    AS PER B.O.Q AS PER EXECUTED

    TOTAL AMOUNT TOTAL AMOUNT

    2 Site Work 1,675.250 100.00% 1,675.250

    3 Concrete 4,012.500 100.00% 4,012.500

    4 Masonry 414.000 100.00% 414.000

    5 Metal 140.000 100.00% 140.000

    7 Thermal and Moisture Protection #REF! #REF! 890.350

    8 Doors and Windows 0.000 #DIV/0! 1,200.000

    9 Finishes 1,431.250 100.00% 1,431.250

    15 Mechanical 3,284.250 100.00% 3,284.250

    16 Electrical 17,681.000 100.00% 17,681.000

    Grand Total #REF! #REF! 30,728.600

    Amount in

    words:Thirty Thousand Seven Hundred Twenty Eight & Sixty Fills& Only

    SUMMARY TRANSFORMER ROOM

    PAGE NO. DIVISION NO.

  • 8/13/2019 3 Transformer Room (1)

    2/30

    TRANSFORMER ROOM- /......

    UNIT RATE AMOUNTC

    KD. FILS KD. FILS K

    DIVISION - 2SITE WORK

    Section 02110

    Demolition & Site preparations

    2.1 Site cleaning including demolition of any

    existing structure until the foundations with

    removing the foundations and all debris

    within the working space as per requirementand engineer's approval including cleaning

    and grading of soil and excavated material

    to distance approved by municipality and

    Filling with lean concrete if reach more than

    the approved level.

    L.S L.S 1000 1000.000 100.00% 100.00%

    Section 02222

    Excavation for Building

    2.2 Excavation mechanically/manually in any

    type of soil up to the required height

    including removing any obstruction during

    excavation and removal of surplus

    excavation material from site.

    2.2.1 Excavation starting from N.G.L. to the

    foundation bed.62 M3 1.5 93.000 100.00% 100.00%

    Section 02223

    Filling & Back Filling

    2.3 Filling and back filling with approved clear

    sand/soil for excavated area of building. All

    complete as per drawings and

    specifications. Filling shall be compacted in

    layers ( not more than 25 cm thick each)

    and compaction shall not be less than 98%

    dry density.

    47 M3 1.75 82.250 100.00% 100.00%

    Section 02280

    Termite Control

    2.4 Termite Control/Soil treatment for the whole

    building all as described.L.S L.S 500 500.000 100.00% 100.00%

    1,675.250

    CARRIED TO COLLECTION

    ITEM DESCRIPTION QTYPREVIOUS

    MONTH %

    COMP.

    THIS

    MONTH %

    COMP.

    UP TO

    DATE %

    COMP.

    The Contractor is referred to the

    specifications & drawings for all details

    related to division of the works and he is to

    include for complying with all the

    requirements contained there in whether or

    UNIT

  • 8/13/2019 3 Transformer Room (1)

    3/30

    TRANSFORMER ROOM-

    UNIT RATE AMOUNT

    KD. FILS KD. FILS

    ITEM DESCRIPTION QTYPREVIOUS

    MONTH %

    COMP.

    THIS

    MONTH %

    COMP.

    UP TO

    DATE %

    COMP

    UNIT

    Note:

    a The excavation, filling and back filling, sub-structure, including water proofing systems.

    These quantities are based on bearing

    capacity 1.5kg/cm2 exact quantity for each

    site will depend on the recommendations of

    soil investigation report for each site and

    contractor must provides engineers with soil

    investigations reports for site.

    b During execution of Site Work and

    excavation if any external services require

    protection, diversions / re-routing including

    any modification there to. The Contractor

    shall implement such works as per statutory

    authorities and Engineer's approval and thecost of such work is deemed to be included

    in the Contractor's Price.

    CARRIED TO COLLECTION

  • 8/13/2019 3 Transformer Room (1)

    4/30

  • 8/13/2019 3 Transformer Room (1)

    5/30

    TRANSFORMER ROOM- ......

    UNIT RATE AMOUNT

    KD. FILS KD. FILS

    DIVISION - 3

    CONCRETE

    Section 03300 Cast-in-Place Concrete

    Plain Concrete - Grade K-150

    3.1

    Plain concrete using sulphate resisting

    cement including form work and all other

    3.1.1 10 cm thick under Footing 31 M2 3.500 108.500 0.00% 100.00% 100.00%

    3.1.2 5 cm thick under G.B. 12 M2 2.000 24.000 0.00% 100.00% 100.00%

    3.1.3 5 cm thick Sand Cement Screed under Footin 31 M2 2.000 62.000 0.00% 100.00% 100.00%

    Reinforced Concrete

    3.2 -

    sulphate resisting cement filled into

    formwork and tamped around reinforcement

    including all watertight formwork, tie bolts

    and reinforcement, all complete as per

    3.2.1 R.C. Footings 16 M3 67.000 1072.000 0.00% 100.00% 100.00%

    3.2.2 R.C. slab-on-grade 8 M3 72.000 576.000 0.00% 100.00% 100.00%

    3.2.3 R.C. Ground Beam 5 M3 87.000 435.000 0.00% 100.00% 100.00%

    3.2.3 R.C. Trance wall 4 M3 90.000 360.000 0.00% 100.00% 100.00%

    3.2.4 R.C. Neck Columns 1 M3 93.000 93.000 0.00% 100.00% 100.00%

    3.3 Reinforced concrete Grade K-300 using

    ordinary Portland cement filled into

    formwork and tamped around reinforcement

    including all formwork and reinforcement

    (fair finished on all exposed faced) Or

    Preferred Column, Beams & Slabs to be

    3.3.1 R.C. Columns 4 M3 90.000 360.000 0.00% 100.00% 100.00%

    3.3.2 R.C. beams, parapet etc. 4 M3 87.000 348.000 0.00% 100.00% 100.00%

    3.3.3 R.C. Suspended solid slabs 7 M3 82.000 574.000 0.00% 100.00% 100.00%

    4,012.500

    The Contractor is referred to the

    specifications & drawings for all details

    related to division of the works and he is to

    include for complying with all the

    requirements contained there in whether or

    UP TO

    DATE %

    COMP.

    PREVIOUS

    MONTH %

    COMP.

    THIS

    MONTH %

    COMP.

    ITEM DESCRIPTION QTY UNIT

    CARRIED TO COLLECTION

  • 8/13/2019 3 Transformer Room (1)

    6/30

    TRANSFORMER ROOM-

    DIVISION - 3

    CONCRETE

    COLLECTION

    1 TOTAL OF PAGE (3-1) 4012.500

    4,012.500CARRIED TO SUMMARY

  • 8/13/2019 3 Transformer Room (1)

    7/30

    TRANSFORMER ROOM-

    UNIT RATE AMOUNT

    KD. FILS KD. FILS

    DIVISION - 4

    MASONRY

    Section 04200

    Masonry

    4.1. Non load bearing solid concrete block work,

    duly bedded in cement and sand mortar

    including R.C. lintel, head fixing, curing,

    scaffolding to any height galvanized steel

    ties etc. and all works complete as per

    4.1.1 200 mm thick block wall 92 M2 4.500 414.000 0.00% 100.00% 1

    PREVIOUS

    MONTH %

    COMP.

    THIS

    MONTH %

    COMP.

    ITEM DESCRIPTION QTY UNIT

  • 8/13/2019 3 Transformer Room (1)

    8/30

    TRANSFORMER ROOM-

    DIVISION - 4

    MASONRY

    COLLECTION

    1 TOTAL OF PAGE (4-1) 414.000

    414.000CARRIED TO SUMMARY

  • 8/13/2019 3 Transformer Room (1)

    9/30

    TRANSFORMER ROOM-

    UNIT RATE AMOUNT

    KD. FILS KD. FILS

    DIVISION - 5

    METAL

    Section 05500

    Metal Fabrication

    Chequered Plate

    5.1 Galvanized steel chequer plate over

    Substation trance, 4 mm thickness, fitting,

    fixing with angle iron frame in position, all

    complete as per Manufacturer's / Engineer's

    instruction.

    7 M2 20.000 140.000 0.00% 100.00% 1

    PREVIOUS

    MONTH %

    COMP.

    THIS

    MONTH %

    COMP.

    ITEM DESCRIPTION QTY UNIT

  • 8/13/2019 3 Transformer Room (1)

    10/30

    TRANSFORMER ROOM-

    DIVISION - 5

    METAL

    COLLECTION

    1 TOTAL OF PAGE (5-1) 140.000

    140.000CARRIED TO SUMMARY

  • 8/13/2019 3 Transformer Room (1)

    11/30

    TRANSFORMER ROOM- ......

    UNIT RATE AMOUNT

    KD. FILS KD. FILS

    DIVISION - 7

    THERMAL AND MOISTURE PROTECTION

    Section 071007.1 Waterproofing System

    7.1.1 Protective membrane laid under footin s. 32 M2 2.250 72.000 0.00% 100.00% 100.00%

    7.1.2 Footin surface and neck columns 81 M2 0.350 28.350 0.00% 100.00% 100.00%

    7.1.3 Water proofing for G.B 30 M2 2.500 75.000 0.00% 100.00% 100.00%

    See the note in page (2-1)

    7.2 Supply and use polyethylene sheets (1000

    gauge) under slab-on-grade, all complete as

    39 M2 2.000 78.000 0.00% 100.00% 100.00%

    Section 07500

    Membrane Roofing

    composite Roofing System

    7.3 Roof treatment with roofing layers laid over

    R.C. roof as per drawings, specifications

    and manufacturer's instructions.

    7.3.1 2 coats of waterproofing paint 49 M2 13.000 637.000 0.00% 100.00% 100.00%

    5:15 cm thick foam concrete laid in slope

    2 cm thick sand-cemnt screed smoothing layer

    4 mm thick waterproofing membrane 2 layers

    2 cm thick sand-cemnt screed

    7.5 cm thick extruded rigid insulation (joints

    shall be covered with tape)Filter fabric

    40x40x4 cm Precast concrete (loosely laid)

    tiles with 5 cm thick sand bed including 10

    cm width mix aggregates around tiles laid

    recessed with parapet and including

    expansion joint filled with

    celotex/rubber/mastic/ sealant / aluminum

    flashing etc. all as per drawings,

    All required flashing mastic/sealant between

    parapet and skirting all as per detail

    890.350

    PREVIOUS

    MONTH %

    COMP.

    THIS

    MONTH %

    COMP.

    UP TO

    DATE %

    COMP.

    CARRIED TO COLLECTION

    ITEM DESCRIPTION QTY UNIT

  • 8/13/2019 3 Transformer Room (1)

    12/30

    TRANSFORMER ROOM-

    DIVISION - 7

    THERMAL AND MOISTURE PROTECTION

    COLLECTION

    1 TOTAL OF PAGE (7-1) 890.350

    890.350CARRIED TO SUMMARY

  • 8/13/2019 3 Transformer Room (1)

    13/30

    TRANSFORMER ROOM-

    UNIT RATE AMOUNT

    KD. FILS KD. FILS

    DIVISION - 8

    DOORS AND WINDOWS

    Section 08110

    Steel Doors and Frames

    8.1 Steel frame with 3mm thick steel panel both

    side claded hollow steel door fixing to

    concrete or block wall complete with glazing,

    painting, all hardware (hinges, tower bolt,

    door lock, door closer etc.). The Contractor

    should refer Hardware Schedule Section

    08711 and Finish Hardware Section 08710

    in Specifications and drawings, showing

    8.1.1 Steel door double leaf, size 2750x2750mm

    Type D12 Nos. 600.000 1200.000 0.00% 100.00% 100.0

    1 200 000

    PREVIOUS

    MONTH %

    COMP.

    THIS

    MONTH %

    COMP.

    UP T

    DATE

    COM

    CARRIED TO COLLECTION

    ITEM DESCRIPTION QTY UNIT

  • 8/13/2019 3 Transformer Room (1)

    14/30

    TRANSFORMER ROOM-

    DIVISION - 8

    DOORS AND WINDOWS

    COLLECTION

    1 TOTAL OF PAGE (8-1) 1200.000

    1,200.000CARRIED TO SUMMARY

  • 8/13/2019 3 Transformer Room (1)

    15/30

    TRANSFORMER ROOM- ..

    UNIT RATE AMOUNT

    KD. FILS KD. FILS

    DIVISION - 9FINISHES

    Secton 09200

    Lath and Plaster

    9.1 Render and set in cement plaster, 2 cm

    thick to internal / external wall and ceiling

    (concrete or block wall), including under

    coat, metal lathe, corner beads, stop beads

    etc. complete as per drawings and

    280 M2 2.150 602.000 0.00% 100.00% 100.00%

    Section 09400Terrazzo Tile

    9.2 Precast Terrazzo floor tile 30x30x3 cm

    Grade-1 on and including cement and sand

    setting bed and backing sand cushion, joints

    grouted in white cement including grinding,

    polishing etc. complete as described.

    35 M2 5.250 183.750 0.00% 100.00% 100.00%

    9.3 2 cm thick x 10 cm high Terrazzo skirting on

    and including cement and sand setting bed

    and backing, joints grouted in white cement -

    ditto.

    32 MR 2.500 80.000 0.00% 100.00% 100.00%

    Section 09900

    Painting

    9.4 Prepare and apply 2 coats of paint including

    preparation of surfaces, under coat, seal

    coat etc. complete as per specifications and

    Manufacture's instructions.

    9.4.1 Textured paint over plaster and fair face

    concrete surfaces.113 M2 3.500 395.500 0.00% 100.00% 100.00%

    9.4.2 Emulsion paint 170 M2 1.000 170.000 0.00% 100.00% 100.00%

    1,431.250

    PREVIOUS

    MONTH %

    COMP.

    THIS

    MONTH %

    COMP.

    UP TO

    DATE %

    COMP.

    CARRIED TO COLLECTION

    ITEM DESCRIPTION QTY UNIT

  • 8/13/2019 3 Transformer Room (1)

    16/30

    TRANSFORMER ROOM-

    DIVISION - 9

    FINISHES

    COLLECTION

    1 TOTAL OF PAGE (9-1) 1431.250

    1,431.250CARRIED TO SUMMARY

  • 8/13/2019 3 Transformer Room (1)

    17/30

    TRANSFORMER ROOM-

    UNIT RATE AMOUNT

    KD. FILS KD. FILS

    INTERNAL WORKSMECHANICAL WORKS

    FIRE FIGHTING SYSTEM

    Supply and installation the following items as per

    specifications and drawings complete in all respect,

    including testing, commissioning and any related

    work to complete the job in perfect condition for the

    satisfaction of the Engineer.

    15.1 2 Nos. 25 Kgs. Powder fire extinguisher with

    trolle2 Nos. 350.000 700.000 0.00% 100.00% 100.0

    in low tension room and transformer room

    SUNDRIES

    15.2 Documents includin drawin s o eratin L.S. L.S. included included

    instructions and maintenance manuals.

    15.3 Tools and s ares includin loose ke s L.S. L.S. included included

    and consumable stores as er en ineerrecommendations.

    Work incidental to the fire fighting

    installation

    15.4 Allow for co-ordination with other engineering L.S. L.S.

    installations. included included

    15.5 Allow for cutting or forming holes,mortise, L.S. L.S. 500.000 500.000 0.00% 100.00% 100.0

    chases or the like and making good finishing

    15.6 Supply and install all missing items, refer to L.S. L.S. included included

    s ecifications and works needed.

    PREVIOUS

    MONTH %

    COMP.

    THIS

    MONTH %

    COMP.

    UP TO

    DATE

    COM

    ITEM DESCRIPTION QTY

    UNIT

  • 8/13/2019 3 Transformer Room (1)

    18/30

    TRANSFORMER ROOM-

    1,200.000

    INTERNAL WORKSMECHANICAL WORKS

    Supply and installation the following items as per

    specifications and drawings complete in all respect,

    including testing, commissioning and any relatedwork to complete the job in perfect condition for the

    satisfaction of the Engineer.

    STORM WATER

    15.7 Rain water sus ended U.P.V.C. i esfittin s as er S ecifications and Drawin s,fixin with and includin all re uisiteand fixin devices includin oints.

    15.7.1 3 inch diameter pipeL.S. L.S. 500.000 500.000 0.00% 100.00% 100.00

    15.7.2 3 inch dia. Parapet roof drain1 Nos. 100.000 100.000 0.00% 100.00% 100.00

    15.8 RAIN WATER PIPE WORK

    15.8.1 3 inch diameter cast iron shoe1 Nos. 200.000 200.000 0.00% 100.00% 100.00

    15.9 Su l and install all missin items, refer to L.S. L.S. included included

    s ecifications and works needed.

    800.000

    CARRIED TO COLLECTION

    CARRIED TO COLLECTION

  • 8/13/2019 3 Transformer Room (1)

    19/30

    TRANSFORMER ROOM- ....../

    DIVISION - 15 - MECHANICAL

    HVAC

    GENERAL NOTES

    A. Contractor is responsible to get approvallocal authorities.

    B. The HVAC system is a scheme contractorcheck all drawin s and do all ad ustmentsincluding complete with all discipline in orderget good performance of HVAC system

    C. Include in quotation all catalogues formaterials and other in which rice based

    HVAC System

    15.10 An other item s not mentioned above and L.S. L.S. included included

    necessary for the optimum operation of the

    15.11 Allow for builders works required for all L.S. L.S. included included

    works

    15.12 Allow for two years maintenance L.S. L.S. included included

    all HVAC equipments and system includingrovidin all re uired s are arts.

    15.13 Allow for submitting as-built drawings, L.S. L.S. included included

    o eration instruction and maintenanceetc.

    Exhaust Fans

    15.14 Exhaust roof extractor centrifu al t ewith fan electric motor casin housin theflanges back draft damper, vibration isolatross rin t e inlet cones wire uards

    panels and all accessorie as perdrawings.

    15.14.1 E.F - 01 (3600 cfm) 1 No. 548.650 548.650 0.00% 100.00% 100.00% 54

    548.650 54CARRIED TO COLLECTION

  • 8/13/2019 3 Transformer Room (1)

    20/30

    TRANSFORMER ROOM- ....../

    Duct Work

    15.15 Galvanized sheet rectan ular/round ductfor su l return fresh air toilet exhaust etc.complete with supply, fabrication, installation,hanger, support, equipment connection, ductaccessories, sealant, air leakage tests etc.SMACNA s ecification and A/C drawin s.

    15.15.1 USG (20) 130 Kg 0.700 91.000 0.00% 100.00% 100.00%

    15.15.2 USG 22 70 Kg 0.680 47.600 0.00% 100.00% 100.00%

    Duct Work Accessories

    15.16 Motorized and manual volume control L.S. L.S. 500.000 500.000 0.00% 100.00% 100.00% 5

    dam er fire dam er turnin vens etc. asand s ecified.

    Air Outlets and Inlets

    Air outlets and inlets, include an exhaust grill,

    exhaust louver, door grill etc, complete asspecified and shown.

    15.17 Exhaust air grill (EAG)

    15.17.1 EAG 60x 18 1 No. 57.000 57.000 0.00% 100.00% 100.00%

    15.17.2 EAG 24x 14 1 No. 40.000 40.000 0.00% 100.00% 100.00%

    15.18 Elect. Type wall mounted thermostat for 1 No. included included

    room fan c.w. sensor and all required

    15.19 Su l and install all missin items refer to L.S. L.S. included included

    s ecifications and works needed.

    735.600 7CARRIED TO COLLECTION

  • 8/13/2019 3 Transformer Room (1)

    21/30

    TRANSFORMER ROOM-

    DIVISION - 15 - MECHANICAL

    COLLECTION

    1 TOTAL OF PAGE (15-1) 1200.000

    2 TOTAL OF PAGE(15-2) 800.000

    3 TOTAL OF PAGE(15-3) 548.650

    4 TOTAL OF PAGE(15-4) 735.600

    3,284.250CARRIED TO SUMMARY

  • 8/13/2019 3 Transformer Room (1)

    22/30

    TRANSFORMER ROOM- ....../

    UNIT RATE AMOUNTA

    CO

    KD. FILS KD. FILS KD

    16 GENERAL NOTES

    include the supply of all materials and

    equipment unless otherwise specified,

    delivery to site, installations, connections,

    testing, commissioning and making ready

    for work complete with all necessary cables

    wiring, earthing, conduits, draw and outlet

    boxes, switches, push-buttons, KWHM,

    cable trays, trenches, supply steel frames,

    angles, beams, rods fixation etc. and all

    necessary accessories and components for

    All works shall be carried out according to

    drawings, particular and generalspecifications, contract conditions, and to

    the latest rules and regulations of M.E.W,

    M.O.C., Kuwait Fire Brigade, and any other

    concerned authorities, and as approved by

    these authorities and approved by the

    Engineering.

    The contractor has the responsibility to

    finalize work as per MEW approval on the

    shop drawings and as built drawings without

    extra cost implication on the owner side

    services (architect, civil and mechanical

    works) to finalize his work in a coordinated

    the contractor has the responsibility to

    fire alarm equipments in the substation to the

    main fire alarm control panel located in the

    building including all ducts, conduites, cables,

    handholes, manholes and all requirements

    accessories.

    The contractor has the responsibility to

    complete voltage drop calculations

    the site conditions and exact locations and to

    change the sizes of cables according to

    the voltage drop calculation results without

    cost implication on the owner side.

    DIVISION 16 ELECTRICAL

    PREVIOUS

    MONTH %

    COMP.

    THIS

    MONTH %

    COMP.

    UP TO

    DATE %

    COMP.

    ITEM DESCRIPTION QTY UNIT

    CARRIED TO COLLECTION

  • 8/13/2019 3 Transformer Room (1)

    23/30

    TRANSFORMER ROOM- ..

    16.1Supply, install, connect, test and commission

    the following Main Low Tension Pannel,

    including all feeding cables, cable trays, ducts,

    hand holes, man holes, and all accessories,

    foundation, earthing, trenching, contract

    drawings, MEW requirement and as per the

    approval of the Engineer.

    16.1.1 M.L.T.B. 1.00 No. 4700.00 4700.00 0.00% 100.00% 100.00%

    16.2

    upp y , ns a , connec , es an comm ss on

    the following Main feeding cables including all its

    cable trays, trenches, ducts, conduites,hand

    holes, man holes, handholes,covers and all

    requirements, accessories, foundation, earthing,

    trenching, contract drawings, MEW requirement

    and as per the approval of the Engineer.

    16.2.1 4c/95mm2 cu/xlpe/swa/pvc feeding cable 20.00 mt 30.00 600.00 0.00% 100.00% 100.00%

    from MLTP to MSB-01

    16.2.2 4c/95mm2 cu/xlpe/swa/pvc feeding cable 20.00 mt 30.00 600.00 0.00% 100.00% 100.00%

    from MLTP to MSB-02

    16.2.3 4c/95mm2 cu/xlpe/swa/pvc feeding cable 20.00 mt 30.00 600.00 0.00% 100.00% 100.00%

    from MLTP to MSB-03

    16.2.4 4c/95mm2 cu/xlpe/swa/pvc feeding cable 20.00 mt 30.00 600.00 0.00% 100.00% 100.00%

    from MLTP to MSB-04

    16.2.5 4c/95mm2 cu/xlpe/swa/pvc feeding cable 20.00 mt 30.00 600.00 0.00% 100.00% 100.00%

    from MLTP to MSB-AHU

    16.2.6 3(4c/300mm2) cu/xlpe/swa/pvc feeding cable 20.00 mt 30.00 600.00 0.00% 100.00% 100.00%

    from MLTP to MSB-CH/P

    16.2.7 4c/25mm2 cu/xlpe/swa/pvc feeding cable 20.00 mt 30.00 600.00 0.00% 100.00% 100.00%

    from MLTP to MSB-PUMP

    16.2.8 (4c/16mm2) cu/xlpe/swa/pvc feeding cable 20.00 mt 30.00 600.00 0.00% 100.00% 100.00%

    from MLTP to S/F-FFP-01

    16.2.9 (4c/16mm2) cu/xlpe/swa/pvc feeding cable 20.00 mt 30.00 600.00 0.00% 100.00% 100.00%

    from MLTP to S/F-FFP-02

    16.2.10 (4c/16mm2) cu/xlpe/swa/pvc feeding cable 20.00 mt 30.00 600.00 0.00% 100.00% 100.00%

    from MLTP to S/F-JFP

    16.2.11 (4c/35mm2) cu/xlpe/swa/pvc feeding cable 20.00 mt 30.00 600.00 0.00% 100.00% 100.00%

    from MLTP to feeder pillar

    16.3

    Supply , install, connect, test and commission

    the following distribution boards,switch fuses

    including all feeding cables, cable trays, ducts,

    handholes, wiring, accessories, foundation,

    earthing, contract drawings, MEW requirement ,

    general specifications and as per the approval of

    16.3.1DB-SS

    1.00 NO. 500.00 500.00 0.00% 100.00% 100.00%

    16.3.2feeder pillar FP-01

    1.00 NO. 2500.00 2500.00 0.00% 100.00% 100.00%

    14,300.000

    DIVISION 16 ELECTRICAL

    CARRIED TO COLLECTION

  • 8/13/2019 3 Transformer Room (1)

    24/30

    TRANSFORMER ROOM- 16.4 supply, install, connect, fix, test and make

    ready for work of all lighting fittings. , the price for

    the following items shall be included the lighting

    points to the respective DBS c/w Wiring ,Conduits

    , Earthing,Switches, Push Button, Ceiling Rose

    , Silicon Wire, and all accessories required as per

    drawings, specifications and MEW regulations for

    light fittings types shown on drawings the Contractor

    should submit a sample of light fittings for approval

    with all internal wiring, control gear and components.

    The Contractor should submit the fixation way of light

    fittings for approval, as arch. Requirements and

    according to the type of ceiling.and as per approval of Engineer.

    16.4.1 TYPE E 4.00 No. 50.00 200.00 0.00% 100.00%

    16.4.2 TYPE E' 3.00 No. 20.00 60.00 0.00% 100.00%

    16.4.3 TYPE K 2.00 No. 35.00 70.00 0.00% 100.00%

    16.5 Supply, install and connect to the respective DBs, the following points including conduit wiring, draw

    boxes, outlet boxes, face plates, trenching, earthing,

    switches, accessories, cable, silicon wire, switches,

    double pole switches and all requirements as specified

    and as shown in drawing and as per the approval of

    Engineer.

    16.5.1 13 A 3 Pin Sw. Socket6.00 No. 30.00 180.00 0.00% 100.00%

    16.5.2 20 A T.P.N. S/F -EF-01/DB-SS1.00 No. 35.00 35.00 0.00% 100.00%

    16.5.3 20 A T.P.N. S/F -FOR MSU 1.00 No. 36.00 36.00 0.00% 100.00%

    EARTHING SYSTEM16.6 Supply, install and connect complete earthing system

    as per drawing, specification and MEW regulation any

    addition earth electrodes needed shall be included1.00 L.S. 250.00 250.00 0.00% 100.00%

    without extra cost.

    SITE INFRA STRUCTURES&BUILDER

    WORK

    16.7

    All necessary Builders Works, civil work,

    foundations, trenching required for electrical

    installation for transfromer room, LT room and

    site layout. Including all under ground upvcconduits, manholes, handholes , covers

    ,warning tape, excavation , backfilling and all

    accessories required for completion work as per

    mew re ulations a rovals and en ineer

    1.00 L.S. included included

  • 8/13/2019 3 Transformer Room (1)

    25/30

    TRANSFORMER ROOM-

    FIRE ALARM SYSTEMS

    16.8 Supply, install, connect, test and make ready for

    complete addressable analogue fire alarm system

    including conduits, wiring,

    boxes draw boxes, terminal box and all components

    and accessories to make the system ready for work asper the drawing, specifications, KFBD approval and

    as per approval of Engineer. The contractor is

    responsible to finalize the work according to any

    changes of KFBD without any extra cost on

    the owner side the system shall contain as a

    minimum.

    16.8.1 Optical Detector 2.00 No. 150.00 300.00 0.00% 100.00% 100.00%

    16.8.2 Interfaces with AHU's 1.00 L.S. 100.00 100.00 0.00% 100.00% 100.00%

    16.8.3 Interfaces with fire fighting system 1.00 L.S. 350.00 350.00 0.00% 100.00% 100.00%

    16.8.4

    Arranging to connect to main system and

    getting approval of KFB for F.A installation

    after completion

    1.00 L.S. 300.00 300.00 0.00% 100.00% 100.00%

    16.8.5 General Fire Alarm Bell suitable for 1.00 No. 1500.00 1500.00 0.00% 100.00% 100.00%

    outdoor W/P

    2,550.000CARRIED TO COLLECTION

  • 8/13/2019 3 Transformer Room (1)

    26/30

    TRANSFORMER ROOM- Collection - Electrical

    TOTAL OF PAGE (16-1) 0.00

    TOTAL OF PAGE (16-2) 14300.00

    TOTAL OF PAGE (16-3) 831.00

    TOTAL OF PAGE (16-4) 2550.00

    17,681.000CARRIED TO SUMMARY

  • 8/13/2019 3 Transformer Room (1)

    27/30

    Index of B.O.Q.

    2 Site Work

    3 Concrete

    4 Masonry

    5 Metal7 Thermal and Moisture Protection

    8 Doors and Windows

    9 Finishes

    15 Mechanical

    16 Electrical

    Summary

    Bill No. 3

    INDEX OF BOQ

    DIVISION

    NO.TITLE

  • 8/13/2019 3 Transformer Room (1)

    28/30

  • 8/13/2019 3 Transformer Room (1)

    29/30

    III-4/Index-1

    2-1 to 2-2

    3-1 to 3-2

    4-1 to 4-2

    5-1 to 5-27-1 to 7-2

    8-1 to 8-2

    9-1 to 9-2

    15-1 to 15-5

    16-1 to 16- 5

    Sum-1

    PAGE NO.

  • 8/13/2019 3 Transformer Room (1)

    30/30