20130528 Adq Implementation Workshop 1d Aim Global Context

17
The European Organisation for the Safety of Air Navigatio 28 May 2013 AIM Global context ADQ Workshop Paul Bosman Manager SWIM/EA Unit, Agency focal point AIM. EUROCONTROL Chairman ICAO AIS-AIMSG

description

Eurocontrol

Transcript of 20130528 Adq Implementation Workshop 1d Aim Global Context

PowerPoint Presentation28 May 2013
AIM Global context
Chairman ICAO AIS-AIMSG
organisation’s representative
AIS-AIM Study Group
Global strategy/roadmap for the transition from AIS to AIM
SARPs/Guidance for a standard AICM/AIXM to enable global digital data exchange
Other material required to support AIM implementation
Participants
*
*
AIM implementation in EUR West region
*
Contribution of ADQ to AIS2AIM
AIM implementation in EUR West region
*
Applicability date 2010
Applicability date November 2013
*
*
*
New Quality Manual (Doc 9839)
New Training Manual (Doc 9991)
Update of Charting Manual (Doc 8697)
Update of eTOD/AMDB Guidance (Doc 9881)
Update of WGS84 Manual (Doc 9674)
Update of Public Usage of Internet (Doc 9855)
*
Data users vs Product users
Ch4 Data & Information scope
Ch5 Temporality and Distribution
Ch6 Services
PANS-AIM
SERVICE 1
SERVICE 2
SERVICE 3
ANNEX 15 SCOPE
States shall provide
- Aeronautical charts (see Anx 4)
- NOTAMs/SNOWTAMs/ASHTAMs/Summs/Chcklists
- PIBs
eAIP
- Thematic baseline data:
- AIP data set
significant
Examples
Prohibited, Restricted and
Geographic al, time window, data features,… Format (and structure)
Accessibility
*
*
*
Doc8126: +- 10% PANS-AIM
More tricky
Need to differentiate between data collection aspects and output data sets
Unlike aerodrome data, there is no companion DQR for data acquisition in other Annexes (4 and 11)
+- 50% stays in Annex 15, 50% go to PANS-AIM
*
*
*
ICAO to
Review NOTAM system - building from Digital NOTAM
States
Encouraged to impl quality processes from data origin onwards
Encouraged to impl (sub-)regional Db & digital data exchange
Review NOTAM proc, guidance & oversight
Industry
*
Anx 15 – ADQ : Two sides of the same coin
I.e. ADQ very much Eur impl of AIS2AIM Roadmap
>= Amdt 38
To be clarified : EASA Anx 15 transposition
See