2001 Virginia Department of Transportation Daily Traffic ... · Because the user determines the...
Transcript of 2001 Virginia Department of Transportation Daily Traffic ... · Because the user determines the...
-
Virginia Department of Transportation
09Jurisdiction Report
Daily Traffic VolumesIncluding Vehicle Classification Estimates
City of Bedford
where available
Bedford County
2001
-
Virginia Department of Transportation Traffic Engineering Division Traffic Monitoring Section
The Virginia Department of Transportation (VDOT) conducts a program where traffic count data are gathered from sensors in or along streets and highways and other sources. From these data, estimates of the average number of vehicles that traveled each segment of road are calculated. VDOT periodically publishes booklets listing these estimates. One of these booklets includes a list of all Interstate and Primary highway segments with the estimated Annual Average Daily Traffic (AADT). AADT is the total annual traffic estimate divided by the number of days in the year. This book is titled “Average Daily Traffic Volumes on Interstate, Arterial and Primary Routes”. The second booklet includes the same information as the first, along with some additional information such as an estimate of the percentage of the AADT made up by 6 different vehicle types, ranging from cars to double trailer trucks. This booklet also includes the estimated Annual Average Weekday Traffic (AAWDT), which is the number of vehicles estimated to have traveled the segment of highway during a 24 hour weekday averaged over the year; and a “Design Hour” estimate which is a value used by planners to formulate design criteria. This book is titled “Average Daily Traffic Volumes with Vehicle Classification Data, on Interstate, Arterial and Primary Routes”. Both of the Interstate and Primary booklets mentioned above include a number of reports summarizing the average Vehicle Miles Traveled (VMT) in selected jurisdictions and other categories of highways. There are many different ways to present traffic volume summary information. Because the user determines the value of each presentation, the booklet has been redesigned based on user requests and feedback. The people at VDOT Traffic Engineering’s Traffic Monitoring Section who produce these books welcome requests for other helpful ways of presenting the summary information. In addition to the two annual publications, one hundred books are published periodically, one for each of 100 areas across the state defined by VDOT for record-keeping purposes. These books include traffic volume estimates for all roads within the county, cities, and towns within the area. These books are titled “Daily Traffic Volumes Including Vehicle Classification Estimates, where available; Jurisdiction Report numbers 00 through 99”. Available this year is a compact disc (CD) that includes files in the Adobe® Portable Document Format (PDF) that can be displayed, searched, and printed using common desktop computer equipment. One disc will include both Primary and Interstate publications as well as each of the 100 Jurisdiction Reports. The CD will also include a number of summary reports not available in the printed version.
-
Publication Notes Parallel Roads For road inventory and management purposes, some roadways are counted separately by direction and have separately published traffic estimates for each direction of travel. Examples of such roadways are the interstate system and routes with separated facilities and (usually) one-way traffic facilities in urban areas. In these publications, they are referred to as parallel roads. As a convenience for the users of the publication, the listing for segments of roads with parallel segments are published with both the traffic estimates for their own direction of travel (e.g. I-95 Northbound) as well as the estimate of the total of all traffic on the same route including parallel roadways (all directions of I-95). The publication will have a “Combined Traffic Estimates for Parallel Roadways on this Route” or “Combined Traffic” identifiers for the combined direction of travel estimates. Roadways such as I-395 with a North segment, a South segment and a separate Reversible lane segment will have the estimate for more than two parallel roadways included in the entire combined traffic estimate. Some routes have very complicated paths through cities and towns. These parallel paths may be too complex to allow a relationship between nearby sections of the opposite direction on the same route. In this case, to indicate that the traffic estimates for such a road segment may not include all directions of traffic on that route, the line that would list the combined values will indicate “NA” for not available. VDOT’s traffic monitoring program includes more than 100,000 segments of roads and highways ranging from several mile sections of Interstate highways to very short sections of city streets. Due to problems experienced obtaining some traffic count data, and the level of quality necessary to maintain confidence in the data, no estimate is currently available for some segments of roadway. These segments are included in the publications indicating “NA” for not available. It is the intention of the VDOT’s Traffic Engineering Traffic Monitoring group to obtain the data necessary and to report traffic volume estimates on all road segments included in these publications. Many of the road segments in this program are local secondary roads. The amount and detail of data collected on these roads are not as great as the data collected on higher volume roads. The vehicle classification, average weekday traffic volumes, and the theoretical design hour traffic volumes are not calculated for these roads. The publications indicate “NA” for the information that is not available. This publication is based on a traffic monitoring program initiated in 1997. Because the data collection techniques and statistical evaluation processes are different than those used in previous years, comparison with previous publications may be misleading.
-
Glossary of Terms: Route: The Route Number assigned to this segment of roadway with the master inventory route number if this is an overlapping route, with official street or highway name if available. Length: Length of the traffic segment in miles. AADT: Annual Average Daily Traffic. The estimate of typical daily traffic on a road segment for all days of the week, Sunday through Saturday, over the period of one year. QA: Quality of AADT:
A Average of Complete Continuous Count Data B Average of Selected Continuous Count Data F Factored Short Term Traffic Count Data G Factored Short Term Traffic Count Data with Growth Element H Historical Estimate M Manual Uncounted Estimate N AADT of Similar Neighboring Traffic Link O Provided By External Source R Raw Traffic Count, Unfactored
4Tire: Percentage of the traffic volume made up of motorcycles, passenger cars, vans and pickup trucks. Bus: Percentage of the traffic volume made up of busses. 2Axle Truck: Percentage of the traffic volume made up of 2 axle single unit trucks (not including pickups and vans). 3+Axle Truck: Percentage of the traffic volume made up of single unit trucks with three or more axles. 1Trail Truck: Percentage of the traffic volume made up of units with a single trailer. 2Trail Truck: Percentage of the traffic volume made up of units with more than one trailer. QC: Quality of Classification Data:
A Average of Complete Continuous Count Data B Average of Selected Continuous Count Data C Short Term Classified Traffic Count Data F Factored Short Term Traffic Count Data H Historical Estimate M Mass Collective Average N Classification Estimates of Similar Neighboring Traffic Link
-
Design Hour: The estimate of the traffic volume for the 30th highest traffic volume occurring in a one-year period. QK: Quality of the Design Hour estimate:
A 30th Highest Hour Observed During 12 Months of Continuous Traffic Data B 30th Highest Hour Observed During Less than 12 Months of Continuous Traffic Data F Factored Highest Hour Collected at in a 48 Hour Weekday Period G Factored Highest Hour Collected at in a 48 Hour Weekday Period with Growth Element M Manual Estimate of 30th Highest Hour N Design Hour of Similar Neighboring Traffic Link O Provided by External Source
AAWDT: Average Annual Weekday Traffic. The estimate of typical traffic over the period of one year for the days between Monday through Thursday. QW: Quality of AAWDT:
A Average of Complete Continuous Count Data B Average of Selected Continuous Count Data F Factored Short Term Traffic Count Data G Factored Short Term Traffic Count Data with Growth Element M Manual Uncounted Estimate N AAWDT of Similar Neighboring Traffic Link O Provided by External Source
Year: Year for which the published values are appropriate. If the Quality of AADT (QA) is “R”, the year is the year that the raw traffic count was collected, and if available, the actual date that the count was obtained is provided. All other AADT data are factored to be accurate for the year of the report.
-
Bus
29
600
7
29
North
81
154600
Interstate Route
US Route
Virginia State Route
ALT - Alternate Route
Bus - Business RouteBypas - Bypass RouteTruck - Truck Route
Wye - Wye Route connector
Secondary Route
The VDOT Maintainenance Jurisdiction number is displayed below the Secondary Route Number ifthe Maintenance Jurisdiction is different than the jurisdiction in the title of the report.
P - Parallel Route; Southbound or Westbound direction lanes of a numbered route wherethey are on a different road facility than the other direction.
ALT
220
11P
Traffic volume data for Interstate Routes and some other routes arereported separately by direction, as well as combined.
Route Shield Legend
Route Systems
Special Routes
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
20000 0% 2% 2000 21000F F1% 1% F FRoanoke County Line
80-651 East of Vinton
96%
From:To:
From:
0.08 0%
Bedford County
200124
16000 0% 2% 1600 17000F F0% 1% F F
09-635
96%
From:To:
4.90 0% 200124
8900 0% 2% 840 9100F F0% 1% C F
W 09-755
96%
From:To:
2.04 0% 200124
7800 0% 2% 700 7900F F0% 1% F F
09-746 Near Chamblissburg
96%
From:To:
2.15 0% 200124
3600 0% 2% 330 3700F F0% 1% F F
09-801
96%
From:To:
4.57 0% 200124
2100 0% 2% 180 2100F F0% 1% F F
SR 122 Davis Mill
96%
From:To:
3.69 0% 200124
1900 0% 2% 180 2000F F0% 1% F F
W SR 43
96%
From:To:
5.51 0% 200124
2200 1% 5% 210 2300F F1% 4% C F
E SR 43
90%
From:To:
2.58 0% 200124
2300 0% 3% 220 2400F F1% 2% C FCampbell County Line
94%To:
7.59 0% 200124
460 1% 2% 48 480G G0% 1% F GCampbell County Line
09-626
96%
From:To:
From:
5.13 0% 200143
2700 1% 3% 260 2700F F2% 2% F F
SR 24 Gillespie
93%
From:To:
2.49 0% 200143
2200 1% 5% 210 2300F F1% 4% C F
SR 24 WEST OF GILLESPIE
90%
From:To:
24 2.58 0% 200143
1700 1% 1% 150 1700F F0% 1% F FSCL Bedford
97%To:
8.32 0% 200143
1800 1% 1% 210 1900F F0% 0% C FSCL Bedford
SR 43 P Talbott St
97%
From:To:
From:
0.96 0%
City of Bedford
200143 South Street
1100 1% 1% 130 1200F F0% 0% C F
Washington St
97%
From:To:
0.14 0% 200143 South Street1800 1% 1% 200 1900F F0% 0% F F97% 0% 2001Combined Traffic:
720 1% 1% 100 750F F0% 1% F F
Main St
97%
Bus From:To:
0.06 0% 200143 South Street1800 1% 1% 220 1900F F0% 1% F F97% 0% 2001Combined Traffic:
6800 1% 2% 700 7100F F0% 1% F F
RT 460 BUS & RT 221
96%
From:To:
460 0.08 0% 200143 E Main St
6200 1% 2% 600 6400F F1% 1% F F
BEDFORD AVE
95%
From:To:
221 0.16 0% 200143 N Bridge St
9500 1% 2% 880 9900F F1% 1% C FRT 221
95%
From:
To:221 0.11 0% 200143 N Bridge St
N Bridge St3500 1% 2% 360 3600F F1% 1% F F
Laurel St
96%
From:To:
0.62 0% 200143 Peaks Street
3100 1% 2% 320 3200F F1% 1% C FNCL Bedford
96%To:
0.94 0% 200143 Peaks Street
2400 1% 2% 210 2500F F1% 1% F FNCL Bedford
09-643 Near Peaksville96%
To:
From:
3.79 0%
Bedford County
200143
18/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
820 1% 1% 90 830F F0% 0% C F09-643 Near Peaksville
Blue Ridge Parkway
98%
From:To:
From:
5.03 0%
Bedford County
200143
400 1% 1% 40 400F F0% 0% F FBotetourt County Line
98%To:
0.11 0% 200143
710 1% 1% 70 740F F1% 1% F FSouth Street
Otey Street
97%
From:
To:
From:
P0.05 0%
City of Bedford
200143 Talbot Street
Talbot St
1800 1% 1% 200 1900F F0% 0% F F97% 0% 2001Combined Traffic:
1100 1% 1% 120 1100F F1% 1% C F
Bus US 460 E Main St
97%
To:
P0.14 0% 200143 Otey Street
1800 1% 1% 220 1900F F0% 1% F F97% 0% 2001Combined Traffic:
6100 1% 2% 550 6100F F1% 5% F FFranklin County Line
09-608 Moneta
91%
From:To:
From:
3.77 0%
Bedford County
2001122
5500 1% 2% 460 5600F F1% 5% F F
09-801
91%
From:To:
2.83 0% 2001122
4300 1% 2% 360 4300F F1% 5% F F
SR 24 Davis Mill
91%
From:To:
2.09 0% 2001122
5100 1% 2% 430 5100F F1% 5% F F
09-747
91%
From:To:
4.06 0% 2001122
7000 1% 2% 650 7100F F1% 5% C FSCL Bedford
91%To:
3.19 0% 2001122
9800 1% 4% 920 10000F F1% 3% C FSCL Bedford
US 46092%
To:
From:
0.54 0%
City of Bedford
2001122 Burks Hill Rd
18000 1% 3% 1500 18000F F2% 9% F FUS 460
SCL Bedford86%
To:
From:
460 0.50 0%
Bedford County
2001122
18000 1% 3% 1500 18000F F2% 9% F FSCL Bedford
86%
Bus From:To:
From:
460 0.94 0%
City of Bedford
2001122
US 4606500 1% 2% 640 6800N N0% 1% N N
E MAIN ST
96%
From:To:
460 0.20 0% 2001122 E Main St
9800 1% 3% 940 10000F F1% 3% F F
Orange St
92%
From:To:
1.02 0% 2001122 Independence Blvd
9900 1% 3% 1000 10000F F1% 3% C F
Dawn Dr
92%
From:To:
0.29 0% 2001122 Independence Blvd
8600 1% 3% 840 9000F F1% 3% F FLongwood Ave
92%
From:
To:
0.50 0% 2001122 Independence Blvd
Independence Ave5400 2% 3% 700 5600F F0% 2% C F
NCL Bedford92%
To:
0.65 0% 2001122 Longwood Ave
3000 2% 3% 270 3000F F0% 2% F FNCL Bedford
N 09-639
92%
From:To:
From:
8.08 0%
Bedford County
2001122
1700 2% 3% 150 1700F F0% 2% F FUS 501 Near Big Island
92%To:
8.72 0% 2001122
28/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
5300 1% 2% 550 5500F F1% 1% C FUS 460
W Main St
95%
Bus From:To:
From:
0.96 0%
City of Bedford
2001Bus
122 Crenshaw St
7200 1% 1% 730 7600F F1% 1% F FN BRIDGE ST
97%
Bus From:To:
221 0.19 0% 2001122 W Main St
E MAIN ST6200 1% 2% 600 6400F F1% 1% F F
BEDFORD AVE
95%
Bus From:To:
221 0.16 0% 2001122 N Bridge St
9500 1% 2% 880 9900F F1% 1% C F
PEAKS ST
95%
Bus From:To:
221 0.11 0% 2001122 N Bridge St
8700 1% 2% 880 9100F F1% 1% F FOAKWOOD ST
95%
Bus From:To:
221 0.71 0% 2001122 Longwood Ave
10000 1% 2% 1000 11000F F1% 1% C FFOREST RD
96%To:
221 0.47 0% 2001122 Longwood Ave
17000 1% 3% 1400 18000F F2% 9% F FBotetourt County Line
11-695
86%
From:To:
From:
460 4.18 0%
Bedford County
2001221
15000 1% 3% 1200 15000F F2% 9% F F
09-831
86%
From:To:
460 7.69 0% 2001221
17000 1% 3% 1400 17000F F2% 9% F F86%To:
460 2.75 0% 2001221
20000 1% 3% 1700 21000F F2% 9% F FWCL Bedford
US 460 OLD TNPK RD
86%
From:To:
From:
460 0.67 0%
City of Bedford
2001221
8300 1% 1% 760 8600F F1% 1% C F
4th St
97%
From:To:
1.01 0% 2001221
6200 1% 1% 640 6500F F1% 1% F F
Crenshaw St
97%
From:To:
0.07 0% 2001221 W Main St
7200 1% 1% 730 7600F F1% 1% F FN Bridge St
97%
From:
To:
0.19 0% 2001221 W Main St
E Main St6200 1% 2% 600 6400F F1% 1% F F
Bedford Ave
95%
From:To:
0.16 0% 2001221 N Bridge St
9500 1% 2% 880 9900F F1% 1% C F
Peaks St
95%
From:To:
0.11 0% 2001221 N Bridge St
8700 1% 2% 880 9100F F1% 1% F F
Oakwood St
95%
From:To:
0.71 0% 2001221 Longwood Ave
10000 1% 2% 1000 11000F F1% 1% C FForest Road
96%
From:
To:
0.47 0% 2001221 Longwood Ave
Longwood Ave6000 1% 3% 610 6200F F0% 2% C F
ECL Bedford93%
To:
0.68 0% 2001221 Forest Rd
5700 1% 3% 540 5700F F0% 2% F FECL Bedford
09-671
93%
From:To:
From:
2.22 0%
Bedford County
2001221
6500 1% 3% 610 6600F F0% 2% F F
09-663
93%
From:To:
9.23 0% 2001221
18000 1% 2% 1700 19000F F1% 2% F F9-620 Bateman Bridge Road
95%To:
2.77 0% 2001221
38/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
27000 1% 2% 2600 28000F F1% 2% C F09-620 Bateman Bridge Rd
WCL Lynchburg95%
To:
From:
2.32 0%
Bedford County
2001221
17000 1% 3% 1400 18000F F2% 9% F FBotetourt County Line
11-695
86%
From:To:
From:
4.18 0% 2001460
15000 1% 3% 1200 15000F F2% 9% F F
09-831
86%
From:To:
7.69 0% 2001460
17000 1% 3% 1400 17000F F2% 9% F FWCL Bedford
86%To:
2.75 0% 2001460
20000 1% 3% 1700 21000F F2% 9% F FWCL Bedford
US 221
86%
From:To:
From:
0.67 0%
City of Bedford
2001460
14000 1% 3% 1200 14000F F2% 9% F FECL Bedford
86%To:
0.18 0% 2001460
15000 1% 3% 1200 15000F F2% 9% F FECL Bedford
WCL Bedford86%
To:
From:
0.24 0%
Bedford County
2001460
15000 1% 3% 1300 15000F F2% 9% F FWCL Bedford
ECL Bedford86%
To:
From:
0.90 0%
City of Bedford
2001460
15000 1% 3% 1300 15000F F2% 9% F FECL Bedford
SR 122
86%
From:To:
From:
0.06 0%
Bedford County
2001460
18000 1% 3% 1500 18000F F2% 9% F FSCL Bedford
86%To:
0.50 0% 2001460
18000 1% 3% 1500 18000F F2% 9% F FSCL Bedford
SR 122, US 221, Bus US 460
86%
From:To:
From:
0.94 0%
City of Bedford
2001460
19000 1% 3% 1600 19000F F2% 9% F FECL Bedford
86%To:
0.28 0% 2001460
14000 1% 3% 1200 15000F F2% 9% F FECL Bedford
09-803
86%
From:To:
From:
4.40 0%
Bedford County
2001460
16000 1% 3% 1300 16000F F2% 9% F FCampbell County Line
86%To:
7.88 0% 2001460
8300 1% 1% 760 8600F F1% 1% C FUS 460 OLD TNPK RD
4TH ST
97%
Bus From:To:
From:
221 1.01 0%
City of Bedford
2001Bus
460
6200 1% 1% 640 6500F F1% 1% F F
CRENSHAW ST
97%
Bus From:To:
221 0.07 0% 2001460 W Main St
7200 1% 1% 730 7600F F1% 1% F F
N Bridge St
97%
Bus From:To:
221 0.19 0% 2001460 W Main St
6800 1% 2% 700 7100F F0% 1% F F
South St
96%
Bus From:To:
0.08 0% 2001460 E Main St
7600 1% 2% 790 8000F F0% 1% F FOrange St
96%To:
0.27 0% 2001460 E Main St
48/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
6500 1% 2% 640 6800F F0% 1% C FOrange St
US 221, SR 122
96%
Bus From:To:
From:
0.71 0%
City of Bedford
2001Bus
460 E Main St
6500 1% 2% 640 6800N N0% 1% N NUS 460
96%To:
0.20 0% 2001460 E Main St
2900 0% 2% 300 2900F F0% 3% F FWCL Lynchburg
09-651
94%
From:To:
From:
3.64 0%
Bedford County
2001501
2600 0% 2% 270 2700F F0% 3% F F
SR 122
94%
From:To:
6.32 0% 2001501
1500 1% 4% 150 1500F F2% 14% C FAmherst County Line
80%To:
4.33 0% 2001501
NA NA NACL Bedford
Dead EndTo:
From:
FR0.19609
120 NA NARSR 122
0.25 MN SR 122From:To:
From:
0.25 1998600
100 NA NAR
0.55 MN SR 122From:To:
0.30 1998600
60 NA NAR
JEFFERSON NATL FOR BNDYFrom:To:
0.65 1998600
60 NA NAR
09-772From:To:
1.10 1998600
100 NA NARUS 501To:
0.90 1998600
50 NA NARDead End
09-820From:To:
From:
0.70 05/29/2001601
190 NA NARSR 122To:
1.10 1998601
110 NA NARNATL PARK RD
SR 122 NORTHFrom:
To:
From:
1.60 1998602
SR 122 SOUTH230 NA NAR
09-637To:1.40 1998602
40 NA NAR09-635
Botetourt County LineTo:
From:
1.70 07/25/2001603
210 NA NARUS 501 SOUTH
US 501 EASTTo:
From:
0.80 1998604
40 NA NARDead End
09-610To:
From:
0.20 1998605
120 NA NAR09-698
09-780From:To:
From:
0.60 1998606
260 NA NAR09-695To:
0.11 1998606
130 NA NARBotetourt County Line
09-616 EASTTo:
From:
1.90 07/23/2001607
58/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
190 NA NAR09-616 EAST
2.07 MN 09-616 EASTFrom:To:
From:
2.07
Bedford County
07/23/2001607
190 NA NAR
2.17 MN 09-616 EASTFrom:To:
0.10 07/23/2001607
190 NA NARUS 460; US 221
From:
To:
1.50 07/23/2001607
US 460; US 221650 NA NAR
09-770 SOUTHFrom:To:
0.05 1998607
290 NA NAR09-695To:
0.55 1998607
310 NA NARPittsylvania County Line
09-734 SouthFrom:To:
From:
8.70 07/02/2001608
1500 1% 6% 130 1500F F0% 2% F F
09-740
91%
From:To:
1.09 0% 2001608
1400 1% 6% 160 1500F F0% 2% F F09-626 South
91%
From:
To:
2.70 0% 2001608
09-626 North2900 1% 6% 260 2900F F0% 2% C F
09-654
91%
From:To:
2.84 0% 2001608
2000 1% 6% 170 2000F F0% 2% F FSR 122 South
91%
From:
To:
3.00 0% 2001608
SR 122 North40 0% 5% 8 40F F0% 3% F F
09-748
90%
From:To:
4.10 0% 2001608
120 1% 6% 10 130F F0% 2% F F09-749 South
90%
From:
To:
1.20 0% 2001608
09-749 North660 1% 6% 80 670F F0% 2% F F
09-757
91%
From:To:
0.40 0% 2001608
1300 1% 6% 130 1300F F0% 2% F FSR 24
91%To:
0.95 0% 2001608
1000 NA NAR09-811
Dead EndTo:
From:
2.18 1998609
200 NA NARUS 501
Dead EndTo:
From:
0.40 1998610
180 NA NARDead End
US 501To:
From:
0.50 1998611
20 NA NARDead End
US 501To:
From:
1.45 05/31/2001612
140 NA NAR09-637
09-615From:To:
From:
0.20 05/31/2001613
30 NA NAR
3.58 MN 09-615From:To:
3.58 05/31/2001613
40 NA NARUS 501To:
1.81 1998613
80 NA NAR09-680
09-687To:
From:
1.30 1998614
68/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
50 NA NAR09-687
Blue Ridge ParkwayTo:
From:
3.80
Bedford County
05/23/2001614
50 NA NAR09-638
09-613To:
From:
2.50 05/31/2001615
440 NA NARDead End
09-655 SOUTHFrom:To:
From:
3.57 07/11/2001616
1800 0% 2% 180 1800F F0% 0% F F
09-655 NORTH
97%
From:To:
0.20 0% 2001616
1100 0% 2% 120 1200F F0% 0% F F09-757 EAST
97%
From:
To:
2.41 0% 2001616
09-757 WEST220 0% 2% 20 230F F0% 0% C F
SR 24
97%
From:To:
2.53 0% 2001616
270 NA NAR
09-653From:To:
0.44 07/18/2001616
170 NA NAR
1.74 MN 09-653From:To:
1.74 07/18/2001616
170 NA NAR
09-755 SOUTHFrom:To:
2.35 07/18/2001616
120 NA NAR
09-755 NORTHFrom:To:
0.46 07/18/2001616
180 NA NAR09-619 SOUTH
From:
To:
1.21 07/18/2001616
09-619 NORTH80 NA NAR
09-787From:To:
0.40 07/23/2001616
20 NA NAR
09-774From:To:
5.10 07/23/2001616
150 NA NAR09-607 EAST
From:
To:
0.10 07/23/2001616
09-607 WEST50 NA NAR
Botetourt County LineTo:1.50 07/23/2001616
600 NA NAR09-695
09-829From:To:
From:
0.80 1998617
520 NA NAR
09-696From:To:
1.30 1998617
300 NA NAR
09-697From:To:
1.10 1998617
60 NA NAR
09-729From:To:
0.97 1998617
45 NA NAR09-693To:
1.30 05/21/2001617
80 NA NARSR 24
Dead EndTo:
From:
0.20 07/25/2001618
1400 0% 2% 150 1400F F0% 1% F F09-634
09-757 Gap Terminus96%
From:
To:
From:
2.97 0% 2001619
SR 24 Gap Terminus3900 0% 2% 390 4000F F0% 1% C F
09-635 WEST96%
To:
1.94 0% 2001619
78/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
3100 0% 2% 290 3200F F0% 1% F F09-635 WEST
09-839
96%
From:To:
From:
1.31 0%
Bedford County
2001619
2000 0% 2% 220 2000F F0% 1% F F
09-699
96%
From:To:
1.65 0% 2001619
1600 0% 2% 160 1600F F0% 1% F F
09-616 SOUTH
96%
From:To:
0.66 0% 2001619
1100 0% 2% 130 1100F F0% 1% F F
09-616 NORTH
96%
From:To:
0.40 0% 2001619
740 0% 2% 90 750F F0% 1% F F
09-726
96%
From:To:
0.99 0% 2001619
250 NA NAR
09-1470From:To:
0.42 07/18/2001619
200 NA NAR09-691 SOUTH
From:
To:
1.70 07/18/2001619
09-691 NORTH30 NA NAR
09-690To:1.45 07/18/2001619
230 NA NAR09-661
US 221To:
From:
0.22 06/11/2001620
140 1% 1% 20 150F F0% 0% F F09-644
09-662
98%
From:To:
From:
4.05 0% 2001621
310 0% 2% 40 330F F0% 0% F F
09-884
98%
From:To:
0.83 0% 2001621
480 0% 1% 60 500F F0% 0% F F
09-1240
98%
From:To:
0.73 0% 2001621
1500 0% 1% 190 1600F F0% 0% F F
09-660
98%
From:To:
0.16 0% 2001621
4300 0% 1% 540 4500F F0% 0% F F
09-1201
98%
From:To:
0.43 0% 2001621
5200 0% 1% 640 5400F F0% 0% F F
09-1204
98%
From:To:
0.23 0% 2001621
6000 0% 1% 760 6300F F0% 0% C FUS 221
98%To:
0.35 0% 2001621
200 NA NAR09-646
09-810From:To:
From:
1.10 1998622
1600 NA NAR
09-1515From:To:
4.77 1998622
2100 NA NAR09-811 WEST
From:
To:
0.35 1998622
09-811 EAST8800 0% 2% 960 9200F F1% 0% C F
Campbell County Line97%
To:
0.90 0% 2001622
1400 NA NARCampbell County Line
09-811To:
From:
1.20 1998623
120 NA NAR09-644
09-658To:
From:
1.78 1998624
70 NA NAR09-711
Campbell County LineTo:
From:
0.50 1998625
88/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
440 1% 3% 60 450F F3% 3% F FDead End
09-656
90%
From:To:
From:
2.15 0%
Bedford County
2001626
1400 1% 3% 140 1500F F3% 3% F F
09-888
90%
From:To:
0.97 0% 2001626
1700 1% 3% 160 1700F F3% 3% C F
09-608 North
90%
From:To:
2.20 0% 2001626
1100 1% 3% 110 1100F F3% 3% F F
09-805
90%
From:To:
3.28 0% 2001626
1200 1% 4% 130 1200F F1% 3% F F
09-630
92%
From:To:
1.59 0% 2001626
1500 1% 4% 150 1500F F1% 3% F F
09-833 SOUTH
92%
From:To:
1.96 0% 2001626
1500 1% 4% 150 1600F F1% 3% C F
SR 43
92%
From:To:
3.04 0% 2001626
800 1% 4% 80 800F F1% 3% F F
09-628
92%
From:To:
0.88 0% 2001626
380 NA NAR
09-627From:To:
2.20 1998626
420 NA NARCampbell County LineTo:
2.00 1998626
20 NA NARDead End
09-626From:To:
From:
0.30 06/18/2001627
180 NA NARSR 24To:
2.48 1998627
1200 1% 5% 120 1200F F1% 6% C FCampbell County Line
09-626
87%
From:To:
From:
3.10 0% 2001628
900 1% 5% 90 910F F1% 3% C F
SR 43
90%
From:To:
1.00 0% 2001628
70 NA NAR
09-826From:To:
0.40 06/20/2001628
30 NA NAR09-727
From:
To:
1.90 06/20/2001628
09-727 SOUTH30 NA NAR
1.04 MS 09-727 SFrom:To:
1.04 06/20/2001628
40 NA NARSR 24To:
0.05 06/20/2001628
20 NA NARCampbell County Line
09-628To:
From:
0.60 06/18/2001629
120 NA NAR09-626
2.42 ME 09-626From:To:
From:
2.42 1998630
40 NA NAR
09-733From:To:
3.40 06/20/2001630
270 NA NAR
09-631From:To:
1.54 1998630
450 NA NARCampbell County LineTo:
0.20 1998630
98/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
200 NA NARCampbell County Line
09-630To:
From:
1.30
Bedford County
1998631
6 NA NARDead End
Campbell County LineTo:
From:
1.30 06/20/2001632
830 NA NARDead End
09-634To:
From:
2.45 07/25/2001633
3800 0% 2% 390 3900F F0% 1% F FRoanoke County Line
09-720 SOUTH
96%
From:To:
From:
0.22 0% 2001634
4600 0% 2% 460 4700F F0% 1% F F
09-788
96%
From:To:
2.56 0% 2001634
5300 0% 2% 510 5400F F0% 1% F F
09-619
96%
From:To:
0.70 0% 2001634
6400 0% 2% 720 6500F F0% 1% C F
09-635 WEST
96%
From:To:
0.69 0% 2001634
7800 0% 2% 850 7900F F0% 1% C FRoanoke County Line
96%To:
0.81 0% 2001634
220 NA NAR09-633
09-634 EASTFrom:
To:
From:
1.50 07/25/2001635
09-634 WEST900 NA NAR
09-1630From:To:
0.54 07/25/2001635
900 NA NARSR 24 EAST
From:
To:
0.96 07/25/2001635
SR 24 WEST890 NA NAR
09-1040From:To:
1.65 07/25/2001635
110 NA NAR
0.94 MN 09-1040From:To:
0.94 07/25/2001635
110 NA NAR
09-603From:To:
2.31 07/25/2001635
70 NA NAR
1.33 ME 09-603From:To:
1.33 07/25/2001635
250 NA NAR09-619 WEST
From:
To:
3.49 07/25/2001635
09-619 EAST600 2% 4% 70 600F F0% 1% C F
SR 24 WEST93%
From:
To:
1.80 0% 2001635
SR 24 EAST100 NA NAR
1.50 MS SR 24From:To:
1.50 07/11/2001635
40 NA NAR09-757 NORTH
From:
To:
1.37 07/11/2001635
09-757 SOUTH80 NA NAR
Dead EndTo:0.40 07/11/2001635
80 NA NARDead End
09-852From:To:
From:
0.65 07/11/2001636
550 NA NAR09-757To:
0.05 07/11/2001636
108/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
140 NA NAR09-670
09-644 EASTFrom:
To:
From:
2.50
Bedford County
1998637
09-644 WEST40 NA NAR
1.00 MN 09-644From:To:
1.00 06/13/2001637
70 NA NAR09-643 EAST
From:
To:
0.60 1998637
09-643 WEST40 NA NAR
09-638 SOUTHFrom:To:
4.30 06/13/2001637
340 2% 6% 40 340F F1% 1% C F
09-638 NORTH
91%
From:To:
0.90 0% 2001637
190 NA NAR
09-613From:To:
0.90 1998637
80 NA NARSR 122To:
4.80 1998637
90 NA NAR09-640
SR 122From:To:
From:
0.70 1998638
300 1% 6% 30 300F F1% 0% C F09-637 NORTH
92%
From:
To:
2.40 0% 2001638
09-637 SOUTH300 1% 6% 40 310F F1% 0% F F
09-615
91%
From:To:
0.60 0% 2001638
340 1% 6% 40 340F F1% 0% F F09-644
91%To:
4.00 0% 2001638
60 NA NAR09-643
3.54 MN 09-643From:To:
From:
3.54 06/13/2001639
120 NA NARSR 122 SOUTH
From:
To:
0.31 1998639
SR 122 NORTH400 NA NAR
09-783From:To:
1.60 1998639
240 NA NAR09-640To:
0.20 1998639
400 NA NARSR 122 SOUTH
09-643 NORTHFrom:
To:
From:
2.85 1998640
09-643 SOUTH380 NA NAR
09-850From:To:
1.00 1998640
180 NA NAR
09-766From:To:
2.20 1998640
30 NA NAR
09-765From:To:
2.80 05/29/2001640
120 NA NAR
09-639From:To:
1.70 1998640
60 NA NAR
09-764From:To:
3.04 05/29/2001640
60 NA NAR
09-638From:To:
0.20 1998640
50 NA NARSR 122 NORTHTo:
0.60 05/29/2001640
118/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
50 NA NARDead End
SR 43To:
From:
0.90
Bedford County
05/23/2001641
80 NA NARDead End
SR 43To:
From:
2.00 05/23/2001642
10 NA NARSR 43 SOUTH
SR 43 NORTHFrom:To:
From:
0.20 1998643
610 2% 1% 70 610F F0% 0% C F
09-640 EAST
96%
From:To:
0.70 0% 2001643
320 2% 1% 40 330F F0% 0% F FSR 122 SOUTH
96%
From:
To:
3.97 0% 2001643
SR 122 NORTH260 2% 1% 30 270F F0% 0% F F
09-644
96%
From:To:
5.47 0% 2001643
670 2% 1% 70 670F F0% 0% F F
US 221
96%
From:To:
3.75 0% 2001643
240 NA NAR
09-762From:To:
1.23 1998643
50 NA NAR
09-704 WESTFrom:To:
4.22 06/18/2001643
550 NA NAR09-811To:
1.70 1998643
620 1% 2% 80 620F F0% 1% F FSR 43
SR 122
95%
From:To:
From:
2.58 0% 2001644
1900 1% 2% 190 2000F F0% 1% C F
09-671
95%
From:To:
0.42 0% 2001644
180 1% 2% 20 180F F1% 2% F F
09-675
95%
From:To:
2.71 0% 2001644
120 1% 2% 20 120F F1% 2% F F
09-674
95%
From:To:
0.79 0% 2001644
46 2% 2% 6 47F F0% 2% F F
09-637 WEST
96%
From:To:
0.69 0% 2001644
20 0% 0% 5 20F F0% 0% F F
09-637 EAST
93%
From:To:
1.14 0% 2001644
100 1% 2% 20 100F F0% 1% F F
09-670
95%
From:To:
1.32 0% 2001644
160 1% 2% 20 170F F1% 1% F F
09-638
95%
From:To:
2.75 0% 2001644
710 1% 2% 80 720F F0% 1% F F
09-663
95%
From:To:
1.48 0% 2001644
340 1% 2% 40 350F F1% 1% F F
09-657
95%
From:To:
2.41 0% 2001644
360 1% 2% 48 360F F1% 1% F F
09-621
95%
From:To:
0.97 0% 2001644
380 1% 2% 50 390F F1% 2% F F
09-624
95%
From:To:
0.95 0% 2001644
500 1% 2% 60 510F F0% 1% F FWCL LYNCHBURG
95%To:
1.66 0% 2001644
128/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
80 NA NARDead End
09-651From:To:
From:
1.30
Bedford County
1998645
60 NA NAR
09-761From:To:
1.60 1998645
430 1% 1% 49 430F F0% 0% C FWCL LYNCHBURG
97%To:
3.10 0% 2001645
480 NA NARUS 221 WEST
US 221 MIDFrom:To:
From:
1.10 1998646
300 NA NARUS 221 EASTTo:
1.00 1998646
480 NA NARUS 501
09-856From:To:
From:
0.15 1998647
400 NA NAR
09-719From:To:
0.30 1998647
120 NA NAR09-761To:
0.35 1998647
60 NA NARSR 122
Dead EndTo:
From:
0.40 1998648
70 NA NAR09-711
09-858From:To:
From:
0.35 06/18/2001649
350 NA NARUS 460To:
0.05 1998649
40 NA NAR09-75 SOUTH
09-755 NORTHTo:
From:
0.18 07/23/2001650
50 NA NAR09-657
US 501 SOUTHFrom:
To:
From:
1.00 05/31/2001651
US 501 NORTH160 NA NAR
09-645To:1.46 1998651
5 NA NAR09-657
09-752From:To:
From:
0.80 05/31/2001652
50 NA NAR
0.86 MN 09-752From:To:
0.86 05/31/2001652
160 NA NARUS 501To:
1.17 1998652
300 NA NARDead End
09-655 WESTFrom:
To:
From:
1.28 07/16/2001653
09-655 EAST1600 0% 3% 170 1700F F1% 3% C F
09-757 EAST94%
From:
To:
1.48 0% 2001653
09-757 WEST300 NA NAR
09-877From:To:
0.03 07/11/2001653
190 NA NAR
09-756From:To:
1.08 07/11/2001653
400 NA NARSR 24To:
2.40 07/11/2001653
138/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
520 NA NARSR 24
09-616To:
From:
0.10
Bedford County
07/18/2001653
820 NA NARDead End
09-655 WESTFrom:To:
From:
1.60 06/25/2001654
2300 0% 4% 220 2400F F0% 2% C F
09-608
93%
From:To:
2.02 0% 2001654
300 NA NAR09-805 SOUTH
From:
To:
3.10 07/02/2001654
09-805 NORTH790 NA NAR
SR 122To:0.70 1998654
80 NA NARDead End
09-653 WESTFrom:To:
From:
0.80 07/11/2001655
380 NA NAR
09-653 EASTFrom:To:
0.17 07/11/2001655
1300 0% 4% 120 1300F F1% 2% F F09-616 SOUTH
93%
From:
To:
1.13 0% 2001655
09-616 NORTH3100 0% 4% 280 3100F F1% 2% C F
SR 122 NORTH93%
From:
To:
3.81 0% 2001655
SR 122 SOUTH1400 0% 5% 130 1400F F1% 2% C F
09-654 WEST92%
From:
To:
2.23 0% 2001655
09-654 EAST700 NA NAR
09-1518From:To:
2.22 06/25/2001655
320 NA NAR
09-1501From:To:
0.73 06/25/2001655
200 NA NAR
09-1502From:To:
0.05 06/25/2001655
48 NA NARDead EndTo:
0.10 06/25/2001655
10 NA NARDead End
0.07 ME Dead EndFrom:To:
From:
0.07 07/02/2001656
20 NA NAR
09-1305From:To:
0.04 07/02/2001656
40 NA NAR
09-1306From:To:
0.03 07/02/2001656
180 NA NAR
09-1304 EASTFrom:To:
0.23 07/02/2001656
420 NA NAR09-626To:
0.77 07/02/2001656
45 NA NAR09-644
09-652From:To:
From:
4.00 05/31/2001657
30 NA NAR
09-651From:To:
2.50 05/31/2001657
80 NA NARUS 501To:
0.70 1998657
120 NA NARDead End
09-624To:
From:
1.30 1998658
148/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
1200 NA NAR09-624
09-1016From:To:
From:
1.02
Bedford County
1998658
1500 NA NARWCL LYNCHBURGTo:
0.25 1998658
1100 1% 3% 130 1100F F0% 1% C F09-660
WCL LYNCHBURG95%
To:
From:
1.46 0% 2001659
3100 1% 2% 410 3200F F1% 1% C F09-621
09-1220
96%
From:To:
From:
1.25 0% 2001660
2000 1% 2% 280 2100F F1% 1% F F
09-659
96%
From:To:
1.05 0% 2001660
420 NA NAR
09-1225From:To:
0.50 1998660
50 NA NAR09-644To:
1.70 06/06/2001660
4200 0% 2% 600 4400F F0% 0% F F09-811
09-1576 SOUTH98%
From:
To:
From:
0.32 0% 2001661
09-15764500 0% 2% 610 4700F F0% 0% F F
09-620
98%
From:To:
0.96 0% 2001661
6200 0% 2% 810 6400F F0% 0% C F09-1415
98%To:
0.85 0% 2001661
60 NA NARDead End
0.28 MN Dead EndFrom:To:
From:
0.28 06/11/2001662
60 NA NAR09-663 NORTH
From:
To:
0.31 06/11/2001662
09-663 SOUTH480 NA NAR
0.41 MN 09-663From:To:
0.41 1998662
80 NA NAR09-621To:
2.29 1998662
9300 2% 2% 1300 9700F F0% 1% C FUS 221
09-662 NORTH
95%
From:To:
From:
0.90 0% 2001663
4200 2% 2% 450 4200F F0% 1% F F
09-1430
95%
From:To:
1.40 0% 2001663
1200 2% 2% 150 1300F F0% 1% F F09-644
95%To:
2.10 0% 2001663
40 NA NAR09-646
Dead EndTo:
From:
0.95 06/13/2001664
60 NA NAR09-668
09-644From:To:
From:
3.30 06/13/2001665
60 NA NARDead EndTo:
3.00 05/31/2001665
70 NA NAR09-646
0.39 ME 09-1044From:To:
From:
1.90 06/11/2001666
180 NA NAR0.44 M FRM 09-1044To:
0.05 1998666
158/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
180 NA NAR0.44 M FRM 09-1044
1.69 ME 09-1044From:To:
From:
1.25
Bedford County
1998666
680 NA NARUS 221To:
0.30 1998666
10 NA NARDead End
0.40 ME Dead EndFrom:To:
From:
0.40 06/27/2001667
10 NA NARSR 43To:
0.10 06/27/2001667
280 NA NAR09-709
1.39 MN 09-709From:To:
From:
1.39 1998668
280 NA NARUS 460 EAST
From:
To:
3.13 1998668
US 460 WEST500 1% 3% 70 510F F0% 1% F F
09-703
96%
From:To:
4.10 0% 2001668
580 1% 3% 80 580F F0% 1% F F
09-762 NORTH
96%
From:To:
1.23 0% 2001668
1200 1% 3% 140 1200F F0% 1% C F
US 221
96%
From:To:
0.60 0% 2001668
900 NA NAR
09-643From:To:
1.70 1998668
60 NA NAR
09-665From:To:
1.50 06/13/2001668
380 NA NAR09-646To:
1.30 1998668
60 NA NAR09-643
Dead EndTo:
From:
1.95 05/31/2001669
450 NA NARUS 221
09-637From:To:
From:
0.50 1998670
130 NA NAR09-644To:
3.50 1998670
1500 1% 2% 140 1500F F2% 1% C F09-644
US 221
93%
From:To:
From:
2.36 0% 2001671
1000 1% 2% 100 1000F F2% 1% F F09-715
93%To:
2.17 0% 2001671
40 NA NARDead End
US 501From:To:
From:
0.12 1998672
20 NA NAR
0.25 MS US 501From:To:
0.25 05/31/2001672
20 NA NAR09-752To:
1.61 05/31/2001672
50 NA NAR09-671
09-644To:
From:
1.53 06/13/2001673
60 NA NAR09-644
09-643To:
From:
2.10 06/13/2001674
168/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
60 NA NARDead End
09-643From:To:
From:
0.40
Bedford County
05/23/2001675
290 NA NAR
SR 122From:To:
1.20 1998675
350 NA NAR09-644To:
2.80 1998675
30 NA NAR09-675
Dead EndTo:
From:
0.90 05/29/2001676
80 NA NARDead End
SR 43To:
From:
1.00 05/25/2001677
290 NA NARDead End
SR 43To:
From:
2.65 1998678
120 NA NARDead End
WCL BEDFORDTo:
From:
0.40 07/16/2001679
40 NA NAR09-746
09-744From:To:
From:
2.04 07/16/2001680
940 NA NAR
US 460; US 221From:To:
2.50 07/16/2001680
360 NA NAR
09-681From:To:
3.00 1998680
230 NA NAR
09-682From:To:
1.55 1998680
750 1% 3% 90 760F F1% 1% C F
09-684
94%
From:To:
0.10 0% 2001680
260 NA NAR
09-614From:To:
2.29 1998680
30 NA NAR
0.50 MW 09-614From:To:
0.50 05/23/2001680
20 NA NAR09-695 SOUTH
From:
To:
3.50 05/21/2001680
09-695 NORTH80 NA NAR
09-693 NORTHFrom:
To:
0.70 05/21/2001680
09-693 SOUTH40 NA NAR
Dead EndTo:0.65 05/21/2001680
740 NA NAR09-684
US 460From:
To:
From:
1.50 07/18/2001681
09-83120 NA NAR
09-680To:2.30 05/23/2001681
740 1% 3% 70 740F F0% 1% C F09-680
SR 43 NORTH95%
From:
To:
From:
3.55 0% 2001682
SR 43 SOUTH100 NA NAR
0.25 ME SR 43From:To:
0.25 1998682
60 NA NAR0.89 ME SR 43To:
0.64 05/23/2001682
178/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
100 NA NAR0.89 ME SR 43
09-640To:
From:
0.81
Bedford County
1998682
70 NA NAR09-682 WEST
09-682 EASTTo:
From:
2.88 1998683
160 NA NAR09-746
2.10 MN 09-746From:To:
From:
2.09 07/23/2001684
160 NA NAR
09-753From:To:
0.67 07/23/2001684
50 NA NAR
09-691 WESTFrom:To:
1.70 07/18/2001684
70 NA NAR
09-691 EASTFrom:To:
0.20 07/18/2001684
190 NA NAR
2.89 MS 09-691From:To:
2.89 07/18/2001684
190 NA NAR
09-681From:To:
0.04 07/18/2001684
48 NA NAR
09-755From:To:
1.20 07/18/2001684
200 NA NAR
US 460; US 221From:To:
0.14 07/18/2001684
220 NA NAR
09-831From:To:
0.23 07/18/2001684
510 2% 4% 60 520F F1% 1% C F09-680
94%To:
3.00 0% 2001684
30 NA NAR09-688
09-684To:
From:
1.10 05/23/2001685
50 NA NAR09-692
1.79 ME 09-692From:To:
From:
1.79 1998686
160 NA NAR09-688To:
1.99 1998686
60 NA NAR09-680
1.10 MN 09-680From:To:
From:
1.10 1998687
20 NA NAR09-614To:
1.18 05/23/2001687
300 NA NAR09-689
09-692From:To:
From:
1.60 1998688
480 NA NAR09-684To:
1.00 1998688
160 NA NARUS 460 WEST
US 460 MIDFrom:
To:
From:
2.30 1998689
US 460 EAST610 NA NAR
Dead EndTo:2.10 07/18/2001689
320 NA NAR09-755
US 460; US 221To:
From:
1.90 07/18/2001690
188/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
480 NA NARUS 460; US 221
09-689To:
From:
0.03
Bedford County
1998690
600 NA NARUS 460; US 221
09-726 NORTHFrom:
To:
From:
2.70 07/18/2001691
09-726 SOUTH230 NA NAR
09-619 WESTFrom:To:
1.20 07/18/2001691
130 NA NAR
09-619 EASTFrom:To:
0.51 07/18/2001691
250 NA NAR09-755 SOUTH
From:
To:
0.70 07/23/2001691
09-755 NORTH40 NA NAR
09-684 WESTFrom:
To:
3.90 07/18/2001691
09-684 EAST180 NA NAR
09-746 SOUTHFrom:
To:
1.60 07/18/2001691
09-746 NORTH40 NA NAR
09-747To:2.25 07/16/2001691
50 NA NAR09-688
09-686From:To:
From:
2.10 05/23/2001692
40 NA NAR
09-717From:To:
0.40 05/23/2001692
20 NA NARDead EndTo:
0.50 05/23/2001692
80 NA NAR09-695
09-617From:To:
From:
1.30 1998693
40 NA NAR
09-694From:To:
0.50 05/21/2001693
50 NA NAR
09-680 SOUTHFrom:To:
1.00 05/21/2001693
40 NA NAR
09-680 NORTHFrom:To:
0.30 05/21/2001693
60 NA NARDead EndTo:
1.20 05/21/2001693
170 NA NAR09-695
09-693From:To:
From:
0.20 1998694
40 NA NARDead EndTo:
1.80 05/21/2001694
1700 0% 2% 180 1700F F0% 1% C FUS 460; US 221
09-617
96%
From:To:
From:
0.54 0% 2001695
940 0% 2% 110 960F F0% 1% F F
09-812
96%
From:To:
0.41 0% 2001695
790 0% 2% 90 800F F1% 1% F F
09-693
96%
From:To:
2.65 0% 2001695
540 0% 4% 60 540F F0% 1% C F
09-680 SOUTH
95%
From:To:
2.46 0% 2001695
160 0% 4% 20 170F F1% 1% F FBotetourt County Line
95%To:
3.95 0% 2001695
198/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
70 NA NAR09-617
09-695To:
From:
0.60
Bedford County
05/21/2001696
490 NA NARUS 460; US 221
Dead EndFrom:To:
From:
1.60 1998697
20 NA NAR09-617To:
0.30 05/21/2001697
80 NA NARDead End
US 460; US 221 WESTFrom:To:
From:
0.18 1998698
70 NA NAR
09-802From:To:
0.02 1998698
160 NA NAR
09-843 SOUTHFrom:To:
2.27 1998698
270 NA NARUS 460; US 221 EAST VILLAMONT RD
From:
To:
0.27 07/23/2001698
US 460; US 221 MID VILLAMONT RD6 NA NAR
Dead End; Gap TerminusFrom:To:
0.15 05/21/2001698
30 NA NAR
09-606From:To:
0.27 05/21/2001698
130 NA NAR09-697To:
0.83 1998698
600 NA NARBotetourt County Line
09-619To:
From:
4.45 07/23/2001699
90 NA NARDead End
09-619To:
From:
0.90 07/23/2001700
380 NA NAR09-759
Dead EndTo:
From:
1.05 07/25/2001701
450 NA NAR09-668
Dead EndTo:
From:
1.00 1998702
100 NA NARDead End
09-668To:
From:
0.80 1998703
150 NA NAR09-705
09-643 WESTFrom:
To:
From:
1.80 1998704
09-643 EAST300 NA NAR
09-811To:1.10 1998704
120 NA NAR09-668
09-643To:
From:
2.30 1998705
80 NA NARUS 460
0.11 MN US 460From:To:
From:
0.11 1998706
60 NA NAR09-668To:
2.41 06/18/2001706
1100 1% 2% 110 1100F F0% 2% C FSR 43
SR 24 WEST94%
To:
From:
1.02 0% 2001707
208/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
110 NA NARSR 24 EAST
09-714 SOUTHFrom:
To:
From:
2.14
Bedford County
1998707
09-714 NORTH45 NA NAR
09-715To:2.20 06/20/2001707
400 NA NARDead End
US 460To:
From:
1.80 1998708
1600 0% 2% 160 1600F F1% 2% C FSR 24
09-81195%
To:
From:
3.70 0% 2001709
180 NA NARDead End
09-755To:
From:
0.81 07/11/2001710
400 NA NARSR 24
09-811From:To:
From:
2.00 1998711
1000 NA NAR
09-649From:To:
2.30 06/18/2001711
1200 NA NARUS 460To:
0.20 1998711
60 NA NAR09-808
Dead EndTo:
From:
1.00 06/20/2001712
170 NA NARSR 24
09-626To:
From:
2.57 1998713
2000 1% 4% 200 2100F F1% 1% C FSCL BEDFORD
09-723
93%
From:To:
From:
2.07 0% 2001714
1100 1% 4% 110 1100F F1% 1% F F
09-784
93%
From:To:
1.17 0% 2001714
780 1% 4% 80 790F F1% 1% F F
09-715 WEST
93%
From:To:
1.51 0% 2001714
290 1% 4% 40 300F F1% 1% F F
09-808 EAST
93%
From:To:
4.26 0% 2001714
230 1% 4% 30 230F F1% 1% F FSR 24
93%To:
2.81 0% 2001714
250 NA NARSR 43
09-714 WESTFrom:
To:
From:
3.40 1998715
09-714 EAST80 NA NAR
09-716From:To:
1.55 06/27/2001715
360 NA NAR
US 460From:To:
2.40 1998715
30 NA NAR
09-803From:To:
0.50 06/13/2001715
1200 1% 2% 120 1200F F3% 1% C F
09-671
93%
From:To:
1.10 0% 2001715
400 NA NARUS 221To:
2.12 1998715
218/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
120 NA NAR09-715
Dead EndTo:
From:
1.50
Bedford County
1998716
120 NA NAR09-689
1.29 MN 09-689From:To:
From:
1.29 1998717
40 NA NAR09-692To:
4.21 05/23/2001717
750 1% 1% 90 760F F0% 1% C FECL BEDFORD
09-890
97%
From:To:
From:
0.50 0% 2001718
300 NA NAR09-671To:
2.20 1998718
48 NA NAR09-647
Dead EndTo:
From:
0.15 1998719
50 NA NAR09-634 SOUTH
09-634 NORTHTo:
From:
0.60 07/25/2001720
350 NA NARSR 122
09-722To:
From:
0.80 1998721
280 NA NAR09-731
SR 24From:To:
From:
1.20 1998722
250 NA NAR
09-725From:To:
0.90 1998722
30 NA NAR
09-819From:To:
0.60 06/27/2001722
130 NA NAR
09-747From:To:
1.80 1998722
40 NA NAR
09-723From:To:
1.70 06/27/2001722
180 NA NARSR 43To:
1.97 1998722
220 NA NAR09-860
09-722From:To:
From:
1.70 1998723
30 NA NARSR 43 SOUTH
From:
To:
1.60 06/27/2001723
SR 43 NORTH540 NA NAR
09-714To:1.19 1998723
30 NA NAR09-722; 09-723
2.01 ME 09-722From:To:
From:
2.01 06/27/2001724
40 NA NARSR 43To:
0.09 06/27/2001724
50 NA NAR09-722
1.50 ME 09-722From:To:
From:
1.50 06/27/2001725
60 NA NARSR 43 SOUTHTo:
1.50 1998725
228/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
100 NA NARSR 43 NORTH
09-714To:
From:
2.50
Bedford County
1998725
460 0% 2% 49 470F F1% 2% C F09-619
US 460; US 22195%
To:
From:
3.90 0% 2001726
450 NA NAR09-626
SR 24To:
From:
4.16 1998727
3 NA NARDead End
SR 43To:
From:
1.50 06/18/2001728
20 NA NAR09-617
Dead EndTo:
From:
0.20 05/21/2001729
20 NA NAR09-732
Dead EndTo:
From:
0.60 06/20/2001730
30 NA NARSR 122
1.30 ME SR 122From:To:
From:
1.29 06/27/2001731
80 NA NAR
09-735From:To:
1.01 1998731
60 NA NAR
09-722From:To:
1.40 06/27/2001731
60 NA NAR09-732 SOUTH
From:
To:
1.10 1998731
09-732 NORTH30 NA NAR
09-727 SOUTHFrom:
To:
2.10 06/20/2001731
09-727 NORTH45 NA NAR
09-626 SOUTHFrom:
To:
1.90 06/20/2001731
09-626 NORTH20 NA NAR
0.36 ME 09-626 NORTHFrom:To:
0.36 06/20/2001731
20 NA NAR
0.41 ME 09-626 NORTHFrom:To:
0.05 06/20/2001731
20 NA NARSR 43To:
0.89 06/20/2001731
30 NA NAR09-734
09-739From:To:
From:
1.10 07/02/2001732
80 NA NAR09-626 SOUTH
From:
To:
1.10 1998732
09-626 NORTH90 NA NAR
09-737From:To:
2.20 1998732
60 NA NAR
09-735From:To:
0.18 06/27/2001732
50 NA NAR
09-771From:To:
0.80 06/27/2001732
120 NA NARSR 24To:
3.90 1998732
238/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
6 NA NARDead End
09-834From:To:
From:
0.80
Bedford County
06/20/2001733
120 NA NAR09-630To:
1.50 1998733
790 NA NARDead End
09-608 SOUTHFrom:
To:
From:
2.50 07/02/2001734
09-608 NORTH320 NA NAR
09-626 NORTHTo:5.40 1998734
50 NA NAR09-732
09-817From:To:
From:
0.50 06/27/2001735
80 NA NAR
1.14 MN 09-817From:To:
1.14 06/27/2001735
200 NA NAR
09-731From:To:
2.16 1998735
410 NA NAR
SR 24From:To:
1.30 1998735
900 1% 2% 90 910F F1% 5% C FSR 122
91%To:
0.70 0% 2001735
40 NA NARDead End
0.67 MS Dead EndFrom:To:
From:
0.67 07/16/2001736
160 NA NAR
SR 122From:To:
0.93 1998736
180 NA NARDead EndTo:
1.20 1998736
60 NA NAR09-608
1.50 ME 09-608From:To:
From:
1.50 07/02/2001737
60 NA NAR
09-805From:To:
1.59 07/02/2001737
30 NA NAR
2.09 ME 09-805From:To:
2.09 06/27/2001737
30 NA NAR09-732To:
0.05 06/27/2001737
40 NA NAR09-626
09-805To:
From:
1.70 1998738
30 NA NAR09-608
09-732To:
From:
2.10 07/02/2001739
100 NA NARDead End
09-608To:
From:
0.92 07/02/2001740
250 NA NARUS 460; US 221
09-812From:To:
From:
0.80 1998741
10 NA NAR09-695To:
1.00 05/21/2001741
40 NA NARDead End
09-644To:
From:
0.60 05/31/2001742
248/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
120 NA NAR09-654
09-805To:
From:
2.20
Bedford County
07/02/2001743
30 NA NAR09-680
1.29 MS 09-680From:To:
From:
1.29 07/18/2001744
120 NA NAR09-681To:
0.51 07/18/2001744
40 NA NAR09-747
09-746 SOUTHFrom:
To:
From:
2.10 07/16/2001745
09-746 NORTH60 NA NAR
Dead EndTo:1.00 07/16/2001745
720 0% 3% 70 730F F0% 1% F FSR 24
09-749
95%
From:To:
From:
3.55 0% 2001746
660 0% 3% 80 660F F0% 1% F F
09-801
95%
From:To:
0.60 0% 2001746
500 0% 3% 60 510F F0% 1% F F
09-691 WEST
95%
From:To:
2.70 0% 2001746
550 0% 3% 60 560F F0% 1% F F
09-680
95%
From:To:
1.60 0% 2001746
890 0% 3% 80 900F F0% 1% C FSR 122
96%To:
3.80 0% 2001746
800 NA NARSR 24
SR 122From:To:
From:
6.60 07/16/2001747
330 NA NAR
09-860 SOUTHFrom:To:
0.07 1998747
150 NA NAR09-722To:
2.20 1998747
60 NA NAR09-608
2.45 MN 09-608From:To:
From:
2.45 07/09/2001748
170 NA NARSR 24To:
1.00 07/09/2001748
45 NA NAR09-655
2.79 MN 09-655From:To:
From:
2.79 07/09/2001749
80 NA NAR
09-608 SOUTHFrom:To:
0.61 07/09/2001749
300 NA NAR
09-608 NORTHFrom:To:
0.60 07/09/2001749
380 NA NAR
SR 24From:To:
0.80 07/09/2001749
60 NA NAR09-746To:
1.66 07/18/2001749
800 NA NARCul-de-Sac
09-655To:
From:
3.50 07/11/2001750
40 NA NARUS 460; US 221
Dead EndTo:
From:
1.00 05/21/2001751
258/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
20 NA NAR09-652
09-672From:To:
From:
1.70
Bedford County
05/31/2001752
20 NA NARUS 501To:
0.70 05/31/2001752
48 NA NAR09-754
09-684To:
From:
1.90 07/18/2001753
220 NA NAR09-746
09-753From:To:
From:
3.50 07/18/2001754
60 NA NAR09-755To:
1.00 07/18/2001754
1200 NA NAR09-757
SR 24 WESTFrom:
To:
From:
3.52 07/11/2001755
SR 24 EAST700 NA NAR
09-650 NORTHFrom:To:
1.83 07/23/2001755
400 NA NAR
0.46 MN 09-650 NORTHFrom:To:
0.46 07/23/2001755
80 NA NAR09-616 SOUTH
From:
To:
1.46 07/23/2001755
09-616 NORTH30 NA NAR
09-754From:To:
2.70 07/18/2001755
330 NA NAR
09-689From:To:
4.67 07/18/2001755
30 NA NAR09-684To:
0.70 07/18/2001755
50 NA NAR09-653
09-616To:
From:
1.80 07/11/2001756
5100 0% 2% 500 5100F F1% 1% F FSR 24
09-619
96%
From:To:
From:
0.25 0% 2001757
3800 0% 2% 360 3800F F1% 1% C F
09-758
96%
From:To:
3.48 0% 2001757
2800 0% 2% 280 2800F F1% 1% F F
09-1535
96%
From:To:
1.90 0% 2001757
2500 0% 2% 240 2500F F1% 1% F F
09-653 EAST
96%
From:To:
1.47 0% 2001757
200 NA NAR
09-616 SOUTHFrom:To:
1.62 07/11/2001757
270 0% 2% 20 270F F1% 1% F F
09-616 NORTH
95%
From:To:
0.58 0% 2001757
1300 0% 2% 120 1300F F1% 1% F F09-608
96%To:
0.86 0% 2001757
1200 NA NARDead End
09-757To:
From:
2.81 07/11/2001758
490 NA NAR09-619
09-701To:
From:
0.10 07/25/2001759
268/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
100 NA NAR09-701
Dead EndTo:
From:
2.15
Bedford County
07/25/2001759
410 NA NAR09-634
1.00 ME 09-634From:To:
From:
1.00 07/25/2001760
6 NA NARDead EndTo:
0.50 07/25/2001760
250 NA NARDead End
US 501From:To:
From:
0.75 1998761
680 1% 5% 70 690F F1% 2% C F
09-645 SOUTH
91%
From:To:
0.90 0% 2001761
280 NA NAR
09-645 NORTHFrom:To:
0.80 1998761
100 NA NARDead EndTo:
1.40 1998761
50 NA NARDead End
09-668 SOUTHFrom:
To:
From:
1.00 06/18/2001762
09-668 NORTH150 NA NAR
09-643 NORTHTo:1.00 1998762
20 NA NARUS 501
Dead EndTo:
From:
0.10 1998763
10 NA NARDead End
09-640To:
From:
1.70 05/29/2001764
40 NA NARDead End
09-640To:
From:
2.00 05/29/2001765
40 NA NARDead End
09-640To:
From:
2.20 05/29/2001766
100 NA NARECL BEDFORD
Dead EndTo:
From:
0.45 06/27/2001767
50 NA NARDead End
09-645To:
From:
0.60 06/04/2001768
150 NA NAR09-671
Dead EndTo:
From:
1.60 1998769
280 NA NAR09-607
Dead EndTo:
From:
0.36 1998770
20 NA NAR09-732
Dead EndTo:
From:
0.04 06/27/2001771
6 NA NARDead End
09-875From:To:
From:
0.09 05/29/2001772
40 NA NAR09-600To:
0.25 1998772
278/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
100 NA NAR09-609
US 221To:
From:
0.30
Bedford County
1998773
100 NA NARDead End
09-616To:
From:
0.80 07/23/2001774
120 NA NAR09-699
0.20 MS 09-699From:To:
From:
0.20 1998775
120 NA NAR
09-1490From:To:
0.49 1998775
60 NA NARDead EndTo:
0.81 07/23/2001775
190 NA NARUS 501
09-604To:
From:
0.10 1998776
350 NA NARUS 460
Dead EndTo:
From:
1.00 1998777
60 NA NARDead End
09-623To:
From:
0.25 1998778
NA NA NAUS 221
Dead EndTo:
From:
0.31779
40 NA NAR09-698
09-606To:
From:
0.70 05/21/2001780
100 NA NAR09-644
0.80 ME 09-644From:To:
From:
0.80 1998781
60 NA NAR09-621To:
0.60 06/06/2001781
20 NA NARSR 122
Dead EndTo:
From:
0.20 05/29/2001782
3 NA NAR09-639
Dead EndTo:
From:
0.10 05/29/2001783
290 NA NAR09-714
09-715 SOUTHFrom:
To:
From:
2.60 1998784
09-715 NORTH250 NA NAR
US 460To:1.90 1998784
20 NA NAR09-622
Dead EndTo:
From:
0.06 1998785
30 NA NAR09-671
09-715To:
From:
1.20 06/13/2001786
20 NA NARDead End
09-616To:
From:
0.50 07/23/2001787
50 NA NAR09-634
Dead EndTo:
From:
0.50 07/25/2001788
288/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
20 NA NARUS 501
Dead EndTo:
From:
0.10
Bedford County
1998789
130 NA NARDead End
09-746To:
From:
0.50 07/16/2001790
100 0% 1% 20 110F F1% 1% C FDead End
09-619
98%
From:To:
From:
0.20 0% 2001791
49 0% 0% 10 49F F0% 0% F F
SR 24
98%
From:To:
0.33 0% 2001791
80 NA NAR
0.20 ME SR 24From:To:
0.20 07/11/2001791
50 NA NARDead EndTo:
0.50 07/11/2001791
30 NA NARDead End
SR 24From:To:
From:
0.15 06/20/2001792
150 NA NAR
0.36 ME SR 24From:To:
0.36 1998792
50 NA NARDead EndTo:
0.94 06/18/2001792
30 NA NAR09-608
09-806To:
From:
2.00 07/09/2001793
210 NA NAR09-645
Dead EndTo:
From:
1.20 06/04/2001794
50 NA NARSR 122
Dead EndTo:
From:
0.70 05/29/2001795
400 NA NARSR 24
09-635To:
From:
0.32 07/25/2001796
20 NA NAR09-608
0.03 ME 09-608From:To:
From:
0.03 07/09/2001797
10 NA NARDead EndTo:
1.07 07/09/2001797
100 NA NAR09-707
0.50 ME 09-707From:To:
From:
0.50 1998798
80 NA NARDead EndTo:
0.90 06/18/2001798
150 NA NARUS 221
Dead EndTo:
From:
0.30 1998799
130 NA NARDead End
09-758To:
From:
1.10 07/11/2001800
1900 2% 3% 200 1900F F1% 2% C FSR 122
SR 24
93%
From:To:
From:
3.35 0% 2001801
520 NA NAR09-747To:
0.75 06/16/2001801
298/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
410 NA NAR09-747
09-746To:
From:
1.00
Bedford County
07/16/2001801
270 NA NARUS 460; US 221 WEST
US 460; US 221 EASTTo:
From:
0.35 07/23/2001802
1200 1% 2% 120 1200F F3% 1% C FUS 460
09-71593%
To:
From:
0.50 0% 2001803
20 NA NARDead End
0.62 MN Dead EndFrom:To:
From:
0.62 06/27/2001804
180 NA NAR09-714To:
1.54 1992804
380 NA NARSR 122
09-626To:
From:
7.44 07/02/2001805
90 NA NARSR 122; 09-9044
09-793From:To:
From:
1.20 07/09/2001806
30 NA NAR
2.29 MN 09-793From:To:
2.29 07/09/2001806
100 NA NAR09-801To:
0.51 07/09/2001806
70 NA NAR09-801
SR 24From:To:
From:
1.19 07/09/2001807
20 NA NAR
1.73 MS SR 24From:To:
1.73 07/16/2001807
20 NA NAR09-747To:
0.05 07/16/2001807
30 NA NAR09-715
09-714 WESTFrom:
To:
From:
2.40 06/20/2001808
09-714 EAST50 NA NAR
1.50 MS 09-714 EASFrom:To:
1.50 06/20/2001808
120 NA NAR
09-712From:To:
0.90 06/20/2001808
200 NA NARSR 24To:
0.10 06/20/2001808
30 NA NAR09-604
Dead EndTo:
From:
0.06 05/31/2001809
3 NA NARDead End
09-622To:
From:
0.20 06/11/2001810
850 1% 3% 100 860F F0% 2% C FCampbell County Line
09-709
94%
From:To:
From:
1.18 0% 2001811
3100 0% 2% 320 3200F F1% 2% C F
US 460
94%
From:To:
1.57 0% 2001811
4400 1% 3% 500 4500F F1% 1% F F09-643
95%To:
0.47 0% 2001811
308/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
4200 1% 3% 440 4200F F1% 1% F F09-643
09-622 SOUTH
95%
From:To:
From:
3.20 0%
Bedford County
2001811
11000 1% 3% 1100 11000F F1% 1% C F
09-622 NORTH
95%
From:To:
0.48 0% 2001811
11000 1% 3% 1300 12000F F1% 1% F F
09-661
95%
From:To:
0.16 0% 2001811
10000 1% 3% 1100 11000F F1% 1% F FUS 221
95%To:
0.99 0% 2001811
200 NA NAR09-695
09-741To:
From:
0.70 05/21/2001812
10 NA NARDead End
09-714To:
From:
0.50 06/27/2001813
70 NA NARDead End
SR 122To:
From:
1.15 05/29/2001814
80 NA NAR09-715
Dead EndTo:
From:
0.60 06/13/2001815
48 NA NARDead End
09-754To:
From:
0.80 07/18/2001816
20 NA NAR09-735
09-732To:
From:
1.80 06/27/2001817
60 NA NARDead End
09-708To:
From:
0.35 06/20/2001818
180 NA NARSR 24
09-722To:
From:
1.20 06/27/2001819
30 NA NARDead End
09-601To:
From:
0.10 05/29/2001820
170 NA NARSR 122
Dead EndTo:
From:
0.30 06/25/2001821
20 NA NARDead End
09-638To:
From:
0.50 05/31/2001822
50 NA NARCul-de-Sac
09-1555From:To:
From:
0.10 06/25/2001823
140 NA NAR
09-1550From:To:
0.36 06/25/2001823
450 NA NAR09-655To:
1.70 06/25/2001823
40 NA NAR09-643
Dead EndTo:
From:
0.30 06/13/2001824
190 NA NARUS 460
0.15 ME US 460To:
From:
0.15 06/20/2001825
318/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
160 NA NAR0.15 ME US 460
Dead EndTo:
From:
0.20
Bedford County
06/20/2001825
40 NA NARDead End
09-628To:
From:
0.80 06/20/2001826
250 NA NAR09-695
09-770To:
From:
0.30 05/21/2001827
160 NA NARSR 122
Dead EndTo:
From:
0.60 05/29/2001828
20 NA NARDead End
09-617To:
From:
0.30 05/21/2001829
70 NA NARUS 221 WEST
US 221 EASTTo:
From:
0.50 06/13/2001830
720 2% 2% 70 720F F0% 0% F FUS 460; US 221 WEST
09-684
95%
From:To:
From:
0.33 0% 2001831
930 2% 2% 100 940F F0% 0% C FUS 460; US 221 EAST
95%To:
0.54 0% 2001831
50 NA NARDead End
SR 122To:
From:
0.70 05/23/2001832
20 NA NAR09-626 SOUTH
09-626 NORTHTo:
From:
0.35 06/20/2001833
130 NA NARDead End
09-733To:
From:
1.90 06/20/2001834
380 NA NARDead End
09-608To:
From:
2.00 06/25/2001835
350 NA NAR09-835
09-654To:
From:
1.40 06/25/2001836
70 NA NAR09-655
Dead EndTo:
From:
0.30 06/25/2001837
90 NA NARDead End
SR 43To:
From:
1.10 05/23/2001838
190 NA NAR09-619
Dead EndTo:
From:
1.25 07/23/2001839
350 NA NARUS 221
09-643To:
From:
1.20 06/18/2001840
490 NA NAR09-643
US 221To:
From:
0.40 06/13/2001841
240 NA NARDead End
09-616To:
From:
0.80 07/11/2001842
328/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
30 NA NAR09-698 SOUTH
09-698 NORTHTo:
From:
0.27
Bedford County
07/23/2001843
60 NA NARUS 221
Dead EndTo:
From:
0.09 06/11/2001845
110 NA NARUS 501
Dead EndTo:
From:
0.20 06/04/2001846
190 NA NARNCL LYNCHBURG
Dead EndTo:
From:
0.53 06/04/2001847
48 NA NAR09-811
Dead EndTo:
From:
0.13 06/18/2001848
50 NA NAR09-640
09-643To:
From:
0.70 05/23/2001849
10 NA NARSR 43
Dead EndFrom:To:
From:
0.10 05/23/2001850
48 NA NAR09-640To:
0.30 05/23/2001850
100 NA NARDead End
09-758To:
From:
0.84 07/11/2001851
70 NA NARCul-de-Sac
09-1580From:To:
From:
0.30 07/11/2001852
400 NA NAR09-636To:
1.11 07/11/2001852
520 NA NARDead End
09-608To:
From:
2.55 07/03/2001853
1400 NA NARUS 221
09-811To:
From:
0.29 06/11/2001854
270 NA NAR09-647
09-856From:To:
From:
0.22 06/04/2001855
160 NA NARDead EndTo:
0.45 06/04/2001855
90 NA NAR09-647
09-885To:
From:
0.30 06/04/2001856
50 NA NAR09-635
Dead EndTo:
From:
0.11 07/25/2001857
260 NA NAR09-649
Campbell County LineTo:
From:
0.04 06/18/2001858
120 NA NAR09-619
Dead EndTo:
From:
0.05 07/25/2001859
338/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
400 NA NARSR 122 SOUTH
SR 122 NORTHTo:
From:
1.19
Bedford County
06/27/2001860
50 NA NARSR 122
Dead EndTo:
From:
0.23 07/16/2001861
400 NA NAR09-661
09-870To:
From:
0.02 06/11/2001862
480 NA NAR09-668
Dead EndTo:
From:
0.65 06/13/2001863
160 NA NAR09-805
SR 122To:
From:
0.26 07/02/2001864
170 NA NARDead End
09-758To:
From:
1.30 07/11/2001865
48 NA NAR09-828
Dead EndTo:
From:
0.15 05/29/2001866
20 NA NARSR 122 SOUTH
SR 122 NORTHTo:
From:
0.35 07/16/2001867
20 NA NARSR 122 SOUTH
SR 122 NORTHTo:
From:
0.30 06/27/2001868
30 NA NARSR 122 SOUTH
SR 122 NORTHTo:
From:
0.27 06/27/2001869
100 NA NAR09-862
Dead EndTo:
From:
0.06 06/11/2001870
60 NA NAR09-747
Dead EndTo:
From:
0.38 07/16/2001871
70 NA NAR09-608
Dead EndTo:
From:
0.90 07/02/2001872
500 NA NARCampbell County Line
US 221To:
From:
0.15 06/11/2001873
1400 NA NARCampbell County Line
US 221To:
From:
0.15 06/11/2001874
6 NA NAR09-772
Dead EndTo:
From:
0.15 05/29/2001875
30 NA NAR09-811
0.07 ME 09-811From:To:
From:
0.07 06/11/2001876
20 NA NARDead EndTo:
0.21 06/11/2001876
20 NA NAR09-653
Dead EndTo:
From:
0.05 07/11/2001877
348/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
48 NA NARSR 122
Dead EndTo:
From:
0.03
Bedford County
06/27/2001878
50 NA NARRoanoke County Line
Dead EndTo:
From:
0.35 07/25/2001880
30 NA NAR09-691 WEST
09-691 EASTTo:
From:
0.53 07/18/2001882
370 NA NARDead End
09-634To:
From:
0.58 07/25/2001883
110 NA NAR09-621
Dead EndTo:
From:
0.25 06/06/2001884
70 NA NARCul-de-Sac
09-883To:
From:
0.25 07/25/2001885
390 NA NARSR 24 WEST
SR 24 EASTTo:
From:
2.05 07/25/2001886
20 NA NAR09-699 SOUTH
09-699 NORTHTo:
From:
0.21 07/23/2001887
420 NA NARDead End
ACCESS ROAD 1From:
To:
From:
1.77 07/02/2001888
Dead End; Gap Terminus200 NA NAR
ACCESS RD 2From:To:
1.14 07/02/2001888
450 NA NAR09-626To:
0.26 07/02/2001888
45 NA NARDead End
09-601To:
From:
0.30 05/29/2001889
130 NA NARDead End
09-718To:
From:
0.30 06/13/2001890
70 NA NARSR 24
09-893From:To:
From:
0.08 06/27/2001891
NA NA NA09-892To:
0.02891
NA NA NA09-891
Dead EndTo:
From:
0.07892
50 NA NARDead End
09-891To:
From:
0.17 06/27/2001893
140 NA NARDead End
09-888To:
From:
0.63 07/02/2001894
100 NA NARDead End
US 460To:
From:
0.19 06/18/2001896
358/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
400 NA NARDead End
US 460; US 221To:
From:
0.08
Bedford County
07/23/2001897
48 NA NARDead End
09-726To:
From:
0.12 07/18/2001900
6 NA NARDead End
US 501To:
From:
0.18 1998905
NA NA NADead End/
SR-00122(B)/09-00721(U)/To:
From:
0.56910
30 NA NARDead End
09-626To:
From:
0.08 06/20/2001920
10 NA NAR09-626
Dead EndTo:
From:
0.07 06/20/2001921
NA NA NA09-00663(B)/
Cul-de-Sac/To:
From:
0.32930
20 NA NARDead End
09-714To:
From:
0.13 1998940
80 NA NAR09-1010
09-1001To:
From:
0.06 06/04/20011000
48 NA NARCul-de-Sac
09-1010To:
From:
0.29 06/04/20011001
30 NA NARCul-de-Sac
09-794To:
From:
0.20 06/04/20011006
170 NA NAR09-1008
Campbell County LineTo:
From:
0.08 06/04/20011007
130 NA NAR09-1007
Dead EndTo:
From:
0.23 06/04/20011008
30 NA NARCampbell County Line
Cul-de-SacTo:
From:
0.14 06/06/20011009
250 NA NARCampbell County Line
09-1011From:To:
From:
0.09 06/04/20011010
130 NA NARDead End
From:
To:
0.20 06/04/20011010
09-100050 NA NAR
Cul-de-SacTo:0.17 06/04/20011010
30 NA NARDead End
09-1012From:To:
From:
0.05 06/04/20011011
80 NA NAR09-1010To:
0.23 06/04/20011011
368/7/2002
-
Virginia Department of TransportationTraffic Engineering Division
2001Annual Average Daily Traffic Volume Estimates By Section of Route
Bedford Maintenance Area
Route AADT1Trail 2Trail
4TireDesign
QA2Axle 3+Axle
QC QKBusLength------------------------------Truck------------------------------
HourAAWDT QW Year
30 NA NARCul-de-Sac
09-1011To:
From:
0.03
Bedford County
06/04/20011012
40 NA NARDead End
09-1014From:To:
From:
0.19 06/06/20011013
60 NA NARCampbell County LineTo:
0.30 06/06/20011013
20 NA NAR09-1013
Cul-de-SacTo:
From:
0.07 06/06/20011014
200 NA NARSR 24
Dead EndTo:
From:
0.42 07/25/20011015
40 NA NAR09-658
Dead EndTo:
From:
0.16 06/04/20011016
48 NA NARCul-de-Sac
09-1018From:To:
From:
0.05 06/04/20011017
150 NA NAR09-658To:
0.12 06/04/20011017
60 NA NAR09-1017
Cul-de-SacTo:
From:
0.16 06/04/20011018
210 NA NARDead End
SR 24To:
From:
0.22 07/25/20011020
160 NA NARCul-de-Sac
SR 24To:
From:
0.30 07/25/20011021
500 NA NARSR 24
Cul-de-SacTo:
From:
0.32 07/25/20011022
240 NA NAR09-1022
09-1024From:To:
From:
0.41 07/25/20011023
80 NA NARCul-de-SacTo:
0.27 07/25/20011023
80 NA NAR09-1023
Cul-de-SacTo:
From:
0.18 07/25/20011024
150 NA NARCul-de-Sac
SR 24To:
From:
0.33 07/25/20011025
80 NA NAR09-761
09-1027To:
From:
0.28 06/04/20011026
48 NA NAR09-1028
09-1026From:To:
From:
0.06 06/04/20011027
20 NA NARCul-de-SacTo:
0.12 06/04/20011027
70 NA NAR09-1027
Cul-de-SacTo:
From:
0.16 19971028
378/7/2002
-
Virginia Department of TransportationTraffi