![Page 1: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/1.jpg)
1
Virgo Commissioning progress and plans
ILIAS, Jan 23rd 2007
Matteo Barsuglia on behalf of the Commissioning Team
![Page 2: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/2.jpg)
2
Outline
Status at the last meeting, November 13th
Commissioning progress during last 2 months
Future steps
Related talks:
Noise hunting issues in Virgo (Gabriele)
Use of a second modulation (Maddalena, Henrich)
Some considerations on Virgo design sensitivity (Matt)
![Page 3: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/3.jpg)
3
Thermal lensing: power decrease needed
Laser power reduction
(25%)
Stored power reduction ~ 10%
wrs WSR-1
20 min100 sec
Matching activity: 10% power
increase
![Page 4: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/4.jpg)
4
WSR5 noise budget
Unknown noise in the 100 Hz region (suspect: diffused light)
Longitudinal control near the sensitivity – sometimes limiting
![Page 5: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/5.jpg)
5
Sensitivity to weather conditions
Red curve: 2.7 Mpc -(wind+sea)
Red curve = 2.7 Mpc-(wind+sea)
![Page 6: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/6.jpg)
6
Progress since last meeting
Calibration uncertainty fixed
Noise hunting
Diffused light investigations
Longitudinal control noise
Increase ITF robustness
Automatic alignment
Mirror suspension control
2 WSR’s performed
WSR-6 in December
WSR-7+ commissioning run in January
![Page 7: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/7.jpg)
7
Calibration fixed – end of November
Discrepancy of 40% between calibrations with north-end and west-end
Conservative value taken so far
Problem discovered in a DAC of one of the end test masses
New value gives “improvement” in sensitivity
1.4 above 100 Hz
Present uncertainty ~ 10%
![Page 8: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/8.jpg)
8
Diffused light investigations
![Page 9: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/9.jpg)
9
Detection port
Dump spurious beam on vacuum (half of December)
Simplify optical scheme of the external bench (beginning of January)
![Page 10: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/10.jpg)
10
B1b
B5b
Optics centering checks:- Realignment of M9 (on B1s)
In vacuum beam dumps
![Page 11: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/11.jpg)
11
In vacuum beam dumps/2
No significant results from the mitigations in and out vacuum
![Page 12: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/12.jpg)
12
Big work on alignment
Increase the gain in the alignment filters, in order to:
Improve the quality of the data
Increase ITF robustness
deal with bad weather conditions
Gain increase already done, further increase planned
Re-design of the alignment control chain
Filters migration to the global control (not the DSP) more flexible
Possibility to change between acquisition/detection filters
Possibility to inject noise on error points and measure open loop TF
Second modulation at 8 Hz, control the “common-end” mode
![Page 13: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/13.jpg)
13
New alignment filters
ty (yaw)
tx (pitch)
![Page 14: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/14.jpg)
14
Quality of the data: WSR5 vs WSR7
WSR5
(nov 10-13)
WSR7
(Jan 12-15)
Coalescing binaries analysis
![Page 15: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/15.jpg)
15
WSR’s program
1 (Sept 8th-11th) ~ 90% duty cycle
2 (Sept 22nd-25th), ~ 65% due to infrastructure failure, >90% after
3 (Oct 6th-9th) - cancelled
4 (Oct 13th-16th) – cancelled
5 (Nov 10th-13th), ~ 65%
6 (Dec 1st -4th), ~ 80%
7 (Jan 12th-15th), ~ 76% + commissioning run 2.5 days
Tests (noise injections, change of some parameters,…) in stable and homogeneous conditions
8 (Feb 9th-12th) planned
![Page 16: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/16.jpg)
16
Earthquake during WSR7
From Hanford e-log
![Page 17: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/17.jpg)
17
Noise budget – WSR7
Unknown noise in the 100 Hz region (suspect: diffused light)
Power recycling control near the sensitivity – sometimes limiting
![Page 18: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/18.jpg)
18
Structures around 100 Hz
![Page 19: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/19.jpg)
19
Longitudinal control noise
Switch to B2
“Beta” technique
Change completely control scheme
![Page 20: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/20.jpg)
20
Locking scheme
![Page 21: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/21.jpg)
21
Switch to B2
PR is currently controlled with B2_3f (third harmonics)
B2 (first harmonics) gives better SNR, about 1 order of mag
Transition B2_3f B2 works
B2 contains an offset
Not understood
Manually compensated
ITF controlled with B2 works for hours but still not convincing (instabilities), more test are needed
![Page 22: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/22.jpg)
22
Noise budget – B2
![Page 23: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/23.jpg)
23
Beta technique
MICH and PRCL corrections sent to the end mirrors to subtract the noise
reintroduced by these loops to the dark fringe
![Page 24: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/24.jpg)
24
Change the control strategy
beta technique is not sufficient to decrease enough the control noise
Fluctuations of the coupling
Second modulation (not resonant in the recycling cavity) already in preparation to control the angular common end mode
If transition to B2 does not work ina reliable way
Lock the SSFS with the second modulation
Move the power recycling control from B2_3f to B5 (pick-off)
![Page 25: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/25.jpg)
25
Plans before next meeting
Noise hunting
Diffused light investigations
Control noise
SSFS new board
Continue work on alignment
Increase filter gain
Second modulation – common end
Continue work on mirror suspension control
WSR8 (mid February) + 1-2 WSR’s to be decided
![Page 26: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/26.jpg)
26
Noise hunting: terminal benches
Diffused light mitigation end benches (next week)
![Page 27: 1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.](https://reader036.fdocuments.in/reader036/viewer/2022062516/56649d535503460f94a2f54c/html5/thumbnails/27.jpg)
27
Noise hunting: detection port
Further diffused light mitigation suspended injection bench (half February)
Further diffused light mitigation external injection bench (February)
Acoustic mitigation detection laboratory (end of March)
New (larger) Brewster (April?)