ROADWAYS AND PARKING LOTS - SECTION 07243 2014 RIP Project #1306: 07243 - Page 1 of 10 PART 1   GENERAL 1.01 WORK INCLUDED A. Section includes all, labor, materials, equipment, and related services for constructing and reconstructin g roadways. Work scope includes (but not limited to) Work Summ ary    Section 01010. B. CONTRACTOR shall sequence construction so as to minimize disruption of access to all roadway users. C. CONTRACTOR shall be responsible for Digger’s Hotline locates, site safety, resident access, traffic control, and protection of existing facilities, features and structures at all times. 1.02 RELATED SECTIONS A. See Table of Contents 1.03 GOVERNING AGENCIES AND APPLICABLE CODES/GUIDELINES/REGULATIONS A. State of Wisconsin Department of Transportat ion (WisDOT) 1. WisDOT Standard Specifications for Highway and Structure Construction (WisDOT Standard Specifications) 2. WisDOT Facility Development Manual (FDM) 3. WisDOT Construction and Materials Manual 4. WisDOT Approved Product List B. Village of Germantown 1. Municipal Code 2. Design, Drafting & Construction Standards & Specifications (Sec. 1-9) 3. Village Board and Committee actions 4. DPW Director, Village ENGINEER, Utility Superintendent discretion C. Other 1. American Association of State Highway and Transportation Officials (AASHTO) Geometric Design of Highways and Streets (latest ed.) 2. AASHTO) Guidelines for Geometric Design of Very Low-Volume Local Roads (ADT<400) (latest ed.) 3. Manual of Uniform Traffic Control Devices (MUTCD) 4. Wisconsin Asphalt Pavement Association (WAPA) Design Guide 5. 28 CFR Part 36, “ADA Standards for Accessible Design”  6. Southeast Wisconsin Regional Planning Commission (SEWRPC) 7. Manufacturer specifications 1.04 QUALITY ASSURANCE A. Work described in specifications and shown on the construction drawings, and all work necessary to completely finish work as described and shown, is to be executed in a

Transcript of 07243 Roadways and Parking Lots_201402211625475914.pdf

Page 1: 07243 Roadways and Parking Lots_201402211625475914.pdf

8/9/2019 07243 Roadways and Parking Lots_201402211625475914.pdf

http://slidepdf.com/reader/full/07243-roadways-and-parking-lots201402211625475914pdf 1/10

ROADWAYS AND PARKING LOTS - SECTION 07243

2014 RIP Project #1306: 07243 - Page 1 of 10

PART 1 –  GENERAL

1.01  WORK INCLUDED

A.  Section includes all, labor, materials, equipment, and related services for constructing andreconstructing roadways. Work scope includes (but not limited to) Work Summary –  Section

01010.

B.  CONTRACTOR shall sequence construction so as to minimize disruption of access to allroadway users.

C.  CONTRACTOR shall be responsible for Digger’s Hotline locates, site safety, resident access,

traffic control, and protection of existing facilities, features and structures at all times.

1.02 RELATED SECTIONS

A.  See Table of Contents

1.03 

GOVERNING AGENCIES AND APPLICABLE CODES/GUIDELINES/REGULATIONS

A. State of Wisconsin Department of Transportation (WisDOT)

1.  WisDOT Standard Specifications for Highway and Structure Construction (WisDOTStandard Specifications)

2.  WisDOT Facility Development Manual (FDM)3.

 

WisDOT Construction and Materials Manual

4.  WisDOT Approved Product List

B. Village of Germantown

1. 

Municipal Code2.

 

Design, Drafting & Construction Standards & Specifications (Sec. 1-9)3.  Village Board and Committee actions4.  DPW Director, Village ENGINEER, Utility Superintendent discretion

C. Other

1.  American Association of State Highway and Transportation Officials (AASHTO)Geometric Design of Highways and Streets (latest ed.)

2.  AASHTO) Guidelines for Geometric Design of Very Low-Volume Local Roads(ADT<400) (latest ed.)

3. 

Manual of Uniform Traffic Control Devices (MUTCD)

4. 

Wisconsin Asphalt Pavement Association (WAPA) Design Guide5.  28 CFR Part 36, “ADA Standards for Accessible Design” 6.  Southeast Wisconsin Regional Planning Commission (SEWRPC)7.  Manufacturer specifications

1.04  QUALITY ASSURANCE

A.  Work described in specifications and shown on the construction drawings, and all worknecessary to completely finish work as described and shown, is to be executed in a

Page 2: 07243 Roadways and Parking Lots_201402211625475914.pdf

8/9/2019 07243 Roadways and Parking Lots_201402211625475914.pdf

http://slidepdf.com/reader/full/07243-roadways-and-parking-lots201402211625475914pdf 2/10

ROADWAYS AND PARKING LOTS - SECTION 07243

2014 RIP Project #1306: 07243 - Page 2 of 10

 professional manner.

B.  All work shall be done by persons who are thoroughly experienced and trained in their particular trade or craft.

1.05 METHODS OF MEASUREMENT/BASIS OF PAYMENT

A.   No explicit direct payment shall be made for incidental work under this section.CONTRACTOR shall include all direct & indirect costs for this work in unit prices provided.

1.06 SITE CONDITIONS

A. Protect existing buildings, patios, gardens, vehicles, landscaping, walks, roads, fences, drives,curbs, utilities, and other features from damage from work of this Section.

B. In event of damage, immediately make all repairs and replacements necessary subject to

approval of ENGINEER and at no additional cost to OWNER.

1.07 SCOPE OF WORK

A. 

Work scope includes (but not limited to) Work Summary –  Section 01010.

PART 2 –  DESIGN CRITERIA

2.01 GEOTECHNICAL SERVICES REPORT

A.  A geotechnical ENGINEER shall be retained to assess and evaluate site conditions andsubsurface conditions, and to recommend pavement structures

B.  The report shall be prepared, sealed and signed by a Wisconsin P.E.

2.02 HMA PAVEMENTS

A.  Design Life = 20 years

B.  Terminal Serviceability = 2.0

C.  Reliability = 85%

D.  Initial Serviceability = 4.2

E. 

Standard Deviation = 0.45

2.03 GEOMETRICS

A.  Conform to WisDOT FDM Sec. 11-10

2.04 LOCAL ROADS

A.  ADT>400: Conform to AASHTO Geometric Design of Highways and Streets Ch. 5

Page 3: 07243 Roadways and Parking Lots_201402211625475914.pdf

8/9/2019 07243 Roadways and Parking Lots_201402211625475914.pdf

http://slidepdf.com/reader/full/07243-roadways-and-parking-lots201402211625475914pdf 3/10

ROADWAYS AND PARKING LOTS - SECTION 07243

2014 RIP Project #1306: 07243 - Page 3 of 10

B.  ADT<400: Conform to AASHTO Guidelines for Geometric Design of Very Low-VolumeLocal Roads

C.  Conform to Municipal Code Sec. 18.07 Tables 2, 2a, and 3; Definitions in Municipal CodeSec. 18.07(1)

2.05 COLLECTOR ROADS

A.  Conform to AASHTO Geometric Design of Highways and Streets Ch. 6

B.  Conform to Municipal Code Sec. 18.07 Tables 2, 2a, and 3; Definitions in Municipal CodeSec. 18.07(1)

2.06 ARTERIALS

A. 

Conform to AASHTO Geometric Design of Highways and Streets Ch. 7

B.  Conform to Municipal Code Sec. 18.07 Tables 2, 2a, and 3; Definitions in Municipal Code

Sec. 18.07(1)

2.07 INTERSECTIONS

A.  ADT>400:

1.  Conform to AASHTO Geometric Design of Highways and Streets Ch. 92.

 

Conform to WisDOT FDM Sec. 11-25

B.  ADT<400: Conform to AASHTO Guidelines for Geometric Design of Very Low-VolumeLocal Roads

C. 

Acceleration, Deceleration and By-pass Lanes are required at all residential subdivision,commercial center and retail center entrances

2.08 LONGITUDINAL SLOPE

A.  1% min.; 10% max.

2.09 CROSS-SLOPES

A.  Driving Lane = 3%

B. 

Parking Lane = 3%

C.  Acceleration / Deceleration Lane = 3%

D.  Gravel Shoulder = 4%

E.  Ditches = 4H:1V preferred (3H:1V max.)

F.  Sidewalk = 2%

Page 4: 07243 Roadways and Parking Lots_201402211625475914.pdf

8/9/2019 07243 Roadways and Parking Lots_201402211625475914.pdf

http://slidepdf.com/reader/full/07243-roadways-and-parking-lots201402211625475914pdf 4/10

ROADWAYS AND PARKING LOTS - SECTION 07243

2014 RIP Project #1306: 07243 - Page 4 of 10

PART 3 – SUBGRADE

3.01 EARTH SUBGRADE

A.  Conform to WisDOT Standard Specification Sec. 211.3.2

3.02 SURFACE ELEVATION TOLERANCE

A.  ±0.10’ 

3.03 COMPACTION

A.  95% Modified Proctor

3.04 WEATHER CONSTRAINTS

A.  Compaction prohibited during rainfall and on wet surfaces

3.05 GEOTECHNICAL FABRIC

A. 

In event of proof-roll failure, place Type SR to overlay utility crossings; Conform to

WisDOT Standard Specifications Sec. 645

PART 4 –  BASE COURSE

4.01 MATERIALS

A.   New Construction or Reconstruction:

1.  Bottom Layer: 3” Dense Graded Base (Bank Run is prohibited)

2. 

Middle Layer: 1-¼“ Dense Graded Base (Bank Run is prohibited)

3.  Top Layer: ¾“ Dense Graded Base (Bank Run is prohibited)

B.  Pulverize & Overlay: Pulverized pavement acceptable when recommended by GeotechnicalServices Report

C.  Conform to WisDOT Standard Specifications Sec. 301 and 305

4.02 THICKNESSES

A. 

Comply with Geotechnical Services Report accepted by Village ENGINEER

4.03 SURFACE ELEVATION TOLERANCE

A.  ±0.05’ 

4.04 COMPACTION

A.  95% Modified Proctor

Page 5: 07243 Roadways and Parking Lots_201402211625475914.pdf

8/9/2019 07243 Roadways and Parking Lots_201402211625475914.pdf

http://slidepdf.com/reader/full/07243-roadways-and-parking-lots201402211625475914pdf 5/10

ROADWAYS AND PARKING LOTS - SECTION 07243

2014 RIP Project #1306: 07243 - Page 5 of 10

B.  Conform to WisDOT Standard Specification Sec. 305.3.2

4.05 WEATHER CONSTRAINTS

A.  Compaction prohibited during rainfall and on wet surfaces

PART 5 –  HOT MIX ASPHALT (HMA) PAVEMENTS

5.01 WISCONSIN ASPHALT PAVEMENT ASSOCIATION DESIGN GUIDE

Traffic

Class

Design

Daily ESAL

Range

Old

Specs

Superpave

Type

Typ. Examples of Use

I <1 LV E-0.3 Residential driveways; Parking lots

(<50 stalls); School areas and

 playfields; Seasonal recreational

roads

II 1-5 LV E-0.3 Parking lots (>50 stalls); Residential

streets and low volume rural

roadways

III 6-50 MV E-1 Collector streets and other roadways;

Light industrial lots

IV 51-275 MV E-3 Local business streets; Major arterial

streets; Medium industrial streets/lots

V 276-1000 HV E-10 Heavy truck terminals/truck stops;

Heavy industrial drives/lots; Bus

stops

Traffic Class I, II, III PG 64°C-22°C

Traffic Class IV, V PG 64°C-22°C

5.02 THICKNESSES

A.  Comply with Geotechnical Services Report accepted by Village ENGINEER

Layer Nominal Size

(mm)

Min. Layer

Thickness (in)

Max. Lower

Layer Thickness

(in)

Max. Upper

Layer Thickness

(in)

Binder 19 2 ¼ 4 N/A

Surface 12 ½ 1 ¾ N/A 2 ½

5.03 HMA TEMPERATURE

A. 

HMA temperatures on project site shall range between 250°F and 300°F

5.04 MINIMUM DENSITY

Location E-0.3, E-1, E-3 E-10

Traffic Lanes 91.5% 92.0%

Conform to WisDOT Standard Specifications Sec. 460.3.3.1

Page 6: 07243 Roadways and Parking Lots_201402211625475914.pdf

8/9/2019 07243 Roadways and Parking Lots_201402211625475914.pdf

http://slidepdf.com/reader/full/07243-roadways-and-parking-lots201402211625475914pdf 6/10

ROADWAYS AND PARKING LOTS - SECTION 07243

2014 RIP Project #1306: 07243 - Page 6 of 10

5.05 CALENDAR & WEATHER CONSTRAINTS

A.  Paving prohibited between Oct. 15 and May 1 unless authorized in writing by VillageENGINEER; Conform to WisDOT Standard Specifications Sec. 450.3.2.1

B.  Paving prohibited when air temp. 3’ above grade in shade and away from artificial heat

sources is < 36°F; Conform to WisDOT Standard Specifications Sec. 450.3.2.1

C.  Paving prohibited during rainfall

D.  Paving prohibited on wet surfaces

5.06 FINAL PAVING SCHEDULE

A. 

Pave surface lift at 80% build-out or 3 years after binder lift paved (whichever is first)

PART 6 –  CONCRETE PAVEMENTS

6.01 TRAFFIC & AUXILIARY LANES

A. 

Conform to WisDOT Standard Specifications Sec. 415 and WisDOT FDM 14-10-10

6.02 CURING

A.  Liquid curing compound; Conform to WisDOT Standard Specifications Sec. 415.2.4

6.03 JOINTING

A.  Longitudinal: Centerline, lane edges

B. 

Transverse:

Pavement Thickness (in) Dowel Bar Dia. (in) Joint Spacing (ft)

5 ½, 6, 6 ½ None 12

7, 7 ½ 1 14

8, 8 ½ 1 ¼ 15

9, 9 ½ 1 ¼ 15

10 and above 1 ½ 15

C.  Conform to WisDOT FDM 14-10-10 Sec. 10.6.1, SDD 13C11, and SDD 13C13

6.04 WEATHER CONSTRAINTS

A. 

Paving prohibited when air temp. in shade and away from artificial heat sources is < 35°F;Conform to WisDOT Standard Specifications Sec. 415.3.15.1

B.  Paving prohibited during rainfall

C.  Paving prohibited on wet surfaces

6.05 CURB & GUTTER

Page 7: 07243 Roadways and Parking Lots_201402211625475914.pdf

8/9/2019 07243 Roadways and Parking Lots_201402211625475914.pdf

http://slidepdf.com/reader/full/07243-roadways-and-parking-lots201402211625475914pdf 7/10

ROADWAYS AND PARKING LOTS - SECTION 07243

2014 RIP Project #1306: 07243 - Page 7 of 10

A.  Public Roads: 30” mountable (typ.); 30” rejecting at cul-du-sac islands

B.  Slip-form preferred

C.  Conform to Village Standard Details

D.  Conform to WisDOT Standard Specifications Sec. 601

6.06 CUL-DU-SACS

A.  Plowable nose required

B.  Conform to Village Standard Detail

6.07 SIDEWALKS

A.  Width: 5’ min. 

B.  Thickness: 5” min. 

C.  Cross-slope = 2%

D.  Slip-form preferred

E. 

Conform to Village Standard Details

F.  Conform to WisDOT Standard Specifications Sec. 602

6.08 DRIVEWAYS

A. 

Residential Width at curb or shoulder = 25’ max. 

B.  Commercial or Retail Width at curb or shoulder = 45’ max. 

C.  Conform to Village Standard Details

PART 7 –  AMERICAN DISABILITIES ACT ACCESSIBILITY

7.01 CURB RAMPS

A. 

Required for all intersections having pedestrian path and sidewalk

B.  Required for all passenger loading zones

C.  Required for all commercial, industrial and retail center driveways having pedestrian path and

sidewalk

D.  Truncated domes required at all curb ramps

E.  Conform to 28 CFR Pt. 36 App. A Sec. 4.7

Page 8: 07243 Roadways and Parking Lots_201402211625475914.pdf

8/9/2019 07243 Roadways and Parking Lots_201402211625475914.pdf

http://slidepdf.com/reader/full/07243-roadways-and-parking-lots201402211625475914pdf 8/10

ROADWAYS AND PARKING LOTS - SECTION 07243

2014 RIP Project #1306: 07243 - Page 8 of 10

F.  Conform to WisDOT FDM 11-46-10 and SDD 8D5 (Sheets a to e)

7.02 PARKING

A.  Situate as close to accessible building entrances as possible

B.  Slope = 2% max (in all directions)

C.  Van-to-regular accessible space ratio: 1:6

D.  Stall lengths = 20’ min. 

E.  Stall widths:

1. 

Car = 96” min. 

2.  Van = 132” min.; or 96” min. with 96” aisle 

F. 

Signage and pavement markings required for ea. stall

G. 

Conform to 28 CFR Pt. 36 App. A Sec. 4.6

PART 8 –  TRAFFIC CONTROL

8.01 TEMPORARY

A.  Conform to WisDOT Standard Specifications Sec. 643

B.  Conform to MUTCD Part 6

C. 

Detours: Post signs along entire detour route

8.02 PAVEMENT MARKINGS

A.  Conform to WisDOT Standard Specifications Sec. 646

B. 

Conform to MUTCD Part 3

8.03 SIGNS

A.  Conform to WisDOT Standard Specifications Sec. 637

B. 

Conform to MUTCD Ch. 2A, 2B, 2C

PART 9 –  INSPECTION & TESTING

9.01 SCHEDULING

A.  Contact ENGINEERing Dept. (262) 250-4721 two business days before construction toschedule inspection(s)

Page 9: 07243 Roadways and Parking Lots_201402211625475914.pdf

8/9/2019 07243 Roadways and Parking Lots_201402211625475914.pdf

http://slidepdf.com/reader/full/07243-roadways-and-parking-lots201402211625475914pdf 9/10

ROADWAYS AND PARKING LOTS - SECTION 07243

2014 RIP Project #1306: 07243 - Page 9 of 10

9.02 PROOF-ROLLS

A.  Use a fully-loaded tri-axle dump truck

B.  Conduct on sub-grade and on base course

C. 

Ruts exceeding 1” depth are considered failure 

D.  In event of failure, EBS, geotechnical fabric Type SR, or a combination of both areacceptable remedies

1.  When using geotechnical fabric Type SR, conform to WisDOT Standard Specifications

Sec. 645

PART 10 –  LIST OF VILLAGE STANDARD DETAILS

10.01 RESERVED

PART 11 –  OTHER REQUIREMENTS

11.01 GENERAL

A.  CONTRACTOR shall be responsible for Digger’s Hotline locates, site safety, resident access,traffic control, erosion & sediment control, and protection of existing facilities, features and

structures at all times

B.  At end of each day, open excavations shall not exceed 25 ft. in length.

C.  At end of each day, CONTRACTOR shall erect barricades with flashers and snow fencing

surrounding excavations.

D. 

Sawcut Exist Pavements: Wheel mounting saw required; Sawcut full-depth; Conform toWisDOT Standard Specifications Sec. 690

E.  Inlet Protection: Conform to Wisconsin DNR Technical Standard #1060

F. 

Dewatering: Conform to Wisconsin DNR Technical Standard #1061

11.02 HEALTH AND SAFETY

A.  CONTRACTOR is responsible to determine health and safety requirements sufficient to provide for employee protection.

B.  CONTRACTOR shall comply with all federal codes, State of Wisconsin statutes andregulations, and Village of Germantown ordinances and specifications, and with any sitespecific safety plans developed by ENGINEER.

C.  At end of each working day, open excavations shall not exceed 25’ in length and shall be

clearly protected with snow fence erected around the open excavation.

Page 10: 07243 Roadways and Parking Lots_201402211625475914.pdf

8/9/2019 07243 Roadways and Parking Lots_201402211625475914.pdf

http://slidepdf.com/reader/full/07243-roadways-and-parking-lots201402211625475914pdf 10/10

ROADWAYS AND PARKING LOTS - SECTION 07243

2014 RIP Project #1306: 07243 - Page 10 of 10

11.03 DOCUMENTATION

A.  ENGINEER will keep a continuous field record of WORK. CONTRACTOR will assistENGINEER in collecting the following data as needed:

1.  Date and time of beginning and completion of each work day.

2. 

Equipment on site.3.  Material used.4.  Location of installed pipe.5.  Any other applicable information.

END OF SECTION 07243