17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created...

32

Transcript of 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created...

Page 1: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 2: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 3: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 4: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...

our reputation has been built on quality over the last 30 years

Page 5: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...

East Midlands Distribution Centre

our reputation has been built on quality over the last 30 years

Page 6: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...

firemasterintroductionFiremaster offers a total internal wall and ceiling solution that is ideally suited for non load bearing internal partition walls and ceilings. It provides a tested fire resistance to match the performance required for internal firewalls, protected zones, ceilings and compartmentation walls.

Arla Super Dairy, Denbigh

All Firemaster wall and ceiling panels are manufactured with a stone wool core that provides ’built in ‘passive fire protection, structural strength, robustness and low environmental impact.

The panels are available in a wide range of finishes including a foodsafe coating, providing a smooth, anti-static internal surface.

66

Page 7: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...

Firemaster Wall LiteThis system gives the optimum balance between fire performance, cost and weight and has been designed specifically as a practical, contractor-friendly solution. There’s no better choice when fire resistance is specified and speed, flexibility and cost effectiveness is demanded and can provide up to 90 minutes fire resistance.

Firemaster Wall ExtraFiremaster Extra is the product of choice when the demand is for a 2 hour fire resistance internal wall panel. Fully tested and independently certified durability, structural integrity and fire performance is at the heart of Firemaster Extra.This panel system is ideal for a wide range of applications including cold store rooms and food processing plants.

Firemaster Wall UltimaFiremaster Ultima provides the demanding solution for fire walls and compartmentation in high risk areas where up to 4 hours’ fire resistance is required. Business continuity and life safety are dramatically increased thanks to the integrity and insulation of this unique system making it ideal for use in high risk buildings such as Data Centres.

Firemaster CeilingFiremaster Ceiling is a class leading fire-rated ceiling panel suitable for both walk on (access and maintenance) and non-walk on use. It’s the ideal solution to compartmentalise a building when protection and life safety are a priority.

All Firemaster systems can be integrated with tested and approved fire, acoustic and security steel doors for a complete fire resistant solution.

Adams Foods, Staffordshire

Illustration does not show support for fire rating.

77

Page 8: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 9: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 10: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...

Winglands Foods, Peterborough

10

Page 11: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 12: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 13: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 14: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 15: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 16: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 17: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 18: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 19: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 20: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 21: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 22: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 23: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 24: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 25: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 26: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 27: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 28: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 29: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 30: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...
Page 31: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...

31

ceiling panels guidance for use The exceptional performance of Firemaster Ceilings has made the use of stone wool ceiling panels a practical proposition for specifiers and contractors alike. However, the abuse of the walk on capacity of Firemaster Ceilings must be avoided and therefore the following guidelines must be strictly adhered to:

How the law appliesThe erection of insulated panel ceilings or subsequent maintenance and access operations come under health and safety law and this requires hazards to be identified and where possible, eliminated. Any residual risks should be assessed and safe systems of work developed to minimise them. Remember, having a safe system of work when undertaking work on a ceiling is a legal duty and should be a co-operative effort between Client, Contractor and Designer.

Provide dedicated and safe access onto the ceiling and ensure that all persons access the ceiling from these point(s) only. Whenever possible, access should be via a stair-tower. However, if ladders are used they should be tied at the top and extend at least 1.1m past the access point. Personnel must not jump or bounce on ceilings and should not gather in groups of more than two. Signs should be erected at all points of access.

Provision of access to maintain the roof Where access is required to the ceiling area to inspect or maintain plant, designated walk ways must be used. These could take the form of an independently supported walk way which gives access to the necessary plant. Where a walk way cannot be installed but access is still required, the ceiling must be protected with 6mm ply/hardboard to spread loads. These

boards should be fixed to the back of the ceiling panels with self-tapping screws and positioned:

Close to and running parallel with the ceiling suspension system.At the Perimeter of the ceiling where the ceilings panels are fixed back to the walls.

NB Should anything other than normal maintenance access be required, Youngman’s type walk boards should be used by all subcontractors at all times.

Fixing the ceiling Always fix ceiling panels in accordance with Eurobond’s recommendations, e.g. sequence of laying down the panels, number of fixings, etc. Never allow partial fixing only of ceiling panels. Each panel should be fully fixed, allowing progress of the work as it is laid down, with the correct number of fixings as required and system of

support. If any cut outs for penetrations over 100mm wide are required this must have prior approval of Eurobond.

Post construction maintenance Like any other product, Eurobond ceilings will perform better and for longer if you maintain them properly. But remember the hazards in maintaining a ceiling or using it for access can be greater than for constructing them. Do not allow any person access to a ceiling without vetting their skills and safety methods. Do not allow untrained employees to access the ceiling or to carry out quick repairs. Remember – Contact Eurobond if in doubt on any aspect of new ceiling construction or subsequent access. The Best Practice Guide for work on ceilings constructed with steel faced insulated composite panels is also available upon request.

Page 32: 17635 • Firemaster brochure 11'JAN'18 · 17635 • Firemaster brochure 11'JAN'18.indd Created Date: 20180111123828Z ...