1 1 Dominic Hayes Frequency Regulation European Commission, DG-TREN, Galileo Unit.
-
Upload
nicole-reeves -
Category
Documents
-
view
213 -
download
0
Transcript of 1 1 Dominic Hayes Frequency Regulation European Commission, DG-TREN, Galileo Unit.
1
1
Dominic HayesFrequency Regulation
European Commission, DG-TREN, Galileo Unit
2
2
Galileo - Frequency Regulatory Support
• It's not sexy, it's not glamorous• It's all about the Radio Regulations
• The Radio Regulations are a UN treaty fundamental to all radio use worldwide• What frequency, when, where, how and who
• Radio waves are crucial to Galileo's operation• Therefore the Radio Regulations are key!
3
3
Radio RegulationsDevelopment
Radio Regulations
World Radiocommunication
Conference (WRC)
ITU-RInternational
TelecommunicationUnion
CEPT‘European ITU’
ATUAfrica
Arab Group
CITELAmericas
RCCRussia & friends
APTAsia
Pacific
Internationalorganisations
National Admins
Industry
Govt Other interests
Satellite Filings
InternationalorganisationsEg ICAO, ESA
EC Communit
y policies
4
4
Support Areas
• WRC-11
• Filings and Coordination
• Non-WRC issues
• Standards
5
5
WRC-11
• Preparations for WRC-11• National, CEPT and ITU-R level meetings• Presence / influence in other ITU Regions • Attendance at WRC-11
• Includes detailed radio compatibility studies for RNSS issues
• Representation, advocation and reporting
6
6
Filings and Coordination
• Monitor the ITU BR-IFIC- Fortnightly distribution of new/modified filings
• Flag potential conflicts with Galileo freqs• Analyse impacts in detail• Advise and support the ITU Coordination process
for Galileo with other systems• Includes 'Res609' meetings between RNSS systems
(maybe Res610 too)
7
7
Non-WRC issues
• At ITU-R- help develop RNSS recommendations- follow other ITU-R issues that may impact Galileo
• At CEPT- follow and contribute to RNSS issues such as GNSS
repeaters, pseudolites and CGC
8
8
Standardisation
• Support for Galileo related work at ETSI
• Development of a generic GNSS/Galileo receiver standard
• Review relevant existing standards to gauge potential interference threats
9
9
Specific Technical Projects
• Specific projects (tbd) to provide evidence supporting Galileo positions- Eg radar interference measurements - study on receiver interference tolerance
• Contractors could sub-contract specific expertise if required
• Flexible implementation on an 'as required' basis
10
10
Contract
• Runs to end 2011• Covering WRC-11 and just after• Intention: the tender statements of work will be
split into three packages• Bidders can bid for individual SoW or all• Details to be developed subject to EC rules and
procedures
11
11
Summary
• Contract to provide radio regulatory support for Galileo until end 2011
• Primary focus on WRC-11 and objectives• Continuous work on satellite filings and
coordination if required• Standardisation tasks to ease and promote
Galileo's introduction • Can include specific technical projects (tbd) to
support Galileo positions