11-Busbar Protection Busbar Protection Rf

download 11-Busbar Protection Busbar Protection Rf

of 63

description

bus

Transcript of 11-Busbar Protection Busbar Protection Rf

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    1/63

    08/0205/02/031 1

    05/02/031

    Busbar Protection

    Protection & Contrle / Application

    Rev. A JM, September 2004

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    2/63

    08/0205/02/032 2

    Without Busbar Protection

    F2F1

    There are fewer faults on busbars than on other parts of the

    power system.

    No risk of dislocation of system due to accidental operation of

    busbar protection.

    Argues

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    3/63

    08/0205/02/033 3

    Without Busbar Protection

    F2F1

    Slow fault clearance.

    Busbar faults at F1 and F2 are cleared by remote time

    delayed protection on circuits feeding the faults:

    Time Delayed Overcurrent or

    Time Delayed Distance Protection

    Drawbacks

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    4/6308/0205/02/034 4

    With Busbar Protection

    BUSBARZONE

    F1

    Fast clearance by breakers at the busbars

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    5/6308/0205/02/035 5

    With Busbar Protection

    BUSBARZONE

    F2F1

    Where busbars are sectionalised,

    Protection can limit the amount of systemdisruption for a busbar fault

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    6/6308/0205/02/036 6

    21 21

    87BB

    87BB

    1/2

    With Busbar Protection

    SS1

    SS2

    SS3

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    7/6308/0205/02/037 7

    21 21

    87BB

    87BB

    2/2

    With Busbar Protection

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    8/6308/0205/02/038 8

    21 21 21

    21 21

    1/2

    With NoBusbar Protection

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    9/6308/0205/02/039 9

    21 21

    2/2

    21

    21 21

    With NoBusbar Protection

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    10/6308/0205/02/0310 10

    21 21 21

    21 21

    21 21

    87BB

    87BB

    With Busbar protection

    With NoBusbar protection

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    11/6308/0205/02/0311 11

    Busbar Faults Are Usually Permanent

    Causes of Busbar Faults :

    Falling debris

    Insulation failures

    Circuit breaker failures

    Current transformer failures Isolators switchs operated on load or outside their ratings

    Safety earths left connected

    Therefore :

    Circuit breakers should be tripped and locked out by busbar

    protection

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    12/6308/0205/02/0312 12

    Busbar Protection must be :

    RELIABLE

    Failure to trip could cause widespread damage to the substation

    STABLE

    False tripping can cause widespread interruption of supplies to

    customers / possible power system instability

    DISCRIMINATING

    Should trip the minimum number of breakers to clear the fault

    FAST

    To limit damage and possible power system instability

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    13/6308/0205/02/0313 13

    Methods of Providing Busbar Protection

    Frame to Earth (Leakage) Protection

    Blocking Scheme Protection

    Differential Protection : High Impedance

    Low Impedance

    Insulation

    >I

    >I >I >I >I>I

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    14/63

    08/0205/02/0314 1405/02/0314

    Frame Leakage Protection

    Protection & Contrle / Application

    Rev. A JM, September 2004

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    15/63

    08/0205/02/0315 15

    Insulation

    >I

    Frame Leakage Busbar Protection

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    16/63

    08/0205/02/0316 16

    >I

    Frame Leakage Busbar Protection

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    17/63

    08/0205/02/0317 17

    >I

    Frame Leakage Busbar Protection

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    18/63

    08/0205/02/0318 18

    >I

    Frame Leakage Busbar Protection

    >I

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    19/63

    08/0205/02/0319 19

    Can detect only earth faults

    Switchgear must be insulated from earth (by standing onconcrete plinth)

    Only one single earth conductor allowed on switchgear

    All cable glands must be insulated

    Switchgear sections must be insulated

    Frame Leakage Busbar Protection

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    20/63

    08/0205/02/0320 20

    >I

    >I

    Frame Leakage Busbar Protection

    Neutral Check

    False Operationbecause inducedloop

    No operationprevents from

    false trip

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    21/63

    08/0205/02/0321 21

    >I

    >I

    Frame Leakage Busbar Protection

    Neutral Check

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    22/63

    08/0205/02/0322 22

    >I

    >I

    Neutral Check

    Frame Leakage Busbar Protection

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    23/63

    08/0205/02/0323 2305/02/0323

    Blocking Scheme Protection

    Protection & Contrle / Application

    Rev. A JM, September 2004

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    24/63

    08/0205/02/0324 24

    >I >I >I >I>I

    Blocking Scheme Busbar Protection

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    25/63

    08/0205/02/0325 25

    >I >I >I >I>I

    Blocking Scheme Busbar Protection

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    26/63

    08/0205/02/0326 26

    >I >I >I >I>I

    Blocking Scheme Busbar Protection

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    27/63

    08/0205/02/0327 2705/02/0327

    High Impedance Protection

    Protection & Contrle / Application

    Rev. A JM, September 2004

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    28/63

    08/0205/02/0328 2808/0205/02/0328

    Single Bus Substation

    Single Bus Substation

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    29/63

    08/0205/02/0329 29

    P1

    P2

    S1

    S2

    P1

    P2

    S1

    S2

    P1

    P2

    S1

    S2

    Single Bus Substation

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    30/63

    08/0205/02/0330 30

    Single Bus Substation

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    31/63

    08/0205/02/0331 31

    Single Bus Substation

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    32/63

    08/0205/02/0332 32

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    33/63

    08/0205/02/0333 3308/0205/02/0333

    Double Bus Substation

    Isolator Auxiliary Switches

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    34/63

    08/0205/02/0334 34

    yCurrent switching

    Bus A

    Bus B

    ab

    Current

    P1

    P2

    S1

    S2

    P1

    P2

    S1

    S2

    P1

    P2

    S1

    S2

    P1

    P2

    S1

    S2

    P1

    P2

    S1

    S2

    Isolator Auxiliary Switches

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    35/63

    08/0205/02/0335 35

    yCurrent switching

    Bus A

    Bus B

    ab

    Current

    Isolator Auxiliary Switches

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    36/63

    08/0205/02/0336 36

    yCurrent switching

    Bus A

    Bus B

    ab

    Current

    Isolator Auxiliary Switches

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    37/63

    08/0205/02/0337 37

    Current switching

    Bus A

    Bus B

    ab

    Current

    Isolator Auxiliary Switches

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    38/63

    08/0205/02/0338 38

    Current switching

    Bus A

    Bus B

    ab

    Current

    Isolator Auxiliary Switches

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    39/63

    08/0205/02/0339 39

    Current switching

    Bus A

    Bus B

    ab

    Current

    Isolator Auxiliary Switches

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    40/63

    08/0205/02/03

    40 40

    Bus A

    Current

    Bus B

    ab

    Tripping switching

    Tripping ab

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    41/63

    08/0205/02/03

    41 41

    Main CT must be identical

    Current switching via auxilliary relay is not acceptable.

    Requirement of number of position contact (Disconnectorswitch) is high

    Interposing CT are not acceptable

    Isolator Auxiliary SwitchesC t it hi

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    42/63

    08/0205/02/03

    42 42

    Current switching

    Bus A

    Bus B

    abCurrent

    Isolator Auxiliary SwitchesC t it hi

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    43/63

    08/0205/02/0343 43

    Current switching

    Bus A

    Bus B

    abCurrent

    Bus A

    Bus B

    abCurrent

    Isolator Auxiliary SwitchesO L d T f

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    44/63

    08/0205/02/0344 44

    Bus A

    Bus B

    a

    bCurrent

    On Load Transfer

    Isolator Auxiliary SwitchesOn Load Transfer

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    45/63

    08/0205/02/0345 45

    Bus A

    Bus B

    abCurrent

    On Load Transfer

    Isolator Auxiliary SwitchesOn Load Transfer

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    46/63

    08/0205/02/0346 46

    Bus A

    Bus B

    abCurrent

    On Load Transfer

    Isolator Auxiliary SwitchesOn Load Transfer

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    47/63

    08/0205/02/0347 47

    Bus A

    Bus B

    abCurrent

    On Load Transfer

    Isolator Auxiliary SwitchesOn Load Transfer

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    48/63

    08/0205/02/0348 48

    Bus A

    Bus B

    ab

    Current

    On Load Transfer

    Isolator Auxiliary SwitchesOn Load Transfer

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    49/63

    08/0205/02/0349 49

    Bus A

    Bus B

    abCurrent

    On Load Transfer

    Isolator Auxiliary SwitchesOn Load Transfer

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    50/63

    08/0205/02/0350 50

    Bus A

    Bus B

    abCurrent

    On Load Transfer

    Isolator Auxiliary SwitchesCheck Zone

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    51/63

    08/0205/02/0351 51

    Bus A

    Bus B

    TripBusA

    TripBusB

    Zone A

    Zone B

    Check Zone

    Isolator Auxiliary SwitchesCheck Zone

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    52/63

    08/0205/02/0352 52

    Bus A

    Bus B

    TripBusA

    TripBusB

    Zone A

    Zone B

    Check Zone

    Current

    switching

    failure

    False

    Tripping

    Isolator Auxiliary SwitchesCheck Zone

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    53/63

    08/0205/02/0353 53

    Bus A

    Bus B

    TripBusA

    TripBusB

    Check

    Zone

    Zone A

    Zone B

    Check Zone

    Isolator Auxiliary SwitchesCheck Zone

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    54/63

    08/0205/02/0354 54

    Bus A

    Bus B

    TripBusA

    TripBusB

    Zone A

    Zone B

    Check Zone

    Isolator Auxiliary SwitchesCheck Zone

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    55/63

    08/0205/02/0355 55

    Bus A

    Bus B

    TripBusA

    TripBusB

    Check

    Zone

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    56/63

    08/0205/02/0356 5608/0205/02/0356

    One Breaker and a HalfSubstation

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    57/63

    08/0205/02/0357 57

    Bus A Bus

    B

    P1

    P2

    S1

    S2

    P1

    S1

    P2

    S2

    P1P2

    S1S2

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    58/63

    08/0205/02/0358 58

    Bus A Bus

    B

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    59/63

    08/0205/02/0359 59

    Bus A Bus

    B

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    60/63

    08/0205/02/0360 60

    Bus A Bus

    B

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    61/63

    08/0205/02/0361 61

    Bus A Bus

    B

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    62/63

    08/0205/02/0362 62

    Bus A Bus

    B

  • 5/26/2018 11-Busbar Protection Busbar Protection Rf

    63/63

    08/0205/02/0363 63

    Bus A Bus

    B

    P1

    S1

    P2

    S2

    P1

    S1

    P2

    S2

    P1

    S1

    P2

    S2

    P1

    S1

    P2

    S2