FINAL CONCEPT MODEL - SITE PLAN & CONTEXT · ardrossan skatepark. final concept model - site plan &...
Transcript of FINAL CONCEPT MODEL - SITE PLAN & CONTEXT · ardrossan skatepark. final concept model - site plan &...
WWW.NEWLINESKATEPARKS.COM
ARDROSSAN SKATEPARK FINAL CONCEPT MODEL - SITE PLAN & CONTEXT
JUNE, 2020ARDROSSAN, AB
SITE PLANCONTEXT PLAN
EXISTING CONDITIONS
AABB
CC
DD
EE
FFGG
HH
II
JJ
KK
RR 221A
QUEEN ST.
PROPOSED TREE
FEATURES LISTAA - 1’6” quarter pipeBB - 3 stair with out ledgeCC - Slappy bank featureDD - Circular bank to mani pad with hay bale themeEE - Flat/down rail and ledgeFF - 4’ quarter pipe/hipGG - 4’ blended transition to flatHH - 3’6” turn around quarter pipeI I - Flat barJJ - Technical street area with transition up to the 3 stair out ledgeKK - Blended transition feature with pump bumpLL - 5’ quarter pipe launch to bankMM - 7’ bankNN - 5’ mini ramp with roll in OO - Seating area with custom concrete benchPP - Custom art wall
LL
MM
FF NN
PROPOSED TREE PROPOSED
TREEPROPOSED
TREE PROPOSED TREE
OO
OO OO
PP
PP
PP
PP
PP
WWW.NEWLINESKATEPARKS.COM
FINAL CONCEPT MODEL - OVERALL VIEWS
ARDROSSAN SKATEPARK
JUNE, 2020ARDROSSAN, AB
WWW.NEWLINESKATEPARKS.COM
FINAL CONCEPT MODEL - DETAIL VIEWSARDROSSAN SKATEPARK
JUNE, 2020ARDROSSAN, AB
WWW.NEWLINESKATEPARKS.COM
FINAL CONCEPT MODEL - ART WALL VIEWSARDROSSAN SKATEPARK
JUNE, 2020ARDROSSAN, AB
Note: All artwork shown in renders are placeholders. This is intended to show location only, it does not
represent the final artwork.