150323 Site Plan-Site Plan F
Transcript of 150323 Site Plan-Site Plan F
servicesenvironmental consulting
LEGEND
7
6
5
8
4
3
2
1720
19
1612
14
13
10
11/MWJ-03
15B
15C
15A
1/MWJ-01
18/MWJ-05
9/MWJ-02
3
TOP OF BERM
BU
NC
E C
RE
EK
SHOULD NOT BE USED TO ESTABLISH PROPERTY BOUNDARY LOCATION IN THE FIELD.
ARE BASED ON AVAILABLE FURNISHED INFORMATION AND ARE APPROXIMATE ONLY AND
THIS IS NOT A PROPERTY BOUNDARY SURVEY, PROPERTY BOUNDARIES SHOWN ON THIS MAP
NOTE:
0 50 100 150 300
SCALE 1" = 150'
J-52
J-MW78
J-48
J-75
J-85
J-91
J-56
J-57
J-58
J-62
J-59
J-60
J-53
J-54
J-51
J-49
J-80
J-50
J-72
J-73
J-70
J-25J-26
J-29
J-27
J-33
J-37
J-32
J-87
J-86
J-89
J-84
J-82
J-22J-23
J-MW74
J-MW77
J-MW55
J-MW28
J-MW31
J-MW38
J-MW81
J-MW83
J-MW47
J-24
J-MW30
J-MW21
J-44
J-88
J-90
J-MW61
SOIL BORING/TEMPORARY MONITORING WELL LOCATION (PHASE II)
SOIL BORING LOCATION (PHASE II)
T
J-65
J-42
J-64
J-63
J-66
J-43
J-45J-46
J-MW40
J-MW41
TT
T
PW-1PW-2
PW-4
GAUGESTREAM
TPW-3
J-MW67
J-MW68
J-93J-92
J-94J-95
J-96
J-97
J-98
PW-5
T
PW-6
T
LOG JAM
J-69
SECTION OF LOSING STREAM
PORE WATER SAMPLE
MONITORING WELL LOCATION
SOIL BORING LOCATION
J-MW34
15/MWJ-04
J-MW76
4" #2 FUEL OIL
10" #6 FUEL OIL
FUEL OIL10" #4
16" FUEL OIL
WHERE ABOVE GROUND)
PRODUCT PIPING (DASHED
APPROXIMATE LOCATION OF
10" #6 FUEL OIL
TOP OF BERM
OIL AST
#4 FUEL
No. 2
METERING AST
#6 FUEL OIL
No. 1
(5.000 GAL)HOLDING UST
CONTAINMENTPAD w/ SECONDARY CONCRETE EQUIPMENT
BUILDINGMAIN CONTROL BUILDING
FIRE SUPPRESSIONBUILDINGBULLDOZER
CONTAINMENTw/ SECONDARY PUMPS & HEATERS CONTAINMENT
w/ SECONDARY PUMPS & HEATERS
CONTAINMENTPAD w/ SECONDARY CONCRETE EQUIPMENT
STATION (#4 FUEL OIL)TRUCK UNLOADING
(5.000 GAL)HOLDING UST
OIL AST
#6 FUEL
No. 3
SEPERATOROIL/WATER
STORM SEWER PIPING (APPROXIMATE)
STORM SEWER INLET LOCATION
PROJECT NO.
FIGURE No.
PH: (269) 342-1100 FAX: (269) 342-4945
KALAMAZOO, MICHIGAN 49048
2960 INTERSTATE PARKWAY
150323
140189_Site_Pla
n-Site Pla
n P-0
00.p
df
MARYSVILLE, MI298 GRATIOT BLVD
GREENWOOD OIL TERMINAL
MONITORING WELL LOCATIONSBORINGS AND
SITE PLAN WITH SOIL