DSM Violation Report of Western Region for November-2016
1.DSM Violation for WR Constituents:
1.1 DSM Violation Summery for WR Constituents:
*Deviation Limits for Renewable Rich States
S.No States having combined installed
capacity of Wind and Solar projects
Deviation Limits (MW)-"L"
Name of State
1 1000 – 3000 MW 200 -
2 > 3000 MW 250 Maharashtra, Gujarat and MP
1.2 Violation Type-1 (Max no. of time blocks Violation in a month -30 Days*96Blocks=2880)
Total Time BlockNo.of Blocks
Violated % of Non-ComplianceMax Violation
in a month
No. of
Violations % of Non-Compliance
Chhattisgarh 2880 1958 68 240 61 25
Guajrat 2880 630 22 240 42 18
Madhya Pradesh 2880 483 17 240 59 25
Maharashtra 2880 758 26 240 24 10
Goa 2880 724 25 240 108 45
Daman and Diu 2880 159 6 240 109 45
Dadar Nagar Haveli 2880 38 1 240 127 53
ESIL 2880 1749 61 240 3 1
Violation Type-1 Deviation in excess of (+/-)12% of Schedule or 150 MW whichever is less (*except Renewable Rich State)
Violation Type-2 Sustained deviation from schedule in one direction beyond 12 consecutive time block
DSM Violation for the Month of November 2016 for Constituents of Western Region
ConstituentsViolation Type-1 Violation Type-2(ZCV)
3 | P a g e
1.3 Violation Type-2, Zero Crossing Violation ( Max Violation in a month -8*30 Days=240)
2.DSM Violation –WR Generating Stations(Regional Entities)
2.1 DSM Violation Summery for Generators:
Total Time Block Violation Type -1 % of Non-ComplianceMax Violation in a
monthViolation Type -2 % of Non-Compliance
KSTPS 2880 51 1.8 240 52 21.7
VSTPS I 2880 201 7.0 240 23 9.6
VSTPS II 2880 19 0.7 240 29 12.1
VSTPS III 2880 133 4.6 240 36 15.0
Sipat2 2880 26 0.9 240 19 7.9
Jindal 2880 117 4.1 240 53 22.1
Kawas 2880 74 2.6 240 18 7.5
Gandhar 2880 18 0.6 240 15 6.3
Lanco 2880 62 2.2 240 170 70.8
NSPCL 2880 73 2.5 240 39 16.3
Korba7 2880 64 2.2 240 34 14.2
Sipat1 2880 19 0.7 240 26 10.8
RGPPL 2880 48 1.7 240 34 14.2
ACBIL 2880 145 5.0 240 147 61.3
BALCO 2880 428 14.9 240 149 62.1
CGPL 2880 3 0.1 240 29 12.1
DCPP 2880 60 2.1 240 57 23.8
VSTPS IV 2880 121 4.2 240 30 12.5
Mauda 2880 160 5.6 240 72 30.0
Emco 2880 110 3.8 240 16 6.7
KSK 2880 50 1.7 240 152 63.3
Essar Mahan 2880 5 0.2 240 30 12.5
Sasan 2880 24 0.8 240 105 43.8DB Power 2880 27 0.9 240 40 16.7
GMR 2880 1 0.0 240 240 100.0
JP Nigrie 2880 19 0.7 240 11 4.6
KWPCL 2880 82 2.8 240 100 41.7
Vandana 2880 0 0.0 240 0 0.0
MB Power 2880 6 0.2 240 78 32.5
JPL-II 2880 55 1.9 240 48 20.0
DGEN 2880 15 0.5 240 237 98.8
DHARIWAL 2880 2 0.1 240 19 7.9
VSTPS V 2880 94 3.3 240 59 24.6
RKM Power 2880 0 0.0 240 155 64.6
Jhabua Power 2880 33 1.1 240 214 89.2TRN Energy 2880 12 0.4 240 205 85.4
Violation Type-1 Deviation in excess of (+/-)12% of Schedule or 150 MW whichever is less/ 48MW if schedule <= 400MW
Violation Type-2 Sustained deviation from schedule in one direction beyond 12 consecutive time block
DSM Violation for the Month of November 2016 for Generators(Regional Entities) of Western Region
Constituents
Violation Type-1 Violation Type-2(ZCV)
4 | P a g e
2.2 Violation Type-1 (Max no. of Violation in a month -30Days*96Blocks=2880):
5 | P a g e
6 | P a g e
2.3 Violation Type-2, Zero Crossing Violation(Out of Max Violation - 8*30Days=240):
7 | P a g e
Observation- GMR and RKM were continuously drawing the power from grid on NO schedule in the month of
Nov’16 and Vandana power had zero schedule and drawl for whole month. DGEN was having schedule only on 25th Nov’16 for total 38 Time Blocks. Except that it was drawing
power from the grid continuously for the month of Nov’16.
8 | P a g e
3.Monthly Deviation Summery of Constituents:
ConstituentsSchedule
In MWH
Actual In
MWH
Total OD
In MWH
Total UD
In MWH
No of
Block OD
No of
Block UD
Total OD In
MWH
Total UD In
MWH
No of Block
OD
No of
Block UD
Total
OD In
MWH
No of
Block
OD
Total
UD In
MWH
No of
Block UD
Chhattisgarh 280294 245636 14953 -49610 764 2116 8434 -30150 412 1530 0 0 -227 16
Gujarat 2280213 2224086 30902 -87030 971 1909 695 -13034 113 504 0 0 -585 13
Madhya Pradesh 4016629 3931984 10852 -95497 517 2363 695 -9048 27 437 0 0 -763 19
Maharashtra 3426297 3391653 48105 -82749 1246 1634 6970 -19257 240 504 0 0 -1502 14
Goa 241991 242703 10291 -9579 1382 1498 2439 -947 455 253 0 0 -69 16
DD 187035 187266 3469 -3239 1386 1494 376 -22 129 20 0.45 1 -20 9
DNH 489348 478431 1172 -12089 578 2302 20 -623 5 13 1 1 -77 19
ESIL 234795 231897 20016 -22914 1375 1503 10063 -10815 862 933 6 1 -216 15
Deviation Monthly Summery -for November 2016
Deviation
Deviation in Excess of (+/-) 12% of Schedule or
150MW whichever is less when frequency is in the
band(>=49.7Hz &<50.1Hz)
Deviation
when grid
frequency is
below 49.7 Hz.
Deviation when
grid frequency
is 50.1 Hz. and
above
9 | P a g e
Distribution List- 1. Chief Engineer(LD), Maharashtra State Electricity Transmission Co.Ltd., State Load Despatch
Centre,Kalwa, Thane-Belapur Road, Airoli, Navi Mumbai 400 708.
2. Chief Engineer (LD), State Load Despatch Centre, Getco, Gotri , Vadodara-390021.
3. Chief Engineer (Comml.), M.P. Power Management Co. Ltd., Shakti Bhavan, Rampur, Jabalpur-482008
4. Chief Engineer (Commercial),C.S. Power Distribution Company Ltd., Danganiya, Raipur- 492013
5. Chief Engineer,Electricity Department, Division-III, Curti, Ponda, Goa 403401
6. Executive Engineer,Electricity Department, Daman & Diu, Oidc, Corporate Office,Plot No. 35,
Somnath,Daman-396210
7. Executive Engineer, Electricity Department, Dadra Nagar Haveli, 66kv Amli Road, Silvassa-396230
8. Vice President-Power Infrastructure Plant- B MRSS, Essar Steel Ltd 27th KM, Surat Hazira Road,Surat-
394270 Gujarat.
9. General Manager (Comml.), NTPC, Samruddhi Trade Complex,2nd Floor, Midc, Marol, Andheri (E),
Mumbai-400 093.
10. Chief Power Controller,Jindal Power Limited, O.P. Jindal Superthermal Power Plant ,Village & Po :
Tamnar, Tehsil :Gharghoda,Dist: Raigarh (Chhattisgarh ) 496107.
11. General Manager (Comml), Lanco Amarkantak Power Private Ltd., Gurgaon – 122 016
12. General Manager (Com. & CP), NTPC Sail Power Co. Pvt. Ltd., New Delhi -110 066
13. Dy. General Manager (Comml), Ratnagiri Gas & Power Pvt. Ltd., Mumbai-400 093
14. Vice President (Powe CG) Acb India Ltd., 2*135 Mw Kasaipali Power Project, Kasaipali, P.O.- Jawali,
Tehsil-Katghora, Korba –Chhatisgarh-495445
15. GM (O&M)Bharat Aluminium Co. Ltd (BALCO), P.O. Balco Nagar, Distt. Korba -495684 Chhattisgarh
16. Head (O & M) ,Coastal Gujrat Power Limited, Tunda Bndh Road, Tunda Village,Mundra, Kutch,
Gujarat-370435
17. AGM(F&A), DCPP JSPL, Dongamahua Captive Power Plant(4*135 Mw), Dhaurabhata(PO) Raigarh-
496107 (CG)
18. Plant Head,GMR EMCO Energy Ltd. B1, MIDC, Growth Centre, Warora-Post Chandrapur- Dist,
Mahrashtra-442907
19. KSK Mahanadi Power Co. Ltd, 8-2-293/82/A/431/A, Road No 22, Jubilee Hills, Hyderabad-500033
20. Sr. Vice President (EPMPL), Essar Power Mp Limited, Thana Road, Near Chunkumari Stadium,
Waidhan, Dist. Singrauli (MP)-486886
21. Sasan Power Limited, Dhirubahi Ambani Knowledge City, 1 Block, 2nd Floor, North Wing, Thane
Belapur Road, Navi Mumbai-400710
22. MS. D B Power Ltd., 3rd Floor, Naman Corporate Link, C-31, G-Block, Bkc Bandra East,Mumbai-
400051
23. M/S. GMR Energy Trading Limited, New Udaan Bhawan, Terminal-3, Opp. Ats Complex, International
Terminal, Indira Gandhi International Airport, New Delhi- 110037
24. Jaypee Nigrie Super Thermal Power Project( A Unit Of Jaiprakash Power Ventures Limited )Vill- Nigrie,
Tehsil- Saraidistt.- Singrauli, Mp-486669
25. Korba West Power Co. Limited, Village Chhotte Bhandar, P.O. Babe Bhandar,Tehsil Pussore Dist.
Raigarh, Chhattisgarh-496001
26. Vice President(Comml.), Vandana Vidhut Ltd., Vandana Bhavan, M.G. Road, Raipur-492001-Cg
27. GM (Operations)MB Power (Madhya Pradesh) Limited, hotel Govindam, Kotma Road,Anuppur, Madhya
Pradesh – 484224
28. Torrent Energy Limited, DGEN Mega Power Project, Plot No Z-9, Dahej SEZ Area(Eastern Side),Taluka
Vagra Distt Bharuch-392130, Gujrat.
29. GM-Coordination, Dhariwal Infrastruture Ltd,CESC House, Chowringheesquare, Kolkata-700001
30. Chief General Manager, RKM Powergen Pvt Ltd, Village Uchpinda, PO Dhurkot, Via Chandrapur,
Tehsil- Dabra, Janjgir-Champa Dist, Chhattisgarh-495692
31. Head-Business Development , Jhabua Power Ltd.,6th Floor,Vatika City Point M.G.Road Gurgaon-122002
32. Sr. VP Power, TRN Energy Pvt ltd, 18, Vasant enclave, Rao tula ram marg,New delhi-110057