1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things...
-
Upload
eleanor-mosley -
Category
Documents
-
view
214 -
download
0
Transcript of 1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things...
![Page 1: 1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ef35503460f94c0630f/html5/thumbnails/1.jpg)
Alan Barr - SCT DAQ 14 July 2006
Experience and plans from running the (SCT) DAQ
HEP
• Setting things up• Calibration mode operations• Physics mode operation• Transitions• Recovery• Modifying configurations
What to dobetter?
![Page 2: 1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ef35503460f94c0630f/html5/thumbnails/2.jpg)
Alan Barr - SCT DAQ 24 July 2006
The good news!
![Page 3: 1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ef35503460f94c0630f/html5/thumbnails/3.jpg)
Alan Barr - SCT DAQ 34 July 2006
Overview
• Almost all things were possible with enough expert hands at the wheel
• Focus is on what could be improved to make life easier, and to reduce down-time
![Page 4: 1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ef35503460f94c0630f/html5/thumbnails/4.jpg)
Alan Barr - SCT DAQ 44 July 2006
Setting things up
• Various mapping scans now in place: streamline checking for mapping errors– TX RX (autoconfig)– TX Module (Trim -> TV50 RMS)– RX DCS (Hard reset scan)
• Perhaps a case for a 1-Pt QCAL scan test at “physics threshold” – look at trim?
• Opto tuning – improvements to algorithms– Hard reset between bins for TX current– Rx Threshold algorithm improved– Still some worries over marginal TX.
![Page 5: 1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ef35503460f94c0630f/html5/thumbnails/5.jpg)
Alan Barr - SCT DAQ 54 July 2006
Timing-in
• Good to ~few ns gross timing done by looking for top/bottom of module co-incidence– Combining statistics between modules– Relatively few stats required
• (few hundred cosmics)
– Good agreement with “offline monitoring”
• Module module done by dead reckoning (at SR1)
![Page 6: 1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ef35503460f94c0630f/html5/thumbnails/6.jpg)
Alan Barr - SCT DAQ 64 July 2006
Mark/Space Ratio(Clock jitter in TX)
• Test done for several rods in SR1 sector – enough stats to test algorithm
• Generally seems to work– Slow– Some funny channels– Investigations into BOC plugins
proceeding
• Some improvements in algorithm made to attempt to flag outlying cases
![Page 7: 1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ef35503460f94c0630f/html5/thumbnails/7.jpg)
Alan Barr - SCT DAQ 74 July 2006
Calibration mode
• Can “do the job”– New response curve taken and used for SR1
cosmics tests
• Less fault tolerant to errors from modules– Still aborts after single module failure– To be improved?
• Would benefit from tools to do statistics on different modules – Nasty fudge used to combine data for timing scan– Need to be able to compare against reference set
rather than just labelling “good”/”bad” modules
![Page 8: 1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ef35503460f94c0630f/html5/thumbnails/8.jpg)
Alan Barr - SCT DAQ 84 July 2006
Things to speed up calibration?
• Diagnostics from DSP greatly improved– Pick out which modules are causing problems
• Improved fault tolerance?– Decrease wasted down-time.
• Has histogram read-out slowed down? – If so where? ROD? Network? NFS demon?
• Quick turn-around with updated configuration (see later)
• Could pack trims better to reduce configuration loading to ROD by factor of ~2.– Simultaneous change needed to DSP code and to
SctRodDaq
![Page 9: 1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ef35503460f94c0630f/html5/thumbnails/9.jpg)
Alan Barr - SCT DAQ 94 July 2006
Physics mode• Standard operation of SCT HW/SW eventually
good• Couldn’t read out histograms during physics
mode when running– And slow when paused
• Runs able to continue for several hours.• What stopped “good” runs?
– Crash of ROS/FILAR• Formatter allowing “illegal” data through?
– LV trips from SCT modules• Reduce frequency• Recover
– Occasionally loss of synchronisation with TRT?• Identify• Add counter resets
![Page 10: 1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ef35503460f94c0630f/html5/thumbnails/10.jpg)
Alan Barr - SCT DAQ 104 July 2006
Non-expert operation?
• Work to be done in:– Detector safety (DCS)– Module initialisation– Module recovery– Information in error messages– Getting configurations to offline– Feedback on synchronisation– Other “error” states
• Recovery time after power failure was I think ~ 8 hours?
![Page 11: 1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ef35503460f94c0630f/html5/thumbnails/11.jpg)
Alan Barr - SCT DAQ 114 July 2006
Transitions
• Physics Calibration transition ok for SCT alone
• Cal. couldn’t be done in configuration containing TRT
• Taking out subdetector involved lots of different resources (EventBuilder, ROS, RODs, …)
• I thinkTDAQ has a way to streamline this?
![Page 12: 1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ef35503460f94c0630f/html5/thumbnails/12.jpg)
Alan Barr - SCT DAQ 124 July 2006
Configuration tools
• SR1 highlighted the need for tools to compare, update and merge configurations.
• Chris and Bruce produced/working on some tools for xml.
• ‘Final’ database configuration solution now has same functionality as xml.
• GUI display of configuration parameters?
![Page 13: 1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ef35503460f94c0630f/html5/thumbnails/13.jpg)
Alan Barr - SCT DAQ 134 July 2006
Headaches• ROS machine failure
– Required reboot, remount, …– Possibly linked to invalid data coming from ROD– Some ideas as to what might be the cause…
• Occasional initialisation problems in SctRodDaq start-up– Not really investigated – replace delays in synch-
init?• “Full” ROD (inc. s-link) reset seems to require
crate reboot (slow!)– What isn’t reset on “reset”?
• Module start up needs Hard Reset, and then send configs automated.– Problem: DCS hand-shaking
• Automation of module power cycle required (from DAQ)
![Page 14: 1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ef35503460f94c0630f/html5/thumbnails/14.jpg)
Alan Barr - SCT DAQ 144 July 2006
Issues for the pit• Configuration (inc. DCS) still a big area • First large-scale multi-crate test• Parallelism needed for analysis• Much harder to reset off-detector hardware!• Auto recovery required for
– Modules– OPTO– DAQ systems
• Can we still use NFS for data transfer?• Auto-archival to CASTOR through firewall?• Set up of trigger chain (resets etc) through LTPs.• ROD monitoring not physics-ready
![Page 15: 1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ef35503460f94c0630f/html5/thumbnails/15.jpg)
Alan Barr - SCT DAQ 154 July 2006
If things don’t work
• Don’t just grumble to yourself…• Grumble to the experts!
– Wiki page: – http://www.hep.phy.cam.ac.uk/daq-bin/
wiki.cgi/UserStories– Email address:– [email protected]
• We rarely bite and will endeavour to help!
![Page 16: 1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ HEP Setting things up Calibration mode operations Physics mode operation.](https://reader036.fdocuments.in/reader036/viewer/2022082711/56649ef35503460f94c0630f/html5/thumbnails/16.jpg)
Alan Barr - SCT DAQ 164 July 2006
The good news!