2013-06-26HHI, TLDD TI Catch-Up Plan Presentation
Transcript of 2013-06-26HHI, TLDD TI Catch-Up Plan Presentation
-
7/30/2019 2013-06-26HHI, TLDD TI Catch-Up Plan Presentation
1/7
Petroleum Vietnam Gas CorporationPTSC Mechanical & Construction
1. Field Layout
-
7/30/2019 2013-06-26HHI, TLDD TI Catch-Up Plan Presentation
2/7
Petroleum Vietnam Gas CorporationPTSC Mechanical & Construction
2. Sequence of TL-DD Project
-
7/30/2019 2013-06-26HHI, TLDD TI Catch-Up Plan Presentation
3/7
Petroleum Vietnam Gas CorporationPTSC Mechanical & Construction
3. Schedule of Review (1/2)
-
7/30/2019 2013-06-26HHI, TLDD TI Catch-Up Plan Presentation
4/7
Petroleum Vietnam Gas CorporationPTSC Mechanical & Construction
3. Schedule of Review (2/2)
Description
Add . Weather Standby
HD-2500 Sch.
Star t Finish Dur .
Original
HD-2500 Sch.
Start Finish Dur.
MILESTONE
Start
HD-2500
Finish Dur.
DSV Sch.
Star t Finish Dur
Catch-up Plan
2013-08-12 2013-09-19 39.0
19 TL PLEM Installation
20 Flooding/Cleaning/Gauging from DD WHP(6/8/10")
21 Spool Install at DD PLEM~P/L from DD WHP(3 points)
22 Weather Standby 2013-08-12 2013-08-13 2.0
2013-08-02 2013-08-05 4.0
2013-08-06 2013-08-11 6.0
2013-07-30 2013-08-01 3.0
6.0
3.0
2013-08-05 4.0
2013-08-09 2013-08-10 2.0
2013-08-06 2013-08-08 3.0
2013-07-30 2013-08-01 3.02013-07-15
2013-07-20
2013-07-13
2013-07-25
2013-07-16 2013-07-19 4.0 2013-08-02
2013-08-16 2013-08-18 3.0
2013-08-19 2013-08-20 2.0
poo nsta at ~ rom po nts
24 Flooding/Cleaning/Gauging from TL PLEM(6")
25 Weather Standby
26 Spool Installation at TL PLEM(6")
27 Spool Installation at TL PLEM(12")
2013-08-22 2013-08-23 2.0
2013-08-24 2013-08-25 2.0
2013-08-18 2013-08-19 2.0
2013-08-20 2013-08-21 2.0
1 - -1 1 - -1 .
2.0
.
2013-08-15 2013-08-16
2.0
2.0 2013-08-17 2013-08-17 1.0
2013-08-18
2.0
1 - -11 1 - -1 .
2013-08-13 2013-08-14 2.02013-07-31
2013-08-022013-08-01
1 - - 1 - -
2013-08-04
2013-07-30
2013-08-03 2013-08-18 1.0
1 - - 1 1 - -
2013-08-23 2013-08-24
2013-08-25 2013-08-25
.
2.0
1.0
2013-08-26 2013-08-26 1.0
28 Weather Standby
29 DD WHP Topside Installation
30 Spool Installation at DD WHP(6"/8"/10")
31 Weather Standby
2013-09-01 2013-09-05 5.0
2013-09-06 2013-09-06 1.0
2013-08-26 2013-08-27 2.0
2013-08-28 2013-08-31 4.04.0
5.0 2013-08-25 2013-08-27 3.0
2013-08-24 4.02013-08-05
2013-08-28 2013-08-28 1.0
2013-08-212013-08-08
2013-08-09 2013-08-13
1.0
2013-08-27 2013-08-28 2.02013-08-19 2013-08-20 2.0
2013-08-29 2013-08-30
2013-08-31 2013-08-31
2.0
32 PLET Installation33 Spool Installation at PLET(6")
34 H/Test for 6" P/L from TL PLEM to PLET
35 H/Test for 6"/8"/10" P/L DD WHP~DD PLEM~TL WHP
36 H/Test from TL WHP to TL PLEM 2013-09-22 2013-09-24 3.0
2013-09-11 2013-09-12 2.0
2013-09-13 2013-09-21 9.0
2013-09-07 2013-09-08 2.02013-09-09 2013-09-10 2.0
2013-08-29 2013-08-302.02.0 2013-08-31 2013-08-31 1.0
2013-08-19
2013-08-20 2013-08-28
2013-08-16
2013-08-29
2013-08-172.02013-08-14 2013-08-15
2013-08-18 2.0
9.0
3.02013-08-31
1.0
2.0
9.0
2013-09-01
2013-09-13 2013-09-15
2013-09-01
2013-09-02 2013-09-03
2013-09-04 2013-09-12
3.0
Demo Customs Clearance 2013-09-25 2013-09-25 1.0 2013-09-01 2013-09-01 1.02013-09-01 2013-09-01 1.0 2013-09-19 4.02013-09-16
-
7/30/2019 2013-06-26HHI, TLDD TI Catch-Up Plan Presentation
5/7
Petroleum Vietnam Gas CorporationPTSC Mechanical & Construction
4. Schedule (Catch-up Plan)
Note : In case of weather standby 14 days from 21st of June.
1 5 10 15 20 25 30 1 5 10 15 20 25 30 1 5 10 15 20 25 30 1 5 10 15 20 25 30
5 31
J une J uly Aug SepCase SpreadNo.
5 24
Original1
2
HD-2500
Add.
WeatherHD-2500
1 Weather impact is 8 days so far
Catch-up3-
+DSV
1. Weather impact is 8 days so far2. Assume 14 days as further weather impact, completion date is 24-Sep3. Reduce 10 days when DSV is mobilized4. Diving team of DSV will be bolting after HD-2500 put seabed with spool assembly5. Additional catch-up will be tried by HD-2500 operating simultaneously (spool measuring andl bl ) t l i t ll ti itipool assembly) at spool installation position
-
7/30/2019 2013-06-26HHI, TLDD TI Catch-Up Plan Presentation
6/7
Petroleum Vietnam Gas CorporationPTSC Mechanical & Construction
5. Progress & Delay Status
5 10 15 20 25 30 5 10
Plan 5-J un 7-J un
Actual 5-J un 9-J un
Plan 8-J un 10-J unTL~DD PLEM (8" x 14.3 x 3.1 km)
TL~DD PLEM (6" x 12.7 x 3.05 km)
Description Start FinishJune July
- -
Plan 11-J un 14-J un
Actual 21-Jun 24-Jun
Plan 15-J un 17-J un
Actual 27-Jun 29-JunPipelaying DD~DD PLEM (8" x 14.3 x 2.88 km)
DD~DD PLEM (6" x 12.7 x 2.68 km)
- -
Actual 30-J ul 2-J ul
Plan 21-J un 23-J un
Actual 4-J ul 6-J ul
Plan 24-J un 25-J un8-Jul
- -TL PLEM~PLET(6" x 12.7 x 0.8 km)
TL~TL PLEM(12" x 19.1 x 2.77 km)
DD~DD PLEM(10" x 12.7 x 2.53 km)
15
Delayed
5
10
Delayed
0
Delayed
Period
Weather
Standby
Welding
Repair
Others
-
7/30/2019 2013-06-26HHI, TLDD TI Catch-Up Plan Presentation
7/7
Petroleum Vietnam Gas CorporationPTSC Mechanical & Construction
6. Spool Lowering