150309-DB S&S AG I.SBP Station Green_engl

32
DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015 StationGreen Horrem First Carbon-Free Train Station Building in Europe

Transcript of 150309-DB S&S AG I.SBP Station Green_engl

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreen

StationGreen HorremFirst Carbon-Free Train Station Building in Europe

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreen

Station&Service AGFuture of StationsStationGreen ProgrammThe develpment of StationGreenNext StepsContact

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreen

DB Station&Service AG 5.400 Railwaystations in use

1.500 Station buildings

15 M. Travelers per day

3 Bill. Travelers and Visitors per annum

4.600 Employees

1 Office for Architecture

DB Station&Service AG | I.SBP Architekten und Ingenieure | StationGreen | Edition August 2013

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreen

Activities

- new stations

- retrofittings

- Masterplanungen

- Traffic infrastructure

- Mobility design

- Programming

The Team

- Architects

- Engineers

- Transport Engineers

- Quantity Surveyor

- Administrative Staff

I.SBP

- 40 Employees

DB Station&Service AG | I.SBP Architekten und Ingenieure | StationGreen | Edition August 2013

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreenFuture of StationsWhat is a Railstation?

A piece of city Lifecycle

A buildingMobilitätssynapse

Image of the city

Gate to the city

Entrance to the system

Meetingpoint

Arrivalspace

Attractor

Local Identifier

Place to Stay

sanctuary

marketplace

Place to Work

Orientation

Infrastructure

Complex functionality

Emotionalspace

place of remembrance

Space of the future

Urban funtions

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreen

Category 1

Category 3

Category 4

Category 6

Category 7

StationsCategory Relationen traveler per day [M.]

Category 2

Category 5

20

77

227

598

1.075

2.529

849

5.375

2,9

2,4

2,9

3,9

2,1

1,1

0,1

17% of Stations78% of Travelers

83% of Stations22% of travelers

15,4 M. per day

StationGreen

StationGreen

StationGreen

Clustering of Stations

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreenObjective

StationGreen…

7

… shall accomplish a measurable contribution to the DB 2020 strategy

… shall be the first station reducing CO2 emissions (operates carbon-free)

… shall set new standards for future stations as a pilot project

… shall be a testbed for new technologies

… shall be the billboard for DB‘s sustainable actions

… shall improve the image of a region and city

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreen

8

EnvironmentEconomy Social Concerns

StationGreen serves the three pillars of the DB 2020 strategy.

Guiding Principles

Modular, extendibleconcept

Easy conversion due toflexible floor plan

Regionally customizedmarketing and operationconcept

Reduced operational costs due to self-sufficient energyproduction / internalpower supply

Construction

Roof canopy givesshade

„Light Catcher“ steersdaylight into back areas

Green roof reducesheat-island-effect andregulates the climate in/ around the building

Heated rooms areembedded in a climateshell (space in spaceconcept)

Materials

Carbon-free primary-construction made oftimber

Use of recyclable or renewable materials

Use of emission-freematerials

Use of regional materials

Avoidance of compositematerials

Technology

Rainwater storage andits use for lavatory flush

Heating and cooling ofroom temperature andwater with renewableenergy (geothermy/ solarthermy)

Use of solar panels forelectricity

LED lighting technology

Concept for maintenance and disposal

Intermodality

Barrier-free access for all passengers with restricted mobility

Digital reception

Wireless internet

Comfortable waitingarea with pleasantseating (includingcharging facilities formobile devices)

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreenModules

StationGreen

DB Station&Service AG | I.SBP Architects and Engineers Edition October 2014

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreenS

US

TAIN

AB

LIT

Y

CO

MF

OR

T

+

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreenLayout

Ground Floor

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreenElevation (City Side)

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreen

13

North Germany

Bavaria

Industrial HeritageSite

ColoursAppearance integral to surroundings Ambience Texture Vegetation Fassade Construction

Adaptability

The Scheme StationGreen stands for: • Accessible station layout• Carbon-free operation of the station• Combination of custumer comfort and sustainabilityA basic module is adabted to the floor plan according to the space available and usage requirements. The station design takes into account local climate and architectural traditions.

Horrem

Station- 11.870 travellers per day

- 5 Plattforms

- Category 3 Station

- 1.100 Park+Ride Parking Spaces

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreen

Foto 11.06.13

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreen

Foto 13.06.13

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreen

JUNE2014

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreen

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreenNext steps

StationGreen Lutherstadt Wittenberg

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreenNext steps

StationGreenLutherstadt Wittenberg

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreenNext steps

StationGreen Lutherstadt Wittenberg Opening2017

DB Station&Service AG | I.SBP Architects and Engineers Edition March 2015

StationGreen

I.SBP CONCEPTION AND DESIGNArchitects and Engineers

Head Architect Marc UlrichDB Station&Service AGWashingtonplatz 2, D-10557 Berlin

Tel. ++49 (0)30 297-65550Fax ++49 (0)30 297-65560Mail: [email protected]

© Copyright 2015 DB Station&Service AG, I.SBP: Any duplication of the StationGreen concept or elements thereof as presented in this document requires the approval of DB Station&Service AG.

StationGreen