2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

download 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

of 39

Transcript of 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    1/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    Substation Construction (Civil works) 

    Site Establishment (Camp)Site access – See Line works for detail (Access to site)

    Site establishment – setting up camp/offices – See line works for detail (Site establishment).

    Receiving, handling and storage on site - Steel and other hardware – See line works (Loading & offloading).

    Earthworks282.0 Bush clearing – See line works (Bush clearing)

    283 Clear and grub Cleared vegetation 283.1 Bush clearing team PM Slipping / tripping N Lack of concentration

    Non-compliance to

    procedure

    Inadequate risk

    assessment

    MI Project specific Environmental Management Plan

    Construction Site Establishment and Dismantling

    (PDPMAN-PC-49)

    Procedure for vegetation clearance and maintenance

    within overhead power line servitude on Eskom owned

    land (32-247)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    Eskom Personal Protective Equipment (240-44175132)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    284.1 Thorns / broken

    branches

    284.1 Bush clearing team PM Contact with N Inadequate PPE

    Lack of concentration

    Inadequate risk

    assessment

    MI Project specific Environmental Management Plan

    Construction Site Establishment and Dismantling

    (PDPMAN-PC-49)

    Procedure for vegetation clearance and maintenance

    within overhead power line servitude on Eskom owned

    land (32-247)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    Eskom Personal Protective Equipment (240-44175132)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  2 C III

    285.0 Manual handling 285.1 Bush clearing team PM Musculoskeletal

    disorders

    N Lack of training /

    experience

    Incorrect lifting

    techniques

    Inadequate supervision

    SI

    MI

    Project specific Environmental Management Plan

    Construction Site Establishment and Dismantling

    (PDPMAN-PC-49)

    Procedure for vegetation clearance and maintenance

    within overhead power line servitude on Eskom owned

    land (32-247)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    PE  2 C III

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    2/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    Eskom Personal Protective Equipment (240-44175132)

    SANS 1200 ALL PARTS

    Project specific drawings

    286.0 Insects 286.1 Bush clearing team

    All persons present

    PM Bites and stings N Habitat invasion

    Inadequate inspection /

    supervision

    Inadequate PPE

    Lack of concentration /

    communication

    Inadequate risk

    assessment

    F

    SI

    MI

    Project specific Environmental Management Plan

    Construction Site Establishment and Dismantling

    (PDPMAN-PC-49)

    Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  4 C II

    287.0 Wild/stray animals 287.1 Bush clearing team

    All persons present

    PM Attacks N Inadequate training /

    experience

    Inadequate risk

    assessment

    Non-compliance to

    procedures

    F

    SI

    MI

    Project specific Environmental Management Plan

    Construction Site Establishment and Dismantling

    (PDPMAN-PC-49)

    Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  4 C II

    288.0 Uneven surfaces /

    terrain/ terrain

    288.1 Bush clearing team

    All persons present

    PM Trips and falls N Lack of concentration

    Inadequate supervision

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    Eskom Personal Protective Equipment (240-44175132)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  1 C III

    289.0 Stripping of soil Motorised equipment 289.1 Operator

    All persons present

    PM Contact with N Poor planning

    Lack of concentration

    Non-compliance to

    procedures

    SI

    MI

    Project specific Environmental Management Plan

    Construction Site Establishment and Dismantling

    (PDPMAN-PC-49)

    Procedure for vegetation clearance and maintenance

    within overhead power line servitude on Eskom owned

    land (32-247)

    Mandatory SHE Specification to be met by contractors

    PE  2 C III

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    3/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    Eskom Personal Protective Equipment (240-44175132)

    SANS 1200 ALL PARTS

    Project specific drawings

    300.0 Dust 300.1 Operator

    All persons present

    PM Inhalation N Inadequate PPE

    Inadequate dust

    suppression

    Inadequate training /

    experience

    MI Project specific Environmental Management Plan

    Construction Site Establishment and Dismantling

    (PDPMAN-PC-49)

    Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  1 C III

    301.0 Noise 301.1 Operator PM Exposure to noise

    levels above 85dB

    Damage to hearing

    Nuisance to local

    residents

    N Lack of signage

    Inadequate hygiene

    surveys

    Inadequate training /

    experience

    Inadequate inspection /

    maintenance

    MI Project specific Environmental Management Plan

    Construction Site Establishment and Dismantling

    (PDPMAN-PC-49)

    Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  1 C III

    302.0 Uneven surfaces /terrain 302.1 Al persons in work

    area

    PM Trips and falls N Lack of concentration

    Non-compliance to

    procedure

    Inadequate risk

    assessment

    Lack of communication

    MI Construction Site Establishment and Dismantling

    (PDPMAN-PC-49)

    Procedure for vegetation clearance and maintenance

    within overhead power line servitude on Eskom owned

    land (32-247)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  1 C III

    303.0 Cut to fill/spoil Motorised equipment 303.1 Operator

    All persons present

    PM Contact with N Poor planning

    Lack of attention

    F

    SI

    MI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    PE  4 C II

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    4/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    Non-compliance to

    procedures

    SANS 1200 ALL PARTS

    Project specific drawings

    304.0 Dust 304.1 OperatorAll persons present PM Inhalation N Inadequate PPE

    Inadequate dust

    suppression

    Inadequate training /

    experience

    SI Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Medical surveillance (32-282)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  2 C III

    305.0 Noise 305.1 Operator

    All persons present

    PM Exposure to noise

    levels above 85dB

    N Lack of signage

    Inadequate hygiene

    surveys

    Inadequate training /experience

    Inadequate inspection /

    maintenance

    MI Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    Hearing Conservation (32-425)

    PE  2 C III

    306.0 Uneven surfaces/ terrain 306.1 All persons present PM Trips and falls N Lack of concentration

    Non-compliance to

    procedure

    Inadequate risk

    assessment

    Lack of communication

    MI Construction Site Establishment and Dismantling

    (PDPMAN-PC-49)

    Procedure for vegetation clearance and maintenance

    within overhead power line servitude on Eskom owned

    land (32-247)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  1 C III

    307.0 Import material from

    quarry/borrow

    pit/stockpile

    Dust 307.1 Geologist and

    anyone present

    PM Dust inhalation N Inadequate PPE

    Inadequate dust

    suppression

    Inadequate training /

    experience

    MI Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    PE  2 C III

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    5/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    308.0 Hand tools 308.1 Geologist and

    anyone present

    PM Caught between N Lack of concentration

    Non-compliance to

    procedures

    Inadequate supervision

    Inadequate inspection

    PPE not worn

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  1 C III

    309.0 Spoil move to

    stockpile area/

    shaping, levelling and

    spreading

    Dust 309.1 All persons present

    and in the vicinity

    PM  Dust inhalation N Inadequate PPE

    Inadequate dust

    suppression

    Inadequate training /

    experience

    Insufficient medical

    monitoring

    MI Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  2 C III

    310.0 Mobile plant i.e.

    excavators, trucks

    310.1 All persons present

    and in the vicinity

    PM Contact with N Inadequate training /

    experience

    Lack of attention

    Non-compliance to

    procedures

    F

    SI

    MI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  4 C II

    311 Stockpile 311.1 All persons in the

    vicinity

    PM Entrapment N Incorrect body position

    Inadequate training /

    experience

    Inadequate signage /

    barricading

    Inadequate

    communication of risks

    F

    SI

    MI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  4 C II

    312.0 Hazardous chemical

    substances

    Fuel for plant 312.1 All persons handling

    hazardous

    substances

    PM Unwanted spill and

    leakages

    N Unsuitable

    transportation

    Hazardous substances

    not stored in suitable

    containers

    Inadequate safety

    signage i.e.

    Safety signs depicting

    “No smoking”, “No

    SI

    MI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Project specific Environmental Management Plan

    Oil spill assessment and reporting (PDPMAN-PC-06)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    6/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    naked lights” and

    “Danger” 

    Incorrect handling

    Inadequate spill

    procedure

    313.0 Soil density

    verification

    Nuclear density gauge

    with radioactive source

    313.1 Operators

    Co workers

    Public

    PM Exposure to radiation N Non-compliance to

    procedures

    Inadequate training /

    experience

    Inadequate signage /

    barricading

    Inadequate PPE

    PPE not worn

    Incorrect disposal

    practise

    Inadequate

    communication of risks

    Inadequate exposuremonitoring.

    SI

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Eskom Personal Protective Equipment (240-44175132)

    Medical surveillance (32-282)

    Life Saving Rules (32-421)

    PE 2 C III

    Roads (Access roads, Terrace maintenance roads and Terrace ring roads)

    314.0 Access road

    construction

    Road transport,

    construction vehicles

    314.1 Work force

    Public

    PM Members of public or

    workmen being

    endangered by

    machine operation

    N Inadequate traffic

    management systems

    F

    SI

    MI

    Project specific Traffic Management Plan

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 4 C II

    315.0 Trenches and manholes 315.1 Public PM Members of public

    being endangered by

    open manholes and

    trenches

    N Unfenced work areas

    and excavations

    SI

    MI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    316.0 Noise 316.1 Workforce Public

    Everyone in close

    proximity of work

    area

    PM Exposure to noise

    levels above 85dB

    N PPE not worn i.e.

    earplugs

    MI Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    PE 2 C III

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    7/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    Hearing Conservation (32-425)

    SANS 1200 ALL PARTS

    Project specific drawings

    317.0 Underground services 317.1 Everyone in close

    proximity of work

    area

    PM Electrocution N Inadequate assessment

    of existing services

    F

    SI

    MI

    Life Saving Rules (32-421)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Eskom Personal Protective Equipment (240-44175132)

    Operating Regulations for High Voltage Systems (32-

    846)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 4 C III

    318.0 Roadbed preparation Earthmoving equipment 318.1 Operators

    Civil team

    PM Machine overturning

    Materials or

    equipment falling

    from machine

    Machine arcing with

    or coming into contact

    with overhead cables

    or underground

    services

    N Lack of concentration

    Non-compliance to

    procedures

    Inadequate supervision

    Inadequate inspection

    PPE not worn

    F

    SI

    MI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 4 C II

    319.0 Crusher stone for

    road surfacing

    Manual operations

    creating dust

    319.1 Civil team

    Anyone within close

    proximity

    PM Dust inhalation N PPE not worn MI Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    320.0 Hand tools e.g. spades,

    rakes

    320.1 Civil team

    Anyone within close

    proximity

    PM Contact with N PPE not worn

    Lack of concentration

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Eskom Personal Protective Equipment (240-44175132)

    PE 1 C III

    321.0 Bituminous surface

    treatment

    Toxic fumes, hot

    bitumen fluid

    321.1 Civil team PM Contact with N Inadequate PPE

    Inadequate training /

    experience

    Non-compliance to

    procedures

    SI

    MI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Eskom Personal Protective Equipment (240-44175132)

    SANS 1200 ALL PARTS

    PE 2 C III

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    8/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    Inadequate supervision Project specific drawings

    321.2 Civil team PM Smoke Inhalation N Inadequate PPE

    PPE not worn

    Inadequate training /

    experience

    Poor ventilation

    MI Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    322.0 Road marking Paint 322.1 Civil team

    Anyone within close

    proximity

    PM Inhalation of paint

    fumes / vapours

    N Non-compliance to

    procedures

    PPE not worn

    Inadequate training /

    experience

    Poor ventilation

    PPE not worn

    MI Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    322.2 Civil team

    Anyone within close

    proximity

    PM Skin contact N Non-compliance to

    procedures

    PPE not worn

    Inadequate training /

    experience

    PPE not worn

    MI Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    323.0 Terrace maintenance

    and ring concrete

    roads

    See risks for “E  xcavation”  , “Shuttering” and “C oncrete casting”  

    324.0 Compacting in-situ

    material

    Hand tools 324.1 Civil Team PM  Contact with N Lack of concentration

    Non-compliance to

    procedures

    Inadequate supervision

    Inadequate inspection

    PPE not worn

    Inadequate

    experience/training

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Eskom Personal Protective Equipment (240-44175132)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  1 C III

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    9/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    Civil Team PM  Musculoskeletaldisorders

    N Lack of concentration

    Awkward body position

    Non-compliance to

    procedures

    Inadequate supervision

    Inadequate inspection

    PPE not worn

    Inadequate

    experience/training

    MI Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  1 C III

    325.0 Compactors 325.1 Civil Team PM Body vibration N Inadequate training /

    experience/supervision

    Inadequate PPE

    Inadequate inspection/

    maintenance

    Non-compliance to

    procedures

    MI Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    325.2 Civil Team PM Exposure to noise

    above 85dB

    N Lack of signage

    Inadequate hygiene

    surveys

    Inadequate training /

    experience

    Inadequate inspection /

    maintenance

    PPE not worn

    MI

    Noise induced

    hearing loss

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    Employee’s right to refuse to work on the grounds of

    SHE related concerns (39-12)

    Hearing Conservation Procedure (32-425)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    326.0 Motorised equipment

    e.g. Rollers

    326.1 Civil Team PM Contact with plant N Poor planning

    Lack of concentration

    Non-compliance to

    procedures

    Inadequate supervision

    MI

    SI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  2 C III

    327.0 Access road /

    offloading pad

    Excavating equipment

    i.e. graders

    327.1 Civil team PM Contact with plant

    (workers)

    N Poor planning F

    SI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    PE 4 C II

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    10/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    construction Lack of attention

    Non-compliance to

    procedures

    MI (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    327.2 Civil team PM Overturning N Poor planning

    Lack of attention

    Non-compliance to

    procedures

    Inadequate training /

    experience

    F

    SI

    MI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 4 C II

    327.3 Civil team PM Contact with plant

    (other plant)

    N Poor planning

    Lack of attention

    Non-compliance to

    procedures

    PD Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C II

    Yard Works (Earth mat, Kerbs & Channels and Yard stoning)328.0 Excavate trenches Earthmoving equipment

    e.g. excavators

    328.1 Civil Team/

    excavating Team

    Operator

    PM Contact with / struck

    by

    Lack of concentration

    Awkward body position

    Non-compliance to

    procedures

    Inadequate inspection /

    maintenance

    PPE not worn

    Inadequate training/

    experience/supervision

    F

    SI

    MI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 4 C II

    329.0 Hand tools 329.1 Civil team PM Contact with N Lack of concentration

    Awkward body position

    Non-compliance to

    procedures

    Inadequate supervision

    Inadequate inspection /

    maintenance

    PPE not worn

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    330.0 Unidentified,

    underground utilities

    330.1 Every person in the

    area

    PM Cutting into

    underground services

    (cables, water mains)

    N Lack of concentration

    Non-compliance to

    procedures

    SI

    MI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    PE 2 C III

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    11/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    Inadequate risk

    assessment

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    331.0 Open excavations – see Excavations for identified risks

    332.0 Dust 332.1 Every person in the

    area

    PM Dust inhalation N Lack of PPE

    Non-compliance to

    procedures

    Inadequate training /

    experience

    MI

    Pulmonary

    diseases

    Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    PE 2 C III

    333.0 Ergonomics 330.2 Civil/ Foundation

    Team

    PM Musculoskeletal

    disorders

    N Non-compliance to

    procedures

    Inadequate training /

    experience

    SI

    MI

    Musculoskeletal

    disorders

    Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction(PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    334.0 Extreme weather

    conditions

    334.1 Every person in the

    area

    PM Exposure to extreme

    weather elements

    N Lack of PPE

    Non-compliance to

    procedures

    Inadequate training /

    experience

    Inadequate risk

    assessment

    Inadequate supervision

    MI

    SI

    Various diseases

    Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    335.0 Install copper and

    crimp joints

    Copper 335.1 Civil Team PM  Contact with /absorption

    N Lack of PPE

    Non-compliance to

    procedures

    Inadequate training /

    experience

    Inadequate risk

    assessment

    MI

    Heavy metal

    poisoning

    Skin irritation

    Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    PE  1 C III

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    12/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    Inadequate supervision Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    336.0 Hand tools e.g. crimping

    tools

    336.1 Civil Team PM Caught between N Lack of concentration

    Awkward body position

    Non-compliance to

    procedures

    Inadequate supervision

    Inadequate inspection /

    maintenance

    PPE not worn

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    337.0 Install flat copper

    ,including brazing of

     joints

    Ultra violet light /

    radiation

    337.1 Welder

    Civil Team

    PM  Eye injury N Lack of concentration

    Non-compliance to

    procedures

    Inadequate supervision

    Inadequate

    training/experience

    PPE not worn

    MI Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction(PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  1 C III

    338.0 Brazing rod and flux 338.1 Welder PM Contact with N Lack of concentration

    Non-compliance to

    procedures

    Inadequate supervision

    Inadequate

    training/experience

    PPE not worn

    MI

    Skin irritation

    Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    339.0 Thermal reaction 339.1 Welder PM Contact with hot

    surface

    N Lack of concentration

    Non-compliance to

    procedures

    Inadequate supervision

    Inadequate

    training/experience

    PPE not worn

    SI

    MI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    13/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    340.0 Welding fumes 340.1 Welder PM Inhalation N Lack of concentration

    Non-compliance to

    procedures

    Inadequate supervision

    Inadequate

    training/experience

    PPE not worn

    SI

    MI

    Metal fever

    Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    341.0 Oxy acetylene set 341.1 Welder PM  Fire N Lack of concentration

    Non-compliance to

    procedures

    Inadequate supervision

    Inadequate

    training/experience

    Inadequate risk

    assessment

    Inadequate inspections

    and maintenance

    MI

    SI

    PD

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Project specific Environmental Management Plan

    Project specific Emergency preparedness and response

    plan

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  2 C III

    341.2 PM Explosion N Lack of concentration

    Non-compliance to

    procedures

    Inadequate supervision

    Inadequate

    training/experience

    Inadequate risk

    assessment

    Inadequate inspections

    and maintenance

    Faulty safety devices e.g.

    flashback arrestor

    F

    SI

    PD

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Project specific Environmental Management Plan

    Project specific Emergency preparedness and response

    plan

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 4 C II

    341.3 All persons in the

    area

    PM Slips and trips over

    lines

    N Lack of concentration

    Non-compliance to

    procedures

    Poor house-keeping

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    342.0 Laying of kerbs and

    channels

    Ergonomics (Manual

    handling)

    342.1 Civil team PM Musculoskeletal

    disorders

    N Incorrectly lifting

    techniques

    PPE not worn

    SI

    MI

    Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    PE 2 C III

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    14/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    Inadequate planning 2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    343.0 Dust from cutting disc 343.1 Operator

    Civil team

    PM Dust inhalation N PPE not worn

    Inadequate planning

    Inadequate training /

    experience

    SI

    MI

    Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    344.0 Noise 344.1 Operator

    Civil team

    PM Noise induced hearing

    loss

    N PPE not worn

    Inadequate

    maintenance and

    inspections

    Inadequate supervision

    SI

    MI

    Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Hearing Conservation (32-425)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    345.0 Yard stoning  Apply weed killing

    agents i.e. granules,

    liquids

    345.1 Applicators

    Bystanders

    PM Inhalation N PPE not worn

    Inadequate training /

    experience

    Non-compliance with

    procedures

    Inadequate ventilation

    SI

    MI

    Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Hearing Conservation (32-425)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Project specific environmental management plan

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    15/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    345.2 Applicators

    Bystanders

    PM Contact with skin N PPE not worn

    Inadequate training /

    experience

    Non-compliance with

    procedures

    SI

    MI

    Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Hearing Conservation (32-425)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Project specific environmental management plan

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    346.0 Dust 346.1 Everyone within site

    vicinity

    PM Dust inhalation N Non-compliance to

    procedures

    Inadequate dust

    suppression

    PPE i.e. dust masks not

    worn

    MI Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction(PDPMAN-ST-001)

    Project specific environmental management plan

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    347.0 Noise 347.1 Everyone within site

    vicinity

    PM Noise above 85 dB N Lack of signage

    Inadequate hygiene

    surveys

    Inadequate training /

    experience

    PPE not worn

    MI Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Hearing Conservation (32-425)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    348.0 Uneven yard surfaces 348.1 Everyone within site

    vicinity

    PM Trips and falls N Lack of concentration

    PPE not worn

    Inadequate risk

    assessment

    Poor communication

    SI

    MI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    Foundations (Flood Lights, Main Columns, Earth Wire Support, Busbars, Equipment Foundations)349.0 Setting out – See line works (Pegging)

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    16/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    350.0 Hazardous chemicals i.e. fuels, lubrication – See line works (Hazardous Chemical Substances)

    351.0 Excavations Hand tools 351.1 Civil Team PM  Contact with /Struck by

    N Lack of concentration

    Awkward body position

    Non-compliance to

    procedures

    Inadequate supervision

    Inadequate inspection

    PPE not worn

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  1 C III

    352.0 Excavating equipment

    e.g. TLB, excavator

    352.1 Operator

    Civil Team

    PM Contact with N Poor planning

    Lack of concentration

    Non-compliance to

    procedures

    Inadequate experience/

    training

    Inadequate supervision

    Awkward body position

    F

    SI

    MI

    Eskom Personal Protective Equipment (240-44175132)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  4 C II

    352.2 Operator

    Civil Team

    PM Equipment failure N Inadequate inspection /

    maintenance

    Latent defects

    Inadequate experience/

    training

    Inadequate supervision

    MI

    SI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  2 C III

    353.0 Noise 353.1 Operator

    Civil team

    PM Exposure above 85 dB N Lack of signage

    Inadequate hygiene

    surveys

    Inadequate training /

    experience

    Inadequate inspection /

    maintenance

    PPE not worn

    MI

    SI

    Noise induced

    hearing loss

    Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Hearing Conservation (32-425)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE  2 C III

    354.0 Blinding Chemical burns 354.1 Civil team PM Contact with wet

    concrete to skin and

    eyes

    N PPE not worn

    Inadequate training/

    experience/supervision

    No suitable facilities for

    washing and immediate

    first aid

    MI Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Hearing Conservation (32-425)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    PE 1 C III

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    17/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    Project specific environmental management plan

    355.0 Reinforcement Protruding rebar 355.1 Civil team PM Contact with (Impaled

    hands)

    N Lack of signage

    Lack of

    concentration

    PPE not worn

    Inadequate training/

    experience/supervision

    SI

    MI

    Eskom Personal Protective Equipment (240-44175132)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction(PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    355.2 Civil team PM Slips and trips N Lack of signage

    Lack of

    concentration

    PPE not worn

    Inadequate training/

    experience/supervision

    SI

    MI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and

    construction(PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    356.0 Pouring of concrete

    (into foundation)

    Chemical burns 356.1 Civil team PM Contact with wet

    concrete to skin and

    eyes

    N PPE not worn

    Inadequate training/experience/supervision

    Inadequate first aid

    treatment facilities

    MI Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    357.0 Manual handling

    operations i.e. hand

    tools such as shovels

    357.1 Civil team PM Musculoskeletal

    disorders

    N Awkward body position

    Repetitive body motion

    caused by bending and

    twisting actions

    Inadequate training /

    experience

    Underlying medical

    conditions

    SI Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    358.0 Vibrators 358.1 Operators PM Whole body vibrations N Inadequate PPE

    Excessive body vibration

    due to teams not taking

    appropriate turn to do

    vibrating operations

    Inadequate training /

    MI Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    PE 1 C III

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    18/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    experience

    Medical surveillance (32-282)

    359.0 Noise 359.1 Operators PM Exposure to noise

    levels above 85dB

    N Inadequate PPE i.e.

    earplugs

    Excessive body vibration

    due to teams not taking

    appropriate turn to dovibrating operations

    SI

    NIHL

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractorsand suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    Hearing Conservation Procedure (32-425)

    Eskom Personal Protective Equipment (240-44175132)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    360.0 Shuttering See shuttering in line risk assessment

    361.0 Installation of HD

    bolts

    HD Bolts 361.1 Civil team/

    Foundation team

    PM Contact with N Inadequate PPE

    Inadequate training

    /experience

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Eskom Personal Protective Equipment (240-44175132)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    362.0 Clean HD bolts Hand tools, i.e. steel

    brush

    362.1 Civil team/

    Foundation team PM Contact with steel

    bristles

    N Lack of concentration

    PPE not worn i.e.

    protective hand gloves

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Eskom Personal Protective Equipment (240-44175132)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    362.2 Civil team/

    Foundation team PM Damage of HD bolt by

    steel bristles

    N Lack of concentration

    Non-compliance to

    procedures

    Inadequate supervision

    PD Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    Fire Protection (Manholes, Sumps, Piping, Oil holding dams, Transformer/reactor bay firewalls)363.0 See all risks in “Excavation” and “Foundations”  

    364.0 Restricted excavation

    i.e. manholes and

    sumps

    Confined spaces 364.1 Civil team PM Collapse of excavation N Non-compliance to

    procedures

    Inadequate excavations

    supports

    F

    SI

    MI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    PE 4 C II

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    19/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    Structural cohesion of

    soil

    Adverse weather

    conditions

    Location of stockpile and

    heavy plant in relationto excavation

    Project specific drawings

    365.0 Elevated position 365.1 Civil team PM Fall into excavation N Lack of concentration

    Inadequate barricading

    Lack of communication

    Inadequate signage

    Lack of training /

    experience

    Lack of risk assessment

    SI

    MI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    367.0 Dust 367.1 Civil team PM Inhalation N PPE not worn

    Inadequate dust

    suppression

    Inadequate training /

    experience

    Inadequate supervision

    MI Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Project specific environmental management plan

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    368.0 Micro organisms 368.1 Civil team PM Exposure to disease

    bearing ground

    organisms while

    excavating

    N Inadequate training /

    experience

    Lack of risk assessment

    Inadequate PPE

    Lack of supervision

    SI

    MI

    Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C II

    369.0 Use of cement – See Hazardous chemical substances

    370.0 Manual operations-

    masonry, trenching,

    laying & bedding of

    pipes

    Hand tools e.g rakes,

    shovels, spades,

    wheelbarrows masonry

    tools

    370.1 Civil team PM Hand and leg injuries N Non-compliance to

    procedures

    PPE not worn

    Poor housekeeping

    Lack of concentration

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Eskom Personal Protective Equipment (240-44175132)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    20/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    Poor supervision

    371.0 Building materials e.g.

    bricks, reinforcing, steel

    mesh, DPC

    371.1 Civil team PM Slips, trips, N Non-compliance with

    procedures

    Lack of attention

    Poor housekeeping

    Lack of planning

    Lack of supervision

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Eskom Personal Protective Equipment (240-44175132)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    371.2 Civil team PM Contact with

    (abrasions, cuts,

    pinching)

    N PPE not worn

    Inadequate training /

    experience

    Lack of supervision

    Awkward body position

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Eskom Personal Protective Equipment (240-44175132)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    374 Ergonomics 374.1 Civil team PM Musculoskeletal

    disorders

    N Awkward body position

    Non-compliance with

    procedures

    Repetitive movement

    Lack of experience

    Underlying medical

    conditions

    SI

    MI

    Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    375.0 Fire walls Scaffolding 375.1 Civil team PM Structural failure N Lack of attention

    Inadequate training

    /experience

    Under estimation of

    load

    Overloading

    Inadequate

    maintenance /

    inspection

    Non-compliance with

    procedures

    PD Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    375.2 Civil team (climbers) PM Fall from height

    (persons and

    equipment)

    N Lack of attention

    Inadequate training

    /experience

    Inadequate

    maintenance /

    inspection

    F

    SI

    MI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    Working at Height (32-418)

    SANS 1200 ALL PARTS

    PE 4 C II

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    21/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    PPE not worn

    Lack of risk assessment

    Lack of supervision

    Project specific drawings

    Drainage376.0 Excavation See all risks for trench excavation in “Yardworks”  

    377.0 Bedding of pipes 

    (Filling and bedding

    material i.e. stone) 

    Uneven surfaces 377.1 Civil team PM Slips and trips N Lack of attention

    PPE not worn

    Poor housekeeping

    Lack of risk assessment

    Poor communication

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    378.0 Hand tools e.g spades

    and wheelbarrows

    378.1 Civil team PM Contact with N Lack of concentration

    Inadequate training /

    experience

    Inadequate

    maintenance /inspection

    PPE not worn

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    379.0 Storm water drains – 

    subsoil and open

    grass lined drains

    Drain hardware i.e.

    Bidem

    379.1 Civil team PM Slips and trips N Lack of concentration

    Poor housekeeping

    Inadequate signage

    Non-compliance to

    procedures

    PPE not worn

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    380.0 Laying of concrete

    pipes

    Ergonomics (Manual

    handling of material)

    380.1 Civil team PM Musculoskeletal

    disorders

    N Underlying diseases

    Repetitive motions

    Lack of experience

    Non-compliance toprocedures

    Underestimation of load

    weight

    Inadequate training /

    experience

    PPE not worn

    SI Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    381.0 Open excavations / trenches – See Line risk assessment excavations

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    22/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    Transformers/Reactor Plinths382.0 Excavation - See risks for “Excavations” and “Foundation” 

    383.0 Place rail tracks Heavy material i.e. rail

    tracks

    383.1 Civil Team PM Contact with / caught

    between

    N Lack of concentration

    Non-compliance to

    procedures

    Inadequate supervision

    Inadequate

    experience/training

    Inadequate risk

    assessment

    SI

    MI

    Eskom Personal Protective Equipment (240-44175132)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2

    C

    III

    Cable Trenches, Ducts, Junctions and Ramps384.0 Refer to all risks for trench excavation in “Yardworks”  

    385.0 Place Kerbs Building material i.e.

    kerb blocks 

    385.1 Civil team PM Contact with N Lack of concentration

    Non-compliance to

    procedures

    Inadequate supervision

    Inadequate

    experience/training

    Inadequate risk

    assessment

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

    386.0 Ergonomics 386.1 Civil team PM Musculoskeletal

    disorders

    N Lack of concentration

    Non-compliance to

    procedures

    Inadequate supervision

    Inadequate

    experience/training

    Inadequate risk

    assessment

    Underestimation of load

    Si Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    387.0 Install JB's, Bends and

    Plug Boxes

    Electrical hardware i.e.

    Joint boxes, conduit,

    plug boxes

    387.1 Electricians

    Assistants

    PM Contact with N Lack of concentration

    Non-compliance to

    procedures

    Inadequate supervision

    Inadequate

    experience/training

    Inadequate risk

    assessment

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Eskom Personal Protective Equipment (240-44175132)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 C III

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    23/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    Support Steel (Structural and Tubular Steelwork)388.0 Installation of

    steel structure

    Uneven surfaces /

    terrain

    (Applicable to all

    substation work)

    388.1 All persons in the

    area

    PM Slips, trips and falls N Lack of concentration

    Horse play

    Inadequate Risk

    assessment

    Inadequate

    communication

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Occupational Hygiene Management (PDPMAN-GL-50)

    Occupational Health Risk Assessment (OHRA/PDP-

    2013/Rev 1)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 D II

    389.0 Open trenches 389.1 General workers PM Slips, trips and falls N Lack of concentration

    Horse play

    Lack of barricading

    Inadequate Risk

    assessment

    Inadequate

    communication

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 D II

    390.0 Adverse weather

    conditions

    390.1 General workers

    Visitors

    PM Exposure to extreme

    elements

    Dehydration

    Frost bite

    N Inadequate planning

    Inadequate rehydration

    Underlying diseases

    Poor Nutrition

    Improper PPE

    F

    SI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 D II

    391.0 Sharp edges on steel

    measuring tape

    391.1 Foundation team PM Cuts (Injuries) N Improper use of

    equipment

    Worn out equipment

    PPE not worn

    Inadequate / Pre-use

    Inspections

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 D III

    392.0 Protruding copper tails 392.1 Foundation team

    All persons in area

    PM Trips

    Fall

    N Protruding metal objects

    not “capped” or

    demarcated

    Lack of concentration

    MI Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 D III

    393.0 Improper hand tools

    usage (e.g. spike

    spanner)

    393.1 Assemblers PM Tool slipping N Over torqueing

    Inadequate PPE

    MI

    SI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Eskom Personal Protective Equipment (240-44175132)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 1 E III

    394.0 Unsecured steel / 394.1 Assemblers PM Falling steel / material N Improper handling F Mandatory SHE Specification to be met by contractors PE 4 D I

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    24/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    material

    Inadequate inspection

    MI

    SI

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    395.0 Manual handling of

    heavy objects / material

    395.1 Assemblers PM Ergonomics N Improper lifting

    techniques

    Under estimation of the

    weight/ load

    Underlying medical

    condition

    Lack of PPE

    Inadequate training /

    experience

    MI

    SI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    396.0 Integrity of lifting

    equipment for lifting of

    equipment and

    employees

    396.1 Operators

    Riggers

    Assemblers

    PM Equipment failure

    Hydraulic failure

    Falling material

    N Inadequate

    maintenance

    Inadequate

    inspections

    Inadequate Risk

    assessmentIncorrect equipment

    Incorrect slinging

    Latent defects

    Inadequate training

    Inadequate supervision

    PD

    F

    SI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    Safe use of lifting machines and lifting tackles (39-98)

    Employee’s right to refuse to work on the grounds of

    SHE related concerns (39-12)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 5 C II

    397.0 Erection, handling

    and lifting of

    equipment

    Deviation from approved

    lifting methodology

    397.1 Operators

    Riggers Erection

    team

    Bystanders

    PM Falling material

    Load shifting

    Failure of equipment /

    tackle

    N Incorrect slinging

    Exceeding load limits

    Inadequate inspection

    Inadequate training

    Lack of supervision

    PD

    F

    SI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    Safe use of lifting machines and lifting tackles (39-98)

    Employee’s right to refuse to work on the grounds of

    SHE related concerns (39-12)

    PE 5 C II

    398.0 Inexperienced

    equipment operator(s)

    398.1 Operator

    Riggers

    Bystanders

    PM Lose control of

    equipment

    Falling material

    N Inadequate training /

    experience

    Lack of supervision

    Underlying medical

    condition

    SI

    PD

    F

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    Safe use of lifting machines and lifting tackles (39-98)

    Employee’s right to refuse to work on the grounds of

    SHE related concerns (39-12)

    SANS 1200 ALL PARTS

    PE 3 C II

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    25/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    Project specific drawings

    399.0 Suspended load 399.1 Erection Team

    Bystanders

    PM Exposure to falling

    objects

    Falling from height

    N Failure of lifting

    equipment

    Improperly secured load

    Elevated position

    Not following

    procedures

    Inadequate training

    SI

    PD

    F

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    Safe use of lifting machines and lifting tackles (39-98)

    Employee’s right to refuse to work on the grounds of

    SHE related concerns (39-12)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 4 C II

    400.0 Unstable terrace 400.1 Operator

    Riggers

    Bystanders

    PM Crane overturn N Sinking terrace

    Poor compaction

    Fill material used not

    according to

    specification

    Inadequate method

    statement or

    Noncompliance tomethod statement

    SI

    PD

    F

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 4 C II

    401.0 Tightening and

    torqueing of bolts and

    nuts

    Incorrect application of

    hand tools e.g. torque

    wrench

    401.1 Erection team PM Falling, slipping N Worn out tools

    Inadequate pre-use

    inspections

    Use of self-made tools

    Incorrect tool

    application

    Inadequate training

    Use of defective tools

    Awkward body posture

    MI

    SI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 2 C III

    402.0 Elevated positions 402.1 Climbers

    Bystanders

    PM Fall from elevated

    positions

    N Failure to secure

    PPE failure

    Inadequate training

    Underlying medical

    conditions

    Engineering design

    constraints

    Non-compliance to

    method statement

    Worker complacency

    F

    SI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    Working at Height (32-418)

    Eskom Personal Protective Equipment (240-44175132)

    Life saving rules (32-421)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 4 D I

    403.0 Component failure 403.1 Erection team

    Bystanders

    PM Collapsing of steel

    structure

    N  Latent defects on bolts

    Incorrect size of bolts

    PD

    F

    SI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    PE 4 C II

  • 8/18/2019 2010923_Final Substation _Civil Baseline Risk Assessment_Rev 0 (3)

    26/39

    Project/department: PDP  Scope:

    H & S – Baseline – 765/400/275 kV Substation Works - V1.0.  

    Next review date

    2014 /09/01

    Date: April – Sept 2013  Prepared by: J M Rheeder Accountable manager:  S Small

    1. 

    Identify Hazards 2. 

    Identify Risks 3. 

    Analyse RisksHaz no Task & Status

    (All active)

    Hazard identification Risk No Affected persons Risk

    owner

    Associated risk Abnormal

    Y/N

    Causes of risk Consequences Existing controls H & S / Fin

    Cons

    Likelihood Risk rating

    Preventive/Reactive RCE

    Exceeding safe work

    load limits

    Inadequate inspections

    of bolts

    Inappropriate storage ofbolts (exposure to

    elements)

    SANS 1200 ALL PARTS

    Project specific drawings

    404.0 Inexperienced

    employees/

    workers

    404.1 Co-workers

    Bystanders

    PM Collapsing of steel

    structure

    Incorrect assembly

    N  Inadequate training

    Inadequate supervision

    Non-compliance to

    procedure

    F

    SI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 4 C II

    405.0 Elevated positions 405.1 Climbers

    Bystanders

    PM Fall from elevated

    positions

    N Failure to secure

    PPE Failure

    Inadequate training

    Underlying medical

    conditions

    Engineering designconstraints

    Non-compliance to

    method statement

    Complacency

    F

    SI

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    Medical surveillance (32-282)

    Working at Height (32-418)

    Eskom Personal Protective Equipment (240-44175132)

    Life saving rules (32-421)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 4 C II

    406.0 Incorrect application of

    hand tools (purpose

    made / special tools)

    406.1 Assemblers PM Equipment failure N Inadequate training

    Non-compliance to

    method statement

    F

    SI

    PD

    Mandatory SHE Specification to be met by contractors

    and suppliers during refurbishment and construction

    (PDPMAN-ST-001)

    SANS 1200 ALL PARTS

    Project specific drawings

    PE 4 C II

    407.0 Assemble / erect

    masts (tubular

    steelwork) with light

    fittings

    Heavy material 407.1 Assemblers PM  Musculoskeletaldisorders

    N Incorrect lifting

    techniques

    Inadequate training /

    experience

    Underestimation of

    weight

    Physical incapability -

    Inadequate selection

    process

    SI

    MI

    Mandat