2011 ced capacitors

168
Capacitors Dominik Pieniazek, P.E. – VI Engineering, LLC Nicholas A. Losito Jr. – Castle Power Solutions, LLC

Transcript of 2011 ced capacitors

Page 1: 2011 ced capacitors

Capacitors

Dominik Pieniazek, P.E. – VI Engineering, LLCNicholas A. Losito Jr. – Castle Power Solutions, LLC

Page 2: 2011 ced capacitors

Outline

Day 1Day 1• Basic Power Calculations• Capacitor Fundamentals• Capacitor Ratings• Capacitor Application• Capacitor ProtectionpDay 2• Harmonics• Capacitor Bank Design Considerations• Capacitor Bank Design Considerations

Page 3: 2011 ced capacitors

Shunt Capacitors• Medium Voltage• Substation Applicationspp• Power Factor Correction

Page 4: 2011 ced capacitors

Basic Power Calculations

Page 5: 2011 ced capacitors

Basic Power Calculations

C Q tiCommon Questions:

What are VARs?Wh d b t VAR ?Why do we care about VARs?

Page 6: 2011 ced capacitors

Basic Power Calculations

Most plant loads (motors, transformers, etc) are INDUCTIVE and require a magnetic field to operate. The magnetic field is necessary, but produces NO USEFUL WORK. The utility must supply the power to produce the magnetic field and themust supply the power to produce the magnetic field and the power to produce USEFUL work.

The ACTIVE component produces the USEFUL work, the REACTIVE component produces the magnetic field.

Page 7: 2011 ced capacitors

Basic Power Calculations

An analogy that

VAR

gymost can understand.

Mugi f i

VA

Capacity of equipment (i.e. xfmr, cable, swgr, etc)

Beer

W

eeStuff that you want

Foam (Head)St ff hi h tStuff which prevents you from maximizing the amount of beer that you get

Page 8: 2011 ced capacitors

Basic Power Calculations

f lV: Reference voltageIR: Resistive loadIL: Inductive loadI : Capacitive loadIC: Capacitive load

Page 9: 2011 ced capacitors

Basic Power Calculations

VrefIres

Power = Re(V I*)

Page 10: 2011 ced capacitors

Basic Power Calculations

VrefIlag

Note that due to phase shift (30 degrees) only 86.66% of current is applied to calculate work. Power = Re(V I*)

Page 11: 2011 ced capacitors

Basic Power Calculations

VrefIlead

Regardless whether leading or lagging, power calculation yields similar resultsPower = Re(V I*)

Page 12: 2011 ced capacitors

Basic Power Calculations

VrefI90

In the case where current leads or lags the voltage by 90 degrees, P = 0Power = Re(V I*)

Page 13: 2011 ced capacitors

Basic Power Calculations

Power Factor [ PF ] = Cos = P / S

S (kVA)

Q (kVAR)

P (W)Power Triangle

The relationship between S, P, and Q. This figure represents a lagging power factor. If Q is negative, leading power factor.

g

Page 14: 2011 ced capacitors

Basic Power Calculations

So how do we know if our current is lagging or leadingcurrent is lagging or leading the voltage, and what can we do to correct it?do to correct it?

Consider this exampleConsider this example,

Page 15: 2011 ced capacitors

Basic Power Calculations

Incoming service is at

5500 kW3400 kVAR

g99.5% capacity

6466 kVA

2000 kW 1000 kW 2500 kW1000 kVAR 800 kVAR 1600 kVAR

Page 16: 2011 ced capacitors

Basic Power Calculations

Power Factor [ PF ] = Cos = P / S0.85 lag

S (kVA)

g

Q (kVAR)3400 kVAR

31.8 deg

P (W)Power Triangle

5500 kW g

Even though our facility require only 5500 kW to perform Real Work, our incoming service must be sized for 6466 kVA.

Page 17: 2011 ced capacitors

Basic Power CalculationsWe have a 6500 kVA mugthat is holding 5500 kWand 3400 kVAR.

VAR

VA

W

With the existing configurationthe facility cannot add any loadsy ywithout upgrading the incoming service.

Page 18: 2011 ced capacitors

Basic Power Calculations

Incoming service is at

5500 kW0 kVAR

g85% capacity

5500 kVA

3400 kVAR

2000 kW 1000 kW 2500 kW1000 kVAR 800 kVAR 1600 kVAR

Page 19: 2011 ced capacitors

Basic Power Calculations

Power Factor [ PF ] = Cos = P / S1.0 unity

S (kVA)

y

Q (kVAR)0 kVAR

0 deg

P (W)Power Triangle

5500 kW g

The cap bank is providing 3400 kVAR, so our service is now providing only 5500 kVA (reduction from 6466 kVA.

Page 20: 2011 ced capacitors

Basic Power Calculations

1,500 kVA

COS [ ] = 0.67COS [ ] = 0.95

Q2 = Q1 + Qc Q1 = 1,118 kVAR

1 000 kW

1,053 kVA

Q2 = 330 kVAR 1,000 kWQ

Qc = 788 kVARRequired Apparent Power

Before and AfterAdding a Power Capacitor Bank

An example of how to calculate the size of a cap bank based on a target power factor

Page 21: 2011 ced capacitors

Basic Power Calculations

But wait, there’s more….

Page 22: 2011 ced capacitors

Basic Power Calculations

Odds are that the utility is

5500 kW3400 kVAR

ycharging you for penalties for a low power factor.

6466 kVA55006466

= 0.85

Typically, penalties are applied for power factor lessapplied for power factor less than 0.95%.

2000 kW 1000 kW 2500 kW1000 kVAR 800 kVAR 1600 kVAR

Page 23: 2011 ced capacitors

Basic Power Calculations

There are also voltage

5500 kW3400 kVAR

gconsiderations.

Assuming typical values:6466 kVA

Assuming typical values: Source impedance = 9% at 6500 kVAVolt Drop = 5.8%

The expected voltage drop atthe main bus will be close to6%!

2000 kW 1000 kW 2500 kW1000 kVAR 800 kVAR 1600 kVAR

Page 24: 2011 ced capacitors

Basic Power CalculationsCapacitor bank reduces the voltage drop at main bus

5500 kW0 kVAR

voltage drop at main busby 5%!

5500 kVA

Volt Drop = 1.0%

3400 kVAR

2000 kW 1000 kW 2500 kW1000 kVAR 800 kVAR 1600 kVAR

Page 25: 2011 ced capacitors

Basic Power CalculationsNote that the capacitor bank can also raise the bus voltage

5500 kW-1600 kVAR

gabove the nominal value.

5728 kVA

Volt Drop = -1.5%

5000 kVAR

2000 kW 1000 kW 2500 kW1000 kVAR 800 kVAR 1600 kVAR

Page 26: 2011 ced capacitors

Basic Power CalculationsThe voltage continues to riseif the capacitor bank remains

3000 kW-3200 kVAR

pconnected and the load is reduced.

4386 kVA

Volt Drop = -3.6%

5000 kVAR

Out of service

2000 kW 1000 kW 0 kW1000 kVAR 800 kVAR 0 kVAR

Page 27: 2011 ced capacitors

Capacitor Fundamentals

Page 28: 2011 ced capacitors

Capacitor Fundamentals

C = eo A / d for a parallel plate capacitor, where eo is the permittivity of the insulating material (dielectric) obetween plates.

Page 29: 2011 ced capacitors

Capacitor Fundamentals

We recall that we can add series capacitances to

1 / C = 1 / C1 + 1 / C2

We recall that we can add series capacitances to obtain an equivalent capacitance.

1 / Ceq 1 / C1 + 1 / C2

Page 30: 2011 ced capacitors

Capacitor Fundamentals

Similarly, we can add parallel capacitances to obtain an equivalent capacitance.

Ceq = C1 + C2

Page 31: 2011 ced capacitors

Capacitor Fundamentals…but we typically do not have much use for capacitance values. So we convert capacitance to impedance:So we convert capacitance to impedance:

fCCXC 2

11

fCCC 2

Page 32: 2011 ced capacitors

Capacitor Fundamentals

cjXRZ

cjXRZ

CXZ

VZ2

XVS

2

S CX

Page 33: 2011 ced capacitors

Capacitor Fundamentals

1000*][][2

kVVkVARS 000

][][

ZkVS

Example:Example:The capacitance of a capacitor is 6.22 F and the nameplate voltage is 8000 V. Calculate the power rating.

][7.426)1022.6)(60)(14.3(2

16 x

XC

][150000,17.426

)8( 2

kVARS

Page 34: 2011 ced capacitors

Capacitor Fundamentals

Page 35: 2011 ced capacitors

Capacitor Fundamentals

Page 36: 2011 ced capacitors

Capacitor Fundamentals

Page 37: 2011 ced capacitors

Capacitor Fundamentals

Page 38: 2011 ced capacitors

Capacitor Fundamentals

Page 39: 2011 ced capacitors

Capacitor FundamentalsNote that IEEE Std 18 requires the discharge

Discharge resistor

requires the discharge resistor to reduce the terminal voltage to 50 V in th ti f ifi dthe time frame as specified in the table below.

Page 40: 2011 ced capacitors

Capacitor Ratings

Page 41: 2011 ced capacitors

Capacitor Ratings

Medium voltage capacitors are available in many different stylesMedium-voltage capacitors are available in many different styles. The main points of differentiation are listed below:

• Voltage rating• kVAR rating• Single bushing or dual bushingg g g• Internally fused, externally fused, or fuseless

Page 42: 2011 ced capacitors

Capacitor Ratings

IEEE 81 defines the ratings for capacitorsIEEE 81 defines the ratings for capacitors

• Voltage, rms (terminal to terminal)• Terminal-to-case (or ground) insulation class• Reactive power• Number of phasesp• Frequency

Page 43: 2011 ced capacitors

Capacitor Ratings

IEEE 18 provides capacitor tolerancesIEEE 18 provides capacitor tolerances• The capacitance shall not vary more than -0% to +10% of

nominal value based on rated kVAR, voltage, and frequency measured at 25 deg C.

This means that a new 150 kVAR unit can range anywhere from g y150 kVAR to 165 kVAR.

Page 44: 2011 ced capacitors

Capacitor Ratings

IEEE 18 states the capacitor is intended to operate at or belowIEEE 18 states the capacitor is intended to operate at or below rated voltage. Capacitors shall be capable of continuous operation given that none of the following limitations are exceeded: • 110% of rated rms voltage (temporary overvoltage parameters

will be discussed later))• 120% of peak voltage, including harmonics but excluding

transients• 135% of nominal rms current based on rated kVAR and rated• 135% of nominal rms current based on rated kVAR and rated

voltage• 135% of rated kVAR

Page 45: 2011 ced capacitors

Capacitor Ratings

* Impulse tests shall be applied between terminals and case, with the terminals connected together. For capacitorshaving bushings with two different BIL ratings, this test shall be based on the bushing with the lowerBIL. The nameplate shall show both BIL ratings, e.g. 150/95 kV BIL.

** Not applicable to indoor ratings

Page 46: 2011 ced capacitors

Capacitor Application

Page 47: 2011 ced capacitors

Capacitor Application

Power factor correction capacitor banks are typically installed inPower factor correction capacitor banks are typically installed in the following ways :

• Pole top• Metal-Enclosed / Pad-Mount• Open rackOpe ac• Terminal end at equipment

Page 48: 2011 ced capacitors

Capacitor Application

P l T I t ll tiPole Top Installation

Page 49: 2011 ced capacitors

Capacitor Application

Transient inrush reactors

P l T I t ll tiPole Top Installation

Page 50: 2011 ced capacitors

Capacitor Application

Pad Mounted InstallationPad-Mounted Installation

Page 51: 2011 ced capacitors

Capacitor Application

Metal-Enclosed Substation InstallationMetal Enclosed Substation Installation

Page 52: 2011 ced capacitors

Capacitor Application

Three-phase iron core harmonic filter reactor

Metal-Enclosed Substation Installation

harmonic filter reactor

Metal Enclosed Substation Installation

Page 53: 2011 ced capacitors

Capacitor Application

Open Rack, Medium-Voltage Substation Installation

Page 54: 2011 ced capacitors

Capacitor Application

Open Rack, High-Voltage Substation Installation

Page 55: 2011 ced capacitors

Capacitor Application

Installation in Equipment

Page 56: 2011 ced capacitors

Capacitor Application

Power factor correction capacitor banks can be configured in thePower factor correction capacitor banks can be configured in the following ways :

• Delta • Wye - Solidly Grounded• Wye - Ungroundedy g

A common misconception is that the capacitor bank should be connected Delta since it is being applied to a delta or highconnected Delta since it is being applied to a delta or high-impedance grounded system. This is NOT true.

Page 57: 2011 ced capacitors

Capacitor Application

The driving factor which determine the configuration for the given application is COST.

Voltage considerationsVoltage considerations

IEEE 1036 suggests that only banks rated 2400 V and below should be Delta connected This is mainly because standardshould be Delta connected. This is mainly because standard voltage ratings for wye connected banks may not be available.

Cost of phase-to-phase vs phase-to-neutral rated capacitors at higher voltages tends to point installations towards wye connected banks for larger bank installations.connected banks for larger bank installations.

Page 58: 2011 ced capacitors

Capacitor Application

DeltaLower voltages (<= 2400 V)• Standard capacitors are typically not available at 1380 V

Distribution systems (pole top)• Units are configured with a single series group of capacitors

with capacitors rated phase to phase Therefore unbalancewith capacitors rated phase-to-phase. Therefore, unbalance detection is not required.

Page 59: 2011 ced capacitors

Capacitor ApplicationWye – Solidly Grounded• Initial cost of the bank may be lower since the neutral does not

have to be insulated from groundhave to be insulated from ground.• Capacitor switch recovery voltages are reduced• High inrush currents may occur in the station ground system

Th d d id l i d f l• The grounded-wye arrangement provides a low-impedance fault path which may require revision to the existing system ground protection scheme. Typically not applied to ungrounded systems.p yp y pp g y

• When applied to resistance-grounded systems, difficulty in coordination between capacitor fuses and upstream ground protection relays (consider coordination of 40 A fuse with a 400 Aprotection relays (consider coordination of 40 A fuse with a 400 A grounded system).

• Typical for smaller installations (since auxiliary equipment is not i d)required)

Page 60: 2011 ced capacitors

Capacitor ApplicationThe most common capacitor bank configurations for larger substation applications are Wye-Ungrounded

Three of the most common unbalance protection schemes are shown. Discussion of the protection schemes will be presented later.

Page 61: 2011 ced capacitors

Capacitor ProtectionFusing• Fuseless

I t ll F d• Internally Fused• Externally Fused

Page 62: 2011 ced capacitors

Capacitor Protection

B k P t ti SBank Protection Summary

Page 63: 2011 ced capacitors

Capacitor Protection

Fuseless CapacitorsConstr cted of small capacitor elements hich are arranged inConstructed of small capacitor elements which are arranged in

series and parallel. The elements are constructed of aluminum foil with a dielectric of electrical grade polypropylene. This design provides a safe failure mode. In the event that the dielectric fails, the energy in the resulting small arc punctures many layers of the thin film and foil within the element. Themany layers of the thin film and foil within the element. The arc causes the film layer to receded allowing many layers of the aluminum foil electrodes to touch and weld together forming an electrically stable electrical joint This results in an entireelectrically stable electrical joint. This results in an entire series section being shorted.

Page 64: 2011 ced capacitors

Capacitor ProtectionExample of Fuseless Installation

Page 65: 2011 ced capacitors

Capacitor Protection

Internally Fused CapacitorsConstr cted s ch that each elementConstructed such that each element

is protected with a series connected current limiting fuse. The design is such that isolated fusing prevents potential damage to the adjacent elements andto the adjacent elements and fuses. The current limiting mode chops the fault current to prevent the energy stored in the parallelthe energy stored in the parallel connected elements from being discharged into the faulted element.

Page 66: 2011 ced capacitors

Capacitor Protection

Group Fusing

Individual Fusingd v du us g

Page 67: 2011 ced capacitors

Capacitor ProtectionGroup Fusing– Considerations for Selecting Fuse(typical for distribution pole mounted racks) • Continuous Current• Continuous Current• Transient Current• Fault Current

k C C di i• Tank Rupture Curve Coordination• Voltage on Good Capacitors

Page 68: 2011 ced capacitors

Capacitor ProtectionContinuous Current• For wye-solidly grounded systems: Fuse > = 135% of rated

capacitor current (includes overvoltage, capacitor tolerances, and harmonics).

• For wye-ungrounded systems: Fuse > = 125% of rated y g ycapacitor current (includes overvoltage, capacitor tolerances, and harmonics).

Care should be taken when using NEMA Type T and K tin links which are rated 150%. In this case, the divide the fuse rating by 1.50.g y

Page 69: 2011 ced capacitors

Capacitor ProtectionTransient Current• Capacitor switching (specifically back-to-back switching)• Lightning surges

Back-to-back is typically not a factor for pole mounted capacitors yp y p pbanks.

High frequency lightning surges:High frequency lightning surges:Use NEMA T tin links for ampere ratings up to 25 A.Use NEMA K tin links for ampere ratings above 25 A.

Page 70: 2011 ced capacitors

Capacitor ProtectionFault CurrentEnsure that the fuse can interrupt the available fault current

Tank Rupture CoordinationEnsure that the fuse maximum clearing TCC curve for the fuse glink is plotted below the capacitor tank rupture curve. In cases of high fault currents, the tank rupture curve should be compensated for asymmetryfor asymmetry.

Voltage on Good Capacitorsd d f l h l iFor an ungrounded system, a fault on one phase results in a 1.73

times overvoltage on the un-faulted phases. Ensure that the fault is cleared before the second capacitor failure.p

Page 71: 2011 ced capacitors

Capacitor ProtectionProblems with Fusing of Small Ungrounded BanksConsider a 12.47 kV, 1500 kVAR cap bank made of three (3) 500 kVAR i l h i500 kVAR single-phase units.

FuseAAAkV

kVAR ][100][1045.144.69][44.69][47.123

][1500

kV ][47.123

If a capacitor fails, we will expect approximately 3x line current.It will take a 100 A fuse approximately 500 seconds to clear this pp yfault (3 x 69.44 A = 208.32 A). The capacitor case will rupture long before the fuse clears the fault.

The solution is using smaller units (explanation to follow).

Page 72: 2011 ced capacitors

Capacitor ProtectionIndividual Fusing– Considerations for Selecting Fuse(typical for substation capacitor banks) • Continuous Current• Continuous Current• Transient Current• Fault Current• Tank Rupture Curve Coordination• Voltage on Good Capacitors• Energy Discharge into Faulted UnitEnergy Discharge into Faulted Unit• Outrush Current• Coordination with Unbalance Detection System

Page 73: 2011 ced capacitors

Capacitor ProtectionContinuous Current• Fuse > = 135% of rated capacitor current (includes overvoltage,

capacitor tolerances, and harmonics)

Care should be taken when using NEMA Type T and K tin links which are rated 150% In this case the divide the fuse rating by 1 50150%. In this case, the divide the fuse rating by 1.50.

Page 74: 2011 ced capacitors

Capacitor ProtectionTransient Current• Lightning surges• Capacitor switching (specifically back-to-back switching)

High magnitude, high frequency lightning surges are typically not g g , g q y g g g yp ya concern for substation installations.

Back to back switching is typically controlled with pre insertionBack-to-back switching is typically controlled with pre-insertion closing resistors or current limiting reactors.

h f i ll i h ll l f ill h hBy the nature of installation, the parallel fuses will share the transient current and will not be a factor.

Page 75: 2011 ced capacitors

Capacitor ProtectionFault CurrentEnsure that the fuse can interrupt the available fault current.

In substation banks with multiple series groups, fault current will not flow through a failed capacitor unit unless other units g pexperience a simultaneous failure. For this reason expulsion fuses are commonly used rather than current limiting fuses

Tank Rupture CoordinationEnsure that the fuse maximum clearing TCC curve for the fuse li k i l d b l h i k flink is plotted below the capacitor tank rupture curve. In cases of high fault currents, the tank rupture curve should be compensated for asymmetry.y y

Page 76: 2011 ced capacitors

Capacitor Protection

Example of a DefiniteExample of a Definite Tank Rupture Curve.

Th i b hThe time between the rupture curve and the fuse maximum clear curve is the coordination margin.

Page 77: 2011 ced capacitors

Capacitor Protection

Example of a 10% and 50% Rupture Curve for a 100 kVARRupture Curve for a 100 kVAR Capacitor.

Probability based tank rupture y pcurves are developed when there is too much variance in rupture test data.

Based on the 10% and 50% curves, one can extrapolate the

f b bilicurves for any probability.

Page 78: 2011 ced capacitors

Capacitor ProtectionVoltage on Good CapacitorsWhen a short-circuit on one unit occurs, an overvoltage results on the un-faulted phases. Ensure that the fault is cleared before the second capacitor failure. A table summarizes this voltage rise on the un-faulted units

Per Unit Voltage on Un-failed Capacitors

Page 79: 2011 ced capacitors

Capacitor ProtectionEnergy Discharge Into a Failed UnitWhen a capacitor failure occurs, the stored energy in the parallel connected capacitors can discharge thro gh the failed capacitorconnected capacitors can discharge through the failed capacitor and its fuse. The total calculated parallel stored energy should not exceed the energy capability (Joule rating) of the capacitor and fuse. If the energy capabilities are exceeded, a failure of the fuse and/or rupture of the capacitor tank can result.

Typical rating of film capacitors is 15,000 Joules (4650 kVAR in parallel) and 10,000 Joules (3100 kVAR in parallel) for paper-film capacitors Expulsion fuses are typically rated 30 000film capacitors. Expulsion fuses are typically rated 30,000 Joules. Current limiting fuses are required if ratings are exceeded.

(1 Joule = 1 W x sec use 0 2 cycle clearing time for calculation)(1 Joule = 1 W x sec, use 0.2 cycle clearing time for calculation)

Page 80: 2011 ced capacitors

Capacitor ProtectionOutrush CurrentWhen a capacitor failure occurs, the parallel connected capacitors can discharge high frequency current into the failed capacitor. The fuses of the un-failed capacitors should be able to withstand the high frequency discharge currents. These calculations and g q y gmeasurements are complex and are determined by the manufacturer.

Coordination with Unbalance Detection SchemeThe individual fuse must clear the fault before the unbalance

i h i h i i b kprotection scheme trips the entire capacitor bank.

Page 81: 2011 ced capacitors

Capacitor ProtectionFusing Recommendations by McGraw Edison

Page 82: 2011 ced capacitors

Capacitor ProtectionRecall Problem with Fusing of Small Ungrounded Banks12.47 kV, 1500 kVAR cap bank made of three (3) 500 kVAR units

FuseAAAkV

kVAR ][100][1045.144.69][44.69][47.123

][1500

It will take a 100 A fuse approximately 500 seconds to clear thisIt will take a 100 A fuse approximately 500 seconds to clear this fault (3 x 69.44 A = 208.32 A). The capacitor case will rupture long before the fuse clears the fault.

The solution is using smaller units with individual fusing.Consider five (5) 100 kVAR capacitors per phase, each with a ( ) p p p ,25 A fuse. The clear time for a 25 A fuse @ 208.32 A is below the published capacitor rupture curve.

Page 83: 2011 ced capacitors

Capacitor ProtectionWhy is the Current 3 x Nominal Line Current for a Phase-to-Neutral Fault on a Wye-Ungrounded Capacitor Bank?

A

B

A

B

V

A

C

NAN

VNG C C

I 3 0Since V = I*Z, where Z is

t t ( i f 60 h ) IA = 3.0 p.u.constant (assuming f = 60 hz)If voltage across capacitor is increased by 1.732, the current also increases by factor of 1.732y

Page 84: 2011 ced capacitors

Capacitor Protection

Minimum Conductor SizeIt was noted that capacitors are rated 135% of rating. This requires the conductor to be sized 135% of the nominal capacitor ratingrating.

Page 85: 2011 ced capacitors

Capacitor ProtectionUnbalance ProtectionAs single-phase units in a multiple unit/phase installation fail and are removed from service the remaining units are experience anare removed from service, the remaining units are experience an overvoltage condition. IEEE Standard 1036 provides overvoltage limitations.

Duration Max Voltage (x rated RMS)

6 cycles 2.20

15 c cles 2 0015 cycles 2.00

1 s 1.70

15 sec 1.40

1 min 1.301 min 1.30

An unbalance protection scheme must by implemented to prevent the failure of the overvoltaged units. g

Page 86: 2011 ced capacitors

Capacitor Protection

Page 87: 2011 ced capacitors

Capacitor Protection

Neutral Voltage Unbalance with Unbalance Compensation

Page 88: 2011 ced capacitors

Capacitor Protection

VA

V

V

VNVGVNG

Normal ConditionsVN = VGVAN = VBN = VCN

VC VB

VAN VBN VCN

Page 89: 2011 ced capacitors

Capacitor ProtectionUngrounded or Impedance Grounded System

VA

V

V

VNVGVNG

Normal ConditionsVN = VGVAN = VBN = VCN = 1.0 p.u.

VC VB

VAN VBN VCN .0 p.u.

Page 90: 2011 ced capacitors

Capacitor Protection

VVNG

Phase to Neutral FaultPhase to Neutral FaultVNG = VLNVAN = VBN = VLL = 1.732 p.u.

Page 91: 2011 ced capacitors

Capacitor Protection

VA

VVNVG

VNG

One Can RemovedVNG = 0.2 p.u.V = 1 2 p u

VC VB

VCN = 1.2 p.u.

Page 92: 2011 ced capacitors

Capacitor ProtectionUngrounded or Impedance Grounded System

VA

V

V

VNVGVNG

Normal ConditionsVN = VGVAN = VBN = VCN = 1.0 p.u.

VC VB

VAN VBN VCN .0 p.u.

Page 93: 2011 ced capacitors

Capacitor ProtectionUngrounded or Impedance Grounded System

VA

V

Gnd

VNVNG

VC VB

Ground FaultVNG = VLNV = V = V = 1 732 p u

VC =VG

Ground Fault at Cap Bank or A h h SVAG = VBG = VLL = 1.732 p.u. Anywhere on the System

Page 94: 2011 ced capacitors

Capacitor Protection

Wye-Ungrounded: Voltage Between Capacitor Bank Neutral and Ground vs. Percentage of Capacitor Units Removed from Series Group

Page 95: 2011 ced capacitors

Capacitor Protection

Wye-Ungrounded: Voltage on Remaining Capacitor Units in Series Group vs. Percentage of Capacitor Units Removed from Series Group

Page 96: 2011 ced capacitors

Capacitor Protection

Wye-Grounded: Neutral Current vs Percentage of Capacitor Units Removed from Series Group

Page 97: 2011 ced capacitors

Capacitor Protection

Wye-Grounded or Delta: Voltage on Remaining Units in Series Group vs. Percentage of Capacitor Units Removed from Series Group

Page 98: 2011 ced capacitors

Capacitor Protection

Double Wye-Ungrounded, Neutrals Tied Together: Neutral Current vs. Percentage of Capacitor Units Removed from Series Group

Page 99: 2011 ced capacitors

Capacitor Protection

Double Wye-Ungrounded, Neutrals Tied Together: Voltage on Remaining Capacitor Units in Series vs. Percentage of Capacitor Units Removed from Series Group

Page 100: 2011 ced capacitors

Capacitor ProtectionA phase B phase C phase

P: Number of units in groupunits in group(P=6)

S: Number ofS: Number of series groups(S=4)

Reference Figure for Calculations to Follow

Page 101: 2011 ced capacitors

Capacitor Protection# of Series Groups Grounded Y or Delta Ungrounded Y Split Ungrounded Y

(equal sections)

1 - 4 21 4 2

2 6 8 7

3 8 9 8

4 9 10 9

5 9 10 10

6 10 10 10

7 10 10 10

8 10 11 10

9 10 11 10

10 10 11 11

11 10 11 11

12 and over 11 11 11

Minimum recommended number of units in parallel per seriesGroup to limit voltage on remaining units to 110% with one unit out

Page 102: 2011 ced capacitors

Capacitor Protection

Many more configurations and calculations shown in IEEE C37.99

Page 103: 2011 ced capacitors

Day 2Day 2

Page 104: 2011 ced capacitors

Capacitor FundamentalsFurther discussion on capacitor voltage ratings:

On a ungrounded or impedance grounded system, a ground fault on one phase will cause the other two phases will be elevated by 1 7321.732.

Does this mean that capacitors must be rated phase-to-phase?

Certainly nothing wrong with this, but cost will be significantly higher.g

Page 105: 2011 ced capacitors

Capacitor FundamentalsRecall:

XVS

2

CX

This means that a 150 kVAR 12470 V unit applied at 7200 VThis means that a 150 kVAR, 12470 V unit applied at 7200 V will provide only 50 kVAR.

][50

][150][12470][7200

2

2

kVARS

kVARVVSNEW

][50 kVARSNEW

Page 106: 2011 ced capacitors

Capacitor FundamentalsUsing 12470 V capacitors on a 12470 V Ungrounded or Resistance-Grounded System will require 3x more cans. y q

It should be noted that the 12470 V cans will also be larger than the 7200 V cansthe 7200 V cans.

Results in a much larger and more costly installation.

This solution would be required if a ground fault could be maintained for extended periods of time. p

Page 107: 2011 ced capacitors

Capacitor FundamentalsPerhaps a 150 kVAR or 200 kVAR, 7620 V or 7960 V units applied at 7200 V would be a better solution.

][150][7620][7200

2

2

kVARVVSNEW ][200

][7620][7200

2

2

kVARVVSNEW

][134OR

kVARSNEW ][178

2

ORkVARSNEW

][123

][150][7960][7200

2

2

kVARS

kVARVVSNEW

][163

][][7960][7200

2

2

kVARS

kVARVVSNEW

][123 kVARSNEW

Note that the 7620 V unit provides an additional 6% The 7960 V unit provides an additional 11%

][163 kVARSNEW

The 7960 V unit provides an additional 11%

Page 108: 2011 ced capacitors

Capacitor FundamentalsExplusion Fuses:

Provides a means of disconnecting a failed capacitor from the circuit by melting a tin-lead low current link. The shorted capacitor unit causes a large increase in the current through the fuse. The current is limited only by the power system reactance and the other capacitor units in series with the failed capacitor unit. Thereactance and the other capacitor units in series with the failed capacitor unit. The pressure is generated by the hot arc making contact with the fiber lining of the fuse tube. The link is cooled and stretched as it is forced out the tube. The fuse continues to conduct until a natural current zero occurs. The current zero is

d b th t f lt t i If th itcaused by the power system fault current crossing zero. If other capacitors are connected in parallel with the failed unit, all the stored energy in these capacitors will be absorbed in either the fuse operation or the failed capacitor unit. Most of the energy is absorbed in the failed capacitor.gy p

Page 109: 2011 ced capacitors

Capacitor FundamentalsCurrent Limiting Fuses:

Uses a long uniform cross section element. This configuration makes the fuse a current chopping fuse. The fuse develops a back voltage per inch of element across the entire length of the element. When this voltage exceeds the available voltage across the fuse, the fuse forces the arc to extinguish. The result is that avoltage across the fuse, the fuse forces the arc to extinguish. The result is that a trapped voltage may and probably will remain on the other capacitors in the series group. The fuse by its design avoids absorbing all of the available energy on the series group. This fuse is used for capacitor banks with a large number of

ll l it It b d li ti ith ti ll i fi it ll lparallel capacitors. It can be used on applications with essentially infinite parallel stored energy, as long as sufficient back voltage can be developed to force the current to extinguish. This is the fuse we apply to series, large shunt, and DC banks.

Because of the high back voltage that is developed, this fuse must be used with several capacitors in parallel to limit the voltage build up or a flashover may occur elsewhere in the capacitor rackoccur elsewhere in the capacitor rack.

Page 110: 2011 ced capacitors

Capacitor FundamentalsCurrent Limiting Fuses vs Expulsion Fuses:

C Li i i FExpulsion Fuse Current Limiting Fuse

Page 111: 2011 ced capacitors

Capacitor FundamentalsCurrent Limiting Fuses vs Expulsion Fuses:

Expulsion FusesOperate mechanically and provide a visual indication

Require additional space for operationRequire additional space for operation

Typically applied for outdoor application due to ionized gas release.

C bi ti l i ith t li iti h t i ti f b d iCombination expulsion with current limiting characteristic fuses can be used in indoor metal-enclosed equipment.

Less expensivep

Page 112: 2011 ced capacitors

Capacitor Fundamentals

Page 113: 2011 ced capacitors

Capacitor FundamentalsCurrent Limiting Fuses

Do not emit ionized gases during operation Ionized gases are undesirableDo not emit ionized gases during operation. Ionized gases are undesirable because they can cause bushing and insulator flashovers that result in additional damage. Do not require ventilation.

Fast current-limiting operation

High interrupting capacity, noiseless operation

Can be specified for indoor and outdoor applications .

No pressure build-up, therefore, no vents or special reinforced compartments are i drequired.

More expensive

Page 114: 2011 ced capacitors

Capacitor FundamentalsNote no pigtail and blown fuse indication

Page 115: 2011 ced capacitors

Capacitor FundamentalsCurrent Limiting with Expulsion

Page 116: 2011 ced capacitors

Capacitor FundamentalsWhat about arresters? How and where should they be applied?applied?

Depending on application, environment, exposure to switching etc arresters may be necessaryswitching, etc, arresters may be necessary.

We recall that when a travelling wave meets a high impedance, the wave can double in size. For this reason, arresters (if used) should be installed as close to the capacitor bank as possible. Installation of arresters at the breaker pfeeding the capacitor bank will not do much for protection of the capacitor bank.

Page 117: 2011 ced capacitors

Capacitor ProtectionA basic three (3) arrester method is shown below. This is typical for solidly grounded systems and wye-groundedtypical for solidly grounded systems and wye grounded capacitor banks.

Page 118: 2011 ced capacitors

Capacitor ProtectionDepending on type of installation, system parameters and level of protection required, a six(6) arrestor method may belevel of protection required, a six(6) arrestor method may be applied.

Page 119: 2011 ced capacitors

Capacitor ProtectionFor an ungrounded system or a high-impedance grounded system, a four (4) arrestor grounding method might besystem, a four (4) arrestor grounding method might be considered an wye ungrounded bank.

Phase to Neutral FaultVNG = VLNNG LNVAN = VBN = VLL = 1.732 p.u.

Ground FaultVNG = VLN

VLL

VLL

ArrNG LNVAG = VBG = VLL = 1.732 p.u.

If faults can be maintained,ArrN

V ArrPH

ArrPH must be rated VLLArrN must be rated VLN

The effective arrester MCOV

N

is VLL + VLN

Page 120: 2011 ced capacitors

Capacitor ProtectionNote that if a basic three (3) arrester method is applied to an ungrounded bank, the arresters must be rated high enough to sustain a temporary overvoltage condition during a phase-to-ground fault on the system. This may not provide an adequate level of protection for the capacitors.

Phase to Neutral FaultVNG = VLNV V V 1 732VAN = VBN = VLL = 1.732 p.u.

Ground FaultVNG = VLNV V V 1 732

VLL

VLL

VAG = VBG = VLL = 1.732 p.u.

If faults can be maintained, Arresters must be rated VLL

V

Arresters do not provide protection across the capacitor bushings. Note that the BIL applies to bushing-to-

i l ticase insulation.

Page 121: 2011 ced capacitors

Capacitor ProtectionGood Presentations on Capacitor – Arrester Applications

“G id li f S l ti f S A t f Sh t“Guidelines for Selection of Surge Arresters for Shunt Capacitor Banks” – ABB Technical Information

“Surge Arrester Application of MV-Capacitor Banks to Mitigate Problems of Switching Restrike” – CIRED 19th

International Conference on Electricity Distribution ViennaInternational Conference on Electricity Distribution, Vienna, 21-24 May 2007.

B th f th l dd h t h tBoth of these papers also address phase-to-phase arrester connections.

Page 122: 2011 ced capacitors

Harmonics

Page 123: 2011 ced capacitors

HarmonicsRecall that the impedance of a capacitor is inversely proportional to the system frequencyproportional to the system frequency.

fCCXC 2

11

fCC 2

Harmonics flow to the point of lowest impedance. The higher the harmonic the lower the impedance of the capacitorthe harmonic, the lower the impedance of the capacitor.

As capacitors absorb harmonics, the capacitor heats up and th lif t i d d Th lt h i tthe life expectancy is reduced. The voltage harmonics stress the capacitor dielectric and reduce the life expectancy of the capacitor.

Page 124: 2011 ced capacitors

Harmonics

Page 125: 2011 ced capacitors

Harmonics

Where do harmonics come from?• Power Electronics (drives, rectifiers, computer power

supplies, etc)• Arcing Devices (welders, arc furnaces, florescent lights, etc)g ( , , g , )• Iron Saturating Devices (transformers)• Rotating Machines (Generators)• Parallel Resonance (between cap bank and power• Parallel Resonance (between cap bank and power

equipment)

IEEE Std 519 provides recommended limits of harmonic distortion at the point-of-common-coupling (PCC) with the utility.y

Page 126: 2011 ced capacitors

Harmonics

Page 127: 2011 ced capacitors

Harmonics

Page 128: 2011 ced capacitors

Harmonics

ResonanceWhen a number of harmonic current sources are injecting currents into the supply and the frequency of one of the harmonics coincides with the resonant frequency of the supply transformer andwith the resonant frequency of the supply transformer and Power Factor Correction capacitor combination, the system resonates and a large circulating harmonic current is excited between these components The result of this is that a largebetween these components. The result of this is that a large current at this harmonic flows in the supply transformer, this resulting in a large harmonic voltage distortion being imposed upon the load voltage.

Page 129: 2011 ced capacitors

Harmonics

A study should be performed to determine levels of harmonics on a y psystem to determine if any filters are necessary when installing a capacitor bank.

Care should be taken to determine if the filtered capacitor bank will introduce any resonance problems. If resonance problems exist, the fil d i b dj dfilter design must be adjusted.

Page 130: 2011 ced capacitors

Harmonics

An example of a 13 8 kV harmonic filterAn example of a 13.8 kV harmonic filter

Page 131: 2011 ced capacitors

Capacitor Bank Design Considerations

Page 132: 2011 ced capacitors

Design ConsiderationsSo how do we size a capacitor bank?

D t i i lDetermine your primary goal• Voltage support• Lower utility bill (avoid penalties)• Increase capacity of system

It can be all three, or any combination of the above.It can be all three, or any combination of the above.

Note that correcting to unity power factor at maximum load is tl d t bcostly and may not be necessary.

Page 133: 2011 ced capacitors

Design Considerations

For a 20 MVA load at 0 88 power factor (17 6 MW 9 5 MVAR)For a 20 MVA load at 0.88 power factor (17.6 MW, 9.5 MVAR)

To achieve 95% power factor, a 3.72 MVAR bank is required

To achieve 98% power factor, a 5.93 MVAR bank is required

To achieve unity power factor, a 9.50 MVAR bank is required

Page 134: 2011 ced capacitors

Design Considerations

Determine if current limiting reactors or tuning reactors areDetermine if current limiting reactors or tuning reactors are required.

Harmonics and resonance may dictate tuning reactors

Back-to-back switching may require current limiting reactorsBack to back switching may require current limiting reactors (unless another method is used to mitigate the switching surges, i.e. pre-insertion closing resistors/reactors, zero-crossing breakers etc)breakers, etc)

Page 135: 2011 ced capacitors

Design ConsiderationsDetermine the proper voltage.

Capacitors are very susceptible to voltage transients and harmonics. Increasing the rated voltage increases the protective margin on the insulation.margin on the insulation.

The voltage at the capacitor terminals will be higher than bus lt if t tili d It i i t t t t f thivoltage if reactors are utilized. It is important to account for this

voltage difference.

Determine the voltage swing of the system. Will the capacitors remain on-line while the facility is lightly loaded.

Page 136: 2011 ced capacitors

Design Considerations

We listed some reasons for specifying higher than bus nominalWe listed some reasons for specifying higher than bus nominal rating of capacitors. However, care must be taken to ensure that the kVAR rating is properly adjusted as a result.

Three (6) 150 kVAR, 7960 V wye-connected capacitors provide a nominal 901 kVAR when connected to a 13.8 kV bus.

Three (6) 150 kVAR, 8320 V wye-connected capacitors provide a nominal 825 kVAR when connected to a 13 8 kV busnominal 825 kVAR when connected to a 13.8 kV bus

Page 137: 2011 ced capacitors

Design ConsiderationsDetermine optimal size and number of stages.

D di i i l t l d i l b k i d f f llDepending on swing in plant load, a single bank sized for full plant capacity may not be the answer.

IEEE 1036 recommends limiting the voltage change to 2-3%. The delta voltage can be estimated by:

MVAR

Switch of a capacitor applies high stresses to the insulation

%100SCMVA

MVARV

Switch of a capacitor applies high stresses to the insulation. Limiting the number of stages and limiting the frequency of switching will increase the life. Ideally, a capacitor is switched on and left on.

Page 138: 2011 ced capacitors

Design Considerations

Determine best location for the installation The most effectiveDetermine best location for the installation. The most effective placement for power factor correction capacitor banks is at the load. However, this is not always practical or cost effective.

Typically, a capacitor bank is installed on each bus of a main-tie-main switchgear.main switchgear.

If capacitors are installed at the motor pecker head (running capacitors) ensure that the capacitor VAR rating does not exceedcapacitors), ensure that the capacitor VAR rating does not exceed 90% of the motor no-load VAR. Otherwise, it is possible to damage the motor by overexcitation.

Page 139: 2011 ced capacitors

Design ConsiderationsUse caution when sizing motor running capacitors.

Logic would suggest that installation of a power factor correction capacitor at the motor terminals sized to provide unity power factor makes sense.y p

THIS IS NOT THE CASE. Do not exceed 90% of the motor no load kVAR demand Exceeding this value canmotor no-load kVAR demand. Exceeding this value can result in damage to the motor insulation as a result of overexcitation.

Page 140: 2011 ced capacitors

Design ConsiderationsAs an example for a 4000 V, 4000 hp motor:

100% load current = 495 A @ 89.7% pf100% load kVAR = 1516 kVAR

No load current = 117 A @ 6.3 % pfNo load kVAR = 809 kVARMax size of running capacitor is 0 90 x 809 kVAR = 728 kVARMax size of running capacitor is 0.90 x 809 kVAR = 728 kVAR

Page 141: 2011 ced capacitors

Design Considerations

M: Motor Magnetizing CurveM: Motor Magnetizing CurveC1: Capacitor size at 100% motor mag currentC2: Capacitor sized > 100% motor mag currentC4: Capacitor sized < 100% motor mag current

If the capacitive reactance of the capacitor is less less than that of the motor reactance (this occurs when to large of a capacitor is chosen). This combination of reactance will result in a resonant frequency below 60 hertz Therefore as the motor slows in speed the frequency of the motorfrequency below 60 hertz. Therefore, as the motor slows in speed, the frequency of the motor terminal voltage will decrease from a value of near 60 hertz toward zero. When the motor's terminal voltage frequency passes through the resonant frequency setup between the capacitor reactance and the motor reactance, the terminal voltage will become very high, only limited by the properties of the iron Depending on the inertia of the motor this resonance (or high voltage) may be present for airon. Depending on the inertia of the motor, this resonance (or high voltage) may be present for a considerable period of time.

Page 142: 2011 ced capacitors

Design Considerations

Determine the most optimal type of installationDetermine the most optimal type of installation.

Will the capacitor bank be installed within a fenced substation?Metal-enclosed, pad mount, or open rack may be good choices

Will the capacitor bank be installed in a process area?Will the capacitor bank be installed in a process area?Metal-enclosed or pad mount may be good choices

Will the capacitor bank be pole mounted on a distribution line?Will the capacitor bank be pole mounted on a distribution line?

Page 143: 2011 ced capacitors

Bank Failures

Page 144: 2011 ced capacitors

Design Considerations

Consider the impact to personnel safety adjacent equipment when deciding between a metal-enclosed and open-rack system.

Porcelain can resemble shrapnel when a capacitor bushing fails.

Page 145: 2011 ced capacitors

Design ConsiderationsDetermine the most optimal configuration.

Higher reliability costs more.

2400 kVAR, 13800 V, wye-grounded (1) 800 kVAR per phase , , y g ( ) p pbank will be a smaller footprint and cost less than

2400 kVAR 13800 V wye ungrounded (8) 100 kVAR per2400 kVAR, 13800 V, wye-ungrounded (8) 100 kVAR per phase bank.

H h li bili f h d d b k iHowever, the reliability of the wye-ungrounded bank is significantly higher

Page 146: 2011 ced capacitors

Design ConsiderationsDetermine the switching equipment

When breakers are used for switching capacitors (single bank or back-to-back switching), the breakers must be rated for capacitor switching. p g

IEEE C37.99 provides the equations for calculating the inrush current and frequencycurrent and frequency.

Page 147: 2011 ced capacitors

Design Considerations

Page 148: 2011 ced capacitors

Design ConsiderationsConsider a single 4800 kVAR wye-ungrounded bank switched (with nominal inductance from equipment):

3253A pk @ 600 Hz, the product is 0.20 x 107

Switching a second similar bank on the same bus without current limiting reactor:

24,058 A pk @ 7.66 kHz, the product is 18.4 x 107

B ddi 100 H li i i h i h iBy adding a 100 mH current limiting reactor, the inrush is:

7254 A pk @ 2.31 kHz, the product is 1.7 x 107p @ , p

Page 149: 2011 ced capacitors

Design Considerations

Page 150: 2011 ced capacitors

Design Considerations

Page 151: 2011 ced capacitors

Design ConsiderationsEnergization of a single capacitor bank.

Page 152: 2011 ced capacitors

Design Considerations

B k b k i hi f h iBack-to-back switching of the same unit.

Page 153: 2011 ced capacitors

Design Considerations

E l f b k i h i i iExample of breaker with pre-insertion resistor.

Page 154: 2011 ced capacitors

Design Considerations

Another application.Another application.

Page 155: 2011 ced capacitors

Design Considerations

A Pre-Insertion Manufacture’s Perspective.p

Page 156: 2011 ced capacitors

Design ConsiderationsAnother concern is voltage amplification as a result of switching a second capacitor bank.

Page 157: 2011 ced capacitors

Design Considerations

Page 158: 2011 ced capacitors

Design ConsiderationsConsider other accessories:

• Disconnect switch• Grounding switch• Kirk-key interlocky• Ventilation requirements• Control power

Page 159: 2011 ced capacitors

Design Considerations

Page 160: 2011 ced capacitors

Design Considerations

Page 161: 2011 ced capacitors

Design ConsiderationsBe aware that larger medium voltage motors may include surge packs.g p

The surge pack will decrease the crest voltage and rate of rise of the impending surge High rates of rise damage endrise of the impending surge. High rates of rise damage end turns while high crest voltage damage winding to core insulation.

Typically the capacitance of the is small enough that it can be neglected, but this should be verified.g

Page 162: 2011 ced capacitors

Design Considerations

Typical Surge Pack Application

Page 163: 2011 ced capacitors

Design Considerations

Do not confuse Harmonic Filter Banks with Power Factor Correction BanksCorrection Banks.

The voltage ratings of harmonic filter banks are substantially higher because they are connected on the back end of a tuning reactor where the voltage is substantially higher. As a result of the higher voltage, the installed kVAR can be anywhere from e g e vo ge, e s ed V c be yw e e o25% to 40% higher than nominal design.

The capacitor cans must be capable of this outputThe capacitor cans must be capable of this output.

Page 164: 2011 ced capacitors

Grounding of Wye BanksIf multiple wye-grounded banks are in close proximity, use peninsula grounding or single-point grounding. p g g g p g g

Single-Point GroundingThe neutrals of all banks of a given voltage are connectedThe neutrals of all banks of a given voltage are connected together with insulated cable/bus and tied to the ground grid only at one point. This prevents high-frequency

(d b k b k i hi ) f fl i icurrents (due to back-to-back switching) from flowing into the ground grid.

Page 165: 2011 ced capacitors

Grounding of Wye BanksPeninsula GroundingOne or more isolated ground grid conductors are carried g gunderneath the capacitor rack of each phase and tied to the station ground grid at one point at the edge of the capacitor area All capacitor bank neutral connections are made toarea. All capacitor bank neutral connections are made to this isolated peninsula ground grid conductor.

Page 166: 2011 ced capacitors

Grounding of Wye Banks

Page 167: 2011 ced capacitors

Grounding of Wye Banks

Page 168: 2011 ced capacitors

References

• IEEE Std. 18• IEEE C37.99• NEMA CP-1• IEEE Std 1036•IEEE Std 399 (Brown Book)IEEE Std 399 (Brown Book)