1. Sap Mm Guide (PART1)

79
Duro Shox Pvt Limited SAP Implementation Project – ‘‘Pragati” USER MANUAL Materials Management DOCUMENT CONTROL SHEET GENERAL INFORMATION Project name Document name Document location Implementation Materials Management DOCUMENT INFORMATION Version Filename Date Author Reviewed by Changes from previous version A A

Transcript of 1. Sap Mm Guide (PART1)

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 1/79

Duro Shox Pvt LimitedSAP Implementation

Project – ‘‘Pragati”

USER MANUAL

Materials Management

DOCUMENT CONTROL SHEET

GENERAL INFORMATION

Project name Document name Document location

Implementation Materials Management

DOCUMENT INFORMATION

Version Filename Date Author Reviewedby

Changes fromprevious version

USER

MAN

U

AL

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 2/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

V 1.0 EUT -MM

REFERENCE DOCUMENTS

Document Version R Reference

DOCUMENT APPROVALS

Kedar KulkarniMM ConsultantPrepared by Approved by(KPIT Cummins Infosystems Limited.) (Duro Shox Pvt Limited)

Confidential Page 2 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 3/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

USER PROCEDURE MANUAL

TABLE OF CONTENTS 

Duro Shox Pvt Limited ________________________________________________ 1

1 Procurement of Stock Materials ............................................................................................................. 1

1.1 Procurement of Stock Materials – Raw Material Local / Return ___________ 101.1.1 Purpose .................................................................................................................................................... .1.1.2 Prerequisites .............................................................................................................................................1.1.3 Material Master Record ..............................................................................................................................1.1.4 Vendor Master Record ...............................................................................................................................1.1.5 Purchasing Info Record .................................................................................................................... .........1.1.6 Source List.................................................................................................................................................1.1.7 CIN Master Data ........................................................................................................................................1.1.8 Excise Condition Record ............................................................................................................................

1.2 Request for Quotation (RFQ) _______________________________________ 561.2.1 Use ..................................................................................................................................................... .......1.2.2 Procedure ..................................................................................................................................................

1.2.3 Result.........................................................................................................................................................1.2.4 Example ....................................................................................................................................................

1.3 Message output: RFQ _____________________________________________ 611.3.1 Use ..................................................................................................................................................... .......1.3.2 Procedure ..................................................................................................................................................

1.4 Maintaining Quotation ____________________________________________ 641.4.1 Use ..................................................................................................................................................... .......1.4.2 Procedure ..................................................................................................................................................1.4.3 Result ........................................................................................................................................................1.4.4 Example ....................................................................................................................................................

1.5 Price Comparison ________________________________________________ 671.5.1 Use ..................................................................................................................................................... .......1.5.2 Procedure ..................................................................................................................................................1.5.3 Result ........................................................................................................................................................

1.6 Creating Purchase Requisition _____________________________________ 691.6.1 Use ..................................................................................................................................................... .......1.6.2 Procedure ..................................................................................................................................................1.6.3 Result ........................................................................................................................................................1.6.4 Example .....................................................................................................................................................

1.7 Release Purchase Requisition ______________________________________ 701.7.1 Procedure ..................................................................................................................................................

1.8. Assign and Process Purchase Requisition ___________________________ 741.8.1 Use .................................................................................................................................................. .........

1.8.2 Procedure ..................................................................................................................................................1.8.3 Result ........................................................................................................................................................

1.9 Purchase Order  __________________________________________________ 771.9.1 Use ..................................................................................................................................................... .......1.9.2 Procedure ..................................................................................................................................................1.9.3 Result ........................................................................................................................................................1.9.4 Example ....................................................................................................................................................

Confidential Page 3 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 4/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.10. Release Purchase Order _________________________________________ 831.10.1. Procedure ....................................................................................................................................... .....

1.11Message Output _________________________________________________ 871.11.1 Use .........................................................................................................................................................

1.11.2 Procedure ................................................................................................................................................

1.12 Goods Receipt for Purchase Order  _________________________________ 891.12.1 Use ..........................................................................................................................................................1.12.2 Prerequisites ...........................................................................................................................................1.12.3 Procedure ................................................................................................................................................1.12.4 Result ......................................................................................................................................................

Material document 5000000009 posted ...............................................................................................1.12.5 Example ..................................................................................................................................................

1.13 Logistics Invoice Verification ____________________________________ 1001.13.1 Use ........................................................................................................................................................11.13.2 Procedure ..............................................................................................................................................11.13.3 Result ....................................................................................................................................................11.13.4 Example ................................................................................................................................................1

1.14 Returning Delivery _____________________________________________ 1061.14.1 Use ........................................................................................................................................................11.14.2 Procedure ..............................................................................................................................................11.14.3 Result ....................................................................................................................................................1Return Delivery document created ........................................................................................................... .......1

1.14.4 Example ................................................................................................................................................1

1.15 Excise Invoice Other Movements __________________________________ 1141.15.1 Procedure ..............................................................................................................................................11.15.2 Result ....................................................................................................................................................11.15.3 Example ................................................................................................................................................1

1.16 Posting and Printing the Excise Invoice ____________________________ 1171.16.1 Use ........................................................................................................................................................1

1.16.2 Prerequisites .........................................................................................................................................11.16.3 Procedure ..............................................................................................................................................11.16.4 Result ....................................................................................................................................................1

1.17 Credit Memo ___________________________________________________ 1211.17.1 Use ........................................................................................................................................................11.17.2 Prerequisites .........................................................................................................................................11.17.3 Procedure ..............................................................................................................................................11.17.4 Result ....................................................................................................................................................11.17.5 Example ................................................................................................................................................1

1.18 Reversals / Cancellation of Invoice or Credit Memo __________________ 1271.18.1 Use ........................................................................................................................................................11.18.2 Prerequisites ..........................................................................................................................................1

1.18.3 Procedure ..............................................................................................................................................11.18.4 Result.....................................................................................................................................................11.18.5 Example .................................................................................................................................................1

1.19 Reversals / Cancellation of Goods Receipt (GR) _____________________ 1341.19.1 Use ........................................................................................................................................................11.19.2 Prerequisites ..........................................................................................................................................11.19.3 Procedure ..............................................................................................................................................11.19.4 Result ....................................................................................................................................................1

Confidential Page 4 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 5/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.19.5 Example ................................................................................................................................................1

1.20 Reversing CENVAT Postings _____________________________________ 1401.20.1 Purpose .......................................................................................................................................... .......11.20.2 Prerequisites .........................................................................................................................................11.20.3 Procedure ..............................................................................................................................................11.20.4 Result.....................................................................................................................................................1

1.20.5 Example .................................................................................................................................................1

1.21 Canceling Excise Invoices _______________________________________ 1451.21.1 Purpose .......................................................................................................................................... .......11.21.2 Prerequisites .........................................................................................................................................11.21.3 Procedure ..............................................................................................................................................11.21.4 Result.....................................................................................................................................................11.21.5 Example .................................................................................................................................................1

2 Procurement of Imported Materials – Business Process Procedure .................................................... 15

2.1 Procurement of Imported Materials ________________________________ 1512.1.1 Purpose ........................................................................................................................................... .......1

2.1.2 Prerequisites ...........................................................................................................................................1

2.2 Creating Purchase Order  ________________________________________ 1522.2.1 Use .........................................................................................................................................................1

2.2.2 Prerequisites ...........................................................................................................................................12.2.3 Procedure ................................................................................................................................................12.2.4 Result ......................................................................................................................................................12.2.5 Example ..................................................................................................................................................1

2.3 Release Purchase Order  __________________________________________ 1592.3.1 Procedure ................................................................................................................................................1

2.4 Message Output _________________________________________________ 1622.4.1 Use ................................................................................................................................................. .........12.4.2 Procedure ................................................................................................................................................1

2.5 CAPTURING BILL OF ENTRY _____________________________________ 1642.5.1 Use ................................................................................................................................................. .........12.5.2 Procedure ................................................................................................................................................12.5.3 Result ......................................................................................................................................................12.5.4 Example ..................................................................................................................................................1

2.6 Goods Receipt for Imported Purchase Order  _________________________ 1722.6.1 Use ................................................................................................................................................. .........12.6.2 Procedure ................................................................................................................................................12.6.3 Result ......................................................................................................................................................12.6.4 Example ..................................................................................................................................................1

2.7 Logistics Invoice Verification for the Materials _______________________ 1842.7.1 Use ................................................................................................................................................. .........1

2.7.2 Procedure ................................................................................................................................................12.7.3 Result ......................................................................................................................................................12.7.4 Example ..................................................................................................................................................1

3 Procurement of Subcontracting Materials – Business Process Procedure .......................................... 19

3.1 Procurement of Subcontracting Materials ___________________________ 1913.1.1 Purpose ................................................................................................................................................ ...13.1.2 Prerequisites ...........................................................................................................................................1

Confidential Page 5 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 6/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

3.2 Creation of Subcontracting Purchase Order  __________________________ 1923.2.1 Use ................................................................................................................................................. .........13.2.2 Prerequisites ...........................................................................................................................................13.2.3 Procedure ................................................................................................................................................13.2.4 Result ......................................................................................................................................................13.2.5 Example ..................................................................................................................................................1

3.3 Message Output _________________________________________________ 1973.3.1 Use ................................................................................................................................................. .........13.3.2 Procedure ................................................................................................................................................1

3.4 Transfer of Components to Subcontractor  ___________________________ 1993.4.1 Use ................................................................................................................................................. .........13.4.2 Prerequisites ...........................................................................................................................................13.4.3 Procedure ................................................................................................................................................13.4.4 Result ......................................................................................................................................................23.4.5 Example ..................................................................................................................................................2

3.5 Creation of Subcontracting Challan _________________________________ 2023.5.1 Use ................................................................................................................................................. .........23.5.2 Prerequisites ............................................................................................................................................2

3.5.3 Procedure ................................................................................................................................................23.5.4 Result ......................................................................................................................................................23.5.5 Example ..................................................................................................................................................2

3.6 Printing of Subcontracting Challan ________________________________ 2053.6.1 Use .........................................................................................................................................................2

3.6.2 Procedure ................................................................................................................................................2

3.7 Goods Receipt for Purchase Order  _________________________________ 2093.7.1 Use ................................................................................................................................................. .........23.7.2 Prerequisites ...........................................................................................................................................23.7.3 Procedure ................................................................................................................................................23.7.4 Result ......................................................................................................................................................23.7.5 Example ..................................................................................................................................................2

3.8 Reconciling Subcontracting Challan ________________________________ 2183.8.1 Use ................................................................................................................................................. .........23.8.2 Procedure ................................................................................................................................................23.8.3 Result ......................................................................................................................................................23.8.4 Example ..................................................................................................................................................2

3.9 Completing/Reversal/Re-credit Subcontracting Challan ________________ 2213.9.1 Use ................................................................................................................................................. .........23.9.2 Procedure ................................................................................................................................................23.9.3 Result ......................................................................................................................................................23.9.4 Example ..................................................................................................................................................2

3.10 Logistics Invoice Verification for Subcontracting Material  _____________ 222

3.10.1 Use ........................................................................................................................................................23.10.2 Procedure ..............................................................................................................................................23.10.3 Result ....................................................................................................................................................23.10.4 Example ................................................................................................................................................2

5. Procurement of External Services: Business Process Procedure ....................................................... 22

5.1 Procurement of External Services – Procurement Process _____________ 2275.1.1 Purpose ................................................................................................................................................ ...25.1.2 Prerequisites ...........................................................................................................................................2

Confidential Page 6 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 7/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

5.2 Creating Service Master  __________________________________________ 2285.2.1 Use ................................................................................................................................................. .........25.2.2 Procedure ................................................................................................................................................25.2.3 Result ......................................................................................................................................................2

5.3 Creating Purchase Requisition ____________________________________ 2305.3.1 Use ................................................................................................................................................. .........2

5.3.2 Procedure ................................................................................................................................................25.3.3 Result ......................................................................................................................................................25.3.4 Example ...................................................................................................................................................2

5.4 Assign and Process Purchase Requisition ___________________________ 2365.4.1 Use ................................................................................................................................................. .........25.4.2 Procedure ................................................................................................................................................25.4.3 Result ......................................................................................................................................................2

5.6 Purchase Order  _________________________________________________ 2395.6.1 Use .........................................................................................................................................................2

5.6.2 Prerequisites ...........................................................................................................................................25.6.3 Procedure ................................................................................................................................................25.6.4 Result ......................................................................................................................................................2

5.6.5 Example ..................................................................................................................................................2

5.7 For Releasing Purchase Order Refer User Manual of Stock Procurement _ 243

5.8 Message Output _________________________________________________ 2435.8.1 Use ................................................................................................................................................. .........25.8.2 Procedure ................................................................................................................................................2

5.9 Creation and Acceptance of Service Entry Sheet _____________________ 2455.9.1 Use ................................................................................................................................................. .........25.9.2 Procedure ................................................................................................................................................25.9.3 Result ......................................................................................................................................................25.9.4 Example ..................................................................................................................................................2

5.10 Logistics Invoice Verification _____________________________________ 2575.10.1 Use ........................................................................................................................................................25.10.2 Procedure ..............................................................................................................................................25.10.3 Result ....................................................................................................................................................25.10.4 Example ................................................................................................................................................2

6 Asset Procurement – Business Process Procedure............................................................................... 2

6.1 Purchase Order  _________________________________________________ 2626.1.1 Use ................................................................................................................................................. .........26.1.2 Procedure ................................................................................................................................................26.1.3 Result.......................................................................................................................................................2

6.2 Release of Purchase Order  _______________________________________ 2666.2.1 Procedure ................................................................................................................................................2

6.3 Goods Receipt for Purchase Order  _________________________________ 2676.3.2 Use ................................................................................................................................................. .........26.3.3 Prerequisites ...........................................................................................................................................26.3.4 Procedure ................................................................................................................................................26.2.3 Result.......................................................................................................................................................2

6.4 Post Excise Invoice ______________________________________________ 2696.4.1 Procedure ...............................................................................................................................................2

Confidential Page 7 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 8/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

6.4.2 Result......................................................................................................................................................2

6.5 Logistics Invoice Verification ______________________________________ 2726.5.1 Use ................................................................................................................................................. .........26.5.2 Procedure ................................................................................................................................................26.5.3 Result.......................................................................................................................................................2

7 Excise Periodic Processing – Business Process Procedure .................................................................. 27.1 Excise Periodic Processing _______________________________________ 276

7.1.1 Purpose ................................................................................................................................................ ...27.1.2 Prerequisites ............................................................................................................................................2

7.2 Excise Report - CENVAT Register  __________________________________ 2777.2.1 Use ................................................................................................................................................. .........27.2.2 Prerequisites ............................................................................................................................................27.2.3 Procedure ................................................................................................................................................27.2.4 Result ......................................................................................................................................................2

7.3 Excise Register Updation .................................................................................................................... 28

7.3Updation of RG1 Register  ________________________________________ 280

7.3.1 Use ................................................................................................................................................. .........27.3.2 Prerequisites ............................................................................................................................................27.3.3 Procedure ................................................................................................................................................27.3.4 Result ......................................................................................................................................................2

7.4 RG1 Register Extraction __________________________________________ 2887.4.1 Use ................................................................................................................................................. .........27.4.2 Prerequisites ............................................................................................................................................27.4.3 Procedure ................................................................................................................................................27.4.4 Result ......................................................................................................................................................2

7.5 RG1 Register Print Utility _________________________________________ 2927.5.1 Use ................................................................................................................................................. .........27.5.2 Prerequisites ............................................................................................................................................2

7.5.3 Procedure ................................................................................................................................................27.5.4 Result ......................................................................................................................................................2

8. PLA Register Extraction ....................................................................................................................... 29

8.1 PLA Register Extraction __________________________________________ 2958.1.1 Use ................................................................................................................................................. .........28.1.2 Prerequisites ............................................................................................................................................28.1.3 Procedure ................................................................................................................................................28.1.4 Result ......................................................................................................................................................2

8.2 PLA Register Print Utility _________________________________________ 2988.2.1 Use ................................................................................................................................................. .........28.2.2 Prerequisites ............................................................................................................................................2

8.2.3 Procedure ................................................................................................................................................28.2.4 Result ......................................................................................................................................................3

9. Reports ................................................................................................................................................. 30

7.1 Purchasing ____________________________________________________ 3017.1.1 Purchasing Documents per Vendor (ME2L) ................................................................................. ...........37.1.2 Purchasing Documents per Material (ME2M) ....................................................................................... ...37.1.3 Source List for Material (ME0M) ........................................................................................................... ...37.1.4 Purchase Info Record per Material (ME1M) .............................................................................................3

Confidential Page 8 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 9/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

7.1.5 Purchasing Values(MC$G) ............................................................................................................... .......3

9.2 Inventory _______________________________________________________ 3079.2.1 Material Document List (MB51) ................................................................................................... ............39.2.2 Diplay Warehouse Stock (MB52) .............................................................................................................39.3.3 Stock on Posting Date (MB5B) .............................................................................................................. .39.3.4 Stock Overview (MMBE) .........................................................................................................................3

9.3.5 Stock in Transit (MB5T) ......................................................................................................................... .39.3.6 Slow Moving Items (MC46) .....................................................................................................................3

Icons

Icon Meaning

Caution

Example

Note

Recommendation

Syntax

 Abbreviations

R Required entry field(used in the end-user procedures)

O Optional entry field(used in the end-user procedures)

C Conditional field

Confidential Page 9 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 10/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

(used in the end-user procedures)

1 Procurement of Stock Materials

1.1 Procurement of Stock Materials – Raw Material Local / Return

1.1.1 Purpose

This process describes the procurement process of raw materials from indigenous source of supply with CountryVersion India (CIN) relevant process like processing of Excise Duty (ED) and Sales Tax (ST) process.

1.1.2 Prerequisites

The following scenario specific master data must be created for operation of this building block.

1. Material Master Record2. Vendor Master Record3. Purchase Info Record (Optional)4. Source List (Optional)5. CIN Master Data6. Excise Condition Record (if Tax applicable for the Vendor-Material Combination)

1.1.3 Material Master Record 

Menu PathLogistics Materials Management Material Master  Material Create

(General)

T Code MM01 – CreateMM02 – ChangeMM03 – Display

Confidential Page 10 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 11/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Press Enter to see the pop-up window.

Confidential Page 11 of 316

 

Enter the Industry Sector 

Enter the Material Type

Internal Number assignment .

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 12/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Select the required views and press Enter to input the organizational levels.

Confidential Page 12 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 13/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Press Enter to input the details of the Material.

1.1.3.1 Basic Data Views

Confidential Page 13 of 316

 

Enter the Material

Enter the Unit of Measureand material Group

Enter the division if StockTransfer will happen for this

Blocking for Procurement or BOM enter here

Enter the Gross and NetWeight for the Finished Goods

Enter here if the material isreturnable packing as VERP andnon returnable packing as LEIH

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 14/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Press Additional Data to maintain the Alternate Unit of Measures (for e.g. 1000G= 20Nos for the Semi finishedgoods)

Confidential Page 14 of 316

 

Enter any Basic Material is there

Press Additional Data tomaintain Alternate Unit of 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 15/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Confidential Page 15 of 316

 

Press Main data to go to the next view

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 16/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.1.3.2 Purchasing Views

Confidential Page 16 of 316

 

If the Ordering Unit is other than the Base UoM, enter theUnit and make VAR. OUn as 1

Enter the Purchasing ValueKey as G1 (5% DeliveryTolerance) or G2 (10%

Enter the Purchasing Group –Person/Group responsible toprocure this material

Select if QM is not active andwant to post to InspectionStock (Mainly used for 

Source list should bemaintained for this material

Enter the No. of Days requiredfor GR Processing once thematerial is arrived at factory.

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 17/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Confidential Page 17 of 316

 

Enter the PO Text normallyspecification is maintained

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 18/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.1.3.3 MRP Views

Confidential Page 18 of 316

 

Enter the appropriate MRPType)

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 19/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Confidential Page 19 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 20/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Work Scheduling View:

Confidential Page 20 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 21/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.1.3.4 Quality Management View 

Confidential Page 21 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 22/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.1.3.5 Accounting Views

Confidential Page 22 of 316

 

Enter the appropriate ValuationClass (Various ValuationClasses given below)

If Price Control is V enter theMoving Average price, S enter the Standard Price

Enter the Price Control as V-Moving Average and S-Standard

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 23/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.1.3.6 Costing Views

 After entering all the details, press to save the Material.

Confidential Page 23 of 316

 

Enter Respective ProfitCentre of Plant/Depot

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 24/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.1.4 Vendor Master Record 

Menu PathLogistics Materials Management Purchasing Master Data Vendor Central

T CodeXK01 – CreateXK02 – ChangeXK03 – Display

Press Enter to input the details of the vendor.Vendor Account Groups:VDOM Domestic VendorsVIMP Import VendorsVSRV Service Vendors

Confidential Page 24 of 316

 

Vendor Number to be put manually

Enter Company Code

Enter Account Group (VariousGroup given below)

Enter Purchasing Organisation

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 25/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.1.4.1 General Data

Confidential Page 25 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 26/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Confidential Page 26 of 316

 

Click on the CIN Details to enter theVendor Excise and Sales Tax details

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 27/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Confidential Page 27 of 316

 

Enter all the details in the respective fields

Excise Indicator for Vendor as 1 –100% Taxable

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 28/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Confidential Page 28 of 316

 

Enter all the details in the respective fields

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 29/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Enter whether this vendor is approved or on Probation

Confidential Page 29 of 316

 

Enter the detail in the respective field

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 30/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

No need to enter in the below screen.

Confidential Page 30 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 31/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.1.4.2 Accounting Data

Reconciliation Accounts:

Confidential Page 31 of 316

 

Enter the appropriate Reconciliation Accounts (Various Accounts given below)

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 32/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

The below screen is explained in detail in FI User Manual:

Confidential Page 32 of 316

 

Enter the appropriate Payment Terms andSelect the Chk double inv

Enter the appropriate Payment MethodsC – Cheque, E – Cash Payment, T – Bank Transfer 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 33/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.1.4.3 Purchasing Data 

Schema group, Vendor:

DM Domestic SchemaIM Import Schema

Confidential Page 33 of 316

 

Enter the Order Currency, Terms of Pa ment and Incoterms

Enter the appropriate Schema group, Vendor (Various groups given below)

1. Select GR-based Inv. Verf if Invoiceverification is done after GR2.. Select the Srv-based Inv. Verf if InvoiceVerification is done after Service Entry sheet.

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 34/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

 

Press to save the Vendor master and the no is generated automatically.

Confidential Page 34 of 316

 

Enter the Partner for the appropriate Partner Functions

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 35/79

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 36/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Confidential Page 36 of 316

 

If the message is displayed like this,intimate the Quality Person to maintainthe QM Info Record (TCode: QI01)

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 37/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

No need to enter anything in the below screen as it copies all the data from the Vendor Master.

Confidential Page 37 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 38/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Confidential Page 38 of 316

 

It is defaulted from the Material Master 

but change for this Vendor-Materialcombination if different.

Enter the Standard Quantity

Enter the appropriate Tax Code

It is defaulted from the Material Master but change for this Vendor-Materialcombination if different.

Enter the Net Price

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 39/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Confidential Page 39 of 316

 

It is defaulted from the Material Master 

but change for this Vendor-Materialcombination if different.

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 40/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.1.5.1 Result  

Purchasing Info Record is created

1.1.5.2 Example

Purchasing Info Record 5300000384 is created.

Confidential Page 40 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 41/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.1.6 Source List  

Menu PathSAP Easy Access Logistics Materials Management Purchasing Master Data Source List Maintain

T CodeME01 – MaintainME03 – Display

ME04 - Changes

Confidential Page 41 of 316

 

Enter the Material No. and Plant

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 42/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Result: Source List changed.

Confidential Page 42 of 316

 

Maintain the ValidityPeriod till until which youwill procure this materialfrom this vendor 

Enter the Vendor andPurchasing Organisation

Select if theVendor is fixed

Select if the Vendor is blocked for Procurement for this particular material alone

Enter 1 to be includedin MRP Run

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 43/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.1.7 CIN Master Data

Menu Path J1ILN SAP Menu Indirect Taxes Master Data Excise Rate Maintenance

T Code J1ID

1.1.7.1 Chapter IDs

Select Chapter ID and Press

Confidential Page 43 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 44/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Press New Entries to go to the next screen.

Confidential Page 44 of 316

 

Press New Entries to Create New Chapter ID

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 45/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Press to save the data.

Confidential Page 45 of 316

 

Enter the Chapter ID

Enter the Description as per law

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 46/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.1.7.2 Material ID and chapter ID combination

Select Material and Chapter ID Combination and Press

Confidential Page 46 of 316

 

Select the Material and Chapter-Id Combination

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 47/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Confidential Page 47 of 316

 

Press New Entries to Create New Material Number and Chapter IDCombination

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 48/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Press to save the data.

Confidential Page 48 of 316

 

Enter the Material No. and Chapter ID Combination

Enter the material type based onthe Material Nature

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 49/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.1.7.3 Vendor Excise Details

Either you can maintain here or else in Vendor Master.

Confidential Page 49 of 316

 

Select the Vendor Excise Details

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 50/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Press to save the data.

Confidential Page 50 of 316

 

Press New Entries to Create Vendor Master ExciseDetails

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 51/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.1.7.4 Excise Indicator for Plants

Select Excise Indicator for Plant and Press

Confidential Page 51 of 316

 

Select the Excise Indicator for Plant

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 52/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Press to save the data.

Confidential Page 52 of 316

 

Press New Entries to Create Plant ExciseDetails

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 53/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.1.8 Excise Condition Record 

1.1.8.1 Use

When you enter a purchasing document, for example, a purchase order, the R/3 Systemautomatically calculates the applicable excise duties using the condition technique.

1.1.8.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu No Menu path available for this transaction

Transaction code FV11

2. Enter the appropriate Condition type (various condition types given in next page) and maintain therespective values.

Confidential Page 53 of 316

 

Enter the appropriate condition type

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 54/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

For Raw Material / Packing Material maintain the Plant/Vendor/Material Combination.For Service Tax /Assets maintain the Plant/Material Group Combination..

Confidential Page 54 of 316

 

Various combinations to maintain thecondition record

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 55/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

3. Press Ctrl+S or 

4.

1.1.8.3 Result  

Condition records saved.

Confidential Page 55 of 316

 

Enter the Plant and Vendor 

Enter the Material No. Enter the Value / amount

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 56/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.2 Request for Quotation (RFQ)

1.2.1 Use

Request for Quotation is used to float enquiries in market to obtain quotations from prospective vendors.This transaction is optional for the process.

1.2.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Material Management Purchasing 

RFQ/quotationRequest for Quotation Create

Transaction code ME41

2. RFQ can be created with reference to Purchase Requisition, Outline Agreement (Contract) and another RFQ.

3. On the Create RFQ: Initial Screen, make the following entries:

Confidential Page 56 of 316

 

1. Enter the RFQ type as “AN”2. Enter the Quotation Deadline3. Enter Purch. Organisation as 11014. Enter the respective Purchasing group

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 57/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

4. Choose (header details icon) on the toolbar, then on screen Create RFQ: Header Data, enter information in the fields as specified in the table below:

Confidential Page 57 of 316

 

Enter the Submission date

Enter the appropriateItem category for Sub-Contracting & Service

Press this button to enter the CollectiveNo and Vendor Reference

1. Enter the Material No2. Enter the RFQ Quantity3. Enter the Deliv. Date4. Enter the Plant if it is Plant specific

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 58/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Confidential Page 58 of 316

 

Enter the Collective No to have a track of all RFQs related to particular instance

Enter the Your Reference if anyreference given by the vendor 

Press this button to enter the vendor code for which it has to be sent?

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 59/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

5. Choose (vendor address button) on the toolbar, then on screen Create RFQ: Vendor Address, enter information in the fields as specified below:

 After entering the vendor code and pressing enter the details of vendor will be displayed automatically.

Confidential Page 59 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 60/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

6. Press to Save the RFQ. This will refresh the Create RFQ: Vendor Address screen to allow creation the same RFQ data to a new vendor by following the steps outlined above.

Confidential Page 60 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 61/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.2.3 Result  

RFQ created

Similarly create for other vendor in the same screen and various RFQ Nos will be generated

1.2.4 Example

RFQ created under the number 6000000000 .

1.3 Message output: RFQ

1.3.1 Use

 A RFQ needs to be printed for transmitting to vendor. This transaction is optional for the process.

1.3.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management  Purchasing 

RFQ/Quotation  Request for Quotation MessagesPrint/Transmit 

Transaction code ME9A

2. On the Message Output screen, make the following entries:

Confidential Page 61 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 62/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Confidential Page 62 of 316

 

Enter the RFQ Nos to be printedand Execute (F8)

Press this button to Execute

Select the check box For Printout clickthis button whichwill create SpoolRequest.

For Direct Printoutclick this button

For Print Previewclick this button

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 63/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

You will see out put as

Confidential Page 63 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 64/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.4 Maintaining Quotation

1.4.1 Use

This transaction is used to maintain the quotation, which is submitted by vendors. Vendor communicatprice for material and as a result the RFQ (Request for Quotation) needs to be updated.

This transaction is optional for the process.

1.4.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management  Purchasing 

RFQ/quotation Quotation Maintain

Transaction code ME47

2. On the Maintain Quotation: Initial Screen, make the following entries:

3. Choose the Enter key, or choose green Enter icon to proceed.

4. View the screen “Maintain Quotation: Header Data” by Choosing on the Header data icon in the toolbar.

Confidential Page 64 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 65/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

5. Enter information in the fields as specified in the table below. Some fields will not be available for input, as theare reference fields only.

6. Once all necessary header data has been maintained, the user can then enter the price information in oneof two fashions:

a. Enter the price in the Net Price field on the Maintain Quotation: Item Overview screen byChoosing overview icon on toolbar.

Confidential Page 65 of 316

 

1. Press to select the line

2. Press to enter the conditions

Enter the Conditions given by vendor.

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 66/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

b. To enter more detailed information in addition to the net price, select the line item and choosethe Item Details icon. Choose the green Back arrow to return to the ‘Overview’ screen oncedata has been maintained.

i. A vendor’s quoted price can be entered in one of two ways.

ii. Enter the net price per unit in the Net price field. This price includes the vendor'snormal discounts and surcharges only. Cash discounts (for prompt payment) and taxe

are calculated separately.iii. Enter the gross price in the Net price field, and maintain the conditions for the item.

Then the system automatically replaces the entered gross price with the calculated neprice. If the net price for an item is entered for which pricing conditions have beenmaintained, the system always replaces the price entered with the calculated net pric

iv. Enter the Tax Code for any relevant taxes (for example, Excise Duty, Sales Taxes etcin the Tax code field. If a purchase order is created by referencing an RFQ, this codefacilitates the determination of the tax amount when the invoice is entered in thesystem.

v. After entering tax code, after choosing this system may give an information messageshowing the effective price, Choose Enter to continue.

7. Once all quotation information has been successfully entered, save the data by Choosing on the Savebutton, or Choose the <Ctrl + S> keys. A message will be displayed that the data has been saved.

1.4.3 Result  

Quotation is maintained.

Maintain the same for other RFQs.

1.4.4 Example

Quotation for RFQ 6000000000 maintained.

Confidential Page 66 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 67/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.5 Price Comparison

1.5.1 Use

Required to compare prices from all quotations received as a result of a competitive bidding process.

This transaction is optional for the process.

1.5.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management  Purchasing 

RFQ/Quotation Quotation Price Comparison

Transaction code ME49

2. On the Price Comparison List screen, make the following entries:

a. Choose the comparison values to be used:

i. Reference quotation: You can compare the quotations within the list with a sample

quotation. The system displays the percentage deviation between each quotation in the liand the sample quotation.

ii. Mean/minimum value quotation: The price comparison list can also display a "fictitious"quotation reflecting the average or minimum value of all quotations. Select either the "Mevalue" or "Minimum value" quotation field to choose the type of fictitious quotation.

iii. Percentage basis: The price comparison list displays the percentage of each item inrelation to the maximum, minimum, or average price. To determine the display type, enteone of the following:

Confidential Page 67 of 316

 

Parameters included for Com arison

Enter the Purchasin Or anisation

Enter the Quotations to be compared or the Collective RFQ

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 68/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

+: The highest value for each item is the 100% value-: The lowest value for each item is the 100% value

 _: The mean value for each item is the 100% value

b. Select the desired price computations:

i. Select the appropriate field to determine which of the following should be included in thedetermination of the comparison price:

i. Include cash discounts

ii. Include delivery costs

iii. Determine effective price

3. Once all entries have been made, Choose the Execute.

4. On screen “Price Comparison List in Currency INR”, view the Price Comparison list.

5. To view any of the following information for a particular quote included in the comparison, Choose the RFQnumber with the mouse to select it, then Choose the appropriate icon/button on the menu toolbar:

6. Display Material: Allows the user to view the purchasing data in the material master record.7. Display Vendor:Allows the user to view the vendor master record.

8. Additional Info: Allows the user to view payment terms, bid dates, currency information for all the vendor quotations in the list.

9. If any information has been modified through the comparison list, save the RFQ before exiting. If changeshave been made and the user attempts to exit without saving, the system will return a message to verifyaction.

10. To exit the transaction, choose the green Back arrow, the yellow Exit arrow, or Choose the F3 button.

Confidential Page 68 of 316

 

Rank isgeneratedautomatically

Mean andEffective Price ishighlighted

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 69/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.5.3 Result  

Price Comparison List in Currency INR is displayed on the screen.

1.6 Creating Purchase Requisition1.6.1 Use

 A Purchase Requisition is created to indicate purchase department to procure materials or services wdetails like how much quantity is required, when required. Generally it is created automatically for Ramaterials and Packing Materials through MRP Run and Spares and Service related to PlantMaintenance Purchase Requisition is generated automatically from Plant maintenance Order.

This transaction is optional for the process.

1.6.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management  Purchasing  Purchase

Requisition Create

Transaction code ME51N

Confidential Page 69 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 70/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

2. On the Create Purchase Requisition screen, make the following entries:

Press or Ctrl+S to Save the Purchase Requisition.

1.6.3 Result  

1.6.4 Example

Purchase requisition number 0010000000 created.

1.7 Release Purchase Requisition

Confidential Page 70 of 316

 

Enter Material No. Enter requiredQuantity

Enter the Desired Vendor if Vendor is known tothe person who is creating PR

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 71/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.7.1 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management  Purchasing  Purchase

Requisition

 Release

Individual ReleaseTransaction code ME51N

Confidential Page 71 of 316

 

Click Other Purchase Re uisition

Enter PR No.

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 72/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Confidential Page 72 of 316

 

Click This Icon to Release PR

Click This Icon to Release

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 73/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

Confidential Page 73 of 316

 

Click This Icon to Save

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 74/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.8. Assign and Process Purchase Requisition

1.8.1 Use

a) This section explains the functions provided by the SAP System for converting requisitions intoexternal purchasing documents (purchase orders, contract release orders, scheduling agreementdelivery schedules, RFQs), and the processing options thereby available to you:

• Assigning means defining the desired source for each purchase requisition itemo Further processing involves generating lists of requisitions that have been assigned or flagged a

outlined above, and the subsequent creation of RFQs, purchase orders, or lines of deliveryschedules under scheduling agreements.

1.8.2 Procedure

2. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management  Purchasing  Purchase

Requisition Follow-On Functions Assign and Process

Transaction code ME57

Confidential Page 74 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 75/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

3. The assignment of sources to and further processing of purchase requisitions are two distinct functionYou can choose whether you wish to perform the functions in two separate steps or in just one.

4. Below are the Selection Parameters to restrict the process of PO from PR

5. Press or F8 to enter into the next screen.

Confidential Page 75 of 316

 

1. Enter the appropriatePurchasing Group2. Enter the Scope of List as B1 for PR generated through MRP Runand A for remaining PR3. Enter the appropriate Plant

1. Select the Assigned PurchaseRequisition (For Spares PRnormally the End User may haveentered the Vendor in the PR)2. Select the appropriate Check

boxes for Processing the PR

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 76/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

6. O is explained in next chapter.

1.8.3 Result 

The source is assigned to PR and can be processed for PO.

Confidential Page 76 of 316

 

1. Select the check boxesrequired PR which are tobe converted in to Pos.

1. If Source List isavailable click this button

1. Since only one source is assigned inSource list system assigns the sourceautomatically or else if more than one sourceavailable a Pop-up window will be comingwhere one vendor has to be selected.

 After assigning the sourceclick on to this button toprocess the PO or else savefor the assignment of source

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 77/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

1.9 Purchase Order 

1.9.1 Use

 A purchase order is a legal document used to record an individual purchase with the vendor. It also

provides the vendor with a reference document to link to shipping (goods receipt) and invoicing (invoicverification) processes. The purchase order is a commitment to a vendor for a given material, in aspecified quantity at a predetermined price and delivery date.

This transaction is mandatory for the process.

 Please ensure that Purchase Order Value does not exceed specified value and if the purchase order valucrosses this limit a release procedure is applied on this purchase order. To release the Purchase Order gto ME28 for collective release and ME29N for individual release.

1.9.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management  Purchasing  Purchase

Order  CreateVendor/Supplying Plant Known

Transaction code ME21N

Confidential Page 77 of 316

 

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 78/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0

2. If you want create purchase order with reference to the purchase requisition, on item details screen enter the purchase requisition number and item number at Purch. Req. field. System will automatically adopt athe data from requisition.

Confidential Page 78 of 316

 

Click thePurchasingRequisitionsand Press

 Adopt

Press this button to viewthe Tax Calculation

7/27/2019 1. Sap Mm Guide (PART1)

http://slidepdf.com/reader/full/1-sap-mm-guide-part1 79/79

Materials Management User Manual For Duro Shox Pvt Limited  Versio1.0