1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production...

19

Transcript of 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production...

Page 1: 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production 1989Precision Air Conditioning Units go into production.
Page 2: 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production 1989Precision Air Conditioning Units go into production.

1988 Foundation of the Bovolenta site (PD). Start of modular

access floor and chillers production

1989 Precision Air Conditioning Units go into production

1995 ISO9001 certification

1996 Uniflair brand chiller production start-up

1998 Opening of the Mobile Telecommunications series

2002 New branch office in South Africa

2003 New production site in China

2004 New Uniflair Headquarter in Conselve (PD)

2005 New branch office in India

2006 New branch in Germany and Hungary

2007 New production site in India

2008 ISO14001 certification & 5S methodology

2009 New production site in China with certified Laboratory

2009 New-organisation structure in Germany

History

Page 3: 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production 1989Precision Air Conditioning Units go into production.

Financial highlights

30%

70%

Domestic

Export

29%

71%

Access flooring

Precision airconditioning

Page 4: 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production 1989Precision Air Conditioning Units go into production.

Close control units

• Precision air conditioning for Data Center and IT

rooms

• Precision air conditioning for telecommunications

• Technical rooms & Laboratories

• High density cooling solutions

Page 5: 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production 1989Precision Air Conditioning Units go into production.

High Density Solutions, Blade Servers…

Page 6: 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production 1989Precision Air Conditioning Units go into production.

Technical cooling

• Technological plant

• Process cooling

• High performance comfort cooling

Page 7: 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production 1989Precision Air Conditioning Units go into production.

Access Floor

Page 8: 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production 1989Precision Air Conditioning Units go into production.

Offices, hotels, shops, department stores, gyms, data centers, restorations…

Page 9: 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production 1989Precision Air Conditioning Units go into production.

Ecoflair®

Innovation air conditioning

• Individual control of the microclimate

• Design flexibility

• Flexible use

• Energy saving

• Reduced operating and running costs

Page 10: 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production 1989Precision Air Conditioning Units go into production.

Important data

Production capacity

• more than 1,200,000 m² of access

flooring/year

• more than 20,000 conditioning

units/year

Products installed

• more than 8,500,000 m² of modular

flooring

• more than 200,000 conditioning units

Page 11: 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production 1989Precision Air Conditioning Units go into production.

Uniflair India

Page 12: 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production 1989Precision Air Conditioning Units go into production.

Uniflair China

Page 13: 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production 1989Precision Air Conditioning Units go into production.

• 5% of the sales turnover is invested in

research and development

• 2000 m2 dedicated to laboratories and test

rooms

• Research laboratory for air conditioning

and refrigeration products

• Testing rooms for air conditioning and

refrigeration products

• Test room for Access floor

Research Centre

Page 14: 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production 1989Precision Air Conditioning Units go into production.

Production sites

Subsidiaries

Dealers

Global presence (outside Europe)

Page 15: 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production 1989Precision Air Conditioning Units go into production.

Presence in Europe

Production sites

Subsidiaries

Dealers

Page 16: 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production 1989Precision Air Conditioning Units go into production.

Our references /1

European Parliament

Ferrari

Barco

China Construction Bank

Egypt Air

ESA

Opera de Lyon

Louvre

Microsoft

BMW

HSBC

The Centre

U.S. Navy

Italian railway

Banque Populaire

Cremlino

King Abdullah University

Singapore Airport

Pirelli

Philip Morris

Rolex

Geneva Airport

Conran

Banco Oriental

do Uruguay

Mercedes Benz

BBC

NATO Headquarter

Sheremetievo Airport

HP

SIEEB

Shell

Wall Street Journal

Hutchinson

Meteosat Canarie

Venice Airport

Page 17: 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production 1989Precision Air Conditioning Units go into production.

Advantage-e

Alcatel

Amena

AT&T

Belgacom

Bell South Chile

Blutel

British Telecom

Cable & Wireless

Cesky Mobil

CISCO

Colt Telecom

Comp. Telecom. de Chile

Cosmote

Deutsche Telekom

Digiplex

Dutch Telecom

Ericsson

Era GSM

Swiss Telecom

Telecom Argentina

Telecom Italia

Telecom Poland

Telefonica de Argentina

Telefonica de Espana

Telekom Austria

Telecom Slovenia

Telia

T mobile

Eurotel

France Telecom

Global One

Intracom

Infostrada

InterXion

Lucent Technology

Mannesmann

Motorola

Mobitel

MTN

Nokia

Orange

Orascom

OTE

Panafon

Pannon

Reliance

Retevision

Siemens

Our references /2 TIM

MCI Worldcom

Uunet

Versatel

Vodafone-Omnitel

Wind

Page 18: 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production 1989Precision Air Conditioning Units go into production.

Some of the main projects

TAVSENTRUM

Page 19: 1988Foundation of the Bovolenta site (PD). Start of modular access floor and chillers production 1989Precision Air Conditioning Units go into production.