Transcript of 07 20R300 1 C300 Configuration
1April 19, 2023
Describe C300 and Series C I/O Configuration
C300 Configuration Describe C300 and Series C I/O Configuration C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
2
April 19, 2023
Introduction
• In this lesson you will learn to configure C300 Controller andSeries C I/O
• PMIO configuration is discussed in a separate lesson• The steps for configuration are similar to the C200
configuration with some differences:– Add a new Control Processor Module to the Project hierarchy
• Control Builder adds the CEE and two IOLINK modules– Configure the Controller– Configure the CEE– Configure the IOLINKs (PMIO or Series C IO)– Configure the IOMs– Assign the IOMs to the IOLINKs– Load the Controller, CEE, IOLINKS, and the IOPs– Activate the CEE
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
3
April 19, 2023
Topics
• Configuring the C300 and CEE
• Configuring IOLINKs
• Configuring IOMs
• Loading the C300, IOLINKs, and IOMs
• Activating the C300
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
4
April 19, 2023
Configuring a Controller
Follow these steps to add a new controller from the pull-down menus
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
5
April 19, 2023
Configuring a Controller – Main Tab
Data entry details will be provided in the lab exercise
Item name
Check for redundant controller
Device index Number of C300
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
6
April 19, 2023
Configuring a Controller – Server History Tab
History parameters and control level required to operate this C300
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
7
April 19, 2023
Configuring a Controller – Group and Trend Assignment
Select OK to close and save the new
controller
Point, group, trend and associated
displays (residing on the server) are
defined on the Server Displays tab
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
8
April 19, 2023
C300 View in Control Builder
C300, CEE, and IOLINKs
Redundancy
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
9
April 19, 2023
Configuring a CEE
Data entry details will be provided in the Lab exercise
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
10
April 19, 2023
Which of the following statements is not true for C300 configuration?
Question 1: C300 Configuration
Incorrect. The false statement is "Only one IOLINK is automatically created for Series C
I/O".When a C300 controller is created in Control Builder 2 IOLINKS are automatically
added.
Click anywhere to continue.
Incorrect. The false statement is "Only one IOLINK is automatically created for Series C
I/O".When a C300 controller is created in Control Builder 2 IOLINKS are automatically
added.
Click anywhere to continue.
Incorrect. The false statement is "Only one IOLINK is automatically created for Series C
I/O".When a C300 controller is created in Control Builder 2 IOLINKS are automatically
added.
Click anywhere to continue.
Incorrect. The false statement is "Only one IOLINK is automatically created for Series C
I/O".When a C300 controller is created in Control Builder 2 IOLINKS are automatically
added.
Click anywhere to continue.
Correct! When a C300 controller is created in Control Builder 2 IOLINKS are automatically
added.
Click anywhere to continue.
Correct! When a C300 controller is created in Control Builder 2 IOLINKS are automatically
added.
Click anywhere to continue.
Incorrect. The false statement is "Only one IOLINK is automatically created for Series C I/O". When a C300 controller is created in
Control Builder 2 IOLINKS are automatically added.
Click anywhere to continue.
Incorrect. The false statement is "Only one IOLINK is automatically created for Series C I/O". When a C300 controller is created in
Control Builder 2 IOLINKS are automatically added.
Click anywhere to continue.
Correct - Click anywhere to continueCorrect - Click anywhere to continueIncorrect - Click anywhere to continueIncorrect - Click anywhere to continueYou answered this correctly!You answered this correctly!
Your answer:Your answer:The correct answer is:The correct answer is:
You did not answer this question completelyYou did not answer this question completelyYou must answer the question before continuing
You must answer the question before continuing
Submit Clear
A) Device Index number specified on the C300 IOTA needs to be specified
B) 2 IOLINKs are automatically created
C) Only one IOLINK is automatically created for Series C I/O
D) 5ms Base Execution Period is supported for non-redundant C300 configuration
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
11
April 19, 2023
Topics
• Configuring the C300 and CEE
• Configuring IOLINKs
• Configuring IOMs
• Loading the C300, IOLINKs, and IOMs
• Activating the C300
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
12
April 19, 2023
IOLINK Configuration – Link 1
I/O Link number 1 Cable - Gray
I/O family selection
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
13
April 19, 2023
IOLINK Configuration – Link 2
I/O Link number 2 Cable - Violet
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
14
April 19, 2023
Configuring C300 Hardware
• The Control Processor Module (CPM) and its Control Execution Environment (CEE) are now configured but not yet downloaded
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
15
April 19, 2023
Question 2: IOLINK Configuration
Correct - Click anywhere to continueCorrect - Click anywhere to continueIncorrect - Click anywhere to continueIncorrect - Click anywhere to continueYou answered this correctly!You answered this correctly!
Your answer:Your answer:The correct answer is:The correct answer is:
You did not answer this question completelyYou did not answer this question completelyYou must answer the question before continuing
You must answer the question before continuing
Submit Clear
Correct! When configuring an IOLINK only one type of IO family can be connected to each IOLINK
i.e. Series C or PM IO, one type on each link.
Click anywhere to continue.
Correct! When configuring an IOLINK only one type of IO family can be connected to each IOLINK
i.e. Series C or PM IO, one type on each link.
Click anywhere to continue.
Incorrect. When configuring an IOLINK only one type of IO family can be connected to each
IOLINK i.e. Series C or PM IO, one type on each link.
Click anywhere to continue.
Incorrect. When configuring an IOLINK only one type of IO family can be connected to each
IOLINK i.e. Series C or PM IO, one type on each link.
Click anywhere to continue.
Incorrect. When configuring an IOLINK only one type of IO family can be connected to each
IOLINK i.e. Series C or PM IO, one type on each link.
Click anywhere to continue.
Incorrect. When configuring an IOLINK only one type of IO family can be connected to each
IOLINK i.e. Series C or PM IO, one type on each link.
Click anywhere to continue.
Which of the following items are specified during IOLINK configuration?A) Series C or PM IO, one type on each IOLINK
B) Series A I/O type
C) Whether Series C and PM IO is to be used on the same IOLINK
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
16
April 19, 2023
Topics
• Configuring the C300 and CEE
• Configuring IOLINKs
• Configuring IOMs
• Loading the C300, IOLINKs, and IOMs
• Activating the C300
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
17
April 19, 2023
Configuring Series_C_IO
Menu method
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
18
April 19, 2023
Configuring Series_C_IO, contd.
Control Builder automatically
names the IOM
21
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
19
April 19, 2023
Configuring Series_C_IO, contd.
IOM number
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
20
April 19, 2023
Assigning Series_C_IO
13
Assigned to CEE
2
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
21
April 19, 2023
Topics
• Configuring the C300 and CEE
• Configuring IOLINKs
• Configuring IOMs
• Loading the C300, IOLINKs, and IOMs
• Activating the C300
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
22
April 19, 2023
Loading the Controller, CEE, and IOMs
Not yet loaded
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
23
April 19, 2023
Verify that the items to load are checked
Note: You can decide to have the modules go to the active state automatically by clicking this checkbox with the Post Load State selected to be “Active”
Loading the Controller, CEE, and IOMs, contd.
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
24
April 19, 2023
Question 3: IOP Configuration
Incorrect. The assigned I/O modules appear under the IOLINK tree in Project tab.
Click anywhere to continue.
Incorrect. The assigned I/O modules appear under the IOLINK tree in Project tab.
Click anywhere to continue.
Correct! The assigned I/O modules appear under the IOLINK tree in Project tab.
Click anywhere to continue.
Correct! The assigned I/O modules appear under the IOLINK tree in Project tab.
Click anywhere to continue.
Incorrect. The assigned I/O modules appear under the IOLINK tree in Project tab.
Click anywhere to continue.
Incorrect. The assigned I/O modules appear under the IOLINK tree in Project tab.
Click anywhere to continue.
Correct - Click anywhere to continueCorrect - Click anywhere to continueIncorrect - Click anywhere to continueIncorrect - Click anywhere to continueYou answered this correctly!You answered this correctly!
Your answer:Your answer:The correct answer is:The correct answer is:
You did not answer this question completelyYou did not answer this question completelyYou must answer the question before continuing
You must answer the question before continuing
Submit Clear
Assigned I/O modules appear under:
A) Unassigned tree in Project tab
B) IOLINK tree in Project tab
C) Directly under the CEE tree in Project tab
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
25
April 19, 2023
Topics
• Configuring the C300 and CEE
• Configuring IOLINKs
• Configuring IOMs
• Loading the C300, IOLINKs, and IOMs
• Activating the C300
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
26
April 19, 2023
Activating a Control Strategy
Select LASTCOLD
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
27
April 19, 2023
Activating a Control Strategy, contd.
Click Yes
Blue: The object is not running (inactive)
Green: The object is running (active)
Red: Communication failure
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
28
April 19, 2023
Other C300 Configuration
• A Control Module is configured like a C200 Control Module, a sample is shown
• For more detail, please refer to the sample lab procedure
Series C I/O Channels
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
29
April 19, 2023
Summary
• When you configure and load C300 hardware and I/O in Control Builder, remember:
– Series C IOM number is set on the IOTA of the corresponding IOM using a numbered jumper plug
– The device index of C300 can be found on the rotary switches located in front of the C300 board
– Before loading the C300 controller, its Control Execution Environment (CEE) and IOLINKs:
• Configure the Controller, its CEE, and IOLINKs
• Define the I/O Family type on each IOLINK
• Assign the IOMs to the respective IOLINKs
– Activate the C300 from the CEE
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE
Honeywell
30
April 19, 2023
Conclusion
Describe C300 and Series C I/O Configuration
CompletionCompletionCertificateCertificate
Proceed to the next lesson in your course material
C300 Configuration Describe C300 and Series C I/O Configuration
EXP20R300 - EPKS CEE C200/C300/ACE