121120 Pcp Gunung Rosa Mine q4 2012
Transcript of 121120 Pcp Gunung Rosa Mine q4 2012
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
1/36
Gunung Rosa Mine Q4 2012
An Indonesian gold mine that can bereopened immediately
ASX - PCP
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
2/36
Important Notice and Disclaimer
Paramount Mining Corporation Limited has prepared this presentation based on information available to it. No representation or
warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and
conclusions contained in this presentation.All dollar terms expressed in this presentation are in Australian dollars unless otherwise stated.
To the maximum extent permitted by law, none of Paramount Mining Corporation Limited, its directors, employees or agents,
advisers, nor any other person accepts any liability, including, without limitation, any liability arising from fault or negligence on the
part of any of them or any other person, for any loss arising from the use of this presentation or its contents or otherwise arising in
connection with it.
This presentation is not an offer, invitation, solicitation or other recommendation with respect to the subscription for, purchase or sale
of any security, and neither this presentation nor anything in it shall form the basis of any contract or commitment whatsoever. This
presentation may contain forward looking statements that are subject to risk factors associated with gold exploration, mining and
production businesses. It is believed that the expectations reflected in these statements are reasonable but they may be affected bya variety of variables and changes in underlying assumptions which could cause actual results or trends to differ materially, including
but not limited to price fluctuations, actual demand, currency fluctuations, drilling and production results, reserve estimations, loss of
market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory changes, economic and financial
market conditions in various countries and regions, political risks, project delay or advancement, approvals and cost estimates.
The information in this presentation that relates to exploration and production targets refers to targets that are conceptual in nature,
where there has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the
determination of a Mineral Resource.
Terry Holohan is a Member of the Institute of Materials, Minerals and Mining (UK) and is a Chartered Engineer with the Engineering
Council (UK) as well a full time employee of Paramount and thus acts as their internal Competent Person.
He has sufficient experience and knowledge relevant to an acquisition of this type as well as understanding the geology in the region
and the engineering requirements for the development of such a mine under consideration . This knowledge and experience qualifies
him as a Competent Person as defined in the December 2004 edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves (the JORC Code). This presentation is based upon field inspection of the Gunung Rosa
Project area, West Java, including the drill core and results during 2011/12 along with input from his associates who have worked on
the property. All of the significant information reported herein was available to Mr Holohan and was reviewed by him for this
presentation.
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
3/36
The Company ASX: PCP
Capitalisation (at 26 October 2012)
Share price 8c Issued shares ~318m
Unlisted options 24m
Convertibles AUD 5.15m @ 4c (~130 million shares)
Market Capitalisation ~AUD 25m
52 week high/low 8.1c/3.7c
Shareholders Share Price Graph
Top 20: 88%
Substantial shareholders
Resource Global Finance Ltd 16%
Zurily Resources 16%
J P Morgan Nominees 13%
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
4/36
The People - Board and Management
Mohammed (Mo) Munshi, Non-executive Chairman: Geologist with Mining Engineering background and Businessmanwith >30 years of experience in finding, funding and developing mineral resource properties. Previously with AshantiGoldfields, J CI, Normandy Mining and Ivanhoe Mines has worked extensively in Asia, Australia, Africa and SouthAmericaTerry Holohan, CEO & MD: Metallurgist and Chartered Engineer with >30 years of experience in exploring, developingand operating mineral resources with specialist experience in precious and base metals. Previously with Anglo American,
Gencor, Golden Dumps, BHP Billiton, Ivanplats and Platmin has worked extensively in Africa, Australia and Asia. Overthe last ten years he has acted as a Competent Person on the TSX, ASX, AIM, and J SE bourses.Garry Taylor, CFO & Co. Sec: A Certified Practising Accountant with >30 years of experience in financial management,risk management, corporate governance and strategy implementation in publicly-listed resource companies. Previouslywith Mitsui & Co where he managed an international trading desk on steel products and has worked extensively inAustralia and AsiaNeil Rutherford, Head of Geology: Geologist with >35 years of experience in mineral exploration, project managementand evaluation with specialist experience in base metals. A recognised industry consultant and lecturer in a range of
mineral commodities has worked extensively in Australia, Asia (including Turkey) and Africa.Over the last fifteen yearshe has acted as a Competent Person on the ASX bourse
Mufti Habriansyah, Non-executive Director: Resources and commercial lawyer with >15 years of experience innatural resources and corporate law in Indonesia. P reviously a partner with S&T (Freehills) has advised to large miningcorporations such as BHPB and PT Antam
Guy Anderson, Non-executive Director: Chemical Engineer, Chartered Accountant and Stockbroker with >30 years ofexperience in the resources industry. Previously with PWC, J ames Capel, CIBC WM and Ivanplats has worked primarilyin Europe and Africa.
John Arbuckle, Non-executive Director: Accountant and corporate advisor with >20 years of experience in theminerals resources industry. Previously with Mount Gibson, Perilya, Rio Tinto, North Limited and Anaconda nickel hisexperience is predominantly in Australasia
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
5/36
The Asset - 125km from capital city Jakarta
GUNUNG ROSAPROJECT
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
6/36
The Asset - Gunung Rosa Mine
Purchasing 85% shares in PT CKP (72.25% attributable to PCP) containingthe Gunung Rosa asset:
Mining License (IUP) valid for 20 years from 2010
Inferred Mineral Resource of 634koz of Au over 900m of 2.5km strike down to 250m still open on all sides
10-20m vein on surface could be accessed by open pit mining
600kg bulk underground sample collected measuring 11.4gpt Au
Aeromagnetic Program and follow-up geochemistry confirmed presence of manysignificant geological targets including several parallel veins at surface
Original local shareholders will retain 15% shares represented, asCommissioner of PT CKP, by prominent captain of Indonesian Mining IndustryDr Ir Rozik Soetjipto
President and COO of PT Freeport, Indonesia
Previously State Minister of Public Works and Director General of Mines
Not positioned in any Forestry or National Parks areas
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
7/36
Recent Highlights
Resource extended to 634koz Au (358koz) over 900m of strike
Inferred 3Mt at 6.8 gpt Au for 634koz Au at 1.5gpt cut-off
By-products of 1Moz Ag, 59kt Zinc, 13kt Lead and 8kt Copper
Metallurgical Gold recovery presently 86%
Base Case EBITDA of ~USD 1k/ounce
AMDAL/EIA study being initiated
Exploration confirmed strike 2.5km and located several veins parallel
to main vein with exciting geochemistry values
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
8/36
The Asset A Brownfields Project
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
9/36
The Asset - Metal in the Ground
Above 900m RL at 3 gpt cut-off ~ Century
Grade at 11.73 gpt Au1 drilling supported by underground sampling
Bulk metallurgical sampling at 11.4 gpt Au in Level 1
Lower levels flooded to be drained shortly
Below 900m RL at 1.5 gpt Au cut-off ~ PCP
Grade at 5.5 gpt Au2 not supported by underground sampling
Historically Dutch and J apanese miners recovered ~20koz of gold at
>15gpt Au
Alteration mineralogy in drill holes and Aeromag indicates the
potential for a porphyry system source for precious and base metals
1 The portion of the Mineral Resource and Reserves estimated by Century is appended as Appendix I
2 The PCP Mineral Resource is appended as Appendix II
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
10/36
Historic Mineral Resource and Reserve1
Cut-off 3gpt Au Tonnes Au g/t Au oz Zn % Zn t Measured Resource 125,470 12.77 51,514 3.33 4,178Indicated Resource 302,878 13.59 132,336 2.99 9,056Inferred Resource 371,000 14.67 174,983 3.71 13,764Total 799,348 13.96 358,832 3.38 26,998
Cut-off 3gpt Au Tonnes Au g/t (cut) Au oz Zn % Zn t Proved Ore Reserves 142,000 11.20 51,133 3.31 4,700Probable Ore Reserves 258,000 11.52 95,557 2.88 7,430Total 400,000 11.41 146,690 3.03 12,130
Century based this on 34 intersecting drill-holes: the metal grade of this resource wassignificantly boosted by over 2,500 channel samples from the underground development
despite a top-cut at 50gpt Au.
1 For more information see Companys ASX announcement of 08 September 2011
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
11/36
Combined Century and Paramount Resource
Conservative mining cuts have been used with 0.5m dilution either side for competent rockand 1m either side for less-competent rock as well as a minimum mining width of 2m:further engineering studies will determine the optimal mining parameters
Cut-off Tonnes Augpt
Auoz
Agoz
Znt
Pbt
Cut
1.5gpt Au 2,992,710 6.8 633,900 1,045,220 59,488 13,020 8,230
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
12/36
The Asset Progress on Metallurgical Test-work
The preliminary saleable product metallurgical recoveries on bulk sample as
determined by Rob Burger of SGS Perth are:
Gold ~86% - from preliminary sighter tests
82% of the gold recovered by CIL;
Further 4% of the gold recovered in the base metal concentrates
Base Metals and Silver into Concentrates
~96% of the Zinc
~87% of the Lead
~92% of the Copper
~94% of the Silver
Now focussing on optimising these recoveries, including alternative unitoperations, however expect Indonesian-standard CIL/flotation circuit for this typeof ore
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
13/36
The Asset - The 2012 Development Plan
Complete metallurgical optimisation test-work, to improve on present
Gold recoveries of 86% (target >90%), and alter plant design
accordingly
Pre-Development Engineering:
Initiate AMDAL
Investigate open-pit options on surface veins of 10-20m thick
Revise Base Case engineering study scope
Purchase both surface rights (63ha) and long lead items
Drain the mine fully and resample drives
Enter into refining agreement with Indonesian entities to treat products
from late 2014
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
14/36
The Asset - Plant hasadequate space forexpansion
Cap PaluPortal
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
15/36
The Asset 2013 Mine Development
Re-open sub-level adits to drain mine tostart refurbishment of development
drives and shafts
Start open pit mining if feasible
Start cut and fill underground panel
development with hand-held drills,
focusing on the high grade material
initially
Start stoping when development
advanced a la Way Linggo!
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
16/36
Start mining in Q2 2013
Within ~20 months (Q3 2014) mine at a rate of 30-35koz of Au per annum(>100ktpa run-of-mine) from existing development drives;
expected cash-cost of 900m RL)
First metal pour Q4 2014 (~18 months plant construction)
Expand mining during 2015 increase production to 40-50koz per annum during 2015-16
Post 2016 expand into optimal size as identified by Exploration
The Asset Base Case without Open Pit Acceleration
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
17/36
Key:1 - AGM approve purchase of WL 2 - KRM buys WL 3 - Mine development starts/Plant ordered 4 -Forestry Permit Received 5 - 15k tons of ROM (8 months of mining) 6 - Plant commissioning starts 7 - firstgold poured (17mths from plant ordered) 8 - Producing at 20koz Au per annum rate (20 months of mining) 9 -Producing at 40koz Au per annum rate (24 months of mining - plateaud)
1 2 3 4 5 6 7
Paramount
8 9
The Asset Position on the Enterprise Value Curve
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
18/36
The Asset - Target Posit ion on Cost Curve
Gunung Rosa - Should be in First Quartile!
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
19/36
The Company Juniors best leverage on gold price
Kingsrose1
(Way Linggo)Medusa1
(Co-O)PCP
(G Rosa)
Total Au Resources (koz) 486 3,119 634
Total Au Reserves (koz) - 568 1472
Enterprise Value (AUD mill ion) 290 1,070 30
EV/Resource oz (AUD/oz)(Attributable)
701 343 65*
1 Annual Reports of J une 2012
2 Original Reserve ex Century in Appendix III
* Significant further upside available when considering the recentlyidentif ied mineralisation
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
20/36
Use of Proceeds estimate for Pre-Development of AU$ 3 million:
Geology and Mine Survey AU$ 1 million
Met Work, Mine Design, Engineering Study and Amdal AU$ 1 million
G&A (including Land Acquisition applications) AU$ 1 million
Total AU$ 3 mil lion*
*of which AU$1.5 million raised on 19 October 2012 through an issue at 7 cents per share
The Company Equity Raising Q4 2012
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
21/36
Contacts
Mo Munshi
+86 139 1017 5192 (M)[email protected]
Terry Holohan Garry Taylor
+65 9230 7751 (M) +65 9665 5840 (M)
[email protected] [email protected]
Operations Office Corporate Office
6 Temasek Boulevard 100 Parry St
25-03 Suntec Tower 4 Perth, WA
Singapore, 038986 Australia, 6000
+65 6884 9423 (O) +61 8 9328 5600 (O)
Website Information
www.paramountmining.com [email protected]
mailto:[email protected]:[email protected]:[email protected]://www.paramountmining.com/mailto:[email protected]:[email protected]://www.paramountmining.com/mailto:[email protected]:[email protected]:[email protected] -
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
22/36
Appendix
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
23/36
The People Commissioners and Directors of PT CKP
Mohammed (Mo) MunshiChairman Commissioner Mufti Habriansyah
President Director
Terry Holohan
Director
Dr Ir Rozik Soetjipto
Commissioner
COO/Director, PT Freeport Indonesia
Donny Padmanagara
Commissioner
Ir Prianda Raspati
DirectorJasir Karwita
Commissioner
Police General (Ret)
Ir Koswara Sasmitapura
Commissioner
Head of Resources, PT Antam (Ret)
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
24/36
The Asset on Indonesian Sunda-Banda Volcanic Arc
GUNUNG
ROSA
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
25/36
The Asset Schematic Model of the Magmatic Arc
Gunung Rosa position- Mesothermal!
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
26/36
Outcrop of intrusive breccia in
porphyritic intrusive
Pebble dyke cutting porphyritic intrusive. The
pebble dyke and hydrothermal breccias precedethe mineralisation event
Hydrothermal breccia in massive porphyritic
diorite typical host to mineralised veins
Narrow mineralised quartz-sphalerite-pyrite
veins cutting altered hydrothermally altered
breccia in massive porphyritic diorite
The Asset Host Intrusive Rocks and Breccias
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
27/36
Banded quartz-sphalerite-pyrite-clay vein Massive quartz-chalcopyrite-pyrite vein
High grade sphalerite-galena-chalcopyrite-pyrite
vein intersection - generally with high Au-grades
Multiple events are shown by distinct
colour changes to sphalerite
sphal
gn
py-cpy
The Asset Sulphide Vein Ores
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
28/36
The Asset Century Block Model for 198/358koz Auabove 900m RL
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
29/36
The Asset PCP Resource of 436koz Au from 900m RL
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
30/36
The Asset Isopacs show High Grade Areas
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
31/36
Blue Sky - The Future
The Aeromagnetic program of
April 2012:
6 major target centres discovered
within the IUP under soil cover
Supports the interpretation that thecluster of veins are part of a
porphyry related mesothermal
system
Could indicate the potential for
discovery of a Au-Cu porphyry
system at depth
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
32/36
Blue Sky 8 Outcrop Veins Sampled within Target 2
Vein 3: Leugok Haji 600meast several collapsed
adits along the vein
Structure 6: Nagrak1.2km east floats and
outcrops
Qtz-Py-Cpy-Sphal-Gnwith associated clay
alteration
Highly oxidised, gossanoushydrothermal Breccia
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
33/36
Blue Sky - Geochemistry
Cluster of parallel veins showingsignificant anomalous values of
gold, silver and base metals
Ground magnetics program being
undertaken east-west to cross vein
strike
Target 2 area incorporating main
vein clusters east of Gunung Rosa
Vein to be soil sampled at 100m x
50m spaced intervals
Blue Sky Ground
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
34/36
RTP Ground Magnetics over maintarget areas - 100 m line spacingshowing veins and old workings.
Test area of 25m detail at Cap Paluillustrated below showing drill holemagnetic response in relation toground survey. Target 2 area to bedetailed at 25 m line spacing.
Blue Sky GroundMagnetics
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
35/36
RTP Ground Magneticimage draped overtopography showing maintarget veins and oldworkings - 100 m linespacing.
Test area of 25m detail atCap Palu Mine site shown
Blue Sky GroundMagnetics
-
7/28/2019 121120 Pcp Gunung Rosa Mine q4 2012
36/36
Historic Gold Price & Project History
Paramount open discussions with PT CKP
Key:1 PT Antam drill 4 holes 2 PT Antam form J V with PT CKP 3 Century Metals contracted as Technical Partner andspend USD10m; drill 60 holes, develop 2 x vertical shafts, 1 x decline and 2.5km of drives, positive engineering study, receiveMining License 4 PT Antam publish internal positive DFS work stops due to lack of finance 5 Delta Gold and ChaseManhattan contracted as Technical Partner Snowden Group carries out positive Technical Review 6 BreX scandal andAsian Financial Crisis 7 PT Antam cede their Shares to PT CKP 8 Paramount open discussions with PT CKP
1 2 3 4 5 6 7 8