Transcript of 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University...
![Page 1: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/1.jpg)
1
Logic-Based Benders Methods for Planning and Scheduling
John HookerCarnegie Mellon University
August 2003
![Page 2: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/2.jpg)
2
• Schedule jobs on several machines.• Each job consumes some resource at a given rate.• Resource consumption rate on each machine must not exceed capacity.• Special case: jobs do not overlap.
The Problem:Multiple-machine resource-constrained scheduling
• Apply logic-based Benders decomposition• Generalizes Benders to any subproblem (not just LP, NLP).• Solve with MILP and CP (constraint programming).
![Page 3: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/3.jpg)
3
• Decompose problem into
assignment + resource-constrained assign jobs scheduling to machines schedule jobs on each machine
Basic Idea
• Use logic-based Benders scheme to link these.• Solve: master problem with MILP -- good at resource allocation subproblem with CP -- good at scheduling
• Applications in manufacturing/supply chain planning & scheduling.
![Page 4: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/4.jpg)
4
Previous Work
1989 (Jeroslow & Wang) – View Horn SAT dual as inference problem.
1995 (JH & Yan) – Apply logic-based Benders to circuit verification.• Better than BDDs when circuit contains error.
1995, 2000 (JH) – Formulate general logic-based Benders.• Specialized Benders cuts must be designed for each problem class.• Branch-and-check proposed.
2001 (Jain & Grossmann) – Apply logic-based Benders to multiple-machine scheduling using CP/MILP.
• Several orders of magnitude speedup wrt CPLEX, ILOG Scheduler. • But… easy problem for Benders approach (min cost).
![Page 5: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/5.jpg)
5
2001 (Thorsteinsson) – Apply branch-and-check to CP/MILP.• 1-2 orders of magnitude speedup on multiple machine scheduling.
2002 (JH, Ottosson) – Apply logic-based Benders to SAT, IP.
2003 (JH, Yan) – Relaxation for resource-constrained scheduling (cumulative constraint).
• Not useful computationally for planning and scheduling.• A simpler relaxation works better.
Today – Apply logic-based Benders to resource-constrained planning/scheduling problems.
• Multiple machines, parallel processing with resource constraint on each machine• Min cost and min makespan.
![Page 6: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/6.jpg)
6
Single-machine resource-constrained scheduling
dj = duration of job j rj = rate of resource consumption of job jL = resources available[aj,bj] = time window for job j
Makespan
L
job 1
job 2
job 3
job 4
job 5resources
timed1
r1
Total resource consumption L at all times.
![Page 7: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/7.jpg)
7
Multiple-machine resource-constrained scheduling
dij = duration of job j on machine irij = resource consumption of job j on machine iLi = resources available on machine i
L1
job 1
job 2
job 3
job 4
job 5
d11
r11
Total resource consumption Li at all times.
L2
d22
r22
Machine 1 Machine 2
![Page 8: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/8.jpg)
8
Some Possible Objectives
Minimize cost = ij
ijij xc
Cost of assigning job j to machine i
= 1 if job j assigned to machine i
Minimize makespan = ijjij
dt max
Start time of job j
Minimize tardiness = ij
jijj bdt,0max
Deadline for job j
![Page 9: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/9.jpg)
9
}1,0{
1 with , all,0
with , all,0
, all,
all,1subject to
min
'
''
ijt
ijijt
jijjijt
ij
ttdt
tijtij
itijt
ijtijtij
x
dNttjx
atdbtjx
tiLxr
jx
xc
ij
Minimize Cost: Discrete Time MILP Model
Job j starts at one time on one machine
Jobs underway at time t consume Li in resources
Jobs observe time windows
= 1 if job j starts at time point ton machine i (t = 1,…,N)
![Page 10: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/10.jpg)
10
Minimize Cost: Discrete Event MILP Model
continued
, all ,
all ,1
all,1,1subject to
min
1, ikki
kijk
kijk
ijijkijk
ikijk
ikijk
ijkijkij
tt
jiyx
kyx
jyx
xc
= 1 if event k is start of job j on machine i (k = 1,…,2N)
= 1 if event k is end of job
Each job is assigned to one machine and starts once and ends once
Events in chronological order
Start time of event k (disaggregated by machine)
![Page 11: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/11.jpg)
11
}1,0{,
, all,
, all,,,
, all,
,, all),1()1(
,, all),1()1(
,, all,,
1,
11
ijkijk
ikf
ikkisik
j jijkij
fikijkij
sik
sii
iik
ijkikijijkik
ijkijkikikijijkikijik
jijikijkj
yx
kiRRRR
kiyrRxrRRR
kiLR
kjiyMtfyMt
kjixMxdtfxMxdt
kjibftxa
Release date and deadline
Definition of finish time
Finish time of job j (disaggregated by machine)
Resource limit
Calculation of resource consumption on machine i at time of each event
![Page 12: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/12.jpg)
12
L
rr
dd
tt
n
n
n
),,(
),,(
),,(
cumulative1
1
1
tLr
ijjj dttt
jj all,
CP: The Cumulative Constraint
is equivalent to
Schedules jobs at times t1, …, tn so as to observe resource constraint.
Edge-finding algorithms, etc., reduce domains of tj.
![Page 13: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/13.jpg)
13
jdbta
i
L
iyr
iyd
iyt
c
jyjjj
i
jij
jij
jj
jjy
j
j
all,
all,)|(
)|(
)|(
cumulativesubject to
min
Minimize Cost: CP Model
Observe time windows Observe resource limit on each machine
yj = machine assigned to job j
start times of jobs assigned to machine i
![Page 14: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/14.jpg)
14
[Declarations]DiscreteResource machine [i in Machines] (Limit [i ]);AlternativeResources mset(machine);Activity sched [ j in Jobs];
minimize sum( j in Jobs) cost [ j ]subject to { forall( j in Jobs) { sched [ j ] requires(jobm[i,j ].resource) mset; forall(i in Machines) activityHasSelectedResource(sched [ j ],mset,machine[ j ]) <=> sched [ j ].duration = jobm[i,j ].duration & cost [ j ] = jobm[i,j ].cost; sched [ j ].start >= job[ j ].release; sched [ j ].end <= job[ j ].deadline; };};search { assignAlternatives; setTimes;};
This is how it looks in OPL Studio…
enforces cumulativeassigns jobs to machines
defines resource requirements
determines cost and durations on the assigned machine
time windows
invokes specialized search procedure (needed for good performance)
![Page 15: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/15.jpg)
15
Inference Duality
zxfSx
z
Dx
Sx
xfDx
)(subject to
max
subject to
)(min
Primal Dual
Solution is a value for x. Solution is a proof that deduces f(x) z from x S.
Duality theorem based on completeness proof for inference method.
domainfeasible set
![Page 16: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/16.jpg)
16
Example of Inference Duality: Linear Programming
zcxbAx
z
x
bAx
cxx
0
subject to
max
0
subject to
min
Primal Dual
Solution is a proof that deduces cx z from Ax b, encoded as a vector of multipliers u.Farkas Lemma
(Completeness theorem for nonnegative linear combination
as an inference method)Ax b cx z iff uA c, ub z for some u 0 (provided primal or dual is feasible).
Farkas Lemma provides basis for classical LP duality theorem.
Since u has polynomial size, LP belongs to NP and co-NP.
![Page 17: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/17.jpg)
17
y
y
yx
x
zx
Dy
Syx
yxf
DyDx
kxBz
z
k
),(subject to
),(min
,
all),(subject to
min,
Logic-Based Benders Decomposition
Master Problem Subproblem
Benders cuts for all iterations k
yx DyDx
Syx
yxf
,
),(subject to
),(min
Solution of subproblem’s inference dual is a proof of bound that is valid when )(xBz x xx Benders cut is based on bound obtained from the same proof schema for other values of x.
Solution of master problem
![Page 18: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/18.jpg)
18
0
)(s.t.
)(min
all)),(()(s.t.
min,
y
xgbAy
cyxf
Dx
kxgbuxfz
zy
x
kzx
Example: Classical Benders
Master Problem Subproblem
Benders cuts
0,
)(subject to
)(min
yDx
bAyxg
cyxf
x
Solution of subproblem’s inference dual is a proof (encoded by u) of bound ))(()( xgbuxfz
Benders cut is based on bound obtained from u, which remains dual feasible (i.e., proof remains valid) for other values of x.
![Page 19: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/19.jpg)
19
Minimize Cost: Logic-Based Benders
cuts Benders
all,max
all,1subject to
min
ibLxrd
jx
xc
jj
jiijijij
iij
ijijij
Master Problem: Assign jobs to machines
Relaxation of subproblem: “Area” dijrij of jobs assigned to a machine fit in the space available before latest deadline.
L1
job1 job 4 job 5 jj
bmax
![Page 20: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/20.jpg)
20
i
btaL
xr
xd
xt
jjj
i
ijij
ijij
ijj
all,)1|(
)1|(
)1|(
cumulative
Subproblem: Schedule jobs assigned to each machineSolve by constraint programming
solution of master problem
Let Jik = set of jobs assigned to machine i in iteration k.If subproblem i is infeasible, solution of subproblem dual is a proof that not all jobs in Jik can be assigned to machine i.This provides the basis for a (trivial) Benders cut.
![Page 21: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/21.jpg)
21
}1,0{
, all,1)1(
all,max
all,1subject to
min
ij
Jjij
jj
jiijijij
iij
ijijij
x
kix
ibLxrd
jx
xc
ik
Master Problem with Benders CutsSolve by MILP
Benders cuts
![Page 22: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/22.jpg)
22
Important observation: Putting a relaxation of subproblem in the master problem is essential for success.
Min cost Min makespan
Objective function Computed in master problem, which yields tighter bounds for MILP
Available only thru Benders cuts.
Subproblem Feasibility problem, simple Benders cuts
Optimization problem (harder for CP), more interesting cuts
Relaxation Trivial More interesting, nice duality with cuts
Min cost problem is particularly easy for logic-based decomposition:
![Page 23: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/23.jpg)
23
cuts Benders
all,
all,1subject to
min
iL
xrd
T
jx
T
i
jijijij
iij
Minimize Makespan: Logic-Based Benders
Relaxation of subproblem: “Area” of jobs provides lower bound on makespan.
L1
job1 job 4 job 5
Master Problem: Assign jobs to machines
makespan
![Page 24: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/24.jpg)
24
i
jbtaL
xr
xd
xt
jdtT
T
jjj
i
ijij
ijij
ijj
ijj
all,
all,
)1|(
)1|(
)1|(
cumulative
all,
subject to
min
Subproblem: Schedule jobs assigned to each machineSolve by constraint programming
Let Jik = set of jobs assigned to machine i in iteration k.
We get a Benders cut even when subproblem is feasible.
![Page 25: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/25.jpg)
25
Duality of Linear Relaxation and Linear Benders Cuts
L1
job1 job 4 job 5
Relaxation:Lower bound on makespan
job 1 job 4 job 5
Benders cut:Lower bounds on makespan as jobs are removed from machine
Minimum makespan for machine i in subproblem
![Page 26: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/26.jpg)
26
}1,0{
)1(
all,
all,1subject to
min
ij
Jjijijk
i
jijijij
iij
x
dxTT
iL
xrd
T
jx
T
ik
Master Problem: Assign jobs to machinesSolve by MILP
Benders cuts
Relaxation
![Page 27: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/27.jpg)
27
Experimental Design
2 Machines
3 Machines
4 Machines
CP(ILOG Scheduler)
6, 8, 10, … jobs*
6, 8, 10, … jobs
6, 8, 10, … jobs
MILP(Discrete time model**)
6, 8, 10, … jobs
6, 8, 10, … jobs
6, 8, 10, … jobs
Hybrid 6, 8, 10, … jobs
6, 8, 10, … jobs
6, 8, 10, … jobs
*1 problem instance each** Discrete event model solved none of the problems
![Page 28: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/28.jpg)
28
Min Cost, 2 MachinesLogarithmic scale
0.01
0.1
1
10
100
1000
10000
5 10 15 20 25
Jobs
Sec
CP
MILP
Hybrid
= computation terminated
![Page 29: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/29.jpg)
29
Min Cost, 2 MachinesLinear scale
0
1000
2000
3000
4000
5000
6000
5 10 15 20 25
Jobs
Sec
CP
MILP
Hybrid
![Page 30: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/30.jpg)
30
Min Cost, 3 MachinesLogarithmic scale
0.01
0.1
1
10
100
1000
10000
5 7 9 11 13 15 17
Jobs
Sec
CP
MILP
Hybrid
![Page 31: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/31.jpg)
31
Min Cost, 4 MachinesLogarithmic scale
0.01
0.1
1
10
100
1000
10000
5 7 9 11 13 15 17
Jobs
Sec
CP
MILP
Hybrid
![Page 32: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/32.jpg)
32
Min Makespan, 2 MachinesLogarithmic scale
0.01
0.1
1
10
100
1000
5 7 9 11 13 15 17
Jobs
Sec CP
Hybrid
![Page 33: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/33.jpg)
33
Min Makespan, 3 MachinesLogarithmic scale
0.01
0.1
1
10
100
1000
10000
5 10 15 20
Jobs
Sec
CP
Hybrid
![Page 34: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/34.jpg)
34
Min Makespan, 4 MachinesLogarithmic scale
0.01
0.1
1
10
100
1000
10000
5 10 15 20 25 30
Jobs
Sec
CP
Hybrid
![Page 35: 1 Logic-Based Benders Methods for Planning and Scheduling John Hooker Carnegie Mellon University August 2003.](https://reader035.fdocuments.in/reader035/viewer/2022062421/56649d235503460f949fa3d4/html5/thumbnails/35.jpg)
35
Min Tardiness
1
10
5 6 7 8 9 10
Jobs
Sec ?