Chapter 8
Risk Management and Disaster Preparedness
2
Introduction
Life-cycle management of infrastructure requires that water, sewer, and storm water utilities provide safe and reliable service in spite of earthquakes, floods, accidents, and even terrorist attacks.
This requires infrastructure managers to deal with several forms of risk that go well beyond engineering design.
They do this by adding security and risk management to other tasks of planning, design, construction operation, and maintenance.
Providing security and avoiding disasters should become part of everyday business in utilities.
3
The world of risk has expanded, and the purposes of this chapter are:
•To outline the risks•Relate them to the integrity of infrastructure systems•Explain how to reduce vulnerability (weakness).
One tool for reducing vulnerability is the “vulnerability assessment”.
Introduction
4
Consequences of disasters and emergencies can be dire .(وخيمة)Some listed by the AWWA for water utilities are the following:• Personnel shortages• Contamination of water supplies• Contamination of air• Well and pump damage• Pipeline breaks and appurtenance damage• Structure damage• Equipment and material damage or loss
Introduction
5
Consequences of disasters and emergencies can be dire. Some listed by the AWWA for water utilities are the following:
• Process tank or basin damage• Electric power outage• Communications disruption (disturbance) • Transportation failure• Hazardous effects on system components
Introduction
6
Risks to water, sewer, and storm water systemsReducing vulnerability and improving reliability are two sides of the same coin.
Threats will always be there, but if vulnerability can be reduced, utility services can continue in spite of them.
Reducing vulnerability and improving reliability extend to almost everything that the utility does, and are quality management issues.
The most visible risks to water, sewer, and storm water systems involve public health and safety, which affect system design and management and require capital investments and decisions
7
Risk category Water supply Wastewater Storm waterHealth, safety, environment
Contamination, sickness, death
Contamination, damage to property, health risks, environmental damage
Children playing around flood facilities, pipes, ponds, etc.
Performance failure
Loss of fire flow Overflow of untreated sewageand enforcement action
Inadequate protection fromflooding
Construction or maintenance failure
Another utility damages pipe during digging
Trench cave-in Pipe damaged duringconstruction
System or component failure
Pipe break Sewer backup due to clogging,leading to property damage
Flooding due to clogged facilities, leading to property damage
Liability Pipe leak leads to cave-in and damage to property
Industrial waste contaminatesaquifer
Redirected flood waters damage property
Financial Rates are inadequate to pay costs for utility, leading to crisis
Inadequate rates to pay forimprovements, leading to fine
Utility held responsible fordamage, not able to pay judgment
Employee problems and accidents
Employee inhales chlorine
Employee injured in maintenanceevent
Employee sues for discrimination
Disaster, human-caused
Pranksters contaminatewater in tank
Construction project damageslarge sewer
Industry dumps toxic waste in drainage system
Disaster, natural Breaks due to earthquakes
Tornado damages treatment plant Flood overwhelms facilities
Table 8.1 : Risks to Water, Sewer, and Storm water Systems
Risks to water, sewer, and storm water systems
8
Risks to water, sewer, and storm water systems
9SF Bay Quake 3
Risks to water, sewer, and storm water systems
10GF WTP
Risks to water, sewer, and storm water systems
11
Elba pumping
Risks to water, sewer, and storm water systems
12
Risk management
Risk management is the term used to explain the different ways an organization handles risk.
In risk management:1.One considers hazards that can threaten vulnerable elements of a system2.Assesses risks and results.3.Develops actions, including mitigation, response, recovery, and communication to essential groups.
13
Risk management
14
Many different terms are used in the risk management field.
They include hazard assessment, disaster mitigation, risk assessment and reduction, vulnerability assessment, mitigation, emergency management, and contingency planning, among others.
On close inspection, however, these fields involve the same general processes, which are identifying, managing, and responding to threats to an organization, and seeking to answer the following questions:
Risk management
15
•What can go wrong and why (what are the hazards and threats, what disaster can occur)?
•How likely is it (what is the risk, chance, probability)?•How bad can it be (who or what would be affected,
what is the vulnerability, what would be the consequences (cost or penalty)?
•What can we do about it (what should be the management actions, mitigation, response, or recovery)?
Risk management
16
These can be reduced to a few essential steps. • Determine, recognize, and appreciate all potential out-of-course events (hazard assessment).• Determine (measure) levels of these risks (risk assessment).• Reduce levels of risk to as low as reasonably practicable or to acceptable levels (risk reduction).• Determine how and why each out-of-course event can affect people, places, and processes and the consequences of the effects (vulnerability assessment).• Establish means and mechanisms by which consequences can be counterbalanced in a manner acceptable to business and regulators (mitigation).
Risk management
17
Risk management
18
For storm water systems, the purpose of the system is to handle hazards, but we do not normally considered interrupting (stopping) regular service as hazard, as we do in water supply and wastewater.
Storm water systems are designed based on acceptable risks.
But storm water systems do present risks, in similar ways to water supply and wastewater.
For example, close links between stormwater and transportation facilities increased interdependence between the systems and can increase risk.
Risk management
19
Risk assessment, vulnerability analysis, and contingency planning
Risk assessment or analysis is the systematic use of information to identify sources and to estimate the risk.
Achieving this is the goal of contingency planning, in which levels of risks must be measured and be reduced to as low as reasonably practicable.
20
Risk assessment, vulnerability analysis, and contingency planning
21
The science of measuring risks is well advanced for some threats but not for others.
In general, risks to water, sewer, and storm water systems would be difficult to quantify, although possibilities can be listed and mapped, as shown before.
Risk assessment, vulnerability analysis, and contingency planning
22
The general process of contingency planning involves:1.Perform disaster scenarios2.Estimating demand3.Identifying measures for meeting minimum needs4.Isolating critical components or systems that may cause system failures.
This is generally referred to as vulnerability assessment or analysis.
Risk assessment, vulnerability analysis, and contingency planning
23
Vulnerability analysis means to determine the consequences of the hazards affecting the facility or operations of concern.
It requires:1.Identification and measurement of risk2.Identifies vulnerabilities.
Risk assessment, vulnerability analysis, and contingency planning
24
Vulnerability analysis presents:
1.Historical data about past disasters
2.Assesses future probability and frequency of
emergencies and disasters
3.Analyzes impacts and effects
4.Validates data.
Risk assessment, vulnerability analysis, and contingency planning
25
In vulnerability analysis, the effects of the hazards on water system components and water quality and quantity should be determined.
The entire system should of course be analyzed, as well as the components.
1.Identify components of the water supply system.2.Estimate potential effects of possible disasters.3.Create goals for performance and levels of service.4.Identify critical components.
Risk assessment, vulnerability analysis, and contingency planning
26
These steps, although stated for water supply systems, apply to sewer and storm water as well.
They would be implemented this way:
1.Identification of system components requires:•An inventory with maps•Condition inspections•Data for operations and maintenance scenarios, including emergency actions.
Risk assessment, vulnerability analysis, and contingency planning
27
2. Quantifying magnitude determines the scale and magnitude of each potential disaster or contingency.
Estimating effects of expected disasters on each component of the system involves disaggregation of systems to assess the effects of each disaster type on each component (for example, a storage reservoir might be vulnerable to a mudslide, whereas the treatment plant might fail during a power outage).
Risk assessment, vulnerability analysis, and contingency planning
28
3. Estimating demand during and after the disaster for all purposes
Determining the capability of a system to meet demands during emergencies requires modeling and analysis to match demands and supplies during the emergency.
Risk assessment, vulnerability analysis, and contingency planning
29
4. Identifying critical components that cause failure during emergencies is the result of the vulnerability analysis and pinpoints the components that need strengthening.
Risk assessment, vulnerability analysis, and contingency planning
30
Risk assessment, vulnerability analysis, and contingency planning
31
Mitigation measures, including design and constructionMitigation consists of “disaster-proofing” activities which eliminate or reduce the probability of disaster effects
32
Reliability as a key design goal means the extent to which a system performs its function without failure.
A systems approach would make sure failure of a component does not lead to failure of system.
Reliability depends on treatment train, equipment, processes, standby equipment, redundancy, parallel systems, and flexibility.
Mitigation measures, including design and construction
33
Principles and ideas for reliable systems are:
• Ensure that failure of any one component does not cause operating failure or noncompliance.• Provide operational flexibility to handle problems with source water variability.• Have reserves and redundancies to keep operating if one unit is out of service.• Have one or more processes perform the same function, such as filters and sedimentation to remove particulates.• Gain flexibility through redundancy, conservative sizing, or unit arrangements.
Mitigation measures, including design and construction
34
Principles and ideas for reliable systems are:
• Ensure overall reliability through interconnections and different sources.
• Avoid independent process trains; use interconnections instead.
• Use gravity flow instead of pumping.• Ensure component system reliability — electrical,
controls, and many other factors.• Consider disasters in design.• Use waterproofing.• Control access.• Have plant security.
Mitigation measures, including design and construction
35
Principles and ideas for reliable systems are: • Store chemicals on site to mitigate truck blockades.• Have on-site generation of chemicals, chlorine.• Have a HAZMAT program.• Have a safety program.• Do a vulnerability analysis.• Have multiple intake ports or well screens.• Use off-stream sources.
Mitigation measures, including design and construction
36
Principles and ideas for reliable systems are:
• Have dual power sources and standby power.• Have chemical storage reliability.• Ensure reliability of process design.• Ensure smooth O&M.• Have shop drawings.• Have computerized maintenance systems.• Have trained people.
Mitigation measures, including design and construction