11-1 ELC 347 project management Day 24

Transcript of 11-1 ELC 347 project management Day 24. Agenda Integrative Project –Part 5 Feedback posted in File...

11-1

ELC 347 project management

Day 24

Agenda

• Integrative Project – Part 5 Feedback posted in File Exchange– Any of the first five sections can be resubmitted for rescoring prior to finals

week. The recorded score will the average of the original score and the score on the resubmitted section.

• Assignment 7 Corrected– 8 A’s

• Quiz 3 is Corrected– 1 A, 1 B, 4 C’s, 1 D and 1 no-take– Everyone missed question on Critical Chain and buffers

• A project is represented by the activity durations (estimated at 90% likelihood of completion) and precedence requirements shown in the table. What is the length of the project buffer if this project is managed using critical chain methodology?

Schedule for rest of semester

• Today

– Project ‘s 5 & 6

• Dec 4

– Group Work

• Dec 8

– Chap 12

– IP Part 6 due

• Dec 11

– Chap 13 & 14

– Assignment 8 due • Dec 18 @ 10 AM

– Quiz 4

– Chap 12, 13 & 14

– IP Project’s due

6-3 © 2007 Prentice-Hall, Inc

Committed to Shaping the Next Generation of IT Experts.

Essentials Microsoft Project 2003

Dawn Parrish WoodMary E. Pascarella

Project 5

Modifying Task

Information

5

ObjectivesObjectivesObjectivesObjectives

• Edit and replace task information and check spelling

• Save a baseline• Enter percent complete• View percent complete

• Edit and replace task information and check spelling

• Save a baseline• Enter percent complete• View percent complete

• Enter actuals• Specify lead and lag

time• Resolve constraint

conflicts and set a task deadline

• Enter actuals• Specify lead and lag

time• Resolve constraint

conflicts and set a task deadline

Copyright © 2004 Prentice-Hall. All rights reserved. 6

Why would I Do This?

• To track project progress– Task level– Assignment level

• Requires assigned resources

– Time period

• Using different viewing options

Copyright © 2004 Prentice-Hall. All rights reserved. 7

Visual SummaryBaseline – original information to track progress

Copyright © 2004 Prentice-Hall. All rights reserved. 8

Editing and Replacing Task Information and Checking Spelling

• Effort-driven scheduling– Default setting

• Resource adjustments– Reflected in overall project

completion dates

Copyright © 2004 Prentice-Hall. All rights reserved. 9

Task Usage View

View the specific task Double-click to open task information

Copyright © 2004 Prentice-Hall. All rights reserved. 10

Task Information Dialog Box

Copyright © 2004 Prentice-Hall. All rights reserved. 11

Task Modification Results

Copyright © 2004 Prentice-Hall. All rights reserved. 12

Find And Replace

Copyright © 2004 Prentice-Hall. All rights reserved. 13

Spell Check

Copyright © 2004 Prentice-Hall. All rights reserved. 14

Saving A Baseline

Copyright © 2004 Prentice-Hall. All rights reserved. 15

Print Baseline Data• Hide Gantt Chart portion of the

Tracking Gantt View• Ready for print

Copyright © 2004 Prentice-Hall. All rights reserved. 16

Entering Percent Complete

• Task Information dialog box

• Tracking toolbar

Copyright © 2004 Prentice-Hall. All rights reserved. 17

Tracking Toolbar Up Close

Copyright © 2004 Prentice-Hall. All rights reserved. 18

Viewing Percent Complete

• Easiest methods– Gantt Chart– Percent complete column

• Background calculations– Actual duration– Remaining duration

Copyright © 2004 Prentice-Hall. All rights reserved. 19

Gantt Chart View

Copyright © 2004 Prentice-Hall. All rights reserved. 20

Adding Percent Complete Column

Copyright © 2004 Prentice-Hall. All rights reserved. 21

Entering Actuals

• Alternate work progress tracking– Actual work– Finish dates– Work durations

• Related fields automatically updated

Copyright © 2004 Prentice-Hall. All rights reserved. 22

Modifying Task Information

Using the Tracking Table

Copyright © 2004 Prentice-Hall. All rights reserved. 23

Specifying Lead and Lag Time

• Lead time– Task overlap– Negative number

• Lag time– Time needed between tasks– Positive number

Copyright © 2004 Prentice-Hall. All rights reserved. 24

Create Lead/Lag Time

Copyright © 2004 Prentice-Hall. All rights reserved. 25

Resolving Constraint Conflicts And Setting A Task Deadline

Copyright © 2004 Prentice-Hall. All rights reserved. 26

Constraint Date Table

Results of removing a constraint

Copyright © 2004 Prentice-Hall. All rights reserved. 27

Deadlines

• Target dates– Task Information dialog box

• Technically not constraints– Indicator icon appears if deadline passes

28

SummarySummarySummarySummary

• Edit and replace task information and check spelling

• Save a baseline• Enter percent complete• View percent complete

• Edit and replace task information and check spelling

• Save a baseline• Enter percent complete• View percent complete

• Enter actuals• Specify lead and lag

time• Resolve constraint

conflicts and set a task deadline

• Enter actuals• Specify lead and lag

time• Resolve constraint

conflicts and set a task deadline

29

Review OptionsReview OptionsReview OptionsReview Options

• Key termsKey terms• Checking concepts and termsChecking concepts and terms• DiscussionDiscussion• Skill drillSkill drill• ChallengeChallenge

• Key termsKey terms• Checking concepts and termsChecking concepts and terms• DiscussionDiscussion• Skill drillSkill drill• ChallengeChallenge

Copyright © 2004 Prentice-Hall. All rights reserved. 30

What are your What are your questions?questions?

Committed to Shaping the Next Generation of IT Experts.

Essentials Microsoft Project 2003

Dawn Parrish WoodMary E. Pascarella

Project 6

Modifying Tasks Using The Gantt Chart

32

ObjectivesObjectivesObjectivesObjectives

• Add a progress line to a Gantt chart

• Remove task dependencies• Reschedule uncompleted

work

• Add a progress line to a Gantt chart

• Remove task dependencies• Reschedule uncompleted

work

• Modify and remove a split• Use Tracking Gantt view to

analyze the critical path• Check overall project progress

• Modify and remove a split• Use Tracking Gantt view to

analyze the critical path• Check overall project progress

Copyright © 2004 Prentice-Hall. All rights reserved.

33

Why would I Do This?

To monitor progress in the three main

project areas

Budget

Time constraints

Scope

Copyright © 2004 Prentice-Hall. All rights reserved.

34

Visual SummaryAdvertising campaign

Copyright © 2004 Prentice-Hall. All rights reserved.

35

Progress Line In A Gantt Chart

Quick visual reference

Copyright © 2004 Prentice-Hall. All rights reserved.

36

To Add Progress Lines to a Gantt Chart

Project information

Copyright © 2004 Prentice-Hall. All rights reserved.

37

Progress Line Dialog Box

Copyright © 2004 Prentice-Hall. All rights reserved.

38

Actual Progress Line

Left spike = behind

Right spike = ahead

Copyright © 2004 Prentice-Hall. All rights reserved.

39

Modifying A Specific TaskDouble-click task to get Task Information

dialog box

Copyright © 2004 Prentice-Hall. All rights reserved.

40

Results Of Change

Copyright © 2004 Prentice-Hall. All rights reserved.

41

Removing Task Dependencies

• No longer needed

• View task Screen Tip

Copyright © 2004 Prentice-Hall. All rights reserved.

42

Unlink Tasks

Copyright © 2004 Prentice-Hall. All rights reserved.

43

Rescheduling Uncompleted Work

Splitting a task

Copyright © 2004 Prentice-Hall. All rights reserved.

44

Split Task Screen Feedback

Copyright © 2004 Prentice-Hall. All rights reserved.

45

Modifying And Removing A Split

• Adjust for changes in the project

• Change the unit of time– Default is one unit

• Remove the split

Copyright © 2004 Prentice-Hall. All rights reserved.

46

To Modify And Remove The Split

Copyright © 2004 Prentice-Hall. All rights reserved.

47

Using Tracking Gantt View To Analyze The Critical Path

• Critical path– Predecessors– Critical tasks

• Tracking Gantt view– Baseline bar– Comparison to actual

• Variance task table

Copyright © 2004 Prentice-Hall. All rights reserved.

48

Tracking Gantt Chart Display

Copyright © 2004 Prentice-Hall. All rights reserved.

49

Critical Task And ScreenTip

Copyright © 2004 Prentice-Hall. All rights reserved.

50

Changing Date Of Critical TaskChanges project completion date

Copyright © 2004 Prentice-Hall. All rights reserved.

51

Checking Overall Project Progress

• Project statistics– Up-to-the-minute statistics– View only

• Project summary report– outlines actual and baseline

data

• Tracking Gantt view

Copyright © 2004 Prentice-Hall. All rights reserved.

52

Project Statistics

Copyright © 2004 Prentice-Hall. All rights reserved.

53

Project Summary Report

Copyright © 2004 Prentice-Hall. All rights reserved.

54

Tracking Gantt View

55

SummarySummarySummarySummary

• Add a progress line to a Gantt chart

• Remove task dependencies• Reschedule uncompleted

work

• Add a progress line to a Gantt chart

• Remove task dependencies• Reschedule uncompleted

work

• Modify and remove a split• Use Tracking Gantt view to

analyze the critical path• Check overall project progress

• Modify and remove a split• Use Tracking Gantt view to

analyze the critical path• Check overall project progress

56

Review OptionsReview OptionsReview OptionsReview Options

• Key termsKey terms• Checking concepts and termsChecking concepts and terms• DiscussionDiscussion• Skill drillSkill drill• ChallengeChallenge

• Key termsKey terms• Checking concepts and termsChecking concepts and terms• DiscussionDiscussion• Skill drillSkill drill• ChallengeChallenge

Copyright © 2004 Prentice-Hall. All rights reserved.

57

What are your What are your questions?questions?