1 INTEROP WP1: Knowledge Map Michaël Petit (U. of Namur) January 19 th 2004 Updated description of...
-
Upload
zoe-preston -
Category
Documents
-
view
214 -
download
0
Transcript of 1 INTEROP WP1: Knowledge Map Michaël Petit (U. of Namur) January 19 th 2004 Updated description of...
1
INTEROP WP1: Knowledge Map
Michaël Petit (U. of Namur)
January 19th 2004
Updated description of tasks after INTEROP Kickoff Meeting, Bordeaux
2WP1, INTEROP Kickoff, Bordeaux, 12/1/ 2004
WP1: First Map & recommendations
Create DB and Encode RE
DB ofResearch
Elements (RE)
Define Framework
Unifying Framework
Draw INTEROP
Knowledge Map
Diagnose
First Map
Orientation of research
New collaborations
M6
M6
M9
D1.1
D1.2
M18
M12
M10
M10
D1.1: Knowledge map of research in interoperability in the INTEROP NoE (first version)
D1.2 : Diagnostic of research inside INTEROP NoE and Recommendations to strengthen research efforts in interoperability (including updated framework, state of the art and knowledge map)
3WP1, INTEROP Kickoff, Bordeaux, 12/1/ 2004
WP1: Tasks planning
M0 M6 M9 M12 M18
Task 1: Create DB and Encode Research
Elements
Task 2: Define first framework
Task 3: Draw first INTEROP
Knowledge Map
Task 4: Refine
framework and
Update DB
Task 5: Diagnose
D1.1 D1.2
4WP1, INTEROP Kickoff, Bordeaux, 12/1/ 2004
Task 1: Create DB and Encode Research Elements (M1-M6)• Task 1.1: Choose DB technology (M1-M2)
– Database with web user interface?
• Task 1.2: Define structure of DB contents (M1-M2)– Kind of elements (projects, competencies,
publications, …) and relations – Templates for elements (attributes)
• Task 1.3: Implement and test DB (M3-M5)• Task 1.4: Describe and encode elements
(M6)
10WP1, INTEROP Kickoff, Bordeaux, 12/1/ 2004
Task 2: Define first framework (M1-M6)• Task 2.1: Study existing frameworks
(UEML, IDEAS,…) and collect input from partners and other WPs (M1-M3)
• Task 2.2: Define INTEROP framework, disseminate, get feedback (M4-M5)
• Task 2.3: Extend DB structure with framework and extend DB user interface to allow classification (M6)
16WP1, INTEROP Kickoff, Bordeaux, 12/1/ 2004
Task 3: Draw first INTEROP Knowledge Map (M7-M9)• Task 3.1: Classify research elements (RE)
according to framework and encode classification in DB (M8)
• Task 3.2: Define and implement queries on RE DB (M7-M8)
• Task 3.3: Write deliverable D1.1 (use queries and summarise) (M8-M9)
19WP1, INTEROP Kickoff, Bordeaux, 12/1/ 2004
Task 4: Refine framework and Update DB (M9-M12)• Task 4.1: Refine framework• Task 4.2: Refine DB structure and refine
queries• Task 4.3: Encode new RE and update
existing RE
20WP1, INTEROP Kickoff, Bordeaux, 12/1/ 2004
Task 5: Diagnose (M12-M18)
• Task 5.1: Analyse INTEROP Map (DB) and elaborate proposals for research reorganisation
• Task 5.2: Write deliverable D1.2• Task 5.3: Disseminate D1.2
2. U
niv
Bor
dea
ux
3. G
RA
ISO
FT
4.U
niv
Nan
cy
5. U
niv
Nam
ur
8. D
FK
I
11. C
NR
- I
AS
I
16. S
INT
EF
19. U
niv
Val
enci
a
32. U
niv
Ath
ens
33. S
ingu
lar
Sof
twar
e
34. U
niv
Mil
ano
35. U
niv
Bre
scia
37. U
niv
Pol
it M
arch
e
38. P
olit
Bar
i
45. N
orw
Un
iv S
&T
46. U
niv
Ber
gen
47. K
un
gl T
ekn
Hög
sk
All
oh
er p
artn
ers
TO
TA
L
Task 1: Create DB and Encode Research Elements
10
Task 1.1: Choose DB technology
Task 1.2: Define structure of DB contents
Task 1.3: Implement and test DB
Task 1.4: Describe and encode elements
Task 2: Define first framework 25
Task 3: Draw first INTEROP Knowledge Map
8
Task 3.1: Extend DB structure with framework
Task 3.2: Classify RE and encode in DB
Task 3.3: Define queries on RE DB
Task 3.4: Write deliverable D1.1
Task 4: Refine framework and Update DB
6.01
Task 4.1: Refine framework
Task 4.2: Refine DB structure and queries
Task 4.3: Encode new RE and update existing RE
Task 5: Diagnose 15 Task 5.1: Analyse
INTEROP Map
Task 5.2: Write deliverable D1.2
Task 5.3: Disseminate D1.2 Total effort M1-18 3 2 4 10 0.66 6.4 1 3.6 2 4 3 3 7 5.1 4 2.25 3 64.01
23WP1, INTEROP Kickoff, Bordeaux, 12/1/ 2004
WP1: Meetings planningM
0:
Nov. 0
3
M6
: M
ay 0
4
M9
: A
ug. 0
4
M1
2:
Nov. 0
4
M1
8:
May 0
5
Task 1: Create DB and Encode Research
Elements
Task 2: Define first framework
Task 3: Draw first INTEROP
Knowledge Map
Task 4: Refine
framework and
Update DB
Task 5: Diagnose
D1.1 D1.2
Kick-off Coord.
M5:
Ap
ril 04
M8:
July
04
D1.1 + Task 4 planning
Coord. andFinal planning
M1
6:
Marc
h 0
5
Finalactivities