11929 Gibdock Brochure AW.qxd:Layout 1 27/7/12 11:49 … · 11929 Gibdock Brochure_AW.qxd:Layout 1...

8

Transcript of 11929 Gibdock Brochure AW.qxd:Layout 1 27/7/12 11:49 … · 11929 Gibdock Brochure_AW.qxd:Layout 1...

11929 Gibdock Brochure_AW.qxd:Layout 1 27/7/12 11:49 Page 1

11929 Gibdock Brochure_AW.qxd:Layout 1 27/7/12 11:49 Page 2

Gibdock has a long-standing reputation for providing thehighest standard in shipyard services in one of the mostconvenient locations in Europe. Situated in the Strait ofGibraltar at the gateway between the Mediterraneanand the Atlantic, Gibdock offers comprehensive repair,maintenance and conversion in its three dry docks andprotected deepwater port.

With customer service and confidence in mind, the teamat Gibdock is united by a shared professional spirit. Everyaspect of the shipyard, from training to individual technicalskills, quality control and safety is operated to meet thehighest international standards including:OHSAS18001:2007, ISO14001:2004 and ISO9001:2008.

PROFESSIONALSPIRIT

OUR COMMERCIAL SHIPREPAIR AND CONVERSIONSERVICES INCLUDE

STEELPIPEPAINTING AND BLASTINGMECHANICAL AND MAIN ENGINETAIL ENDELECTRICAL

11929 Gibdock Brochure_AW.qxd:Layout 1 27/7/12 11:51 Page 3

SPAIN

FRANCE

AFRICA

MEDITERRANEAN SEA

11929 Gibdock Brochure_AW.qxd:Layout 1 27/7/12 11:51 Page 4

DOCK2

DOCK3

5

6

DOCK1

7

8

10

11

9

THE PILLARSOF HERCULES

As one of the fabled Pillars of Hercules, Gibraltar guardsthe entrance to the Mediterranean, making it the perfectlocation for shipyard services. At the crossroads ofMediterranean and Atlantic shipping lanes Gibdock offersminimal deviation to ships working these waters.

The isthmus of Gibraltar is globally connected. It has itsown airport; Jerez, Malaga and Seville are within strikingdistance; while Madrid is less than an hour away by plane.

Hot summers and mild winters create a year round dryclimate that is ideal for outdoor ship-work, especially withtoday’s advanced paint systems.

11929 Gibdock Brochure_AW_8pp.qxd:Layout 1 27/7/12 11:54 Page 2

DOCK2

DOCK3

5

6

DOCK1

7

8

10

11

9

THE PILLARSOF HERCULES

As one of the fabled Pillars of Hercules, Gibraltar guardsthe entrance to the Mediterranean, making it the perfectlocation for shipyard services. At the crossroads ofMediterranean and Atlantic shipping lanes Gibdock offersminimal deviation to ships working these waters.

The isthmus of Gibraltar is globally connected. It has itsown airport; Jerez, Malaga and Seville are within strikingdistance; while Madrid is less than an hour away by plane.

Hot summers and mild winters create a year round dryclimate that is ideal for outdoor ship-work, especially withtoday’s advanced paint systems.

11929 Gibdock Brochure_AW_8pp.qxd:Layout 1 27/7/12 11:54 Page 2

DOCK2

DOCK3

5

6

DOCK1

7

8

10

11

9

THE PILLARSOF HERCULES

As one of the fabled Pillars of Hercules, Gibraltar guardsthe entrance to the Mediterranean, making it the perfectlocation for shipyard services. At the crossroads ofMediterranean and Atlantic shipping lanes Gibdock offersminimal deviation to ships working these waters.

The isthmus of Gibraltar is globally connected. It has itsown airport; Jerez, Malaga and Seville are within strikingdistance; while Madrid is less than an hour away by plane.

Hot summers and mild winters create a year round dryclimate that is ideal for outdoor ship-work, especially withtoday’s advanced paint systems.

11929 Gibdock Brochure_AW_8pp.qxd:Layout 1 27/7/12 11:54 Page 2

YARDFACTS

DRYDOCK 1272M x 38M x 10M

SERVED BY TWO 45AND ONE 8 TONNE CRANE

DRYDOCK 2184M x 29M x 11M

SERVED BY TWO 15 TONNE CRANE

DRYDOCK 3154M x 29M x 11M

RETRACTABLE COVER WITH 29.5M

AIR DRAUGHT OVER 2M DOCK BLOCKS 29M

CLEARANCE. SERVED BY TWO10 TONNE CRANES

MAIN WHARF300M x 9.5M

SOUTH MOLE435M x 11M

LOCATION CRANE NO CAPACITY RADIUS (M) HEIGHTOF LIFT (M)

DOCK 1 9 & 11 10 45 30-10 3017-10

25 40 3030 35 3037 30 3045 26 3045 14 30

10 3 40 304.27 30 308 17.30 308 2.60 30

DOCK 2 7 & 8 7.5 FAST ANY 2515 SLOW RADIUS UP

TO 27

DOCK 3 5 & 6 10 22 2010 9 20

MAIN 1 & 2 3 40 40WHARF 4.27 30 40

8 17.30 408 2.60 40

SOUTH 12 3 40 40MOLE 4.27 30 40

8 17.30 408 2.60 40

CRANE DETAILS

DOCK NO 1 NO 2 NO 3

LENGTHCAISSON 260M 172M 141M

IN INNERSTOP

CAISSON 272M 184M 154M

IN OUTERSTOP

DOCK 38M 29M 29M

BREADTH

DRAUGHT 10M 11M 11M

OVERBLOCK ATMLWS

DOCK DIMENSIONS

12

M A I N W H A R F

S O U T H M O L E

DOCK1

DOCK2

DOCK3

5

7

8

10

11

12

9

6

M A I NW

H A R F

S O U T H M O L E

MAINWORKSHOP

MAINENTRANCE

1

2

5

6

7

8

9 10

11

12

DOCK 3

DOCK 2

DOCK 1

11929 Gibdock Brochure_AW_8pp.qxd:Layout 1 27/7/12 11:54 Page 1

DOCK2

DOCK3

5

6

DOCK1

7

8

10

11

9

THE PILLARSOF HERCULES

As one of the fabled Pillars of Hercules, Gibraltar guardsthe entrance to the Mediterranean, making it the perfectlocation for shipyard services. At the crossroads ofMediterranean and Atlantic shipping lanes Gibdock offersminimal deviation to ships working these waters.

The isthmus of Gibraltar is globally connected. It has itsown airport; Jerez, Malaga and Seville are within strikingdistance; while Madrid is less than an hour away by plane.

Hot summers and mild winters create a year round dryclimate that is ideal for outdoor ship-work, especially withtoday’s advanced paint systems.

11929 Gibdock Brochure_AW_8pp.qxd:Layout 1 27/7/12 11:54 Page 2

THE RIGHTPEOPLETHE RIGHTTEAM

To handle a diverse range of projects professionally youneed the right people and the right team. From projectmanagers to craftsmen, our experienced specialists atGibdock bring all the necessary skills to the yard whilebeing bonded by a common goal – performance, efficiencyand client confidence.

In the knowledge that our strength rests in our peoplewe run an internal skills training programme that ensuresthe team is able to deliver to the highest standards whilegiving individuals the chance for advancement withinthe organisation.

From initial project planning through to its execution andon-time completion our aim at Gibdock is to deliver athoroughly professional and friendly experience.

11929 Gibdock Brochure_AW.qxd:Layout 1 27/7/12 11:51 Page 13

Gibdock’s commitment to professionalism and safetyis certified by the standards we maintain in every areaof the yard. Our independently audited and approvedmanagement system sets out a strict code of qualityfor personnel and processes. At the same time weare proud of our accreditations from Lloyds Register:

OHSAS18001:2007 which certifies the proficiency ofour Occupational Health and Safety Management Systems.ISO14001:2004 which certifies our EnvironmentalManagement System and confirms our commitment tosafeguarding our environment.ISO9001:2008 which certifies our Quality ManagementSystem to the highest standards for the repair of vessels indry dock up to 75000 tonnes deadweight and up to 30000tonnes deadweight at repair berth afloat. Construction,repair/maintenance and facilities for metal structures and pipesystems for Oil and Gas Offshore installations and vessels.ISPS which certifies our commitment to enhancingdockyard and ship security in accordance with theInternational Ship and Port Facility Security Code.

MARKS OFAPPROVAL

ISPSCODEPORTID NO.21752

11929 Gibdock Brochure_AW.qxd:Layout 1 30/7/12 14:34 Page 14 11929 Gibdock Brochure_AW.qxd:Layout 1 27/7/12 11:49 Page 15

GIBDOCKMAIN WHARF ROADTHE DOCKYARDGIBRALTAR

TELEPHONE+350 200 59400

FAX+350 200 44404

[email protected]

WEBWWW.GIBDOCK.COM

SPAIN

FRANCE

AFRICA

MEDITERRANEAN SEA

11929 Gibdock Brochure_AW.qxd:Layout 1 27/7/12 11:49 Page 16