(050619) DVPL Presentation100819) DVPL Presentation.pdf · Integrated Infrastructure Development...
Transcript of (050619) DVPL Presentation100819) DVPL Presentation.pdf · Integrated Infrastructure Development...
GENERAL PRESENTATION PERFORM.
TRANSFORM
WE DO IT ALL
Building
Highway / Expressway
Railway Infrastructure
Water Supply
Electrification
1989 2012
Started Operations as M/s Patel Enterprises
Renamed as DEE VEE Projects Limited
Timeline
Leadership Team
• Mr. Dinesh Kumar Patel (Promoter and Whole Time Director) • Mr. Vikas Ranjan Mahto (Promoter and Whole Time Director) • Mr. Navin Patel (Promoter and Whole Time Director) • Mr. Vivek Ranjan Mahto (Whole Time Director) • Mr. Ashok Patel (Director) • Mr. Deepak Patel (Director) • Mr. Dheeraj Dubey (Director) • Mr. Ritesh Bhawnani (Director) • Mr. Gaurav Gupta (Independent Director) • Mr. Amit Sharma (Independent Director) • Mr. Anup Agarwal (President & COO ) • Mr. Sumit R Das (Vice President) • Mr. Avinash Bansal (Vice President) • Mr. Deep Patel (Vice President) • Mr. Prashant Singh (Vice President) • Mr. Hitesh Luna (Vice President) • Mr. Satish Kumar Sarawgi (CFO) • Mr. N V Subrahmanyam (CGM)
Directors
Business Management & Administration Units Business Management & Administration Units
Operating Work Divisions
R&D
Core Management Group
Auditing Group
Roads and Highways Division
Building Division
Railway Division
Water Supply Division
Marketing Division
Procurement Division
Financing & Accounting Division
Human Resource Division
Electrification Division
Organization Structure
Human Resources
1%
32%
4% 1%
62%
Taxation Audit
Recruitment Salary Administration Statutory Compliance
Financial Highlights
CRORE NETWORTH : 2017‐18
109.36
CRORE NETWORTH : 2018‐19
146.43 INR
INR
Financial Highlights
NET WORTH
Financial Highlights
CRORE 660
0
100
200
300
400
500
600
700
800
2016 ‐ 2017 2017 ‐ 2018 2018 ‐ 2019
INR Cr
Average Annual Turnover (2017~2019)
INR
No Loss Certificate
Financial Highlights
Plant & Equipment
Equipment Description Qty
Batching Plant (30 Cum / hr)
Computerized and Fully Automatic Concrete Batching plant of minimum 30Cum / hr. capacity Cement Silos for 2 (two) days capacity with direct feeding 08 Nos
Batching Plant (60 & 70 Cum / hr)
Computerized and Fully Automatic Concrete Batching plant of minimum 60Cum / 70Cum hr capacity with direct feeding 02 Nos
Batching Plant (112 Cum / hr)
Computerized and Fully Automatic Concrete Batching plant of minimum 112 Cum / hr capacity with direct feeding 02 Nos
Concrete Pump Concrete Pump with MS concrete Piping system for pumping 23 Set
Transit Mixer Capacity – 6 Cum 35 Nos
Crusher MESTO 250 TPH 01 No.
Plant & Equipment
Equipment Description Qty
Wet Mix Macadam Plant WMM Plant ( 100 – 120 TPH) 01 Nos.
Weigh Bridge 100 MT Capacity 08 Nos.
Earthmovers and Excavators
JCB 4DX (JCB HYDRAULIC - EXCAVATOR) 02 Nos.
JCB 3DX (JCB HYDRAULIC – EXCAVATOR\ 06 Nos.
EXCAVATOR (KOMATSU), Tata Hitachi, Hyundai, JCB) 10 Nos.
HYUNDAI POKLAIN (CHAIN MOUNTED) 215 01 Nos.
BACKHOE LOADER (JCB) 30 Nos.
Plant & Equipment
Plant & Equipment
Equipment Description Qty
Earthmovers and Excavators
L&T CASE 770 SS LOADER BACKHOE 14 Nos.
TATA HITACHI 110EX 03 Nos.
BOBCAT 12 Nos.
HYWA 45 Nos.
HYWA WITH WATER TANK 10 Nos.
ROLLER 1407 L&T (WIBRO) 12 Nos.
GRADER (CAT / CASE 120 H) 06 Nos.
CASE 1107 ROLLER 01 No.
Plant & Equipment
Equipment Description Qty
Earthmovers and Excavators
CASE 752 ROLLER 01 Nos.
CASE 50 DX MINI ROLLER 01 Nos.
BABY ROLLER 01 Nos.
SENSOR PAVER (GOMACO) 02 Nos.
MANUAL PAVER (UNISTEEL) 03 Nos.
Crane and Hydra
TOWER CRANE (POTAIN ) 06 Nos.
MOBILE TOWER CRANE ACE 04 Nos.
HYDRA CRANE (MODEL 14 XW) 06 Nos.
Plant & Equipment
Equipment Description Qty
Concrete Sensor Paver SENSOR PAVER – CONCRETE - WIEIGHTEN 01 Nos.
Bituminous Sensor Paver SENSOR PAVER - BITUMINOUS 03 Nos.
Hydra Hydra 10 Nos.
Boom Placer Boom Placer – Putzmeister 01 Nos.
DG Set Diesel Generator 50 Nos
HDD Machine Goodeng 06 Nos
Plant & Equipment
Equipment Description Qty
Hoist BUILDING HOIST 8 Nos.
MONKEY HOIST SAFARI 45 Nos.
Tractor TRACTOR 11 Nos.
Site Vehicles SUV, MUV, Sedan, Pick-up 30 Nos.
Shuttering Materials Shuttering material along with steel props, pipes, scaffolding cup lock system for all heights
100,000 sqm
Certificate
ISO 9001:2015 Building, Roads, Highways, Mechenical, Electrical, Structural, & Civil Engineering Works.
Certificate
ISO 14001:2015 Building, Roads, Highways, Mechanical, Electrical, Structural, & Civil Engineering Works.
Certificate
OHSAS 18001:2017 Building, Roads, Highways, Mechanical, Electrical, Structural, & Civil Engineering Works.
Our Esteemed Clientele
and the list is growing..
Bhopal, Shahdol,, Singrauli
Dhanbad
Raipur,, Korba, Bilaspur,
Ambikapur
Sundergarh
Nagpur, GondiaAmravati,
Bhandara
Project Locations
Office Locations
Offices : Head Office and Corporate Office Registered Office 1st Floor Vikas Complex, P.H Road, Korba ‐ 495677 (C.G.), Phone : +91 771 2972 580 Corporate Office Dee Vee Building , Maulshree Vihar, Raipur ‐ 492006 (C.G.), Phone : +91 7759 245 168
Project Details
Electrification Building Works Roads and Highways Works
Railway Infrastructure
Water Supply
Synopsis of
EXISTING PROJECTS
Project Location Client Construction Period
Value (INR Cr)
Medical College Building at Ambikapur, CG Ambikapur, CG CGPWD Mar'2019 ~ Mar'2021 336.42
Face Lifting and Renovation of 'F' Type Buildings (87 Buildings) in Colony at CSTPS, Chandrapur, MH Chandrapur, MH MSPGCL, MH Jan'2019 ~ Jul'2020 37.32
Face Lifting and Renovation of 'F' Type Buildings (116 Buildings) in Colony at CSTPS, Chandrapur, MH Chandrapur, MH MSPGCL, MH Jan'2019 ~ Jul'2020 34.46
Execution of Casting of Precast RCC Boxes and making them available near the Bridges at nominated places in connection with rebuilding of Stone Slab Bridges in KBJ‐LAE Section Of
E.CO. Railway in Chhattisgarh and Odisha State, India
Raipur, CG DGM, Raipur, CG Dec'2018 ~ Mar'2020 16.82
Synopsis of Existing Projects (1/6)
Synopsis of Existing Projects (2/6)
Project Location Client Construction Period
Value (INR Cr)
Balance Civil Renovation Work for Mining Engineering, CentralLibrary, Metallurgical & Chemical Engineering, Civil Engineering,Electronics & Communication Engineering, MechanicalEngineering, Admin Block, Deshpande Auditorium, ElectricalSubstation, (Hostel 1‐6), Rain Water Harvesting System,Horticulture & Landscaping, Road, (Package‐I) at B.I.T. Sindri,Dhanbad, Jharkhand
Dhanbad, JH Engineering Projects (I) LTD Oct'2018 ~ Jul’2019 23.04
Civil & associated Works of Road Works for 4 Lane with pavedshoulder configuration of Bilaspur to Pathrapali (Km 00+000 To Km53+300) Section Of NH 111 (New NH‐130) in the State OfChhattisgarh, India
Bilaspur, CG ADANI Infra Feb'2019 ~ Aug'2020 304.48
Beautification of Ranisagar and Bhuthsagar Lake at Rajnandgaon,CG Rajnandgaon, CG
Municipal Corporation, Rajnandgaon,
CG Sept'2018 ~ Mar'2020 17.04
Construction of 118 Nos. Sr. HIG (Duplex), 38 Nos. HIG (Duplex), 54Nos. Jr. HIG (Duplex), 123 Nos. Sr. MIG (Duplex), & 122 Nos. Jr.MIG (Duplex) at Sector‐12, Naya Raipur i/c External DevelopmentWorks at Sector‐12, Naya Raipur (Phase‐I), CG
Raipur, CG CGHB Aug'2018 ~ Feb'2021 149.82
Construction of House and Development of Infrastructure forIdentified Slum Localities in Indore, M.P. under PMAY at Rau NearSilicon City, MP
Indore, MP Municipal Corporation, MP Jul'2018~ Jul'2020 388.30
Synopsis of Existing Projects (3/6)
Project Location Client Construction Period
Value (INR Cr)
Construction of Dipka‐Jawali‐Chakabuda Road in KM 1/2 To KM15/2 (100) = 14.10 KM i/c Hume Pipe Culverts Korba, CG CGPWD Jul'2018 ~ Jan'2020 33.31
Construction of Head Quarter Building, Western Region‐II, NTPCLtd. at Sector‐24, Naya Raipur, CG Naya Raipur, CG NRDA, CG Jun'2018 ~ Jul'2019 70.07
Construction of 50 HIG Duplex ,18 Sr. MIG Duplex, 31 Jr. MIGDuplex, 52 LIG Duplex & 160 EWS (G+3) Flats i/c internal W/S, S/F,E/F & all related Infrastructure Development Work & ExternalDevelopment Work under Atal Vihar Yojna at Jhagarha, KorbaDistrict, CG
Korba, CG CGHB May'2018 ~ May'2020 40.95
Construction of Head Office Building of Chhattisgarh Rajya GraminBank at Naya Raipur, CG Naya Raipur, CG CGRB Apr'2018 ~ May'2019 4.74
Demolition, Land Development & Boundary Wall Repair Works(Package‐I) at Sindri, Jharkhand Sindri, JH PDIL Feb'2018 ~ May'2019 55.19
Construction of Education Hub Phase‐II i/c Development Work atBlock Katghora, CG Korba, CG CGHB Jan'2018 ~ Jan'2020 63.53
Construction & Commisioning of balance Canal Work i/c CrossDrainage structures and design of Gosikhurd National Project inBhandara, Narela (MH), Package‐I, NBCC
Bhandara, MH NBCC Sept''2017 ~ Jul'2019 332.97
Synopsis of Existing Projects (4/6)
Project Location Client Construction Period
Value (INR Cr)
Re‐habilitation and up‐gradation of Korchi‐Chichgad‐Deori‐Amgaon‐Gondia from existing Km 180+330 of SH‐276 (on413+540 NH‐53, Deori) to KM 213+330 of SH‐249 (Amgaon)(Design KM 0.000 to KM 38.000) Section of National Highway toTwo lane with paved shoulders on EPC Mode in the State ofMaharashtra
Deori, MH NH‐PWD, MH Aug'2017 ~ Aug'2019 288.5
Construction of GAD Houses i/c Development Work for Govt.Officers and Employees at various 5 Block level offices ForDistrict Korba, CG
Korba, CG CGHB Aug'2017 ~ May'2019 23.93
Construction Of GAD Houses i/c Development Work for Govt.Officers and Employees at All Block Head Quarters of DistrictKoriya, CG
Koriya, CG CGHB Jul'2017 ~ Jun'2019 24.18
Rehabilitation and Up‐gradation Of NH‐111 (New NH‐130) fromKM 163.400 to KM 215.800 (Shivnagar to Ambikapur) to 2‐Lanewith Paved Shoulder (Value 223.89 Cr, DEE VEE 49% = 109.70 Cr& GAWAR 51% = 114.18 Cr)
Shivnagar‐Ambikapur, CG National Highway Zone
PWD, Raipur, CG
Jun'2017 ~ Jun'2019 109.70
Construction of 674 EWS, 436 MIG and 108 HIG ResidentialTenements on land bearing survey No. 47, 57 and 58 at MaujaAkoli, Dist.‐Amravati, MH
Amravati, MH AHAADB, Amravati, MH Jun'2017 ~ Dec'2019 139.83
Construction & External Development of Inter State BusTerminal at Raipur, CG Raipur, CG UADD, CG Mar'2017 ~ May'2019 43.21
Synopsis of Existing Projects (5/6)
Project Location Client Construction Period
Value (INR Cr)
Two Laning with hard shoulder of Tara‐Premnagar‐Ramanujnagar road section from existing chainage KM 0.000 ToKM 50.312 (Design Chainage From Km 0.000 To Km 50.242) inthe State of Chhattisgarh on EPC Mode. (GAWAR ‐ Rs. 54.18 Cr &DEE VEE ‐ Rs. 50.29 Cr)
Tara‐Premnagar‐Ramanujnagar, CG CGRDC Feb'2017 ~ Jun'2019 50.29
Construction of Art & Cultural Centre and Conventional Hall atKorba, CG Korba, CG CGHB Feb'2017 ~ May'2019 14.97
Construction of Houses and Development of Infrastructure underPMAY, Singrauli Municipal Corporation, MP Singrauli, MP Municipal Corporation Singrauli, MP Dec'2016 ~ May'2019 197.16
Integrated Infrastructure Development work for Sector‐24 (Part‐A Phase‐II) Naya Raipur, CG Naya Raipur, CG NRDA, CG Dec'2016 ~ Jun'2019 71.37
Renovation work for various building (Pkg‐III) at B.I.T. Sindri,Dhanbad, Jharkhand Dhanbad, JH Engineering Projects (I) LTD Nov'2016 ~ May'2019 19.93
Synopsis of Existing Projects (6/6)
Project Location Client Construction Period
Value (INR Cr)
Construction of Degree Collage Shahdol to University Shahdol,Distt Shahdol, MP i/c Water Supply, Sanitary Fitting andElectrification,
Shahdol, MP MPPWD Sept'2016 ~ May'2019 38.56
Township Package for Darlipali Super Thermal Power Project,Stage‐ I (2X800 MW) near Jharsuguda, Odisha Darlipali, OR NTPC LTD Aug'2016 ~ Jun'2019 167.90
Construction of Engineering College at Chatwai, Distt‐Shahdol,MP i/c Water Supply, Sanitary Fitting and Electrification Shahdol, MP MPPWD Sept'2016 ~ Jun'2019 30.37
Construction of New Medical College and up‐gradation of Hospital at Shahdol, MP
Shahdol, MP MPRDC Jan'2016 ~ May'2019 201.47
Synopsis of
COMPLETED PROJECTS
Synopsis of Completed Projects (1/6)
Project Location Client Construction Period
Value (INR Cr)
Airport Highway (V.I.P. Road) Widening Contract, Raipur,CG Raipur, CG UADD, CG May'2016 ~ Sept'2018 67.87
Construction of Girls Hostel for IIIT at Naya Raipur, CG Naya Raipur, CG NRDA, CG Nov'2017 ~ Aug'2018 7.00
Construction of Commercial Retail (Formal & Informal) i/cBuildings and Services on Plot No. E04, E05, E09 & E10 ofPhase-1, CBD Complex, Sector 21 at Naya Raipur, CG
Naya Raipur, CG NRDA, CG Dec'2014 ~ Jul'2018 121.59
Supply and Stacking of balance quantity of Ballast betweenTitlagarh-Lakhna Section of Sambalpur Division of E.Co.R inOdisha, India, in connection with Raipur-Titlagarh Doubling.
Titlagarh-Lakhna Sec. of Sambalpur Div., OR RVNL Oct'2016 ~ Jun'2018 18.45
Synopsis of Completed Projects (2/6)
Project Location Client Construction Period
Value (INR Cr)
Construction of Civil Works i/c Earthwork in formation for Embankment and Cutting, Blanketing, Culverts, Major & Minor Bridges and other Ancillary Works from KM 98.860 to KM 134.660 and Flyover Line from KM 128.000 to KM 135.200 (Pkg-I) in connection with the construction of New BG Electrified Double Line in the State of Chhattisgarh over SECR East-West Corridor–Gevra Road-Pendra Road via Dipka, Kathghora, Sendurgarh and Pasan. (DEE VEE-GAWAR (JV)) (Value 197.54 Cr, DEE VEE: 70%=138.28 Cr & GAWAR: 30%=59.26 Cr)
Gevra Road-Pendra Road, CG IRCON Jul'2016 ~ Jun'2018 80.97
Execution of all P.Way works (Excluding PF shelter & FOB), Supply of Ballast and misc. Civil works i/c supply and transporting of P.Way material in ARN (Ex)-BLSN (in) section and ANMD yard of Sambalpur division of E.Co.R. in the State of Chhattisgarh, India, in connection with Raipur-Titlagarh Doubling Project.
Raipur, CG RVNL Nov'2016 ~ May'2018 24.73
Rehabilitation and up-gradation of NH-43 from KM 241.00 to KM 298.00 (Dahikonda to Jagdalpur ) in the State of Chhattisgarh to Two-lanes with Paved Shoulders under NHDP-IV on EPC Basis. (Barbric-DEE VEE (JV) TotalAmount 175.99 Cr. DEE VEE-60%=105.5 Cr & Barbric-40%=70.39 Cr)
Dahikonda to Jagdalpur, CG NHDP Mar'2015 ~ May'2018 176.55
Synopsis of Completed Projects (3/6)
Project Location Client Construction Period
Value (INR Cr)
Construction of Commercial Office Campus i/c buildings andservices on Plot No. C03 of Phase-1, CBD Complex, Sector21 at Naya Raipur, CG
Naya Raipur, CG NRDA, CG Dec'2014 ~ Apr'2018 153.26
Construction of Chhattisgarh State Judicial Academy Bhawanat High Court, Bodri, Bilaspur, CG Bilaspur, CG PWD, Bilaspur, CG Aug'2014 ~ Mar'2018 171.41
Construction of New Civil at Visveswaraya National Instituteof Technology, Nagpur, MH Nagpur, MH NBCC Sept'2015 ~ Feb'2018 189.86
Construction of 1 no. ROB and 5 no. RUB (full height andlimited height) and allied work in connection withconstruction of New Rail Line between Mandirhasaud-Nayaraipur-Kendri, CG
Mandirhasaud-Nayaraipur-Kendri, CG SECR-Bilaspur Apr'2016 ~ Oct'2017 18.21
Rehabilitation and up-gradation of NH-43 from KM 81.50 to KM 130.00 (Dhamtari to Kanker) in the State of Chhattisgarh to Two-lanes with Paved Shoulders under NHDP-IV on EPC. (Barbric-DEE VEE (JV)) (Value 135.99 Cr, DEE VEE: 40%=54.40 Cr & Barbric: 60%=81.59 Cr)
Dhamtari to Kanker, CG NHDP Mar'2015 ~ Jun'2017 54.39
Synopsis of Completed Projects (4/6)
Project Location Client Construction Period
Value (INR Cr)
Construction of 12 HIG Type-II, 47 Sr. MIG Type-II, 57 Jr.MIG Type-II, 150 LIG Type-II, & 272 EWS Type-I for AtalVihar Yojna at Chilhati, Bilaspur, CG
Chilhati, CG CGHB Jul'2014 ~ Mar'2017 30.80
Construction of Forest Department building at North block,Sector-19 of Naya Raipur, CG Raipur, CG NRDA, CG Feb' 2015 ~ Feb'2017 38.92
C.G.H.B. 30 Acre Land Development Work at Urga, Dist-Korba, CG Korba, CG CGHB Sept'2013 ~ Apr'2016 12.31
Construction of Paryavas Bhawan (Composite Building) ofSector-19 at Naya Raipur, CG Naya Raipur, CG NRDA, CG Mar'2013 ~ Apr'2016 61.59
Construction of 24 No. HIG -II, 131 No. Sr. MIG-II, 131 No. Jr.MIG-II, 90 No. LIG-II & 432 No. EWS (G+3), Total 808 No.Houses i/c W/S, S/F, Electrification Works at Atal Vihar Urga,Korba, CG
Korba, CG CGHB Sept'2013 ~ Mar'2016 39.98
Construction of Cement Concrete road in KM 1 to 23/4 = 22.40KM of Dipka to Pali Road i/c Bridge and Culverts, CG Dipka to Pali, CG PWD, Korba, CG Aug'2013 ~ Dec'2015 61.89
Constrution of 688 EWS and 510 LIG houses dwelling unit withRCC Framed Structure under Atal Vihar Yojana at ParsadaKumhari, Disst. Durg, CG
Durg, CG CGHB Sept'2013 ~ Oct'2015 33.39
Synopsis of Completed Projects (5/6)
Project Location Client Construction Period
Value (INR Cr)
Construction of 34 No. HIG (Premium), 144 No. HIG(Duplex), 176 No. Sr. MIG, 176 No. Jr. MIG, 320 No. EWS(G+3), 432 No. LIG (S+6), 144 No. HIG (S+6), CommercialComplex (G+4) & Club House, Water Supply i/cElectrification Work at Sector-29, Naya Raipur, CG (Group-A)
Naya Raipur, CG CGHB Feb' 2012 ~ Apr'2015 209.19
Construction of Cement Concrete Road in KM 9/2 to 13/10 =5.00 KM on Ring Road Korba (Godhi To Risdhi), Korba, CG Korba, CG PWD, Korba, CG Sept'2013 ~ Jan'2015 9.09
Construction of Police Head Quarter at Naya Raipur, CG Naya Raipur, CG NRDA, CG Nov'2012 ~ Dec'2014 49.63
Construction of Cement Concrete Road in KM 1 to KM 8 =8.00 KM on Barbaspur to Godhi Road (Ring Road Korba) i/cHume Pipe Culverts, CG
Korba, CG PWD, Korba, CG Mar'2013 ~ Dec'2014 19.31
Construction of 35 HIG-I Delux Duplex, 20 HIG-II DeluxDuplex, 64 HIG- II Std., 38 MIG Duplex, 7 MIG, 65 LIG(Total 229) House at Hasdev Vihar Janjgir i/c Water Supply,Internal Electrification& Balance Development Work, Korba,CG
Korba, CG CGHB Sept'2012 ~ Aug'2014 26.61
Construction of 32 HIG (Duplex), 63 Sr. MIG (Duplex), 576MIG (S+6), 144 HIG (S+6) & Commercial Complex underComposite Housing Scheme at Sector-29 Naya Raipur,CG(Group-B)
Naya Raipur, CG CGHB Dec'2011 ~ Jun'2014 125.22
Synopsis of Completed Projects (6/6)
Project Location Client Construction Period
Value (INR Cr)
Construction of Naya Raipur Capital Complex-Lake (Rakhi)front development under Conservation & Development ofWater Bodies under the Head of 13th Finance Commission
Naya Raipur, CG NRDA, CG Apr'2012 ~ Mar'2014 26.02
Construction of 52 No. HIG (Duplex), 152 No. Sr. MIG, 72No. HIG (S+6), 256 No. HIG (S+8) and CommercialComplex (G+2) and Community Hall i/c Water Supply andInternal Electrification at Sector-29 Naya Raipur, CG (Group-C)
Naya Raipur, CG CGHB Dec'2011 ~ Feb'2014 124.8
Construction of New Composite Building at Bilaspur, CG Bilaspur, CG PWD, Bilaspur, CG Jun'2012 ~ Dec'2013 14.82
Construction of 168 (G+2) Deendayal Awas House and 84EWS (G+2) at Kharmora, Korba, CG Korba, CG CGHB Apr'2012 ~ Sept'2013 7.89
Constrution of Institute of Tecnology Building at Korba i/cWater Supply, Sanitary fitting, Electrification with ApproachRoad, Korba, CG
Korba, CG PWD, Korba, CG Jan'2011 ~Sept'2012 26.94
Quality Policy
VISION To be the preferred source of quality construction services while building a most favorable and successful organization. MISSION • To specialize in all segments of construction activities. • To provide quality project supervision and workmanship through recruitment, training and systems support. • To foster a corporate culture where our employees have a safe, respectful and rewarding work environment. • To deliver projects on schedule and on budget • To maximize the utilization of resources • To seek business opportunities that optimize our multi-disciplinary capabilities. QUALITY STATEMENT We are committed to providing quality work to our customers that meets the project standards and specifications for materials, workmanship, schedules while maintaining Profitability and competitiveness. We seek to achieve quality by instilling the principle of “Trust to Last” in the efforts of all levels of staff. We ensure continual improvement through quality processes which are directed by a strong management team.
HSE Policy
STATEMENT OF POLICY It is the policy of our company to perform work in the safest possible manner consistent with the Health & Safety Act and Regulations for Construction Projects. It is our belief that every employee in the construction industry is entitled to work in a safe and healthy construction environment. Every reasonable precaution shall be taken to provide such an environment. Our goal is to eliminate or minimize the hazards that cause accidents and injuries. Any accident in this company shall be viewed as a serious matter and shall be thoroughly investigated. POLICY COMMITMENT Copies of this policy must be posted, distributed and explained to all workers. Compliance with this policy will be reviewed regularly at all employee levels. Violations will be recorded. Repeated disregard or willful violations of this policy by any subcontractor or employee at any level may be considered cause for discipline in accordance with the Company Rules and existing laws.
PROJECTS GLIMPSES
If one needs to succeed in the construction industry, one needs to be committed & pay attention to detail. There is also a need to be resolute in one's work ethic.
Constructing Success Committed to Superior Quality, Safety and Timely Completion.
Visit us at www.dvplindia.in