Cutting-Edge Software for Managing Gas Production and Storage Operations
![Page 2: 1 October 2004 Cutting-Edge Software for Managing Gas Production and Storage Operations.](https://reader038.fdocuments.in/reader038/viewer/2022110320/56649c905503460f9494a84e/html5/thumbnails/2.jpg)
2
1. Goal of forthcoming initial release targeted for 1st Quarter, 2005: • Accurate prediction of performance of gas storage
reservoir/compressor/pipeline systems with a speed that allows hourly/daily scheduling of compressors for production and injection. Schedules obtained are efficient and economic.
• Given a complete database GasPal allows operations to be quickly rescheduled in response to new opportunities or unexpected changes in available equipment and/or supply/demand requirements.
• GasPal, focusing on operational planning, is a logical counterpart to Maraco’s GasTop software, which performs optimal investment planning for storage operations.
![Page 3: 1 October 2004 Cutting-Edge Software for Managing Gas Production and Storage Operations.](https://reader038.fdocuments.in/reader038/viewer/2022110320/56649c905503460f9494a84e/html5/thumbnails/3.jpg)
3
GasPal Characteristics
• GasPal: foundation is a PC-based gas reservoir simulator.• GasPal: complex surface network may include splits, loops and
multiple offtake points.• GasPal: each of several reservoirs may have up to 5 producing
layers • GasPal: GRIDDER™ preprocessor inserts arbitrary number of
computing cells into each reservoir.• GasPal: simulates injection and production or a mixture of the two,
providing full storage scheduling flexibility.• GasPal: hourly, daily or monthly time steps accommodate short-,
mid- and long-term planning needs.• GasPal: optimizes service allocation and size of possible
compressor configurations.
![Page 4: 1 October 2004 Cutting-Edge Software for Managing Gas Production and Storage Operations.](https://reader038.fdocuments.in/reader038/viewer/2022110320/56649c905503460f9494a84e/html5/thumbnails/4.jpg)
4
Operational Planning Scope
• Short-term operation: hourly time steps for two weeks. Useful for immediate injection/withdrawal planning.
• Mid-term planning: daily time step for one year. Useful for overall storage planning.
• Long-term production : monthly time step for 30 years. Useful for regular gas reservoir production or blowdown.
![Page 5: 1 October 2004 Cutting-Edge Software for Managing Gas Production and Storage Operations.](https://reader038.fdocuments.in/reader038/viewer/2022110320/56649c905503460f9494a84e/html5/thumbnails/5.jpg)
5
Surface Flow Capabilities:Splits, Loops & Offtake Points
Produce against or inject with a given back pressure
Produce or inject a requested rate profile
Split flow at node Choke total flow or either flowline
![Page 6: 1 October 2004 Cutting-Edge Software for Managing Gas Production and Storage Operations.](https://reader038.fdocuments.in/reader038/viewer/2022110320/56649c905503460f9494a84e/html5/thumbnails/6.jpg)
6
Surface Line Capabilities:Multiple Reservoirs
Choke each producing cell and/or reservoir to produce requested rate
Each cell in each reservoir may have different characteristics
![Page 7: 1 October 2004 Cutting-Edge Software for Managing Gas Production and Storage Operations.](https://reader038.fdocuments.in/reader038/viewer/2022110320/56649c905503460f9494a84e/html5/thumbnails/7.jpg)
7
Surface Line Capabilities:Compressor Optimization
Compressor locations and sizes optimized to maximize withdrawal, injection and inventory revenues
Work is now underway on GasPal’s compressor scheduling capability
![Page 8: 1 October 2004 Cutting-Edge Software for Managing Gas Production and Storage Operations.](https://reader038.fdocuments.in/reader038/viewer/2022110320/56649c905503460f9494a84e/html5/thumbnails/8.jpg)
8
Reservoir: Arbitrary Number Of Simulation Cells
FaultsComputing mesh generated by GRIDDER
![Page 9: 1 October 2004 Cutting-Edge Software for Managing Gas Production and Storage Operations.](https://reader038.fdocuments.in/reader038/viewer/2022110320/56649c905503460f9494a84e/html5/thumbnails/9.jpg)
9
Reservoir:Multiple Layers
![Page 10: 1 October 2004 Cutting-Edge Software for Managing Gas Production and Storage Operations.](https://reader038.fdocuments.in/reader038/viewer/2022110320/56649c905503460f9494a84e/html5/thumbnails/10.jpg)
10
Results From Current Development Version Of GasPal
October 2004
![Page 11: 1 October 2004 Cutting-Edge Software for Managing Gas Production and Storage Operations.](https://reader038.fdocuments.in/reader038/viewer/2022110320/56649c905503460f9494a84e/html5/thumbnails/11.jpg)
11
Interface Layout
Surface network
Output Results
ReservoirsOfftake points
![Page 12: 1 October 2004 Cutting-Edge Software for Managing Gas Production and Storage Operations.](https://reader038.fdocuments.in/reader038/viewer/2022110320/56649c905503460f9494a84e/html5/thumbnails/12.jpg)
12
Reservoir Output
![Page 13: 1 October 2004 Cutting-Edge Software for Managing Gas Production and Storage Operations.](https://reader038.fdocuments.in/reader038/viewer/2022110320/56649c905503460f9494a84e/html5/thumbnails/13.jpg)
13
Flow Rate Through Each Pipe
![Page 14: 1 October 2004 Cutting-Edge Software for Managing Gas Production and Storage Operations.](https://reader038.fdocuments.in/reader038/viewer/2022110320/56649c905503460f9494a84e/html5/thumbnails/14.jpg)
14
Pressure Drop Across Each Pipe
![Page 15: 1 October 2004 Cutting-Edge Software for Managing Gas Production and Storage Operations.](https://reader038.fdocuments.in/reader038/viewer/2022110320/56649c905503460f9494a84e/html5/thumbnails/15.jpg)
15
Offtake Rate: Fixed Back Pressure
![Page 16: 1 October 2004 Cutting-Edge Software for Managing Gas Production and Storage Operations.](https://reader038.fdocuments.in/reader038/viewer/2022110320/56649c905503460f9494a84e/html5/thumbnails/16.jpg)
16
Pressure: With Offtake Rate Fixed
![Page 17: 1 October 2004 Cutting-Edge Software for Managing Gas Production and Storage Operations.](https://reader038.fdocuments.in/reader038/viewer/2022110320/56649c905503460f9494a84e/html5/thumbnails/17.jpg)
17
Bi-directional Flows
• Gas flow direction is determined by system pressure distribution
![Page 18: 1 October 2004 Cutting-Edge Software for Managing Gas Production and Storage Operations.](https://reader038.fdocuments.in/reader038/viewer/2022110320/56649c905503460f9494a84e/html5/thumbnails/18.jpg)
18
Reverse Flow
Dictated by pressure at end nodes, flow can be reversed
Reversed flow displayed as “negative”