Government of India Ministry of Environment, Forest & Climate Change
JorRagh Road, New Delhi Dated: 21st October,.2019
NOTICE INVITING TENDER. Sealed tender are invited from the interested agencies for the procurement of following works: Name of work: Selection of Third Party Assessment agencies for Evaluation of Central Sector Schemes of Ministry of Environment, Forest & Climate Change in four categories namely
I. Environment Protection (EP) II. Environment Conservation (EC) III. Decision Support Systems (DSS) IV. Environmental Awareness and Capacity Building (EACB)
• Last date of submission of Technical and Financial Proposals: 14th November, 2019 (Time: 11.00 a.m.). Any Proposal delivered after the deadline will not be considered and returned unopened
• Opening of Technical Sid: 14th November; 2019 at 03.30 pin. in room Na 650, Agni Wing, 6th Floor, MoEF&CC
• Tentative date of Comrnenqement of services: 26th November, 2019 • Validity of Proposal: Technical and Financial Proposals to be valid up 30th
April, 2020. • Interested eligible bidders may obtain complete information on the website of
the ministry: www.moef.govin (Request for Proposals (RFP) for Selection of Third Party Assessment agencies for Evaluation of Central Sector Schemes)
• The interested bidders shall drop their bids-in sealed enitelopes based on single stage-two envelope procedure one outer and two Inner envelopes-ona technical and one financiS proliosal in the tender box named as .
Request forProposals (RFP) ifer. selection, of Third Party Assessment agencies for Evaluation of Central Sector Schemes placed at the Ground floor, Prithvi Wing, Indira Paryavaran Bhawan, JorBagh Road, New Delhi-110003
davp 13101/11/0026/1920 (Shoyabahmed Kalal)
Deputy Director
10/21/2019
Government of India
Ministry of Environment, Forest & Climate Change
October, 2019
Request for Proposals (RFP) for Selection of Third Party Assessment Agencies for
Evaluation of Central Sector Schemes
Table of Contents
S. No. Content Pages
1. Proposal 1-2
2. Instruction to Bidders 3-9
3. Evaluation Criteria 10
4. Technical Proposal 11-12
5. Financial Proposal 13-14
6. Terms of Reference including
Schemes details
15-82
7. Payment Schedule 83
8. General Terms & Conditions 84-95
9. Annexure- 1 : Format of Contract 96
10. Annexure- 2 EMC Constitution 97-98
11. Annexure- 3 Budget Allocation of
Schemes
99
1
Section 1: Proposal
Project Name Evaluation of Central Sector Schemes of Ministry of
Environment, Forest & Climate Change*
Method of Selection Lowest financial bid (L1) of the technically qualified
bidders as per the groupings of the schemes
Last date of submission of
Technical and Financial
Proposals
14th November, 2019 (11 A.M) [Tentative]
Any proposal delivered after the deadline will not be
considered and returned unopened
Tentative date of
Commencement of services
26th November, 2019 [Tentative]
Validity of Proposal Technical and Financial Proposals to be valid up to
30th April, 2020 [Tentative]
Technical Evaluation
Criteria
Refer to Section- 3
Contact Person for any
clarifications
Economic Advisor, MoEF&CC 6th Floor, Agni Wing , Indira Paryavaran Bhawan, Jorbagh
New Delhi-110003
Tele (011)- 24695287 Fax: (011)- 24695289
Email: [email protected]
Copies of Proposal Bidders must submit original and one copy each of the Technical
and Financial Proposal. A soft copy of the Technical Proposal only
must be submitted in a pen drive also in MS Word Format. (Refer
Section-4 for Technical Proposal format and Section-5 for
Financial Proposal format). Proposals non-compliant with
aforesaid shall be disqualified
Proposal Submission
Addressed to
Economic Advisor, MoEF&CC 6th Floor, Agni Wing,
Indira Paryavaran Bhawan, Jorbagh
New Delhi-110003
Consortium, as submitted
in the RFP
The Memorandum of Understanding for the consortium
must be included as part of the Technical Proposal
submission * MoEF&CC invites RFP for each group of the Schemes separately as explained in the following table
One Agency can apply for up to a maximum of 2 groups only
2
Grouping of Schemes
I Environment Protection (EP)
1. Pollution Abatement
2. Hazardous Substances Management
3. Control of Pollution
II Environment Conservation (EC)
4. Eco-Task Force
5. Climate Change Action Plan
6. National Adaptation Fund
7. National Coastal Mission (including EAP)
III Decision Support Systems (DSS)
8. Environmental Information Systems (ENVIS)
9. R&D for Conservation and Development
10. National Mission on Himalayan Studies
IV Environmental Awareness and Capacity Building (EACB)
11. Forestry Training and Capacity Building
12. Environmental Education, Awareness and Training including Media,
Publicity & Information
3
Section-2:
Instructions to Bidders
2.1 General
2.1.1 Purpose of the project is to evaluate the Central Sector schemes of the Ministry as per
the Terms of Reference provided by MoEF&CC and NITI Aayog.
2.1.2 No bidder shall submit more than one bid for each group of Schemes and apply for up
to a maximum two groups of the Schemes for the evaluation studies.
2.1.3 Definition of Central Sector Scheme: Under Central sector schemes, it is 100% funded
by the Union Government and implemented by the Central Government machinery.
2.2 Cost of Proposal
The Bidder shall bear all costs associated with the preparation and submission of the Proposal.
The Ministry will in no case be responsible or liable for those costs, regardless of the conduct or
outcome of the project.
2.3 Proposal Documents
2.3.1 Contents of Proposal documents
Proposals must offer services for the total requirement. Proposals offering only part of the
requirement will be rejected. The Bidder is expected to examine all corresponding instructions,
forms, terms and specifications contained in the Proposal documents. Failure to comply with these
documents will be at the Bidder’s risk and may affect the evaluation of the Proposal.
2.3.2 Amendments to the Proposal Documents
At any time prior to the deadline for submission of Proposals, the Ministry may, for any reason,
whether at its own initiative or in response to a clarification requested by a prospective Bidder,
modify the Proposal Documents by amendment, which shall be uploaded on the Ministry’s
website.
In order to afford prospective Bidders reasonable time in which to take the amendments into
account in preparing their offers, the Ministry may, at its discretion, extend the deadline for the
submission of Proposals.
2.4 Preparation of Proposals
2.4.1 Language of the Proposal
The Proposals prepared by the bidder and all correspondence and documents relating to the
Proposal exchanged by the bidder and the Ministry shall be written in the English language.
2.4.2 Documents comprising the proposal
The Proposal shall comprise the following components:
4
a. Technical Proposal, as detailed in Section-4
b. Financial Proposal, as detailed in Section-5
2.4.3 Technical Proposal
The bidder shall structure the Technical Proposal in the manner prescribed in Section 4.
The Technical Proposal should not contain any pricing information whatsoever on the services
offered. Pricing information shall be separated and only contained in the appropriate Price
Schedules/ Financial Proposal. Each page of the Technical bid should be signed by the authorized
representative of the bidder. Information which the bidder considers proprietary, if any, should be
clearly marked “proprietary” next to the relevant part of the text and it will then be treated as such
accordingly.
2.4.4 Financial Proposal
The bidder shall indicate on the format given in Section-5, the price of services it proposes to
provide under the contract.
The bidder shall prepare the bid based on details provided in the Proposal Documents. However,
it must be clearly understood that the specifications and requirements are intended to give the
bidders an idea about the order and magnitude of the work and are not in any way exhaustive and
guaranteed by the Ministry.
Prices quoted must be in INR (Indian Rupees). The prices must be firm and final and shall not be
subject to any upward modifications, on any account whatsoever.
The Financial Bid should clearly indicate the price to be charged without any qualifications
whatsoever and should exclude all taxes, duties, fees, Insurance, levies, works contract/service tax
and other charges as may be applicable in relation to the activities proposed to be carried out.
The bidders are advised not to indicate any separate discount. Discount, if any, should be merged
with the quoted prices. Discount of any type, indicated separately, will not be taken into account
for evaluation purpose.
2.4.5 Period of validity of Proposals
Proposals shall remain valid up to 30th April, 2020. A Proposal valid for a shorter period may be
rejected by the Ministry.
In exceptional circumstances, the Ministry may solicit the bidder’s consent to an extension of the
period of validity. The request and the responses thereto shall be made in writing. A bidder
granting the request will not be required nor permitted to modify its Proposal.
5
2.4.6 Format and signing of Proposals
The bidder shall prepare two copies of each of the Proposal, clearly marking each “Original” and
“Copy” as appropriate. In the event of any discrepancy between them, the original shall govern.
In addition, the bidder shall prepare and provide Technical Proposal in MS Word format in a Pen
drive also.
The two copies of the Proposal shall be typed or written in indelible ink and shall be signed by the
bidder or a person or persons duly authorized to bind the bidder to the contract. The latter
authorization shall be indicated by written power-of- attorney accompanying the Proposal.
A Proposal shall contain no interlineations, erasures, or overwriting except, as necessary to correct
errors made by the bidder, in which case such corrections shall be initialed by the person or persons
signing the Proposal.
2.4.7 Payment
Ministry shall effect payments to the Consultant after acceptance by Ministry of the invoices
submitted by the Consultant, upon achievement of the corresponding milestones, as per the
payment schedule mentioned at Section -7
2.5 Submission of Proposals
2.5.1 Sealing and marking of Proposals
(a) The bidder shall seal the Proposals in one outer and two inner envelopes, as detailed below.
The outer envelope shall be addressed to-
Deputy Secretary
(Development Monitoring and Evaluation Division),
1st floor ‘Agni’, Indira Paryavaran Bhawan,
Jorbagh, New Delhi-110003
and, marked with – “RFP: for Selection of Third Party Assessment Agency for Evaluation of
Central Sector Schemes.
(b) Both inner envelopes (one each for Technical and Financial Proposal respectively) should be
sealed and shall superscribe “Technical Proposal” or “Financial Proposal” as the case may be and
the name and address of the bidder.
(c) The envelope for Technical Proposal should contain the original and copy as well as the soft
copy in a Pen drive.
(d) The envelope containing the Financial Proposal should bear a writing as “DO NOT OPEN
WITH THE TECHNICAL PROPOSAL”.
6
Note: If the inner envelopes are not sealed and marked as per the instructions in this clause, the
Ministry will not assume any responsibility for the Proposal’s misplacement or premature opening.
2.5.2 Deadline for submission of Proposals
Proposals must be received by the Ministry at the address specified in Section-1.
The Ministry may, at its own discretion extend this deadline for the submission of Proposals by
amending the RFP documents in accordance with clause amendments of Proposal Documents, in
which case all rights and obligations of the Ministry and bidders previously subject to the deadline
will thereafter be subject to the deadline as extended.
2.5.3 Late Proposals
Any Proposal received by the Ministry after the deadline for submission of proposals, will be
summarily rejected.
2.5.4 Modification and withdrawal of Proposals
No Proposal may be modified subsequent to the submission of same.
No Proposal may be withdrawn in the Interval between the opening of Technical bid and the
expiration of the period of proposal validity specified by the Bidder on the Proposal Submission
Form.
2.6 Opening and Evaluation of Proposals
2.6.1 Opening of Proposals
The proposals shall be opened by the Evaluation & Monitoring Committee‟.
2.6.2 Clarification of Proposals
To assist in the examination, evaluation and comparison of Proposals, the Evaluation &
Monitoring Committee (EMC) [Constitution of EMC is at Annexure-II] may at its discretion,
ask the Bidder for clarification of the Proposal, if any. The request for clarification and the response
shall be in writing and no change in price or substance of the Proposal shall be sought, offered or
permitted.
2.6.3 Preliminary examination of Technical Proposal
The EMC will examine the Proposals to determine whether they are complete, whether the
documents have been properly signed, and whether the Proposals are generally in order.
2.6.4 Presentation by the bidder:
The presentation should clearly bring out the Consultant’s understanding of the requirements of
the services, capability and approach for carrying out the tasks set forth through the nominated
experts.
The presentation shall ensure the following:
(i) Work plan in graphical format indicating the major activities, interface requirements and
deliverables such as reports required under ToRs (Section-6).
7
(ii) Flow chart may be included to clearly indicate the involvement of the various agencies
including those of consultants/sub-consultant/ Associates/client etc. This may be linked to
work plan and staffing schedule.
(iii) The work plan, flow chart, staffing schedule, approach and methodology must provide a
logical description of how the consultant will carry out the services to meet all the
requirements of ToRs
(iv) Comments, if any, on the ToRs to improve performance in carrying out the assignment.
Innovativeness will be appreciated, including workable suggestions that could improve the
quality/effectiveness of the Consultant. In this regard, unless the Consultant clearly states
otherwise, it will be assumed that work required to implement any such improvements, are
included in the inputs shown on the Consultant’s Staffing Schedule.
2.6.5 Evaluation and comparison of Technical proposals
The technical evaluation shall be done by the EMC on the basis of the criteria specified in Section-
3.
Only the Bidders who have secured 75% and above in addition to at least 50% in each section of
the technical evaluation shall be considered as technically qualified and processed further.
Note: The score weights and points obtainable in the evaluation sheet are tentative and can be
changed depending on the need or major attributes of technical proposal.
2.6.6 The Ministry has the right to vary requirements at the time of award of the studies;
The Ministry reserves the right at the time of award of contract to vary the quantity of services and
goods specified in the Proposal with suitable change in price or other terms and conditions.
8
2.6.7 Opening of Financial Proposal
The EMC will open the Financial Proposals of only Technically Qualified Bidders, in the presence
of the representatives of the Bidders who choose to attend, at the time, date & place, as decided
by the Ministry which shall be informed to Bidders in advance.
2.6.8 Preliminary examination of Financial Proposal:
Each Financial Proposal will be inspected by the EMC to confirm that it has remained sealed and
un-opened. It shall then be examined by the Evaluation Committee for completeness and accuracy.
If there are minor arithmetical errors, the bid amount will be adjusted. If there is a discrepancy
between words and figures, the amount in words will prevail.
2.6.7 Evaluation and comparison of Financial Proposals
The representative from Ministry will read out aloud the name of the Bidder and the total price
shown in the Bidder’s Financial Proposal. This information will be recorded in writing by the
Ministry’s representative.
Selection Criteria to be adopted will be on the basis of L1 (Lowest Financial Bid).
In case of a tie in the bid value, the bidder with the higher Technical Score will be invited for
negotiations and selection first.
2.6.8 Notification of Award
Prior to the expiration of the period of Bid Validity, Ministry will notify the successful Bidder in
writing by registered letter or by fax and email, to be confirmed in writing subsequently by
registered letter, that its bid has been found technically qualified. The notification of award shall
constitute the formation of the Contract.
2.6.9 Signing of Contract
At the time, the Ministry notifies the successful bidder that its bid has been technically qualified
and Ministry will send the Bidder the Contract Form. Within 7 days of receipt of the contract form,
the successful Bidder shall sign and date the contract and return it to Ministry. The copy of the
contract is enclosed at Annexure-1.
Within 7 days of the receipt of notification of award from Ministry, the successful Bidder shall
furnish a Performance Guarantee (10% of the bid amount) in accordance with the conditions of
this document. This performance guarantee will have to be paid in the form of Demand
Draft/Banker’s Cheque payable to DDO, MoEF&CC
Failure of the successful bidder to comply with the requirement of the above Clause shall
constitute sufficient grounds for the annulment of the award and forfeiture of the Bid Security and
in such an event Ministry may award the Contract to the next best evaluated Bidder or call for new
Bids.
2.7.0 Timeline for Submission of Final Reports: [Schedule of Evaluation Studies]
The Third Party Agency shall submit its first draft of evaluation reports positively by 5th
February, 2020 to the Ministry. Final Draft would require to be submitted by 28th February,
9
2020 after receiving suitable comments from Programme Divisions on the each scheme. The
Agency would be required to make presentations on the progress made as and when EMC decides
suitably.
2.7.1 General Rejection Criteria
The following bids would be summarily rejected:
1. Bids submitted without or improper Bid Security or Financial Bid/Proposal.
2. Bids received through Fax/E-Mail.
3. Bids which do not conform to validity of the Bid as prescribed.
4. If the information provided by the Bidder is found to be incorrect/misleading at any stage
/ time during the Bid evaluation process.
5. Bids not submitted in Two cover systems in sealed state (in two separate envelopes as
prescribed)
6. Bid received by Ministry after the last date for receipt of Bids prescribed by Ministry,
pursuant to Section-1.
7. Bids without power of authorization or any other document consisting of adequate proof
of the Signatory’s Authority.
8. Bids of bidders who are black listed by the Central Government.
10
Section 3: Evaluation Criteria
Technical Proposal Evaluation Criteria:
Particulars Marks
a) Key Personnel
General qualifications, appropriate experience and track record, experience in the
region/ State, back-up support, availability and certainty of obtaining named
individuals etc. Special emphasis on CVs of core team and management structure
of team.
(Marks allotted would be on the basis of quality of key personnel).
37
b) Bidder/Firm experience
Experience (during last 5 years) of the firm as Third Party Assessment Agency
(TPAA) for evaluation of Projects/ Schemes in Environment, Forestry, Wildlife
and Climate Change sector run by Central Govt./State Govt./Autonomous
Bodies/Public Sector.
38
c) Methodology and Work Plan
Proposed methodology and work plan as indicated in the Presentation* &
Technical Proposal
25
Total Marks 100
* All the bidders who submit their proposals would be invited for a detailed presentation. The
Team leader indicated in the proposed team is expected to make the presentation. The purpose of
proposal presentation is to enable the Ministry to seek clarifications and gain a better
understanding about the team and the approach to the assignment.
11
Section 4: Technical Proposal
The Technical Proposal should contain the following documents:
4.1 Cover Letter
In the cover letter, the bidder should confirm the following:
Confirm that all personnel listed in the technical proposal will be available to provide the
required services for the duration of the contract as set-out in the technical proposal.
Confirm that the technical and financial proposals are valid period as prescribed in the Proposal.
Confirm that the bidder has not indulged in any corrupt or fraudulent practices in preparing
this proposal.
Confirm that the person signing the cover letter and the proposal has been duly authorized
to do so.
Cover letter to contain the name, address, telephone and fax number and email ID of the
authorized person with whom Ministry to communicate.
Confirm that the bidder will bear all costs incurred in connection with the preparation and
submission of the proposal and to bear any further pre-contract costs.
Confirm that the terms and conditions laid out in the RFP document are acceptable.
Confirm that, if the financial Proposal is accepted, will commence and complete delivery of
all services specified in the contract within the time frame stipulated.
4.2 Bidder/ Firm’s profile, in general
4.3 Key Personnel
The team engaged for the assignment should have an appropriate mix of experience and expertise
in India with respect to evaluation of Projects/ Schemes in Environment, Forestry, Wildlife and
Climate Change run by Central Govt./State Govt./Autonomous Bodies/Public Sector. The key
professional staff is also expected to be from technical background and also having the knowledge
for evaluation of Projects/ Schemes in Environment, Forestry, Wildlife and Climate Change sector
run by Central Govt./State Govt./Autonomous Bodies/Public Sector. The team shall comprise a
Team Leader and one Team Member. The bidder may propose additional members in their team
required, if any.
Note: The CV of key personnel should include name, nationality, profession/designation,
proposed position in the team, whether employee of the firm, number of years with the firm,
qualifications, date of birth, experience in the relevant fields. Any key personnel who is not a full
time employee of the firm to give an undertaking that he/she is available to undertake the tasks
allocated to him/her in the technical proposal. The CVs should be signed by the key personnel
confirming that the information given in the CV is correct.
4.4 Experience of the Bidder/Firm
The bidder should give the details of the projects/assignments undertaken during the last 5 years
only, in detail (including name of assignment, name/address of employer, date of award of
assignment, date of completion of assignment, nature of the assignment, value of the assignment,
12
scope/geographical coverage of the assignment and role of the bidder/firm viz. prime consultant,
sub-consultant, consortium member etc.)
4.5 Proposed methodology and work plan.
4.6 Matters not appropriate in any other appendix, e.g. Joint Ventures, Disclosures, conflict of
Interest etc. may also be mentioned in this Section.
13
Section- 5 – Financial Proposal
5.1 Bid Security
5.1.1 Bid Security of ₹ 1 lakh by way of Demand Draft/Banker’s cheque payable in the name of
DDO, MoEF&CC shall be furnished by the bidder at the time of responding to the Proposal. Bid
Security must be valid up to 120 days after the last date of submission of proposal and the same
will be returned to the un-successful bidders after completion of selection process. Bid Security
should be part of Technical Proposal.
5.1.2 The bid security of the successful bidder will be discharged upon the bidder executing the
contract and furnishing the performance guarantee security.
5.2 Format for submission of the Financial Proposal:-
To,
Economic Advisor,
6th Floor, Agni Wing,
Indira Paryavaran Bhawan,
Jorbagh, MoEF&CC
New Delhi- 110003.
Dear Sir,
We, the undersigned, offer to provide the services to undertake an evaluation of Central Sector
Schemes (Group. No....) in accordance with your Request for Proposal dated [Insert Date] and our
Technical Proposal. Our attached Financial Proposal is for the sum of [Insert amount(s) in words
and figures]. This amount is exclusive of the local indirect taxes, service tax and duties.
Our Financial Proposal shall be binding upon us subject to the modifications resulting from
Contract negotiations, up to expiration of the validity period of the Proposal, i.e. before the date
indicated in Section-1.
We undertake that, in competing for (and, if the award is made to us, in executing) the above
contract, we will strictly observe the laws against fraud and corruption in force in India namely
“Prevention of Corruption Act, 1988”.
We acknowledge the right of the Ministry to reject our Bid without assigning any reason or
otherwise and hereby waive, to the fullest extent permitted by applicable law, our right to
challenge the same on any account whatsoever.
14
We offer a Bid Security of ₹ 1 lakh (Rupees One Lakh only) to the Ministry in accordance with
the Proposal Document.
The Bid Security in the form of * is attached.
We understand you are not bound to accept any Proposal you receive.
Yours sincerely,
Authorized Signature [In full and initials]:
Name and Title of Signatory:
Name of Bidder:
Address:
NOTE- The Bidder should quote the total lump sum price for providing the services included in
the TOR exclusive of local indirect taxes, service tax and duties.
15
Section 6
Terms of References (ToR)
The Ministry of Environment, Forest and Climate Change (MoEF&CC) is the nodal agency in the
administrative structure of the Central Government for the planning, promotion, co-ordination and
overseeing the implementation of India's environmental and forestry policies and programmes.
The primary concerns of the Ministry are implementation of policies and programmes relating to
conservation of the country's natural resources including its lakes and rivers, its biodiversity, forests
and wildlife, ensuring the welfare of animals, and the prevention and abatement of pollution. While
implementing these policies and programmes, the Ministry is guided by the principle of sustainable
development and enhancement of human well-being.
The Ministry also serves as the nodal agency in the country for the United Nations Framework
Convention on Climate Change (UNFCCC), United Nations Convention to Combat Desertification
(UNCCD), United Nations Environment Programme (UNEP), South Asia Co-operative Environment
Programme (SACEP), International Centre for Integrated Mountain Development (ICIMOD) and for
the follow-up of the United Nations Conference on Environment and Development (UNCED). The
Ministry is also entrusted with issues relating to multilateral bodies such as the Commission on
Sustainable Development (CSD), Global Environment Facility (GEF) and of regional bodies like
Economic and Social Council for Asia and Pacific (ESCAP) and South Asian Association for
Regional Co-operation (SAARC) on matters pertaining to the environment.
The broad objectives of the Ministry are:
a) Conservation and survey of flora, fauna, forests and wildlife
b) Prevention and control of pollution
c) Afforestation and regeneration of degraded areas
d) Protection of the environment and
e) Mitigation and adaptation to climate change
These objectives are well supported by a set of legislative and regulatory measures, aimed at the
preservation, conservation and protection of the environment. Besides the legislative measures, the
National Conservation Strategy and Policy Statement on Environment and Development, 1992; NGT
Act 2010, National Forest Policy, 1988; Policy Statement on Abatement of Pollution, 1992; and the
National Environment Policy, 2006 also guide the Ministry's work.
As per the to the Cabinet Secretary‘s D.O. letter No. 1/50/1/2016-Cab. dated 19th December, 2017
and Department of Expenditure O.M. No. 66(59)/PFC-II/2018, an independent third party evaluation
of all continuing schemes is mandatory before the appraisal and approval by appropriate authority.
The Development Monitoring and Evaluation Division, MoEF&CC to complete the third party
evaluation for all Schemes of the Ministry being financed by Public funds, implemented during 2017-
18 to 2019-20, to determine their effectiveness in achieving the desired outcomes. As per directions
of NITI Aayog vide D.O. letter no. I-190011/33/2019-DMEO dated 12th Feb, 2019 only the Central
Sector Schemes will be evaluated by Ministries and the Centrally Sponsored Schemes will not be
evaluated by the Ministry. The approved groupings for the evaluation of Central Sector Schemes are
16
as follows:
Along with Common TORs, each schemes is briefly mentioned along with objectives, outcomes,
outputs, budget allocations, to be till 2019-20, Scheme specific TORs if any for the better
understanding of the scheme for Evaluation. Each evaluation agency with respect to each sub-scheme
is expected to evaluate as per the Terms of References as under;
Common Terms of References (ToRs) for Evaluation:
The following terms of references have been approved by MoEF&CC and would be applied to all
evaluation studies to be conducted by third party agencies for center sector schemes. Third party
would require to submit their reports for each scheme as per the template provided as in the next
section and Explanatory Memorandum.
On Financial Performance:
1. To critically evaluate budgetary outlay, utilization of funds, along with capital and revenue
composition, surrender of funds/ shortfalls, if any.
2. To explore avenues of generating funds/ suggestions for making schemes/ institutes self-
sustainable wherever applicable.
On Physical Performance:
1. To assess Targets set in EFCs/SFCs and achievements (2017-18 to 2019-20), against the
backdrop of the Annual Plan of Operations and the base line status at inception of the scheme
2. To examine the extent of use of technology in implementing schemes.
3. To review the extent to which a scheme has been successful in fulfilling the objectives of this
Ministry.
4. To consider the recommendations mentioned in the report of evaluation committee constituted
for Review of the XII Plan Schemes of the MoEF&CC and third party evaluation study.
Table no.: 01 Umbrella Category and Sub-Scheme there under;
I Environment Protection (EP)
1 Pollution Abatement
2 Hazardous Substances Management
3 Control of Pollution
II Environment Conservation (EC)
1 Eco-Task Force
2 Climate Change Action Plan
3 National Adaptation Fund
4 National Coastal Mission (including EAP)
III Decision Support Systems (DSS)
1 Environmental Information Systems (ENVIS)
2 R&D for Conservation and Development
3 National Mission on Himalayan Studies
IV Environmental Awareness and Capacity Building (EACB)
1 Forestry Training and Capacity Building
2 Environmental Education, Awareness and Training
including Media, Publicity & Information
17
5. On Performance related to Implementation and other issues:
6. To determine the deficiencies in implementing the schemes.
7. To examine the mid-course corrections undertaken, if any
8. To re-determine the role of Centre/State Governments/ Agencies related to implementation of
scheme
9. To review the coverage of the scheme.
10. To assess the inter-Ministerial deployment of funds towards common purpose wherever
applicable, and its effectiveness
11. To compare with the best practices followed in other countries, wherever applicable
12. To appraise the scheme’s potential in achieving India’s Intended Nationally Determined
Contributions (INDCs) & SDGs
13. To undertake a ‘SWOT’ analysis, and recommend the future road map for the scheme –
medium term/long term
14. To suggest any further rationalization of Schemes
15. Any other related issues
18
Template for Evaluation of Central Sector Scheme:
(Scheme Name..............)
1. EXECUTIVE SUMMARY
2. OVERVIEW OF THE SCHEME
2.1 BACKGROUND OF THE SCHEME
a. Brief writes up on the scheme including Objectives, Implementation Mechanism, and Scheme
architecture/design
b. Name of sub-schemes/components
c. Year of commencement of scheme
d. Present status with coverage of scheme (operational/non-operational)
e. Sustainable Development Goals (SDG) Served
f. National Development Plans (NDP) Served
2.2 Budgetary allocation and expenditure pattern of the scheme
Sub-
scheme/
component
(Year-1) (Year 2) (Year 3) (Year 4) (Year 5)
BE RE Actual BE RE Actual BE RE Actual BE RE Actual BE RE Actual
2.3 Summary of past evaluation since inception of scheme
Year of Evaluation Agency hired for
Evaluation
Recommendations
made and accepted
Recommendations made
but not accepted
3. METHODOLOGY
3.1 Approach (Methodology adopted), Division of country into 9 Biogeographical regions as classified by the
Ministry
3.2 Sample size and sample selection process, tools used: field study/ questionnaire, primary and
secondary data.
4. OBJECTIVE OF THE STUDY
4.1 Performance of the scheme based on the Output/Outcome indicators.
4.2 Additional parameters
a) Coverage of beneficiaries
State District
Urban Rural Urban Rural
Male Female Male Female Male Female Male Female
SC/ST SC/ST SC/ST SC/ST SC/ST SC/ST SC/ST SC/ST
19
b) Implementation mechanism
c) Training / Capacity building of administrators/ facilitators
d) IEC activities
e) Asset/ Service creation& its maintenance plan
f) Benefits (individual, community)
g) Convergence with scheme of own Ministry/ Department or of other Ministry/ Department.
4.3 Gaps in achievement of outcomes
4.4 Key Bottlenecks & Challenges
4.5 Input Use Efficiency
5. OBSERVATION AND RECOMMENDATIONS
5.1 Thematic Assessment
5.2 Externalities
6. CONCLUSION
6.1 Issues & Challenges
6.2 Vision for the future
6.3 Recommendation for scheme with reasons
7. REFERENCES
8. APPENDICES
20
EXPLANATORY MEMORANDUM
2.1(A) Latest guidelines of the scheme may also be annexed.
2.1(b) Sub-schemes/ components which have separate budgetary allocations either through budget line or
through Detailed Demand for Grants (DDG) may also be listed along with component-wise budget
allocation.
2.1(d) Details of number of states/districts/villages where the scheme is functional may be included.
2.1 (e) & (f) May be linked with objective of the scheme.
2.2 If DDG makes allocations for certain items which are not shown as sub schemes/components, the same
may be separately indicated along with allocation in the table.
3.1 Complete list of states as classified by NSSO may be seen on its website.
4.1 Output / Outcome Indicators as proposed/ prepared by NITI Aayog may be considered. In the absence
of these, indicators as spelt out in SFC/ EFC memorandum during appraisal of the scheme may be utilized.
Output / Outcome Indicators (numbers or percentage) must be compared with base year value at all-time
points (periodicity) as per monitoring mechanism framework, also defined in SFC/EFC Memorandums.
4.2 (a) Tabulated information up to Tehsil / Block Level and if possible, up to village level may be provided.
4.2 (b) Focus should be on clarity of instructions, availability of scheme or programme guidelines, clear
definition of roles and responsibilities of functionaries and the number and nature of clarifications /
additional instructions issued w.r.t scheme guidelines.
4.2 (c) Details about training (PFMS /EAT Module, scheme’s portal or any other) with number of
interventions and levels at which these interventions were carried out may be included.
4.2 (d) Details about Stakeholders / Beneficiaries, details of campaigns, media, frequency, feedback etc.
may be included.
4.2 (g) Details about apparatus-manpower office transport etc. may be included. If there is no convergence,
NIL may be recorded.
4.3 These gaps could be attributed to absence of intervention/ non-performance of existing interventions.
4.4 Focus may be on Financial, administrative, Project Management and any other key Bottlenecks &
Challenges.
4.5 Details of (a) requirement of funds as Indicated in EFC / SFC in relation to actual allocation of funds
including timelines of release (b) requirement and allotment of manpower in implementation of scheme /
programme at various levels (PMU / Central / State) (c) involvement of private players Volunteers, non-
governmental organizations and local community etc. in the scheme may be provided.
21
5.1 Thematic assessment should focus on Accountability, Transparency, Employment generation (direct /
indirect). Climate Change and sustainability, Role of TSP/ SCSP, Use of IT, Behavioral change in
stakeholder/beneficiary, R&D, Role, functions, involvement/ support of State govts. Cross cutting themes
can be assessed both through secondary data as well as primary. While conducting meta-analysis of existing
reports, the evaluator should actively review the cross-cutting themes. The primary data for cross cutting
themes will be elicited through specific questions and responses during the key informant interviews and
beneficiary surveys. For example, use of IT in scheme implementation, fund flow, monitoring and
evaluation can be assessed from interaction with concerned ministries/departments as well as states
officials. Similarly, gender mainstreaming can be assessed by introducing specific questions on changes in
knowledge, attitude and practices pertaining to gender equality, attributable to the CS intervention at hand,
through household survey.
5.2 Details of best practices, innovations or scheme / projects where best practices were replicated may be
provided.
6.3 It is essential to highlight the importance of recommendations made for the scheme. The evaluation
agency may provide recommendation for the scheme in any of the following categories (a) Continue in
existing form (b) Continue with some Modifications (suggest modifications) (c) scale up the scheme
(Financial/ Physical/ both) (d) Scale down the scheme (Financial/ Physical/ both) )e) Close (f) Merge with
another scheme as sub-scheme/component.
22
DETAILS OF THE SCHEMES
IN
EACH CATEGORY
23
CATEGORY– I
ENVIRONMENT PROTECTION (EP)
1.1. POLLUTION ABATEMENT SCHEME:
Background & Objectives:
Pollution Abatement Scheme is being implemented since the Seventh Five Year Plan (1990- 1995).
During the XII Plan, two other schemes, Development/ Promotion of Clean Technology & Waste
Minimization Strategies, and Common Effluent Treatment Plant (CETP) were merged with this
scheme.
Approved Outlay of the scheme is ₹ 70.0 crore for 3 years
Proposed duration of the scheme: Three years [FY 2017-18 to FY 2019-20]
The Scheme have following components:
a) Abatement of Pollution;
b) Existing and ongoing Common Effluent Treatment Plants (CETP) funded by the Ministry
c) Existing and ongoing projects funded under Development and Promotion of Clean
d) Technology and Waste Minimization Strategies
Objectives of the scheme include the following:
1. Lab upgradation/procurement of equipment’s- weaker SPCBs/PCCs
2. Salary support- scientific and technical staff of SPCBs of NE region and all PCCs
3. Construction of Office-cum-laboratory building- SPCBs of NE region and all weaker PCCs.
4. Capacity building of SPCBs/PCCs through semi-government organizations and NGOs
5. Capacity Building of SPCBs/PCCs including other environmental organizations by imparting
training and education through semi-Governmental Organizations and NGOs.
6. Awareness and education, seminars/workshops/conference, compliance assistance amongst
SMEs through CPCBs/SPCBs, semi-governmental organizations and NGOs.
7. Result oriented time bound Technical Studies for R&D, survey and documentation for
creation of environmental database and consultation in the area of pollution abatement
8. Demonstration/pilot Projects, including prototype development for Best Available
Technologies and Best Environmental Practices for waste prevention and minimization
strategies and control and abatement of pollution whose primary research has already been
completed and is ready for pilot scale demonstration.
9. Revival of the ECOMARK Scheme.
10. Formulation of Action Plan for control of air pollution in 100 Non-attainment cities.
24
11. Formulation of Action Plan for control of pollution in 30 river stretches and 5 lakes.
12. Domestic component of Externally Aided Project
13. Funding to projects for Environmental Health.
14. Funding for ongoing CETP and CT projects.
Scope of the Scheme
1. Establishment of new CETPs in an industrial estate or a cluster of SSIs
2. Upgradation/modernization proposals for CETPs earlier financed through the MoEF&CC to
be considered for one-time funding provided time interval between the commission of the
existing CETP and the submission of proposal for upgradation should not be less than 7 yea
Outcome:
1. Strengthening of 5 SPCBs/PCCs each year by funding for Salary Support, Office cum
Laboratory Building and procurement of laboratory equipment.
2. 2-3 new projects under Environmental Health each year.
3. Performance based funding to 3-4 new innovative technologies for prevention, minimization,
control and abatement of air, water and any other industrial pollution.
4. At least 15-20 R&D projects are undertaken
5. Completion of the approximately 8 ongoing CETPs and generation of Effluent Treatment
Capacity
6. Completion of the approximately 25 ongoing CT projects.
7. Finalization of the Final Technical reports of the completed projects and Booklet as awareness
document.
Output:
Table No.2: Outputs of the Scheme
Component 2017-18 2018-19 2019-20
Funding to the
ongoing CETP
projects
Provide funding for 2
ongoing CETP projects
Complete the
ongoing 3 CETP
projects
Complete the
ongoing 3 CETP
projects.
Funding to the
ongoing CT projects
Provide funding for
ongoing 3 CT projects
Complete 7 ongoing
CT projects
Complete 7 ongoing
CT projects.
Funding for Ongoing
and New projects
under Assistance for
Abatement of
Pollution.
Provide funding for
strengthening of 5
SPCBs.
Take up 2-3 new
projects under
Environmental Health.
Provide funding for
strengthening of 5
SPCBs
Take up 2-3 new
projects under
Provide funding for
strengthening of 5
SPCBs.
Take up 2-3 new
projects under
25
Component 2017-18 2018-19 2019-20
Environmental
Health.
Environmental
Health.
Performance based
funding to new
innovative
technologies for
prevention,
minimization, control
and abatement of air,
water and any other
industrial pollution
To take up 3-4 new
projects and to
disseminate outcome of
various completed
studies.
To take up 3-4 new
projects and to
disseminate
outcome of various
completed studies.
To finalise the Final
Technical report
and Booklet as
awareness
document.
To organize the
workshop/Training
programmes for
dissemination of the
outcome of the
project among the
entrepreneur
To take up 3-4 new
projects and to
disseminate
outcome of various
completed studies.
To finalise the Final
Technical report
and Booklet as
awareness
document.
To organize the
workshop/Training
programmes for
dissemination of the
outcome of the
project among the
entrepreneur
Formulation of Action
Plan for control of air
pollution in 100 Non-
attainment cities and
extend implementation
support.
Prepare action plan for
30 Cities.
Prepare action plan
for 30 Cities.
Prepare action plan
for 40 Cities.
Formulation of Action
Plan for control of
pollution in 30 river
stretches and 5 lakes
and extend
implementation
support.
Formulation of action
plan for 10 river
stretches.
Formulation of action
plan for 1 lake.
Formulation of
action plan for 10
river stretches.
Formulation of
action plan for 1
lake.
Formulation of
action plan for 10
river stretches.
Formulation of
action plan for 1
lake.
Financials:
Table No. 3 : The Budget Allocation of the Scheme
(₹ in crore)
Name of Scheme 2017-18 2018-19 2019-20 Total
BE BE RE Actual BE RE Actual BE
Pollution Abatement 21.20 7.50 7.47 20.00 20.00 19.72 10.00 51.20
26
1.2.HAZARDOUS SUBSTANCES MANAGEMENT SCHEME
A. Background
Hazardous Substances Management (HSM) involves planning and overseeing
implementation of policies/ programs on management of chemical emergencies and hazardous
substances, promoting their safe handling, management and use of hazardous substances
(hazardous chemicals, hazardous and other wastes).
Such activities are being undertaken in the following major thrust areas:
i. Hazardous Waste Management
ii. E- Waste Management.
iii. Chemical safety.
iv. Municipal Solid Waste (MSW) Management and Plastic Waste Management.
v. Bio-Medical Waste Management.
vi. International Conventions on Management of Hazardous Substances
The following sub-schemes/components are part of the Central Sector Scheme:
1) Innovative solution for municipal solid waste segregation, handling and treatment including
SAMPATTI - ‘Sustainable Management of Pre-owner Asset through Trade Initiatives’.
2) Capacity building of government agencies/organizations/department/civil society/institute
with respect to environmentally sound management of chemicals and wastes.
3) Organizing awareness program with various stakeholders for implementation of various
waste and chemicals management rules;
4) Innovative technologies for environmentally sound management of chemicals and wastes
(except municipal solid waste); and
5) Setting up facilities for management of biomedical waste and treatment, storage and disposal
of hazardous waste.
B. Objectives
i. Prevention & mitigation of damages to health and environment primarily from Hazardous
Substances.
ii. Promote safer handling and management of Hazardous Substances.
iii. Inventorization of wastes viz. Municipal solid waste, Biomedical waste, C&D waste, Plastic
Waste, Industrial Solid waste, e-waste;
iv. Integration of informal sector with recycling/recovery centers;
v. Establishing institution framework for management of hazardous chemicals including chemical
accidents to minimize the environmental impacts; and
vi. Capacity building in various sectors such as waste collection/transportation /recycling/ recovery/
disposal including aspects such as technology, skill, environmental safeguards, research, etc.
vii. Awareness of stakeholders for implementation of rules on waste management; and
viii. Promotion of innovative technologies for management of chemicals and waste.
ix. Setting up facilities for management of biomedical waste (CBMWTF) and treatment, storage and
disposal (TSDF) for hazardous waste.
27
C. Outcome:
(i) Inventory of the quantity wastes viz. Municipal solid waste, Biomedical waste, C&D waste,
Plastic Waste, Industrial Solid waste, e-waste.
(ii) Innovative technologies for segregation, handling and treatment of municipal solid waste
including setting up of waste banks for collection of segregated waste.
(iii) Identification of cost-effective, eco-friendly and innovative technology for treatment of various
waste streams (Municipal solid waste, Biomedical waste, C&D waste, Plastic Waste, Industrial
Solid waste, e-waste).
(iv) Training of personnel on waste management w.r.t. awareness, safety, environmentally sound
technology, skill development, entrepreneurship, etc.
(v) Development of Centre for Excellence in the institutions for management, training, consulting
and mentoring the country in the field of Hazardous Chemicals, Waste Management, Fly Ash
Utilization and Chemical Accidents Management.
(vi) Creation of National Cell for International Convention on Chemicals and Waste.
(vii) Number of studies conducted on chemicals and waste management.
(viii) Development of various tools supporting chemicals and waste management.
(ix) Number of facilities i.e. TSDF and CBMWTF established.
D. Output:
Table No. 4: Outputs of the Scheme
Components Year 1 Year 2 Year 3
Physical Financial Physical Financial Physical Financial
SAMPATTI -
‘Sustainable Management
of Pre-owner Asset
through Trade Initiatives’
: Innovative solutions for
municipal solid waste
segregation, handling and
treatment
The new
projects
are likely
to be
approved
under the
scheme.
₹
10
Crores
To
pursue
the
ongoing
projects
as well as
the new
projects
is likely
to be
approved
under the
scheme.
₹
10 Crores
To
pursue
the
ongoing
projects
as well as
the new
projects
is likely
to be
approved
under the
scheme.
₹
10Crore
Capacity building of
government
agencies/organizations/de
partment/civil
society/institute with
respect to
environmentally sound
management of chemicals
and wastes.
Ongoing
sub-
scheme
on
maintena
nce of
software
and
website
on
₹
5 Crores
Ongoing
sub-
scheme
on
maintena
nce of
software
and
website
on
₹
7.5
Crores
Ongoing
sub-
scheme
on
maintena
nce of
software
and
website
on
₹
7.5
Crores
28
Components Year 1 Year 2 Year 3
Physical Financial Physical Financial Physical Financial
chemical
and
waste
manage
ment.
Two
training
programs
of 100
personne
l on
chemical
accidents
through
SPCB
Two
trainings
of 100
personne
l engaged
in solid
waste
manage
ment
through
SPCB
Five
Skill
Develop
ment
trainings
50
person
each 250
person
chemical
and
waste
manage
ment.
Three
training
programs
of 150
personne
l on
chemical
accidents
through
SPCB
Five
trainings
programs
of 250
personne
l engaged
in solid
waste
manage
ment
through
SPCB
Five
Skill
Develop
ment
trainings
50
person
each 250
person
Funding
to centre
for
excellenc
chemical
and
waste
manage
ment.
Three
training
programs
of 150
personne
l on
chemical
accidents
through
SPCB
Five
training
programs
of 250
personne
l engaged
in solid
waste
manage
ment
through
SPCB
Five
Skill
Develop
ment
trainings
50
person
each 250
person
Funding
of centre
for
excellenc
29
Components Year 1 Year 2 Year 3
Physical Financial Physical Financial Physical Financial
Identific
ation of
centre for
excellenc
e
for
national
capacity
building
for
multilate
ral
environ
mental
agreeme
nts on
chemical
s and
waste
e for
national
capacity
building
for
multilate
ral
environ
mental
agreeme
nts on
chemical
s and
waste
e for
national
capacity
building
for
multilate
ral
environ
mental
agreeme
nts on
chemical
s and
waste
Organizing awareness
program with various
stakeholders for
implementation of various
waste and chemicals
management rules.
Preparati
on of
media
clips,
advertise
ments,
brochure
s, etc.
Organiza
tion of
two
Awarene
ss
campaig
ns and
worksho
ps of
stake
holders
₹
5 Crores
Broadcas
t through
various
media
such as
social,
televisio
ns, radio,
newspap
er etc.
Organiza
tion of
five
Awarene
ss
campaig
ns and
worksho
ps of
stake
holders
Creation
of
₹
7.5
Crores
Broadcas
t through
various
media
such as
social,
televisio
ns, radio,
newspap
er etc.
Organiza
tion of
five
Awarene
ss
campaig
ns and
worksho
ps of
stake
holders
₹
7.5
Crores
30
Components Year 1 Year 2 Year 3
Physical Financial Physical Financial Physical Financial
Creation
of
website
for
informati
on of
public
with
FAQs.
Advertis
ement
will also
be done
in
collabora
tion with
other
stakehol
ders by
sharing
the cost.
website
for
informati
on of
public
with
FAQs
and
updates
on waste
manage
ment
Innovative technologies
for environmentally
sound management of
chemicals and wastes
(except municipal solid
waste).
Assessm
ent and
appraisal
of the
proposal
s
received
under the
sub-
scheme
Release
of funds
to the
approved
projects.
₹
5 Crores
Assessm
ent and
appraisal
of the
proposal
s
received
under the
sub-
scheme
Release
of funds
to the
approved
projects.
₹
7.5
Crores
Release
of funds
to the
approved
projects
and
monitor
its
progress
₹
7.5
Crores
31
Components Year 1 Year 2 Year 3
Physical Financial Physical Financial Physical Financial
Setting up facilities for
management of
biomedical waste and
treatment, storage and
disposal of hazardous
waste.
New
projects
for
setting
up
facilities
for
manage
ment of
biomedic
al waste
(CBMW
TF) and
treatment
, storage
and
disposal
(TSDF)
for
hazardou
s waste.
₹
10
Crores
To
pursue
the
ongoing
projects
as well as
the new
projects
is likely
to be
approved
under the
scheme.
₹
10 Crores
To
pursue
the
ongoing
projects
as well as
the new
projects
is likely
to be
approved
under the
scheme.
₹
10
Crores
E. Financials:
Table No. 5: The Budget Allocation of the Scheme
(₹ in crores)
Sl.
No
.
Name of Scheme 2017-18 2018-19 2019
-20 Total
BE BE RE Actual BE RE Actual BE
3
Hazardous
Substances
Management 54.32 75.50 72.26 15.00 13.0 12.96 15.00 84.32
F. Key Deliverables of the Scheme:
1. Covering above scope and expected outputs.
2. Progress Report of the project to be submitted containing clear roadmap/ strategies to evaluate the
scheme in an effective and efficient manner.
3. Listing the drawbacks, merits, demerits, bottlenecks
4. To evaluate:
a. Inventory of the quantity wastes viz. Municipal solid waste, Biomedical waste, C&D waste,
Plastic Waste, Industrial Solid waste, e-waste.
b. Innovative technologies for segregation, handling and treatment of municipal solid waste
including setting up of waste banks for collection of segregated waste.
32
c. Identification of cost-effective, eco-friendly and innovative technology for treatment of
various waste
streams (Municipal solid waste, Biomedical waste, C&D waste, Plastic Waste, Industrial Solid
waste, e-waste).
d. Training of personnel on waste management w.r.t. awareness, safety, environmentally
sound technology, skill development, entrepreneurship, etc.
e. Development of Centre for Excellence in the institutions for management, training,
consulting and mentoring the country in the field of Hazardous Chemicals, Waste
Management, Fly Ash Utilization and Chemical Accidents Management.
f. Creation of National Cell for International Convention on Chemicals and Waste.
g. Number of studies conducted on chemicals and waste management.
h. Development of various tools supporting chemicals and waste management.
i. Number of facilities i.e. TSDF and CBMWTF established.
33
1.3.CONTROL OF POLLUTION
Background
The Central Pollution Control Board (CPCB) is a statutory organisation constituted in September, 1974
under the Water (Prevention and Control of Pollution) Act, 1974. Further, CPCB was entrusted with powers
and functions under the Air (Prevention and Control of Pollution) Act, 1981. Subsequently CPCB was
delegated powers under the Environment (Protection) Act, 1986.
Approved Outlay of the Scheme is Rs. 907.46 crore
Proposed duration of the scheme: Two year (2018-19 to 2019-20)
Objective:
(a) Financial support to CPCB, SPCBs and PCCs for identified activities viz.Laboratory Development,
E-Governance and IT applications including online consent management, Online emission/effluent
monitoring systems, development of IT infrastructure, Training and Mass Awareness, Pollution
Assessment (Source monitoring, Monitoring of Ambient Air, water and Noise)
(b) Financial support for office operation and establishment of SPCBs and PCCs
(c) Salary support- scientific and technical staff of SPCBs and PCCs
(d) Capacity Building of SPCBs/PCCs including other environmental organizations by imparting
training and education through semi-Governmental Organizations and NGOs
(e) Awareness and education, seminars/workshops/conference, compliance assistance amongst SMEs
through CPCBs/SPCBs, semi-governmental organizations and NGOs
(f) Result oriented time bound R&D studies for control and abatement of pollution specifically air and
water pollution through CPCB/SPCBs/PCCs
(g) Formulation of Action Plan for control of air pollution in 100 Non-attainment cities through CPCB
(h) Formulation of Action Plan for control of pollution in 30 river stretches and 5 lakes through CPCB
(i) Funding to projects for Environmental Health
(j) Funding to NCAP
(k) Strengthening of air quality monitoring network – NAMP
(l) Strengthening of air quality monitoring network – CAAQMS
(m) Strengthening of National Ambient Noise Monitoring Network – NANMN
(n) Funding for Outreach Programmes
34
The Scheme have following components:
a) Assistance for Abatement of Pollution to Central Pollution Control Board (CPCB) and State
Pollution Control Boards/ Pollution Control Committee (SPCBs/ PCCs) in lieu of Water Cess funds
subsumed with GST with special provision to SPCBs/PCCs of weaker States/UTs and NE States
b) National Clean Air Programme (NCAP)
c) Operation and Maintenance of National Air Quality Monitoring Programme (NAMP) stations
d) Operation and Maintenance of Continuous Ambient Air Quality Monitoring Stations (CAAQMS)
e) National Ambient Noise Monitoring Network (NANMN) – strengthening and establishment New
Stations in Million Plus Cities
f) National Water Monitoring Programme
g) Outreach programmes
Outcomes:
1 Pollution Abatement
2 Providing financial support to CPCB and all State Pollution Control Boards/Pollution Control
Committee (SPCBs/ PCCs) as well as NE states in lieu of Water Cess
3 Funding to SPCBs/PCCs and NE States/ UTs for laboratory development, e-governance, IT
applications, pollution assessment, training and mass awareness, R&D activities, salary and
establishment
4 2-3 new projects under Environmental Health each year
5 Provide funding for augmenting of 500 NAMP stations
6 Funding O&M cost to CPCB for NAMP
7 Provide funding for SAS for 50 non-attainment cities
8 Provide funding for augmenting of 75 CAAQMS
9 Funding O&M cost to CPCB for CAAQMS
10 Funding to CPCB for Monitoring of PM2.5
11 Funding to CPCB for AQMP for 50 non-attainment cities
12 Funding to CPCB, SPCBs/PCCs and NE States/UTs for capacity building
13 Installation of 52 Noise Monitoring Stations by CPCB
14 Reimbursement to CPCB for water quality monitoring to 29 States and 6 UT 10-15 R&D study
15 Finalization of the Final Technical reports of the completed projects and Booklet as awareness
35
document
16 Preparation & implementation action plan for 70 Cities
17 Formulation & implementation of action plan for 20 river stretches
18 Formulation of action plan for 4 lakes
19 15 Stakeholder’s consultations / meetings, 9 Interaction with common people and 9 Pollution
campaigns & Field survey
Outputs:
Table: 6 : Output of the scheme
Component 2018-
19
2019-20
Funding to projects under
scheme
‘Providing financial support
to CPCB and State Pollution
Control Boards/ Pollution
Control Committee
(SPCBs/ PCCs) in lieu of
Water Cess ‘
Provide funding for
utilization on
programme and
activities related to the
prevention and
control of pollution
of 22 SPCBs and 5
PCC
Provide funding for utilization
on programme and activities
related to the prevention and
control of pollution of all 22
SPCBs and 5 PCC
Funding for Ongoing and New
projects under Assistance
for Abatement of Pollution.
Provide funding for
strengthening of 5
weaker SPCBs.
Take up 2-3 new
projects under
Environmental
Health.
Provide funding for
strengthening of 5 weaker
SPCBs.
Take up 2-3 new projects under
Environmental Health.
Funding to NCAP Provide funding for
augmenting of 500
NAMP stations
SAS for 50 non-
attainment cities
Provide funding for
augmenting of 75
CAAQMS
Monitoring of PM2.5
AQMP for 50
non- attainment cities
Capacity building
Provide funding for
augmenting of 500 NAMP
stations
SAS for 50 non- attainment
cities
Provide funding for
augmenting of 75 CAAQMS
Monitoring of PM2.5
AQMP for 50 non-
attainment cities
Capacity building
O&M of NAMP stations O&M to 12
SPCBs/PCC
O&M to 13
SPCBs/PCC
36
Component 2018-
19
2019-20
O&M of CAAQMS CAAQMS in 3
Million- Plus Cities
CAAQMS in 5 State
Capitals
CAAQMS in 6
UT Capitals
CAAQMS in 2
Polluted Cities
CAAQMS in 1
Eco
Cities
CAAQMS in 3 Million- Plus
Cities
CAAQMS in 5 State Capitals
CAAQMS in 6 UT Capitals
CAAQMS in 2 Polluted Cities
CAAQMS in 1 Eco
cities
Funding for National Ambient
Noise Monitoring Network
(NANMN)
Installation of 52
Noise Monitoring
Stations
O&M
Installation of 52 Noise
Monitoring Stations
O&M
Funding to National Water
Monitoring Programme
Reimbursement for
water
quality monitoring to
15
State/UT
Reimbursement for water
quality monitoring to 15
State/UT
R & D Studies for
Pollution Abatement
7 R & D Studies 8 R & D Studies
Formulation and
implementation of
Action Plan for control
of air pollution in 100
Non-attainment cities
and extend
implementation
support
Preparation
implementation
action plan for 30
Cities.
Preparation
implementation action plan for
40 Cities.
Formulation and
implementation of Action Plan
for control of pollution in 30
river stretches and 5 lakes and
extend
implementation support
Formulation
& implementation of
action plan for 10
river stretches.
Formulation of
action plan for 2 lake.
Formulation&
implementation action plan of
10 for river stretches.
Formulation action plan
of 2 for
Lake.
Funding for Outreach
Programmes
5
Stakeholder’s
consultations
/ meetings
3 Interaction with
common people;
3 Pollution
campaigns
& Field survey
5 Stakeholder’s
consultations /
meetings
3 Interaction with common
people;
3 Pollution campaigns
& Field survey
37
Financial:
Table No. 7 Budget Allocation of the Scheme (₹ in crore)
Name of Scheme 2017-18 2018-19 2019-20 Total BE
Control of
Pollution
BE RE Actual BE RE Actual BE
- - - - 5.00 4.95 460.00 460.00
38
TERMS OF REFERENCE FOR EVALUATION
OF
CATEGORY - II
ENVIRONMENT CONSERVATION (EC)
39
2.1 ECO-TASK FORCE SCHEME
A. Objectives
1. The Ecological Task Force (ETF) scheme was conceptualized by the Ministry of Defense in 1982 for
ecological restoration of terrains, rendered difficult either due to severe degradation or remote location
or difficult law and order situation. The scheme also envisages for soil conservation and water
resources management techniques. It serves to secure the involvement of ex-servicemen for
productive work and to create employment for retired army personnel mainly in the rural areas. The
Scheme is implemented in collaboration with three agencies namely, Ministry of Defense, Ministry
of Environment, Forest and Climate Change and the concerned State Government where the ETF
Battalions are functioning. Each Battalion has been raised through SFC approval under the
Chairmanship of Secretary (EF&CC).
2. The Battalions take up assignments in the ecologically fragile and sensitive areas as per the requirements
of the concerned State Government. An area of 10200 ha in different states is proposed to be afforested
during three years (2017-2020). The scheme is not location specific. At present six ETF battalions are
being supported under the Scheme in a) Uttarakhand, b) Rajasthan, c) Jammu & Kashmir and d)
Assam.
3. The details of Battalions along with the area of operation are given in Table:
Table No.:8 - Details of ETF Battalions along with the area of operation
Sl.
No.
TA Bn ID
No.
For year Location Area to be
covered
approx.(In
Hectares)
Saplings to be
planted (In
lakhs)
1 127 ETF
Bn
2017-2020 Shivalik Hills
(Uttarakhand)
1200 12.00
2 128 ETF
Bn
2017-2020 Rajasthan Cannal (Bajju) 1800 18.00
3 129 ETF
Bn
2017-2020 State of J & K 600 6.00
4 130 ETF
Bn
2017-2020 Pithoragarh (Uttarakhand) 1200 12.00
5 134 ETF
Bn
2017-2020 Sonitpur (West), Assam 2700 27.00
6 135 ETF
Bn
2017-2020 Haltugaon, Assam 2700 27.00
Total(6
bns)
4 States 10200 102.00
Land under difficult degraded forest traits is earmarked by State Forest Departments to the ETF
Battalions annually and eco-restoration costs including the cost of material plus sapling is also met by
SFDs.
4. The scheme of Eco Development Force is based on twin objectives of
40
i. Ecological degeneration in difficult areas like deserts, terrains, mountain slopes.
ii. Creating employment opportunities for the ex-servicemen.
5. Proposed duration of the scheme: Three years
B. Scope of Work
a) ETF uses technical expertise of the respective State Forest Department (SFD) for its activities. The
major components of the scheme are:
i. Ecological Restoration of Terrains
ii. Soil Conservation
iii. Water Management Techniques
iv. Plantation of Saplings and fencing etc.
v. Meaningful employment of Ex-serviceman.
C. Outcome:
The outcome of the scheme can be measured by area which has been ecologically restored by taking
up plantation over such fragile and degraded lands in difficult terrain. So far under ETF 55188 ha
area has been brought under plantations by planting 530.26 lakh numbers of saplings. In addition to
afforestation, another outcome of this scheme is providing employment to ex-servicemen. Apart from
the ecological impact, due to the availability of abundant grass and leaf fodder for cattle the health
and milk yield has improved thereby generating employment for the local public including women.
Continuation of the scheme will bring about environmental improvement and ecological restoration
thus having a positive impact on the environment.
D. Key Deliverables of the Scheme:
a) Taking up plantation over such fragile and degraded lands in difficult terrain.
b) Covering above scope and expected outputs.
c) Preparing the draft report which shall contain clear roadmap/ strategies to evaluate the scheme in
an effective and efficient manner.
d) Listing the drawbacks, merits, demerits, bottlenecks
E. Output: The Battalions take up assignments in the ecologically fragile and sensitive areas as per the
requirements of the concerned State Govt. An area of 10200 ha in different States is proposed to be
afforested during next three years (Battalion-wise), as per the details given below:
Table No. 9: Outputs of the Scheme
Unit Year State Area to be covered
approx.
(In Hectares)
Saplings to be
planted (In lakhs)
127 ETF Bn(TA) 2017-20 Uttarakhand 1200 12.00
128 ETF Bn(TA) 2017-20 Rajasthan 1800 18.00
129 ETF Bn(TA) 2017-20 J &K 600 6.00
130 ETF Bn(TA) 2017-20 Uttarakhand 1200 12.00
134 ETF Bn(TA) 2017-20 Assam 2700 27.00
135 ETF Bn(TA) 2017-20 Assam 2700 27.00
41
F. Financials:
Table No. 10: The Budget Allocation of the Scheme
(₹ in crore)
Name of Scheme 2017-18 2018-19 2019-
20
Total
BE
BE RE Actual BE RE Actual BE
Eco-Task Force 30.00 120.00 120.00 67.50 112.85 112.85 75.00 172.50
42
2.2 CLIMATE CHANGE ACTION PLAN
A. Background
a) The Ministry formulated India’s climate change policies in line with National Action Plan on Climate
Change (NAPCC), “Climate Change Action Programme (CCAP)”, which was approved by the
Cabinet in January 2013 for implementation in the XII Five Year Plan as a Central Scheme.
b) The scheme was created to strengthen the scientific and analytical capacity for assessment of climate
change in the country, formulate adequate response measures to the challenge and implement the
activities/programmes in order to achieve sustainable development.
c) Approved Outlay of the scheme is ₹ 290.0 crore for 3 years
d) Proposed duration of the scheme: Three years (2017-18 to 2019-20)
B. Objectives
i. Build and support capacity at Central & State levels to assess climate change, formulate
adequate response measures and implement relevant activities
ii. Create and strengthen scientific & analytical capacity for assessment of climate change in the
country
iii. Establish appropriate institutional framework for scientific & policy initiatives
iv. Implementation of climate related actions in the context of sustainable development
v. The objective of NCAP is:
• Understanding role of carbonaceous aerosols in regional climate change over
India using source measurement, modelling and impact analysis
• Developing national carbonaceous aerosols emission inventory, emission
measurement in four sectors (residential, diesel transport, agriculture field
burning & brick production)
• Modeling for source apportionment and regional transport
• Understanding influence on clouds & rainfall.
C. Scope of Work
i. Coordination of implementation of National Action Plan on Climate Change (NAPCC) –
nodal Ministry for coordinating implementation of the National Missions and giving
inputs and support to Prime Minister’s Council on Climate Change and to Executive
Committee on Climate Change
ii. National Carbonaceous Aerosols Programme (NCAP) -Consortium of 17 institutes –
Understand role of carbonaceous aerosols in regional climate change over India using
source measurement, modeling and impact analysis; Developing national carbonaceous
aerosols emission inventory, emission measurement in four sectors (residential, diesel
transport, agriculture field burning & brick production); Modeling for source
apportionment and regional transport; Understanding influence on clouds &rainfall
iii. Long Term Ecological Observatories (LTEO) Programme – to create a network of field
sites for undertaking observations to study effects of climate change with a total outlay of
₹ 40 crore for five yea₹ Different agencies will conduct studies on identified themes across
43
eight sites.
iv. Coordinated Studies on Climate Change in North Eastern Region (CSCCNER) – to
undertake studies on impacts of Climate Change in North Eastern India in the areas of
Forests, Biodiversity, Water, Agriculture, Human Settlements and develop mitigation and
adaptation options for the region.
v. State Action Plan on Climate Change (SAPCC) – to enhance capacity at State level for
undertaking climate change activities in line with NAPCC and give financial support to
States for specific projects
vi. National Institute on Climate Change Studies & Actions (NICCSA) – An apex
autonomous institution to support and inform the Government & public in the area of
climate change– external funding of four million Euros by GIZ (Germany) for
technological support.
vii. International negotiations and contribution
viii. Capacity Building
ix. Other Administrative and Foreign travels.
D. Outcomes:
Table No. 11: Outcomes of the Scheme
Components
Year 2017-18 Year 2018-19 Year 2019-20
Physical Deliverables Physical Deliverables Physical Deliverables
(i) National
Carbonaceous
Aérosols
Programme
(NCAP)
a) Official Launch of
the NCAP program
at IIT Bombay by
Hon’ble Minister
(EF&CC)
b) Release of the
Program Document
on NCAP-
COALESCE.
b) Finalisation of
specification and
procurement of
equipment for field
sampling and
analysis of data.
a) Pre-operations
workshop for PM2.5
sampling, sampling
schedule, datasheet
templates
b) Pre-operations
workshop for source
sampling, instrument
inter-comparison
c) Emission inventory
compilation with
uncertainty analysis.
a) Workshop on
laboratory inter-
comparison for all
analytes and
Chemical analysis of
source and ambient
samples.
b) Long-term
simulations and
analysis; Modelling
sensitivity of
radiative forcing to
sources and mixing
state; transport
pathways to
Himalaya.
c) Receptor modelling
exercises
44
Components
Year 2017-18 Year 2018-19 Year 2019-20
Physical Deliverables Physical Deliverables Physical Deliverables
d) Establishment of
Emission Inventory
data portal.
(ii) Long Term
Ecological
Observatories for
Climate Change
Studies
a) Identification of
institutions
undertaking the
studies
b) Identification of
Network of field
sites for
undertaking long
term observations
to study effects of
climate change
across 8 ecological
regions.
c) Establishment of
Automated
Weather Stations
across LTEO sites
a) Launch of
observations at project
sites
b) Inception Reports
a) Preparation of reports
on various thematic
areas.
b) Disseminations of
research findings.
(iii)Coordinated
Studies on
Climate Change
for North
Eastern Region
a) Studies on impacts
of climate change
on forests,
biodiversity, water,
agriculture &
human settlements
in North Eastern
States to be
awarded.
a) Creation of Knowledge
base to bridge existing
gap on CC impact,
adaptation &
mitigation and for
monitoring Climate
Change in NER owing
to its special
geographical and
ecological context.
a) Preparation of
reports on impacts of
climate change on
forests, biodiversity,
water, agriculture &
human settlements.
b) Dissemination of
research findings.
c) Development of
adaptation and
mitigation plans for
the region.
(iv) Coordination of
the National
a) Organization of
meetings of the
Prime Minister’s
a) Organization of
meetings of the Prime
Minister’s Council on
a) Organization of
meetings of the
Prime Minister’s
45
Components
Year 2017-18 Year 2018-19 Year 2019-20
Physical Deliverables Physical Deliverables Physical Deliverables
Action Plan on
Climate Change
Council on Climate
Change (PMCCC)
and Executive
Committee on
Climate Change
(ECCC) to review
the progress of
implementation of
the National
Missions under
NAPCC.
Climate Change
(PMCCC) and
Executive Committee
on Climate Change
(ECCC) to review the
progress of
implementation of the
National Missions
under NAPCC.
Council on
Climate Change
(PMCCC) and
Executive
Committee on
Climate Change
(ECCC) to review
the progress of
implementation of
the National
Missions under
NAPCC.
b) Organisation of
Workshops/Consu
ltations/training
programmes
(v) State Action Plan
on Climate
Change
a) Implementation of
demonstrations
projects at the
States.
b) Provide grants to
States for capacity
building under
SAPCC
a) Implementation of
demonstrations
projects at the States.
b) Provide grants to
States for capacity
building under SAPCC
a) Implementation of
demonstrations
projects at the States.
b) Provide grants to
States for capacity
building under
SAPCC
(vi) International
Negotiations &
Contributions
a) Participation at
Conference of the
Parties (COP 23)
to the United
Nations
Framework
Convention on
Climate Change
(UNFCCC) and
inter-sessional
a) Participation at
Conference of the
Parties (COP24) to the
United Nations
Framework
Convention on Climate
Change (UNFCCC)
and inter-sessional
meetings of the
UNFCCC
a) Participation at
Conference of the
Parties (COP25) to
the United Nations
Framework
Convention on
Climate Change
(UNFCCC) and
inter-sessional
meetings of the
UNFCCC
46
Components
Year 2017-18 Year 2018-19 Year 2019-20
Physical Deliverables Physical Deliverables Physical Deliverables
meetings of the
UNFCCC
b) Organization of
India Pavilion at
the COP23
c) Financial
contributions to
UNFCCC and
Kyoto Protocol for
the year 2017-
2018
d) Participation/orga
nizing meetings
with coalition
groups eg G-77,
BASIC, LMDC
b) Organization of India
Pavilion at the COP24.
c) Financial contributions
to UNFCCC and Kyoto
Protocol for the year
2018-2019
d) Participation/organizin
g meetings with
coalition groups eg G-
77, BASIC, LMDC
b) Organization of India
Pavilion at the
COP25.
c) Financial
contributions to
UNFCCC and Kyoto
Protocol for the year
2019-2020
d) Participation/organiz
ing meetings with
coalition groups e.g.
G-77, BASIC,
LMDC
(vii) Capacity
Building
a) Support scientific
studies
b) Organization of
training
programmes/
conferences /
workshops at the
central, state and
levels sub-regional
a) Support scientific
studies
b) Organization of
Training programmes/
conferences /
workshops at the
central, state and levels
sub-regional
a) Support scientific
studies
b) Organization of
training
programmes/
conferences /
workshops at the
central, state and
levels sub-regional
(viii) Other
Administrative
and Foreign
Travels
Publications,
Advertisements,
Professional Fee etc
Publications,
Advertisements,
Professional Fee etc
Publications,
Advertisements,
Professional Fee etc
47
E. Output:
Table No. 12: Outputs of the Scheme
Components
Year 2017-18 Year 2018-19 Year 2019-20
Physical
Deliverables
₹
in
cr
Physical
Deliverables
₹
in
cr
Physical
Deliverables
₹
in
cr
1. Coordinati
on of the
National
Action Plan
on Climate
Change
(NAPCC).
Organize
meeting of
the
Executive
Committee
on Climate
Change to
review the
progress of
implementat
ion of the
National
Missions
under
NAPCC.
....
(i) Organize
meeting of the
Prime Minister’s
Council on
Climate Change.
(ii) Organize
meeting of the
Executive
Committee on
Climate Change
to review the
progress of
implementation
of the National
Missions under
NAPCC.
(i) Organize
workshops/
consultations/trai
ning
programmes.
(iii)Prepare and
disseminate
knowledge
products.
0.10
(i) Organize
meetings of the
Executive
Committee on
Climate Change
to review the
progress of
implementation of
the National
Missions under
NAPCC.
(ii) Organize
Workshops/
Consultations/trai
ning programmes
(iii)Prepare and
disseminate
knowledge
products.
0.20
2. State
Action Plan
on Climate
Change
(SAPCC)
Support
demonstrati
on projects
for
implementat
ion of
activities
under
SAPCC,
mass
awareness &
training of
officials.
7.72 Support
demonstration
projects for
implementation of
activities under
SAPCC, mass
awareness & training
of officials.
7.73 Support
demonstration
projects for
implementation of
activities under
SAPCC, mass
awareness & training
of officials.
7.73
48
Components
Year 2017-18 Year 2018-19 Year 2019-20
Physical
Deliverables
₹
in
cr
Physical
Deliverables
₹
in
cr
Physical
Deliverables
₹
in
cr
3. National
Institute for
Climate
Change
Studies &
Actions
(NICCSA).
Finalisation
of the way
forward to
set up
NICSSA
...
(i) Committee of
Secretaries to
approve and
decide on the
structure and
functions of the
NICCSA.
(ii) Infrastructure
setup for NICCSA
and initial
functioning of
institution.
0.50 (i) Support
preparation of
National
Communications
(NATCOM) to the
United Nations
Framework
Conventions on
Climate Change
(UNFCCC) and
Biennial Update
Reports (BUR)
(ii) Support
research studies
on climate
change issues.
(iii)Support socio-
economic,
technical and
analytical
studies.
0.50
4. National
Carbonace
ous
Aérosols
Programme
(NCAP)
(i) Official
Launch of
the
program
by the
Minister
and
Workshop
of 17
participati
ng
institutions
at IIT
Bombay
(ii) Release of
the
Program
Document
on the
Black
6.60 (i) Pre-operations
workshop for
PM2.5 sampling,
sampling
schedule,
datasheet
templates
(ii) Procurement of
equipment
required for
source samplings
(iii)Pre-operations
workshop for
source sampling,
instrument inter-
comparison,
(iv) Emission
inventory
compilation with
7.26 (i) Workshop on
laboratory inter-
comparison for all
analytes and
Chemical analysis
of source and
ambient samples.
(ii) Long-term
simulations and
analysis;
Modelling
sensitivity of
radiative forcing
to sources and
mixing state;
transport
pathways to
Himalaya.
7.99
49
Components
Year 2017-18 Year 2018-19 Year 2019-20
Physical
Deliverables
₹
in
cr
Physical
Deliverables
₹
in
cr
Physical
Deliverables
₹
in
cr
Carbon
Research.
(iii)Recruitme
nt of staff
and
procureme
nt of
equipment
.
uncertainty
analysis.
(iii)Receptor
modelling
exercises
(iv) Establishment of
Emission
Inventory data
portal.
5. Long Term
Ecological
Observatori
es for
Climate
Change
Studies
(LTEO)
(i) Identify of
institutions
undertakin
g the
studies
(ii) Identify
Network
of field
sites for
undertakin
g long
term
observatio
ns to study
effects of
climate
change
across 8
ecological
regions.
(iii) Selection
of research
project
proposals
from
participati
ng
institutions
and award
of studies
(iv) Establish
Coordinati
4.40 (i) Establish
network of field
sites for
undertaking long
term observations
to study effects
of climate change
across 8
ecological
regions.
(ii) Implementation
of projects under
LTEO by various
institutions.
4.84 (i) Produce reports
on various
thematic areas.
(ii) Disseminations of
research findings.
5.32
50
Components
Year 2017-18 Year 2018-19 Year 2019-20
Physical
Deliverables
₹
in
cr
Physical
Deliverables
₹
in
cr
Physical
Deliverables
₹
in
cr
on Cell of
the LTEO
(v) Establish
Automated
Weather
Stations
across all
LTEO
sites
6. Coordinate
d Studies
on Climate
Change for
North
Eastern
Region
(CSCC
NER)
(i) Finalize
science
plan of the
studies
and
identify
thematic
areas
(ii) Identify
institutions
undertakin
g the
studies.
(iii)Selection
of research
proposals
award of
studies.
1.00 (i) Studies on
impacts of
climate change
on forests,
biodiversity,
water, agriculture
& human
settlements in
North Eastern
States
undertaken.
(ii) Create
knowledge base
to bridge existing
gap on CC
impact,
adaptation &
mitigation and
for monitoring
Climate Change
in NER owing to
its special
geographical and
ecological
context.
1.10 (i) Produce reports
on impacts of
climate change on
forests,
biodiversity,
water, agriculture
& human
settlements.
(ii) Dissemination of
research findings.
(iii)Development of
enhanced
adaptation and
mitigation plans
for the region.
1.21
7. Internation
al
Negotiation
s &
Contributio
ns
(i) Participat
ion at Pre-
COP23
18.0
0
(i) Participation at
Pre-COP24
(ii) Participation at
COP 24
19.3
0
(i) Participation at
Pre-COP25
(ii) Participation at
COP 25
21.2
8
51
Components
Year 2017-18 Year 2018-19 Year 2019-20
Physical
Deliverables
₹
in
cr
Physical
Deliverables
₹
in
cr
Physical
Deliverables
₹
in
cr
(ii) Participat
ion at
COP 23
(iii)India
Pavilion
exhibition
at COP23
(iv) Participat
ion at
other
internatio
nal
negotiatio
ns
(iii)India Pavilion
exhibition at
COP24
(iv) Participation at
other
international
negotiations
(iii)India Pavilion
exhibition at
COP25
(iv) Participation at
other international
negotiations
8. Capacity
Building
Support
Projects on
Capacity
building.
1.00 Support Projects on
Capacity building.
1.00 Support Projects on
Capacity building.
1.00
9. Other
Administra
tive and
Foreign
Travels
Publications,
Advertisement
s, Professional
Fee etc 2.00
Publications,
Advertisements,
Professional Fee etc
2.20 Publications,
Advertisements,
Professional Fee etc
2.42
F. Financials:
Table No. 13: The Budget Allocation of the Scheme (₹ in crore)
Name of Scheme 2017-18 2018-19 2019-20 Total
BE BE RE Actual BE RE Actual BE
Climate Change Action Plan 40.00 33.00 26.86 40.00 40.00 33.17 40.00 120.00
G. Key Deliverables of the Schemes:
a. Covering above scope and expected outputs.
b. Progress Report of the project to be submitted containing clear roadmap/ strategies to
evaluate the scheme in an effective and efficient manner.
c. Listing the drawbacks, merits, demerits, bottlenecks
52
2.3. NATIONAL ADAPTATION FUND SCHEME
A. Background
The National Adaptation Fund for Climate Change (NAFCC) is meant to assist National and
State level activities to meet the cost required for implementing the concrete adaptation measures and
programs in areas that are particularly vulnerable to the adverse effects of climate change. National
Adaptation Fund for Climate Change (NAFCC) was announced in interim budget for 2014-15. As per
the availability of budget, the funding will be provided on adaptation cost basis of projects and
programmes to address the adverse impacts of Climate Change. Accessing funds from NAFCC is done
by various Executing Entities through NABARD, which will act as National Implementing Entity (NIE).
NABARD as NIE will be responsible for overall implementation of the project through its regional
offices located in the states/UTs. Ministries/ Departments of Government of India and State Government
Departments are the executing entities eligible to submit proposals for accessing fund from NAFCC.
B. Objective:
The funds will be operated on the basis of criteria outlined in the Strategic Priorities, Policies and
Guidelines of the Adaptation Fund, specifically:
i. Level of vulnerability;
ii. Level of urgency and risks arising from delay;
iii. Ensuring access to the fund in a balanced and equitable manner;
iv. Lessons learned in project and program design and implementation to be captured;
v. Securing regional co-benefits to the extent possible, where applicable;
vi. Maximizing multi-sectoral or cross-sectoral benefits;
vii. Adaptive capacity to the adverse effects of climate change
C. Scope of Work
I. Funding concrete adaptation projects/programmes aligned with the relevant Missions under NAPCC
and the SAPCCs in agriculture, horticulture, agro-forestry, environment, allied activities, water,
forestry, urban, coastal and low-lying system, disaster management, human health, marine system,
tourism, habitat sector and other rural livelihood sectors to address climate change related issues.
II. Preparing and updating climate scenario, assessing vulnerability and climate impact assessment
III. Capacity building of various stakeholders on climate change adaptation and project cycle
management and developing knowledge network
I. Mainstreaming the approaches/ learnings from project/programme implementation through
knowledge Management.
II. Projects/programmes to be supported should have specific objective(s) and concrete outcome(s)
and output(s) that are measurable, monitor able, and verifiable.
D. Outcome:
Fund level outcome parameters will consist of the following:
a) Reduced key risks and adverse impacts of climate change in water and agriculture sectors
b) Maximized multi-sectoral, cross-sectoral benefits/co-benefits to meet the challenges of water and
food security
53
c) Human development, poverty alleviation, livelihood security an enhanced awareness of
community
d) Strengthened institutional & individual capacity to reduce risks associated with climate-induced
socioeconomic and environmental losses
e) Strengthened awareness and ownership of adaptation and climate risk reduction processes at local
level
f) Increased adaptive capacity within relevant development and natural resource sectors
g) Increased ecosystem resilience in response to climate change and variability-induced stress
h) Diversified and strengthened livelihoods and sources of income for vulnerable people in targeted
areas
i) Improved policies and regulations that promote and enforce resilience measures
These outcomes/ benefits could be considered as indicators for evaluation of projects on annual and
planned basis.
E. Outputs:
Table No. 14: Outputs of the Scheme
Sectoral Components Year Total
Year 1
(2017-18)
Year 2
(2018-19)
Year 3
(2019-2020)
Physical
(No.)
₹
in
crore Physical
(No.)
₹
in
crore
Physical
(No.)
₹
in
crore
Physical
(No.)
₹
in
crore
Projects in agriculture
sector
11
103
15
114
15
126
41
343
Projects in water sector
Projects in forestry,
urban, coastal and low-
lying system, disaster
management, human
health, marine system,
tourism
Capacity building and
Project preparation
10
1.5
10
1.5
10
1.5
30
4.5
National conference /
workshop
2
2
2
6
Awareness/
information
dissemination
- 5 - 5 - 5 - 15
54
Research and
Development
- 0 - 0 - 0 - 0
Establishing a
coordination and
monitoring unit and
administrative expenses
- 0.5 - 0.5 - 0.5 - 1.5
Total 364
F. Key Deliverables:
a. Covering above scope and expected outputs.
b. Progress Report of the project to be submitted containing clear roadmap/ strategies to
evaluate the scheme in an effective and efficient manner.
c. Listing the drawbacks, merits, demerits, bottlenecks.
d. To evaluate:
i. Reduction in key risks and adverse impacts of climate change in water and agriculture
sectors
ii. Increase in multi-sectoral, cross-sectoral benefits/co-benefits to meet the challenges of
water and food security
iii. Human development, poverty alleviation, livelihood security an enhanced awareness of
community
iv. To improve strengthen of institutional & individual capacity to reduce risks associated
with climate-induced socioeconomic and environmental losses
v. To improve awareness and ownership of adaptation and climate risk reduction processes
at local level
vi. To improve adaptive capacity within relevant development and natural resource sectors
vii. To improve ecosystem resilience in response to climate change and variability-induced
stress
viii. To diversify and strengthen livelihoods and sources of income for vulnerable people in
targeted areas
ix. To Improve policies and regulations that promote and enforce resilience measures
G. Financials:
Table No. 15: The Budget Allocation of the Scheme
(₹ in crores)
Sl.
No.
Name of Scheme 2017-18 2018-19 2019-20 Total
BE BE RE Actual BE RE Actual BE
5
National
Adaptation Fund 110.00 108.25 119.41 110.00 110.00 109.78 100.00 320.00
55
2.4. NATIONAL COASTAL MISSION SCHEME [Including EAP]
A. Background
1. Keeping in view of the importance of the coastal environment and to assist MoEF&CC in the
implementation of Coastal Regulation Zone (CRZ) Notification 2011 and Island Protection Zone (IPZ)
Notification, 2011, MoEF&CC undertook the implementation of the World Bank Assisted Integrated
Coastal Zone Management (ICZM) project.
2. The ICZM project has two components namely,
a) A National level component which covers establishment of Society of Integrated Coastal
Management (SICOM) and
b) National Centre for Sustainable Coastal Management (NCSCM), as Registered Societies, mapping
of hazard line through Survey of India, shore line change mapping, sediment cell mapping, mapping of
ecologically sensitive areas etc., and State level component consisting of piloting ICZM in the coastal States
of Gujarat, Odisha and West Bengal.
B. Objective:
The objectives of the scheme include –
i. To develop the capacity and institutions to implement the Coastal Regulation Zone Notification,
1991 and achieve the objectives of integrated and sustainable coastal management as per the
National Environmental Policy 2006.
ii. To address the issues relating to climate change which have a major implication on the coastal
areas and coastal communities especially with respect to sea level rise and increased frequency of
cyclones and storm surges. Under the programme, an exercise of hazard mapping will be carried
out to protect the coastal people and infrastructure located in the coastal regions.
iii. To develop an institution to carry out studies and research in the area of coastal and marine
management.
iv. To conserve and protect the fragile coastal ecosystems such as the mangroves, brackish water
wetlands, coral reefs etc.
v. To control pollutions of coastal waters from land based sources.
vi. To demonstrate and pilot improved livelihood options of coastal communities threatened by
coastal hazard and pollution.
vii. To develop Integrated Coastal Zone Management plans for better management of coastal areas.
C. Scope of Work
The major components of the scheme are:
1. Mapping, delineation and demarcation of hazard lines and ecological Sensitive areas,
Environmentally Sensitive Areas (ESAs).
2. Delineation of coastal sediment cells for the entire mainland coast of India. Abatement in Coastal
56
States/UTs Phase II of the project.
3. Capacity building of the MoEF and the State Coastal Zone Management Authorities and Nation-
wide training program for coastal zone management.
4. Setting up of a National Centre for Sustainable Coastal Management in Gujarat facility in
Paradeep Odisha Gujarat, Odisha and West Bengal.
D. Outcomes:
As per the National DPR Para no 2.2 the key outcome indicators envisaged are:
i) The existence of an appropriate national institutional structure for guiding coordinating and
implementation of ICZM approaches
ii) The number of “knowledge benchmarks” showing improvement according to end- users of knowledge
services
iii) The number of completed pilot ICZM activities demonstrating cross sectorial and spatial integration and
iv) The number of other ICZM Plans initiated to replicate the lessons learnt.
The project is under implementation and has made remarkable achievements. The World Bank along
with the officials of SICOM, SPMUs, MoEF, State Departments monitor the project periodically and
report is submitted for action. Apart from the above, the project is periodically monitored by State
Steering Committees, and Governing Councils. NPMU is also appointing a third party Monitoring and
Evaluation Consultancy firm and consultants shall be on board from May 2017.The detailed result
framework with outcome indicators is placed at page no 23 to 28. All implementing agencies shall
provide latitude and longitude details for the activities carried out under ICZM Project and Google
imageries/photographs showing status before and after implementation of the activities under ICZM
Project.
E. Output:
Table No. 16: Outputs of the Scheme
Component
s
Year 2017-2020
Physical
Output (Major)
April 2017-March 2018
Physical
Output (Major)
April 2018 to March 2019
Physical
Output (Major)
April 2019 to March
2020
Financials(BE) Financials (BE) Financials(BE)
Recurr
ing
Non-recurring Recurr
ing
Non-recurring Recur
ring
Non-
recurring
74.90 366.98 44.80 40.00 45.00 1.70
National
Component
(a)Hazard line Mapping of east
coast of 37000 sq km
(b)Award of tender for
establishment of 4 Data Centres
(a)Security vetting of Hazard
line of east coast by MoD.
Contract execution and
establishment of 4 Data
57
Component
s
Year 2017-2020
Physical
Output (Major)
April 2017-March 2018
Physical
Output (Major)
April 2018 to March 2019
Physical
Output (Major)
April 2019 to March
2020
State
Component-
Gujarat
State
Component-
Odisha
SPMU-West
Bengal
in Hyderabad, Bangalore,
Chennai and CGO Complex
Delhi.
(C)Third party Monitoring and
Evaluation of the outcome of
the ICZM Project.
(d)Preparatory activities of
Phase-II of each respective
States/UTs and preparation of
DPRs
(e)Preparation of Master Plan
of DANDI
(f) On-going research activities
of NCSCM.
Award and execution of
contract for establishment of
1(one) Marine Research
Conservation and Information
Centre (MRCI)
Award and execution of
contract of Solid Waste
Management at Paradeep.
Award of contract and
preparation of ICZM Plan.
Centres in Hyderabad,
Bangalore, Chennai and CGO
Complex Delhi.
Third Party Monitoring and
Evaluation of the ICZM
Project and report submission.
(a)Setting up of States
SPMUs /UTs and approvals
from DEA, EFC & CCEA of
Phase-II.
Implementation of Master
Plan of DANDI.
On-going research activities of
NCSCM.
Contract execution and
establishment of Marine
Research Conservation and
Information Centre (MRCI)
Execution of contract of Solid
Waste Management at
Paradeep.
Submission of ICZM plan to
State Govt.
(a)Approvals from
DEA, EFC & CCEA
of Phase-II.
On-going research
activities of NCSCM.
Completion of
contract of
establishment of
Marine Research
Conservation and
Information Centre
(MRCI)
58
Component
s
Year 2017-2020
Physical
Output (Major)
April 2017-March 2018
Physical
Output (Major)
April 2018 to March 2019
Physical
Output (Major)
April 2019 to March
2020
Additional
activity of
National
Component
Beach development and
pollution management
activities –Creation of Data
Base of beaches, Quantification
and characterisation of each
litter, Tourism mgt plan and
Waste mgt plan
Beach development and
pollution management
activities –Creation of Data
Base of beaches,
Quantification and
characterisation of each litter,
Tourism mgt plan and Waste
mgt plan and clean-up
operation of at least one beach
in each coastal states/UTs and
to develop one “Blue Flag”
beach
Clean-up operation of
at least one beach in
each coastal
states/UTs and to
develop one “Blue
Flag” beach
F. Financials
Table No. 17: The Budget Allocation of the Scheme
(₹ in Crores)
Name of Scheme 2017-18 2018-19 2019-20 Total
BE BE RE Actual BE RE Actual BE
National Coastal Mission 441.98 152.50 152.50 165.10 135.10 129.55 95.00 701.98
59
CATEGORY - III
DECISION SUPPORT SYSTEMS (DSS)
60
3.1. ENVIRONMENTAL INFORMATION SYSTEM (ENVIS)
A. Background:
Environmental information plays a vital role not only in formulating environmental management policies
but also in the decision making process aiming at environmental protection and improvement of
environment for sustaining good quality of life for all living beings. Realizing such a need the Ministry
set up an Environmental Information System (ENVIS) in 1983 as a plan programme to be a
comprehensive network of environmental information collection, collation, storage, retrieval and
dissemination to different users, which includes decision-makers, researchers, academicians, policy
planners research scientists and general public, etc.
ENVIS was conceived as a distributed information network with the subject-specific centres to
carry out the mandates and to provide the relevant and timely information to all stakeholders ENVIS
network at present consists of a chain of 69 network partners out of which 39 are on -specific thematic
areas and 30 on State/UT environment and related issues. These network partners are called ENVIS
Centres and are located in the notable organizations/institutions/State/UT Government
Departments/Universities throughout the country. The focal point of ENVIS is located in the Ministry
and assists the Environment Information (EI) Division in coordinating the activities of all the ENVIS
network partners by making ENVIS a web-enabled comprehensive information system.
India State-Level Basic Environmental Information Database (ISBEID) has been developed to help
State Government/ UT Centers to collect, compile and disseminate information on a centralized server.
It is used especially to fill their environment data gaps. There are 17 modules covering air and water
pollution, forestry, land resources, flora, fauna, etc. Further there are 48 sub-modules on which
information is captured. ISBEID has two components, namely, Management Information System (MIS)
and Geographic Information System (GIS) that have been developed by NIC in collaboration with
ENVIS Cell.
B. Objectives:
i. Grid Based Decision Support System (GRIDSS)- for Sustainable Management of Natural
Resources: ENVIS Resource Partners would carry out survey of all the districts in a phased
manner. The country would be divided into grids of 50 km x 50 km for effective survey of various
environmental parameters such as air, water, noise, soil quality, solid, hazardous & e-waste,
forest & wildlife, flora & fauna, wetlands, lakes, rivers & other water bodies, public health etc.
Since the grid size is large and could cover over 2 or more districts, it is proposed to survey all
districts by taking samples from smaller grids, which would then be brought into the 50 kmx50
km grid. For the survey the data already collected by various agencies would be taken as a base
information and if required primary data would also be collected for further analysis. The grid
based survey of the districts would result in 1) availability of information on various
environmental parameters grid-wise, 2) support in development of District level Status of
environment report, 3) ranking of districts, 4) valuation of eco-system services, 5) assessing the
carbon sequestration potential of the districts, 6) documenting the best environmental practices
of the districts, 7) expanding the ISBEID database from State level to district level for all 337
parameters and 8) serve as on job training platform for candidates of Green Skill Development
Program.
61
In this context, discussions between Chairman, CPCB and Sr. Economic Adviser and other officers
of CPCB and EI Division of the Ministry, were held to ensure that there was no overlap/duplication
of grid based activities related to pollution. Minutes of the meeting are in Annexure-11.
ii. Monitoring (Ground Truth Verification) of Schemes: ENVIS Plus Hubs would carry out
ground truth verification of various Central Sector (CS) and Centrally Sponsored Schemes (CSS)
being implemented by the Ministry, as and when required. The detailed monitoring may also be
assigned to ENVIS Resource Partners & ENVIS Hubs as per requirement of the Ministry.
iii. Repository of Environmental Knowledge: To serve as a repository of environmental
knowledge, both thematic and State ENVIS Centres would work in coordination to collect
information pertaining to their respective themes/grid/schemes assigned to them for monitoring,
maintain and update the subject-specific database, produce value-added information such as
educational-kits on various themes including international protocols/conventions/agreements,
mobile apps, environmental videos, photo bank, research papers/publications, compendium,
abstracts and journals, case studies, success stories and directories of information on
State/regional/ National level, CD, atlases etc. The information thus collected would be
disseminated through their respective websites and ENVIS Portal.
To increase the accessibility and security features of ENVIS websites, the existing ENVIS
websites would be restructured as per requirement of GIGW Guidelines and to comply with Deity
guidelines to make the website accessible to all and to create unhindered access for Persons with
Disability. The ENVIS websites would be restructured on CMS System to provide the users a
better search ability and accessibility options. The restructured websites would be able to capture
even those keywords searched for by users, which did not yield information from the system.
This would help the ENVIS Centers to fill the data gaps and knowledge gaps in the specified
subject areas and take action to provide relevant information to various stakeholders.
Note: In the meeting held on 29.11.2016 under the chairmanship of Hon’ble Minister (EF&CC) it was
decided to build ENVIS as a repository of (environmental) Knowledge.
iv. International Cooperation: To build linkages with information sources in the country and
abroad for relevant and comprehensive information contents and to develop national ENVIS
Secretariat as a South Asia Hub.
v. Environment Channel: To launch a dedicated TV Channel for wider dissemination of
Environmental Information.
vi. Green Skills Development: Green Skills Development Programme (GSDP) proposed to be
taken up on pilot basis in 2017-18 to skill 10th and 12th class pass/dropouts in various fields like
nature guides, para-taxonomists, and other environment fields. The para-taxonomists would be
trained in field identification of flora and fauna, botanical surveys, processing of herbarium and
62
raw drug voucher specimen, vegetation monitoring, data digitization, Nature photography,
preparation of PBRs for BMCs, Ethno-Botanical Documentation, Gardening, nursery,
landscaping techniques, Green pharmacy (skills to prepare basic forms of traditional medicine
and semi-processing value added products, production assistance at industrial scale, marketing).
They can also be employed in grid-wise monitoring by the ENVIS Centres. The funding would
be from the existing budget of ENVIS and from the training budget of BSI/ZSI who undertake
such training. The programme was launched and training modules were released by Hon’ble
Minister (EF&CC) on 4 June 2017.
vii. Ranking of States/Districts on Environmental and related parameters
viii. To help the Ministry in achieving INDCs targets and SDGs - Control of Pollution; Conservation
and Management of Natural Resources; Combating Climate Change etc.
C. Outcomes:
1. Effective third party monitoring and evaluation of the various Schemes of the Ministry.
2. Third party survey of the districts (grid-wise) would help the Central and State governments in
policy framing, decision making and planning.
3. Enhancing skills of youth in environmental activities
4. A repository of value-added information such as educational-kits, mobile Apps, environmental
videos, photo bank, research papers/publications, compendium, abstracts and journals, case
studies, research papers, thematic maps, directories of information on State/regional/ National
level, CD, atlases, thematic database etc., will be created.
5. Implementation of the environment development activities under Saansad Adarsh Gram Yojana
(SAGY) and Member of Parliament Local Area Development Scheme (MPLADS) will be
achieved
6. Achieve INDCs and SDGs of MoEF&CC as targeted.
D. Output:
Table No. 18: Outputs of the Scheme
Year Physical Financial
2017-2018
Survey of 8-10 Grids/Districts based on
Bio-Geographic Regions (BGR).
Developing a framework for monitoring of
various Schemes of the Ministry.
To prepare SoER for 10 States viz.
Arunachal Pradesh, Andhra Pradesh,
Chandigarh, Tripura, Madhya Pradesh,
Assam, Andaman &Nicobar Island,
Lakshadweep, Uttar Pradesh and Daman &
Diu.
To produce 350 value-added information
products including newsletters, books,
theme based special publications, e-books,
e-bulletins, booklets, environment
Financial Assistance would be
provided to 55 ENVIS Centres.
Financial Assistance to support the
restructuring of the ENVIS
websites, ISBEID and Monitoring
Tool.
Financial assistance for third party
monitoring of and theme based
projects.
63
Year Physical Financial
calendars, brochures, pamphlets
educational-kits etc.
To Develop 5 Mobile Apps.
Development of thematic maps.
Analysis of the time series data of 17
modules of ISBEID viz. administrative,
infrastrcture, energy, agriculture,
industries, tourism & heritage, natural
resources, forest resources, water
resources, ground water resource, ecology,
sanitation, water pollution, air pollution,
biodiversity, waste and disaster which will
feed into the proposed Green Platform.
Based on XII Plan period data of reports
downloaded, number of downloads on the
ENVIS Network is estimated to be more
than 1.0 Lakh.
2018-2019
Survey of 30 Districts
Third party monitoring of various Schemes
of the Ministry.
Establishing 4 ENVIS Plus Hubs/Resource
Partners
To prepare SoER for 10 States viz. Jammu
& Kashmir, Chhattisgarh, Himachal
Pradesh, Uttarakhand, Maharashtra,
Rajasthan, Orissa, Gujarat, Haryana, Delhi
.
To produce 380 value-added information
products including newsletters, books,
theme based special publications, e-books,
e-bulletins, booklets, environment
calendars, brochures, pamphlets,
educational kits etc.
To Develop 7 Mobile Apps.
Development of thematic maps.
Upgrading ISBEID Application.
Based on XII Plan period data of reports
downloaded, number of downloads on the
ENVIS Network is estimated to be more
than 1.5 Lakh.
Financial Assistance would be
provided to 59 ENVIS Centres
Financial Support for monitoring of
30 Districts.
Financial Assistance to support the
restructuring of the ENVIS
websites, ISBEID and Monitoring
Tool.
Financial assistance for third party
monitoring and theme based
projects.
64
Year Physical Financial
2019-2020
Survey of 60 Districts
Third party monitoring of various Schemes
of the Ministry.
Establishing 3 New ENVIS Plus
Hubs/Resource Partners
To prepare SoER for 10 States viz. Kerala,
Bihar, Rajasthan, Goa, West Bengal, and
Daman & Diu, Telangana, Tamil Nadu,
Puducherry, Jharkhand and Punjab.
To produce 400 value-added information
products including, newsletters, books,
theme based special publications, e-books,
e-bulletins, booklets, environment
calendars, brochures, pamphlets,
educational kits etc.
To Develop10 Mobile Apps.
Development of thematic maps.
Based on XII Plan period data of reports
downloaded, number of downloads on the
ENVIS Network is estimated to be more
than 2.0 Lakh.
Financial Assistance would be
provided to 61 ENVIS Centres.
Financial Support for monitoring of
60Districts.
Financial Assistance to support the
restructuring of the ENVIS
websites, ISBEID and Monitoring
Tool.
Financial assistance for third party
monitoring and theme based
projects.
E. Financials
Table No. 19: The Budget Allocation of the Scheme
(₹ In Crore)
Name of Scheme 2017-18 2018-19 2019-20 Total
BE BE RE Actual BE RE Actual BE
Environmental
Information Systems
(ENVIS)
23.0
0 23.00 20.22 24.00 28.00 23.84 46.00 93.00
65
3.2. R&D FOR CONSERVATION AND DEVELOPMENT
A. Background
The R&D Scheme for Conservation and Development is an important Decision Support System
for Policy and Planning of the Ministry’s programmers and activities incorporating the key objectives
for addressing environmental problems and measures for conservation and protection of environment by
building indigenous capacities and strengthen manpower in multi-disciplinary aspects and new and
emerging areas of environment and ecology, generating information for taking policy decisions,
preparedness and basis for international negotiations, supporting basic and applied research in
environment, ecology and related fields, and to facilitate database management on Research projects
undertaken under the Scheme on relevant thematic areas of the Ministry.
Promotion of Research & Development in various facets of ecology and environment for the
conservation and protection of environment and natural resources of the country. To plan, support and
coordinate environmental research in public interest for enhancing the understanding of environment
and ecology and devising strategies and solutions for environmental protection and management for
achieving the overarching objectives of sustainable development.
i. To generate information and knowledge required for developing policies, strategies, action
plans from outcomes of R&D projects. This also includes technologies and methodologies including
pilot studies and demonstration projects for better environmental management and conservation of
natural resources.
ii. The outputs/outcome of the projects would be used to prepare a Road Map/Action Plan for
implementation of the findings in the field/communities for improving quality of life and for
sustainable livelihoods.
iii. To find practical solutions to problems of environmental protection and management (eg. Eco-
regeneration of degraded areas, management of wastes, bioremediation of contaminated sites,
conservation of ecologically sensitive areas and landscapes, etc.).
iv. To build indigenous capacities and strengthen scientific manpower in multidisciplinary and
emerging areas of environment and ecology and sustainable development.
v. To conduct R&D in cleaner technologies and production including the 3Rs, Resource
Efficiency, Waste minimization and management, etc
vi. To generate, document and analyse information for taking policy decisions relating to
environment and natural resources, and Action Plans of GOI, including preparedness for international
negotiations on Conventions, Treaties, Protocols, Laws, etc.
vii. To support basic research which leads to applied research in the areas of environment and
ecology with the aim of development of management and policy interventions. Adoption of successful
technologies, demonstration projects in Industry and in other sectors, and to find cost-effective
solutions to environmental problems.
viii. Creation of MIS-Portal in Ministry website for database management at one single point in the
Ministry.
66
B. Scope/Thrust Areas of the Scheme
(1) Biodiversity Conservation
- Sustainable Forest Management & Forest certification
- Alien and invasive species
- Human-wildlife Interface
(2) Ecosystems Conservation & Management (Mountain, Forest, Coastal, Wetlands, Pastoral,
etc) and Evaluation of Ecosystem Services.
(3) Socio-economic issues of environment
(4) Conservation and Management of Landscapes and Ecologically sensitive areas including
issues of sustainable livelihoods.
(5) Sustainable Management of Natural Resources
(6) Climate Change: Vulnerability & Risk Assessment, Process, Mitigation and Adaptation
(7) Pollution prevention - Clean Technologies and Processes, Cleaner Production, 3Rs,
Resource Efficiency, Waste Minimisation and Management, Environmental health, etc.
C. Outcomes:
The broad outcomes of the scheme are as follows:
1. The research projects will enable the Ministry to build database, which could be used for further
research and for decisions and build upon existing schemes’ objectives.
2. Finding practical solutions to problems of environmental protection and management (e.g., eco-
regeneration of degraded areas, management of wastes, bioremediation of contaminated sites,
etc.)
3. To generate information and knowledge required for developing policies, strategies, action plans
from outcomes of R&D projects. This also includes technologies and methodologies including
pilot studies and demonstration projects for better environmental management and conservation
of natural resources.
4. The outputs/outcome of the projects would be used to prepare a Road Map/Action Plan for
implementation of the findings in the field/communities for improving quality of life and for
sustainable livelihoods.
5. In identifying and addressing data and knowledge gaps; and in funding of projects addressing
these.
6. Generating information and knowledge required for developing strategies, including
preparedness for international negotiations.
7. Building indigenous capacities and strengthen scientific manpower in multidisciplinary and
emerging areas of the environment and ecology and also facilitating database management at one
single point in the Ministry.
8. Supporting basic research based on the baseline data which leads to applied research in the areas
of the environment and ecology with the aim of development of management and policy
interventions.
9. Project specific outcomes will be set and monitored through project specific measurable
parameters
67
D. Outputs:
Table No. 20: Outputs of the Scheme
Name
of the
Scheme
Objective /
outcomes
2017-18 2018-19 2019-20
Physical
Outputs/
deliverables
Financial
Physical
Outputs/
deliverables
Financial
Physical
Outputs/
deliverables
Financial
R&D
Scheme
Launch of
New
Revamped
R&D Scheme
Uploading
of new
revamped
R&D
Scheme on
MoEF&CC
portal.
Reciept of
on-line
applications
Meetings of
Screening
and Steering
Committee
for approval
of about 20
to 25
proposals.
Release
of about
3 crores
as first
installme
nt
Recipe of on-
line
applications
Meetings of
Screening and
Steering
Committee
for approval
of about 20 to
25 proposals.
UC and
Interim
Reports on
approved
projects
Release
of about
4 crores
as first
installme
nt
Recipe of on-
line
applications
Meetings of
Screening and
Steering
Committee for
approval of
about 20 to 25
proposals.
UC and Interim
Reports on
approved
projects
Release
of about
7 crores
as
first/seco
nd/final
installme
nt for
approved
projects
Guidelines for
New R&D
Scheme
Draft
Guidelines
to be
prepared
Rs 5
lakhs
New
Guidelines
uploaded on
MoEFCC
portal
-
-
-
New MIS
Portal
Approval
and launch
of MIS
Portal and
receipt and
processing
of new
applications
(Money
already
released
to NIC
during
XIIth
Five-
Year
Plan).
Receipt and
processing of
new
applications
recd on-line
only
- Receipt and
processing of
new
applications
on-line only.
-
Liability
from 12th
Five-Year
Plan
Processing
of 20 to 30
approved
R&D
Proposals
under XIIth
4.0 cr UC and
Interim
Reports on
approved
projects.
2.41 cr UC and Interim
Reports on
approved
projects
Processing of
0.60 cr
68
Name
of the
Scheme
Objective /
outcomes
2017-18 2018-19 2019-20
Physical
Outputs/
deliverables
Financial
Physical
Outputs/
deliverables
Financial
Physical
Outputs/
deliverables
Financial
Plan.
Release of
Installment
of 53
approved
project.
Processing of
20 to 30
approved
R&D
Proposals
under XIIth
Plan for
release of
next/final
Installment of
29 approved
project.
Final Report
for 20
projects
20 to 30
approved R&D
Proposals
under XIIth
Plan for
release of
next/final
Installment of
11 approved
project.
Final Report
for 30 projects
Preparation
of
Compendiu
m on Final
Reports
received
from 12th
Plan
Spiral
Binding and
Printing of
projects of
XIIth Plan
Rs 5
lakhs
Compilation
of XIth Plan
final Reports
5 lakhs Compendium
on Final
Reports recd
during 2017-
2020.
Printing of the
Compendium
and uploading
on Ministry
website.
5 Lakhs
Creation of
an MIS
Portal for
on-line
submission
of
applications
of Revised
Scheme
To be
completed
by Dec 2017
Rs 5
lakhs
Archives to
be uploaded
on the MIS
Portal
Rs 5
lakhs
Report on the
Projects’
outputs and its
proposed
integration
with MoEF
Policies,
Schemes,
Action Plan for
2020 onwards
5 Lakhs
Third Party
Evaluation
To be got
done in Jan-
March 2018
and report
prepared for
placing to
Rs 5
lakhs
To be got
done in Jan-
March 2019
and report
prepared for
placing to
Rs 5
lakhs
To be got done
in Jan-March
2020 and
report prepared
for placing to
Steering
Rs 5
lakhs
69
Name
of the
Scheme
Objective /
outcomes
2017-18 2018-19 2019-20
Physical
Outputs/
deliverables
Financial
Physical
Outputs/
deliverables
Financial
Physical
Outputs/
deliverables
Financial
Steering
Committee
Steering
Committee
Committee
E. Financials:
Table No. 21: The Budget Allocation of the Scheme (₹ in Crore)
Name of Scheme 2017-18 2018-19 2019-
20 Total
BE BE RE Actual BE RE Actual BE
R&D for Conservation and
Development 17.50 7.00 6.98 9.70 4.40 1.56 10.00 37.20
70
3.3. NATIONAL MISSION ON HIMALAYAN STUDIES (NMHS)
A. Background
Realizing the significance of the Himalaya for Ecological Security of the nation, the Government of
India attaches highest priority to protect unique but highly fragile Himalayan ecosystem by launching in
year 2015–16 the National Mission on Himalayan Studies (NMHS) as a Central Sector (CS) Grant-
in-aid Scheme of the Ministry of Environment, Forest and Climate Change (MoEF&CC), New Delhi
and G.B. National Institute of Himalayan Environment and Sustainable Development, Kosi-Katarmal,
Almora, Uttarakhand as the Nodal Institute for the Indian Himalayan Region (IHR).
The jurisdiction of NMHS includes all IHR states with a broad Vision “to support the sustenance and
enhancement of the ecological, natural, cultural, and socio-economic capital assets and values of the
IHR”. The mission is to launch and support innovative studies and related knowledge interventions with
strategy to focus on enhancing livelihoods of local communities, in line with the National Environment
Policy, 2006 of the Government. To guide the overall implementation, a Steering Committee, chaired
by the Secretary, EF&CC, is in place. Also, a Scientific and Technical Advisory Group (STAG) with
wide base representation of stakeholder groups, and under the Chair of Additional Secretary,
MoEF&CC, has been constituted; and both are presently in motion towards supervising the progress of
the Mission. The Monitoring, Learning & Evaluation (MLE) Missions/Panels comprising 36 Expert
Members with respect to each Thematic Area had been constituted to sustain the quality and pace of
progressive work under Project Grant of NMHS.
B. Objectives:
The objectives of the Scheme include the following:
(i) To build a body of scientific and traditional knowledge through demand driven action research
and technological innovations along with institutional strengthening & capacity building;
(ii) To strengthen technological innovations leading to sustainable management of natural resources
of Himalaya for ensuring the ecological, water, livelihood security at the local, regional and
national levels;
(iii) To create science-policy-practice connect through a network of policy makers and practitioners
(individual and institutions) engaged in working solutions to problems in the thematic areas;
(iv) To demonstrate workable/implementable/replicable solutions to the problems in the priority
thematic areas.
C. Parameters of the Third Party Evaluation:
The following would be the main parameters for undertaking the evaluation for the scheme
performance over the last 3 years:
I. On Financial performance:
i. To critically evaluate budgetary outlay, utilization of funds, along with capital and revenue
composition, surrender of funds/shortfalls during 2017-18 to 2019-20 in the scheme
ii. To explore avenues for generating funds, if any
71
II. On physical performance:
i. To assess targets/outcomes and outputs set in EFCs/SFCs for different components and
achievements (2017-18 to 2019-20), against the backdrop of the Annual plan of Operations
and the base line status at inception of the scheme
ii. To examine the extent of use of technology in implementing schemes to make the scheme’s
implementation more transparent
iii. To review the extent to which a scheme has been successful in fulfilling the objectives of
this Ministry.
iv. To evaluate implementation status of agreed recommendation mentioned in the report of
evaluation committee constituted for Review of the XII plan schemes of the MoEF&CC and
third party evaluation study.
III. On performance related to implementation and other issues:
i. To determine the deficiencies in implementing the schemes, if any
ii. To examine the mid-course corrections undertaken, if any
iii. To re-determine the role of Centre/state Governments/Agencies relate to
implementation of scheme
iv. To review the coverage area of the scheme and components of the scheme
v. To assess the inter-Ministerial deployment of funds towards common purpose wherever
applicable, and its effectiveness
vi. To compare with best practices followed in other countries, wherever applicable in the
same sector
vii. To appraise the scheme’s potential in achieving India’s National Determined
Contributions (NDCs) & SDGs
viii. To undertake a ‘SWOT’ analysis indicating whether the set rules and procedures of
planning, monitoring and evaluation of scheme activities and administration need any
review to meet the objectives of the scheme; and recommend the future road map for the
scheme – medium term/long term
ix. To suggest any further rationalization of Scheme
The Recommendation part of Final Evaluation Report should include the overall evaluation of the
Scheme (NMHS) and be able to clearly spell out achievements, constraints and way forward with
respect to the Scheme mandate, especially focusing on the Demand-driven Himalayan Action
Research Studies and Demonstrative Developmental Activities.
72
3. Scheme Specific Methodology for Evaluation
The methodology of the Evaluation shall be comprehensive, involving both desk review and field
checks on inter- and intra-communication modes. It would include:
(i) Project Sites Visits/ Field Surveys to selected project sites, including interaction with the
NMHS-PMU, Project PIs, and other stakeholders, including concerned officials of
MoEF&CC and State government agencies to know about the current status, achievements
and weaknesses, future plans, resources, future requirements, etc.;
(ii) Discussion with the Members of the Scientific and Technical Advisory Group (STAG) and
Monitoring, Learning and Evaluation (MLE) Panel of the NMHS;
(iii) Quantitative and Qualitative Assessment of Financial resource utilization and physical
achievements using standard methodology;
(iv) Collection, Compilation and Evaluation of the reports and records such as the published
papers, reports, records, and office files, etc.
The Evaluating Agency will discuss the draft Final Evaluation Report with the Director,
GBPNIHESD, Nodal Officer NMHS-PMU and also with Director (MD) MoEF&CC before
submitting it to the Appointing Authority.
4. Others
(i) The Final Evaluation Audit Report ( in the format given in Annexure I) would be open to
review by NMHS officials, and jointly agreed issues would be duly addressed in a time-
bound manner.
(ii) The intellectual property right of the Final Evaluation Audit Report and its outputs shall be
the property of NMHS/Ministry.
D. Outcomes
Table No. 22: Outcomes of the Scheme
Sl.
No.
Broad & Sub Thematic
Areas
Monitoring Indicators Expected Outcomes
1 Water Management
Conservation, sustainable
use and equitable benefit
sharing arising out of use of
natural resources
Extent of area
conserved/brought under
sustainable
use/communities
benefitted/good practices
documented and
promoted
Participatory conservation
framework developed;
Sustainable harvesting protocols
for diverse natural resources
developed;
Number of community
institutions engaged/
communities
benefitted from
equitable benefit
sharing mechanisms
Sustainable harvesting
methods demonstrated
Local natural resource
management institutions
strengthened;
Good practices documented and
up-scaled
73
Water Conservation and
Management including
recharge of groundwater and
aquifers, etc.
Number of watersheds
studied/plans prepared and
executed
Number of spring-sheds
investigated and treated/
rejuvenated
Management decisions
supported by the database
Periodic studies on utilization of
ground water and aquifers and
their recharge to ensure
sustainability
Development of a database on
utilization and recharge of
ground water and aquifers
Studies on watershed
management to ensure increase in
recharge of ground water and
aquifers
Study/ Inventory of Springs
in the IHR
Effectiveness of
knowledge products
emanating from
inventories
Quantum of data-sets
generated/analyzed/synthe
sized
All springs in the IHR inventoried
Periodic flow patterns and
dependence on springs studied
and documented
2 Livelihood Options and Employment Generation
Supplementary livelihood
options for local
communities and other
rural population
Number of value chains
established and green jobs
created
Value added products
brought to market and
number of persons
benefitted
Alternative livelihood means
giving emphasis on green job
creation explored; and
Value addition in local products
and value chain established.
Sustainable tourism
including eco-tourism
Extent of innovative
approached
developed/implemented
for promotion of
ecotourism
Proportional increase
in eco- tourism/decline
in unregulated tourism
Ecologically compatible and
equitable tourism
promoted/implemented leading
to stoppage of unregulated
tourism
Invasive alien species (IAS) Extent of IAS
assessed/analyzed/
mapped
• Effectiveness of
approaches developed for
reduction of IAS/
Vulnerable habitats
identified/mapped;
Threat of proliferation of invasive
alien species reduced and
adversely impacted
areas/landscapes restored;
74
innovative use of
biomass/ extent of
areas/landscapes restored
Suggest innovative use of
available biomass; and
Ensure strict implementation
of quarantine regulations.
Non-timber Forest Products
(NTFPs), medicinal and
aromatic plants, and other
high value niche products
from the region
Number of sustainable
harvest practices
developed and quantum of
NTFPs/other high value
species brought under
sustainable harvesting/
ensured volume of
produce through
cultivation
Extent of benefits accrued
by community from value
addition and value chains
Level of community
participation in
conservation/sustainable
harvesting
The regeneration patterns,
quantum of harvest of various
important NTFPs/MFPs, MAPs
and other high value marketable
niche products is determined
Community based management
supported and participatory
mechanisms for sustainable
harvesting/ conservation
developed
Market linkages for NTFPs
established through local level
value addition and value chains
development;
Bio-prospecting of resources
conducted.
4 Skill Development and Capacity Building
Options for
education,
awareness and
outreach
No of beneficiaries
No of trainings/ awareness
programs organized
No. of publications/ display
materials
Scientific evidences and
databases developed/
augmented/disseminated;
Photo documentation, film,
documentary production;
dissemination via electronic and
other means supported;
Local, state, national and
regional dialogues and fora on
the identified thematic areas
supported;
Human capacity
building including
promotion of micro-
enterprises and green
technologies
Extent of impact of
capacity building
programmes
Level of effectiveness of
microenterprises/extent of
green technologies in place
Identify key sectors and capacity
building needs of those having
immediate bearing on
conservation and livelihoods
Natural resource based and
community oriented
microenterprises
developed/promoted
75
E. Financials:
Table No. 23: The Budget Allocation of the Scheme
(₹ in Crores)
Name of Scheme 2017-18 2018-19 2019-20 Total
BE BE RE Actual BE RE Actual BE
National Mission on Himalayan Studies 50.00 41.00 41.00 50.00 50.00 50.00 50.00 150.00
76
CATEGORY - IV
ENVIRONMENTAL AWARENESS AND CAPACITY BUILDING (EACB)
77
4.1. FORESTRY TRAINING AND CAPACITY BUILDING
A. Background
The scheme aims to cover the whole gamut of the training and exposure needs of the forestry
sector personnel as well as members of the civic society in the country. The scheme of Capacity
Building includes training of members of Indian Forest Service, State Forest Service, Range Officers,
Forest Guard, etc. Awareness Programme through short-term training/workshops/ study tours for
personnel of various departments such as police, revenue etc. are also one of the components of the
capacity building scheme. Training of Other Stakeholders like Panchayat Members, elected
representatives, teachers, social activist, NGOs and Media personnel is also arranged by the various
institutions under the Capacity Building Schemes.
a) It’s a Central Sector Scheme. There are two parts to this scheme. One is on capacity building
and is an externally-aided component, with financial support in the form of a soft loan from
Japan International Cooperation Agency (JICA). The second is on forestry training, with
domestic and foreign component
b) Total Cost of the proposed Scheme: ₹ 40.75 crores
c) Proposed duration of the Scheme: 3 years (2017-18 to 2019-20)
B. Scope/Operation of the Scheme
There is no separate Central and state component under the scheme. The sub-schemes are as under:
i) Training of IFS Officers
ii) Training of Personnel of Other Services
iii) Foreign Training of Forestry Personnel
iv) Training of Other Stakeholders
v) Capacity Development for Forest Management and Training of Personnel (EAP)
C. Output & Outcomes
The specific outputs expected out of the implementation of the scheme inter alia include the
following:
(i) Of more skilled and technically equipped forestry force that will be able to marry the
objectives of sustainable management of forests and wildlife with socio-economic field
situations in general and livelihood needs of the people in particular.
(ii) More extensive and effective involvement of local people in joint forestry endeavors due to
improved understanding of the JFM concept particularly its strengths and limitations.
(iii) Improved state of forests and wildlife and improved productivity from the forests due to
honed skills of its manage₹
(iv) Uniformity in standards of forestry training for the forestry force throughout the country.
(v) Number of refresher courses conducted for IFS and SFS officers
78
(vi) Number of IFS and SFS officers trained through refresher courses.
(vii) Number of courses conducted for personnel of other services.
(viii) Number of personnel of other services exposed to forestry sector.
(ix) Number of courses conducted for non-official stakeholders of the country including people’s
representatives.
(x) Number of other stakeholders exposed to forestry sector.
(xi) Number of Forest officers trained specifically in the thrust areas of environment, wildlife
and forest so as to build up a pool of specialized officers
Table No.24: Outputs of the Scheme
Components Year 1
(2017-18)
Year 2
(2018-19)
Year 3
(2019-20)
Total
Physical ₹ In
Cr Physic
al
₹
In
Cr
Physical ₹
In Cr Physical ₹
In Cr
Training of IFS Officers
In service short
term (one to three
week) refresher
courses
35 3.4 35 3.50 40 3.60 110 10.50
Training
workshops/seminar
20 0.4 20 0.45 20 0.50 60 01.35
Sponsoring officers
for long term
courses in India
sponsored by
DoPT.
5 0.3 6 0.40 6 0.45 17 1.15
Sponsoring officers
for short term/long
term courses under
DFFT scheme of
DoPT
3 0.3 4 0.40 6 0.45 13 01.15
Training of Personnel of Other Services
One week courses 5 0.15 7 0.17 10 0.20 22 0.52
Two/Three days’
workshop
5 0.10 7 0.13 8 0.15 20 0.38
Foreign Training of Forestry Personnel
Short-term courses 3 1.00 4 1.20 5 1.40 12 3.60
Forestry Personnel
for participating in
International
Workshop
5 0.10 5 0.10 5 0.10 15 0.30
Training of Other Stakeholders
79
One week courses 5 0.15 7 0.15 8 0.20 20 0.50
Two/Three days
workshop
5 0.10 6 0.10 7 0.10 18 0.30
Capacity Development for Forest Management and Training of Personnel (EAP)
Renovation/
Consultancy/ Soft
component/etc
17.00 4.00 0.00 21.00
D. Financial:
Table No. 25: The Budget Allocation of the Scheme
(₹ in Crores)
Name of Scheme 2017-18 2018-19 2019-
20 Tota
l
BE
BE RE Actual BE RE Actua
l
BE
Forestry Training and
Capacity Building 23.00
15.5
0 15.16 15.00 28.60 28.52 10.80
48.8
0
80
4.2. ENVIRONMENT EDUCATION, AWARENESS AND TRAINING (EEAT)
A. Background
The Scheme is for promoting environmental education for schools and colleges (youth) and creating
environmental awareness amongst different stakeholders using various forms of awareness including
media. The scheme also aims to build capacity building activities.
The following programmes will be undertaken under Environment Education Awareness and Training
(EEAT) scheme:
i. National Green Corps (NGC) – “Ecoclub” Programme:
The programme aims at creating awareness and sensitise school and college students towards
environmental conservation and sustainable development across the country. Every student
in school and college is eligible to participate in the programme.
ii. National Nature Camping Programme (NNCP)
This involves field visit for 3 days-2 Nights stay in established Trails & Nature Camps in the
different protected areas of country to create awareness amongst school students on
environment and nature. The concept of conservation of biodiversity (flora and fauna) in
general and conservation need of rare/endangered/threatened (RET) species, concept of
ecosystem, food chains, food web, etc could be learnt by students in-field through practical
experience. Students would get an opportunity to learn about natural resources, ecosystem
services and the importance of the area by involving them in activities.
iii. Capacity Building Activities on EEAT scheme
The objective of this programme is to support capacity building activities such as
seminars/trainings/workshops for the activities of EEAT scheme; and to impart skills in specific
areas decided by the Ministry related to EEAT Scheme. It will be conducted by identified
institutions have high credentials and expertise/experience of working in the field of concerned
thematic area. Such institutions/societies may also include Natural History Museums, Science
Centres, Registered Societies, etc. Through this programme a platform will be provided to share
the knowledge on various subjects related to environment.
iv. Use of Media (including Advertising and Publicity)
Rapid expansion of different forms of media including Television, Radio, Print, Internet
including use of mobile app, etc., offers cost effective means of reaching out to a large multitude
of population across the country through appropriate messages for realising the desired
attitudinal and behavioural changes for protection of environment and conservation of natural
resources. In addition, traditional forms of mass communication such as cinema, folk theatre&
songs, posters, hoardings, exhibitions etc., are also relevant for environmental messaging. The
Ministry would be taking up media campaigns throughfilms, audio, visual and print, theatre,
drama, advertisements, hoarding, posters, seminars, workshops, competitions, meetings etc. for
spreading messages concerning environment and awareness. The print, electronic and social
media would be utilized to increase public awareness. To achieve this objective, a separate
Sub-Head is proposed for Media-related activities to undertake following media-related
initiatives during 2017-18 to 2019-20:
SECAS Train
Advertisement in print media including newspapers
Editorials in magazines and newsletters
81
Publicity through other print medias
Making of films/documentaries
Exhibitions and outdoor publicity
Engagement of community radio, FM and television
Social Media
Celebration of international and national days related to Env. For and CC
Organising press conference and media interaction
Engagement of professional media agencies and consultants
B. Output
Table No. 26: Outputs of the Scheme
Component
s
Year 1
(2017-18)
Year 2
(2018-19)
Year 3
(2019-20)
Physical Financial Physical Financial Physical Financial
National
Green Corps (Eco clubs)
Approx. 1 lakh
schools involved in celebration of
environment
days, cleanliness drives, waste
segregation
activities and plantation
drives.
30 cr
Approx. 1 lakh
schools involved in celebration of
environment days,
cleanliness drives, waste segregation
activities and
plantation drives.
40 cr
Approx. 1 lakh
schools involved in celebration of
environment days,
cleanliness drives, waste segregation
activities and
plantation drives.
50 cr
Media
Media
campaigns in form of Science
Express train,
Documentary films, Radio
programme,
Video
programme/TV Serial and
Jingles.
20 cr
Media campaigns
in form of Science Express train,
Documentary
films, Radio programme,
Video
programme/TV
Serial and Jingles.
20 cr
Media campaigns
in form of Science Express train,
Documentary
films, Radio programme,
Video
programme/TV
Serial and Jingles.
20 cr
Capacity building
programme
20 events for stakeholders of
EEAT scheme
on various
thematic area.600
participants will
be involved.
1 cr 20 events for stakeholders of
EEAT scheme on
various thematic
area.600 participants will
be involved.
1 cr 20 events for stakeholders of
EEAT scheme on
various thematic
area. 600 participants will
be involved.
1 cr
NNCP Approx. 500
nature camps to
be conducted
involving 25,000 students
5 cr Approx. 500
nature camps to be
conducted
involving 25,000 students
5 cr Approx. 500
nature camps to be
conducted
involving 25,000 students
5 cr
82
C. Outcomes
Table No. 27: Outcomes of the Scheme
S.No. Outcomes Measurable indicator
1. Schools show environmentally sustainable practices
Celebration of environment days including observance of Swachhta pakhwada fortnight
Number of cleanliness drives
Details of composting pits in schools
2. Sensitization of children to issues
related to environment and
development through field visits
No. of school children involved
No. of field visits/jungle camp
3. Exposure to Environment awareness
on various environmental issues
Media campaigns in form of Science Express
train, Documentary films, Community Radio programme, and Video programme/TV Serial
and Jingles.
No. of visitors for the above programmes
4. Engagement in environment friendly
action
Implementation of three colour bins to use the
concept of 3 Rs
5. Inculcation of proper attitudes towards
the environment and its conservation through community interactions.
Capacity building programmes
D. Financials
Table No. 28: The Budget Allocation of the Scheme (₹ in Crore)
Name of Scheme 2017-18* 2018-19 2019-
20 Total
BE BE RE Actual BE RE Actual BE
Environmental
Education, Awareness
and Training 60.00 58.29 49.61 40.00 40.00 39.49 50.00 150.00
Media, Publicity &
Information - - - 20.00 23.00 21.55 25.00 45.00 * EEAT Scheme included Media, Publicity & Information for the FY 2017-18
83
Section- 7: Payment Schedule
S.
No.
Stage/Activity Stages % of total
payment
payable
1. Award of Study Initiation of study and furnishing of signed
contract by Consultant with Performance
Guarantee.
50%
2. Submission of
Draft Report
After completion of survey and information
collection, submission of survey/draft report.
30%
3. Final Report Acceptance of the Final Report by the Competent
Authority in the Ministry within 30 working days
of receipt of final Report.
20%
84
Section- 8: General Terms & Conditions
8.1 General Provisions
Unless the context otherwise requires, the following terms whenever used in this Contract have
the following meanings:
a. “Applicable Law” means the laws and any other instruments having the force of law in India,
as they may be issued and in force from time to time.
b. Contract means the Contract signed by the Parties;
c. “Effective Date ‟means the date on which this Contract comes into force and effect pursuant to
clause8.7;
d. “Government” means Government of India;
e. “Local currency” means the Indian Rupees;
f. “Member”, in case the Successful Bidder consists of a joint venture of more than one entity,
means any of these entities, and “Members” means all of these entities;
g. “Party‟meanstheMinistryortheImplementingAgency(consultant)asthecase may be, and Parties
means both of them;
h. “Personnel” means persons hired by the Successful Bidder or by any Sub- Consultant as
Employees and assigned to the performance of the Services or any part thereof; and „key
personnel‟ means the personnel referred to in Clause 4.3 (Section-4).
i. "Services" means the work to be performed by the Successful Bidder pursuant to the contract.
The approach and methodology to be adopted by the Successful Bidder for carrying out the
assignment may be modified after mutual discussions with Ministry. The work plan as indicated
by the Successful Bidder may also get modified accordingly.
j. "Sub-consultant" means any entity to which the Successful Bidder subcontract part of the
Services in accordance with the provisions of Clause 8.13.12 (a);and
k. "Third Party" means any person or entity other than the Government/Ministry and the
Successful Bidder
l. “Ministry” means Ministry of Environment, Forest & Climate, New Delhi
8.2 Relation between the Parties
Nothing contained herein shall be construed as establishing a relation of master and servant or of
principal and agent as between the Ministry and the Successful Bidder. The Successful Bidder,
subject to this Contract, should have complete charge of Personnel and Sub-consultants, if any,
performing the Services and shall be fully responsible for the Services performed by them or on
their behalf hereunder. The Consultant shall be considered as having the legal status of an
independent Consultant vis-à-vis Ministry. The Consultant's personnel and sub-Consultants shall
not be considered in any respect as being the employees or agents of Ministry or the Government.
85
8.3 Law Governing Contract
This Contract, its meaning and interpretation, and the relation between the Parties shall be
governed by the Applicable Law.
8.4 Notices
Any notice, request or consent required or permitted to be given or made pursuant to this Contract
shall be in writing. Any such notice, request or consent shall be deemed to have been given or
made when delivered in person to an authorized representative of the Party to whom the
communication is addressed, or when sent by registered mail, telex, telegram or facsimile.
8.5 Language
This Contract has been executed in the English language, which shall be the binding and
controlling language for all matters relating to the meaning or interpretation of this Contract.
8.6 Taxes and Duties
The Successful Bidder, Sub-consultants and Personnel shall pay such taxes, duties, fees and other
impositions as may be levied under the Applicable Law and the Ministry shall perform such duties
in regard to the deduction of such taxes as may be lawfully imposed. The Ministry shall not be
liable for any tax levied on the remuneration and allowances of the Successful Bidder as per this
contract.
8.7 Effectiveness of Contract
This Contract shall come into force and effect on the date (the "Effective Date") of the
Ministry‟snoticetotheSuccessfulBidderinstructingtheSuccessfulBiddertobegin carrying out the
Services.
8.8 Expiration of Contract
Unless terminated earlier pursuant to Clause 8.12 this Contract shall expire when services have
been completed and all payments have been made as per the payment schedule mentioned at
Section-7.
8.9 Modification
Modification of the terms and conditions of this Contract, including any modification of the scope
of the Work, may only be made by written agreement between the Parties to the contract or their
duly authorized representatives with the mutual consent of both parties.
8.10 Force Majeure
8.10.1. Definition
a. For the purposes of this Contract, "Force Majeure" means an event which is beyond the
reasonable control of a Party, and which makes a Party's performance of its obligations
hereunder impossible or so impractical as reasonably to be considered impossible in the
86
circumstances, and includes, but is not limited to, war, riots, civil disorder, earthquake,
fire, explosion, storm, flood or other adverse weather conditions, strikes, lockouts or other
industrial action (except where such strikes, lockouts or other industrial action are within
the power of the Party invoking Force Majeure to prevent), confiscation or any other action
by government agencies.
b. Force Majeure shall not include (i) any event which is caused by the negligence or
intentional action of a party or such Party's Sub-consultants or agents or employees, nor
(ii) any event which a diligent Party could reasonably have been expected to both (A) take
into account at the .time of the conclusion of this Contract and (B) avoid or overcome in
the carrying out of its obligations hereunder.
c. Force Majeure shall not include insufficiency of funds or failure to make any payment
required here under.
8.10.2 No Breach of Contract
The failure of a Party to fulfil any of its obligations hereunder shall not be considered to be a
breach of, or default under, this Contract insofar as such inability arises from an event of Force
Majeure, provided that the Party affected by such an event has taken all reasonable precautions,
“due care" and reasonable alternative measures, all with the objective of carrying out the terms
and conditions of this Contract.
8.10.3 Measures to betaken
a. A Party affected by an event of Force Majeure shall take all reasonable measures to remove
such Party's inability to fulfil its obligations hereunder with a minimum ofdelay.
b. A Party affected by an event of Force Majeure shall notify the other Party of such event as
soon as possible, and in any event not later than fourteen (14) days following the
occurrence of such event, providing evidence of the nature and cause of such event, and
shall similarly give notice of the restoration of normal conditions as soon as possible.
c. The Parties shall take all reasonable measures to minimize the consequences of any event
of Force Majeure.
8.10.4 Extension of Time
Any period within which a Party shall, pursuant to this Contract, complete any action or task, shall
be extended for a period equal to the time during which such Party was unable to perform such
action as a result of Force Majeure. This doesn’t preclude the Ministry from extending the time
period of the assignment in pursuant to clause 8.13.12(b).
87
8.10.5 Consultation
Not later than thirty (30) days after the Successful Bidder, as the result of an event of Force
Majeure, have become unable to perform a material portion of the Services, the Parties shall
consult with each other with a view to agreeing on appropriate measures to be taken in the
circumstances.
8.11 Suspension
The Ministry may, by written notice of suspension to the Successful Bidder, suspend all payments
to the Successful Bidder hereunder if the Successful Bidder fail to perform any of their obligations
under this Contract, including the carrying out of the Services, provided that such notice of
suspension (i) shall specify the nature of the failure, and (ii) shall request the Successful Bidder to
remedy such failure within a period not exceeding thirty (30) days after receipt by the Successful
Bidder of such notice of suspension.
8.12 Termination of the Contract
8.12.1 By the Ministry
The Ministry may, by not less than seven (7) days' written notice of termination to the Successful
Bidder, such notice to be given after the occurrence of any of the events specified in paragraphs
(a) through (g) of this Clause, terminate this Contract.
a. if the Successful Bidder fail to remedy a failure in the performance of their obligations
hereunder, as specified in a notice of suspension pursuant to Clause
8.11 hereinabove, within seven (7) days of receipt of such notice of suspension or within
such further period as the Ministry may have subsequently approved in writing;
b. if the Successful Bidder become insolvent or bankrupt or enter into any agreements with
their creditors for relief of debt or take advantage of any law for the benefit of debtors or
go into liquidation or receivership whether compulsory or voluntary;
c. if the Successful Bidder fail to comply with any final decision reached as a result of
arbitration proceedings pursuant to Clause 8.19.3hereof;
d. if the Successful Bidder submit to the Ministry a statement which has a material effect on
the rights, obligations or interests of the Ministry and which the Successful Bidder know
to be false;
e. if, as the result of Force Majeure, the Successful Bidder is unable to perform a material
portion of the Services for a period of not less than sixty (60) days; or
f. if the Ministry, in its sole discretion and for any reason whatsoever, decides to terminate
this Contract.
g. if the Successful Bidder, in the judgment of the Ministry has engaged in corrupt or
fraudulent practices in competing for or in executing the Contract. For the purpose of this
clause: "corrupt practice" means the offering, giving, receiving or soliciting of anything of
value to influence the action of a public official in the selection process or in contract
execution. "fraudulent practice" means a misrepresentation of facts in order to influence a
selection process or the execution of a contract to the detriment of the Borrower, and
includes collusive practice among Consultants (prior to or after submission of proposals)
designed to establish prices at artificial non-competitive levels and to deprive the Borrower
88
of the benefits of free and open competition.
8.12.2 By the Successful Bidder
The Successful Bidder may, by not less than seven (7) days' written notice to the Ministry, such
notice to be given after the occurrence of any of the events specified in paragraphs (a) through (d)
of this Clause, terminate this Contract:
a. if the Ministry fails to pay any money due to the Successful Bidder pursuant to this
Contract and not subject to dispute pursuant to Clause 8.19 hereof within seven days (7)
days after receiving written notice from the Successful Bidder that such payment is
overdue;
b. if the Ministry is in material breach of its obligations pursuant to this Contract and has not
remedied the same within seven (7) days (or such longer period as the Successful Bidder
may have subsequently approved in writing) following the receipt by the Ministry of the
Successful Bidder’s notice specifying such breach;
c. if, as the result of Force Majeure, the Successful Bidder is unable to perform a material
portion of the Services for a period of not less than seven (7) days; or
d. if the Ministry fails to comply with any final decision reached as a result of arbitration
pursuant to Clause 8.19.3hereof.
8.12.3 Cessation of Services
Upon termination of this Contract by notice of either Party to the other pursuant to Clauses 8.12.1
or 8.12.2 hereof, the Successful Bidder shall, immediately upon dispatch or receipt of such notice,
take all necessary steps to bring the Services to a close in a prompt and orderly manner and shall
make every reasonable effort to keep expenditures for this purpose to a minimum. With respect to
documents prepared by the Successful Bidder and equipment and materials furnished by the
Ministry, the Successful Bidder shall proceed as provided, respectively, by Clauses 8.13.14 or
8.13.15 hereof.
8.12.4 Payment upon Termination
In the event of such termination, the Successful Bidder shall be compensated for the actual amount
of work performed to the satisfaction of the Ministry on pro rata basis after offsetting against these
payments any amount that may be due from the Successful Bidder to the Ministry. All advances
paid to the Successful Bidder shall be immediately refunded to the Ministry along with the
borrowing rate of interest of Government of India (@ 12%) from the date of receipt of the said
amount by the Successful Bidder to the date of refund thereof.
89
8.12.5 Disputes on Events of Termination
If either Party disputes whether an event specified in paragraphs (a) through (d) of Clause 8.12.1
or in Clause 8.12.2 hereof has occurred, such Party may, within forty-five (45) days after receipt
of notice of termination from the other Party, refer the matter to arbitration pursuant to Clause 8.19
hereof, and this Contract shall not be terminated on account of such event except in accordance
with the terms of any resulting arbitral award.
8.13 Obligation of the Successful Bidder
8.13.1 Standard of Performance
The Successful Bidder shall perform the Services and carry out their obligations hereunder with
all due diligence, efficiency and economy, in accordance with generally accepted professional
techniques and practices, and shall observe sound management practices, and employ appropriate
advanced technology and safe and effective equipment, machinery, materials and methods. "The
Successful Bidder shall always" act, in respect of any matter relating to this Contract or to the
Services, as faithful advisers to the Ministry, and shall at all times support and safeguard the
Ministry's legitimate interests in any dealings with Sub- consultants or Third Parties. The
Consultant shall be responsible for the professional and technical competence of its employees
and will select, for work under this Contract, reliable individuals who will perform effectively in
the implementation of this Contract, respect the local customs, and conform to a high standard of
moral and ethical conduct.
8.13.2 Fraud and Corrupt Practices
8.13.2.1 The Bidders and their respective officers, employees, agents and advisers shall observe
the highest standard of ethics during the Bidding Process and during the subsistence of the
contract. Notwithstanding anything to the contrary contained herein, or in the contract, the
Ministry may reject a Bid, or terminate the Contract, as the case may be, without being liable in
any manner whatsoever to the Bidder, if it determines that the Bidder has, directly or indirectly or
through an agent, engaged in corrupt practice, fraudulent practice, coercive practice, undesirable
practice or restrictive practice in the Bidding Process. In such an event, the Ministry shall be
entitled to forfeit and appropriate the Bid Security or Performance Security, as the case may be,
as Damages, without prejudice to any other right or remedy that may be available to the Ministry
under the Bidding Documents and/ or the Contract, or otherwise.
8.13.2.2 Without prejudice to the rights of the Ministry under Clause 8.13.2.1 hereinabove and
the rights and remedies which the Ministry may have under the contract, or otherwise if a Bidder
is found by the Ministry to have directly or indirectly or through an agent, engaged or indulged in
any corrupt practice, fraudulent practice, coercive practice, undesirable practice or restrictive
practice during the Bidding Process, or during the execution of the Contract, such Bidder shall not
be eligible to participate in any tender or RFP issued by the Ministry during a period of 2 (two)
years from the date such Bidder is found by the Ministry to have directly or indirectly or through
an agent, engaged or indulged in any corrupt practice, fraudulent practice, coercive practice,
undesirable practice or restrictive practices, as the case maybe.
90
8.13.2.3 For the purposes of this Clause 8.13.2, the following terms shall have the meaning
hereinafter respectively assigned to them:
(a) "corrupt practice" means the offering, giving, receiving, or soliciting, directly or indirectly,
of anything of value to influence the actions of any person connected with the Bidding
Process (for avoidance of doubt, offering of employment to or employing or engaging in
any manner whatsoever, directly or indirectly, any official of the Ministry who is or has
been associated in any manner, directly or indirectly, with the Bidding Process or has dealt
with matters concerning the contract or arising therefrom, before or after the execution
thereof, at any time prior to the expiry of one year from the date such official resigns or
retires from or otherwise ceases to be in the service of the Ministry, shall be deemed to
constitute influencing the actions of a person connected with the bidding process.
(b) "fraudulent practice" means a misrepresentation or omission of facts or suppression of facts
or disclosure of incomplete facts, in order to influence the Bidding Process;
(c) "coercive practice" means impairing or harming, or threatening to impair or harm, directly
or indirectly, any person or property to influence any person's participation or action in
the Bidding Process;
(d) "undesirable practice" means (i) establishing contact with any person connected with or
employed or engaged by the Ministry with the objective of canvassing, lobbying or in any
manner influencing or attempting to influence the Bidding Process; or (ii) having a
Conflict of Interest; and
(e) "Restrictive practice" means forming a cartel or arnvmg at any understanding or
arrangement among Bidders with the objective of restricting or manipulating a full and fair
competition in the Bidding Process.
8.13.3 Encumbrances/Liens
The Successful Bidder shall not cause or permit any lien, attachment or other encumbrance by any
person to be placed on file or to remain on file in any public office or on file with Ministry against
any money due or to become due for any work done or materials furnished under this Contract, or
by reason of any other claim or demand against the Consultant.
8.13.4 Use of name, Emblem or official seal of Ministry/Government
The Successful Bidder shall not advertise or otherwise make public the fact that it is a service
provider to the Ministry, nor shall the Successful Bidder, in any manner whatsoever use the name,
emblem or official seal of Ministry or the Government, or any abbreviation of the name of Ministry
or the Government in connection with its business or otherwise.
8.13.5 Law Governing Services
The Successful Bidder shall perform the Services in accordance with the Applicable
LawandshalltakeallpracticablestepstoensurethatanySub-consultants,as well as the Personnel of
the Successful Bidder and any Sub- consultants, comply with the Applicable Law.
8.13.6 Conflict of Interests
8.13.6.1 The Remuneration of the Successful Bidder pursuant to Clause 8.16.1 hereof shall
constitute the Successful Bidder's sole remuneration in connection with this Contract or the
Services and, subject to Clause 8.13.6.2 hereof, the Successful Bidder shall not accept for their
91
own benefit any trade commission, discount or similar payment in connection with activities
pursuant to this Contract or to the Services or in the discharge of their obligations hereunder, and
the Successful Bidder shall use their best efforts to ensure that any Sub- consultants, as well as the
Personnel and agents of either of them, similarly shall not receive any such additional
remuneration.
8.13.6.2 If the Successful Bidder, as part of the Services, have the responsibility of advising
the Ministry on the procurement of goods, works or services, the Successful Bidder shall comply
with any applicable procurement guidelines of the Government of India and shall at all times
exercise such responsibility in the best interest of the Ministry. Any discounts or commissions
obtained by the Successful Bidder in the exercise of such procurement responsibility shall be for
the account of the Ministry.
8.13.7 Confidentiality
The Successful Bidder, their Sub-consultants and the Personnel of either of them shall not, disclose
any proprietary or confidential information relating to the Project, the Services, this Contract or
the Ministrys business or operations without the prior written consent of the Ministry.
8.13.8 Liability of the Successful Bidder
The Successful Bidder’s liability under this Contract shall be as provided by the Applicable Law.
8.13.9 Insurance to be taken out by the Successful Bidder
All costs involved in taking the insurance will be borne by the Successful Bidder.
8.13.10 Reporting Arrangements
The Successful Bidder shall neither seek nor accept instructions from any authority external to the
Ministry in connection with the performance of services under the Contract
8.13.11 Accounting, Inspection and Auditing
The Successful Bidder (i) shall keep accurate and systematic accounts and records in respect of
the Services, in such form and detail as will clearly identify all relevant time charges and cost, and
the bases thereof; (ii) shall permit the Successful Bidder or its designated representative
periodically, and up to one year from the expiration or termination of this Contract, to inspect the
same and make copies thereof as well as to have them audited by auditors appointed by the
Ministry; and (iii) shall permit the Ministry to inspect the Successful Bidder's accounts and records
relating to the performance of the Successful Bidder and to have them audited by auditors
appointed by the Ministry.
8.13.12 Successful Bidder’s Actions Requiring Ministry’s Prior Approval
The Successful Bidder shall obtain the Ministry's prior approval in writing before taking any of
the following actions:
(a) entering into a subcontract for the performance of any part of the Services, it being
understood
(i) that the selection of the Sub-consultant and the terms and conditions of the subcontract
shall have been approved in writing by the Ministry prior to the execution of the
subcontract, and
92
(ii) That the Successful Bidder shall remain fully liable for the performance of the Services
by the Sub- consultant and its Personnel pursuant to this Contract.
(b) Extension of time period for completion of services for any reason including Force majeure.
8.13.13 Reporting Obligations
The Successful Bidder shall furnish, compile or make available at all times to the Ministry and
records of information, oral or written, which the Ministry may reasonably request of the services
to be performed under this contract.
8.13.14 Documents Prepared by the Successful Bidder to Be the Property of the Ministry
a. All drawings, photographs, reports, questionnaires, recommendations, estimates,
documents and all other data, including the Raw data, compiled or received by the
Successful Bidder under this Contract shall be the property of the Ministry, shall be treated
by him/her as confidential, shall be delivered only to the duly authorized officials on
completion of work under this Contract or as may otherwise be specified by the Ministry
under this Contract. In no event shall be the contents of such document or data are made
known by the Successful Bidder to any person or organization without written approval of
the Ministry. Subject to the provisions of this Article, the Successful Bidder may retain a
copy of the document produced by him.
b. All copyright, patents and other intellectual property rights in all countries and all
proprietary rights in the manuscripts, records and other materials except for the existing
materials, publicly or privately owned, collected or prepared in the course of the execution
of this Contract, shall become the property of the Ministry as appropriate, who shall have
the right to publish the same in whole or in part, copyright and takeout patents etc. as the
Ministry may determine appropriate.
8.13.15 Equipment and Materials Furnished by the Ministry
Equipment and materials made available to the Successful Bidder by the Ministry, or purchased
by the Successful Bidder with funds provided by the Ministry, shall be the property of the Ministry
and shall be marked accordingly. Upon termination or expiration of this Contract, the Successful
Bidder shall make available to the Ministry an inventory of such equipment and materials and
shall dispose of such equipment and materials in accordance with the Ministry’s instructions. Such
equipment or property when returned to the Ministry shall be in the same condition as when
delivered to the Successful Bidder, subject to normal wear and tear. The Successful Bidder shall,
if any event be liable to the Ministry for the loss of or damage to such equipment or property
through his/her fault or negligence.
8.14 Successful Bidder’s Personnel and Sub-consultants
8.14.1 In general, the Successful Bidder shall employ such qualified and experienced Personnel,
as required and stated Clause 4.3 (Section-4) to carry out the said study.
8.14.2 Removal and/or Replacement of Personnel
a. Except as the Ministry may otherwise agree, no changes shall be made in the Key
Personnel. If, for any reason beyond the reasonable control of the Successful Bidder, it
becomes necessary to replace any of the Personnel, the Successful Bidder shall forthwith
93
provide as a replacement a person of equivalent or better qualifications with the prior
approval of the Ministry.
b. If the Ministry (i) finds that any of the Personnel has committed serious misconduct or has
been charged with having committed a criminal action, or (ii) has reasonable cause to be
dissatisfied with the performance of any of the Personnel, then the Successful Bidder shall,
at the Ministry's written request specifying the grounds therefore, forthwith provide as a
replacement a person with qualifications and experience acceptable to the Ministry.
8.15 Right and remedies of Ministry
8.15.1 Nothing in or relating to this contract shall be deemed to prejudice or constitute a waiver
of any rights or remedies of the Ministry.
8.15.2 The Ministry shall not be liable for any consequences of, or claims based upon any act of
omission on the part of the Government
8.16 Payment to the consulting agency
8.16.1 Lump sum remuneration
The Successful Bidder’s total remuneration shall not exceed the Contract price and shall be a fixed
lump sum including all staff costs, sub consultants costs, printing, communications, travel,
accommodation and the like, and all other costs incurred by the Successful Bidder in carrying out
the said study.
8.16.2 Terms and Conditions for payment
i. Payments will be made to the account of the Successful Bidder and according to the
payment schedule as stated inSection-7.
ii. Payments will be made by the Ministry within sixty days of its approval of the quality of
the deliverable from the Successful Bidder against each milestone, as mentioned at
Section-7 and on the receipt of the corresponding invoice from the Successful Bidder
specifying the amount due.
8.17 Indemnification
a. The Successful Bidder shall indemnify, hold and save harmless and defend at his/her own
expenses the Ministry and its personnel from and against all suits, claims, demands and
liability of any nature whatsoever, including without limitations, costs and expenses arising
out of acts or omissions of the Successful Bidder its employees and/or agents caused by or
resulting from any operations(s) conducted by or on behalf of the Successful Bidder.
b. The Successful Bidder shall , at all times, further indemnify Ministry against any damages,
cost, expenses and/or claims occasioned by any infringement(s) of Copyrights or
Intellectual Property Rights (IPRs) of any third party occasioned by the services acts or
commissions or omission or on behalf of the Successful Bidder.
c. Any failure or delay on the part of any party to exercise right or power hereunder shall not
operate as a waiver thereof.
d. Neither this contract nor any rights under it may be assigned by either party without the
express prior written consent of the other party. However upon assignment of the
94
assignor’s interest in this Contract, the assignor shall be released and discharged from its
obligations hereunder only to the extent that such obligations are assumed by the assignee.
e. The Successful Bidder shall at all times indemnify the Ministry against any claims which
may be made under the Workmen’s compensation act, 1923 or any statutory modification
thereof or otherwise for or in respect of any damages or compensation payable in
consequence of any accident or injury sustained by any workmen, staff and agent of the
Successful Bidder or to the person whether in the employment of the Successful Bidder or
not
8.18 Operation of the Contract
The Parties recognize that it is impractical in this Contract to provide for every contingency which
may arise during the life of the Contract, and the Parties hereby agree that it is their intention that
this Contract shall operate fairly as between them, and without detriment to the interest of either
of them, and that, if during the term of this Contract either Party believes that this Contract is
operating unfairly, the Parties will use their best efforts to agree on such action as may be necessary
to remove the cause or causes of such unfairness, but no failure to agree on any action pursuant to
this Clause shall give rise to a dispute subject to arbitration in accordance with Clause 8.19hereof.
8.19 Settlement of Disputes
8.19.1 Amicable Settlement
The Parties shall use their best efforts to settle amicably all disputes arising out of or in connection
with this Contract or the interpretation thereof.
8.19.2 Dispute Settlement
Any dispute between the Parties as to matters arising pursuant to this Contract which cannot be
settled amicably within thirty (30) days after receipt by one Party of the other Party's request for
such amicable settlement may be submitted by either Party for settlement in accordance with the
provisions specified in Clause 8.19.3
8.19.3 Dispute Settlement Mechanism
8.19.3.1 Arbitration
Any disputes arising out of or in connection with this Contract shall be submitted to arbitration to
a sole arbitrator, if attempts at settlement by negotiations and/or conciliation have failed. Selection
of arbitrator shall be made by mutual consultation. The arbitrator shall give its award on the costs,
which may be divided between the parties. The decision rendered in the arbitration shall constitute
final adjudication of the dispute. The venue of arbitration shall be at New Delhi in India. The
arbitration shall be governed by the Arbitration and Conciliation Act 1996 as amended from time
to time. In any arbitration proceeding hereunder:
i. The English language shall be the official language for all purposes; and
ii. The decision of the sole arbitrator shall be final and binding and shall be enforceable in any
court of competent jurisdiction in New Delhi and the parties hereby waive any objections
to or claims of immunity in respect of such enforcement.
8.19.3.2 Jurisdiction
In case of any dispute, jurisdiction shall be a court in the NCT of Delhi/New Delhi only.
95
Annexure-1
(Contract for execution on Stamp Paper of ₹100/-)
CONTRACT
This contract is made at Delhi on this day of (Month) of two
Thousand Nineteen between Ministry of Environment, Forest & Climate Change, Government of
India (hereinafter called Ministry and [name of Selected bidder] (hereinafter called Consultant/
Agency) on the other part:
Whereas the Ministry has decided to assign the task of undertaking an evaluation the Central
Sector Schemes [Group..............] following the procedure laid down in proposal issued by the
Ministry on ….21st October, 2019.
The Consultant / Agency undertakes to abide by the Terms & Conditions as laid down in the
Proposal document and complete the study within time-schedule prescribed in the proposal issued
by the Ministry on the 21st October, 2019
IN WITNESS WHEREOF..................................... (Name and Designation of the
Authorized representative of the Consultant/ Agency) for............................. (Name of Consulting
Firm) and Economic Advisor on behalf of Ministry of Environment, Forest & Climate Change
hereunto have set their respective hand on the day of
(month) of 2019 herein above written.
Signature ................................. on behalf of Consulting Firm/ Agency Signature
…………………………. on behalf of Ministry
In the presence of Witness:
1. Name &Address
2. Name &Address
96
ANNEXURE-II
97
98
ANNEXURE-III Last Three year BE, RE & Actual Expenditure
2019-20
BE RE Actual BE RE Actual BE
I Environment Protection (EP) 75.52 83.00 79.73 35.00 33.00 32.68 485.00
1 Pollution Abatement 21.20 7.50 7.47 20.00 20.00 19.72 10.00
2 Hazardous Substances Management 54.32 75.50 72.26 15.00 13.00 12.96 15.00
3 Control of Pollution 0.00 0.00 0.00 0.00 0.00 0.00 460.00
II Environment Conservation (EC) 621.98 413.75 418.77 382.60 397.95 385.35 310.00
4 Eco-Task Force 30.00 120.00 120.00 67.50 112.85 112.85 75.00
5 Climate Change Action Plan 40.00 33.00 26.86 40.00 40.00 33.17 40.00
6 National Adaptation Fund 110.00 108.25 119.41 110.00 110.00 109.78 100.00
7 National Coastal Mission (including EAP) 441.98 152.50 152.50 165.10 135.10 129.55 95.00
III Decision Support Systems (DSS) 90.50 71.00 68.20 83.70 82.40 75.40 106.00
8 Environmental Information Systems (ENVIS) 23.00 23.00 20.22 24.00 28.00 23.84 46.00
9 R&D for Conservation and Development 17.50 7.00 6.98 9.70 4.40 1.56 10.00
10 National Mission on Himalayan Studies 50.00 41.00 41.00 50.00 50.00 50.00 50.00
IV Environmental Awareness and Capacity
Building (EACB) 83.00 73.79 64.77 75.00 91.60 89.56 85.80
11 Forestry Training and Capacity Building 23.00 15.50 15.16 15.00 28.60 28.52 10.80
12 Environmental Education, Awareness and Training 60.00 58.29 49.61 40.00 40.00 39.49 50.00
12.1 Media, Publicity & Information 0.00 0.00 0.00 20.00 23.00 21.55 25.00
Total 871.00 641.54 631.47 576.30 604.95 582.99 986.80