Page 1: 1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/16 168-Hour.

1 Texas Nodal

Market Trials Update

Page 2: 1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/16 168-Hour.

2 Texas Nodal

• Full System Market and Reliability Test• 24-Hour Test Observations• Duration of Test for Week of 8/16

• 168-Hour Preparations for TAC / Board• Action Items from Last Meeting• TAC Feedback / Revisit Conclusions

Agenda

Page 3: 1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/16 168-Hour.

3 Texas Nodal

Today’s objectives:

1) Agree on format and duration of the next Full System Market and Reliability Test during the week of 8/16/2010

2) Agree on the format of the 168-Hour Test

Objectives

Page 4: 1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/16 168-Hour.

4 Texas Nodal

Full System Market and Reliability Test

Page 5: 1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/16 168-Hour.

Full System Market and Reliability Test: 24-Hour Test Observations

Issues and Observations from the test• Total of 19 constraints activated, 7 at one time during the test

• QSEs released from AS obligations

– 2 instances where QSEs were released from their Regulation Obligation to make resources available to SCED to resolve congestion. 

– This was the correct Operator action. Not previously observed during a closed loop test.

• CPS1 score of -34

– Primarily due to resources being off of their expected generation (HE 17)

– Resources were also having equipment problems and did not reflect those changes in telemetry. 

– Time Error Correction was also being performed during this time.

– For some intervals, ERCOT Operations responded with a manual offset in SCED.

http://nodal.ercot.com 5

Page 6: 1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/16 168-Hour.

Full System Market and Reliability Test: 24-Hour Test Observations

Issues and Observations from the test• Quick Starts coming on or offline

– For testing purposes QSEs will need to call the ERCOT Operators before coming on or going offline. 

• Energy constraints superseding transmission constraints

– Occurred during the peak load intervals. 

• Telemetry Inconsistencies 

– Cases where HSLs were being set lower than MWs. 

– QSEs were not using the “ONTEST” resource status as expected.  Some resources were testing and not using this status.  There were also resources which were using this status who were not testing.

http://nodal.ercot.com 6

Page 7: 1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/16 168-Hour.

Full System Market and Reliability Test: 24-Hour Test Observations

Issues and Observations from the test

• Ramping down of resources to take them offline

– A number of resources were off their expected generation which negatively affected ERCOT’s ability to manage frequency. 

– More guidance for ramp-offs and start-ups will be provided on the 8/13 RTM Market Call.

• Shift Factors being sent to SCED

– Issue #1 - 3 intervals with shift factors not sent to SCED (1815, 1835 and 1850). This is a known issue and the fix is planned to be implemented before the next full system test.

– Issue #2 – For specific constraints with unresolved contingencies, shift factors were not passed. Vendor is working on an emergency patch.

http://nodal.ercot.com 7

Page 8: 1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/16 168-Hour.

http://nodal.ercot.com

Full System Market and Reliability Test: 24-Hour Test Observations

Overview – Completion Criteria• ERCOT will communicate an initial assessment of the following completion criteria

upon conclusion of the test on August 5th:– The rolling CPS1 one minute average score must equal or exceed 100% during the test

period• Note that the CPS1 average will not take into account the periods where ERCOT is

transitioning to Nodal and then back to Zonal• Note that the CPS1 average will not take into account the periods where ERCOT is

performing system tuning– Hourly CPS1 Scores:

» Max: 167, Min: -34, » Average: 130 (137 when HE17 -34 is removed)

– Zonal Commercially Significant Constraints (CSCs) and Closely Related Elements (CREs) managed below thermal limits. None active

– Local Congestion managed below thermal limits Yes– Stability limits managed below transfer limits None active – No NERC Disturbance Control Standard (DCS) failure if applicable. No DCS failures

during the test– No LFC-SCED system issues that result in termination of the test. No LFC / SCED

failures– Procedural and software fixes have been verified to address lessons learned from

previous rounds of testing. All software fixes put in prior to the test worked as expected.

Page 9: 1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/16 168-Hour.

http://nodal.ercot.com

Full System Market and Reliability Test: 24-Hour Test Observations

Summary of Martket Participant Issues:• Transitioning to Nodal prior to ERCOT Control Room instructing to do so• Going on-line / off-line• Quick start units• General telemetry issues

• Incorrect limits after de-rating• Ancillary Services inconsistent with Zonal responsibility• Resource Status Codes Incorrect

– ONTEST status used in appropriately– Offline status code while generating

• Using Output Schedule • Offer curves not extending to unit’s capability• Wrong CC configuration number telemetered

Page 10: 1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/16 168-Hour.

http://nodal.ercot.com

Full System Market and Reliability Test: Next Test

Test to Occur the Week of 8/16 – Considerations from the 24-Hour Test– Issues during Ramp-Down into the evening hours– Issues during Ramp-Up (not as notable as Ramp-Down)– Much was learned during the on-peak hours (e.g. contingencies– Have not yet tested during weekend– ERCOT proposes the following:

• Thursday 8/19/2010: Troubleshooting period and Market Notice to occur 10am – 1pm• Thursday 8/19/2010: Cutover to Nodal start 1pm completing at 2pm• Friday 8/20/2010: Cutover back to Zonal to begin at 12am• Friday 8/20/2010: Cutover to Zonal complete by 1am• Total test duration: 12 hours on Nodal systems (including transition hours)• This provides testing during peak and ramp-down

Page 11: 1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/16 168-Hour.

11 Texas Nodal

168-Hour Test Review

Page 12: 1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/16 168-Hour.

12 Texas Nodal

• ERCOT to incorporate Exit Criteria into Handbook

• ERCOT to revise logistics of the test to allow flexibility on duration and closed vs. open loop testing

• Logistics were to be locked in at NATF on 8/19/2010 session

• Status: ERCOT is prepared to publish a revised 168-Hour Handbook this evening based on today’s NATF discussion today• This will be forwarded to the TAC• TAC is scheduled to vote on the 168-Hour Test Methodology (Handbook)

this Thursday

168-Hour Test: Action Items from Last Meeting

Page 13: 1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/16 168-Hour.

13 Texas Nodal

• Proposed Start Date – 9/8

168-Hour Test: TAC Feedback / Revisit Conclusions

Sunday Monday Tuesday Wednesday Thursday Friday Saturday

DAMHRUCDRUCWRUCSettlementsCredit

DAMHRUCDRUCWRUCSettlementsCredit

Transition to Nodal 2pm – begin closed loop testDAMHRUCDRUCWRUCSettlementsCredit

Continue closed loop test

DAMHRUCDRUCWRUCSettlementsCredit

Transition to Zonal 2pmDAMHRUCDRUCWRUCSettlementsCredit

DAMHRUCDRUCWRUCSettlementsCredit

DAMHRUCDRUCWRUCSettlementsCredit

DAMHRUCDRUCWRUCSettlementsCredit

Evaluate Completion Criteria – Special NATFDetermine next testing step

Page 14: 1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/16 168-Hour.

14 Texas Nodal

Open Discussion