11-29-04-1 Distribution Statement A. Approved for public release: distribution is unlimited....

28
11-29-04- 1 Distribution Statement A. Approved for public release: distribution is unlimited. 11-29-04 F-35 JSF F-35 JSF Global Global Sustainment Sustainment Luke Gill, VP LM Aero 29 November 2004 29 November 2004 Distribution Statement A. Approved for public release: distribution is unlimited Copyright 2004 by Lockheed Martin Corporation. CURRENCY NOTICE: A hard copy of this document may not be the document currently in effect. The current version is always the version in the Lockheed Martin Network.

Transcript of 11-29-04-1 Distribution Statement A. Approved for public release: distribution is unlimited....

11-29-04-1Distribution Statement A. Approved for public release: distribution is unlimited.11-29-04 - 1

F-35 JSF F-35 JSF Global SustainmentGlobal Sustainment

Luke Gill, VPLM Aero

29 November 200429 November 2004

Distribution Statement A. Approved for public release: distribution is unlimited

Copyright 2004 by Lockheed Martin Corporation.

CURRENCY NOTICE: A hard copy of this document may not be the document currently in effect. The current version is always the version in the Lockheed Martin Network.

11-29-04-2Distribution Statement A. Approved for public release: distribution is unlimited.

11-29-04-3Distribution Statement A. Approved for public release: distribution is unlimited.

JSF VISION

LM JSF Team Program Information

DELIVER AND SUSTAIN THE MOST ADVANCED, AFFORDABLE

STRIKE FIGHTER AIRCRAFT TO PROTECT

FUTURE GENERATIONS WORLDWIDE.

11-29-04-4Distribution Statement A. Approved for public release: distribution is unlimited.

What is JSF ?

CTOLCTOL(USAF)(USAF)

STOVLSTOVL(USMC and UK)(USMC and UK)

CVCV(USN)(USN)

F-35AF-35A F-35BF-35B F-35CF-35C

11-29-04-5Distribution Statement A. Approved for public release: distribution is unlimited.

What Is JSF?

Lethal Survivable Supportable Affordable

The Family of Next Generation Strike Fighters

F-16 / F/A-18 “Like” Aerodynamic Performance

Increased Range with Internal Fuel and Weapons

Avionics and Data Links

Stealth Signature and Advanced Countermeasures

Less Support, Smaller Footprint

World’s First Stealthy, Supersonic, STOVL Strike Fighter

The Family of Next Generation Strike Fighters

F-16 / F/A-18 “Like” Aerodynamic Performance

Increased Range with Internal Fuel and Weapons

Avionics and Data Links

Stealth Signature and Advanced Countermeasures

Less Support, Smaller Footprint

World’s First Stealthy, Supersonic, STOVL Strike Fighter

11-29-04-6Distribution Statement A. Approved for public release: distribution is unlimited.

Service Needs

USAF Multi-Role Fighter to Replace the F-16

and A-10 and to Complement the F/A-22

USN Multi-Role, Stealthy Strike Fighter to

Complement the F/A-18E/F

USMC Multi-Role, STOVL Strike Fighter to

Replace the AV-8B and F/A-18C/D

UK (RN and RAF) Supersonic STOVL Replacement for the

Sea Harrier and GR-7

2593 Aircraft Production Program of Record

11-29-04-7Distribution Statement A. Approved for public release: distribution is unlimited.

Commonality Drives Affordability – Cross Service and International

Supply Chain

TrainingMission Planning

Maintenance

AutonomicLogistics

ProgramJSF

One Affordable Solution

UK

US

NL

IT

TU

AS

CA

DK

NO

11-29-04-8Distribution Statement A. Approved for public release: distribution is unlimited.

CTOL

STOVL

CVF135 or F136F135 or F136

Engine Interchangeability…

Any Engine in Any Variant

11-29-04-9Distribution Statement A. Approved for public release: distribution is unlimited.

The Autonomic Logistics Concept

A Global Evolution In Fighter Sustainment

Optimized Supportability Decisions Agile / Scaleable Support Integrated Training ALIS-Integrated Infrastructure Partnering with Government and

Industry for Best Value

11-29-04-10Distribution Statement A. Approved for public release: distribution is unlimited.

430 Total JCS Requirements 100 are AutoLog-related

65 are owned by AutoLog 35 are R&M requirements allocated to AV design teams

N/A145 knotsN/AN/AMaximum Approach SpeedUSN

2 x 1K JDAM + 2 x AIM 120 + fuel

N/AN/A2 x 1K JDAM + 2 x AIM 120 + fuel

Vertical Lift Bring BackUSMC/UK

Secure Voice and Data ConnectivityInteroperabilityJoint98.5 (95)%98.6 (95)%98.5 (93)%99 (95) %Mission ReliabilityJoint

101 (<102) ST109 (<243) ST5.9 (<8) C-17s4.6 (<8) C-17sLogistics FootprintJoint

4.3 (3)4.4 (3)3.7 (3)6.5 (4)Sortie Generation (surge)Joint

450 nm600 nm590 nm450 nmCombat RadiusJoint

Very Low ObservableRadio Frequency SignatureJoint

UKUSNUSAFUSMCKey Performance ParameterOwner

Results in Integrated Sustainment

Assessed (Requirement)

AL is Prominent in KPPs and Requirements

All Values Reflect 240-3 – As of 8 March 2004

11-29-04-11Distribution Statement A. Approved for public release: distribution is unlimited.

JSF Autonomic Logistics System

Support System Sustaining Engineering

24/7 Help Desk Electronic Joint-Service Tech Data Intelligent Maintenance Management Global Supply Chain Insight Support Equipment Management

Training System Integrated Training Embedded Pilot Training On Demand

Maintenance Training Air Vehicle Software Reuse

Highly Supportable Aircraft Smart / Reliable Design Prognostics and Health Management Remove and Replace (R/R) Maintenance On Condition Maintenance

Autonomic Logistics Information System

Distributed Information System Enterprise Resource Solution Secure Scalable Deployable

Autonomic logistics targets O&S savings

11-29-04-12Distribution Statement A. Approved for public release: distribution is unlimited.

Unit LevelMaintenance

Suppliers and OEMs

Autonomic Logistics Information System

• Decision Support• Autonomic Process• Integration

Off Board PHM• Prognosis Models• Life Usage Algorithms• Failure Resolution Algorithms• Diagnostic Tools

Fleet Mngt Activities

Customer Support

Air Vehicle PHM• Enhanced diagnostics / BIT • Corroboration• Correlation• Information Fusion • Health Management Reports

MVI: PMAMVI: PMA

AV Data: AMDAV Data: AMD

PMD

Downlink

PMA

Prognostics Health Management

11-29-04-13Distribution Statement A. Approved for public release: distribution is unlimited.

CHARACTERISTICS High Reliability with Robust Prognostics,

Health, Management (PHM) PHM Provides Failure Prediction &

Estimated Remaining Life Ground Level Maintenance Quick Access Doors & Panels Self Sufficient – Integrated Power Package (IPP) Provides Ground Power & Cooling

BENEFITS PHM Reduces Troubleshooting

and Scheduled Maintenance 71% Reduction in Maintenance

Man Hours No LO Restoration for 99% of

Maintenance 25% Improvement in SGR 95% of LRCs are Single-Tiered

for R&R Reduced Log Footprint

APPROACH• Unit Level (On/Off Equipment) & Depot

• On Equipment – R/R and Servicing

• Aircraft Handling / Weapons Loading

• Off-Equipment

• Seat, Tire & Wheel, etc.

• OEM/ Organic Depot Repair of Repairables

• Three Maintenance Task Groups

Remove and Replace Aircraft Maintenance Concept

11-29-04-14Distribution Statement A. Approved for public release: distribution is unlimited.

Engine Maintenance Concept

Unit Level (On-Equipment Maintenance) Engine R&R within Maintenance Box Engine LRC R&R Lift Fan R&R Inspections/Servicing/Repair No High Power Engine Run Required No Sched JOAP RequirementsUnit Level (Off-Equipment Maintenance) Module R&R Repair in Place Hardware R&R

No I-Level Engine Shop Required:• No Test Cell or Uninstalled Engine Runs• Reduced Engine Spares• Reduced Manpower• Reduced SE• Reduced Training

NOZZLE

50

FAN MODULE

COREMODULE

3BSD

GEARBOX

11-29-04-15Distribution Statement A. Approved for public release: distribution is unlimited.

ALIS consists of the system, application and network infrastructures required to provide global integrated and autonomic support

– Single, Secure Information Environment

– Distributed Network Based on Web Technologies

– Capabilities Integrate Broad Range of Domains

• Operations

• Maintenance

• Supply Chain

• Customer Support Services

Autonomic Logistics Information System

• Training

• Tech Data

• External Interfaces

“Provide All Information To Support Operations and Maintenance at Any Basing Location”

Functionality Focused on Enhancing

Operations and Support

• Decision Support

• Autonomic Process Integration

Theater LevelImmediate Air Asset Allocation

Wing LevelMission Support Rqmts

Squadron LevelMaintenance & Support

Resource Allocation

11-29-04-16Distribution Statement A. Approved for public release: distribution is unlimited.

WarfighterWarfighter

ALISSupply Services ProviderGovt Transportation Service

Autonomic LogisticsOperations

Sources of Repair / Supply

Local Supply

Commercial Transportationand Warehousing

Supply Chain Management Infrastructure

Forward DistributionPoint

AL

ISA

LIS

SE, Weapons, Fuel

JSF Industry TeamJSF Industry Team

11-29-04-17Distribution Statement A. Approved for public release: distribution is unlimited.

JSF TrainingVirtual – Constructive - Live

Pilot Entry Criteria• T-38• T-45• Fighter

Qualified

Pilot Entry Criteria• T-38• T-45• Fighter

Qualified

Operational and Deployed

• Pilot Mission Rehearsal

• Maintainer Task Rehearsal

• Distributed Mission Training

Deployed/On -Demand Training

• Flying Syllabus• Advanced Simulation Systems• Interactive Multimedia Instruction• Electronically Mediated Lecture

• Deployable Mission Rehearsal Trainer

• Distributed Learning

- Full Access to All JSF Courseware

Computer Resource Centers

Service Training Squadrons

• Service -Unique Training

• Tactics/Weapons• Embedded Training

Advanced Simulation

• Web Based on Demand CBT

• Continuation Training

• Embedded Training

Training Infrastructure

System

Distributed Management

Records, Courseware,

Software, Tech Data,

Configurations

Integrated Training Center

Maintainers Entry Criteria• A School• Tech School• Previously Qualified Tech

Maintainers Entry Criteria• A School• Tech School• Previously Qualified Tech

Electronic Classrooms

ALIS Connectivity

Feedback

11-29-04-18Distribution Statement A. Approved for public release: distribution is unlimited.

O & S Cost Reductions

SavingsSavings

Based onLegacy AV Design

F-16AV-8BF-18

R&M

PHM

SLO

ALO

Training

Business Approach

LegacyJSF

in Legacy

JSF in

PBL

AL Design

Autonomic Logistics Objectives

The Affordability Challenge

TODAY

R&D and Production

O&S

R&D and Production

JSF

O&S

Best Value Solution meets WarfighterNeeds at Lowest Cost of Ownership

11-29-04-19Distribution Statement A. Approved for public release: distribution is unlimited.

Airframe: 80-90%Common or Cousin Parts

Reduced Total

Ownership Costs

SDDSDD

SDDCosts

JSFTotalCVSTOVLCTOL

Affordability – Total Ownership Cost Reduction

KPPsKPPs

CommonalityIs Key to

Affordability in SDD, URF, O&S

Support

Joint Training

ALIS

AL Operations

Design AV to Minimize Design AV to Minimize Resource DemandsResource Demands

Design Autolog to Design Autolog to Sense & RespondSense & Respond

SustainmentSustainment

Avionics System~100% Common

N/A145 knotsN/AN/AMaximum Approach SpeedUSN

2 x 1K JDAM + 2 x AIM 120 + fuel

N/AN/A2 x 1K JDAM + 2 x AIM 120 + fuel

Vertical Lift Bring BackUSMC/UK

Secure Voice and Data ConnectivityInteroperabilityJoint

98.5 (95)%98.6 (95)%98.5 (93)%99 (95) %Mission ReliabilityJoint

101 (<102) ST109 (<243) ST5.9 (<8) C-17s4.6 (<8) C-17sLogistics FootprintJoint

4.3 (3)4.4 (3)3.7 (3)6.5 (4)Sortie Generation (surge)Joint

450 nm600 nm590 nm450 nmCombat RadiusJoint

Very Low ObservableRadio Frequency SignatureJoint

UKUSNUSAFUSMCKey Performance ParameterOwner

N/A145 knotsN/AN/AMaximum Approach SpeedUSN

2 x 1K JDAM + 2 x AIM 120 + fuel

N/AN/A2 x 1K JDAM + 2 x AIM 120 + fuel

Vertical Lift Bring BackUSMC/UK

Secure Voice and Data ConnectivityInteroperabilityJoint

98.5 (95)%98.6 (95)%98.5 (93)%99 (95) %Mission ReliabilityJoint

101 (<102) ST109 (<243) ST5.9 (<8) C-17s4.6 (<8) C-17sLogistics FootprintJoint

4.3 (3)4.4 (3)3.7 (3)6.5 (4)Sortie Generation (surge)Joint

450 nm600 nm590 nm450 nmCombat RadiusJoint

Very Low ObservableRadio Frequency SignatureJoint

UKUSNUSAFUSMCKey Performance ParameterOwner

Performance and Price

Based Contract

Drive Desired Behaviors

Drive Desired Behaviors

11-29-04-20Distribution Statement A. Approved for public release: distribution is unlimited.

The O&S “Death Spiral”

• Dr. Ja

Rel

iab

ility

Legacy A/C

$ /F

lyin

g H

ou

r

O&

S C

os

ts

Life Cycle

Legacy A/C

Life Cycle

• O&S Costs Rising at 10-

14%/Year

• Budgets Not Keeping Pace

with Requirements

• Results: Readiness

Declining and Reduced $$ for

Modernization

THE PROBLEM:

Modernization Shortage

Aging Equipment

Rising O&S Costs

Less $ for Modernization

Declining Future Readiness

The Crux of Dr. Gansler’s “Death Spiral”

11-29-04-21Distribution Statement A. Approved for public release: distribution is unlimited.

The Promise of JSF

TODAY

R&D and Production O&S

The Question is “How do you do it?”

Higher Reliability Spares

O&S Cost Savings

More $ for Modernization

Increased Future Readiness

The Vital Spiral

JSF

O&SR&D and Production

Rel

iab

ility

JSF A/C

Life Cycle

O&

S C

os

ts

Life Cycle

JSF A/C

11-29-04-22Distribution Statement A. Approved for public release: distribution is unlimited.

PBL Emphasis

QDR (2001): “DoD will implement Performance-Based Logistics to compress the supply chain and improve readiness…”

DoDD 5000.1; DoDI 5000.2 (12 May 2003): “PBL is the preferred support strategy within the Department of Defense whenever practical, and PMs are to work directly with users…”

Wynn Memo, Jan 04: Provided BCA guidance for PBL programs Wolfowitz Memo, Feb 04: Directed USD(AT&L) to issue clear guidance on

purchasing using performance criteria. Also directed Services to provide plan to aggressively implement PBL

MID 917: Identifies JSF as a potential PBL pilot program and requires BCA within 180 days of MID 917 signature

11-29-04-23Distribution Statement A. Approved for public release: distribution is unlimited.

Contracting Strategy

Contracting Strategy• Eight Year Multi-Year

O&M Service Contract• Revisit After Three

Years• Priced-Based Contracts

For Life of Program• Usage, Not Breakage

Algorithm• Significant Savings

Contracting Strategy• Six Annual Contracts• Initially Cost Reimbursable, Transitioning

to Fixed-Price Incentive• Brings On End-State Terms Incrementally• Provide the Government and the

Contractors the Data Required to Implement the End State Terms

End-State(2014 – )

LRIP I – LRIP VI (2008 – 2013)

11-29-04-24Distribution Statement A. Approved for public release: distribution is unlimited.

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

04 04 05 06 07 08 09 10 11 12 13 C

Long-Lead Full Funding DeliveryUSMC USAF

USN

DAB Program Reviews

LRIP 1LRIP 2

LRIP 3LRIP 4

LRIP 5LRIP 6

LRIP 7MY 1

Contract: Price-Based

Production Lots

Full PBL

F-35 Logistics Roadmap to PBL

Key Decisions and Events…

Training Centers Defined

Spares Procurement, Ownership, & Mgt Responsibilities

Services’ Final PBL Position

Partnering Agreements (Public / Private)

ALO Design / Stand-UpSSP Selection & Integration

Support Equipment Solution by Service

Core Depot Work Load Determination (USG)

DSOR Competition Partnering (USG)

PSFD MOUs Signed (USG)

PSC/ASC PBL Harmonization

Single Line of Accounting (MID 917)

Long-term Multi-year Contract

Cost-Based Transitional

ALIS COTS Tools SelectionLRIP Proposal

11-29-04-25Distribution Statement A. Approved for public release: distribution is unlimited.

Key Elements of F-35 PBL

Programmatic Benefits

Air System Benefits

Rel

iab

ility

Continued Performance Improvement at Lower LCC

Legacy A/C

JSF A/C

$ /F

lyin

g H

ou

r

O&

S C

os

ts

DecreasingO&S Costs

Continued Reliability Improvements

Life Cycle

Legacy A/C

JSF A/C

Multi-year Contracting Period Life Cycle

AWARD-TERM CONTRACT: PROVIDES DoD “OFF RAMP” “Power By The Hour” Concept – Fixed revenue per flight hour  Continuous cost reductions only method to achieve commercial profitability  Incentives/penalties flowed to all teammates – including DoD Depots & ICPs  Comprehensive support per flight hour cost periodically reduced based on

learning curve & actuals  Improved component reliability & depot turn-around times perpetually

incentivized – only means to enhance profit is through cost reductions

11-29-04-26Distribution Statement A. Approved for public release: distribution is unlimited.

Multi-Year Performance-Based Support Contract Long-Term Horizon To Facilitate Investment

Monthly Payments Based on Usage Versus Breakage Constant Revenue Stream to Contractor Team

Fixed Price Contract in Sustainment $/Flying Hour (FH) Basis

Advanced Down Payment Additive to URF for Infrastructure and Spares

Price Improvement Curve 50/50 Gain sharing of Cost Reductions With Government

Spares Ownership Buy-Back Plan One-Time Title Transfer With Payment via Credits on $/FH

Challenges

11-29-04-27Distribution Statement A. Approved for public release: distribution is unlimited.

Summary

Large Production Base for Lowest Cost

Most Advanced Technologies Stealth, Performance, Advanced Weapon Systems

Unprecedented Access, Range, Persistence

High Tempo / Combat Power Generated

Reduced Ownership Costs

High Reliability, Increased Sortie Generation, Lower Manning and Innovative Contractor Support

Agile Support Integrated Electronic Training of Pilots and Maintainers ALIS-Integrated Infrastructure Partnering with Government and Industry for Best Value

11-29-04-28Distribution Statement A. Approved for public release: distribution is unlimited.

Questions?Questions?