Agenda
• Integrative Project – Part 5 Feedback posted in File Exchange– Any of the first five sections can be resubmitted for rescoring prior to finals
week. The recorded score will the average of the original score and the score on the resubmitted section.
• Assignment 7 Corrected– 8 A’s
• Quiz 3 is Corrected– 1 A, 1 B, 4 C’s, 1 D and 1 no-take– Everyone missed question on Critical Chain and buffers
• A project is represented by the activity durations (estimated at 90% likelihood of completion) and precedence requirements shown in the table. What is the length of the project buffer if this project is managed using critical chain methodology?
Schedule for rest of semester
• Today
– Project ‘s 5 & 6
• Dec 4
– Group Work
• Dec 8
– Chap 12
– IP Part 6 due
• Dec 11
– Chap 13 & 14
– Assignment 8 due • Dec 18 @ 10 AM
– Quiz 4
– Chap 12, 13 & 14
– IP Project’s due
6-3 © 2007 Prentice-Hall, Inc
Committed to Shaping the Next Generation of IT Experts.
Essentials Microsoft Project 2003
Dawn Parrish WoodMary E. Pascarella
Project 5
Modifying Task
Information
5
ObjectivesObjectivesObjectivesObjectives
• Edit and replace task information and check spelling
• Save a baseline• Enter percent complete• View percent complete
• Edit and replace task information and check spelling
• Save a baseline• Enter percent complete• View percent complete
• Enter actuals• Specify lead and lag
time• Resolve constraint
conflicts and set a task deadline
• Enter actuals• Specify lead and lag
time• Resolve constraint
conflicts and set a task deadline
Copyright © 2004 Prentice-Hall. All rights reserved. 6
Why would I Do This?
• To track project progress– Task level– Assignment level
• Requires assigned resources
– Time period
• Using different viewing options
Copyright © 2004 Prentice-Hall. All rights reserved. 7
Visual SummaryBaseline – original information to track progress
Copyright © 2004 Prentice-Hall. All rights reserved. 8
Editing and Replacing Task Information and Checking Spelling
• Effort-driven scheduling– Default setting
• Resource adjustments– Reflected in overall project
completion dates
Copyright © 2004 Prentice-Hall. All rights reserved. 9
Task Usage View
View the specific task Double-click to open task information
Copyright © 2004 Prentice-Hall. All rights reserved. 15
Print Baseline Data• Hide Gantt Chart portion of the
Tracking Gantt View• Ready for print
Copyright © 2004 Prentice-Hall. All rights reserved. 16
Entering Percent Complete
• Task Information dialog box
• Tracking toolbar
Copyright © 2004 Prentice-Hall. All rights reserved. 18
Viewing Percent Complete
• Easiest methods– Gantt Chart– Percent complete column
• Background calculations– Actual duration– Remaining duration
Copyright © 2004 Prentice-Hall. All rights reserved. 21
Entering Actuals
• Alternate work progress tracking– Actual work– Finish dates– Work durations
• Related fields automatically updated
Copyright © 2004 Prentice-Hall. All rights reserved. 22
Modifying Task Information
Using the Tracking Table
Copyright © 2004 Prentice-Hall. All rights reserved. 23
Specifying Lead and Lag Time
• Lead time– Task overlap– Negative number
• Lag time– Time needed between tasks– Positive number
Copyright © 2004 Prentice-Hall. All rights reserved. 25
Resolving Constraint Conflicts And Setting A Task Deadline
Copyright © 2004 Prentice-Hall. All rights reserved. 26
Constraint Date Table
Results of removing a constraint
Copyright © 2004 Prentice-Hall. All rights reserved. 27
Deadlines
• Target dates– Task Information dialog box
• Technically not constraints– Indicator icon appears if deadline passes
28
SummarySummarySummarySummary
• Edit and replace task information and check spelling
• Save a baseline• Enter percent complete• View percent complete
• Edit and replace task information and check spelling
• Save a baseline• Enter percent complete• View percent complete
• Enter actuals• Specify lead and lag
time• Resolve constraint
conflicts and set a task deadline
• Enter actuals• Specify lead and lag
time• Resolve constraint
conflicts and set a task deadline
29
Review OptionsReview OptionsReview OptionsReview Options
• Key termsKey terms• Checking concepts and termsChecking concepts and terms• DiscussionDiscussion• Skill drillSkill drill• ChallengeChallenge
• Key termsKey terms• Checking concepts and termsChecking concepts and terms• DiscussionDiscussion• Skill drillSkill drill• ChallengeChallenge
Copyright © 2004 Prentice-Hall. All rights reserved. 30
What are your What are your questions?questions?
Committed to Shaping the Next Generation of IT Experts.
Essentials Microsoft Project 2003
Dawn Parrish WoodMary E. Pascarella
Project 6
Modifying Tasks Using The Gantt Chart
32
ObjectivesObjectivesObjectivesObjectives
• Add a progress line to a Gantt chart
• Remove task dependencies• Reschedule uncompleted
work
• Add a progress line to a Gantt chart
• Remove task dependencies• Reschedule uncompleted
work
• Modify and remove a split• Use Tracking Gantt view to
analyze the critical path• Check overall project progress
• Modify and remove a split• Use Tracking Gantt view to
analyze the critical path• Check overall project progress
Copyright © 2004 Prentice-Hall. All rights reserved.
33
Why would I Do This?
To monitor progress in the three main
project areas
Budget
Time constraints
Scope
Copyright © 2004 Prentice-Hall. All rights reserved.
35
Progress Line In A Gantt Chart
Quick visual reference
Copyright © 2004 Prentice-Hall. All rights reserved.
36
To Add Progress Lines to a Gantt Chart
Project information
Copyright © 2004 Prentice-Hall. All rights reserved.
38
Actual Progress Line
Left spike = behind
Right spike = ahead
Copyright © 2004 Prentice-Hall. All rights reserved.
39
Modifying A Specific TaskDouble-click task to get Task Information
dialog box
Copyright © 2004 Prentice-Hall. All rights reserved.
41
Removing Task Dependencies
• No longer needed
• View task Screen Tip
Copyright © 2004 Prentice-Hall. All rights reserved.
43
…
Rescheduling Uncompleted Work
Splitting a task
Copyright © 2004 Prentice-Hall. All rights reserved.
45
…
Modifying And Removing A Split
• Adjust for changes in the project
• Change the unit of time– Default is one unit
• Remove the split
Copyright © 2004 Prentice-Hall. All rights reserved.
47
Using Tracking Gantt View To Analyze The Critical Path
• Critical path– Predecessors– Critical tasks
• Tracking Gantt view– Baseline bar– Comparison to actual
• Variance task table
Copyright © 2004 Prentice-Hall. All rights reserved.
50
Changing Date Of Critical TaskChanges project completion date
Copyright © 2004 Prentice-Hall. All rights reserved.
51
Checking Overall Project Progress
• Project statistics– Up-to-the-minute statistics– View only
• Project summary report– outlines actual and baseline
data
• Tracking Gantt view
55
SummarySummarySummarySummary
• Add a progress line to a Gantt chart
• Remove task dependencies• Reschedule uncompleted
work
• Add a progress line to a Gantt chart
• Remove task dependencies• Reschedule uncompleted
work
• Modify and remove a split• Use Tracking Gantt view to
analyze the critical path• Check overall project progress
• Modify and remove a split• Use Tracking Gantt view to
analyze the critical path• Check overall project progress
56
Review OptionsReview OptionsReview OptionsReview Options
• Key termsKey terms• Checking concepts and termsChecking concepts and terms• DiscussionDiscussion• Skill drillSkill drill• ChallengeChallenge
• Key termsKey terms• Checking concepts and termsChecking concepts and terms• DiscussionDiscussion• Skill drillSkill drill• ChallengeChallenge