Pearl GTL Project
LINDE ENGINEERING
Shell Project No: HP-3000-QAT Contractor Project No : 5887
Project Document Number: T- 4.250.924 Project Rev.: C Page 2 of 17
Purchase Order Number:
2MH127
Tag/Item Number(s): N/A
Unit(s): ASU
PCWBS: Z
QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION
J C 14.02.09 Company Comments Incorporated SK EO AG CCI
I C 17.01.09 Issued for Review (As Required) SK EO AG IFR
H
C
04.12.08 Ready for Construction SK EO AG RFC
G B 29.10.08 Issued for Review FB EO AG IFR
F B 28.10.08 Issued for Review FB EO AG IFR
E B 17.09.08 Issued for Review SK EO AG IFR
D A 28.06.08 Ready For Construction FB EO AG RFC
C O 30.03.08 Issued for Company comments BR UA ZG ICC
B 15.03.08 Issued for Review BR UA ZG IFR
A 10.03.08 Issued for Internal Review BR UA ZG IIR
C O 30.03.08 Issued for Company comments BR UA ZG ICC
GAMA Rev.
Project Rev
Date Description Prepared
By Checked
By
Approved By
Status
No. No. ORIGINATOR
LINDE ENGINEERING AG
Document Title:
ITP FOR VESSEL AND COLUMNS
Contractor
Gama Qatar Co. W. L. L.
Document No.
LOC470 GAM ITP QAC GTL 037 J
Org.
Code
Doc.
Type
Disc. Code
Geogr. Area
Seq.
No
Rev. No
Vendor Code
Project Document Number: T-4.250.924
Rev No: C
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-037
C2 ASU Construction Works
ITP FOR VESSELS & COLUMNS DATE: 14.02.2009 REV. J
S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item Activity Test
Frequency Reference Document Acceptance Criteria
Responsible Party
Verifying Documents S X C A
T-4.250.924 Rev. C Page 4
1.0 DOCUMENTATION
1.1 Contractor drawings, project specifications, manuals, codes
100% - - TECHINICAL
OFFICE - H R R
1.2 Lifting studies (For Heavy Equipments)
100%
T.4.234.084 - HSSE - H H W
2.0 EQUIPMENT
2.1
Equipment identification and name plate verification
100% T.4.250.947
Approved Name plate drawings
STORE
INCHARGE GAM-QCR-QAC-GTL-080 I S S
2.2 Receiving inspection
100% T.4.250.927;T.4.250.947
Approved drawing
Vendor Instruction Manual
STORE
INCHARGE GAM-QCR-QAC-GTL-080 I I S
2.3 Storage, preservation and documentation(FSI)
100% T.4.250.932; T.13.377.803
Approved drawing,
DEP 70.10.70.11,
T.13.377.454E,T.13.376.921
Vendor instruction Manual
FSI GAM-QCR-QAC-GTL-069 I I S
3.0 INSTALLATION
3.1
Foundation complete (including anchor bolts, chipping pocket depths etc.) and
accepted
100% T.4.250.947
Approved drawing, DEP 34.19.20.31;T.13.376.358
QCI MC Check Record
3.2 Ref. Item code 3.1
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-037
C2 ASU Construction Works
ITP FOR VESSELS & COLUMNS DATE: 14.02.2009 REV. J
S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item Activity Test
Frequency Reference Document Acceptance Criteria
Responsible Party
Verifying Documents S X C A
T-4.250.924 Rev. C Page 5
3.3 Ref. Item code 3.1
3.4 Shims installation 100% T.4.250.947 Approved Drawings
Vendor Instructions QCI
GAM-QCR-QAC-GTL-122 I I I
3.5 Leveling and orientation 100% T.4.250.947:T.13.377.803
Approved drawings and Vendor Instructions;
0100-W-SP-1301
QCI GAM-QCR-QAC-GTL-122 GAM-QCR-QAC-GTL-115
H I S
3.6 Horizontality / Verticality 100% T.4.250.947
Vendor Instruction Manual, Approved Drawings
0100-W-SP-1301
QCI GAM-QCR-QAC-GTL-122 GAM-QCR-QAC-GTL-115
I I S
3.7 Anchor Bolts Tightening 100% T.4.250.947
Vendor Instruction Manual: Approved Drawings;
DEP 34.19.20.31
QCI GAM-QCR-QAC-GTL-122 GAM-QCR-QAC-GTL-041
I I I
3.8 Settlement monitoring 0% T-4.250.947 Vendor Instruction Manual QCI Refer T-4.250.947
Clause 13.7
3.9 Grouting 100% T.4.250.545
DEP34.19.20.31,
T.13.376.358;Manufacturer Instructions
QCI GAM-QCR-QAC-GTL-025 I I S
3.10 Temporary earthing 0% T-4.250.947 Approved drawings QCI Refer – T-4.250.947
3.11 Deleted
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-037
C2 ASU Construction Works
ITP FOR VESSELS & COLUMNS DATE: 14.02.2009 REV. J
S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item Activity Test
Frequency Reference Document Acceptance Criteria
Responsible Party
Verifying Documents S X C A
T-4.250.924 Rev. C Page 6
3.12 Internal parts and accessories Installation
0% DELETED
3.13 Leak Testing of Internals 0%
3.14 Fillings Deleted- not in Gama Scope-
3.15 Nozzle flange face inspection (prior to piping connection)
QCI Refer ITP-033; clause 7.2
3.16 Piping connection and blind installation including piping alignment to vessel
QCI Refer ITP-033; clause 7.2
3.17 External accessories (Platforms/Ladders, etc.)
QCI Refer ITP-026
3.17.1 Accessories welding 100% Applicable WPS IFC Drawings QCI GAM-QCR-QAC-GTL-161 I S S
3.18 Equipment If any Damage during installation
100% T.4.250.947 - QCI GAM-QCR-QAC-GTL-127 I I R
4.0 FINAL INSPECTION
4.1 See clause 3.15
4.2 Internal Cleaning (FSI) Refer ITP-033 clause 7.15
4.3 Refer ITP-033; clause 7.21
4.4 Permanent Gasket for
Manhole 100% T.4.250.947
Approved drawing ,Vendor Manual Instructions
0100-W-SP-2001
QCI GAM-QCR-QAC-GTL-122 H W I
4.5 Final Internal inspection prior to Vessel Closure
100% T.4.250.947; T.4.250.943 DEP 61.10.08.11; QCI GAM-QCR-QAC-GTL-122 H W W
QSGTL PEARL PROJECT
Document No.: GAM-ITP-QAC-GTL-037
C2 ASU Construction Works
ITP FOR VESSELS & COLUMNS DATE: 14.02.2009 REV. J
S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)
I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)
Item Activity Test
Frequency Reference Document Acceptance Criteria
Responsible Party
Verifying Documents S X C A
T-4.250.924 Rev. C Page 7
4.6
Installation Satisfactorily
Completed (Excluding
painting & Insulation)
100% T.4.250.947
Approved drawing ,Vendor Manual Instructions
QCI GAM-QCR-QAC-GTL-122 I I S
4.7 General Punch List (Clearing) 100% T-4.250.947 - QCI Linde Punch List H H R
4.8 Equipment Final Closure 100% T-4.250.947 - QCI GAM-QCR-QAC-GTL-133 H H I
4.9 Compile documentation /
Records for hand over. 100% T.4.250.947 T.13.377.355G QCI ALL REPORTS H H R
GROUT POUR CARD (PRE/POST POUR)
C2-ASU GTL PROJECT
Form No: GAM-QCR-QAC-GTL-025 Rev. O Inspection Gr.:
ITP No.: Laboratory:
Record No: Date:
TAG NO.: LOCATION:
DESCRIPTION: DRAWING:
TYPE OF GROUT: QUANTITY OF GROUT:
Item
No.
TYPE OF ACTIVITY
GAMA - QC CONTRACTOR COMPANY THIRD PARTY REMARKS
Signature Date Signature Date Signature Date Signature Date
1.0 Setting Out
2.0 Concrete Surface Preparation
3.0 Equipment / Surface Alignment 4.0 Formworks
5.0 Isolation Joint N/A N/A N/A N/A N/A N/A N/A N/A
6.0 Metal Surface Preparation
7.0 Mixing / Placing / Finishing of Grout (1)
8.0 Curing of Grout (1)
9.0 Removal of Shims N/A N/A N/A N/A N/A N/A N/A N/A 10.0 Mixing / Placing / Finishing of Grout (2) 11.0 Curing of Grout (2)
12.0 Sealant to Isolation Joint N/A N/A N/A N/A N/A N/A N/A N/A
13.0 Final Inspection Remarks:
Name Date Signature
GAMA QATAR
CONTRACTOR (Linde)
QSGTL or its PMC
GAM-QCR-QAC-GTL-041 Rev. O
C2 ASU PEARL GTL PROJECT
RASLAFFAN INDUSTRIAL CITY
BOLT TIGHTENING INSPECTION REPORT
Subcontract Ref.: Report No.:
Item Description: Inspection Date:
Item Location / Area:
Test Code No.:
Subsystem: ITP No.:
Ref. DWG / Docs:
Used Measuring and test equipment ref. (if applicable):
INSPECTIONS
Item No/Spool No
Mark No./Joint No Bolting Bolt Tightening (Torque Value)
Inspector’s Signature Grade Size
ORGANIZATIONS DATE NAME SIGNATURE
Accepte
d B
y THIRD PARTY REP.
GAMA REP.
LINDE REP.
QSGTL OR its PMC REP.
PROJECT: C2 ASU PEARL GTL PROJECT, RAS LAFFAN INDUSTRIAL CITY
EQUIP. TAG.NO.: DESCRIPTION: LOCATION:
MANUFACTURER: DRG.NO.: RFI NO:
MONTH
1 2
3 4 5 6
7
8
9
10
11
12
ACTIVITY Month
Date Checked
Check all internal and accessories storage is acceptable
Visual Check : Is there any damage
Check for protective covers on all the openings
Check all warning labels,like N2 warning plate are existent
Actual Pressure level
Required Pressure Level
GAMA SIGN WITH DATE
LINDE SIGN WITH DATE
QSGTL or its PMC
NOTE:
GAM-QCR-QAC-GTL-069 Rev. O
STORAGE, PRESERVATION AND NITROGEN PURGING REPORT
FORM NO:
SHT:
C2 ASU PEARL GTL PROJECT
RAS LAFFAN INDUSTRIAL CITY
GAM-QCR-QAC-GTL-080 Rev. O
EQUIPMENT RECEIPT CHECK SHEET
ITEM No: PO No: REQ No:
UNIT No: MANUFACTURER :
ITEMS TO BE CHECKED INSPECTOR
INITIAL REMARKS
1 Name Plate
2 Preparation and painting
3 Desiccant installed
4 Moisture present
5 Nozzle flange faces acceptable
6 Temporary nozzle protection acceptable
7 Internals and accessories complete and storage acceptable
8 Purge - pressure:
Purge monitoring date: Pressure
Date of initial inspection:
Name and signature of Inspector:
GAM-QCR-QAC-GTL-115 Rev. O PAGE 1 OF 2
EQUIPMENT LEVELLING & ALIGNMENT REPORT
Report No:
Date:
PROJECT: C2 ASU PEARL GTL PROJECT-RAS LAFFAN INDUSTRIAL CITY
Tag No: Manufacturer: Drg. No:
Equip. Description
No. of reading Orientation Elevation Plumpness Tolerance Remarks
ORIENTATION : ACCEPTED REJECTED
LEVELLING REQUIRED ACTUAL ACC REJECTED
GRADIENT / SLOPE
REQUIRED
ACTUAL ACC REJECTED
GAM-QCR-QAC-GTL-115 Rev. O PAGE 2 OF 2
REMARKS: …………………………………………………………………………………………………….. …………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………… ……………………………………………………………………………………………………………………
GAMA LINDE QSGTL or its PMC
Name
Sign
Date
C2 ASU PEARL GTL PROJECT
RAS LAFFAN INDUSTRIAL CITY
COLUMN / VESSEL INSTALLATION PROCESS SHEET
Item/Tag No: Report No:
Item Description: Date:
Drawing No: Area:
System No: Sub System:
Item No
Description
Signature & Date
Gama Linde QSGTL
1. Foundation complete, level & accepted
2. Shim & Set
3. Erection
3.1 Orientation correct
3.2 Elevation correct
3.3 Vessel plump
3.4 Anchor bolts tight
3.5 Grouted
4. Internals inspected
5. Cleanliness checked
Remarks:
The Installation of the above Equipment has been satisfactorily completed in accordance with the Drawings & Specifications
ORGANIZATIONS
DATE NAME SIGNATURE
GAMA QATAR REP
LINDE REP
QSGTL REP
GAM-QCR-QAC-GTL-122 Rev. O
QQQ AAA TTT AAA RRR
PROJECT: C2 ASU PEARL GTL PROJECT –RAS LAFFAN INDUSTRIAL CITY
Originator Date of observation:
Discipline:
Location / Area:
Unit No :
SYSTEM NUMBER:
Drawing / Specification Numbers
Description of Discrepancy/Observation (Be specific, events, time, date, location, etc :)
Corrective Action:
Originator: Name: _____________________________Signature: _____________________Date: ________________
NCR Required YES NO (Circle one) CTQ to Contractor Required YES NO (Circle one) Remarks if any: Site Engineer: Name: _______________________ Signature: ________________ Date: ______________ QA/QC Manager: Name: _________________________ Signature: _______________ Date: ______________
Discrepancy Corrected/Remarks: GAMA Representative: Name: ____________________ Signature: ______________ Date: ________________
Close-out of Corrective Action - Remarks: NCR No.: ___________________ CTQ No: ______________ Site Engineer: Name: ___________________ Signature: __________________ Date: ___________
DISTRIBUTION (Original QA/QC file)
QA/QC Manager Site Manager
Site Engineer Project Manager
Construction Manager Originator
GAM-QCR-QAC-GTL-127 Rev. O
SITE INSPECTION REPORT
REPORT NO.:
DATE:
C2 ASU PEARL GTL PROJECT RAS LAFFAN INDUSTRIAL CITY
Equipment Box-Up Acceptance Sheet
Report No:
Date:
Area:
QQQ AAA TTT AAA RRR
It is hereby certified that the Equipment referenced has been mechanically completed in accordance with Drawings, Specifications, Inspection and Test Records. The referenced Equipment is ready for box-up.
Equipment No
Equipment Designation
Vendor / Manufacturer
PID No
C h e c k l i s t Accepted GAMA
Accepted VENDOR
Accepted LINDE
Accepted QSGTL
1 Name Plate, CE-marking (if applicable)
2 Internals installed
3 Internal piping installed
4 Fillings completed
5 Refractory completed
6 Internal transport protection removed
7 Equipment internally clean and dry
8 Nozzles / manholes closed acc. drawing
9 Specified blind flanges installed
10 Specified nozzle gaskets installed
11 Specified bolts and nuts installed
12 Specified torques applied
13 Bolts lubricated (covers, manholes)
14
Remarks /
ORGANIZATIONS
NAME
DATE
SIGNATURE
GAMA
VENDOR
LINDE
QSGTL or its PMC
GAM-QCR-QAC-GTL-133 Rev. O
Welder
ID
1
Visual
InspectionLocation RemarksWPS No
VISUAL INSPECTION REPORT FOR EQUIPMENT/STRUCTURAL STEEL
Date of
Acceptance Visual
Inspection
Name :
Project Name : ASU C2 PEARL GTL PROJECT Date :
Report No :
SL
No
GAM-QCR-QAC-GTL-161 REV. O
ProcessEquipment TypeName of Welder
Company / PMC QCLINDE QC
Date :
Note: Acceptence Criteria-
Prepared By Checked By: GAMA QATAR QC
Signature :