SITE TEST REPORT Date :
Contractors name: Advance EnergyCompany(AECC)
Client: ! " SA
Name of substation: 115/13.8KV Khafji Substation - 5SEC # EOA Contract o$ :
%&&%&&'()**
STATIO SER+ICE TRAS,OR-ERPage o. &*
-a/e: E01ip$ o$: D2g$ Re.$: Record o$:
S$ O: DESCRIP7IO DOE RE-AR5S
e. oisture Content (AS4 # 1*"")
f. $oer factor test(AS4 # 02&)
g. #issoled 6as in :il Analysis (AS4 #" ,12)
h. (#ielectric #issipation factor' 3esistiity' Sediment and>or
$erceptible sludge)
Another oil sample shall be gien to S8C transmission for their on
analysis ? comparison purposes. A syringe oil sample shall be taken by
contractor.
TRAS,OR-ER A-E P4ATE DETAI4S: ake
?
@
&*
$ IDI! IS64ATIO RESISTACE AD PO4ARIBATIO IDE
!nstrument < !nsulation 3esistance 4ester
ake Sr. +o. 'C
,ACT:P3ASE"
;CA4: at
>'C,ACT:
P3ASE"C
CA4: at>'C
,ACT:
1
2
"
&
*
4+ IDI! RESISTACE -EAS6RE-ET$
OTI Temp:
C Am9: C
TEST
IDI! RESISTACE (4+)
1&"nCA4: at
>'C,ACT: v&"n
CA4: at>'C
,ACT: 2&"nCA4: at
>'C,ACT:
1
,orm1la to convert 2inding resistance to re.erence temperat1re at >' C.or copper 2inding$
+:48< 1.
3c D Calculated alue at * C
3m D easurement alue hich contained a measurement cable.
+:48< 2Calculated * C 3c D (3mK3) (2"&.*I*)
(2"&.*I4a)
3 D 3esistance alue of the measurement cable. 4a D :il 4emperature ====C
+:48< "
3esistance alue of measurement cable 3 D =======
TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL
TESTI! E!IEER CSD" Engineer
Signature:================ Signature:================
Name :================ Name :================
-
8/10/2019 1.Station.service Transformer (1)
8/10
SITE TEST REPORT Date :
Contractors name: Advance EnergyCompany(AECC)
Client: ! " SA
Name of substation: 115/13.8KV Khafji Substation - 5SEC # EOA Contract o$ :
%&&%&&'()**
STATIO SER+ICE TRAS,OR-ERPage ? o. &*
-a/e: E01ip$ o$: D2g$ Re.$: Record o$:
@$ ECITATIO C6RRET -EAS6RE-ET
8citation current as measured by applying three phase source to 7.V. side' keeping L.V. side :pen.
!nstrument < ultimeter (Current)
ake