WELCOME TO THE COURSE

WORK STUDY(IE 341)OFFERED BY

SAYED ALIUL HASAN RIZVI, PhD PROFESSOR

DEPT OF INDUSTRIAL ENGINEERINGKING ABDULAZIZ UNIVERSITY, JEDDAH

Page 2: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

2

INTRODUCTION• With increasing complexities of the

technological world,need to simplify the work system has been increasing day by day.

• Work study is an area of knowledge that addresses the problem of work simplification with the basic objectives of

1. PRODUCTIVITY ENHANCEMENT, and

2. HUMAN COMFORT & SAFETY

Page 3: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

3

“WORK STYDY” HAS MANY OTHER NAMES FOR EXAMPLE

METHODS ENGINEERING, WORK SCIENCE,

WORK DESIGN,JOB ESIGNWORK METHODS DESIGN &WORK

MEASUREMENTMOTION &TIME STUDYOriginal names were:

Motion study,Time Study & then, Motion & Time Study

Page 4: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

4

DEFINITION

It is the systematic study of work systems with the purposes of

1. Developing the preferred system and Method ( with lowest cost)2. Standardizing this system and method3. Determining standard time for the task4. Assisting in training the worker in the

preferred Method

Page 5: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

5

EXPLANATION

Above stated definition has FOUR parts. However, the TWO most important for WORK STUDY are:

1.MOTION STUDY

(or Work Methods Design) &

2. TIME STUDY

(or Work Measurement)

Page 6: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

6

ILO DEFINITION

It is the systematic examination of carrying on activities so as to improve the effective use of resources and to set standards of performance for the activities being carried out.

Page 7: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

7

LECTURE : 3-4

CHAPTER : 2

WORK STUDY & PRODUCTIVITY

Page 8: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

8

HUMAN’S BASIC NEEDS & PRODUCTIVITY

In 1950: world population was 2.5 b

Now : it is of the order of 6.5 b

90% increase has occurred in developing nations.

Page 9: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

9

CONTD.Out of these people, more than 1 b are below poverty line, struggling

for the BASIC NEEDS which are :• food, • clothing, • shelter, • security, • health and • essentials like water, sanitation etc.

Page 10: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

10

CONTD.For Improving the STANDARD OF LIVING, of its

citizens, the concerned nation must raise its PRODUCTIVITY for economic growth. For any organization, its input-output system can be represented as follows:

INPUT OUTPUT

PROCESS

Page 11: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

11

CONTD.

INPUTS may be in the form of different M’s:

man, material, machine, method, management, market, message ( i.e. information), moment (i.e. time )

OUTPUT may be a

product or

service.

PRODUCTIVITY may be defined as follows:

Page 12: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

12

MATHEMATICALLY: PRODUCTIVITY = [OUTPUT / INPUT]THUS: PRODUCTIVITY measures the extent to which a certain OUTPUT can be extracted FROM A GIVEN INPUT.It may be noted that PRODUCTION ( which is number of products) is different from PRODUCTIVITY.

Page 13: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

13

CONTD.

• WORK STUDY IS A TOOL OF PRODUCTIVITY ENHANCEMENT.

• It simplifies a job TO REDUCE UNNECESSARY OR EXCESS WORK,WASTEFUL USE OF RESOURCESand sets up STANDARD TIME for performing that job.

Page 14: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

14

CONTD.

THIS IMPLIES THAT :

• THERE IS A DIRECT RELATIONSHIP BETWEEN WORK STUDY AND PRODUCTIVITY.

• THUS, BY APPLYING WS PRINCIPLES IF THE COST IS REDUCED BY 20%, THEN, WE CAN SAY THAT PRODUCTIVITY HAS GONE UP BY 20%.

Page 15: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

15

WORK CONTENT OF A JOB“WORK CONTENT”

• It means the amount of work contained in a given job/work/product/process.

• It is measured in MAN-HOURS/ WORK-HOURS (effort or labor of ONE person for ONE hour), or MACHINE HOURS (running of a machine/plant for ONE hour).

Page 16: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

16

TOTAL TIME OF A JOB

‘TOTAL TIME OFA JOB’ COMPRISES OF:

1. BASIC WORK CONTENT &

2. EXCESS WORK CONTENT

BASIC WORK CONTENT is irreducible minimum time required theoretically to produce one unit of product

In REAL LIFE WORLD, actual operation times are FAR MORE IN EXCESS due to the EXCESS WORK CONTENT.

Page 17: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

17

CONTD.

• EXCESS WORK CONTENT may be due to following

THREE CATEGORIES of factors:

(i) A-category:

A1: POOR DESIGN & FREQUENT DESIGN CHANGES

A2: WASTE OF MATERIALSA3: INAPPROPRIATE QUALITY

STANDARDS

Page 18: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

18

CONTD.

(ii) B-category

B1: POOR LAYOUT & POOR

UTILISATION OF SPACEB2: INADEQUATE MATERIAL

HANDLINGB3: FREQUENT STOPPAGES AS

PRODUCTION CHANGES FROM

ONE PRODUCT TO ANOTHER

Page 19: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

19

CONTD.

B4: INEFFECTIVE METHOD OF WORK B5: POOR PLANNING OF INVENTORY B6: FREQUENT BREAKDOWN OF MACHINES AND EQUIPMENT

Page 20: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

20

iii) C-category

C1: ABSENTEEISM AND LATENESSC2: POOR WORKMANSHIP, ANDC3: ACCIDENTS AND OCCUPATIONAL HAZARDS

= BASIC WORK CONTENT + EXCESS WORK CONTENT ( A + B +C ) (OR, TOTAL INEFFECTIVE TIME)

TOTAL TIME OF A JOB

Page 21: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

21

LECTURE : 5-8

CHAPTER : 3

WORK STUDY ,THE APPROACH:

Page 22: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

22

WS IS VALUABLE because

By carrying out its systematic procedures,one can get results as good as or even better than the less systematic genius would have been able to achieve in the past.

It is systematic both in the investigation of the problem and in the development of its solution.

Page 23: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

23

CONTD.

• It raises productivity of the plant /unit by simply reorganization of the work, with either a nominal or no extra input.

It sets the performance standards on which the effectiveness of the production planning and control depends.

Page 24: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

24

CONTD.

It contributes to human safety by providing safer methods of work, and allows for better working conditions by exposing the hazardous situations.

Its application starts providing savings immediately, and continues till the operation continues.

Page 25: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

25

CONTD.

It is a tool that can be used every where, be it industrial or non-industrial environment.

It is easy and relatively cheaper in its application.It is an excellent weapon for starting an attack on the inefficient system.

• HOWEVER, WS SPECIALISTS SHOULD APPLY IT TACTFULLY, SO THAT WORKERS REMAIN CO-OPERATIVE WHILE STUDIES ARE CONDUCTED IN THE PLANT.

Page 26: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

26

TECHNIQUES OF WORK STUDY: These are:

1. METHOD STUDY is the systematic recording and critical examination of ways of doing things in order to make improvements. THUS it simplifies the job and develops more economical method of doing it.

2.WORK MEASUREMENT is the application of techniques designed to establish the time for a qualified worker to carry out a task at a defined rate of working.THUS it determines how long it should take to carry out the work.

Page 27: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

27

BASIC PROCEDURE OF WS comprise of following STEPS:

1.SELECT the job/task/process to be studied.2.RECORD all the relevant data/facts about the selected job.3.EXAMINE the recorded facts critically by challenging its purpose, place, sequence, person, and method.4.DEVELOP new methods,as alternative methods, of doing the selected job. 5.EVALUATE results of different alternative solutions. 6.DEFINE the new method and present it to the concerned people. 7.INSTAL the new method and provide training to the concerned staff . 8.MAINTAIN the new standard practice and establish control procedures.

Page 28: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

28

ACCORDING TO BARNES:ACCORDING TO BARNES:Since Methods Engineering is a form of Since Methods Engineering is a form of CREATIVE CREATIVE PROBLEM SOLVINGPROBLEM SOLVING, THE GENERAL PROBLEM , THE GENERAL PROBLEM SOLVING PROCESSES can be employed in WS also. SOLVING PROCESSES can be employed in WS also. Accordingly, following Accordingly, following FIVE STEPSFIVE STEPS can be used: can be used: 1.Problem definition1.Problem definition : Statement of the : Statement of the purpose/goalpurpose/goal

2. Analysis of the problem2. Analysis of the problem : Fact-recording no : Fact-recording no evaluationevaluation

3.Search for possible solutions3.Search for possible solutions : Finding several : Finding several alternative alternative solutions. solutions. 4. Evaluation of alternatives4. Evaluation of alternatives : Examining which : Examining which alternative meets the goal/criteria most, alternative meets the goal/criteria most, in in order to evolve the preferred solution. order to evolve the preferred solution. & & 5. Recommendation5. Recommendation for actionfor action : : Communicating the Communicating the details ,related to the preferred method to all details ,related to the preferred method to all concerned.concerned.

Page 29: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

29

LECTURE : 9-10

CHAPTER : 6

METHOD STUDY & JOB SELECTION

Page 30: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

30

STEP I : JOB/TASK/PROCESS SELECTION

It involves following considerations:

1. ECONOMIC CONSIDERATIONS

2. TECHNOLOGICAL CONSIDERATIONS and

3. HUMAN CONSIDERATIONS

Page 31: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

31

Contd.1.ECONOMIC CONSIDERATIONS

Cost effectiveness i.e. to check whether or not the WS application would pay. For this, key-profit giving/ costliest operations with largest waste/scrap should be attacked first. Next bottleneck operations, repetitive operations, repeated material handling operations should be studied. For locating most important operations, PARETO ANALYSIS could be used.

Page 32: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

32

2.TECHNICAL/TECHNOLOGICAL CONSIDERATIONS

The analysis involves application of WS for the selection of the operations/processes where new technology e.g. automation/ robotisation should be introduced.

Page 33: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

33

3.HUMAN CONSIDERATIONS

Analysis involves location of those operations which present the sources of dissatisfaction and/or annoyance to the workers due to fatigue or monotony or unsafe environment or a work which is clumsy in nature.

Page 34: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

34

LECTURE : 11-12

CHAPTER : 7

RECORDING THE FACTS :DIAGRAMS & CHARTS

Page 35: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

35

STEP II : RECORDING THE FACTS

Related to the existing process/ job ALL THE FACTS should be recorded ACCURATELY.

TOOLS OF FACT-RECORDING are:

(A) CHARTS, which may be of two types:

(i) Based on SEQUENCE:

(a) Outline Process Chart (b) Flow Process Chart

(c) Two-Handed Chart ( or Operation Chart / Left Hand & Right Hand chart)

Page 36: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

36

CONTD.

(ii ) Based on TIME scale:

(a) Multiple Activity Chart

(b) SIMO ( SImultaneous MOtion) Chart

(B) DIAGRAMS: which may be of the following types:

Flow diagram, String Diagram, Travel Chart,

Cyclegraph, & Chronocyclegraph,

Page 37: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

37

PROCESS CHART SYMBOLSASME has recommended FIVE standard symbols to be used on Process Charts, given below:1. OPERATION : Main steps of the task /job involving modification /change.2. INSPECTION: Checking quality / quantity. 3. TRANSPORTATION : For movement of persons/materials.4. DELAY (TEMPORARY) : For waiting time of operators or materials.5. STORAGE (PERMANENT DELAY)] : For controlled storage involving authorized issue/receipt of material etc.NOTE: FOR TWO PARALLEL EVENTS, BOTH ARE SHOWN IN ONE JOINT OR COMBINED SYMBOL: e. g.

operation & inspection ,jointly are shown by symbol, indicated in the figure.

Page 38: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

38

THE OUTLINE FLOW PROCESS CHART

• It uses ONLY TWO SYMBOLS:

&

• It provides an OVERALL PICTURE of the process / job / task.

• Primarily it is used to show the sequence of operations & inspections for a MANUFACTURING or an ASSEMBLY kind of jobs.

Page 39: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

39

FLOW PROCESSCHART• It uses ALL THE FIVE SYMBOLS and provides the

total sum details of the process/job under study.• A Flow Process chart may be of the following

types:1.MAN-TYPE in which every symbol is

related to his/her activity only.2.MATERIAL TYPE in which every symbol

is related to the material of the job or a document (e.g. in offices) or a machine/equipment.• Data / information in a flow process chart are

recorded in specifically designed FORM, as given in the TEXT BOOK / CLASS ROOM.

Page 40: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

40

LECTURE : 13-14

CHAPTER : 7 (CONTD)

Page 41: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

41

STEP III : CRITICAL EXAMINATION

The facts recorded in the Flow Process Chart are now EXAMINED CRITICALLY

by applying the

QUESTIONING TECHNIQUE,

which involves the following SEQUENCE:

Page 42: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

42

CONTD.

• PURPOSE for which the activity is done

• PLACE at ,, ,, ,, ,, ,,

• SEQUENCE in ,, ,, ,, ,, ,,

• PERSON by whom ,, ,, ,, ,, ,,

• MEANS by which ,, ,, ,, ,, ,,

WITH THE OBJECTIVE OF ELIMINATING/ COMBINING/ REARRANGING/ SIMPLIFYING

THE ACTIVITIES INVOLVED IN THE PROCESS.

QUESTIONING TECHNIQUE involves

1. PRIMARY QUESTIONS and

2. SECONDARY QUESTIONS explained below:

Page 43: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

43

PRIMARY QUESTIONSAccording to the QUESTIONING TECHNIQUE the PRIMARY

QUESTIONS are as follows:• Purpose-based: WHAT is actually done?

WHY is the activity ELIMINATE necessary, at all?• Place-based: WHERE is it being done? WHY at this place?• Sequence-based: WHEN is it done?

WHY at that time? COMBINE or• Person-based: WHO is doing it ? REARRANGE

WHY by this person?

• Means-based: HOW is it being done? SIMPLIFY WHY in that particular way?

Page 44: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

44

SECONDARY QUESTIONS

• Corresponding to each answer obtained through the PRIMARY QUESTIONS further questions are raised to explore about the

ALTERNATIVES i. e. alternate purpose, place,

sequence, person & means.

This methodology makes use of the SECONDARY QUESTIONS given as follows:

Page 45: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

45

Contd.• WHAT ELSE might be done?

• WHERE ELSE might it be done?

• WHEN ELSE might it be done?

• WHO ELSE might do it? &

• HOW ELSE might it be done?

BY ANSWERING THE PRIMARY & SECONDARY QUESTIONS WE USE THE SYSTEMATIC CRITICAL EXAMINATION IN ORDER TO EVOLVE A BETTER METHOD OF DOING THE WORK.

Page 46: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

46

Contd.

AS A RESULT, ONE CAN DEVELOP A BETTER METHOD IN LIGHT OF THE OBTAINED ANSWERS TO THE FOLLOWING QUESTIONS:

• WHAT should be done?

• WHERE should it be done?

• WHEN should it be done?

• WHO should do it ?

• HOW should it be done?

Page 47: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

47

LECTURE : 15-17

CHAPTER : 8

RECORDING MOVEMENT OF WORKERS/MATERIALS

Page 48: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

48

RECORDINGMOVEMENT OF WORKERS/ MATERIALS

TOOLS USED FOR THIS PURPOSE ARE:

• STRING DIAGRAM

• FLOW DIAGRAM

• TRAVEL CHART

Page 49: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

49

STRING DIAGRAM

• IT IS A SCALE PLAN OR MODEL ON WHICH A THREAD OR STRING IS USED TO TRACE AND MEASURE THE PATH OF WORKERS/ MATERIALS DURING A SPECIFIED SEQUENCE OF EVENTS.

• LENGTH OF THE THREAD/STRING MEASURES THE DISTANCE MOVED.

Page 50: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

50

FLOW DIAGRAM

• It is a FLOOR-PLAN showing the path of travel of the operator or the material, through the plant.

• It ALSO indicates the direction of travel by means of arrows, drawn on the diagram.

Page 51: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

51

TRAVEL CHART ( or, FROM-TO CHART)• It is a tabular record of quantitative data about

movement of workers/materials/equipment between any number of places over a given period of time. It is always in the form of a SQUIRE, having within it the squires.

EACH SMALL SQUIRE REPRESENTS A STATION.

Along the TOP, squires from left to right represent the stations FROM where movement or travel occurs.

Along those DOWN THE LEFT HAND, the squires represent the stations TO which the movement is made.

Page 52: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

52

MAN-MACHINE CHART (MULTIPLE ACTIVITY CHART)

• This kind of process chart records the activities of the operator as well as the machine on the same chart against a common time scale.

• Separate vertical columns ( in the form of bars) are used for both.

• The chart clearly indicates the IDLENESS (or UTILISATION) of operator as well as the machine.

• On the basis of the recorded events in the chart, one can rearrange the process so that IDLE-TIME is reduced, or BETTER UTILISATION of the operator/machine is achieved.

• It is used for balancing the work between man and machine ;proper utilization of maintenance crew /team-activities in mass production.

Page 53: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

53

LECTURE : 18-24

CHAPTER : 9

METHODS & MOVEMENTS AT THE WORKPLACE

Page 54: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

54

METHODS & MOVEMENTS AT THE WORKPLACE

PRINCIPLES OF MOTION ECONOMYThese principles can be helpful in work design, in

reducing the human fatigue and in improving the work efficiency. According to Barnes, these can be presented under following THREE subgroups:

1.Principles of motion economy as related to the USE OF HUMAN BODY

2.Principles of motion economy as related to the ARRANGEMENT OF THE WORKPLACE

3.Principles of motion economy as related to the DESIGN OF TOOLS & EQUIPMENT

Page 55: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

55

[A] .Principles of motion economy as related to the USE OF HUMAN BODY

• 1.The two hands should begin and complete their movements at the same time.

• 2. The two hands should not be idle at the same time.

• 3.Motions of the arms should be symmetrical and in opposite direction and should be made simultaneously.

Page 56: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

56

Principles: Contd

• 4.Hand and body motions should be made at the lowest classification at which it is possible to do the work satisfactorily.

[The term ‘CLASSIFICATION OF HAND

MOTION’ is explained as follows]

Page 57: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

57

CLASSIFICATION OF HAND MOTIONS

CLASS PIVOT BODY MEMBERS MOVED

1 Knuckle Finger (F)

2 Wrist Hand (H) + F

3 Elbow Fore Arm (FA) + H + F

4 Shoulder Upper Arm (UA) +FA+H+F

5 Trunk Torso + UA + FA + H + F

Page 58: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

58

Principles : CONTD.• 5. Momentum should be employed to help the

worker ,but should be reduced to a minimum whenever it is to overcome by muscular effort.

• 6.Continuous curved motions are to be preferred to straight line motion involving sudden and sharp changes in direction.

• 7. Ballistic (free-swinging) motions are faster, easier, and more accurate than restricted or controlled motions.

Page 59: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

59

Principles CONTD.

• 8.Rhythm is essential to the smooth and automatic performance of a repetitive operation. The work should be arranged to permit an easy and natural rhythm whenever it is possible.

• 9.Work should be arranged so that eye-movements are confined to a comfortable area, without the need for frequent changes of the focus.

Page 60: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

60

[B].Principles of motion economy as related to the ARRANGEMENT OF THE WORKPLACE

• 1.Definite and fixed positions/stations should be provided for all tools and materials to permit habit formation.

• 2.Tools and materials should be pre-positioned to reduce searching.

Page 61: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

61

CONTD.

• 3.Gravity-feed, bins and containers should be used to deliver the materials as close to the point of use as possible.

• 4.Tools, materials, and controls should be located within the ‘maximum working area’ and as near to the worker as possible.

[WORKING AREA (WA) may be divided into: 1.NORMAL WA & 2.MAXIMUM WA explained below ]

Page 62: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

62

Cotd.Normal Working Area (WA) :

( Finger + wrist + elbow) Movement MOST CONVENIENT ZONE

Edge of bench operator

operatorMaximum WA : (Shoulder Movement)

Page 63: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

63

DIMENSIONS FOR SEATED TASKS• 1.SEAT HEIGHT should be adjustable :

( range:36-45 ) • 2. WORK SURFACE HEIGHT should be around

elbow level (range:65-72 cm)• 3.LEG CLEARANCE : 40 cm at knee level

& 60 cm for the feet• 4.THIGH CLEARANCE : 20 cm minimum• 5.WORK SURFACE THICKNESS : 5cm max.

Page 64: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

64

Principles : CONTD.• 5.Materials and tools should be arranged to

permit the best sequence of motions.

• 6.‘Drop deliveries’ or ejectors should be used wherever possible, so that operators do not have to use his/her hands to dispose of the finished work.

Page 65: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

65

Principles: CONTD.

• 7.Provision should be made for adequate lighting and, a chair of the type of height to permit good posture should be provided. The height of the workplace and seat should be arranged to allow alternate standing and sitting.

• 8.The color of the workplace should contrast with that of the work and thus reduce the eye-fatigue.

Page 66: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

66

[C]. Principles of motion economy as related to the the DESIGN OF TOOLS & EQUIPMENT

• 1.The hands should be relieved of all work of “holding” the work-piece where this can be done by a jig, fixture or foot-operated device.

• 2.Two or more tools should be combined wherever possible.

• 3.Where each finger performs some specific movement, as in typewriting, the load should be distributed in accordance with the inherent capacities of the fingers.

Page 67: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

67

Principles : CONTD.• 4.Handles such as those on cranks and large

screw divers should be so designed that as much surface of the hand as possible can come in contact with the handle. This is specially necessary when considerable force has to be used on the handle.

• 5.Levers crossbars and hand-wheels should be so placed that the operator can use them with the least change in body position and the largest mechanical advantage.

Page 68: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

68

TWO-HANDED PROCESS CHART (OPERATION CHART/LEFT-HAND RIGHT-HAND CHART)

• It shows the activities of the two hands in relation to one another.

ACCORDING TO BARNES:• It uses ONLY TWO SYMBOLS: &

Small circle for TRANSPORTATION

& Big circle for OPERATION.

ACCORDING TO ILO :• It uses ALL process chart symbols EXCEPT

INSPECTION • After studying a few cycles recording is done.• ONLY ONE HAND is charted AT A TIME.

Page 69: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

69

FUNDAMENTAL HAND MOTIONS

• Gilbreth observed that most work done by two hands consists of a few fundamental motions.

• He called EACH ONE of them as THERBLIG. (name of GILBRETH ,read in reverse order).

THERBLIG : G I L B R E T H

( read in reverse order)

Page 70: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

70

contd.• Today we have 17 Therbligs as follows:

Search, select, grasp, transport empty, transport loaded, hold, release load position, preposition, inspect, assemble, disassemble, use, unavoidable delay avoidable delay, plan, & rest for overcoming fatigue.

• THESE ARE USED IN MICROMOTION STUDIES (FACTS RECORDED ON FILMS)

Page 71: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

71

MICROMOTION STUDIES

• Operations with very short cycles & repetitive cycles need greater details to analyze it for saving motions and effort( i.e. planning for lesser fatigue). This goal can be achieved through Micro-motion Studies.

• MICRO means ‘small. Thus here we study the motions in terms of THERBLIGS.

Page 72: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

72

CONTD.

• Such a study involves the use of

FILM and VIDEO when operator performs the job.

• Later on the film/video can be run slowly THROUGH A PROJECTOR and

• ‘Frame by frame’ analysis of the work can be carried out.

• Film provides greater flexibility of filming and playback speeds WHEREAS video is easier in use.

Page 73: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

73

Contd.

STEPS:

1. Filming the job

2. Analysis of the film, &

3. Presenting DATA/FACTS

graphically through

SIMO chart.

(SImultaneous Motion Chart)

Page 74: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

74

CONTD.• EQUIPMENT: Camera, Film, Micro-chronometer, Exposure meter, Flood lights, Reflectors, Tripod,, Projector etc.

OR,

VIDEOCAMERA plus its accessories for filming operation.

Page 75: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

75

CONTD.ADVANTAGES OF MICROMOTION STUDIES

OVER DIRECT OBSERVATION.

• Greater details are made availalble

• More accurate

• Easier in data collection

• Better for record keeping

• Help in work study personnel's development

Page 76: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

76

FILM ANALYSIS:• Film is run on projector,

• Details of the work-cycle are identified in terms of THERBLIGS, first for

Left hand

and then for

Right hand,

• TIME ( in WINK) is noted from the

Chronometer readings of the film for each

therblig.

[1 WINK = (1/2000) OF A MINUTE ]

Page 77: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

77

CONTD.

With these data SIMO (Simultaneous Motion) chart is made as shown below :

LH Activities Therblig Time Therblig RH Activity

Page 78: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

78

MEMOMOTION ANALYSIS

• It was introduced by MUNDEL.

• It is a special type of micro-motion study in which activities are FILMED AT MUCH SLOWER SPEED (60 to 100 frames per minute) i.e. at longer intervals than normal (intervals being between 0.5 to 4 s).

• Thus a general pattern of movements can be obtained and avoidable motions can be identified.

Page 79: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

79

contd.• STEPS: Study the operation to be filmed ;

Prepare the film ; Analyze the film ;

Develop a better method.• ADVANTAGES: More economical (less film

consumed) and Long sequence of activities can be recorded;

• APPLICATIONS:

Team-work studies ;

Material flow studies ( e.g. baggage

movement at the airports )

Long cycle job studies &

Study of artificial limbs’ motions etc

Page 80: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

80

CYCLEGRAPH• It was introduced by Gilbreth.• It is a photographic record of the path of

movement of the operator doing a job.• Little source of light (bulb) is attached to the

hand or finger or any other body part, whose motions are to be analyzed. When he/she performs the operation and photograph is taken continuously, the path of motions is recorded on the film as CONTINUOUS STREAK OF LIGHT as shown below

OPERATO R

Page 81: 1 WELCOME TO THE COURSE WORK STUDY (IE 341) OFFERED BY SAYED ALIUL HASAN RIZVI, PhD PROFESSOR DEPT OF INDUSTRIAL ENGINEERING KING ABDULAZIZ UNIVERSITY,

81

CHRONOCYCLEGRAPH• It is a special type of cycle-graph in which the light

source (bulb) is suitably INTERRUPTED ELECTRICALLY so that the path of motion in the photograph appears as a SERIES OF PEAR-SHAPED SPOTS instead of continuous streak of light as shown below

PEAR-SHAPED SPOTS

MOTION DIRECTION

• The pointed end of the pear shows the direction of movement.• More elongated and spaced pear-spots indicate higher speed of

operation..• It helps in studying the complex and restricted motions also.