2010 CDOT construction cost data book

download 2010 CDOT construction cost data book

of 528

Transcript of 2010 CDOT construction cost data book

  • 8/8/2019 2010 CDOT construction cost data book

    1/527

    2010 COST DATA

    CONSTRUCTION

    TABLE OF CONTENTS

    BRIDGE COSTS PER SQUARE FOOT

    INDEX & AVG UNIT PRICES

    ITEM UNIT COSTS

    PROJECT BID (JANUARY-SEPTEMBER 2010)

    A di A 2010 C t ti T P j t *

  • 8/8/2019 2010 CDOT construction cost data book

    2/527

    Appendix A 2010 Construction Type Projects *

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 1

    2010 Cost Data

    BRIDGE COST PER SQUARE FOOT

    (01/01/10 THROUGH 09/30/10)

    ------------------------------------------------------------------------------------------------------------------------------------

    PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER

    DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT

    ------------------------------------------------------------------------------------------------------------------------------------

    BRIDGE REPAIR

    100204 IM 0703-352 M

    I-70 WEST EJMT TO BAKERVILLE 144.0000 44.5000 6408.0 $32,543 $5.08

    F-13-J 144.0000 44.5000 6408.0 $33,263 $5.19

    F-13-O 292.0000 42.7500 12483.0 $113,748 $9.11

    F-13-P 277.0000 41.0000 11357.0 $67,330 $5.93

    F-13-T 216.0000 36.5000 7884.0 $140,412 $17.81

    100218 ES20504-060 R

    US 50B: EAST OF JCT 96 TO HUER K-19-U 306.0000 30.0000 9180.0 $184,179 $20.06

    K-19-Q 306.0000 30.0000 9180.0 $89,920 $9.80

    L-19-H 406.0000 32.0000 12992.0 $87,121 $6.71

    100318 STA0853-065 U

    ON US 85 IN WELD COUNTY C-18-BL 303.0000 30.0000 9090.0 $177,218 $19.50

    C-18-BM 307.0000 30.0000 9210.0 $180,673 $19.62

    C-18-BK 344.0000 30.0000 10320.0 $174,442 $16.90

    100325 STA157A-010 R

    SH 157A IN BOULDER COUNTY E-16-HX 185.0000 50.0000 9250.0 $107,416 $11.61

    E-16-HY 153.0000 42.0000 6426.0 $52,138 $8.11

    D-16-CX 152.0000 100.0000 15200.0 $30,347 $2.00

    D-16-CV 185.0000 88.0000 16280.0 $35,834 $2.20

    D-16-CU 154.0000 70.0000 10780.0 $117,478 $10.90

    100708 C025A-011 U

    I-25/SANTA FE F-16-DT F-16-DT 337.0000 52.0000 17524.0 $147,319 $8.41

    WEIGHTED AVERAGE COST:

    NEW STRUCTURES 179972.0 $1,771,381 $9.84

    BRIDGE DECK REPLACEMENT

    100708 FBR0242-047 M

    US 24 AT MILE MARKER 270.8 AND I-15-Y 52.8000 35.0000 1848.0 $1,961,700 $1,061.53

    WEIGHTED AVERAGE COST:

    NEW STRUCTURES 1848.0 $1,961,700 $1,061.53

    CONCRETE SLAB AND GIRDER

    100701 ES4 0853-072 R

    SH 85 WYOMING SOUTH-STRUCTURES A-17-W 69.0000 30.0000 2070.0 $27,638 $13.35

    100923 ES1 0705-078 P

    I-70, AGATE TO KANSAS BORDER G-28-H 94.0000 38.5000 3619.0 $4,484 $1.24

  • 8/8/2019 2010 CDOT construction cost data book

    3/527

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 2

    2010 Cost Data

    BRIDGE COST PER SQUARE FOOT

    (01/01/10 THROUGH 09/30/10)

    ------------------------------------------------------------------------------------------------------------------------------------

    PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER

    DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT

    ------------------------------------------------------------------------------------------------------------------------------------

    G-28-L 94.0000 38.5000 3619.0 $17,884 $4.94

    G-28-N 94.0000 38.5000 3619.0 $13,484 $3.73

    G-28-O 95.0000 38.5000 3657.5 $17,884 $4.89

    G-28-K 94.0000 38.5000 3619.0 $17,884 $4.94

    G-28-M 93.0000 38.5000 3580.5 $17,884 $4.99

    100930 STA 119A-051 M

    SH 119 FROM SOUTH BLACK HAWK C E-15-AM 446.0000 81.0000 36126.0 $3,363,175 $93.10

    WEIGHTED AVERAGE COST:

    NEW STRUCTURES 59910.0 $3,480,317 $58.09

    PRESTRES GIRDER (BOX SECTION)

    100318 FBR 069A-026 L

    0.5 MILES S/O THE TOWN OF FARI N-16-Q 106.0000 43.0000 4558.0 $711,639 $156.13

    WEIGHTED AVERAGE COST:

    NEW STRUCTURES 4558.0 $711,639 $156.13

    MAJOR STRUCTURE CBC OR PIPES

    100701 ES4 0853-072 R

    SH 85 WYOMING SOUTH-STRUCTURES A-17-X 39.3300 90.0000 3539.7 $299,458 $84.60

    A-17-Y 34.5000 90.0000 3105.0 $304,219 $97.98

    WEIGHTED AVERAGE COST:

    NEW STRUCTURES 6644.7 $603,677 $90.85

    ROLLED STEEL GIRDER

    100610 FBR5502-068 M

    US 550 ON RED MOUNTAIN PASS SO P-05-B 86.6700 39.0000 3380.1 $1,399,722 $414.10

    WEIGHTED AVERAGE COST:NEW STRUCTURES 3380.1 $1,399,722 $414.10

    TIMBER BRIDGE (GLUELAM)

    100603 FBR138A-008 P

    REGION 4 VARIOUS LOCATIONS A-24-C 38.0000 28.0000 1064.0 $65,937 $61.97

    WEIGHTED AVERAGE COST:

    NEW STRUCTURES 1064.0 $65,937 $61.97

    PEDESTRIAN OR BIKEWAY BRIDGE

    100930 STA 119A-051 M

    SH 119 FROM SOUTH BLACK HAWK C E15-AN 142.5000 10.0000 1425.0 $260,150 $182.56WEIGHTED AVERAGE COST:

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 2

    2010 Cost Data

    BRIDGE COST PER SQUARE FOOT

    (01/01/10 THROUGH 09/30/10)

    ------------------------------------------------------------------------------------------------------------------------------------

    PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER

    DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT

    ------------------------------------------------------------------------------------------------------------------------------------

    G-28-L 94.0000 38.5000 3619.0 $17,884 $4.94

    G-28-N 94.0000 38.5000 3619.0 $13,484 $3.73

    G-28-O 95.0000 38.5000 3657.5 $17,884 $4.89

    G-28-K 94.0000 38.5000 3619.0 $17,884 $4.94

    G-28-M 93.0000 38.5000 3580.5 $17,884 $4.99

    100930 STA 119A-051 M

    SH 119 FROM SOUTH BLACK HAWK C E-15-AM 446.0000 81.0000 36126.0 $3,363,175 $93.10

    WEIGHTED AVERAGE COST:

    NEW STRUCTURES 59910.0 $3,480,317 $58.09

    PRESTRES GIRDER (BOX SECTION)

    100318 FBR 069A-026 L

    0.5 MILES S/O THE TOWN OF FARI N-16-Q 106.0000 43.0000 4558.0 $711,639 $156.13

    WEIGHTED AVERAGE COST:

    NEW STRUCTURES 4558.0 $711,639 $156.13

    MAJOR STRUCTURE CBC OR PIPES

    100701 ES4 0853-072 R

    SH 85 WYOMING SOUTH-STRUCTURES A-17-X 39.3300 90.0000 3539.7 $299,458 $84.60

    A-17-Y 34.5000 90.0000 3105.0 $304,219 $97.98

    WEIGHTED AVERAGE COST:

    NEW STRUCTURES 6644.7 $603,677 $90.85

    ROLLED STEEL GIRDER

    100610 FBR5502-068 M

    US 550 ON RED MOUNTAIN PASS SO P-05-B 86.6700 39.0000 3380.1 $1,399,722 $414.10

    WEIGHTED AVERAGE COST:NEW STRUCTURES 3380.1 $1,399,722 $414.10

    TIMBER BRIDGE (GLUELAM)

    100603 FBR138A-008 P

    REGION 4 VARIOUS LOCATIONS A-24-C 38.0000 28.0000 1064.0 $65,937 $61.97

    WEIGHTED AVERAGE COST:

    NEW STRUCTURES 1064.0 $65,937 $61.97

    PEDESTRIAN OR BIKEWAY BRIDGE

    100930 STA 119A-051 M

    SH 119 FROM SOUTH BLACK HAWK C E15-AN 142.5000 10.0000 1425.0 $260,150 $182.56WEIGHTED AVERAGE COST:

    NEW STRUCTURES 1425.0 $260,150 $182.56

  • 8/8/2019 2010 CDOT construction cost data book

    4/527

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 3

    2010 Cost Data

    BRIDGE COST PER SQUARE FOOT

    (01/01/10 THROUGH 09/30/10)

    ------------------------------------------------------------------------------------------------------------------------------------

    PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER

    DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT

    ------------------------------------------------------------------------------------------------------------------------------------

    MISCELLANEOUS

    100318 ES6 0852-103 - CONCRETE ALT R

    US 85 / C-470 INTERCHANGE (STA F-16_YE, F-16-WY 1728.8300 33.0000 57051.4 $5,441,000 $95.37

    100401 BR M356-022 U

    80TH OVER US36 ON WESTMINISTER 0.0000 0.0000 0.0 $2,630,306

    100603 FBR138A-008 P

    REGION 4 VARIOUS LOCATIONS A-26-F 0.0000 0.0000 0.0 $79,808

    100624 FBR 0703-357 M

    STR. F-14-AZ WEST OF IDAHO SPR F-14-AZ 125.0000 40.0000 5000.0 $852,484 $170.50

    WEIGHTED AVERAGE COST:

    NEW STRUCTURES 62051.4 $9,003,597 $145.10

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 3

    2010 Cost Data

    BRIDGE COST PER SQUARE FOOT

    (01/01/10 THROUGH 09/30/10)

    ------------------------------------------------------------------------------------------------------------------------------------

    PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER

    DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT

    ------------------------------------------------------------------------------------------------------------------------------------

    MISCELLANEOUS

    100318 ES6 0852-103 - CONCRETE ALT R

    US 85 / C-470 INTERCHANGE (STA F-16_YE, F-16-WY 1728.8300 33.0000 57051.4 $5,441,000 $95.37

    100401 BR M356-022 U

    80TH OVER US36 ON WESTMINISTER 0.0000 0.0000 0.0 $2,630,306

    100603 FBR138A-008 P

    REGION 4 VARIOUS LOCATIONS A-26-F 0.0000 0.0000 0.0 $79,808

    100624 FBR 0703-357 M

    STR. F-14-AZ WEST OF IDAHO SPR F-14-AZ 125.0000 40.0000 5000.0 $852,484 $170.50

    WEIGHTED AVERAGE COST:

    NEW STRUCTURES 62051.4 $9,003,597 $145.10

  • 8/8/2019 2010 CDOT construction cost data book

    5/527

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 12010 Cost Data

    INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/10 THROUGH 09/30/10

    ------------------------------------------------------------------------------------------------------------------------------------

    ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE

    ------------------------------------------------------------------------------------------------------------------------------------

    201-00000 Clearing and Grubbing 17 Lump Sum 387,398.81 22,788.17

    201-00001 Clearing and Grubbing 81 Acre 128,921.50 1,591.62

    201-00002 Clearing 1 Lump Sum 4,800.00 4,800.00

    201-00005 Removal of Debris 5 Lump Sum 28,141.16 5,628.23

    202-00000 Removal of Structures and Obstructions 3 Lump Sum 13,454.00 4,484.67

    202-00001 Removal of Structure 53 Each 70,891.00 1,337.57

    202-00003 Removal of Structure (Special) 1 Lump Sum 3,000.00 3,000.00

    202-00008 Tree Trimming 140 Hour 12,417.00 88.69

    202-00010 Removal of Tree 215 Each 70,317.92 327.06

    202-00015 Removal of Headwall 11 Each 8,150.00 740.91

    202-00019 Removal of Inlet 85 Each 41,091.74 483.43

    202-00020 Removal of Concrete Box Culvert 1 Each 8,800.00 8,800.00

    202-00021 Removal of Manhole 29 Each 11,529.14 397.56

    202-00023 Removal of Embankment Protector Type 3 9 Each 3,175.00 352.78

    202-00026 Removal of Slope and Ditch Paving 7,056 Sq Yard 41,803.51 5.92

    202-00027 Removal of Riprap 139 Sq Yard 2,557.00 18.40

    202-00031 Removal of Fire Hydrant 2 Each 1,400.00 700.00

    202-00032 Removal of Valve 5 Each 2,000.00 400.00

    202-00033 Removal of Pipe 265 Each 25,438.75 96.00

    202-00035 Removal of Pipe 30,860 Lin Foot 484,453.44 15.70

    202-00037 Removal of End Section 24 Each 5,933.63 247.23

    202-00040 Removal of Electrical Conduit 1,600 Lin Foot 6,400.00 4.00

    202-00090 Removal of Delineator 5,690 Each 32,395.67 5.69

    202-00150 Removal of Wall 8 Each 10,560.00 1,320.00

    202-00155 Removal of Wall 2,298 Lin Foot 39,302.00 17.10

    202-00160 Removal of Wall 300 Sq Foot 12,300.00 41.00

    202-00165 Removal of Wall 1 Lump Sum 22,000.00 22,000.00202-00170 Grinding And Texturing Concrete Pavement 638 Sq Yard 3,975.60 6.23

    202-00190 Removal of Concrete Median Cover Material 12,610 Sq Yard 64,249.03 5.10

    202-00195 Removal of Median Cover 4,278 Sq Yard 32,277.26 7.54

    202-00200 Removal of Sidewalk 12,130 Sq Yard 83,115.05 6.85

    202-00201 Removal of Curb 17,343 Lin Foot 54,741.42 3.16

    202-00202 Removal of Gutter 198 Lin Foot 645.48 3.26

    202-00203 Removal of Curb and Gutter 87,580 Lin Foot 358,266.07 4.09

    202-00204 Removal of Curb, Gutter and Sidewalk 75 Lin Foot 487.50 6.50

    202-00206 Removal of Concrete Curb Ramp 1,723 Sq Yard 26,430.11 15.34

    202-00210 Removal of Concrete Pavement 101,498 Sq Yard 1,009,393.94 9.94

    202-00212 Removal of Concrete Pavement 1,716 Sq Yard 15,083.64 8.79

  • 8/8/2019 2010 CDOT construction cost data book

    6/527

  • 8/8/2019 2010 CDOT construction cost data book

    7/527

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 1

    2010 Cost Data

    PROJECTS BID FROM 01/01/10 THROUGH 09/30/10

    ------------------------------------------------------------------------------------------------------------------------------------

    BID CONTRACTOR/

    LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX

    ------------------------------------------------------------------------------------------------------------------------------------

    20100107 INTERMOUNTAIN SLURRY SEAL, INC. 4 $1,453,413.00 86.81

    ES4 0343-030 SH 34: BRUSH TO AKRON 4 P

    20100114 AMERICAN CIVIL CONSTRUCTORS, INC. 11 $6,422,888.00 85.20

    ES3 0702-297 I-70 EDWARDS INTERCHANGE 3 M

    20100128 FOUR CORNERS MATERIALS 7 $5,293,814.51 87.98

    ES51602-123 US 160 FLORIDA RIVER TO 1 MILE 5 R

    20100128 KOLBE STRIPING INC. 6 $354,835.00 64.96

    MTCER100-171 MTCE FY10 R1 STENCIL SOUTH 1 R

    20100128 VILLALOBOS CONCRETE INC. 5 $2,059,265.97 83.22

    NH 0821-088 SH 82 IN GARFIELD COUNTY MP 0. 3 M

    20100128 COULSON EXCAVATING COMPANY 6 $436,930.00 87.99

    STA2873-156 WEST OF SH 287 & LCR 17 INTERS 4 R

    20100128 COULSON EXCAVATING COMPANY 5 $9,384,771.55 104.28

    IM0253-210 I-25 RUBB NB & SB N OF LCR 36 4 R

    20100204 ASPHALT SPECIALTIES CO., INC. 5 $2,955,811.15 88.62

    IM 0703-352 I-70 WEST EJMT TO BAKERVILLE 1 M

    20100204 LAFARGE NORTH AMERICA, INC 4 $6,051,601.78 95.28

    IM0251-337 TRINIDAD - NORTH 2 R

    20100204 DILLIE & KUHN, INC. 11 $561,154.86 78.62

    MP0211-001 SH16A, SH21A, US24A, SH67D & U 2 R

    20100204 APC SOUTHERN CONSTRUCTION COMPANY, LLC 7 $4,527,417.86 93.49

    ES1 0243-079 US 24 WEST OF LIMON 1 P

    20100211 BRANNAN SAND AND GRAVEL, LLC 6 $403,509.27 85.86

    CCR600-330 CHATFIELD STATE PARK MAIN RD. 6 R

    20100211 NCB, LLC 15 $332,453.00 71.47

    ES1 2854-120 US 285 MM 172.3 1 M

    20100218 LAFARGE NORTH AMERICA, INC 4 $2,801,243.94 100.39

    ES4 0061-080 WASHINGTON AND LOGAN COUNTY 4 R

    20100218 ROCKY MOUNTAIN MATERIALS & ASPHALT, INC. 6 $4,406,202.39 91.21

    ES20504-060 US 50B: EAST OF JCT 96 TO HUER 2 R

    20100225 LAFARGE NORTH AMERICA, INC 8 $4,608,918.98 79.04

    ES30141-021 MP 0-23, JACKSON COUNTY, SH 14 3 M

    20100225 LAFARGE NORTH AMERICA, INC 8 $3,332,949.85 80.20

    ES30141-021 MP 0-23, JACKSON COUNTY, SH 14 3 M

  • 8/8/2019 2010 CDOT construction cost data book

    8/527

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 2

    2010 Cost Data

    PROJECTS BID FROM 01/01/10 THROUGH 09/30/10

    ------------------------------------------------------------------------------------------------------------------------------------

    BID CONTRACTOR/

    LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX

    ------------------------------------------------------------------------------------------------------------------------------------

    20100304 APC SOUTHERN CONSTRUCTION COMPANY, LLC 6 $5,165,043.41 98.73

    ES5 1602-125 US 160 SHAW CREEK TO DEL NORTE 5 R

    20100304 LAFARGE NORTH AMERICA, INC 6 $1,509,306.60 77.31

    ES6 002A-003 SH 2, 62ND AVE. TO QUEBEC PARK 6 U

    20100311 INTERFACE COMMUNICATIONS, COMPANY 4 $70,059.48 87.77

    STAR400-249 SH 257 MP 9.558 AND SH 7B MP 5 4 R

    20100311 KOLBE STRIPING INC. 4 $585,181.00 116.61

    MPR200-172 SH287 A & B AND US50 B 2 P

    20100318 LAFARGE NORTH AMERICA, INC 5 $3,299,328.29 92.90

    STA0853-065 ON US 85 IN WELD COUNTY 4 U

    20100318 STURGEON ELECTRIC COMPANY, INC 4 $577,954.00 101.16

    C0703-356 I-70, EAST OF SILVERTHORN TO L 1 M

    20100318 WALSENBURG SAND AND GRAVEL 7 $1,837,111.00 104.92

    FBR 069A-026 0.5 MILES S/O THE TOWN OF FARI 2 L

    20100318 EDWARD KRAEMER & SONS INC. 5 $17,172,771.47 31.38

    ES6 0852-103 - CONCRETE ALT US 85 / C-470 INTERCHANGE (STA 6 R

    ES6 0852-103 - DEFAULT ALT US 85 / C-470 INTERCHANGE (STA 6 R

    ES6 0852-103 - STEEL ALT US 85 / C-470 INTERCHANGE (STA 6 R

    20100318 FLATIRON CONSTRUCTORS, INC. 4 $620,830.00 84.08

    ER 0702-307 I-70 MP 124-126 IN GARFIELD CO 3 M

    20100325 BRANNAN SAND AND GRAVEL, LLC 6 $2,378,047.60 89.14

    STA157A-010 SH 157A IN BOULDER COUNTY 4 R

    20100401 STRUCTURES, INC. 8 $6,959,186.05 87.91

    BR M356-022 80TH OVER US36 ON WESTMINISTER 6 U

    20100401 LAFARGE NORTH AMERICA, INC 6 $3,808,889.81 92.81

    NHC010-100 SH2, ALAMEDA TO MLK 6 U

    20100401 SCHMIDT CONSTRUCTION COMPANY 3 $2,641,487.47 91.06

    STA R200-167 SH 21 BRADLEY RD. TO N/O DRENN 2 R

    20100401 STURGEON ELECTRIC COMPANY, INC 4 $122,513.00 90.87

    C0703-355 I-70, EAST OF SILVER PLUME TO 1 M

    20100401 UNITED COMPANIES OF MESA COUNTY 3 $849,450.25 94.45

    STA 0241-054 SH 24 BATTLE MOUNTAIN CHIP SEA 3 M

    20100408 LAFARGE NORTH AMERICA, INC 6 $2,662,412.20 88.57

    STA2854-119 US 285 DEER CREEK TO RICHMOND 1 M

    20100408 ELAM CONSTRUCTION, INC. 3 $3,529,926.50 95.92

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 2

    2010 Cost Data

    PROJECTS BID FROM 01/01/10 THROUGH 09/30/10

    ------------------------------------------------------------------------------------------------------------------------------------

    BID CONTRACTOR/

    LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX

    ------------------------------------------------------------------------------------------------------------------------------------

    20100304 APC SOUTHERN CONSTRUCTION COMPANY, LLC 6 $5,165,043.41 98.73

    ES5 1602-125 US 160 SHAW CREEK TO DEL NORTE 5 R

    20100304 LAFARGE NORTH AMERICA, INC 6 $1,509,306.60 77.31

    ES6 002A-003 SH 2, 62ND AVE. TO QUEBEC PARK 6 U

    20100311 INTERFACE COMMUNICATIONS, COMPANY 4 $70,059.48 87.77

    STAR400-249 SH 257 MP 9.558 AND SH 7B MP 5 4 R

    20100311 KOLBE STRIPING INC. 4 $585,181.00 116.61

    MPR200-172 SH287 A & B AND US50 B 2 P

    20100318 LAFARGE NORTH AMERICA, INC 5 $3,299,328.29 92.90

    STA0853-065 ON US 85 IN WELD COUNTY 4 U

    20100318 STURGEON ELECTRIC COMPANY, INC 4 $577,954.00 101.16

    C0703-356 I-70, EAST OF SILVERTHORN TO L 1 M

    20100318 WALSENBURG SAND AND GRAVEL 7 $1,837,111.00 104.92

    FBR 069A-026 0.5 MILES S/O THE TOWN OF FARI 2 L

    20100318 EDWARD KRAEMER & SONS INC. 5 $17,172,771.47 31.38

    ES6 0852-103 - CONCRETE ALT US 85 / C-470 INTERCHANGE (STA 6 R

    ES6 0852-103 - DEFAULT ALT US 85 / C-470 INTERCHANGE (STA 6 R

    ES6 0852-103 - STEEL ALT US 85 / C-470 INTERCHANGE (STA 6 R

    20100318 FLATIRON CONSTRUCTORS, INC. 4 $620,830.00 84.08

    ER 0702-307 I-70 MP 124-126 IN GARFIELD CO 3 M

    20100325 BRANNAN SAND AND GRAVEL, LLC 6 $2,378,047.60 89.14

    STA157A-010 SH 157A IN BOULDER COUNTY 4 R

    20100401 STRUCTURES, INC. 8 $6,959,186.05 87.91

    BR M356-022 80TH OVER US36 ON WESTMINISTER 6 U

    20100401 LAFARGE NORTH AMERICA, INC 6 $3,808,889.81 92.81

    NHC010-100 SH2, ALAMEDA TO MLK 6 U

    20100401 SCHMIDT CONSTRUCTION COMPANY 3 $2,641,487.47 91.06

    STA R200-167 SH 21 BRADLEY RD. TO N/O DRENN 2 R

    20100401 STURGEON ELECTRIC COMPANY, INC 4 $122,513.00 90.87

    C0703-355 I-70, EAST OF SILVER PLUME TO 1 M

    20100401 UNITED COMPANIES OF MESA COUNTY 3 $849,450.25 94.45

    STA 0241-054 SH 24 BATTLE MOUNTAIN CHIP SEA 3 M

    20100408 LAFARGE NORTH AMERICA, INC 6 $2,662,412.20 88.57

    STA2854-119 US 285 DEER CREEK TO RICHMOND 1 M

    20100408 ELAM CONSTRUCTION, INC. 3 $3,529,926.50 95.92

    NH5502-067 US 550 NORTH OF DURANGO ON MOL 5 M

  • 8/8/2019 2010 CDOT construction cost data book

    9/527

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 3

    2010 Cost Data

    PROJECTS BID FROM 01/01/10 THROUGH 09/30/10

    ------------------------------------------------------------------------------------------------------------------------------------

    BID CONTRACTOR/

    LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX

    ------------------------------------------------------------------------------------------------------------------------------------

    20100408 BRANNAN SAND AND GRAVEL, LLC 4 $4,268,360.97 80.01

    IM0253-211 I-25 NB AND SB AT WCR 32 4 L

    20100415 HAMON CONTRACTORS, INC. 6 $16,421,806.87 87.37

    STU 0831-107 PARKER RD (SH 83) AND ARAPAHOE 6 U

    20100415 ZAK DIRT, INC. 7 $2,894,701.75 80.23

    NH 2873-157 SH 287:BROOMFIELD TO LAFAYETTE 6 R

    20100415 CRUZ CONSTRUCTION, INC. 7 $427,135.50 77.01

    C0761-205 I-76 NORTH OF WCR 8 IN WELD CO 4 L

    20100422 INTERMOUNTAIN SLURRY SEAL, INC. 4 $588,793.08 96.40

    NH 1603-026 US 160 FORT GARLAND EAST 5 R

    20100422 APC SOUTHERN CONSTRUCTION COMPANY, LLC 2 $805,394.81 94.32

    IM0704-219 I70 WEST OF SIEBERT - EAST 1 P

    20100422 INTERFACE COMMUNICATIONS, COMPANY 2 $182,171.81 102.14

    C3921-011 SH 392 AND CR 31 INTERSECTION 4 R

    20100422 W.L. CONTRACTORS, INC. 3 $218,837.75 94.92

    C0931-028 INTERSECTION OF SH 93 AND SH 1 4 R

    20100429 INTERSTATE HIGHWAY CONSTRUCTION 6 $20,293,515.37 95.34

    IM 2254-074 I-225: MISSISSIPPI TO 2ND AVE 6 U

    20100429 ARROW ELECTRIC SERVICE, INC. 6 $415,249.90 95.47

    SHE045A-008 SH45(PUEBLO BLVD.) AND GOODNIG 2 U

    20100429 LAFARGE NORTH AMERICA, INC 5 $5,399,788.69 83.49

    IM0252-406 ON I-25 1 MI. S. OF PUEBLO THR 2 U

    20100506 CASTLE ROCK CONST. CO. OF COLO, LLC 4 $10,000,000.00 101.76

    NH R100-131 HUGO-EAST 1 P

    20100506 MIDWEST ROCKFALL, INC. 5 $1,012,145.00 82.87

    STA145A-044 SH 145 ON NORWOOD HILL IN SAN 5 M

    20100506 MOUNTAIN CONSTRUCTORS, INC. 6 $484,338.95 110.26

    SHE2873-152 1.5 MILES WEST OF I-25 IN LARI 4 R

    20100506 OLDCASTLE SW GROUP, INC. 5 $1,283,923.65 88.75

    NH0402-078 US40&SH131 GRAND&ROUTT COUNTIE 3 M

    20100513 COLORADO BORING. CO. 8 $294,642.88 59.04

    STAR600-359 SH 7, SH 72, SH 177, SH 287 6 L

    20100513 PAVETEC, INC. 4 $3,915,572.76 100.33

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 3

    2010 Cost Data

    PROJECTS BID FROM 01/01/10 THROUGH 09/30/10

    ------------------------------------------------------------------------------------------------------------------------------------

    BID CONTRACTOR/

    LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX

    ------------------------------------------------------------------------------------------------------------------------------------

    20100408 BRANNAN SAND AND GRAVEL, LLC 4 $4,268,360.97 80.01

    IM0253-211 I-25 NB AND SB AT WCR 32 4 L

    20100415 HAMON CONTRACTORS, INC. 6 $16,421,806.87 87.37

    STU 0831-107 PARKER RD (SH 83) AND ARAPAHOE 6 U

    20100415 ZAK DIRT, INC. 7 $2,894,701.75 80.23

    NH 2873-157 SH 287:BROOMFIELD TO LAFAYETTE 6 R

    20100415 CRUZ CONSTRUCTION, INC. 7 $427,135.50 77.01

    C0761-205 I-76 NORTH OF WCR 8 IN WELD CO 4 L

    20100422 INTERMOUNTAIN SLURRY SEAL, INC. 4 $588,793.08 96.40

    NH 1603-026 US 160 FORT GARLAND EAST 5 R

    20100422 APC SOUTHERN CONSTRUCTION COMPANY, LLC 2 $805,394.81 94.32

    IM0704-219 I70 WEST OF SIEBERT - EAST 1 P

    20100422 INTERFACE COMMUNICATIONS, COMPANY 2 $182,171.81 102.14

    C3921-011 SH 392 AND CR 31 INTERSECTION 4 R

    20100422 W.L. CONTRACTORS, INC. 3 $218,837.75 94.92

    C0931-028 INTERSECTION OF SH 93 AND SH 1 4 R

    20100429 INTERSTATE HIGHWAY CONSTRUCTION 6 $20,293,515.37 95.34

    IM 2254-074 I-225: MISSISSIPPI TO 2ND AVE 6 U

    20100429 ARROW ELECTRIC SERVICE, INC. 6 $415,249.90 95.47

    SHE045A-008 SH45(PUEBLO BLVD.) AND GOODNIG 2 U

    20100429 LAFARGE NORTH AMERICA, INC 5 $5,399,788.69 83.49

    IM0252-406 ON I-25 1 MI. S. OF PUEBLO THR 2 U

    20100506 CASTLE ROCK CONST. CO. OF COLO, LLC 4 $10,000,000.00 101.76

    NH R100-131 HUGO-EAST 1 P

    20100506 MIDWEST ROCKFALL, INC. 5 $1,012,145.00 82.87

    STA145A-044 SH 145 ON NORWOOD HILL IN SAN 5 M

    20100506 MOUNTAIN CONSTRUCTORS, INC. 6 $484,338.95 110.26

    SHE2873-152 1.5 MILES WEST OF I-25 IN LARI 4 R

    20100506 OLDCASTLE SW GROUP, INC. 5 $1,283,923.65 88.75

    NH0402-078 US40&SH131 GRAND&ROUTT COUNTIE 3 M

    20100513 COLORADO BORING. CO. 8 $294,642.88 59.04

    STAR600-359 SH 7, SH 72, SH 177, SH 287 6 L

    20100513 PAVETEC, INC. 4 $3,915,572.76 100.33

    NH 2851-005 US 285 LA JARA TO ALAMOSA 5 R

  • 8/8/2019 2010 CDOT construction cost data book

    10/527

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 4

    2010 Cost Data

    PROJECTS BID FROM 01/01/10 THROUGH 09/30/10

    ------------------------------------------------------------------------------------------------------------------------------------

    BID CONTRACTOR/

    LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX

    ------------------------------------------------------------------------------------------------------------------------------------

    20100513 ASPHALT SPECIALTIES CO., INC. 7 $507,335.30 111.74

    SHE085A-011 US 85 & 144TH AVENUE INTERSECT 6 R

    20100513 OLDCASTLE SW GROUP, INC. 8 $1,398,999.00 97.47

    C0701-205 I-70 EXIT 37 MESA COUNTY 3 L

    20100513 WATERFORD CORPORATION 3 $1,128,603.25 103.66

    C 0821-091 SH 82 MP 10-16 3 M

    20100520 W.L. CONTRACTORS, INC. 5 $236,502.80 98.00

    SHE0821-089 SH82 @ BRUSH CK. SIGNAL IMPROV 3 R

    20100520 APC SOUTHERN CONSTRUCTION COMPANY, LLC 3 $4,859,868.06 93.35

    NH 1603-028 US 160 MP 240.3 E TO FT GARLAN 5 P

    20100527 ZAK DIRT, INC. 11 $649,545.50 96.79

    STA1381-006 US 138 EAST OF STERLING 4 P

    20100527 LAFARGE NORTH AMERICA, INC 3 $4,343,627.51 96.76

    STA0362-029 US 36 KANSAS STATE LINE WEST ( 4 P

    20100527 LAWSON CONSTRUCTION COMPANY 3 $8,237,445.21 112.28

    NH0701-202 I-70B WIDENING EAST OF 24 ROAD 3 U

    20100527 CONTRACT MANAGEMENT, INC. dba US ROADS 4 $303,303.00 94.80

    NH050A-012 SANTA FE AT ILEX IN PUEBLO 2 U

    20100527 EARTH CONTRACTORS, INC 5 $147,800.00 73.28

    NH 0841-007 2 MI NORTH OF NM STATE LINE ON 5 M

    20100603 ZAK DIRT, INC. 4 $593,177.45 112.76

    FBR138A-008 REGION 4 VARIOUS LOCATIONS 4 P

    20100610 ALERT TRAFFIC CONTROL, INC. 5 $123,642.50 74.54

    BR1602-126 US 550/160 SOUTH OF DURANGO AT 5 M

    20100610 AMERICAN CIVIL CONSTRUCTORS, INC. 5 $3,491,481.00 92.29

    FBR5502-068 US 550 ON RED MOUNTAIN PASS SO 5 M

    20100610 INTERFACE COMMUNICATIONS, COMPANY 5 $172,629.84 91.48

    C056A-004 SH 56 AND 4TH ST IN BERTHOUD 4 R

    20100610 AMERICAN CIVIL CONSTRUCTORS, INC. 5 $2,834,922.00 110.73

    IM0704-221 I-70 FROM WEST OF COLORADO BLV 6 U

    20100610 COLORADO CONSTRUCTORS, INC. 8 $2,040,049.60 99.40

    IM0703-358 8 MILES EAST MILE MARKER 205.5 1 M

    20100617 APC CONSTRUCTION CO., LLC 5 $830,035.85 94.24

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 4

    2010 Cost Data

    PROJECTS BID FROM 01/01/10 THROUGH 09/30/10

    ------------------------------------------------------------------------------------------------------------------------------------

    BID CONTRACTOR/

    LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX

    ------------------------------------------------------------------------------------------------------------------------------------

    20100513 ASPHALT SPECIALTIES CO., INC. 7 $507,335.30 111.74

    SHE085A-011 US 85 & 144TH AVENUE INTERSECT 6 R

    20100513 OLDCASTLE SW GROUP, INC. 8 $1,398,999.00 97.47

    C0701-205 I-70 EXIT 37 MESA COUNTY 3 L

    20100513 WATERFORD CORPORATION 3 $1,128,603.25 103.66

    C 0821-091 SH 82 MP 10-16 3 M

    20100520 W.L. CONTRACTORS, INC. 5 $236,502.80 98.00

    SHE0821-089 SH82 @ BRUSH CK. SIGNAL IMPROV 3 R

    20100520 APC SOUTHERN CONSTRUCTION COMPANY, LLC 3 $4,859,868.06 93.35

    NH 1603-028 US 160 MP 240.3 E TO FT GARLAN 5 P

    20100527 ZAK DIRT, INC. 11 $649,545.50 96.79

    STA1381-006 US 138 EAST OF STERLING 4 P

    20100527 LAFARGE NORTH AMERICA, INC 3 $4,343,627.51 96.76

    STA0362-029 US 36 KANSAS STATE LINE WEST ( 4 P

    20100527 LAWSON CONSTRUCTION COMPANY 3 $8,237,445.21 112.28

    NH0701-202 I-70B WIDENING EAST OF 24 ROAD 3 U

    20100527 CONTRACT MANAGEMENT, INC. dba US ROADS 4 $303,303.00 94.80

    NH050A-012 SANTA FE AT ILEX IN PUEBLO 2 U

    20100527 EARTH CONTRACTORS, INC 5 $147,800.00 73.28

    NH 0841-007 2 MI NORTH OF NM STATE LINE ON 5 M

    20100603 ZAK DIRT, INC. 4 $593,177.45 112.76

    FBR138A-008 REGION 4 VARIOUS LOCATIONS 4 P

    20100610 ALERT TRAFFIC CONTROL, INC. 5 $123,642.50 74.54

    BR1602-126 US 550/160 SOUTH OF DURANGO AT 5 M

    20100610 AMERICAN CIVIL CONSTRUCTORS, INC. 5 $3,491,481.00 92.29

    FBR5502-068 US 550 ON RED MOUNTAIN PASS SO 5 M

    20100610 INTERFACE COMMUNICATIONS, COMPANY 5 $172,629.84 91.48

    C056A-004 SH 56 AND 4TH ST IN BERTHOUD 4 R

    20100610 AMERICAN CIVIL CONSTRUCTORS, INC. 5 $2,834,922.00 110.73

    IM0704-221 I-70 FROM WEST OF COLORADO BLV 6 U

    20100610 COLORADO CONSTRUCTORS, INC. 8 $2,040,049.60 99.40

    IM0703-358 8 MILES EAST MILE MARKER 205.5 1 M

    20100617 APC CONSTRUCTION CO., LLC 5 $830,035.85 94.24

    STA128A-005 SH128: MCCASLIN TO ELDORADO 6 R

  • 8/8/2019 2010 CDOT construction cost data book

    11/527

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 5

    2010 Cost Data

    PROJECTS BID FROM 01/01/10 THROUGH 09/30/10

    ------------------------------------------------------------------------------------------------------------------------------------

    BID CONTRACTOR/

    LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX

    ------------------------------------------------------------------------------------------------------------------------------------

    20100617 APC CONSTRUCTION CO., LLC 5 $715,892.15 91.61

    STA072A-032 5.4 MILES WEST OF SH 93 ON SH 1 R

    20100617 TONY J. BELTRAMO & SONS, INC. 6 $432,535.05 96.05

    SHE0504-059 SH50B AT BONFORTE BLVD. IN PUE 2 U

    20100617 DIAMOND SURFACE, INC. 8 $1,112,535.62 134.23

    IM 0762-046 I-76, BRUSH TO STERLING 4 R

    20100617 K.E.C.I. COLORADO, INC. 2 $934,987.00 122.36

    SHE R100-175 US 6 (MP 259), SH 9 (MP 109), 1

    20100624 STRUCTURES, INC. 7 $2,908,694.00 84.47

    FBR096A-039 SH 96: WEST OF HASWELL 2 P

    20100624 SEMA CONSTRUCTION, INC. 4 $1,524,680.50 108.89

    FBR 0703-357 STR. F-14-AZ WEST OF IDAHO SPR 1 M

    20100701 CONNELL RESOURCES, INC. 5 $6,373,187.25 102.72

    ES4 0853-072 SH 85 WYOMING SOUTH-STRUCTURES 4 R

    20100701 BRANNAN SAND AND GRAVEL, LLC 4 $1,719,481.25 109.96

    STA2854-118 US 285 TURKEY CREEK CANYON 1 M

    20100708 MOUNTAIN CONSTRUCTORS, INC. 5 $543,250.87 100.65

    SHE0073-008 SH7 AT YORK ST 6 P

    20100708 NEW DESIGN CONSTRUCTION CO. 6 $2,238,350.22 101.13

    SHE4701-120 C-470 ACRES G TO I-25 MEDIAN C 6 R

    20100708 SEMA CONSTRUCTION, INC. 1 $2,006,630.00 84.22

    FBR0242-047 US 24 AT MILE MARKER 270.8 AND 2 M

    20100708 STRUCTURES, INC. 5 $271,164.00 88.88

    C025A-011 I-25/SANTA FE F-16-DT 6 U

    20100715 TRICON 2, LLC 5 $2,954,000.00 74.10

    NH 1602-109 US 160 JACKSON MTN SLIDE REPAI 5 M

    20100715 TRICON 2, LLC 4 $684,000.00 105.13

    C 0132-018 US40 & SH13 MOFFAT COUNTY CULV 3 R

    20100715 ROCK SOLID SOLUTIONS CORPORATION 6 $767,243.50 73.86

    C 0821-090 SH 82 SHALE BLUFFS MP 35.2 - M 3 M

    20100722 STURGEON ELECTRIC COMPANY, INC 3 $556,425.00 114.87

    SHE R300-161 070A 124-125 GARFIELD_040A 140 3 M

    20100722 CONTRACT MANAGEMENT, INC. dba US ROADS 6 $269,274.50 107.64

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 5

    2010 Cost Data

    PROJECTS BID FROM 01/01/10 THROUGH 09/30/10

    ------------------------------------------------------------------------------------------------------------------------------------

    BID CONTRACTOR/

    LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX

    ------------------------------------------------------------------------------------------------------------------------------------

    20100617 APC CONSTRUCTION CO., LLC 5 $715,892.15 91.61

    STA072A-032 5.4 MILES WEST OF SH 93 ON SH 1 R

    20100617 TONY J. BELTRAMO & SONS, INC. 6 $432,535.05 96.05

    SHE0504-059 SH50B AT BONFORTE BLVD. IN PUE 2 U

    20100617 DIAMOND SURFACE, INC. 8 $1,112,535.62 134.23

    IM 0762-046 I-76, BRUSH TO STERLING 4 R

    20100617 K.E.C.I. COLORADO, INC. 2 $934,987.00 122.36

    SHE R100-175 US 6 (MP 259), SH 9 (MP 109), 1

    20100624 STRUCTURES, INC. 7 $2,908,694.00 84.47

    FBR096A-039 SH 96: WEST OF HASWELL 2 P

    20100624 SEMA CONSTRUCTION, INC. 4 $1,524,680.50 108.89

    FBR 0703-357 STR. F-14-AZ WEST OF IDAHO SPR 1 M

    20100701 CONNELL RESOURCES, INC. 5 $6,373,187.25 102.72

    ES4 0853-072 SH 85 WYOMING SOUTH-STRUCTURES 4 R

    20100701 BRANNAN SAND AND GRAVEL, LLC 4 $1,719,481.25 109.96

    STA2854-118 US 285 TURKEY CREEK CANYON 1 M

    20100708 MOUNTAIN CONSTRUCTORS, INC. 5 $543,250.87 100.65

    SHE0073-008 SH7 AT YORK ST 6 P

    20100708 NEW DESIGN CONSTRUCTION CO. 6 $2,238,350.22 101.13

    SHE4701-120 C-470 ACRES G TO I-25 MEDIAN C 6 R

    20100708 SEMA CONSTRUCTION, INC. 1 $2,006,630.00 84.22

    FBR0242-047 US 24 AT MILE MARKER 270.8 AND 2 M

    20100708 STRUCTURES, INC. 5 $271,164.00 88.88

    C025A-011 I-25/SANTA FE F-16-DT 6 U

    20100715 TRICON 2, LLC 5 $2,954,000.00 74.10

    NH 1602-109 US 160 JACKSON MTN SLIDE REPAI 5 M

    20100715 TRICON 2, LLC 4 $684,000.00 105.13

    C 0132-018 US40 & SH13 MOFFAT COUNTY CULV 3 R

    20100715 ROCK SOLID SOLUTIONS CORPORATION 6 $767,243.50 73.86

    C 0821-090 SH 82 SHALE BLUFFS MP 35.2 - M 3 M

    20100722 STURGEON ELECTRIC COMPANY, INC 3 $556,425.00 114.87

    SHE R300-161 070A 124-125 GARFIELD_040A 140 3 M

    20100722 CONTRACT MANAGEMENT, INC. dba US ROADS 6 $269,274.50 107.64

    C021A-001 POWERS BLVD. AND DUBLIN 2 U

  • 8/8/2019 2010 CDOT construction cost data book

    12/527

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 6

    2010 Cost Data

    PROJECTS BID FROM 01/01/10 THROUGH 09/30/10

    ------------------------------------------------------------------------------------------------------------------------------------

    BID CONTRACTOR/

    LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX

    ------------------------------------------------------------------------------------------------------------------------------------

    20100729 CRUZ CONSTRUCTION, INC. 6 $597,486.70 78.16

    C0252-410 I-25, TOMAH RD INTERCHAGE TO P 1 P

    20100805 K.E.C.I. COLORADO, INC. 3 $448,904.00 112.26

    SHE006A-044 US6, 19TH TO HERITAGE RD, GOLD 6 R

    20100805 SEMA CONSTRUCTION, INC. CONTRACT REJ - NO REASON GIVEN

    FBR 0241-053 US-24 MP 171.0 3 M

    20100819 INTERFACE COMMUNICATIONS, COMPANY 5 $769,809.00 80.78

    STA R600-381 I-70@32ND AVE, C470@ALAMEDA AN 6 P

    20100819 TLM CONSTRUCTORS, INC. 8 $273,461.00 98.04

    IM0761-207 I 76 WEST BOUND IN MORGAN COUN 4 R

    20100826 MAYS CONCRETE, INC 4 $685,104.62 60.61

    IM 0702-302 I-70 HANGING LAKE TUNNELS MP 1 3 M

    20100902 TRICON 2, LLC 2 $2,100,000.00 116.37

    NH 4912-001 NORTH OF CORTEZ 5 M

    20100902 ROCKY MOUNTAIN MATERIALS & ASPHALT, INC. 5 $3,899,982.32 89.11

    ES21151-025 SH 115 M.P. 8.9 TO M.P. 37.0, 2 R

    20100909 HAMON CONTRACTORS, INC. 7 $2,333,728.50 109.90

    STA083A-036 SH 83: E-470 TO PEORIA 6 U

    20100909 SEMA CONSTRUCTION, INC. 5 $10,280,721.20 103.03

    NH1601-061 ON U.S. 160 MP 11.50 TO MP 17. 5 R

    20100909 DKS ENTERPRISES INC. 6 $978,397.50 94.80

    ES6 0853-079 SH 85- I-76 TO SH 7 6 R

    20100909 ASPHALT SPECIALTIES CO., INC. 5 $3,172,153.70 119.26

    IM0703-361 I-70 MM 242 TO MM 247 1 M

    20100916 NEW DESIGN CONSTRUCTION CO. 10 $3,107,176.94 99.34

    STA177A-007 UNIVERSITY BLVD: C470, DRY CR 6 U

    20100916 TEZAK HEAVY EQUIPMENT CO., INC. 3 $3,919,895.28 65.95

    NH050A-013 MONTROSE CO US 50 MM 103.1 - 1 3 R

    20100916 TEZAK HEAVY EQUIPMENT CO., INC. 3 $3,835,029.55 65.42

    NH050A-013 MONTROSE CO US 50 MM 103.1 - 1 3 R

    20100916 TEZAK HEAVY EQUIPMENT CO., INC. 3 $3,794,755.66 66.47

    NH050A-013 MONTROSE CO US 50 MM 103.1 - 1 3 R

    20100923 OLDCASTLE SW GROUP, INC. 3 $3,509,854.00 106.91

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 6

    2010 Cost Data

    PROJECTS BID FROM 01/01/10 THROUGH 09/30/10

    ------------------------------------------------------------------------------------------------------------------------------------

    BID CONTRACTOR/

    LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX

    ------------------------------------------------------------------------------------------------------------------------------------

    20100729 CRUZ CONSTRUCTION, INC. 6 $597,486.70 78.16

    C0252-410 I-25, TOMAH RD INTERCHAGE TO P 1 P

    20100805 K.E.C.I. COLORADO, INC. 3 $448,904.00 112.26

    SHE006A-044 US6, 19TH TO HERITAGE RD, GOLD 6 R

    20100805 SEMA CONSTRUCTION, INC. CONTRACT REJ - NO REASON GIVEN

    FBR 0241-053 US-24 MP 171.0 3 M

    20100819 INTERFACE COMMUNICATIONS, COMPANY 5 $769,809.00 80.78

    STA R600-381 I-70@32ND AVE, C470@ALAMEDA AN 6 P

    20100819 TLM CONSTRUCTORS, INC. 8 $273,461.00 98.04

    IM0761-207 I 76 WEST BOUND IN MORGAN COUN 4 R

    20100826 MAYS CONCRETE, INC 4 $685,104.62 60.61

    IM 0702-302 I-70 HANGING LAKE TUNNELS MP 1 3 M

    20100902 TRICON 2, LLC 2 $2,100,000.00 116.37

    NH 4912-001 NORTH OF CORTEZ 5 M

    20100902 ROCKY MOUNTAIN MATERIALS & ASPHALT, INC. 5 $3,899,982.32 89.11

    ES21151-025 SH 115 M.P. 8.9 TO M.P. 37.0, 2 R

    20100909 HAMON CONTRACTORS, INC. 7 $2,333,728.50 109.90

    STA083A-036 SH 83: E-470 TO PEORIA 6 U

    20100909 SEMA CONSTRUCTION, INC. 5 $10,280,721.20 103.03

    NH1601-061 ON U.S. 160 MP 11.50 TO MP 17. 5 R

    20100909 DKS ENTERPRISES INC. 6 $978,397.50 94.80

    ES6 0853-079 SH 85- I-76 TO SH 7 6 R

    20100909 ASPHALT SPECIALTIES CO., INC. 5 $3,172,153.70 119.26

    IM0703-361 I-70 MM 242 TO MM 247 1 M

    20100916 NEW DESIGN CONSTRUCTION CO. 10 $3,107,176.94 99.34

    STA177A-007 UNIVERSITY BLVD: C470, DRY CR 6 U

    20100916 TEZAK HEAVY EQUIPMENT CO., INC. 3 $3,919,895.28 65.95

    NH050A-013 MONTROSE CO US 50 MM 103.1 - 1 3 R

    20100916 TEZAK HEAVY EQUIPMENT CO., INC. 3 $3,835,029.55 65.42

    NH050A-013 MONTROSE CO US 50 MM 103.1 - 1 3 R

    20100916 TEZAK HEAVY EQUIPMENT CO., INC. 3 $3,794,755.66 66.47

    NH050A-013 MONTROSE CO US 50 MM 103.1 - 1 3 R

    20100923 OLDCASTLE SW GROUP, INC. 3 $3,509,854.00 106.91

    ES35502-069 SH 550 MM 117.43 - 126.5 MONTR 3 L

  • 8/8/2019 2010 CDOT construction cost data book

    13/527

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 7

    2010 Cost Data

    PROJECTS BID FROM 01/01/10 THROUGH 09/30/10

    ------------------------------------------------------------------------------------------------------------------------------------

    BID CONTRACTOR/

    LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX

    ------------------------------------------------------------------------------------------------------------------------------------

    20100923 INTERSTATE HIGHWAY CONSTRUCTION 11 $1,766,906.69 78.78

    ES1 0705-078 I-70, AGATE TO KANSAS BORDER 1 P

    20100930 AMERICAN CIVIL CONSTRUCTORS, INC. 6 $15,693,969.00 100.23

    STA 119A-051 SH 119 FROM SOUTH BLACK HAWK C 1 M

    20100930 R.E. MONKS CONSTRUCTION COMPANY LLC 4 $3,567,183.63 85.63

    NH1151-023 SH115A MP 38.3 TO 41.5 2 R

    ======= ================ ======

    TOTALS 556 $300,728,877.05 83.07

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 7

    2010 Cost Data

    PROJECTS BID FROM 01/01/10 THROUGH 09/30/10

    ------------------------------------------------------------------------------------------------------------------------------------

    BID CONTRACTOR/

    LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX

    ------------------------------------------------------------------------------------------------------------------------------------

    20100923 INTERSTATE HIGHWAY CONSTRUCTION 11 $1,766,906.69 78.78

    ES1 0705-078 I-70, AGATE TO KANSAS BORDER 1 P

    20100930 AMERICAN CIVIL CONSTRUCTORS, INC. 6 $15,693,969.00 100.23

    STA 119A-051 SH 119 FROM SOUTH BLACK HAWK C 1 M

    20100930 R.E. MONKS CONSTRUCTION COMPANY LLC 4 $3,567,183.63 85.63

    NH1151-023 SH115A MP 38.3 TO 41.5 2 R

    ======= ================ ======

    TOTALS 556 $300,728,877.05 83.07

  • 8/8/2019 2010 CDOT construction cost data book

    14/527

  • 8/8/2019 2010 CDOT construction cost data book

    15/527

  • 8/8/2019 2010 CDOT construction cost data book

    16/527

  • 8/8/2019 2010 CDOT construction cost data book

    17/527

  • 8/8/2019 2010 CDOT construction cost data book

    18/527

  • 8/8/2019 2010 CDOT construction cost data book

    19/527

  • 8/8/2019 2010 CDOT construction cost data book

    20/527

  • 8/8/2019 2010 CDOT construction cost data book

    21/527

  • 8/8/2019 2010 CDOT construction cost data book

    22/527

  • 8/8/2019 2010 CDOT construction cost data book

    23/527

  • 8/8/2019 2010 CDOT construction cost data book

    24/527

  • 8/8/2019 2010 CDOT construction cost data book

    25/527

  • 8/8/2019 2010 CDOT construction cost data book

    26/527

  • 8/8/2019 2010 CDOT construction cost data book

    27/527

  • 8/8/2019 2010 CDOT construction cost data book

    28/527

  • 8/8/2019 2010 CDOT construction cost data book

    29/527

  • 8/8/2019 2010 CDOT construction cost data book

    30/527

  • 8/8/2019 2010 CDOT construction cost data book

    31/527

  • 8/8/2019 2010 CDOT construction cost data book

    32/527

  • 8/8/2019 2010 CDOT construction cost data book

    33/527

  • 8/8/2019 2010 CDOT construction cost data book

    34/527

  • 8/8/2019 2010 CDOT construction cost data book

    35/527

  • 8/8/2019 2010 CDOT construction cost data book

    36/527

  • 8/8/2019 2010 CDOT construction cost data book

    37/527

  • 8/8/2019 2010 CDOT construction cost data book

    38/527

  • 8/8/2019 2010 CDOT construction cost data book

    39/527

  • 8/8/2019 2010 CDOT construction cost data book

    40/527

  • 8/8/2019 2010 CDOT construction cost data book

    41/527

  • 8/8/2019 2010 CDOT construction cost data book

    42/527

  • 8/8/2019 2010 CDOT construction cost data book

    43/527

  • 8/8/2019 2010 CDOT construction cost data book

    44/527

  • 8/8/2019 2010 CDOT construction cost data book

    45/527

  • 8/8/2019 2010 CDOT construction cost data book

    46/527

  • 8/8/2019 2010 CDOT construction cost data book

    47/527

  • 8/8/2019 2010 CDOT construction cost data book

    48/527

  • 8/8/2019 2010 CDOT construction cost data book

    49/527

  • 8/8/2019 2010 CDOT construction cost data book

    50/527

  • 8/8/2019 2010 CDOT construction cost data book

    51/527

  • 8/8/2019 2010 CDOT construction cost data book

    52/527

  • 8/8/2019 2010 CDOT construction cost data book

    53/527

  • 8/8/2019 2010 CDOT construction cost data book

    54/527

  • 8/8/2019 2010 CDOT construction cost data book

    55/527

  • 8/8/2019 2010 CDOT construction cost data book

    56/527

  • 8/8/2019 2010 CDOT construction cost data book

    57/527

  • 8/8/2019 2010 CDOT construction cost data book

    58/527

  • 8/8/2019 2010 CDOT construction cost data book

    59/527

  • 8/8/2019 2010 CDOT construction cost data book

    60/527

  • 8/8/2019 2010 CDOT construction cost data book

    61/527

  • 8/8/2019 2010 CDOT construction cost data book

    62/527

  • 8/8/2019 2010 CDOT construction cost data book

    63/527

  • 8/8/2019 2010 CDOT construction cost data book

    64/527

  • 8/8/2019 2010 CDOT construction cost data book

    65/527

  • 8/8/2019 2010 CDOT construction cost data book

    66/527

  • 8/8/2019 2010 CDOT construction cost data book

    67/527

  • 8/8/2019 2010 CDOT construction cost data book

    68/527

  • 8/8/2019 2010 CDOT construction cost data book

    69/527

  • 8/8/2019 2010 CDOT construction cost data book

    70/527

  • 8/8/2019 2010 CDOT construction cost data book

    71/527

  • 8/8/2019 2010 CDOT construction cost data book

    72/527

  • 8/8/2019 2010 CDOT construction cost data book

    73/527

  • 8/8/2019 2010 CDOT construction cost data book

    74/527

  • 8/8/2019 2010 CDOT construction cost data book

    75/527

  • 8/8/2019 2010 CDOT construction cost data book

    76/527

  • 8/8/2019 2010 CDOT construction cost data book

    77/527

  • 8/8/2019 2010 CDOT construction cost data book

    78/527

  • 8/8/2019 2010 CDOT construction cost data book

    79/527

  • 8/8/2019 2010 CDOT construction cost data book

    80/527

  • 8/8/2019 2010 CDOT construction cost data book

    81/527

  • 8/8/2019 2010 CDOT construction cost data book

    82/527

  • 8/8/2019 2010 CDOT construction cost data book

    83/527

  • 8/8/2019 2010 CDOT construction cost data book

    84/527

  • 8/8/2019 2010 CDOT construction cost data book

    85/527

  • 8/8/2019 2010 CDOT construction cost data book

    86/527

  • 8/8/2019 2010 CDOT construction cost data book

    87/527

  • 8/8/2019 2010 CDOT construction cost data book

    88/527

  • 8/8/2019 2010 CDOT construction cost data book

    89/527

  • 8/8/2019 2010 CDOT construction cost data book

    90/527

  • 8/8/2019 2010 CDOT construction cost data book

    91/527

  • 8/8/2019 2010 CDOT construction cost data book

    92/527

  • 8/8/2019 2010 CDOT construction cost data book

    93/527

  • 8/8/2019 2010 CDOT construction cost data book

    94/527

  • 8/8/2019 2010 CDOT construction cost data book

    95/527

  • 8/8/2019 2010 CDOT construction cost data book

    96/527

  • 8/8/2019 2010 CDOT construction cost data book

    97/527

  • 8/8/2019 2010 CDOT construction cost data book

    98/527

  • 8/8/2019 2010 CDOT construction cost data book

    99/527

  • 8/8/2019 2010 CDOT construction cost data book

    100/527

  • 8/8/2019 2010 CDOT construction cost data book

    101/527

  • 8/8/2019 2010 CDOT construction cost data book

    102/527

  • 8/8/2019 2010 CDOT construction cost data book

    103/527

  • 8/8/2019 2010 CDOT construction cost data book

    104/527

  • 8/8/2019 2010 CDOT construction cost data book

    105/527

  • 8/8/2019 2010 CDOT construction cost data book

    106/527

  • 8/8/2019 2010 CDOT construction cost data book

    107/527

  • 8/8/2019 2010 CDOT construction cost data book

    108/527

  • 8/8/2019 2010 CDOT construction cost data book

    109/527

  • 8/8/2019 2010 CDOT construction cost data book

    110/527

  • 8/8/2019 2010 CDOT construction cost data book

    111/527

  • 8/8/2019 2010 CDOT construction cost data book

    112/527

  • 8/8/2019 2010 CDOT construction cost data book

    113/527

  • 8/8/2019 2010 CDOT construction cost data book

    114/527

  • 8/8/2019 2010 CDOT construction cost data book

    115/527

  • 8/8/2019 2010 CDOT construction cost data book

    116/527

  • 8/8/2019 2010 CDOT construction cost data book

    117/527

  • 8/8/2019 2010 CDOT construction cost data book

    118/527

  • 8/8/2019 2010 CDOT construction cost data book

    119/527

  • 8/8/2019 2010 CDOT construction cost data book

    120/527

  • 8/8/2019 2010 CDOT construction cost data book

    121/527

  • 8/8/2019 2010 CDOT construction cost data book

    122/527

  • 8/8/2019 2010 CDOT construction cost data book

    123/527

  • 8/8/2019 2010 CDOT construction cost data book

    124/527

  • 8/8/2019 2010 CDOT construction cost data book

    125/527

  • 8/8/2019 2010 CDOT construction cost data book

    126/527

  • 8/8/2019 2010 CDOT construction cost data book

    127/527

  • 8/8/2019 2010 CDOT construction cost data book

    128/527

  • 8/8/2019 2010 CDOT construction cost data book

    129/527

  • 8/8/2019 2010 CDOT construction cost data book

    130/527

  • 8/8/2019 2010 CDOT construction cost data book

    131/527

  • 8/8/2019 2010 CDOT construction cost data book

    132/527

  • 8/8/2019 2010 CDOT construction cost data book

    133/527

  • 8/8/2019 2010 CDOT construction cost data book

    134/527

  • 8/8/2019 2010 CDOT construction cost data book

    135/527

  • 8/8/2019 2010 CDOT construction cost data book

    136/527

  • 8/8/2019 2010 CDOT construction cost data book

    137/527

  • 8/8/2019 2010 CDOT construction cost data book

    138/527

  • 8/8/2019 2010 CDOT construction cost data book

    139/527

  • 8/8/2019 2010 CDOT construction cost data book

    140/527

  • 8/8/2019 2010 CDOT construction cost data book

    141/527

  • 8/8/2019 2010 CDOT construction cost data book

    142/527

  • 8/8/2019 2010 CDOT construction cost data book

    143/527

  • 8/8/2019 2010 CDOT construction cost data book

    144/527

  • 8/8/2019 2010 CDOT construction cost data book

    145/527

  • 8/8/2019 2010 CDOT construction cost data book

    146/527

  • 8/8/2019 2010 CDOT construction cost data book

    147/527

  • 8/8/2019 2010 CDOT construction cost data book

    148/527

  • 8/8/2019 2010 CDOT construction cost data book

    149/527

  • 8/8/2019 2010 CDOT construction cost data book

    150/527

  • 8/8/2019 2010 CDOT construction cost data book

    151/527

  • 8/8/2019 2010 CDOT construction cost data book

    152/527

  • 8/8/2019 2010 CDOT construction cost data book

    153/527

  • 8/8/2019 2010 CDOT construction cost data book

    154/527

  • 8/8/2019 2010 CDOT construction cost data book

    155/527

  • 8/8/2019 2010 CDOT construction cost data book

    156/527

  • 8/8/2019 2010 CDOT construction cost data book

    157/527

  • 8/8/2019 2010 CDOT construction cost data book

    158/527

  • 8/8/2019 2010 CDOT construction cost data book

    159/527

  • 8/8/2019 2010 CDOT construction cost data book

    160/527

  • 8/8/2019 2010 CDOT construction cost data book

    161/527

  • 8/8/2019 2010 CDOT construction cost data book

    162/527

  • 8/8/2019 2010 CDOT construction cost data book

    163/527

  • 8/8/2019 2010 CDOT construction cost data book

    164/527

  • 8/8/2019 2010 CDOT construction cost data book

    165/527

  • 8/8/2019 2010 CDOT construction cost data book

    166/527

  • 8/8/2019 2010 CDOT construction cost data book

    167/527

  • 8/8/2019 2010 CDOT construction cost data book

    168/527

  • 8/8/2019 2010 CDOT construction cost data book

    169/527

  • 8/8/2019 2010 CDOT construction cost data book

    170/527

  • 8/8/2019 2010 CDOT construction cost data book

    171/527

  • 8/8/2019 2010 CDOT construction cost data book

    172/527

  • 8/8/2019 2010 CDOT construction cost data book

    173/527

  • 8/8/2019 2010 CDOT construction cost data book

    174/527

  • 8/8/2019 2010 CDOT construction cost data book

    175/527

  • 8/8/2019 2010 CDOT construction cost data book

    176/527

  • 8/8/2019 2010 CDOT construction cost data book

    177/527

  • 8/8/2019 2010 CDOT construction cost data book

    178/527

  • 8/8/2019 2010 CDOT construction cost data book

    179/527

  • 8/8/2019 2010 CDOT construction cost data book

    180/527

  • 8/8/2019 2010 CDOT construction cost data book

    181/527

  • 8/8/2019 2010 CDOT construction cost data book

    182/527

  • 8/8/2019 2010 CDOT construction cost data book

    183/527

  • 8/8/2019 2010 CDOT construction cost data book

    184/527

  • 8/8/2019 2010 CDOT construction cost data book

    185/527

  • 8/8/2019 2010 CDOT construction cost data book

    186/527

  • 8/8/2019 2010 CDOT construction cost data book

    187/527

  • 8/8/2019 2010 CDOT construction cost data book

    188/527

  • 8/8/2019 2010 CDOT construction cost data book

    189/527

  • 8/8/2019 2010 CDOT construction cost data book

    190/527

  • 8/8/2019 2010 CDOT construction cost data book

    191/527

  • 8/8/2019 2010 CDOT construction cost data book

    192/527

  • 8/8/2019 2010 CDOT construction cost data book

    193/527

  • 8/8/2019 2010 CDOT construction cost data book

    194/527

  • 8/8/2019 2010 CDOT construction cost data book

    195/527

  • 8/8/2019 2010 CDOT construction cost data book

    196/527

  • 8/8/2019 2010 CDOT construction cost data book

    197/527

  • 8/8/2019 2010 CDOT construction cost data book

    198/527

  • 8/8/2019 2010 CDOT construction cost data book

    199/527

  • 8/8/2019 2010 CDOT construction cost data book

    200/527

  • 8/8/2019 2010 CDOT construction cost data book

    201/527

  • 8/8/2019 2010 CDOT construction cost data book

    202/527

  • 8/8/2019 2010 CDOT construction cost data book

    203/527

  • 8/8/2019 2010 CDOT construction cost data book

    204/527

  • 8/8/2019 2010 CDOT construction cost data book

    205/527

  • 8/8/2019 2010 CDOT construction cost data book

    206/527

  • 8/8/2019 2010 CDOT construction cost data book

    207/527

  • 8/8/2019 2010 CDOT construction cost data book

    208/527

  • 8/8/2019 2010 CDOT construction cost data book

    209/527

  • 8/8/2019 2010 CDOT construction cost data book

    210/527

  • 8/8/2019 2010 CDOT construction cost data book

    211/527

  • 8/8/2019 2010 CDOT construction cost data book

    212/527

  • 8/8/2019 2010 CDOT construction cost data book

    213/527

  • 8/8/2019 2010 CDOT construction cost data book

    214/527

  • 8/8/2019 2010 CDOT construction cost data book

    215/527

  • 8/8/2019 2010 CDOT construction cost data book

    216/527

  • 8/8/2019 2010 CDOT construction cost data book

    217/527

  • 8/8/2019 2010 CDOT construction cost data book

    218/527

  • 8/8/2019 2010 CDOT construction cost data book

    219/527

  • 8/8/2019 2010 CDOT construction cost data book

    220/527

  • 8/8/2019 2010 CDOT construction cost data book

    221/527

  • 8/8/2019 2010 CDOT construction cost data book

    222/527

  • 8/8/2019 2010 CDOT construction cost data book

    223/527

  • 8/8/2019 2010 CDOT construction cost data book

    224/527

  • 8/8/2019 2010 CDOT construction cost data book

    225/527

  • 8/8/2019 2010 CDOT construction cost data book

    226/527

  • 8/8/2019 2010 CDOT construction cost data book

    227/527

  • 8/8/2019 2010 CDOT construction cost data book

    228/527

  • 8/8/2019 2010 CDOT construction cost data book

    229/527

  • 8/8/2019 2010 CDOT construction cost data book

    230/527

  • 8/8/2019 2010 CDOT construction cost data book

    231/527

  • 8/8/2019 2010 CDOT construction cost data book

    232/527

  • 8/8/2019 2010 CDOT construction cost data book

    233/527

  • 8/8/2019 2010 CDOT construction cost data book

    234/527

  • 8/8/2019 2010 CDOT construction cost data book

    235/527

  • 8/8/2019 2010 CDOT construction cost data book

    236/527

  • 8/8/2019 2010 CDOT construction cost data book

    237/527

  • 8/8/2019 2010 CDOT construction cost data book

    238/527

  • 8/8/2019 2010 CDOT construction cost data book

    239/527

  • 8/8/2019 2010 CDOT construction cost data book

    240/527

  • 8/8/2019 2010 CDOT construction cost data book

    241/527

  • 8/8/2019 2010 CDOT construction cost data book

    242/527

  • 8/8/2019 2010 CDOT construction cost data book

    243/527

  • 8/8/2019 2010 CDOT construction cost data book

    244/527

  • 8/8/2019 2010 CDOT construction cost data book

    245/527

  • 8/8/2019 2010 CDOT construction cost data book

    246/527

  • 8/8/2019 2010 CDOT construction cost data book

    247/527

  • 8/8/2019 2010 CDOT construction cost data book

    248/527

  • 8/8/2019 2010 CDOT construction cost data book

    249/527

  • 8/8/2019 2010 CDOT construction cost data book

    250/527

  • 8/8/2019 2010 CDOT construction cost data book

    251/527

  • 8/8/2019 2010 CDOT construction cost data book

    252/527

  • 8/8/2019 2010 CDOT construction cost data book

    253/527

  • 8/8/2019 2010 CDOT construction cost data book

    254/527

  • 8/8/2019 2010 CDOT construction cost data book

    255/527

  • 8/8/2019 2010 CDOT construction cost data book

    256/527

  • 8/8/2019 2010 CDOT construction cost data book

    257/527

  • 8/8/2019 2010 CDOT construction cost data book

    258/527

  • 8/8/2019 2010 CDOT construction cost data book

    259/527

  • 8/8/2019 2010 CDOT construction cost data book

    260/527

  • 8/8/2019 2010 CDOT construction cost data book

    261/527

  • 8/8/2019 2010 CDOT construction cost data book

    262/527

  • 8/8/2019 2010 CDOT construction cost data book

    263/527

  • 8/8/2019 2010 CDOT construction cost data book

    264/527

  • 8/8/2019 2010 CDOT construction cost data book

    265/527

  • 8/8/2019 2010 CDOT construction cost data book

    266/527

  • 8/8/2019 2010 CDOT construction cost data book

    267/527

  • 8/8/2019 2010 CDOT construction cost data book

    268/527

  • 8/8/2019 2010 CDOT construction cost data book

    269/527

  • 8/8/2019 2010 CDOT construction cost data book

    270/527

  • 8/8/2019 2010 CDOT construction cost data book

    271/527

  • 8/8/2019 2010 CDOT construction cost data book

    272/527

  • 8/8/2019 2010 CDOT construction cost data book

    273/527

  • 8/8/2019 2010 CDOT construction cost data book

    274/527

  • 8/8/2019 2010 CDOT construction cost data book

    275/527

  • 8/8/2019 2010 CDOT construction cost data book

    276/527

  • 8/8/2019 2010 CDOT construction cost data book

    277/527

  • 8/8/2019 2010 CDOT construction cost data book

    278/527

  • 8/8/2019 2010 CDOT construction cost data book

    279/527

  • 8/8/2019 2010 CDOT construction cost data book

    280/527

  • 8/8/2019 2010 CDOT construction cost data book

    281/527

  • 8/8/2019 2010 CDOT construction cost data book

    282/527

  • 8/8/2019 2010 CDOT construction cost data book

    283/527

  • 8/8/2019 2010 CDOT construction cost data book

    284/527

  • 8/8/2019 2010 CDOT construction cost data book

    285/527

  • 8/8/2019 2010 CDOT construction cost data book

    286/527

  • 8/8/2019 2010 CDOT construction cost data book

    287/527

  • 8/8/2019 2010 CDOT construction cost data book

    288/527

  • 8/8/2019 2010 CDOT construction cost data book

    289/527

  • 8/8/2019 2010 CDOT construction cost data book

    290/527

  • 8/8/2019 2010 CDOT construction cost data book

    291/527

  • 8/8/2019 2010 CDOT construction cost data book

    292/527

  • 8/8/2019 2010 CDOT construction cost data book

    293/527

  • 8/8/2019 2010 CDOT construction cost data book

    294/527

  • 8/8/2019 2010 CDOT construction cost data book

    295/527

  • 8/8/2019 2010 CDOT construction cost data book

    296/527

  • 8/8/2019 2010 CDOT construction cost data book

    297/527

  • 8/8/2019 2010 CDOT construction cost data book

    298/527

  • 8/8/2019 2010 CDOT construction cost data book

    299/527

  • 8/8/2019 2010 CDOT construction cost data book

    300/527

  • 8/8/2019 2010 CDOT construction cost data book

    301/527

  • 8/8/2019 2010 CDOT construction cost data book

    302/527

  • 8/8/2019 2010 CDOT construction cost data book

    303/527

  • 8/8/2019 2010 CDOT construction cost data book

    304/527

  • 8/8/2019 2010 CDOT construction cost data book

    305/527

  • 8/8/2019 2010 CDOT construction cost data book

    306/527

  • 8/8/2019 2010 CDOT construction cost data book

    307/527

  • 8/8/2019 2010 CDOT construction cost data book

    308/527

  • 8/8/2019 2010 CDOT construction cost data book

    309/527

  • 8/8/2019 2010 CDOT construction cost data book

    310/527

  • 8/8/2019 2010 CDOT construction cost data book

    311/527

  • 8/8/2019 2010 CDOT construction cost data book

    312/527

  • 8/8/2019 2010 CDOT construction cost data book

    313/527

  • 8/8/2019 2010 CDOT construction cost data book

    314/527

  • 8/8/2019 2010 CDOT construction cost data book

    315/527

  • 8/8/2019 2010 CDOT construction cost data book

    316/527

  • 8/8/2019 2010 CDOT construction cost data book

    317/527

  • 8/8/2019 2010 CDOT construction cost data book

    318/527

  • 8/8/2019 2010 CDOT construction cost data book

    319/527

  • 8/8/2019 2010 CDOT construction cost data book

    320/527

  • 8/8/2019 2010 CDOT construction cost data book

    321/527

  • 8/8/2019 2010 CDOT construction cost data book

    322/527

  • 8/8/2019 2010 CDOT construction cost data book

    323/527

  • 8/8/2019 2010 CDOT construction cost data book

    324/527

  • 8/8/2019 2010 CDOT construction cost data book

    325/527

  • 8/8/2019 2010 CDOT construction cost data book

    326/527

  • 8/8/2019 2010 CDOT construction cost data book

    327/527

  • 8/8/2019 2010 CDOT construction cost data book

    328/527

  • 8/8/2019 2010 CDOT construction cost data book

    329/527

  • 8/8/2019 2010 CDOT construction cost data book

    330/527

  • 8/8/2019 2010 CDOT construction cost data book

    331/527

  • 8/8/2019 2010 CDOT construction cost data book

    332/527

  • 8/8/2019 2010 CDOT construction cost data book

    333/527

  • 8/8/2019 2010 CDOT construction cost data book

    334/527

  • 8/8/2019 2010 CDOT construction cost data book

    335/527

  • 8/8/2019 2010 CDOT construction cost data book

    336/527

  • 8/8/2019 2010 CDOT construction cost data book

    337/527

  • 8/8/2019 2010 CDOT construction cost data book

    338/527

  • 8/8/2019 2010 CDOT construction cost data book

    339/527

  • 8/8/2019 2010 CDOT construction cost data book

    340/527

  • 8/8/2019 2010 CDOT construction cost data book

    341/527

  • 8/8/2019 2010 CDOT construction cost data book

    342/527

  • 8/8/2019 2010 CDOT construction cost data book

    343/527

  • 8/8/2019 2010 CDOT construction cost data book

    344/527

  • 8/8/2019 2010 CDOT construction cost data book

    345/527

  • 8/8/2019 2010 CDOT construction cost data book

    346/527

  • 8/8/2019 2010 CDOT construction cost data book

    347/527

  • 8/8/2019 2010 CDOT construction cost data book

    348/527

  • 8/8/2019 2010 CDOT construction cost data book

    349/527

  • 8/8/2019 2010 CDOT construction cost data book

    350/527

  • 8/8/2019 2010 CDOT construction cost data book

    351/527

  • 8/8/2019 2010 CDOT construction cost data book

    352/527

  • 8/8/2019 2010 CDOT construction cost data book

    353/527

  • 8/8/2019 2010 CDOT construction cost data book

    354/527

  • 8/8/2019 2010 CDOT construction cost data book

    355/527

  • 8/8/2019 2010 CDOT construction cost data book

    356/527

  • 8/8/2019 2010 CDOT construction cost data book

    357/527

  • 8/8/2019 2010 CDOT construction cost data book

    358/527

  • 8/8/2019 2010 CDOT construction cost data book

    359/527

  • 8/8/2019 2010 CDOT construction cost data book

    360/527

  • 8/8/2019 2010 CDOT construction cost data book

    361/527

  • 8/8/2019 2010 CDOT construction cost data book

    362/527

  • 8/8/2019 2010 CDOT construction cost data book

    363/527

  • 8/8/2019 2010 CDOT construction cost data book

    364/527

  • 8/8/2019 2010 CDOT construction cost data book

    365/527

  • 8/8/2019 2010 CDOT construction cost data book

    366/527

  • 8/8/2019 2010 CDOT construction cost data book

    367/527

  • 8/8/2019 2010 CDOT construction cost data book

    368/527

  • 8/8/2019 2010 CDOT construction cost data book

    369/527

  • 8/8/2019 2010 CDOT construction cost data book

    370/527

  • 8/8/2019 2010 CDOT construction cost data book

    371/527

  • 8/8/2019 2010 CDOT construction cost data book

    372/527

  • 8/8/2019 2010 CDOT construction cost data book

    373/527

  • 8/8/2019 2010 CDOT construction cost data book

    374/527

  • 8/8/2019 2010 CDOT construction cost data book

    375/527

  • 8/8/2019 2010 CDOT construction cost data book

    376/527

  • 8/8/2019 2010 CDOT construction cost data book

    377/527

  • 8/8/2019 2010 CDOT construction cost data book

    378/527

  • 8/8/2019 2010 CDOT construction cost data book

    379/527

  • 8/8/2019 2010 CDOT construction cost data book

    380/527

  • 8/8/2019 2010 CDOT construction cost data book

    381/527

  • 8/8/2019 2010 CDOT construction cost data book

    382/527

  • 8/8/2019 2010 CDOT construction cost data book

    383/527

  • 8/8/2019 2010 CDOT construction cost data book

    384/527

  • 8/8/2019 2010 CDOT construction cost data book

    385/527

  • 8/8/2019 2010 CDOT construction cost data book

    386/527

  • 8/8/2019 2010 CDOT construction cost data book

    387/527

  • 8/8/2019 2010 CDOT construction cost data book

    388/527

  • 8/8/2019 2010 CDOT construction cost data book

    389/527

  • 8/8/2019 2010 CDOT construction cost data book

    390/527

  • 8/8/2019 2010 CDOT construction cost data book

    391/527

  • 8/8/2019 2010 CDOT construction cost data book

    392/527

  • 8/8/2019 2010 CDOT construction cost data book

    393/527

  • 8/8/2019 2010 CDOT construction cost data book

    394/527

  • 8/8/2019 2010 CDOT construction cost data book

    395/527

  • 8/8/2019 2010 CDOT construction cost data book

    396/527

  • 8/8/2019 2010 CDOT construction cost data book

    397/527

  • 8/8/2019 2010 CDOT construction cost data book

    398/527

  • 8/8/2019 2010 CDOT construction cost data book

    399/527

  • 8/8/2019 2010 CDOT construction cost data book

    400/527

  • 8/8/2019 2010 CDOT construction cost data book

    401/527

  • 8/8/2019 2010 CDOT construction cost data book

    402/527

  • 8/8/2019 2010 CDOT construction cost data book

    403/527

  • 8/8/2019 2010 CDOT construction cost data book

    404/527

  • 8/8/2019 2010 CDOT construction cost data book

    405/527

  • 8/8/2019 2010 CDOT construction cost data book

    406/527

  • 8/8/2019 2010 CDOT construction cost data book

    407/527

  • 8/8/2019 2010 CDOT construction cost data book

    408/527

  • 8/8/2019 2010 CDOT construction cost data book

    409/527

  • 8/8/2019 2010 CDOT construction cost data book

    410/527

  • 8/8/2019 2010 CDOT construction cost data book

    411/527

  • 8/8/2019 2010 CDOT construction cost data book

    412/527

  • 8/8/2019 2010 CDOT construction cost data book

    413/527

  • 8/8/2019 2010 CDOT construction cost data book

    414/527

  • 8/8/2019 2010 CDOT construction cost data book

    415/527

  • 8/8/2019 2010 CDOT construction cost data book

    416/527

  • 8/8/2019 2010 CDOT construction cost data book

    417/527

  • 8/8/2019 2010 CDOT construction cost data book

    418/527

  • 8/8/2019 2010 CDOT construction cost data book

    419/527

  • 8/8/2019 2010 CDOT construction cost data book

    420/527

  • 8/8/2019 2010 CDOT construction cost data book

    421/527

  • 8/8/2019 2010 CDOT construction cost data book

    422/527

  • 8/8/2019 2010 CDOT construction cost data book

    423/527

  • 8/8/2019 2010 CDOT construction cost data book

    424/527

  • 8/8/2019 2010 CDOT construction cost data book

    425/527

  • 8/8/2019 2010 CDOT construction cost data book

    426/527

  • 8/8/2019 2010 CDOT construction cost data book

    427/527

  • 8/8/2019 2010 CDOT construction cost data book

    428/527

  • 8/8/2019 2010 CDOT construction cost data book

    429/527

  • 8/8/2019 2010 CDOT construction cost data book

    430/527

  • 8/8/2019 2010 CDOT construction cost data book

    431/527

  • 8/8/2019 2010 CDOT construction cost data book

    432/527

  • 8/8/2019 2010 CDOT construction cost data book

    433/527

  • 8/8/2019 2010 CDOT construction cost data book

    434/527

  • 8/8/2019 2010 CDOT construction cost data book

    435/527

  • 8/8/2019 2010 CDOT construction cost data book

    436/527

  • 8/8/2019 2010 CDOT construction cost data book

    437/527

  • 8/8/2019 2010 CDOT construction cost data book

    438/527

  • 8/8/2019 2010 CDOT construction cost data book

    439/527

  • 8/8/2019 2010 CDOT construction cost data book

    440/527

  • 8/8/2019 2010 CDOT construction cost data book

    441/527

  • 8/8/2019 2010 CDOT construction cost data book

    442/527

  • 8/8/2019 2010 CDOT construction cost data book

    443/527

  • 8/8/2019 2010 CDOT construction cost data book

    444/527

  • 8/8/2019 2010 CDOT construction cost data book

    445/527

  • 8/8/2019 2010 CDOT construction cost data book

    446/527

  • 8/8/2019 2010 CDOT construction cost data book

    447/527

  • 8/8/2019 2010 CDOT construction cost data book

    448/527

  • 8/8/2019 2010 CDOT construction cost data book

    449/527

  • 8/8/2019 2010 CDOT construction cost data book

    450/527

  • 8/8/2019 2010 CDOT construction cost data book

    451/527

  • 8/8/2019 2010 CDOT construction cost data book

    452/527

  • 8/8/2019 2010 CDOT construction cost data book

    453/527

  • 8/8/2019 2010 CDOT construction cost data book

    454/527

  • 8/8/2019 2010 CDOT construction cost data book

    455/527

  • 8/8/2019 2010 CDOT construction cost data book

    456/527

  • 8/8/2019 2010 CDOT construction cost data book

    457/527

  • 8/8/2019 2010 CDOT construction cost data book

    458/527

  • 8/8/2019 2010 CDOT construction cost data book

    459/527

  • 8/8/2019 2010 CDOT construction cost data book

    460/527

  • 8/8/2019 2010 CDOT construction cost data book

    461/527

  • 8/8/2019 2010 CDOT construction cost data book

    462/527

  • 8/8/2019 2010 CDOT construction cost data book

    463/527

  • 8/8/2019 2010 CDOT construction cost data book

    464/527

  • 8/8/2019 2010 CDOT construction cost data book

    465/527

  • 8/8/2019 2010 CDOT construction cost data book

    466/527

  • 8/8/2019 2010 CDOT construction cost data book

    467/527

  • 8/8/2019 2010 CDOT construction cost data book

    468/527

  • 8/8/2019 2010 CDOT construction cost data book

    469/527

  • 8/8/2019 2010 CDOT construction cost data book

    470/527

  • 8/8/2019 2010 CDOT construction cost data book

    471/527

  • 8/8/2019 2010 CDOT construction cost data book

    472/527

  • 8/8/2019 2010 CDOT construction cost data book

    473/527

  • 8/8/2019 2010 CDOT construction cost data book

    474/527

  • 8/8/2019 2010 CDOT construction cost data book

    475/527

  • 8/8/2019 2010 CDOT construction cost data book

    476/527

  • 8/8/2019 2010 CDOT construction cost data book

    477/527

  • 8/8/2019 2010 CDOT construction cost data book

    478/527

  • 8/8/2019 2010 CDOT construction cost data book

    479/527

  • 8/8/2019 2010 CDOT construction cost data book

    480/527

  • 8/8/2019 2010 CDOT construction cost data book

    481/527

  • 8/8/2019 2010 CDOT construction cost data book

    482/527

  • 8/8/2019 2010 CDOT construction cost data book

    483/527

  • 8/8/2019 2010 CDOT construction cost data book

    484/527

  • 8/8/2019 2010 CDOT construction cost data book

    485/527

  • 8/8/2019 2010 CDOT construction cost data book

    486/527

  • 8/8/2019 2010 CDOT construction cost data book

    487/527

  • 8/8/2019 2010 CDOT construction cost data book

    488/527

  • 8/8/2019 2010 CDOT construction cost data book

    489/527

  • 8/8/2019 2010 CDOT construction cost data book

    490/527

  • 8/8/2019 2010 CDOT construction cost data book

    491/527

  • 8/8/2019 2010 CDOT construction cost data book

    492/527

  • 8/8/2019 2010 CDOT construction cost data book

    493/527

  • 8/8/2019 2010 CDOT construction cost data book

    494/527

  • 8/8/2019 2010 CDOT construction cost data book

    495/527

  • 8/8/2019 2010 CDOT construction cost data book

    496/527

  • 8/8/2019 2010 CDOT construction cost data book

    497/527

  • 8/8/2019 2010 CDOT construction cost data book

    498/527

  • 8/8/2019 2010 CDOT construction cost data book

    499/527

  • 8/8/2019 2010 CDOT construction cost data book

    500/527

  • 8/8/2019 2010 CDOT construction cost data book

    501/527

  • 8/8/2019 2010 CDOT construction cost data book

    502/527

  • 8/8/2019 2010 CDOT construction cost data book

    503/527

  • 8/8/2019 2010 CDOT construction cost data book

    504/527

  • 8/8/2019 2010 CDOT construction cost data book

    505/527

  • 8/8/2019 2010 CDOT construction cost data book

    506/527

  • 8/8/2019 2010 CDOT construction cost data book

    507/527

  • 8/8/2019 2010 CDOT construction cost data book

    508/527

  • 8/8/2019 2010 CDOT construction cost data book

    509/527

  • 8/8/2019 2010 CDOT construction cost data book

    510/527

  • 8/8/2019 2010 CDOT construction cost data book

    511/527

  • 8/8/2019 2010 CDOT construction cost data book

    512/527

  • 8/8/2019 2010 CDOT construction cost data book

    513/527

  • 8/8/2019 2010 CDOT construction cost data book

    514/527

  • 8/8/2019 2010 CDOT construction cost data book

    515/527

  • 8/8/2019 2010 CDOT construction cost data book

    516/527

  • 8/8/2019 2010 CDOT construction cost data book

    517/527

  • 8/8/2019 2010 CDOT construction cost data book

    518/527

  • 8/8/2019 2010 CDOT construction cost data book

    519/527

  • 8/8/2019 2010 CDOT construction cost data book

    520/527

  • 8/8/2019 2010 CDOT construction cost data book

    521/527

  • 8/8/2019 2010 CDOT construction cost data book

    522/527

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 2

    2010 Cost Data

    PROJECTS BID FROM 01/01/10 THROUGH 09/30/10

    ------------------------------------------------------------------------------------------------------------------------------------

    BID CONTRACTOR/

    LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX------------------------------------------------------------------------------------------------------------------------------------

    20100304 APC SOUTHERN CONSTRUCTION COMPANY, LLC 6 $5,165,043.41 98.73

    ES5 1602-125 US 160 SHAW CREEK TO DEL NORTE 5 R

    20100304 LAFARGE NORTH AMERICA, INC 6 $1,509,306.60 77.31

    ES6 002A-003 SH 2, 62ND AVE. TO QUEBEC PARK 6 U

    20100311 INTERFACE COMMUNICATIONS, COMPANY 4 $70,059.48 87.77

    STAR400-249 SH 257 MP 9.558 AND SH 7B MP 5 4 R

    20100311 KOLBE STRIPING INC. 4 $585,181.00 116.61

    MPR200-172 SH287 A & B AND US50 B 2 P

    20100318 LAFARGE NORTH AMERICA, INC 5 $3,299,328.29 92.90

    STA0853-065 ON US 85 IN WELD COUNTY 4 U

    20100318 STURGEON ELECTRIC COMPANY, INC 4 $577,954.00 101.16

    C0703-356 I-70, EAST OF SILVERTHORN TO L 1 M

    20100318 WALSENBURG SAND AND GRAVEL 7 $1,837,111.00 104.92

    FBR 069A-026 0.5 MILES S/O THE TOWN OF FARI 2 L

    20100318 EDWARD KRAEMER & SONS INC. 5 $17,172,771.47 31.38

    ES6 0852-103 - CONCRETE ALT US 85 / C-470 INTERCHANGE (STA 6 R

    ES6 0852-103 - DEFAULT ALT US 85 / C-470 INTERCHANGE (STA 6 R

    ES6 0852-103 - STEEL ALT US 85 / C-470 INTERCHANGE (STA 6 R

    20100318 FLATIRON CONSTRUCTORS, INC. 4 $620,830.00 84.08

    ER 0702-307 I-70 MP 124-126 IN GARFIELD CO 3 M

    20100325 BRANNAN SAND AND GRAVEL, LLC 6 $2,378,047.60 89.14

    STA157A-010 SH 157A IN BOULDER COUNTY 4 R

    20100401 STRUCTURES, INC. 8 $6,959,186.05 87.91

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 2

    2010 Cost Data

    PROJECTS BID FROM 01/01/10 THROUGH 09/30/10

    ------------------------------------------------------------------------------------------------------------------------------------

    BID CONTRACTOR/

    LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX------------------------------------------------------------------------------------------------------------------------------------

    20100304 APC SOUTHERN CONSTRUCTION COMPANY, LLC 6 $5,165,043.41 98.73

    ES5 1602-125 US 160 SHAW CREEK TO DEL NORTE 5 R

    20100304 LAFARGE NORTH AMERICA, INC 6 $1,509,306.60 77.31

    ES6 002A-003 SH 2, 62ND AVE. TO QUEBEC PARK 6 U

    20100311 INTERFACE COMMUNICATIONS, COMPANY 4 $70,059.48 87.77

    STAR400-249 SH 257 MP 9.558 AND SH 7B MP 5 4 R

    20100311 KOLBE STRIPING INC. 4 $585,181.00 116.61

    MPR200-172 SH287 A & B AND US50 B 2 P

    20100318 LAFARGE NORTH AMERICA, INC 5 $3,299,328.29 92.90

    STA0853-065 ON US 85 IN WELD COUNTY 4 U

    20100318 STURGEON ELECTRIC COMPANY, INC 4 $577,954.00 101.16

    C0703-356 I-70, EAST OF SILVERTHORN TO L 1 M

    20100318 WALSENBURG SAND AND GRAVEL 7 $1,837,111.00 104.92

    FBR 069A-026 0.5 MILES S/O THE TOWN OF FARI 2 L

    20100318 EDWARD KRAEMER & SONS INC. 5 $17,172,771.47 31.38

    ES6 0852-103 - CONCRETE ALT US 85 / C-470 INTERCHANGE (STA 6 R

    ES6 0852-103 - DEFAULT ALT US 85 / C-470 INTERCHANGE (STA 6 R

    ES6 0852-103 - STEEL ALT US 85 / C-470 INTERCHANGE (STA 6 R

    20100318 FLATIRON CONSTRUCTORS, INC. 4 $620,830.00 84.08

    ER 0702-307 I-70 MP 124-126 IN GARFIELD CO 3 M

    20100325 BRANNAN SAND AND GRAVEL, LLC 6 $2,378,047.60 89.14

    STA157A-010 SH 157A IN BOULDER COUNTY 4 R

    20100401 STRUCTURES, INC. 8 $6,959,186.05 87.91

  • 8/8/2019 2010 CDOT construction cost data book

    523/527

    , , ,

    BR M356-022 80TH OVER US36 ON WESTMINISTER 6 U

    20100401 LAFARGE NORTH AMERICA, INC 6 $3,808,889.81 92.81

    NHC010-100 SH2, ALAMEDA TO MLK 6 U

    20100401 SCHMIDT CONSTRUCTION COMPANY 3 $2,641,487.47 91.06

    STA R200-167 SH 21 BRADLEY RD. TO N/O DRENN 2 R

    20100401 STURGEON ELECTRIC COMPANY, INC 4 $122,513.00 90.87

    C0703-355 I-70, EAST OF SILVER PLUME TO 1 M

    20100401 UNITED COMPANIES OF MESA COUNTY 3 $849,450.25 94.45STA 0241-054 SH 24 BATTLE MOUNTAIN CHIP SEA 3 M

    20100408 LAFARGE NORTH AMERICA, INC 6 $2,662,412.20 88.57

    STA2854-119 US 285 DEER CREEK TO RICHMOND 1 M

    20100408 ELAM CONSTRUCTION, INC. 3 $3,529,926.50 95.92

    , , ,

    BR M356-022 80TH OVER US36 ON WESTMINISTER 6 U

    20100401 LAFARGE NORTH AMERICA, INC 6 $3,808,889.81 92.81

    NHC010-100 SH2, ALAMEDA TO MLK 6 U

    20100401 SCHMIDT CONSTRUCTION COMPANY 3 $2,641,487.47 91.06

    STA R200-167 SH 21 BRADLEY RD. TO N/O DRENN 2 R

    20100401 STURGEON ELECTRIC COMPANY, INC 4 $122,513.00 90.87

    C0703-355 I-70, EAST OF SILVER PLUME TO 1 M

    20100401 UNITED COMPANIES OF MESA COUNTY 3 $849,450.25 94.45STA 0241-054 SH 24 BATTLE MOUNTAIN CHIP SEA 3 M

    20100408 LAFARGE NORTH AMERICA, INC 6 $2,662,412.20 88.57

    STA2854-119 US 285 DEER CREEK TO RICHMOND 1 M

    20100408 ELAM CONSTRUCTION, INC. 3 $3,529,926.50 95.92

    NH5502-067 US 550 NORTH OF DURANGO ON MOL 5 M

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 3

    2010 Cost Data

    PROJECTS BID FROM 01/01/10 THROUGH 09/30/10

    ------------------------------------------------------------------------------------------------------------------------------------

    BID CONTRACTOR/

    LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX------------------------------------------------------------------------------------------------------------------------------------

    20100408 BRANNAN SAND AND GRAVEL, LLC 4 $4,268,360.97 80.01

    IM0253-211 I-25 NB AND SB AT WCR 32 4 L

    20100415 HAMON CONTRACTORS, INC. 6 $16,421,806.87 87.37

    STU 0831-107 PARKER RD (SH 83) AND ARAPAHOE 6 U

    20100415 ZAK DIRT, INC. 7 $2,894,701.75 80.23

    NH 2873-157 SH 287:BROOMFIELD TO LAFAYETTE 6 R

    20100415 CRUZ CONSTRUCTION, INC. 7 $427,135.50 77.01

    C0761-205 I-76 NORTH OF WCR 8 IN WELD CO 4 L

    20100422 INTERMOUNTAIN SLURRY SEAL, INC. 4 $588,793.08 96.40

    NH 1603-026 US 160 FORT GARLAND EAST 5 R

    20100422 APC SOUTHERN CONSTRUCTION COMPANY, LLC 2 $805,394.81 94.32

    IM0704-219 I70 WEST OF SIEBERT - EAST 1 P

    20100422 INTERFACE COMMUNICATIONS, COMPANY 2 $182,171.81 102.14

    C3921-011 SH 392 AND CR 31 INTERSECTION 4 R

    20100422 W.L. CONTRACTORS, INC. 3 $218,837.75 94.92

    C0931-028 INTERSECTION OF SH 93 AND SH 1 4 R

    20100429 INTERSTATE HIGHWAY CONSTRUCTION 6 $20,293,515.37 95.34

    IM 2254-074 I-225: MISSISSIPPI TO 2ND AVE 6 U

    20100429 ARROW ELECTRIC SERVICE, INC. 6 $415,249.90 95.47

    SHE045A-008 SH45(PUEBLO BLVD.) AND GOODNIG 2 U

    20100429 LAFARGE NORTH AMERICA, INC 5 $5,399,788.69 83.49

    IM0252-406 ON I-25 1 MI. S. OF PUEBLO THR 2 U

    Colorado Department of Transportation 13:34 Tuesday, November 16, 2010 3

    2010 Cost Data

    PROJECTS BID FROM 01/01/10 THROUGH 09/30/10

    ------------------------------------------------------------------------------------------------------------------------------------

    BID CONTRACTOR/

    LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX------------------------------------------------------------------------------------------------------------------------------------

    20100408 BRANNAN SAND AND GRAVEL, LLC 4 $4,268,360.97 80.01

    IM0253-211 I-25 NB AND SB AT WCR 32 4 L

    20100415 HAMON CONTRACTORS, INC. 6 $16,421,806.87 87.37

    STU 0831-107 PARKER RD (SH 83) AND ARAPAHOE 6 U

    20100415 ZAK DIRT, INC. 7 $2,894,701.75 80.23

    NH 2873-157 SH 287:BROOMFIELD TO LAFAYETTE 6 R

    20100415 CRUZ CONSTRUCTION, INC. 7 $427,135.50 77.01

    C0761-205 I-76 NORTH OF WCR 8 IN WELD CO 4 L

    20100422 INTERMOUNTAIN SLURRY SEAL, INC. 4 $588,793.08 96.40

    NH 1603-026 US 160 FORT GARLAND EAST 5 R

    20100422 APC SOUTHERN CONSTRUCTION COMPANY, LLC 2 $805,394.81 94.32

    IM0704-219 I70 WEST OF SIEBERT - EAST 1 P

    20100422 INTERFACE COMMUNICATIONS, COMPANY 2 $182,171.81 102.14

    C3921-011 SH 392 AND CR 31 INTERSECTION 4 R

    20100422 W.L. CONTRACTORS, INC. 3 $218,837.75 94.92

    C0931-028 INTERSECTION OF SH 93 AND SH 1 4 R

    20100429 INTERSTATE HIGHWAY CONSTRUCTION 6 $20,293,515.37 95.34

    IM 2254-074 I-225: MISSISSIPPI TO 2ND AVE 6 U

    20100429 ARROW ELECTRIC SERVICE, INC. 6 $415,249.90 95.47

    SHE045A-008 SH45(PUEBLO BLVD.) AND GOODNIG 2 U

    20100429 LAFARGE NORTH AMERIC