of Nevada certified laboratory. Results from this lab must accompany the Discharge Monitoring Report.

I.B.2. Reporting

a. Annual Report: The fourth quarter report shall contain plots of monitoring parameter (y-axis) versus date (x-axis) for each monitored parameter. The plots shall include data from the preceding five years, if available. Any data point from the current year that is greater than the limits in Part l.A.l must be explained by a narrative. The Permittee shall also submit to this office labeled and dated photograph(s) of the ABF and LSA, annually, as part of the 4th quarter DMR.

b. Quarterly Reporting: Monitoring results obtained during the previous three (3) months shall be summarized for each month and reported on a Discharge Monitoring Report (DMR) Form received in this office no later than the 28th day of the month following the completed reporting period. The first report is due on July 28, 2012. An original signed copy of these, and all other reports required herein, shall be submitted to the State at the following address:

I.B.3. Definitions

Department of Conservation and Natural Resources Division of Environmental Protection Bureau of Water Pollution Control 901 S. Stewart Street, Suite 4001 Carson City, Nevada 89701

a. The "30-day average discharge" means the total discharge during a month divided by the number of samples in the period that the facility was discharging. Where less than daily sampling is required by this permit, the 30-day average discharge shall be determined by the summation of all the measured discharges divided by the number of samples during the period when the measurements were made.

Page 177: 2014 Apex Operations Plan-web Site-1

I.B.4.

I. B.S.

I.B.6.

Permit NEV93011 Page 9 of15

b. The "daily maximum" is the highest measurement during the monitoring period.

c. The "30-day average concentration", other than for fecal coliform bacteria, means the arithmetic mean of measurements made during a month. The "30-day average concentration" for fecal coliform bacteria means the geometric mean of measurements made during a month. The geometric mean is the "n1

h"

root of the product of "n" numbers. Geometric mean calculations where there are non-detect results for fecal coliform shall use one-half the detection limit as the value for the non-detect results.

d. A "discrete" sample means any individual sample collected in less than 15 minutes.

e. A "composite" sample, in regards to this permit, means a sample comprising two or more increments selected to represent the material being analyzed.

f. TPH: Total Petroleum hydrocarbons

g. GRO: Gasoline Hydrocarbon range

h. mg/L: Milligrams per liter

i. J.l.g/L: Micrograms per liter

j. M&R: Monitor and Report

Test Procedures. Analyses shall be conducted by a "certified laboratory" using an "approved method of testing", as defined in NAC 445A.0564 and NAC 445A.0562, respectively.

Recording the Results: For each measurement or sample taken pursuant to the requirements of this permit, the Permittee shall record the following information:

a. TI1e exact place, date, and time of sampling;

b. The dates the analyses were performed;

c. The person(s) who pe1formed the analyses;

d. The analytical techniques or methods used; and

e. The results of all required analyses, including the reporting limits.

Reporting Limits. Unless otherwise allowed by the Division, the approved method of testing selected for analyses shall have a reporting limit which is:

a. Half or less of the discharge limit; or, if there is no limit,

Page 178: 2014 Apex Operations Plan-web Site-1

Permit NEV93011 Page 10 oflS

b. Half or less of the applicable water quality criteria; or, if there is no limit or criteria,

c. The lowest reasonably obtainable using an approved test method.

I.B.7. Additional Monitoring by Permittee: If the Permittee monitors any pollutant at the location(s) designated herein more frequently than required by this permit, using approved analytical methods as specified above, the results of such monitoring shall be included in the calculation and reporting of the values required in the Discharge Monitoring Report Form. Such increased frequency shall also be indicated.

I.B.8. Records Retention: All records and information resulting from the monitoring activities required by this permit, including all records of analyses performed and calibration and maintenance of instrumentation and recordings from continuous monitoring instrumentation, shall be retained for a minimum of three (3) years, or longer if required by the Administrator.

I.B.9. Modification of Monitoring Frequency and Sample Type: After considering monitoring data, stream flow, discharge flow and receiving water conditions, the Division may, for just cause, modify the monitoring frequency and/or sample type by issuing an order to the Permittee.

PART II

II.A.

II.A.l.

II.A.2.

II.A.3.

MANAGEMENT REQUIREMENTS

Change in Discharge: All discharges authorized herein shall be consistent with the terms and conditions of this permit. The discharge of any pollutant identified in this permit more frequently than or at a level in excess of that authorized shall constitute a violation of the permit. Any anticipated facility expansions, or treatment modifications which will result in new, different, or increased discharges of pollutants must be reported by submission of a new application or, if such changes will not violate the effluent limitations specified in this permit, by notice to the permit issuing authority of such changes. Any changes to the permitted treatment facility must comply with Nevada Administrative Code NAC 445A.283 to 445A.285. Pursuant to NAC 445A.263, the permit may be modified to specify and limit any pollutants not previously limited.

Facilities Operation: The Permittee shall at ail time~ maintain in good working order and operate as efficiently as possible all treatment or control facilities, collection systems or pump stations installed or used by the Permittee to achieve compliance with the terms and conditions of this permit

Adverse Impact: The Permittee shall take all reasonable steps to minimize any adverse impact to receiving waters resulting from noncompliance with any effluent limitations specified in this permit, including such accelerated or additional monitoring as necessary to determine the nature and impact of the noncomplying discharge.

Page 179: 2014 Apex Operations Plan-web Site-1

I

I· II.A.4.

·~

Permit NEV93011 Page 11 oflS

Noncompliance, Unauthorized Discharge, Bypassing and Upset

a. Any diversion, bypass, spill, overflow or discharge of treated or untreated wastewater from wastewater treatment or conveyance facilities under the control of the Permittee is prohibited except as authorized by this permit. In the event the Permittee has knowledge that a diversion, bypass, spill, overflow or discharge not authorized by this permit is probable, the Permittee shall notify the Division immediately.

b. The Permittee shall notify the Division within twenty four (24) hours of any diversion, bypass, spill, upset, overflow or release of treated or untreated discharge other than that which is authorized by the permit. A written report shall be submitted to the Division within five (5) days of diversion, bypass, spill, overflow, upset or discharge, detailing the entire incident including:

c.

d.

e.

f.

i. T~e and date of discharge;

ii. Exact location and estimated amount of discharge;

iii. Flow path and any bodies of water which the discharge reached;

iv. The specific cause of the discharge; and

v. The preventive and corrective actions taken.

The foiiowing shall be included as information which must be reported within 24 hours: any unanticipated bypass which exceeds any effluent limitation in the permit; any upset which exceeds any effluent limitation in the permit; and violation of a limitation for any toxic poiiutant or any poiiutant identified as the method to control a toxic poiiutant.

The Permittee shall report ali instances of noncompliance not reported under Part II.A.4.b. at the time monitoring reports are submitted. The rep01ts shall contain the infonnation listed in Part 1I.A.4.b.

An "upset" means an incident in which there is unintentional and temporary noncompliance with the permit effluent limitations because of factors beyond the reasonable control of the Permittee. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation.

In selecting the appropriate enforcement option, the Division shall consider whether or not the noncompliance was the result of an upset.

g. The burden of proof is on the Permittee to establish that an upset occurred. In order to establish that an upset occurred, the Permittee must provide, in addition to the information required under paragraph TI.A.4.b. above, properly signed contemporaneous logs or other documentary evidence that:

Page 180: 2014 Apex Operations Plan-web Site-1

IJ.A.5.

II.A.6.

II.B.

ll.B.l.

II.B.2.

II.B.3.

Permit NEV93011 Page 12 oflS

i. The facility was at the time being properly operated as required in paragraph II.A.2. above, and

ii. All reasonable steps were taken to minimize adverse impacts as required by paragraph II.A.3. above.

Removed Substances: Solids, sludges, filter backwash, or other pollutants removed in the course of treatment or control of waste waters shall be disposed of in a manner that will prevent any pollution from such materials from entering any navigable waters.

Safeguards to Electric Power Failure

a. Provide at the time of discharge an alternative power source sufficient to operate the wastewater control facilities, or

b. Halt or reduce all discharges upon the reduction, loss, or failure of the primary source of power to the wastewater control facilities.

RESPONSffiiLITIES

Right of Entry: The Permittee shall allow authorized representatives of the Division, upon the presentation of credentials, to:

a. Enter upon the Permittee's premises where an effluent source is located or in which any records are kept under the terms and conditions of this permit;

b. Have access to and to copy any records kept under the terms and conditions of this permit;

c. Inspect any facilities, equipment, or operations related to compliance with this permit; and

b. Perform any necessary sampling or monitoring to determine compliance with this permit.

Transfer of Ownership or Control: In the event of any change in control or ownership of facilities from which the authorized discharge emanates, the Permittee shall notify the succeeding owner or controller of the existence of this permit, by letter, a copy of which shall be forwarded to the Division. All transfer of permits shall be approved by the Division.

Availability of Reports: Except for data determined to be confidential under NRS 445A.665, all reports prepared in accordance with the terms of this permit shall be available for public inspection at the office of the Division. Effluent data shall not be considered confidential. Knowingly making any false statement on any such report may result in the imposition of criminal penalties as provided for in NRS 445A.710.

Page 181: 2014 Apex Operations Plan-web Site-1

II.B.4.

II. B.S.

II.B.6.

II. B.?.

ll.B.8.

Il.B.9.

II.B.IO.

Permit NEV9301 1 Page 13 oflS

Furnishing False Information and Tampering with Monitoring Devices: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan or other document filed or required to be maintained by the provisions of NRS 445A.300 to 445A.730, inclusive, or by any permit, rule, regulation or order issued pursuant thereto, or who falsities, tampers with or knowingly renders inaccurate any monitoring device or method required to be maintained under the provisions of NRS 445A.300 to 445A.730, inclusive, or by any permit, rule, regulation or order issued pursuant thereto, is guilty of a gross misdemeanor and shall be punished by a fine of not more than $10,000 or by imprisonment. This penalty is in addition to any other penalties, civil or criminal, provided pursuant to NRS 445A.300 to 445A.730, inclusive.

Penalty for Violation of Permit Conditions: Nevada Revised Statutes NRS 445A.675 provides that any person who violates a permit condition is subject to administrative and judicial sanctions as outlined in NRS 445A.690 through 445A.705.

Permit Modification, Suspension or Revocation: After notice and opportunity for a hearing, this permit may be modified, suspended, or revoked in whole or in part during its tenn for cause including, but not limited to, the following:

a. Violation of any terms or conditions of this permit;

b. Obtaining this permit by misrepresentation or failure to disclose fully all relevant facts; or

c. A change in any condition that requires either a temporary or permanent reduction or elimination of the authorized discharge.

Toxic Pollutants: Notwithstanding Prut II.B.6. above, if a toxic effluent standard or prohibition (including any schedule of compliance specified in such effluent standard or prohibition) is established under NAC 445A for a toxic pollutant which is present in the discharge and such standard or prohibition is more stringent than any limitation for such pollutant in this permit, this permit shall be revised or modified in accordance with the toxic effluent standard or prohibition and the Permittee so notified.

Liability: Nothing in this permit shall be constnted to preclude the institution of any legal action or relieve the Permittee from any responsibilities, liabilities, or penalties established pursuant to any applicable Federal, State or local laws, regulations, or ordinances.

Property Rights: The issuance of this permit does not convey any property rights, in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of Federal, State or local laws or regulations.

Severability: The provisions of this permit are severable, and if any provision of this permit, or the application of any provisions of this permit to any circumstance, is held

Page 182: 2014 Apex Operations Plan-web Site-1

PART Ill

Permit NEV93011 Page 14 oflS

invalid, the application of such provision to other circumstances, and the remainder of this permit, shall not be affected thereby.

III.A. OTHER REQUIREMENTS

III.A.l. Reapplication: If the Permittee desires to continue to discharge, he shall reapply not later than 180 days before this permit expires on the application forms then in use. The application shall be accompanied by the renewal application fee required by NAC 445A.232.

III.A.2. Signatures, Certification Required on Application and Reporting Forms:

a. All applications, reports, or information submitted to the Division shall be signed and certified by making the following certification.

"I certify under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

b. All applications, reports or other information submitted to the Division shall be signed by one of the following:

i. A principal executive officer of the corporation (of at least the level of vice president) or his authorized representative who is responsible for the overall operation of the facility from which the discharge described in the application or reporting form originates; or

ii. A general partner of the partnership; or

iii. The proprietor of the sole proprietorship; or

iv. A principal executive officer, ranking elected official or other authorized employee of the municipal, state or other public facility.

c. Duly Authorized Representative: All Discharge Monitoring Reports and any other information required by this permit or requested by the Division shall be signed by a person described in paragraph (b) of this section, or by a duly authorized representative of that person. A person is a duly authorized representative only if:

Page 183: 2014 Apex Operations Plan-web Site-1

Permit NEV93011 Page 15 of15

i. The authorization is made in writing by a person described in paragraph (a) of this section;

11 . The authorization specifies either an individual or a position having responsibility for environmental matters for the company; and

iii. The authorization is submitted to the Division.

d. Changes to Authorization. If an authorization under paragraph c. of this section is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, a new authorization satisfying the requirements of paragraph b. of this section must be submitted to the Division prior to or together with any reports, information, or applications to be signed by an authorized representative.

Page 184: 2014 Apex Operations Plan-web Site-1

0

STATE OF NEVADA

Apex Regional Lanflll • NEV201151 0 Page1of9

DIVISION OF ENVIRONMENTAL PROTECTION

AUTHORIZATION TO DISCHARGE

PERMIT: NEV2011510

In compliance with the provisions of Chapter 445A of the Nevada Revised Statutes,

Republic Dumpco Incorporated 770 East Sahara Avenue Las Vegas, Nevada 89104

As defined herein, is authorized to discharge to ground waters of the State of Nevada from its

Apex Regional Landfill- Holding Tanks 13550 US Hwy. 93 Las Vegas, Clark County, Nevada 89165 Latitude - 36° 22' 56" Longitude - 114° 53' 02" Township -18S, Range- 64E, Sections -19 & 20

In accordance with effluent limitations, monitoring requirements, and other conditions set forth in Part I, II and Ill hereof.

EFFECTIVE DATE OF PERMIT:

EXPIRATION DATE OF PERMIT (midnight):

Signed this 11th day of October, 2011

Tuesday, October 111\ 2011

Tuesday, October 111h, 2016

) Alexi Lanza, P. E. Nevada Division of Environmental Protection Bureau of Water Pollution Control - Permits Branch

Page 185: 2014 Apex Operations Plan-web Site-1

Apex Regional Lanlill - NEV201151 0 Page 2 of9

PART I -SPECIFIC PERMIT CONDITIONS

I.A. EFFLUENT LIMITATIONS, MONITORING REQUIREMENTS AND CONDITIONS

I.A.1. During the period beginning on the effective date of this permit and lasting until the permit expires, the Permittee is authorized to discharge leachate and/or landfill process water collected in its permanent holding tanks to ground waters of the State via dust control on its Apex Regional Landfill.

I.A.2. This permit authorizes discharges associated with dust control activities at this facility.

I.A.3. All dust control discharges shall take place over the lined part of the landfill - dust control discharges over non-lined parts of the landfill are strictly prohibited.

I.A.4. All discharges shall be In accordance with the provisions of this Permit.

I.A.6. There shall be no discharges to any waters of the state other than the ones authorized by this permit.

I.A.6. Proposed Operational Conditions: Holding tanks shall be monitored as specified below in Table- 1 -Holding Tank Limitations & Special Conditions.

1 Tank#1 22,500 As Needed

2 Tank#2 22,500 As Needed

Total Volume 45,000

I.A.7. Table -1: Applicable conditions: a. Holding tanks shall be inspected daily for leaks;

b. All equipment used for leachate and/or landfill process water dust control application shall be inspected daily for leaks;

c. All dust control activities shall be carried out In a way that minimizes exposure to workers and anyone present at the facility during discharge activities

d. There shall be no discharge of floating solids or visible foam in other than trace amounts.

I.A.B. Flow: Total holding tank volume capacity approved for this operation is 45,000 gallons- two (2) holding tanks with a 22,500 gallon capacity each.

I.A.9. Holding tank flows are not required to be metered either indMdually or collectively.

I.A.10. Water Quality Standards: There shall be no discharge of substances that would cause an

)

Page 186: 2014 Apex Operations Plan-web Site-1

excedance of drinking water standards in the groundwater.

Apex Regional Lanflll - NEV201 1510 Page 3 of9

I.A.11. Odors: There shall be no objectionable odors generated in the conduct of this project.

I.A.12. Ponding of leachate and/or landfill process water during dust control activities is strictly prohibited.

I.A.13. In order to ensure proper leachate and/or landfill process water collection, the daily flow into each of the tanks shall not exceed its volume capacity.

I.A.14. Operations & Maintenance Manual (0 & M): The Permittee shall operate the facility within permit provisions and requirements and in accordance with the agency approved Operations & Maintenance Manual

I.A.15. Best Management Practices (BMP): The Permittee shall incorporate BMP provisions and requirements as part of its 0 & M Manual in order to ensure safe discharge activities at this facility.

I.A.16. Schedule of Compliance: The Permittee shall achieve compliance with the permit limitations upon issuance of the permit.

a. By January 11th, 2012 the Permittee shall submit to NDEP a new Operations & Maintenance Manual (0 & M) for this facility.

I.A.17. Annual Fee: The Permittee shall remit an annual review and services fee in accordance with Nevada Administrative Code NAC 445A.232 starting July 18

\ 2012, and every year thereafter until the permit is terminated.

I.A.18. Disclosure: The Permittee shall provide to all workers and affected personnel, a copy of a document describing the possible hazards and proper hygiene/personal protection equipment for those working around leachate and/or landfill process water. A copy shall be included in the approved (0 & M) for this facility.

a. All dust control areas shall be posted with conspicuous warning signs, clearly stating that leachate and/or landfill process water is utilized and contact should be avoided.

I.A.19. Dust Control Activities: Discharges shall be conducted in accordance with management practices which minimize leachate and/or landfill process waters from drifting or carrying off the property ..

I.A.20. Spills and or overflows from the holding tank collection systems is strictly prohibited.

I.A.21. Plans Approval: The project elements/components/activities shall be constructed and or conducted in accordance with the plans submitted to and approved by the Division. The plans must be approved by the Division prior to the start of construction.

I.A.22. Changes to Approved Plans: All changes to the approved plans or changes in project operations must be approved by the Division prior to any activities taking place.

) I.A.23. Presumption of Possession and Compliance: Copies of this permit, any subsequent modifications shall be maintained at the permitted project site at all times.

Page 187: 2014 Apex Operations Plan-web Site-1

Apex Regional Lanfill- NEV201151 0 Page 4 of9

I.A.24. Abandonment Procedures: All holding tank systems shall be abandoned in a manner that is consistent with the Division's Water Technical Sheet- 20 (WTS-20).

a. A final abandonment report shall be prepared by Engineer-In-Charge of the project certifying that the abandonment was carried out in a manner that is consistent with WTS-20.

b. This report shall include the engineer's signature and professional engineer stamp;

c. The final report shall be received, at the address given below, by the 281h day of the month

following project completion or permit expiration, whichever comes first:

Nevada Division of Environmental Protection Bureau of Water Pollution Control ATTN: Compliance Coordinator South Stewart Street, Suite 4001 Carson City, Nevada 89701-5249

1.8. MONITORING AND REPORTING

1.8.1. Oversight and Inspection: The Division reserves the right to oversee any installation and/or sampling activities required and/or approved under the terms and conditions of this permit. Failure to accommodate prior verbal or written notification from the Division indicating intent to oversee, inspect, or review such activities constitutes a violation of the permit.

1.8.2. General Conditions: The Division must approve all plans prior to the start of any construction. Plans to modify or expand the holding tank systems must be must be stamped by a Professional Engineer registered in the State of Nevada and approved by the Division prior to construction or implementation.

1.8.3. Additional Monitoring by Permittee: If the Permittee monitors any pollutant at the location(s) designated herein more frequently than required by this permit, using approved analytical methods as specified above, the results of such monitoring shall be included in the calculation and reporting of the values required in the Discharge Monitoring Report Form. Such increased frequency shall also be indicated.

1.8.4. Additional Monitoring: Additional monitoring requirements may be added at the Division's discretion.

1.8.5. 0 & M Manual: This facility shall be operated in accordance with a Division approved Operations & Maintenance manual.

a. A Permittee shall implement 0 & M Manual requirements to ensure compliance with the terms and conditions of this permit.

b. The 0 & M Manual shall be prepared in accordance with professional and/or good engineering practices.

c. Pumping frequency shall be listed in the 0 & M Manual.

d. System failure due to inadequate pumping shall be considered a violation of the permit and

)

)

Page 188: 2014 Apex Operations Plan-web Site-1

~)

grounds for enforcement actions.

Apex Regional Lanfill· NEV2011510 Page 5 of9

e. The Permittee shall make all records and manuals available upon request to the State or its representative.

1.8.6. Precedence: All terms and conditions of this permit shall not supersede the requirements of the Nevada Division of Water Resources.

1.8.7. A Notice of Termination (NOT) shall be submitted to NDEP upon abandonment of the approved discharge activity in order to terminate permit coverage.

1.8.8. The minimum information required on a NOT consists of:

a. Permit number;

b. Facility operator information: name, address, city, state, zip code, and phone number

c. Facility/site location information: name, address, city, state, zip code, and phone number

d. Certification statement signed and dated by the Permittee.

e. Compliance with WTS-20. http://ndep.nv.gov/bwpc/wts-20.pdf

1.8.9. Any person signing a NOT shall make the following certification:

"I certify under penalty of law that all discharges associated with this commercial activity from the identified facility that was authorized by a permit have been eliminated or that I am no longer the operator of the facility or site. I understand that by submitting this Notice of Termination, I am no longer authorized to discharge associated with this commercial activity under this permit, and that discharging pollutants associated with this commercial activity to waters of the state is unlawful under the Nevada Water Pollution Control Law where the discharge is not authorized by a permit.

1.8.10. Analysis, if any, shall be conducted by a "certified laboratory" using an approved method of testing as defined in NAC 445A.0564 and NAC 445A.0562. All laboratory analysis conducted in accordance with this discharge permit must have detection at or below the permit limits.

1.8.11. Test Procedures: Test procedures for the analysis of pollutants shall conform to regulations (40 CFR, Part 136) published pursuant to Section 304(h) of the Act, under which such procedures may be required unless other procedures are approved by the Division.

1.8.12. Recording the Results: For each measurement or sample taken pursuant to the requirements of this permit, the Permittee shall record the following information:

I. The exact place, date, and time of sampling; ii. The dates the analyses were performed; ill. The person(s) who performed the analyses; iv. The analytical techniques or methods used; and v. Results of all required analyses & reporting limits.

1.8.13. Records Retention: All records and information resulting from the monitoring activities required by this permit, including all records of analyses performed and calibration and

Page 189: 2014 Apex Operations Plan-web Site-1

Apex Regional Lanfill- NEV2011510 Page 6 of9

maintenance of instrumentation and recordings from continuous monitoring instrumentation, shall be retained for a minimum of three (3) years, or longer if required by the Administrator. r • )

PART II • PERMIT CONDITIONS

li.A. MANAGEMENT REQUIREMENTS

II.A.1. Change in Discharge: All discharges authorized herein shall be consistent with the terms and conditions of this permit. The discharge of any pollutant identified in this permit more frequently than or at a level in excess of that authorized shall constitute a violation of the permit. Any anticipated facility expansions, or treatment modifications which will result in new, different, or increased discharges of pollutants must be reported by submission of a new application or, if such changes will not violate the effluent limitations specified in this permit, by notice to the permit issuing authority of such changes. Any changes to the permitted treatment facility must comply with Nevada Administrative Code NAC 445A.283 to 445A.285. Pursuant to NAC 445A.263, the permit may be modified to specify and limit any pollutants not previously limited.

II.A.2. Facilities Operation: The Permittee shall at all times maintain in good working order and operate as efficiently as possible all treatment or control facilities, collection systems or pump stations installed or used by the Permittee to achieve compliance with the terms and conditions of this permit.

II.A.3. Adverse Impact-Duty to Mitigate: The Permittee shall take all reasonable steps to minimize releases to the environment resulting from noncompliance with any effluent limitations specified in this permit, including such accelerated or additional monitoring as necessary to determine the nature and impact of the noncomplying discharge. The Permittee shall carry out such measures, as reasonable, to prevent significant adverse impacts on human health or the environment.

II.A.4. Noncompliance, Unauthorized Discharge, Bypassing and Upset

a. Any diversion, bypass, spill, overflow or discharge of treated or untreated wastewater from wastewater treatment or conveyance facilities under the control of the Permittee is prohibited except as authorized by this permit. In the event the Permittee has knowledge that a diversion, bypass, spill, overflow or discharge not authorized by this permit is probable, the Permittee shall notify the Division immediately.

b. The Permittee shall notify the Division within twenty-four (24) hours of any diversion, bypass, spill, upset, overflow or release of treated or untreated discharge other than that which is authorized by the permit; this notification may be done by calling NDEP's spill hotline at (888)331-6337. A written report shall be submitted to the Administrator within five (5) days of diversion, bypass, spill, overflow, upset or discharge, detailing the entire incident including:

i. time and date of discharge; ii. exact location and estimated amount of discharge; iii. flow path and any bodies of water which the discharge reached; iv. the specific cause of the discharge; and v. the preventive and/or corrective actions taken.

~'

)

Page 190: 2014 Apex Operations Plan-web Site-1

)

)

)

Apex Regional Lanfill- NEV201151 0 Page 7 of9

c. The following shall be included as information which must be reported within 24 hours: any unanticipated bypass which exceeds any effluent limitation in the permit; any upset which exceeds any effluent limitation in the permit; and violation of a limitation for any toxic pollutant or any pollutant identified as the method to control a toxic pollutant.

d. The Permittee shall report all instances of noncompliance not reported under Part II.A.4.b. at the time monitoring reports are submitted. The reports shall contain the information listed in Part II.A.4.b.

e. An "upset" means an incident in which there is unintentional and temporary noncompliance with the permit effluent limitations because of factors beyond the reasonable control of the Permittee. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation.

f. In selecting the appropriate enforcement option, the Division shall consider whether or not the noncompliance was the result of an upset.

g. The burden of proof is on the Permittee to establish that an upset occurred. In order to establish that an upset occurred, the Permittee must provide, in addition to the information required under paragraph II.A.4.b. above, properly signed contemporaneous logs or other documentary evidence that:

i. The facility was at the time being properly operated as required in paragraph II.A.2. above; and

ii. All reasonable steps were taken to minimize adverse impacts as required by Section II.A.3 above.

II.A.5. Removed Substances: Solids, sludges, filter backwash, or any other pollutants removed in the course of treatment or control of waste waters shall be disposed of in a manner such as to prevent any pollution from such materials from entering any navigable waters.

II.A.6. Safeguards to Electric Power Failure: In order to maintain compliance with the effluent limitations and prohibitions of this permit the Permittee shall either:

a. Provide at the time of discharge an alternative power source sufficient to operate the wastewater control facilities; or

b. Halt or reduce all discharges upon the reduction, loss, or failure of the primary source of power to the wastewater control facilities.

II.B. RESPONSIBILITIES

11.8.1. Right of Entry and Inspection: The Permittee shall allow the Administrator and/or his authorized representatives, upon the presentation of credentials, to:

a. Enter at reasonable times upon the Permittee's premises where an effluent source is located or in which any records are required to be kept under the terms and conditions of this permit;

b. Have access to and copy any records required to be kept under the terms and conditions of

Page 191: 2014 Apex Operations Plan-web Site-1

this permit;

Apex Regional Lanfin- NEV201151 0 Page 8 ore

c. Inspect, at reasonable times, any facilities, equipment (including monitoring and control equipment), practices, or operations required in this permit; and

d. Perform any necessary sampling or monitoring to determine compliance with this permit at any location for any parameter.

11.8.2. Transfer of Ownership or Control: In the event of any change in control or ownership of facilities from which the authorized discharge emanates, the Permittee shall notify the succeeding owner or controller of the existence of this permit, by letter, a copy of which shall be forwarded to the Administrator. ALL transfers of permits require Division approval.

11.8.3. Availability of Reports: Except for data determined to be confidential under NRS 445A.665, all reports prepared in accordance with the terms of this permit shall be available for public inspection at the office of the Division. As required by the Act, effluent data shall not be considered confidential. Knowingly making any false statement on any such report may result in the imposition of criminal penalties as provided for in NRS 445A.710.

11.8.4. 24 Hour Reporting~ the Permittee shall verbally report any noncompliance or discharge which may seriously endanger health or the environment as soon as possible, but no later than 24 hours from the time the Permittee becomes aware of the circumstances. the report shall be made to NDEP at (775) 687-9485 during normal business hours. A written report shall also be submitted to NDEP within ten days of the time the Permittee becomes aware of the circumstances.

)

11.8.5. Furnishing False Information and Tampering with Monitoring Devices: Any person who ) knowingly makes any false statement, representation, or certification in any application, record, report, plan or other document filed or required to be maintained by the provisions of NRS 445A.300 to 445.730, inclusive, or by any permit, rule, regulation or order issued pursuant thereto, or who falsifies, tampers with or knowingly renders inaccurate any monitoring device or method required to be maintained under the provisions of NRS 445A.300 to 445A.730, inclusive, or by any permit, rule, regulation or order issued pursuant thereto, is guilty of a gross misdemeanor and shall be punished by a fine of not more than $10,000 or by imprisonment. This penalty is in addition to any other penalties, civil or criminal, provided pursuant to NRS 445A.300 to 445A.730, inclusive.

11.8.6. Penalty for Violation of Permit Conditions: Nevada Revised Statutes NRS 445A675 provides that any person who violates a permit condition is subject to administrative and judicial sanctions as outlined in NRS 445A.690 through 445A.705.

11.8.7. Permit Modification, Suspension or Revocation: After notice and opportunity for a hearing, this permit may be modified, suspended, or revoked in whole or in part during its term for cause including, but not limited to, the following:

a. Violation of any terms or conditions of this permit;

b. Obtaining this permit by misrepresentation or failure to disclose fully all relevant facts; or

c. A change in any condition that requires either a temporary or permanent reduction or elimination of the authorized discharge. )

Page 192: 2014 Apex Operations Plan-web Site-1

)

Apex Regional Lanlill- NEV201151 0 Page 9 of9

11.8.8. Toxic Pollutants: if a toxic effluent standard or prohibition (including any schedule of compliance specified in such effluent standard or prohibition) is established under Section 307(a) of the Act for a toxic pollutant which is present in the discharge and such standard or prohibition is more stringent than any limitation for such pollutant in this permit, this permit shall be revised or modified in accordance with the toxic effluent standard or prohibition and the Permittee so notified.

11.8.9. Liability: Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the Permittee from any responsibilities, liabilities, or penalties established pursuant to any applicable Federal, State or local laws, regulations, or ordinances.

11.8.10. Property Rights: The issuance of this permit does not convey any property rights, in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of Federal, State or local laws or regulations.

11.8.11. Severability: The provisions of this permit are severable, and If any provision of this permit, or the application of any provisions of this permit to any circumstance, is held invalid, the application of such provision to other circumstances, and the remainder of this permit, shall not be affected thereby.

PART Ill OTHER REQUIREMENTS

III.A.1. Reapplication: If the Permittee desires to continue to discharge, it shall reapply not later than 180 days before this permit expires on the application forms then in use. The application shall be accompanied by the renewal application fee required by NAC 445A.232.

III.A.2. Signatures Required on Application and Reporting Forms:

a. Application and reporting forms submitted to the department must be signed by one of the following:

i. A principal executive officer of the corporation (of at least the level of vice president) or his authorized representative who is responsible for the overall operation of the facility from which the discharge described in the application or reporting form originates; or

ii. A general partner of the partnership; or iii. The proprietor of the sole proprietorship; or iv. A principal executive officer, ranking elected official or other authorized employee of

the municipal, state or other public facility. b. Each application must contain a certification by the person signing the application that he is

familiar with the information provided, that to the best of his knowledge and belief the information is complete and accurate and that he has the authority to sign and execute the application.

c. Changes to Authorization. If an authorization under paragraph b. of this section is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, a new authorization satisfying the requirements of paragraph b. of this section must be submitted to the Division prior to or together with any reports, information, or applications to be signed by an authorized representative.

Page 193: 2014 Apex Operations Plan-web Site-1

Permit No. NEV95010

Nevada Division of Environmental Protection

AUTHORIZATION TO DISCHARGE

In compliance with Chapter 445A of the Nevada Revised Statutes,

Republic Dumpco 770 E Sahara Ave

Las Vegas NV 891 04

is authorized to discharge from facilities located at

Apex Regional Waste Management Center (Scale House and Maintenance Building)

13550 North U.S. Highway 93 Apex, Clark County

Latitude 36° 22' 58 11 North Longitude 114° 53' 00 11 West

Township 18 South -Range 64 East- Sections 19 and 20

to: Groundwaters of the State

in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, and Ill hereof.

This permit shall become effective July 10, 2009.

This permit and the authorization to discharge shall expire at midnight, July 9, 2014.

Signed this 1Oth day of July, 2009.

teve McGoff,· Staff Engineer) I Bureau of Water Pollution Control

Page 194: 2014 Apex Operations Plan-web Site-1

Part I

Permit NEV9501 0 Page 2 of 10

I.A Effluent Limitations and Monitoring Requirements

During the period beginning on the effective date of this permit, and lasting until the permit expires, the Permittee is authorized to discharge from Outfalls 001, 002, and 003, as described below.

Outfall 001: Outlet of maintenance building holding tank. Wastewater resulting from washing vehicles and the building interior is treated in a 2000 gallon sand-oil separator, stored in a 5000 gallon holding tank, then discharged to water trucks for application as dust control water within the lined portion of the landfill. Backwash, regeneration, and reject water from the drinking water treatment system is also discharged to the holding tank. The drinking water system consists of water softening, reverse osmosis, and filtration; and is used to render water from the on­site well potable.

Outfall 002: Scale House septic system leachfield. Plumbing fixtures in the guard shack consist of one toilet and one lavatory sink in the restroom that flow into a 1000 gallon septic tank and out into a 1 000 gpd leachfield.

Outfall 003: Maintenance building septic system leachfield. A restroom, kitchen, shower, janitorial facilities and drinking fountains discharge into a 2500 gallon septic tank and then out into a 2250 gallon per day (gpd) leachfield with a distribution box and dosing tank.

The discharges shall be limited and monitored as specified below:

Table LA Discharge Monitoring Requirements

Parameter Limitation

Monthly Sample Measurement Sample Average Location Frequency Type

Flow, gpd 111 monitor & report 121 Outfall 001 each discharge flow meter

(1) gpd = gallons per day (2) For the purpose of determining the fee required by NAC 445A.232, the flow from this facility

is less than 50,000 gpd based on the design capacities of the septic tanks and reported flows for the holding tank.

I.B Schedule of Compliance

1.8.1 The Permittee shall implement and comply with the provisions of the Schedule of Compliance after approval by the Division, including in said implementation

Page 195: 2014 Apex Operations Plan-web Site-1

Permit NEV9501 0 Page 3 of 10

and compliance, any additions or modifications which the Division may make in approving the schedule of compliance.

a. The Permittee shall achieve compliance with the effluent limitations upon issuance of the permit.

b. The Permittee shall submit a revised Operations and Maintenance (O&M) Manual on or before January 6, 2010. The manual shall be submitted to:

Technical Services Branch Bureau of Water Pollution Control

Nevada Division of Environmental Protection 2030 E. Flamingo Rd, Ste 230

Las Vegas NV 89119-0837

A copy should also be sent to the Compliance Coordinator at the Carson City office at the address found in Part I.B.2.

I.C GENERAL CONDITIONS

I.C.1 Sinks, toilets, and drains discharging into the septic systems shall only discharge typical restroom, shower, kitchen, and janitorial wastewater. There shall be no discharge of industrial, or other non-domestic wastes to septic systems.

I.C.2 Discharges to the holding tank (Outfall 001) shall be limited to wastewater resulting from vehicle and floor washing in the maintenance building; and backwash, regeneration, and reject water from the drinking water system. There shall be no disposal of other wastes. Drip pans shall be used as needed under vehicles and equipment in the maintenance building. Oils and other fluids spilled to the floor shall be dry cleaned with absorbents and swept up and removed prior to washing the floor with water. The sinks shall be posted to prohibit chemical use.

I.C.3 Septic tanks and the sand-oil separator shall be inspected at least annually and pumped by a licensed septage hauler as needed to prevent discharge of solids or oil to the leachfields. Dates of pumping and disposition of the waste shall be reported on the Discharge Monitoring Reports (DMR). Inspection and pumping procedures shall be in accordance with the O&M Manual.

I.C.4 Vehicular traffic shall be prohibited from crossing over the leachfields.

I.C.S There shall be no objectionable odors from the collection system, treatment facility or disposal area.

I.C.6 There shall be no discharge of substances that would cause a violation of the drinking water standards in the groundwater.

Page 196: 2014 Apex Operations Plan-web Site-1

Permit NEV9501 0 Page 4 of 10

I.C.7 There shall be no discharge from the collection, treatment, storage, and disposal facilities except as authorized by this permit.

I.C.8 The collection, treatment, storage, and disposal facilities shall be constructed in conformance with plans approved by the Division. The plans must be approved by the Division prior to the start of construction. All changes to the approved plans must be approved by the Division.

I.C.9 The facility shall be operated in accordance with the Division-approved O&M Manual.

I.C.1 0 There shall be no discharge of floating solids or visible foam in other than trace amounts.

I.C.11 The Permittee shall remit an annual review and services fee in accordance with NAC 445A.232 starting July 1, 2010, and every year thereafter until the permit is terminated.

1.8. MONITORING AND REPORTING

1.8.1 Samples and measurements taken as required herein shall be representative of the volume and nature of the monitored discharge. Analyses shall be performed by a State of Nevada certified laboratory. Results from this laboratory must accompany the DMR.

1.8.2 Reporting

1.8.2.1 Quarterly Reporting Monitoring results obtained during the previous three (3) months shall be summarized for each month and reported on a DMR form or other approved format received in this office no later than the 28th day of the month following the completed repot1ing period. Any data submitted in excess of the limits in Part I.A.1 must be explained by a narrative. The reporting periods are January through March, April through June, July through September, and October through December. The first report is due on October 28, 2009. An original signed copy of these, and all other reports required herein, shall be submitted to NDEP at the following address:

Compliance Coordinator Bureau of Water Pollution Control

Nevada Division of Environmental Protection 901 S. Stewart St., Suite 4001

Carson City NV 89701

1.8.2.2 Annual Septic Tank and Sand/Oil Separator Report

Page 197: 2014 Apex Operations Plan-web Site-1

Permit NEV9501 0 Page 5 of 10

Septic tanks and the sand-oil separator shall be inspected at least annually as required in Part I.C.3. Dates of the inspection(s} shall be reported on the quarterly DMR following the inspection(s} along with any other relevant information concerning the inspection(s} including pumping and disposition of any waste.

1.8.3 Test Procedures Test procedures for the analysis of pollutants shall conform to regulations (40 CFR, Part 136} published pursuant to Section 304(h} of the Clean Water Act, under which such procedures may be required unless other procedures are approved by the Division.

1.8.4 Recording the Results For each measurement or sample taken pursuant to the requirements of this permit, the Permittee shall record the following information:

a. the exact place, date, and time of sampling b. the dates the analyses were performed c. the person(s} who performed the analyses d. the analytical techniques or methods used, and e. the results of all required analyses.

1.8.5 Additional Monitoring by Permittee If the Permittee monitors any pollutant at the location(s) designated herein more frequently than required by this permit, using approved analytical methods as specified above, the results of such monitoring shall be included in the calculation and reporting of the values required in the DMR form. Such increased frequency shall also be indicated.

1.8.6 Records Retention All records and information resulting from the monitoring activities required by this permit, including all records of analyses performed and calibration and maintenance of instrumentation and recordings from continuous monitoring instrumentation, shall be retained for a minimum of three (3) years, or longer if required by the Division.

1.8.7 Modification of Monitoring Frequency and Sample Type After considering monitoring data, stream flow, discharge flow and receiving water conditions, the Division may, for just cause, modify the monitoring frequency, sample type, or both, by issuing an order to the Permittee.

1.8.8 All laboratory analyses conducted in accordance with this discharge permit must have detection at or below the permit limits.

PART II

Page 198: 2014 Apex Operations Plan-web Site-1

II.A. MANAGEMENT REQUIREMENTS

II.A.1. Change in Discharge

Permit NEV9501 0 Page 6 of 10

All discharges authorized herein shall be consistent with the terms and conditions of this permit. The discharge of any pollutant identified in this permit more frequently than or at a level in excess of that authorized shall constitute a violation of the permit. Any anticipated facility expansions, or treatment modifications which will result in new, different, or increased discharges of pollutants must be reported by submission of a new application or, if such changes will not violate the effluent limitations specified in this permit, by notice to the permit issuing authority of such changes. Any changes to the permitted treatment facility must comply with Nevada Administrative Code (NAC) 445A.283 to 445A.285. Pursuant to NAC 445A.263, the permit may be modified to specify and limit any pollutants not previously limited.

II.A.2. Facilities Operation The Permittee shall at all times maintain in good working order and operate as efficiently as possible all treatment or control facilities, collection systems or pump stations installed or used by the Permittee to achieve compliance with the terms and conditions of this permit.

II.A.3. Adverse Impact The Permittee shall take all reasonable steps to minimize any adverse impact to receiving waters resulting from noncompliance with any effluent limitations specified in this permit, including such accelerated or additional monitoring as necessary to determine the nature and impact of the non-complying discharge.

II.A.4. Noncompliance, Unauthorized Discharge, Bypassing and Upset

a. Any diversion, bypass, spill, overflow or discharge of treated or untreated wastewater from wastewater treatment or conveyance facilities under the control of the Permittee is prohibited except as authorized by this permit. In the event the Permittee has knowledge that a diversion, bypass, spill, overflow or discharge not authorized by this permit is probable, the Permittee shall notify the Division immediately.

b. The Permittee shall notify NDEP's Spill Hotline at 1-888-331-6337 within twenty four (24) hours of any diversion, bypass, spill, upset, overflow or release of treated or untreated discharge other than that which is authorized by the permit. A written report shall be submitted to the Division within five (5) days of diversion, bypass, spill, overflow, upset or discharge, detailing the entire incident including:

1 . Time and date of discharge 2. Exact location and estimated amount of discharge 3. Flow path and any bodies of water which the discharge reached

Page 199: 2014 Apex Operations Plan-web Site-1

4. The specific cause of the discharge, and 5. The preventive and corrective actions taken.

Permit NEV9501 0 Page 7 of 10

c. The following shall be included as information which must be reported within 24 hours: any unanticipated bypass which exceeds any effluent limitation in the permit; any upset which exceeds any effluent limitation in the permit; and violation of a limitation for any toxic pollutant or any pollutant identified as the method to control a toxic pollutant.

d. The Permittee shall report all instances of noncompliance not reported under Part II.A.4.b. at the time monitoring reports are submitted. The reports shall contain the information listed in Part II.A.4.b.

e. An "upset" means an incident in which there is unintentional and temporary noncompliance with the permit effluent limitations because of factors beyond the reasonable control of the Permittee. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation.

f. In selecting the appropriate enforcement option, the Division shall consider whether or not the noncompliance was the result of an upset.

g. The burden of proof is on the Permittee to establish that an upset occurred. In order to establish that an upset occurred, the Permittee must provide, in addition to the information required under paragraph II.A.4.b, properly signed contemporaneous logs or other documentary evidence that:

1. The facility was at the time being properly operated as required in paragraph II.A.2, and

2. All reasonable steps were taken to minimize adverse impacts as required by paragraph II.A.3.

II.A.5. Removed Substances Solids, sludges, filter backwash, or other pollutants removed in the course of treatment or control of waste waters shall be disposed of in a manner that will prevent any pollution from such materials from entering any navigable waters.

II.A.6. Safeguards to Electric Power Failure a. Provide at the time of discharge an alternative power source sufficient to

operate the wastewater control facilities, or b. Halt or reduce all discharges upon the reduction, loss, or failure of the

primary source of power to the wastewater control facilities.

II.B. RESPONSIBILITIES

Page 200: 2014 Apex Operations Plan-web Site-1

11.8.1. Right of Entry

Permit NEV9501 0 Page 8 of 10

The Permittee shall allow the Division and/or his authorized representatives, upon the presentation of credentials:

a. To enter upon the Permittee's premises where an effluent source is located or in which any records are required to be kept under the terms and conditions of this permit, and

b. At reasonable times, to have access to and copy any records required to be kept under the terms and conditions of this permit; to inspect any monitoring equipment or monitoring method required in this permit; and to perform any necessary sampling to determine compliance with this permit or to sample any discharge.

11.8.2. Transfer of Ownership or Control In the event of any change in control or ownership of facilities from which the authorized discharge emanates, the Permittee shall notify the succeeding owner or controller of the existence of this permit, by letter, a copy of which shall be forwarded to the Division. All transfer of permits shall be approved by the Division.

11.8.3. Availability of Reports Except for data determined to be confidential under NRS 445A.665, all reports prepared in accordance with the terms of this permit shall be available for public inspection at the office of the Division. Effluent data shall not be considered confidential. Knowingly making any false statement on any such report may result in the imposition of criminal penalties as provided for in NRS 445A.710.

11.8.4. Furnishing False Information and Tampering with Monitoring Devices Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan or other document filed or required to be maintained by the provisions of NRS 445A.300 to 445.730, inclusive, or by any permit, rule, regulation or order issued pursuant thereto, or who falsifies, tampers with or knowingly renders inaccurate any monitoring device or method required to be maintained under the provisions of NRS 445A.300 to 445A.730, inclusive, or by any permit, rule, regulation or order issued pursuant thereto, is guilty of a gross misdemeanor and shall be punished by a fine of not more than $10,000 or by imprisonment. This penalty is in addition to any other penalties, civil or criminal, provided pursuant to NRS 445A.300 to 445A. 730, inclusive.

11.8.5. Penalty for Violation of Permit Conditions

Page 201: 2014 Apex Operations Plan-web Site-1

Permit NEV9501 0 Page 9 of 10

Nevada Revised Statutes NRS 445A.675 provides that any person who violates a permit condition is subject to administrative and judicial sanctions as outlined in NRS 445A.690 through 445A.705.

11.8.6. Permit Modification, Suspension or Revocation After notice and opportunity for a hearing, this permit may be modified, suspended, or revoked in whole or in part during its term for cause including, but not limited to, the following: a. violation of any terms or conditions of this permit b. obtaining this permit by misrepresentation or failure to disclose fully all

relevant facts, or c. a change in any condition that requires either a temporary or permanent

reduction or elimination of the authorized discharge.

11.8.8. Liability Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the Permittee from any responsibilities, liabilities, or penalties established pursuant to any applicable Federal, State or local laws, regulations, or ordinances.

11.8.9. Property Rights The issuance of this permit does not convey any property rights, in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of Federal, State or local laws or regulations.

11.8.1 0. Severability The provisions of this permit are severable, and if any provision of this permit, or the application of any provisions of this permit to any circumstance, is held invalid, the application of such provision to other circumstances, and the remainder of this permit, shall not be affected thereby.

PART Ill

III.A. OTHER REQUIREMENTS

III.A.1 Reapplication If the Permittee desires to continue to discharge, it shall reapply not later than 180 days before this permit expires on the application forms then in use. The application shall be accompanied by the renewal application fee required by NAG 445A.232.

III.A.2 Signatures and Certification Required on Application and Reporting Forms

Page 202: 2014 Apex Operations Plan-web Site-1

Permit NEV9501 0 Page 10 of 10

a. All applications, reports, or information submitted to the Division shall be signed and certified by making the following certification.

"I certify under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

b. All applications, reports or other information submitted to the Division shall be signed by one of the following:

i. A principal executive officer of the corporation (of at least the level of vice president) or his authorized representative who is responsible for the overall operation of the facility from which the discharge described in the application or reporting form originates; or

ii. A general partner of the partnership; or iii. The proprietor of the sole proprietorship; or iv. A principal executive officer, ranking elected official or other authorized

employee of the municipal, state or other public facility.

c. Duly Authorized Representative All DMRs and any other information required by this permit or requested by the Division shall be signed by a person described in paragraph (a) of this section, or by a duly authorized representative of that person. A person is a duly authorized representative only if:

i. The authorization is made in writing by a person described in paragraph (a) of this section

ii The authorization specifies either an individual or a position having responsibility for environmental matters for the company, and

iii. The authorization is submitted to the Division.

d. Changes to Authorization. If an authorization under paragraph c. of this section is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, a new authorization satisfying the requirements of paragraph b. of this section must be submitted to the Division prior to or together with any reports, information, or applications to be signed by an authorized representative.

Page 203: 2014 Apex Operations Plan-web Site-1

July 10, 2009

Rob Tidwell Regulatory Compliance Republic Services P.O. Box 751600 Las Vegas, NV 89136

STATE OF NEVADA Department of Conservation & Natural Resources

DIVISION OF ENVIRONMENTAL PROTECTION

RE: Renewal of Discharge Permit #NEV95010 for Republic Dumpco

Dear Mr. Tidwell:

Jim Gibbons, Governor

Allen Bia9gi, Director

Lea M. Drozdoff, P.E., Administrator

Pursuant to Nevada Revised Statute 445A.495, the Nevada Division of Environmental Protection ("NDEP") has reviewed the renewal application for Discharge Permit NEV95010. Copies of the draft permit conditions, fact sheet, and public notice were sent to your office and the Clark County Board of County Commissioners for review and comments. The public notice was also published in the Las Vegas Review Journal and sent to interested persons and governmental agencies on NDEP's electronic notification e-mail list. During the 30-day public notice period which closed at 5:00P.M. on June 12, 2009, NDEP did not receive any written comments or inquiries. Therefore, NDEP made the decision to issue the enclosed discharge permit for a period of five (5) years. This pennit action does not constitute a significant change from the tentative determinations set forth in the public notice.

In accordance with the permit conditions, an annual review and services fee to maintain the discharge permit is due on July 1, 2010 and every year thereafter until the permit is terminated.

Should you have any questions in regards to this permit action, please call me at (775) 687-9429.

Sincerely,

7./t!:!:l! Staff Engineer III Bureau of Water Pollution Control

Enclosure: Final Permit

cc: Rory Reid, Chairman, Clark County Board of Commissioners, 500 Grand Central Parkway, Las Vegas, NV 89106 (w/enclosure) Diana Silsby (w/o enclosure- hand delivered copy) AI Tinney, P.E. (w/o enclosure) Cliff Lawson, P.E. (w/o enclosure)

901 S. Stewart Street, Suite 4001 • Carson City, Nevada 89701 • p: 775.687.4670 • f: 775.687.5856 • ndep.nv.gov

Page 204: 2014 Apex Operations Plan-web Site-1

3.11 STORM WATER DISCHARGE PERMIT

Page 205: 2014 Apex Operations Plan-web Site-1

L. H. DODGION Administrator

Administration: (702) 687-4670 Fax 687·5856

Air Quality Mining Regulation and Reclamation Water Quallly Planning Water Pollution Control

STATE OF NEVADA BOB MILLER

Couemor

DEPARTMENT OF CONSERVATION AND NATURAL RESOURCES

DIVISION OF ENVIRONMENTAL PROTECTION

Tom Gardner Environmental Technologies 770 East Sahara Ave. Las Vegas, NV 89104

Capitol Complex

333 W. Nye Lane

Carson City, Nevada 89710

February 23, 1994

Ref: Stormwater Permits, Silver State Disposal Services, Apex,

Dear Mr. Gardner:

Nevada

PETER C. f.IORROS Director

Fax (702) 885·0868 TOO 687·4678

Waste Management Corrective Acllons Federal Facllllles

Thank you for your letter dated December 16, 1993. After reviewing the information supplied by your office the staff of the Stormwater Program concur that your sites do not require a stormwater permit at this time. We have therefore removed Apex Soil Treatment, Apex Transfer Station, and Apex Landfill from the general stormwater permit.

Thank you for your interest in the Stormwater Program. If you have any further question feel free to call me at (702) 687-4670 extension 3153.

Sincerely,

-/a:Lt~ Kathi Brandmueller, E.I.T. Bureau of Water Pollution Control

KB:ns cc: John Nelson

101 191JI

Page 206: 2014 Apex Operations Plan-web Site-1

3.12 PERMIT TO OPERATE A PUBLIC WATER SYSTEM

Page 207: 2014 Apex Operations Plan-web Site-1
Page 208: 2014 Apex Operations Plan-web Site-1
Page 209: 2014 Apex Operations Plan-web Site-1
Page 210: 2014 Apex Operations Plan-web Site-1

4 DESIGN REPORT

Page 211: 2014 Apex Operations Plan-web Site-1

Golder, Golder Associates and the GA globe design are trademarks of Golder Associates Corporation

A world ofcapabilities

delivered locally

TAB 4 –DESIGN REPORT Apex Regional Landfill

Submitted To: Republic DUMPco Inc. 770 East Sahara Avenue Las Vegas, Nevada 89104 Submitted By: Golder Associates Inc. 1000 Enterprise Way, Suite 190 Roseville, CA 95678

June 2014 Project No. 103-97145

Tab

4 –

Repo

rt of

Des

ign

Page 212: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

i Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

Table of Contents

4.0  INTRODUCTION .............................................................................................................................. 1 

4.1  Miscellaneous............................................................................................................................... 1 

4.1.1  Service Area ............................................................................................................................. 1 

4.1.2  Signs ........................................................................................................................................ 2 

4.1.3  Waste Management Areas ...................................................................................................... 2 

4.1.3.1  Waste Management Areas .................................................................................................. 2 

4.1.3.2  Site Seismicity ...................................................................................................................... 4 

4.1.4  Facilities ................................................................................................................................... 6 

4.2  Air Control .................................................................................................................................... 7 

4.3  Emergency Control ...................................................................................................................... 8 

4.3.1  Fire Control .............................................................................................................................. 8 

4.3.2  Pollution Control ....................................................................................................................... 8 

4.3.3  Other Provisions....................................................................................................................... 9 

4.3.3.1  Communication .................................................................................................................... 9 

4.3.3.2  Emergency Escape Plan ...................................................................................................... 9 

4.3.3.3  Flood Control ........................................................................................................................ 9 

4.4  Employees .................................................................................................................................... 9 

4.5  Equipment .................................................................................................................................. 10 

4.6  Facility Access............................................................................................................................ 10 

4.6.1  Access Control ....................................................................................................................... 10 

4.6.2  Access Roads ........................................................................................................................ 10 

4.7  Facility Capacities ...................................................................................................................... 11 

4.8  Litter Control ............................................................................................................................... 12 

4.9  Odor Control ............................................................................................................................... 12 

4.10  Public Areas ............................................................................................................................... 13 

4.10.1  Buffer Zones ........................................................................................................................... 13 

4.10.2  Esthetics ................................................................................................................................. 13 

4.10.3  Zoning .................................................................................................................................... 13 

4.11  Traffic Control ............................................................................................................................. 14 

4.12  Vector Control ............................................................................................................................ 15 

4.13  Waste Measurement .................................................................................................................. 15 

4.14  Waste Processing ...................................................................................................................... 16 

4.14.1  Landfill Covers ....................................................................................................................... 16 

4.14.1.1  Operational Elements of Cover .................................................................................... 18 

4.14.1.1.1  Cover at Continuously Operating Landfills .............................................................. 18 

4.14.1.1.2  Alternative Materials ................................................................................................ 19 

4.14.1.1.3  Waiver ..................................................................................................................... 19 

Page 213: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

ii Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

4.14.1.1.4  Interim Cover ........................................................................................................... 19 

4.14.1.1.5  Integrity of Daily and Intermediate Cover ................................................................ 19 

4.14.1.1.6  Grade Daily and Temporary Cover ......................................................................... 20 

4.14.1.1.7  Operating Day ......................................................................................................... 20 

4.14.2  Landfill Gas Control ............................................................................................................... 20 

4.14.2.1  Composting .................................................................................................................. 21 

4.14.3  Process Flow .......................................................................................................................... 21 

4.15  Water Protection ........................................................................................................................ 23 

4.15.1  Industrial Waste Drainage Control ......................................................................................... 23 

4.15.2  Leachate Control .................................................................................................................... 24 

4.15.3  Run-On and Run-Off Control ................................................................................................. 26 

4.15.3.1  Permitted Retention Basins ......................................................................................... 26 

4.15.3.2  Design Storm ............................................................................................................... 26 

4.15.3.3  Detention Basin ............................................................................................................ 27 

4.15.4  Water Monitoring .................................................................................................................... 28 

List of Tables

Table 1 Cell Construction Dates Table 2 Soil Borrow Requirements Table 3 Design Storm

List of References

Tab 10.7 Special Waste Management, Policies and Procedures Manual Tab 10.11 Special Waste Handling Procedures Tab 10.17 Slope Variance Tab 16.1 Base Grading Plans Tab 16.2 1994 Alternative Liner Design Tab 16.3 Operations and Maintenance Manual for On-Site Tank Storage Tab 17.1 Well Locations and Boring Logs Tab 17.2 Groundwater Monitoring Plan

Page 214: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

1 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

4.0 INTRODUCTION

The following Report of Design for the Apex Regional Landfill has been prepared in accordance with

Nevada Administrative Code (NAC) 444.680. This report provides design details for the entire design of

the Apex Regional Landfill Class I Disposal Site. The original Report of Design for disposal units at the

Apex Regional Landfill was prepared by Vector Engineering in 1993. Vector’s report included disposal

units for the entire Apex Regional Landfill that formed the basis for the current operating permit Nos.

LF001-G3X-01 and LF002-G3X-01. Permit No. LF001-G3X-01 is a Class III disposal permit for 218 acres

and 81 million cubic yards (cy) of disposal capacity and Permit No. LF002-G3X-01 is a Class I disposal

permit for 1,015 acres and 784 million cy of disposal capacity. This report proposes to combine the

current industrial disposal area (Class III) as part of the existing municipal solid waste disposal areas

(Class I) under one permit.

The current permits reflect a total 1,233 acres of municipal solid waste disposal area with a total design

capacity of 865 million cy to a maximum elevation of 2,900 feet above mean sea level (msl). A revised

Design Report was completed in 1997 for both the municipal and industrial waste disposal areas as

reflected in comments made to these reports by the SNHD in a July 1999 letter. Changes made in this

2012 revision increase the usable disposal area to 1,722 acres with the total airspace remaining 865

million cubic yards.

The Apex Regional Landfill (landfill) is owned and operated by Republic DUMPco, Inc. (Republic). In

August 1997, the assets of Silver State Disposal and DUMPco were acquired by Republic Services Inc.

(then called Republic Industries Inc.). The landfill is located 15 miles north of Las Vegas, Nevada at the

intersection of Interstate 15 and Highway 93

This report and associated drawings have been prepared under the direct supervision and responsible

charge of Randall V. Wall, Nevada Professional Engineer No. 13746. Detailed drawings, specifications

and Construction Quality Assurance Manuals for the site are on file and updated as needed according to

industry standards.

4.1 Miscellaneous

4.1.1 Service Area

Apex Regional Landfill currently serves the greater Las Vegas Area including the cities of Las Vegas,

North Las Vegas, and Henderson along with most of the unincorporated areas of Clark County, Nevada.

The current population base of Clark County Nevada is nearly 1.4 million people. Out-of-state waste may

also be accepted.

Page 215: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

2 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

4.1.2 Signs

The general site information presented on a sign at the site entrance includes the name of the owner,

hours of operation, materials accepted and excluded and fees charged for disposal. Tab 8.1, Figure 1

presents the location of this sign and all other signs on site for traffic flow and other needs.

4.1.3 Waste Management Areas

4.1.3.1 Waste Management Areas

To date, approximately 295 acres of landfill area have been developed for refuse disposal. The first two

municipal solid waste units were constructed in 1993 and are designated MA-1 and IA-1. These units

were designed and constructed following the Nevada Administrative Code and were approved for use by

the South Nevada Health District (SNHD). The design of these units include the use of a GundsealTM

liner comprised of 60-mil High Density Polyethylene (HDPE) geomembrane with a bentonite soil layer

adhered to the bottom of the geomembrane to provide a composite liner. This liner product was placed

over natural ground subgrade as described in construction quality assurance documents on file at the

Health District. Cell IA-1 was constructed with a secondary GundsealTM liner below a leak detection

geocomposite drainage layer with a layer of 60-mil HDPE geomembrane above the geocomposite to

create a double liner for industrial waste area.

In 1994 an Alternative Liner Design was approved for the site, is provided in Tab 16, 2. The Alternative

Liner Design, allowed under Federal regulations, takes into consideration site specific factors such as the

geology and hydrogeology of the site for approving liner systems. The design involved placing a 60-mil

HDPE geomembrane over a thin layer of prepared soil subgrade, followed by 1-foot thick permeable

cover soil to protect the liner. Areas of the landfill with sloped surfaces greater than or equal to 2 to 1,

horizontal to vertical, do not have to be lined according to permit conditions. This condition

accommodates the mountainous terrain of the landfill.

In 1994, Cell MA-2 was constructed with this Alternative Liner Design. In 1995, MA-3 was constructed,

and in 1997, Cell MA-4 was constructed, each following the approved Alternative Liner Design.

In August 1998, Republic contracted with EMCON to create Specifications for the Construction of

Lining and Leachate Collection Systems, v. 1 (herein after refer to as “Specifications v.1”) for the Apex

Regional Landfill to formalize the 1994 approved Alternative Liner Design for the landfill. These

specifications added more conservative elements to the Alternative Liner Design including a requirement

for at least six inches of soil bedding placed above the subgrade, upon which the 60-mil HDPE

geomembrane would be placed, followed by at least six inches of “Select Fill” permeable material,

followed by at least 12 inches of “Random Fill” soil to protect the underlying layers.

Page 216: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

3 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

In early 1999, Republic constructed Cells MA-0 and IA-2 following the Alternative Liner Design and

“Specifications v.1,” and once again, the IA-2 cell unit included an additional GundsealTM secondary liner

and geocomposite leak detection layer.

In September 1999, Cell MA-5 was constructed following the Alternative Liner Design and “Specifications

v.1” and in June 2001, MA-6 was constructed using an April 2001, rev 2, to the “Specifications” and the

Alternative Liner Design. Revision 2 to the Specification changed errors noted with the Specification v.1

calling for 12 inches of Select Fill above the geomembrane liner, when only six inches was intended and

constructed.

In February 2003, Republic constructed Cell MA-7 with “Specifications v.2. In May 2004, Cell MA-8 was

constructed using the Alternative Liner Design and an April 2004 version 3 of the “Specifications.”

Specification v.3, April 2004 was revised to present details of construction soils within Section 02225 for

Cell MA-8 rather than descriptions applicable to any cell built following the Specifications.

In June 2006, Cell MA-10 was constructed, following the Alternative Liner Design and referenced a

revision to the “Specifications” updated in March 2006, but still called v.3. This revision updated

geosynthetic liner construction quality control parameters which reflected current industry standards for

HDPE Manufacturing according to the Geosynthetic Research Institutes standard test GM-13.

In April 2007, Cell MA-21 was constructed following the June 2006 revision to the “Specifications” and the

Alternative Liner Design. In November 2009, MA-9 was also constructed according to the Cell MA-10

Alternative Liner Design.

Each of these specification revisions meet the basis of the original approved Alternative Liner Design

intent and are on file with the Health District.

Provided below is a table that summarizes the disposal cell construction dates.

Page 217: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

4 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

TABLE 1 - CELL CONSTRUCTION DATES

Cell Design Consultant CQA Consultant CQA Report

IA-1/2 EMCON EMCON July 21, 1999

MA-0 EMCON EMCON July 21, 1999

MA-2 Vector Engineering Vector Engineering February 6, 1998

MA-3 Vector Engineering Vector Engineering February 6, 1998

MA-4 Vector Engineering Vector Engineering February 6, 1998

MA-5 EMCON/OWT EMCON/OWT June 19, 2001

MA-6 EMCON EMCON October 4, 1999

MA-7 Shaw

EMCON/OWT Shaw EMCON/OWT February 1, 2003

MA-8 Shaw

EMCON/OWT Shaw EMCON/OWT May 1, 2004

MA-9 Golder Associates Golder Associates October 30, 2009

MA-10 Shaw

EMCON/OWT SCS Engineers June 9, 2006

MA-21 Shaw

EMCON/OWT Converse

Consultants March 21, 2007

Each of the designs and CQA reports presented in Table 1 were prepared by engineers are registered in

the State of Nevada.

Refer to Tab 9, Figure 9.1 for an aerial photograph which depicts the current landfill development. Plan

drawings and sections are provided on 24”x36” sheets at a scale of 1 inch equals 200 feet in Volume 2 of

this report. Reduced drawings are presented in this Volume on 11” by 17” sheets for easy reference and

convenience. Steep sideslope contours are generally shown at 5-foot intervals for clarity. Contours in

areas of very steep natural topography may have greater intervals.

The Apex Regional Landfill Class I Site will consist of several cells (MA-East, MA-North, MA-West and

MA-South, see Tab 8.2).

4.1.3.2 Site Seismicity

According to Vector's initial Operations Report, United States Geological Survey (USGS) map MF-916,

Preliminary Map of Young Faults in the United States as a Guide to Possible Fault Activity, shows no

Page 218: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

5 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

evidence of Holocene faulting in the Las Vegas area. Rogers, et al. (1983) USGS Open-File Report 83-

669 indicates that most northwest trending faults within the Southern Great Basin, including the Las

Vegas shear zone, are inactive. By contrast, many faults of north to northeast orientation are active, using

evidence of late Quaternary displacement or current seismicity. Rogers, et al. (1983) concluded that faults

with a north to northeast trend should be considered potentially active in the Yucca Mountain area, though

geologic evidence and a current near absence of seismicity indicate they are not active.

Earthquakes in the Southern Great Basin occur at depths of up to 10 kilometers with no evidence that

they occur on listric faults, which are characterized by dips that shallow with depth (Rogers, et aI., 1983).

Rogers, et al. (1983) concluded that the earthquakes in the region are occurring on faults of significant

vertical extent. In contrast, north trending faults mapped by Longwell (1965) at the Apex Regional Landfill

are shallow angle thrust or reverse faults formed under a compressional tectonic regime during the

Cretaceous period, over 65 million years ago. Today, the Southern Great Basin is characterized by

extensional tectonics. Therefore, it is unlikely that the faults originally mapped by Longwell, et al. (1965)

are currently active. Geologic reconnaissance of an area with a 3,000 foot radius of municipal solid waste

landfill Cells IA and MA indicates no evidence of Holocene faulting. Field investigations conducted by

Vector and others indicated no displacement of alluvial or other surface deposits. A field and aerial

photograph investigation of the area by SEA, Inc., (SEA, 1988) confirmed the existence of thrust faults

mapped by Longwell in 1965, but concluded that there was no evidence of recent movement on the

faults. The SEA study also confirms the absence of any evidence of displacement of surface sediments.

Therefore, the Apex Regional Landfill satisfies the requirements of 444.6791.

Maps within USGS Open File Report 82-1033, entitled Probabilistic Estimates of Maximum Acceleration

and Velocity in Rock in the Contiguous United States, indicate that the Apex Regional Landfill lies within a

seismic impact zone with a maximum horizontal acceleration of 0.20g with a 10 percent chance of being

exceeded in 250 years. Vector Engineering conducted its own site-specific seismic assessment of the

Apex Regional Landfill utilizing a computer program entitled EQSEARCH. The program uses an

attenuation relation after Joyner and Boore (1982) combined with historical earthquake data for the years

from 1800 to 1991 to calculate the maximum probable ground acceleration experienced in the area

encompassing the site and having a 62-mile radius. The nearest historical earthquake was approximately

1 mile from the site with a maximum Richter magnitude of 5.0. SEA determined that a 1966 event 60

miles away in Clover Mountain had a magnitude 6.1. The computer analysis by Vector produced a

maximum probable ground acceleration of 0.073g with a 4 percent probability of exceedance in 100

years. Based on these findings, a conservative acceleration value of 0.15 g was utilized in all

pseudostatic stability analyses. Pursuant to 444.6793, all containment structures at the Apex Regional

Landfill are designed to resist a minimum peak ground acceleration value of 0.15g.

Page 219: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

6 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

Pursuant to 444.6795, the stability of the Apex Regional Landfill was assessed and the results

incorporated into the overall design. Waste cell designs call for removing the relatively thin layer of

alluvium where present, exposing the bedrock beneath, and replacing the area with compacted fill.

Excavation down to bedrock decreases the likelihood of differential settlement.

A geologic investigation was conducted by SEA in 1988. According to this report, bedrock in the area

consists of limestone and siltstone. These bedrock structures are not likely to move under the proposed

waste loads. Surface soils, where present, generally consist of silty sands with gravel. Caliche is common

within this sparse alluvial covering. No expansive soils are known to exist anywhere on the facility.

Natural slopes around the site are composed almost entirely of well-indurated, relatively erosion-resistant

limestone bedrock. Rockfall potential has been recognized on the western and southern slopes of the

large synclinal ridge located northeast of MA -1.

Liquefaction of embankments, slopes, and soils are believed to be negligible given the lack of loose

sandy soil, depth to groundwater, and low seismic impact zone. There is no indication of karst terrain or

topography in the area.

4.1.4 Facilities

The site is equipped with an administration/maintenance building located approximately one mile east of

the site entrance. The plans for the facility are provided in Tabs 8.5. and 8.6. Generally, the maintenance

facility is a two story building with the administrative offices located on the second floor in the center of the

building. Parts stockroom, equipment maintenance bays and employee restrooms are located on the first

floor. Water is supplied from the water well MW-5 located at the northern perimeter of the site. Waste

water for the maintenance building is discharged to a 2,500 gallon underground septic tank and 2,250

gpd leachfield with distribution box and dosing tank. The layout of this system is presented on Sheet 3 of

4, Utility Plan in Tab 8.6. Waste water for the scalehouse is discharged to a 1,000 gallon septic tank and

1,000 gallon per day (gpd) leachfield.

The layout of this system is presented on Figure 6.1 in Tab 8.6. Waste water resulting from washing

vehicles and the maintenance building interior is treated in a 2,000 gallon sand-oil separator, stored in a

5,000 gallon holding tank, then discharged to water trucks for use as dust control over the lined area of

the landfill.

Onsite wastewater is discharged to septic systems permitted under permit #NEV95010 for the scalehouse

and maintenance building. Permit #NEV93011 was issued for the soil treatment facility from the Bureau of

Water Pollution Control. Permit #NEV2011510 as issued for the leachate holding tanks adjacent to the

H2S treatment facility.

Page 220: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

7 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

The site operates a Bioremediation Facility and Liquid Solidification Area in accordance with the Nevada

Division of Environmental Protection Permit No. NEV93011, refer to Figures 1 through 3 in Tab 10.14.

There is one leachate collection sump and one leak detection sump located in pond 4 on the West side of

cell 4. These sumps are accessed with a 6-inch diameter pipe and a-3 inch diameter pipe respectively.

Waste water that meets the requirements of the permit is brought on site for disposal is discharged into

one of ten double lined (second liner provides secondary containment) evaporation ponds. The ponds are

considered one continuous unit because the liner system is continuous throughout the pond area with

earthen berms separating the individual cells beneath the liner system. Waste water disposed of is

evaporated and any residuals are disposed of within the landfill. The bioremediation facility encompasses

approximately 7.5 acres and is located north of the administration/maintenance building. The liquid

solidification area only accepts nonhazardous and non-petroleum-based liquids. All wastes are screened

for hazardous characteristics per applicable state and federal requirements. The approved liquids for

solidification can be mixed with wood chips, sawdust, soil, and/or auto fluff. The residual is landfilled.

Refer to tab 3.10, Industrial Waste Discharge Permit.

The site also operates a landfill gas (LFG) hydrogen sulfide (H2S) treatment facility. This facility is an

approximate 8,000 square feet enclosed building approximately equipped with H2S gas removal

equipment that is used to pretreat the LFG prior to combustion in turbines used to create electricity. The

energy plant, located on 1.5 acres in the southwestern corner of the site, uses the treated LFG to fuel two

Solar Centaur 60 combustion turbines manufactured by Solar Turbines, a subsidiary of Caterpillar Inc.

LFG is drawn from vertical and horizontal wells up to 300 feet deep that tie into a header system that

conveys the LFG to the H2S removal system to treat sulfur content. Next, gas is filtered for moisture and

particulates then is compressed and injected into 5.5-megawatt air-cooled turbines that generate

electricity. Emissions are treated by a selective catalytic reduction process that removes harmful nitrogen

oxides from the exhaust plume.

Drinking water for the site is permitted by the Division of Environmental Protection Bureau of Safe Water

Drinking, Permit Number CL – 0379 – 12NTNC presented in Tab 3.12, Drinking Water Approval.

4.2 Air Control

Provisions in place for controlling dust to prevent a public nuisance include water pulls equipped with

spray bars which apply water or leachate (over lined areas) to unpaved haul roads and operating areas

adjacent to the working face. Approval of leachate application for dust control and the overall Title V Part

70 Operating Permit are provided in Tab 3.6.

Page 221: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

8 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

4.3 Emergency Control

4.3.1 Fire Control

Operating personnel at the Apex Regional Landfill are prepared to provide immediate fire suppression in

the event of any active landfill face or structural fire. A 10,000 gallon water pull contains water for

emergency fire suppression. Fire suppressant systems on site include:

Appropriate placement of fire extinguishers capable of extinguishing fires rated A, B, or C in conformance with County, State and Federal law

Use of two on-site water wells to maintain a water reservoir with seven million gallons of available water resources at all times

A fire sprinkler system in the administrative/maintenance building and H2S treatment facility

A chemical fire suppressant system in the H2S treatment facility

Stockpiling of soils near to working face(s) for immediate coverage of detected waste fires.

Restriction of ignitable liquid materials from the site

The fire control approval is located in Tab 3, Section 3.7.

4.3.2 Pollution Control

The location restriction requires that the sub-soil structure of the Apex Regional Landfill provides a

reasonable assurance that any potential leachate generated from the landfill will not contaminate ground

waters or ephemeral waterways in the area. It also requires that suitable procedures will be followed to

prevent such contamination. Such procedures include:

The installation of a geomembrane liner system

The installation and operation of a leachate collection and removal system to collect leachate generated in the landfill

The control of storm water to prevent infiltration

The climatic conditions and geologic and hydrogeologic features of the landfill area also help to prevent

groundwater contamination. These features include:

The limestone bedrock that underlies the site

The low annual precipitation and high evapotranspiration rate in the area

The large distance from the ground surface to groundwater

A detailed assessment of these factors is included in the original Design Report (Vector, 1993).

The sites EPA identification number for the landfill is 110027803367.

Page 222: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

9 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

Recovered liquids and materials used to service vehicles on site are disposed of properly and recycled

where appropriate.

4.3.3 Other Provisions

4.3.3.1 Communication

Site personnel are equipped with radios to allow for direct communication between management and

operating personnel. These radios not only provide an avenue for communication during normal operating

conditions but also provide communication assistance in case of emergency.

4.3.3.2 Emergency Escape Plan

The following contacts are made in the case of an emergency:

1. Contact LVP and KR Drenth (third party haulers)

2. Contact Republic operations supervisors

3. Contact employees

4. Meet at site entrance to discuss further evacuation procedures

As emergency escape plan for the facility is provided in Tab 8.4. This plan addresses emergency

provisions to be followed in the event of an emergency at the disposal area or at the maintenance facility.

4.3.3.3 Flood Control

Vector Engineering determined that the Apex Regional Landfill does not lie within a 100-year floodplain or

a major stream or playa, as designated by the Federal Emergency Management Agency (FEMA) refer to

Tab 3.9 and Figure 10-4 in Tab 10.6. A review of the U.S. Department of Housing and Urban

Development FEMA Community Panel maps for Clark County unincorporated areas (nos. 320003 0026

and 320003 0027 A) shows that the nearest "Zone A" (100-year flood hazard zone) is approximately two

miles northwest of the site. This Zone A area depicts a portion of the alkali flat known as Dry Lake

4.4 Employees

A large maintenance facility equipped with lockers, a breakroom, restrooms, and a kitchen are provided

for personnel. On the second floor of the maintenance facility building, administrative offices for Republic

management and personnel are located. Wastewater generated from the Maintenance building is

discharged to a leachfield. Plumbing fixtures in the maintenance building consist of a restroom, kitchen,

shower, janitorial facilities and drinking fountains. A 2,500 gallon septic tank and 2,250 gpd leachfield with

distribution box and dosing tank serve this area.

Waste water resulting from washing vehicles and the maintenance building interior is treated in a 2,000

gallon sand-oil separator, stored in a 5,000 gallon holding tank, then discharged to water trucks for use as

Page 223: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

10 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

dust control over the lined are of the landfill. Backwash, regeneration, and reject water from the drinking

water treatment system is also discharged to the holding tank. The drinking water system consists of

water softening, reverse osmosis, and filtration that is used to treat water from the onsite potable well.

Wastewater from the Hydrogen Sulfide (H2S) Treatment Facility operations building is discharged to a

tank and emptied as necessary.

The scale house at the landfill entrance is provided with electricity and restrooms. Communication from

the scale house is provided via telephone and radio. Wastewater generated from the scale house is

discharged to a leachfield. A 1,000 gallon septic tank and 1,000 gallon per day (gpd) leachfield serve this

area.

Refer to Tabs 8.5 and 8.6 for figures presenting the employee facilities.

4.5 Equipment

Equipment utilized at the Apex Regional Landfill is maintained on site at the maintenance facility. The

maintenance building is 22,000 square feet and houses parts, equipment maintenance bays

administrative offices and employee facilities (restrooms, etc.). Drawings presenting the maintenance

building are provided in Tab 8.6.

Pictures of representative pieces of equipment and their associated identification numbers are presented

in Tab 10.2.

4.6 Facility Access

4.6.1 Access Control

The Apex Regional Landfill is an isolated site. This isolation assists in keeping unauthorized vehicular

traffic away from the landfill. There is only one entrance to the site and it is controlled by personnel at the

scale house. Visitors must check in at the scale house prior to entering the site. The natural topographic

barriers around the site prevent access to the landfill other than through the front gate. An attendant is on

duty 24 hours a day at the scale house to control access to the facility.

4.6.2 Access Roads

Primary access to the site is via a paved frontage road from the Highway 93 and Interstate 15

interchange. The access road to the entrance of the facility was constructed by Republic and extends

from the lnterstate 15 frontage road north approximately ¼ of a mile where it then turns east into the site.

The roadway is 35-feet wide with 5.5-foot wide shoulders. Culverts and grade dips are located at natural

drainages to control storm water and provide all-weather access. Beyond the entrance, the main site

access road is paved to the maintenance building and landfill area.

Page 224: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

11 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

Access to the current refuse disposal area, MA-East, is provided by two paved and gravel-packed roads.

One road traverses the existing refuse slopes to provide access to the top deck area of the landfill while

the second road extends around the perimeter of the existing refuse disposal areas providing access to

the lower reaches of the landfill. These roads will be extended and maintained over time to provide this

dual access to the site.

The current and future roads will be a minimum of 30 feet wide to allow for two-way traffic. The slope of

the roads may vary from less than 1 to 9 percent to conform to the proposed excavation and fill grades.

Road cross slope will be 2 percent to the toe of slope to promote runoff from the road surface. All roads

used for refuse hauling trucks are constructed and maintained to provide an all-weather surface. Because

the landfill is in continuous flux with new areas being developed for refuse disposal operations, new roads

will be constructed to the criteria set forth above to maintain appropriate access to the site.

Location of the current access roads is shown in Tab 8.7, Figure 7.

4.7 Facility Capacities

The site as designed has an overall fillspace capacity of 865,000,000 cubic yards (cy) from the top of the

operations layer to the bottom of final cover. This fillspace is the volume between the design base grades

and the design final grades for the site excluding the volume taken by the base liner and final cover

quantities. Using a refuse to daily and intermediate cover soil ratio of nine parts refuse to one part soil,

approximately 778,500,000 cy of refuse will be placed to reach final grade. Approximately 57,241,194 cy

of airspace has been consumed as of March 17, 2013, leaving a remaining airspace of 807,758,806 cy.

Based on the current incoming waste stream of 8,491 tons per day and a density of 2,816 lbs/cy, the site

life is estimated to be 468.3 years once the remaining airspace is corrected for base liner and final cover

quantities. The information used to determine the in place airspace utilized to date and the calculation of

the remaining airspace is provided in Tab 13.

The initial Design Capacity Report was prepared by Vector in 1993. The drawings prepared by Vector and

used to determine the initial design capacity of the site are provided in Tab 12.

Other site capacities include:

8,000 sf H2S removal building

2,500 gallon septic tank and 2,250 gpd leachfield with distribution box and dosing tank for the maintenance building

2,000 gallon sand-oil separator, stored in a 5,000 gallon holding tank for the truck wash area

1,000 gallon septic tank and 1,000 gallon per day (gpd) leachfield serve this area for the scale house

two 22,500 gallon leachate storage tanks located near the H2S removal building

Page 225: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

12 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

three 6,500 gallon leachate storage tanks located at the northeast corner of MA–10 with 21,500 gallons of secondary containment available

daily maximum of 499,000 gallons for the bioremediation facility in soil solidification area combined

4.8 Litter Control

Generation of windblown debris at the active working face is a common occurrence at solid waste

landfills. Windblown debris commonly consists of lightweight waste materials blown from the active

working area. It may be generated during the physical unloading of waste from haul vehicles or during

placement. When wind speeds become excessive, debris may be blown from the active area and carried

to other parts of the facility. As wind speeds increase, the quantity of windblown debris in the area may

correspondingly increase.

Climatological data from the site indicates the wind direction at the Apex Regional Landfill is commonly

from the northeast and from the southwest. Permanent and portable litter control fences are positioned

near the active working face in positions consistent with wind direction in order to contain windblown

debris. Debris that is not contained by the litter fences is hand-picked by a staff of Republic employees.

The collection of windblown litter around the site is staffed up and down depending on conditions and

effectiveness of the fences.

The majority of refuse hauling vehicles come to the site utilizing Interstate 15. As such, the stretch of

Interstate 15 from the City of Las Vegas to the landfill undergoes a degree of pollution from windblown

litter that escapes from haul trucks on their way to the landfill. As such, Republic has a program in place

with Adopt a Highway that provides personnel to collect litter from the Interstate 15 ten miles south on the

north side and seven miles on the south side of the Interstate from the landfill to the City of Las Vegas.

4.9 Odor Control

Republic operates the landfill in a manner that minimizes the creation of odors, unsightliness, or other

nuisances. Waste is placed in controlled compacted layers and cover is placed over the top and

sideslopes of completed lifts. The solid wastes are spread and compacted in thin layers, not to exceed

two feet in thickness. Due to the 24-hour operating condition at the site, the active refuse area is

continually covered with incoming waste. Perimeter intermediate slopes created around the active refuse

area are covered with soil or approved alternative daily cover to control odors. This continual filling

operation allows for any waste that may be an odor nuisance to be immediately covered. If odors persist,

soil is placed and compacted over the area to eliminate the nuisance.

The active landfill gas collection system on site also is used to control odors on site. The current landfill

gas system is discussed in section 4.14.2 and presented in Tab 15.

Page 226: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

13 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

4.10 Public Areas

4.10.1 Buffer Zones

A site plan showing the site and surrounding areas is presented in Tab 8.8, Figure 8.8.

A survey of the area surrounding the Apex Regional Landfill, documented on the World Aeronautical

Chart, CG - 18, 23rd Edition May 27, 1993, indicates that the nearest airport runway is at the Nellis Air

Force Base located approximately 13 miles southwest of the site. Therefore, the landfill does not fall

within the 10,000-foot airport safety requirement for the airstrip; thus satisfying the airport location

restrictions as posed by 444.6783.

The next nearest airport runway is located at Clark County General Aviation Administration, North Las

Vegas Terminal, 2772 North Rancho Drive, Las Vegas. Past communications with this air terminal

indicate that it services primarily piston-type aircraft with very few small jet aircraft entering the terminal.

The air terminal is located 22 miles to the southwest of the landfill, well outside of the 5,000- and 10,000-

foot requirements.

Other airports identified in the region are located in Overton, 27 miles to the northeast and in Glendale, 23

miles to the north. The Overton airpark service’s small piston type aircraft and also falls outside the 5,000-

foot requirement. The Glendale Airport serves as an emergency landing strip for small aircraft.

Section 444.686 (5) requires that solid waste must not be placed within 200 feet of the boundary line of a

Class I or Class III site unless the appropriate regulatory agency approves a smaller distance. A minimum

50-foot setback has been approved by the SNHD for the industrial area and for all sides of the MA-East

portion of Apex Landfill, refer to Tab 10.4 for the June 23, 2003 setback approval letter from the SNHD. A

minimum 50-foot offset will be used for the remainder of the site development in accordance the June 23,

2003 letter, refer to Tab 14, Figure 1 for the proposed final grading plan.

4.10.2 Esthetics

Although the landfill is within 1,000 feet of a public highway, the final cover system is not proposed for

revegetation at closure, the landfill cover will promote natural vegetation to allow the site to blend in with

surrounding topography and visual landscapes. No irrigation of vegetation is planned for the site.

4.10.3 Zoning

On July 26, 1993, Republic submitted Zone Change Application No. ZC-1264-93, Conditional Use Permit

Application No. UC-1266-93, and Variance Application No. VC-1266-93 to the Clark County Department

of Comprehensive Planning, Zoning Division. The zoning is M-2 (Industrial) to for Assessor's Parcel

numbers 103-13-000-003, 103-13-000-005, 103-13-000-006, 103-13-000-008, 103-24-000-004, 104-07-

000-003, 104-07-000-005, 104-18-000-001, 104-18-000-002, 104-18-000-003, 104-19-000-001, 104-19-

Page 227: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

14 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

000-002, 104-19-000-003, and 104-20-000-001. The applications are consistent with the proposed heavy

industry use project as proposed by the County Department of Comprehensive Planning in January 1989.

The conditional use permit applications included a landfill for disposal of municipal solid waste, including

industrial waste, with soil borrow areas adjacent to Interstate 15.

A site location map showing the general location of the Apex Regional Landfill is presented in Tab 10.1

and a zoning map in included in Tab 10.5, Figure 10-1. Areas immediately east, north, and south to

Apex’s MA-East area are managed by the U.S. Bureau of Land Management. Areas northwest and

southwest of the main Apex Regional Landfill within a mile radius are zoned and M-2 (Industrial) and OS

(open space).

4.11 Traffic Control

The site is accessed off of Interstate 15 at the intersection of U.S. Highway 93. A frontage road to the

east of Interstate 15 leads to the site entrance and scale facilities. Once through the scale facilities the

access road travels to the east beneath the railroad tracks and to the active disposal area.

Figures 1 in Tab 8.1 presents the current signage plan and Figure 1 in Tab 8.7 presents the current traffic

flow plan for the site. This basic flow pattern will be used for the remainder of filling within MA-East,

approximately 20 years.

Traffic is predominantly controlled on site through the use of signs. After trucks and/or visitors enter the

site at the scale house, a timed stop light allows one-way traffic through an underpass below the railroad

tracks that cross over the main access road. Once a green light allows one-way traffic to proceed through

the underpass, the paved access road widens to allow for two way traffic after the underpass and

throughout the site. Traffic heads east into the site until the maintenance area is reached where a side

road continues to the east to access the maintenance facility and employee parking area while the main

access road turns to the south. Approximately after ¼ mile, the main access road splits into two access

roads. One road traverses the west and south slopes of the existing landfill while the other extends

around the perimeter of the existing disposal area. These two roads provide access to the upper and

lower refuse disposal areas respectively. These roads are posted with speed limits, stop signs and other

traffic control signs as necessary to provide safe traffic control for the site.

Because the site is ever changing due to the ongoing refuse disposal operations at the site, road

locations are revised to accommodate the changing topography. As changes are made, traffic controls

are updated as necessary to provide a safe working environment.

Page 228: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

15 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

The use of dual access roads is planned to be used throughout the life of the landfill. This plan allows for

one road to be shut down while still providing accessible refuse disposal areas. Roads may be closed due

to maintenance needs, relocation or unforeseen occurrences.

4.12 Vector Control

The combination of routine crushing, compaction and covering of the wastes and the climatic conditions

at the site effectively eliminate the potential for insect and rodent problems, which can be carriers

(vectors) of disease.

A designated area at the landfill is provided for public drop-off of dead animals, carrion, slaughterhouse

wastes, and other putrescible wastes. The animals are placed in the designated area in the Class I landfill

and covered with 36 inches of cover material. Republic controls vectors according to NAC 444.6678.

4.13 Waste Measurement

Trucks delivering solid waste to the site are weighed or measured at the scale house before they enter

the landfill. Transfer trucks are weighed before entering and again before leaving the landfill to determine

the weight of waste received from the transfer stations. For other trucks, the waste is measured

volumetrically and the weight estimated using assumed densities for various types of. Over the past five

years the waste inflow to the site has varied greatly from a peak of approximately 13,000 tons per day to

a low of approximately 7,000 tons per day.

Waste is tracked to determine the specific amounts of each type going into the landfill. The types of waste

that are recorded are presented below:

Small Animals

Large Animals

Appliances

Solid Waste – Trash

Solid Waste by Ton

Demo Dirt, Concrete, Rock

Demo Dirt, Concrete, Rock by Ton

Mattress Set

Public Sludge

Septic Waste

Non-Septic Waste

Special Handling

Tipping Fee

Medical Waste

Page 229: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

16 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

Wood Recycle

Asbestos

Industrial

Off spec materials

Disposal and waste handling procedures for special waste are presented in Tabs 10.7 and 10.11. No

hazardous waste is accepted for disposal at the landfill.

Topographic maps and other surveys are used to determine the volume of waste placed and the amount

of soil used at the landfill. These records are maintained at the site.

4.14 Waste Processing

4.14.1 Landfill Covers

The proposed alternative cover system design for the landfill consists of an evapotranspirative cover

system composed of on-site soils and 4 feet in thickness. The depth of soil cover may be increased in

some areas, like benches, to allow for the installation of drainage improvements. The cover system

meets the regulatory standard established in NAC 444.6891.

Currently, Republic has a contract in place with a private developer to excavate and process soils to

create construction aggregates from within the landfill footprint for off-site sale. Cover material is currently

processed through this operation. However, depending on the quality of the limestone within a planned

refuse disposal cell, the material may or may not be excavated as part of the ongoing third party quarry

operations at the site. If cover material is not generated within the quarry operation, soil will be obtained

from within the landfill footprint in adjacent cells.

Soil required for cell construction will generally be taken from the quarry operations that process the soils

to the correct gradations for use. Processed soils are typically silty sand and gravels that have proven

effective as soil cover. The soil requirements for the planned site development are summarized below.

Page 230: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

17 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

TABLE 2 - SOIL BORROW REQUIREMENTS

Cell Net Cell Excavation

(CY)

Soil Needed For Operations

(CY)

Cumulative Stockpile

(CY)

MA-5 Constructed -

MA-6 Constructed -

MA-7 Constructed -

MA-8 Constructed -

MA-10 Constructed -

MA-21 Constructed

MA-9 Constructed 1,072,000 600,000

MA-11 390,800 1,550,000 -559,200

MA-12 861,300 1,117,000 -814,900

MA-14 697,700 642,800 -760,000

MA-13 551,500 968,400 -1,176,000

MA-22 866,200 738,300 -1,049,000

MA-23 1,190,000 1,879,400 -1,738,400

MA-24 2,724,000 1,098,700 -113,100

MA-25 6,579,000 3,021,500 3,444,400

MA-26 4,133,000 1,471,700 6,105,700

MA-20 589,000 3,597,700 3,097,000

MA-27 13,878,000 11,483,100 5,491,900

MA-31 24,611,000 4,302,300 25,800,600

MA-30 31,486,419 5,596,800 51,690,219

MA-29 39,089,000 8,088,500 82,690,719

MA-28 27,471,000 20,972,000 89,189,719

MA-32 5,015,000 8,065,400 86,139,319

MA-North 25,999,000 10,190,000 101,948,319

In the above table, the “Soil Needed for Operations” requirement includes soil for earthfill to reach base

grades, daily and intermediate (D&I) cover, final cover construction and base liner construction. Net

Page 231: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

18 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

excavation is the total excavation from the module construction. The above table does not account for

expansion or contraction of the soil from in-place bank yards to stockpiled or recompacted yards. If

additional soils are needed, they may be obtained from the on-site sand and gravel operations. The

approximate 100,000,000 cy surplus is assumed to be sold off site as aggregate during the life of the

landfill.

The Final Grading Plan, Tab 14 Figure 1, shows final slopes. No areas of the landfill have been closed to

date.

4.14.1.1 Operational Elements of Cover

4.14.1.1.1 Cover at Continuously Operating Landfills

Apex Regional Landfill operates 24 hours-a-day, 7 days-a-week. 155,250 square feet is the approved

open face area that the landfill is restricted to. This approved area allows for safe operations and the

ability to segregate the public from the commercial haulers.

Waste is placed in lifts over an active area of the landfill, and as the tipping floor (i.e. area receiving

waste) moves laterally, cover soil or approved alternative daily cover is placed over the final or

intermediate slopes and top. The soil cover creates a stable floor for vehicular traffic and tipping

operations. As an area is filled with a completed lift, a new lift is begun on top of the old lift. Soil that was

previously used as cover is removed, to the extent possible, to reduce the amount of soil within the landfill

and remove any barriers to the downward migration of liquids. If these soil barriers are not removed,

leachate can move laterally to the exposed slopes. Areas that are not actively receiving waste remain

covered with soil. Continuous waste placement satisfies the requirements for control of disease vectors,

fires, odors, blowing litter, scavenging, and presents no danger to public health or the environment. The

operations described above are currently approved by the SNHD. Based on inspections by the SNHD,

the continuous waste placement operations for control of vectors will be assessed. If additional operating

criteria or revisions to the existing operations are identified to increase the control of vectors, Republic will

work with SNHD to implement additional controls or revise operations as necessary.

Republic is requesting that interim refuse slopes used for waste unloading be constructed with a minimum

slope of one percent, refer to variance request in Tab 10.17, all final slopes will have a minimum of 3%.

The requested one percent slopes facilitate the safe operation of tippers (hydraulic systems that empty

transfer trucks by raising the front end of the transfer trailer to an approximate 45 degree angle with the

ground surface). Slopes steeper than one percent can create dangerous situation where the tippers,

when extended, can become unstable. Utilizing a one percent slope reduces this potential significantly

while still maintaining surface water runoff control.

Page 232: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

19 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

The master development design, geological investigation and operating experience have confirmed the

adequacy and availability of soil for use in the landfill operations. Cover soils have been obtained from

the blasting excavation, crushing, and screening operations on site since operations began.

4.14.1.1.2 Alternative Materials

Currently, soil is used as cover. In addition to soil, Republic is requesting authorization to use the

following Alternative Materials for cover in the future:

Synthetic liner materials

Spray-on or spread-on binder materials sold in the industry as alternatives to dirt cover

Treated Auto Shredder Waste

Non-Putrescible C&D Material

Processed wood

Material Recovery Facility Fines

Imported Soil

Solidified Septic Liquid Waste

Crushed or Ground Concrete

Greenwaste

When one of the alternative materials proposed for cover is to be utilized by Republic, specific information

regarding the material and its use will be submitted to SNHD prior to implementation.

Based on inspections by the SNHD, the continuous waste placement operations for control of vectors will

be assessed. If additional operating criteria or revisions to the existing operations are identified to

increase the control of vectors, Republic will work with SNHD to implement additional controls or revise

operations as necessary.

4.14.1.1.3 Waiver

A waiver of cover requirements is not requested at this time, but Republic reserves the right to seek a

waiver in case of extreme conditions. The waiver being requested for the interim one percent slopes is

provided in Tab 10.17

4.14.1.1.4 Interim Cover

A minimum of 12 inches of soil will be in place to function as intermediate cover over areas that will not

receive waste for more than 90 days.

4.14.1.1.5 Integrity of Daily and Intermediate Cover

Cover in operating areas is monitored and deficient areas are repaired immediately.

Page 233: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

20 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

4.14.1.1.6 Grade Daily and Temporary Cover

Republic is requesting that interim refuse slopes used for unloading of waste be constructed with a

minimum slope of one percent refer to section 4.15.1.1.3. The requested one percent slopes facilitate the

safe operation of tippers (hydraulic systems that empty transfer trucks by raising the front end of the

transfer trailer to an approximate 45 degree angle with the ground surface). Slopes steeper than one

percent can create dangerous situation where the tippers, when extended, can become unstable. Utilizing

a one percent slope reduces this potential significantly while still maintaining surface water runoff control.

All final slopes will have a minimum slope of 3%.

4.14.1.1.7 Operating Day

“Continuous operation” means that at all times throughout each 24-hour period:

1) Waste is being received, placed, spread or compacted on the working surface of the site; and

2) At least one piece of heavy equipment is operating on the working surface of the site to spread or

compact the waste.

A request for approval of current operating procedures was made by Republic to the SNHD on November

1, 1999 and was subsequently approved.

4.14.2 Landfill Gas Control

LFG is drawn from vertical and horizontal wells up to 300 feet deep that tie into a header system that

conveys the LFG to the H2S removal system treat sulfur content. The LFG collection system consists of

vertical wells drilled through the waste and horizontal collectors that are installed during waste placement.

These collection systems are maintained under vacuum from a blower to convey the LFG to the

appropriate control technology. The vertical well and horizontal collectors are monitored monthly for flow

rate, temperature and methane content to determine the effectiveness of the extraction systems. From

the data collected, adjustments are made to the collection system to optimize collection.

The H2S facility is an enclosed building approximately 8,000 square feet equipped with H2S removal

equipment that is used to pretreat the LFG prior to combustion in turbines used to create electricity. The

elemental sulfur collected in the process will either be disposed of in the landfill or sold as a product

The electricity plant, located on 1.5 acres in the southwestern corner of the site, uses the treated LFG to

fuel two Solar Centaur 60 combustion turbines manufactured by Solar Turbines, a subsidiary of

Caterpillar Inc. LFG from the H2S treatment facility is filtered for moisture and particulates then is

compressed and injected into 5.5-megawatt air-cooled turbines that generate electricity. Emissions are

treated by a selective catalytic reduction process that removes harmful nitrogen oxides from the exhaust

plume.

Page 234: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

21 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

As the landfill continues to expand, the energy production facility will also expand. The LFG flare is still in

place and is used for emergencies or to combust LFG collected beyond the capacity of the engines. All

LFG that is collected for disposal is permitted under Federal New Source Performance Standards.

Construction and operations of any control facility will have all proper local, state and federal permits prior

to operation.

Methane monitoring meters are located in the scalehouse, operations trailer, and the site operations

building. The combustible gas monitors are manufactured by Sierra Monitor Corporation. The H2S facility

also has a methane monitoring mere that is a sophisticated system is connected with the fire suppression

system. According to EPA's RCRA regulations, owners and operators of landfills subject to monitoring

requirements must ensure that the concentration of methane gas does not exceed 25% of the LEL for

methane (1.25% by volume) in indoor air samples collected in the facilities' structures.

4.14.2.1 Composting

Composting may be proposed for the site in the future. If proposed, a supplemental plan will be prepared

and submitted for review and approval prior to composting operations beginning.

4.14.3 Process Flow

In general, refuse brought to the site for disposal proceeds through the following steps:

1. Load checking occurs at the transfer stations for all transfer trailers.

2. One percent of Third-party Haul trucks are inspected at the scale house for prohibited wastes.

3. If prohibited wastes are found, that trucks are directed to a proper disposal facility.

4. If no prohibited wastes are found, haul trucks are weighed and directed to the appropriate refuse disposal area.

5. Haul trucks follow the assigned roads (designated by signage) to the active face of the landfill.

6. Landfill personnel direct the truck to a designated dumping area.

7. Haul trucks deposit refuse at the active face.

8. Dozers and compactors spread the waste in thin lifts over previously placed waste.

9. Soil or additional refuse is placed over the top depending on the grade at which the refuse was placed, i.e. is the active area to final grade or intermediate grade.

In general, special waste brought to the site for disposal proceeds through the following steps (refer to the

Special Waste Management, Policies and Procedures Manual in Tab 10.7 and the Special Waste

Handling Procedures in Tab 10.11 for additional information):

1. Haul trucks are inspected at the scale house for prohibited wastes.

2. If prohibited wastes are found, that trucks are directed to a proper disposal facility.

3. If no prohibited wastes are found, haul trucks are weighed and directed to the appropriate refuse disposal area.

4. Haul trucks follow the assigned roads (designated by signage) to the active face of the landfill.

Page 235: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

22 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

5. Landfill personnel direct the truck to a designated dumping area.

6. Haul trucks deposit special waste at the designated disposal area.

7. Republic personnel record latitude, longitude and the elevation of waste disposal.

8. Dozers and compactors spread the waste in thin lifts.

9. Soil is placed over the top of the waste.

In general, sewage sludge brought to the site for disposal proceeds through the following steps:

1. Haul trucks are inspected at the scale house for prohibited wastes.

2. If prohibited wastes are found, that trucks are directed to a proper disposal facility.

3. If no prohibited wastes are found, haul trucks are weighed and directed to the appropriate sewage sludge processing area.

4. Haul trucks follow the assigned roads (designated by signage) to the sludge processing area of the landfill to reduce moisture content.

5. Haul trucks deposit sludge at the active working face for disposal.

In general, household hazardous waste brought to the site for collection proceeds through the following

steps:

1. Every haul truck is inspected at the scale house for prohibited wastes.

2. If prohibited wastes are found, that trucks are directed to a proper disposal facility.

3. If no prohibited wastes are found, haul trucks are weighed and directed to the appropriate collection area.

4. Haul trucks follow the assigned roads (designated by signage) to the collection area.

5. Landfill personnel collect and store household hazardous waste according to regulatory requirements. If

6. Household hazardous wastes are collected by outside vendors on an as needed basis.

In general, septic waste brought to the site for disposal proceeds through the following steps:

1. Haul trucks are inspected at the scale house for prohibited wastes.

2. If prohibited wastes are found, that trucks are directed to a proper disposal facility.

3. If no prohibited wastes are found, haul trucks are weighed and directed to the appropriate septic waste processing area.

4. Haul trucks follow the assigned roads (designated by signage) to the septic waste processing area of the landfill to reduce moisture content.

5. Haul trucks deposit septic waste at the designated processing area.

6. Sludge is processed by mixing it with soils and other inert wastes using dozers and other heavy equipment.

7. Processed septic waste is disposed of in the landfill.

Process flow diagrams are presented in Tab 8.11, Figures 11-1 through 11-5 for Refuse Disposal, Special

Waste Disposal, Sewage Sludge Disposal, Household Hazardous Waste Disposal and Septic Treatment.

Figure 6 located in Tab 8.6 provides the location of site facilities. The septic processing areas are

currently located south of the active disposal area.

Page 236: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

23 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

4.15 Water Protection

4.15.1 Industrial Waste Drainage Control

The site operates a bioremediation facility and a liquid solidification area at the site permitted under the

Nevada Division of Environmental Protection (NEV93011); refer to Tab 3.10. This permit authorizes the

site to treat non-hazardous petroleum contaminated liquids through the bioremediation facility and

nonhazardous and non-petroleum contaminated liquids through the liquid solidification area. The permit

also allows for disposal of petroleum contaminated soils. Treated material is disposed in the Apex Landfill.

The permit for this facility requires containment of the 25-yr, 24-hour storm and must be able to withstand

the 100-yr, 24-hour storm event. The facility has been designed to meet these standards. The facility is

operated to control odors and is maintained in good working order.

Petroleum contaminated waste water that is brought on site for disposal at the bioremediation facility is

discharged into one of ten double lined (second liner provides secondary containment) evaporation

ponds. The ponds are considered one continuous unit because the liner system is continuous throughout

the pond area with earthen berms separating the individual cells beneath the liner system. Petroleum

contaminated waste water disposed of is evaporated and any residuals are disposed of within the landfill.

The bioremediation facility encompasses approximately 7.5 acres and is located north of the

administration/maintenance building.

The liquid solidification area treats nonhazardous and nonpetroleum liquid wastes. These wastes are

deposited on a mixing floor and soil, sawdust, or other nonhazardous materials are mixed with the liquids

to reduce the moisture content. Once the moisture content is below 50% the resulting mixture is disposed

of in the landfill. The liquid solidification area is located south of MA 21, refer to figure 6 and Tab 8.6.

The Apex Regional Landfill maintains the following permits/authorizations, copies of which are available in

Tab 3, relating to industrial waste drainage:

Non Transient Non Community Groundwater Water System – From the Division of Environmental Protection Bureau of Safe Drinking Water. Permit #CL-0379-12NTNC

The Landfill is authorized by the Nevada Division of Environmental Protection to operate the Apex Bioremediation Facility for the treatment of non-hazardous petroleum contaminated soil and water, Permit Number NEV93011. Treated material is disposed of or used for cover in Apex Landfill

The Landfill is also authorized by the Nevada Division of Environmental Protection to operate leachate holding tanks, Permit Number NEV2011510

Bureau of Water Pollution Control Permit Number NEV95010 – Groundwater Permit for the Apex Maintenance Building and Scale House. For treatment of wastewater from washing vehicles and the building interior; the Scale House septic system leachfield; and Maintenance building septic system leachfield

Page 237: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

24 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

4.15.2 Leachate Control

Tab 16.1 presents the asbuilt and proposed base grades for the landfill along with the existing and

proposed leachate collection and removal system. Tab 16.3 contains the Operations and Maintenance

Manual for On-Site Storage Tanks that presents the leachate pumping and storage system for the entire

site. The asbuilt base grades were taken from the Construction Quality Assurance (CQA) Reports

prepared for each module that have been constructed and compiled into one drawing. Each of the CQA

Reports was stamped by a Nevada registered engineer certifying that they were constructed in

conformance with the approved construction plans and specifications.

Leachate drains through the Select Fill layer across the floor of the landfill on top of the geomembrane

liner until it intercepts collection trenches. These trenches consist of one foot deep v-ditches filled with

highly permeable drainage gravel that surrounds a perforated HPDE pipe. These v-ditches with the pipe

and surrounding gravel are sloped to convey leachate to dedicated sumps for extraction. Material

properties for the Select Fill and Gravel Fill are specified in the technical specifications for each cells

design. Soil permeability and pipe spacing are designed to limit leachate build-up over the geomembrane

below one foot. Minimum base slopes are 2 percent with a minimum 2 percent slope along drainage pipe

segments. Two existing sumps area located in MA-7 and MA-10, however leachate collected in the MA-

10 sump gravity drains to the MA-7 sump for extraction. Sumps are also proposed in the future MA-12

area and in MA-14 in the southeast corner of MA-East.

MA-0 through MA- 5 drain to a leachate tank in the northwest corner of MA-0 and will drain to the sump

in MA-26 once constructed. Leachate from this tank is pumped to the two 22,500 gallon tanks located

north of H2S facility. Leachate from these tanks is used for dust control or pumped to the solidification

ponds for evaporation.

Cell MA-21 gravity drains to a dedicated sump within the cell. Water trucks evacuate the leachate from

this sump daily and use it as dust control.

Leachate collected in the MA-7 sump (MA– 6 through MA–10) is currently pumped to three 6,500 gallon

tanks with secondary containment located near the northwest corner of MA-10. Water trucks evacuate the

tanks on a consistent basis and use it as dust control. In the future, a solar powered automatic pumping

system will be used to pump the leachate to the tanks located in the Northeast corner of MA–10. A gravity

outlet pipe from the tanks enables water pulls or water trucks to load the leachate from overhead for use

as dust control on site. The tank area and loading area has been constructed with secondary containment

consisting of an HDPE geomembrane covered with an appropriate amount of soil to protect it from

damage. An HDPE pipe will is booted through the secondary containment liner and connected to the

LCRS riser pipe in the northeast corner of MA-10. This provides a gravity drainage point for any leaked or

spilled leachate in the tank storage area. Refer to Tab 16, Drawings 1-4. The current and future pumps

Page 238: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

25 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

are and will be actuated with pressure transducers that are set to turn the pump on when the sump is

filled to a point where the head over the liner is just below one foot.

Leachate generated within the previously permitted Class III IA – 1, 2 gravity flows into the Class I MA –

21 leachate collection system. The liner systems of these two areas were connected during the

construction of MA – 21.

Other sumps are planned for MA-20, MA-27, MA-28-29, MA-30-31, MA-32 and two sumps in MA-north for

a total of 12 sumps for the entire site at closure.

The Apex Regional Landfill is not located within 1,000 feet of any naturally occurring surface water.

Based on the hydrogeologic investigations performed at the site by Vector Engineering and groundwater

monitoring well information, the uppermost aquifer ranges from 400 to 500 feet below ground surface

(Design Report, Vector Engineering, March 1997). The Apex Regional Landfill satisfies both the distance

to surface water and the uppermost aquifer requirements.

New solid waste landfill units must meet the Design Criteria of NAC 444.681 that requires a composite

liner or "a design approved by the solid waste management authority that is sufficient to protect the

waters of the State from degradation by pollutants or contaminates." A design consisting of a

geomembrane over a 6-inch thick bedding layer was approved by the Southern Nevada District Board of

Health on March 22, 1994. This same approval allowed for no liner to be placed on slopes 2:1 or steeper.

As required by NAC 444.681(2) the approval was based on the consideration of hydrogeologic

characteristics, climate and leachate characteristics.

The hydrogeologic characteristics and climate remain unchanged from the original alternative liner

demonstration. Now that the landfill has been operating for over 18 years, the amount of leachate

collected has been updated. The leachate production averages approximately 40 to 50 gallons per acre

per day (gpad). This average is sometimes exceeded during the winter months when heavy storms

infiltrate into the LCRS of partially filled cells. This condition is not common and is not an indication of

average leachate flows at the site. Based on the leakage evaluation methods presented by Vector, this

amount of leachate can still be considered negligible in the landfill and is anticipated to decrease over

time and cells are brought to final grade and closed. Based on the earlier Vector evaluation, updated site

information, and approval from the SNHD the previously approved alternative liner has been used for all

of MA-East cells constructed to date.

A copy of the Leachate Management Plan is presented in Tab 16.4.

Page 239: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

26 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

4.15.3 Run-On and Run-Off Control

Stormwater controls are designed as cells are constructed and final grades are achieved at the landfill. A

master drainage plan that calculates flows and sizes pipes and ditches has not been completed to date

due to the service life of the landfill, estimated at greater than 200 years, and the potential for changes to

take place to the landfill configuration over the next 50 to 100 years. The current active area, MA-East,

storm water control system has been designed to discharge storm water flow from the southern facing

slope into the southern retention basins. All storm water that will fall on the northern slopes of MA-East

will be collected and discharge to the wash area to the north of the landfill.

Stormwater retention basins are also planned for the southern limit of the landfill along MA-27 and MA-28.

These basins would function in the same manner as the permitted MA-East basins. These basins are

planned to be designed and permitted as the site develops over time.

The MA-South, MA-West and MA-North areas planned for refuse disposal are planned to be constructed

with 3:1 (horizontal to vertical) slopes with 20-foot wide benches placed every 50 vertical feet or as

needed for access and to limit erosion. The benches will convey storm water to dedicated pipe

downdrains. These downdrains will transport the storm water down the slopes to the base of the landfill

and discharge it to a perimeter storm water control ditch located along the perimeter access road.

Stormwater will travel in dedicated ditches along the perimeter access road to low points where it will

discharge to natural drainage ways surrounding the site. The size and type of ditch lining will be

determined as the site expands. Refer to Tab 8.13, Figure 13 and 14 for the current and proposed storm

water drainage plan for the site respectively. As the site develops a new disposal areas are constructed

updated drainage plans will be submitted to the SNHD for review and approval at the time the design

plans are submitted.

4.15.3.1 Permitted Retention Basins

The permitted retention basins located along the southern perimeter of MA-East have been designed

utilizing the Army Corp of Engineers, HEC-HMS modeling program. The basins were sized to

accommodate the flow from a 500-yr, 24-hr storm event followed by a 25-yr, 24-hr storm event. This

conservative design criterion was selected to eliminate the need for permanent spillways. It should also

be noted that once the waste in the MA-East area is filled above the top of the retention basin berm, there

is no potential for overflow from the basin areas even from a Probable Maximum Precipitation event. Dam

permits are included in Tab 3.9.

4.15.3.2 Design Storm

The procedures listed in the Clark County Regional Flood Control District (CCRFCD) Hydrologic Criteria

and Drainage Design Manual (August 1999) have been used to determine the appropriate design storm

depth and distribution for the design of drainage structures at the Apex Regional Landfill. The basis for

Page 240: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

27 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

hydrological analysis of the proposed design storm is the durations and frequencies of storms as listed in

the Precipitation Frequency Atlas of the Western United States - Volume VII-Nevada as required by NAC

444.6885, with an adjustment required by CCRFCD to account for more recent storm data. However, the

design storm was modified slightly following procedures developed for the nearby Sunrise Mountain

Landfill in Las Vegas, Nevada (EMCON, 1999). This modification effectively increases the intensities of

shorter duration intervals within the storm, while maintaining the design storm depth.

The Army Corps of Engineers HEC-HMS precipitation model, a widely accepted standard for hydrological

modeling, uses the precipitation depths stated in the table below to simulate the 25-year and 500-year

storms. The 25-year storm is used to size drainage improvements per NAC regulations. The 500-year

storm was used to size the retention basins. The table also compares the design storm to maximum

precipitation depths observed in the Las Vegas vicinity.

TABLE 3 - DESIGN STORM

25-yr, 24-hr storm 500-yr, 24-hr storm Observed precipitation maxima near Las Vegas

Duration Depth (in) Duration Depth (in) Duration Depth (in)

5 min 0.54 5 min 0.98 5 min 0.50

15 min 1.06 15 min 1.87 15 min 1.34

1 hr 1.86 1 hr 3.26 1 hr 2.56

2 hr 2.03 2 hr 3.67 2 hr 2.96

3 hr 2.15 3 hr 3.83 3 hr 2.96

6 hr 2.37 6 hr 4.32 6 hr no data

12 hr 2.37 12 hr 4.32 12 hr no data

24 hr 2.37 24 hr 4.32 24 hr 3.72

4.15.3.3 Detention Basin

The primary run-on controls for MA-East are the detention basins south of the landfill area. Shaw

Environmental Inc. (Shaw) designed two retention basins to accommodate a 500-year, 24-hour storm

followed by a 25-year, 24-hour storm. These retention basins have been designed to accommodate both

run-on from off-site areas and run-off from the south side of the landfill. Both retention basins are located

at the toe of the south side of the landfill and both basins take advantage of the existing contours to

reduce the amount of excavation and earthfill. No earthwork is required outside the property boundaries

of the Apex landfill.

The retention basins were configured so that the initial storage was set to zero (empty), storage

capacities were entered for elevations every 10 feet, and the outflow was specified to be zero (no outlet).

In the case of the 500-year storm followed by the 25-year storm, the final storage in the retention basin

due to the 500-year storm was entered as the initial storage of the retention basin, and the model was

Page 241: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

28 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

then re-run for a 25-year storm. No reduction in the stored volume due to evaporation or percolation from

the ponded water was included in the analysis.

The western retention basin has a storage capacity of 25.3 acre-feet (ac-ft), and the eastern basin has a

storage capacity of 278.7 ac-ft. Available capacities were determined based on criteria to maintain the

water surface below the perimeter road at the top of the berm. Under the 25-year storm event, the peak

storage for the western and eastern basins is 3.19 ac-ft and 74 ac-ft, respectively. For the worst case

500-year plus 25-year event, the peak storage is 10.3 ac-ft and 239.7 ac-ft; still below the ultimate basin

capacities. The earthfill berm along the south side of the landfill effectively creates basins large enough

to contain run-on from the worst-case design event.

The complete design of the basins is included in the “Submittal of Dam Application for Review by the

State of Nevada Department of Conservation and Natural Resources,” Shaw (February 13, 2007).

Future basins are proposed to be designed with similar design criteria and will be approved by the State

of Nevada Division of Water Resources.

Once refuse is placed in the area between IA-1/2 and MA-21, a depression will be created that will not

have an outlet. To remedy this situation, a plan for regrading this area has been developed to raise the

grades in the immediate area by placing earthfill and forcing the storm water that falls in this area to flow

to the existing retention basin to the east, Refer to Figure 10-3 in Tab 10.6. This grading will be completed

once the refuse slopes are in place and final cover is installed over the slopes.

4.15.4 Water Monitoring

Tab 17.1 includes a drawing which shows the location of groundwater monitoring wells and associated

boring logs. The groundwater monitoring program at the Apex Regional Landfill was established in

accordance with NAC 444.683 for Class I sites and incorporate the requirements of NAC 444.741 for

Class III sites. A copy of the approved groundwater monitoring plan is included in Tab 17.2.

The groundwater monitoring system at the Apex Regional Landfill consists of four wells permitted as

active production wells located and screened to provide groundwater samples from the uppermost water-

producing horizon.

One upgradient well (Well #6) is located at the south-central boundary of the landfill; two downgradient

wells (currently Wells #2 and #7) are located at the northern boundary of the existing waste fill, and one

farther downgradient (Well #5) at the northern limit of the landfill. Refer to Tab 17 for the location of the

wells and logs presenting the construction of the wells. The northerly groundwater gradient for the landfill

area is coincident with the regional flow direction. Based on the site hydrogeologic information acquired

during drilling, it is expected that water is sampled from fractured bedrock. The "aquifer" is a water-

Page 242: 2014 Apex Operations Plan-web Site-1

Apex Regional LandfillJune 2014

29 of 29 Tab 4 – Design Report Project No. 103-97145

n:\projects\_2010\103-97145 (apex 2010 services)\2014 op plan\tab 4 outline r11.docx June 18, 2014

bearing structural zone, probably hosted by limestone. Thickness of this producing zone is approximated

to range from 30 to 100 feet. Monitoring well yields range from 5 to 200 gallons per minute (gpm). Static

water levels are at depths greater than 450 feet, and, currently, the production zones sampled are at

depths greater than 700 feet. However, sampling intervals in all wells coincide with the uppermost

"aquifer" encountered.

Based on the available data, the four wells encounter the same source of water, regardless of the depth

below surface at which the first water-bearing zones were encountered. The shallowest water-bearing

zone in each well that produced usable quantities of water was screened and sampled. Because of this,

screened intervals are not at the same depth in upgradient and downgradient wells.

Samples are taken semiannually for testing and reports are submitted to the SNHD semiannually.