SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES INSPECTION & TEST PLAN FOR ELECTRICAL Job No. : 99012 Doc No. : INSP 99012 999 8700 0004 Page : 1/23 Rev. 4 SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE) EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES INSPECTION & TEST PLAN FOR ELECTRICAL 4 07/01/0 1 ISSUE OF APPROVED FINAL DOCUMENT M. G. KIM S. Y. KIM S. K. AN 3 21/12/0 0 ISSUE OF APPROVED FINAL DOCUMENT M. G. KIM S. Y. KIM S. K. AN 2 20/12/9 9 APPROVED FOR CONSTRUCTION M. G. KIM S. Y. KIM Y. H. KIM 1 17/11/9 9 APPROVED FOR CONSTRUCTION M. G. KIM S. Y. KIM Y. H. KIM 0 30/09/9 9 ISSUED FOR APPROVAL M. G. KIM S. Y. KIM Y. H. KIM REV. DATE DESCRIPTION BY REVIEWED APPROVED

description

Inspection and test plan

Transcript of Electrical ITP

Page 1: Electrical ITP

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)

EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

INSPECTION & TEST PLAN FORELECTRICAL

Job No. : 99012Doc No. : INSP 99012 999 8700 0004

Page : 1/23

Rev. 4

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLANFOR

ELECTRICAL

4 07/01/01 ISSUE OF APPROVED FINAL DOCUMENT M. G. KIM S. Y. KIM S. K. AN

3 21/12/00 ISSUE OF APPROVED FINAL DOCUMENT M. G. KIM S. Y. KIM S. K. AN

2 20/12/99 APPROVED FOR CONSTRUCTION M. G. KIM S. Y. KIM Y. H. KIM

1 17/11/99 APPROVED FOR CONSTRUCTION M. G. KIM S. Y. KIM Y. H. KIM

0 30/09/99 ISSUED FOR APPROVAL M. G. KIM S. Y. KIM Y. H. KIM

REV. DATE DESCRIPTION BY REVIEWED APPROVED

TOTAL SOUTH PARSSOUTH PARS FIELD DEVELOPMENT (PHASE TWO & THREE)

DOCUMENT TITLEINSPECTION & TEST PLAN FOR

ELECTRICAL

INSP 99012 999 8700 0004 4 IAFD NONE 2 1/23

DOCUMENT No. REV STATUS SCALE CLASS PAGE

Page 2: Electrical ITP

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)

EPSCC3-CONTRACT NO. TSP/PJ/013 ONSHORE FACILITIES

INSPECTION & TEST PLAN FORELECTRICAL

Job No. : 99012Doc No. : INSP 99012 999 8700 0004

Page : 2/23

Rev. 4

TABULATION OF REVISED PAGES

PAGE Rev.1 Rev.2 Rev.3 Rev.4 PAGE Rev.1 Rev.2 Rev.3 Rev.41 45 X2 463 X X 47 X4 X X X 48 X5 X X X 49 X6 X X 50 X7 X X 518 X X 529 X X 53

10 X X X 5411 X X X 5512 X X 5613 X X 5714 X X 5815 X X 5916 X X 6017 X X 6118 X X 6219 X X X 6320 X X X 6421 X X 6522 X X 6623 X 6724 X 6825 X 6926 X 7027 X 7128 X 7229 X 7330 X 7431 7532 7633 7734 X 7835 X 7936 8037 8138 8239 8340 8441 8542 8643 8744 X 88

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)

EPSCC3-CONTRACT NO. TSP/PJ/013

Page 3: Electrical ITP

ONSHORE FACILITIES

INSPECTION & TEST PLAN FORELECTRICAL

Job No. : 99012Doc No. : INSP 99012 999 8700 0004

Page : 3/23

Rev. 4

CONTENTS

A. EARTHING AND LIGHTNING INSTALLATION ----------------------------------------

B. CABLE LADDER INSTALLATION ---------------------------------------------------------

C. CABLE INSTALLATION ----------------------------------------------------------------------

D. EQUIPMENT INSTALLATION --------------------------------------------------------------

E. LIGHTING AND SMALL POWER INSTALLATION -----------------------------------

F. HEAT TRACING INSTALLATION ---------------------------------------------------------

G. CATHODIC PROTECTION INSTALLATION -------------------------------------------

H. TELECOMMUNICATION INSTALLATION ---------------------------------------------

PAGE 4

PAGE 6

PAGE 8

PAGE 11

PAGE 18

PAGE 20

PAGE 22

PAGE 23

NOTE :

COMPANY reserves the right to increase surveillance from SW to W and from W to H

depending on results of site surveillance activities.

COMPANY shall be notified of inspection points by CONTRACTOR at least 3 days in Advance

of the Activity

Page 4: Electrical ITP

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Earthing and Lightning Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 4 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BYREMARK

SUBCON HDEC/TPA

COMPANY

A

1

1.1

1.2

1.3

2

2.1

2.2

2.3

2.4

EARTHING AND LIGHTNING INSTALLATION

Material Verification(Receiving Inspection)

Verify the Material Type/Size/Quantity

Check the Damage

Review the Test Report

Earthing Installation

Cable Type/Size Location & Routing

Bolts and Nuts Tighting

Compression Type Connection

RP 5561V 9991630 029

PP 99012 9990001 550

RP 5561V 999 1620 001

Related DWG

SP-COM-511 Related STD

: IEC 364

QP 550 002

CPX26

-

-

-

W

W

W

W

SW

SW

R

SW

SW

SW

SW

SW

SW

R

SW

SW

SW

SW

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

FORM NO. QP 545 002 2

Page 5: Electrical ITP

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Earthing and Lightning Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 5 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BY

REMARKSUBCON

HDEC/TPA

COMPANY

3

3.1

3.2

Test

Continuity Test

Earthing Resistance Test

RP 5561V 999 1620 001

TPX26 W

H

SW

W

SW

W

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

FORM NO. QP 545 002 2

Page 6: Electrical ITP

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Cable Ladder Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 6 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BY

REMARKSUBCON

HDEC/TPA

COMPANY

B

1

1.1

1.2

CABLE LADDER INSTALLATION

Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity

Check the Damage & Sharp Edge

Review the Related Document

Cable Ladder Installation Proper Type / Size

Cable Ladder Location / Routing

Cable Ladder Damage, Sharp Edge, Burr

PP 99012 999 0001 550

Related DWG

Related DWG

RP 5561V 999 1630 007

RP 5561V 999 1620 001

QP 550 002

CPX30

-

-

-

W

W

W

SW

SW

R

SW

SW

SW

-

-

-

SW

W

SW

Page 7: Electrical ITP

1.3

2

2.1

2.1

2.3

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Cable Ladder Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 7 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BY

REMARKSUBCON

HDEC/TPA

COMPANY

Page 8: Electrical ITP

2.4

2.5

2.6

2.7

Support(Type/Size/Welding/Anchoring )

Coating(touch up paint) on cut end & damagePortions

Earthing / Bonding

Final Inspection

W

W

W

W

SW

SW

SW

W

W

W

SW

W

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Cable Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 8 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BY

REMARKSUBCON

HDEC/TPA

COMPANY

Page 9: Electrical ITP

C

1

1.1

1.2

1.3

2

2.1

2.2

2.3

2.4

CABLE INSTALLATION

Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity

Check the Cable Damage

Review the Related Test Record

Cable Installation Cable Type / Size / Routing

Cable Arrangement

Cable Damage

Cable Pulling Tension

RP 5561V 999 1630 029

PP 99012 999 0001 550

Related DWG

RP 5561V 999 1630 007

RP 5561V 999 1630 008

QP 550 002

CPX08(HV cable)

CPX09(LV power/control)

-

-

-

W

W

W

SW

SW

SW

R

SW

SW

SW

SW

-

SW

-

SW

SW

SW

SW

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Cable Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 9 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BY

REMARKSUBCON

HDEC/TPA

COMPANY

Page 10: Electrical ITP

2.5

3

3.1

3.2

3.3

3.4

3.5

Cable Installation(In Cable Trenches)

- Cable Trenches Preparation

- Cable Segregation

- Sand Bedding and Depth

Cable Termination Crimping Lug or Plug Size / Bolting

Cable Bending Radius

Gland , Fitting

ID Marker & Wire ID Marker

Cable Splicing( If required )

RP 5561V 999 1630 029

CPX08(HV cable)

CPX09(LV power/control)

W

W

W

W

W

W

W

H

W

SW

SW

SW

SW

SW

SW

W

W

W

SW

SW

SW

SW

SW

W

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Cable Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 10 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BY

REMARKSUBCON

HDEC/TPA

COMPANY

Page 11: Electrical ITP

4

4.1

4.2

Cable Test Above 1000V Cable

- Continuity Test

- Insulation Resistance Test

- High-Voltage Test

Up to 1000 V Cable

- Continuity Test

- Insulation Resistance Test

SP-COM-511

RP 5561V 999 1630 029

TPX08

TPX09

H

H

H

W

H

W

H

H

W

W

W

W

H

W

W

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Equipment Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 11 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BY

REMARKSUBCON

HDEC/TPA

COMPANY

Page 12: Electrical ITP

D

1

1.1

1.2

1.3

2

2.1

2.2

2.3

EQUIPMENT INSTALLATION

Equipment Verification(Receiving Inspection) Verify the Equipment Type/Size/Quantity

Check the Physical Damage

Review the Related Document

Generator Installation Foundation/Level/Alignment

Anchor Bolt Setting

Physical Damage/Loose Parts

RP 5561V 999 1630 007

PP 99012 999 0001 550

Related DWG

RP 5561V 999 1630 033

Vendor Spec

QP 550 002

CPX01

-

-

-

W

H

W

SW

SW

R

W

W

W

-

SW

-

-

-

-

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

Page 13: Electrical ITP

FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Equipment Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 12 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BY

REMARKSUBCON

HDEC/TPA

COMPANY

2.4

2.5

2.6

3

3.1

3.2

3.3

3.4

Earthing / Bonding

Cleaning

Electrical Test

Power Transformer Installation

Location/Foundation/Level/Alignment

Anchor Bolt Setting

Physical Damage/Loose Parts

Bushing joint / Seal

SP-COM-511

RP 5561V 999 1630 007

RP 5561V 999 1630 021

Vendor Spec

TPX01

CPX02

W

W

H

H

W

H

W

W

SW

W

W

SW

W

W

W

SW

W

W

SW

W

W

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

Page 14: Electrical ITP

FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Equipment Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 13 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BY

REMARKSUBCON

HDEC/TPA

COMPANY

3.5

3.6

3.7

3.8

Oil Level / No Leak

Tap change mechanism

Earthing / Bonding

Electrical Test

- HV Transformer

- LV Transformer

SP-COM-511

Vendor Spec TPX02

TPX03

W

W

W

H

W

W

SW

SW

H

W

W

W

W

H

W

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

FORM NO. QP 545 002 2

Page 15: Electrical ITP

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Equipment Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 14 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BY

REMARKSUBCON

HDEC/TPA

COMPANY

4.

4.1

4.2

4.3

4.4

4.5

4.6

4.7

Bus Duct Installation

Bus Duct Location / Routing Support Type/Foundation/Welding/Anchoring

Bus Duct Level / Alignment

Bus Bar Connection(Bolt tighting) Earthing / Bonding

Cleaning

Electrical Test

Related DWG

RP 5561V 999 1630 007

Vendor Spec

SP-COM-511

CPX07

TPX07

W

W

W

H

W

W

H

SW

SW

SW

W

SW

SW

W

W

SW

SW

W

W

SW

W

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

FORM NO. QP 545 002 2

Page 16: Electrical ITP

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Equipment Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 15 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BY

REMARKSUBCON

HDEC/TPA

COMPANY

5

5.1

5.2

5.3

5.4

5.5

5.6

5.7

5.8

5.9

HV/LV SWITCHGEAR/MCC Installation

Location / Level / Foundation Support /Welding/Anchoring/Bolting

Alignment of Total Board

Bus Bar Connection

Physical Damage

Earthing / Bonding

Mechanical operation & CT’s data

Cleaning

Electrical Test

Related DWG

RP 5561V 999 1630 007

RP 5561V 999 1630 022 RP 5561V 999 1630 023

Vendor Spec

SP-COM-511

CPX04(HV)

CPX05(LV)

TPX04(HV)

TPX05(LV)

W

W

H

H

W

H

W

W

H

SW

SW

SW

W

SW

SW

W

SW

H

W

SW

SW

SW

SW

W

W

SW

H

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

FORM NO. QP 545 002 2

Page 17: Electrical ITP

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Equipment Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 16 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BY

REMARKSUBCON

HDEC/TPA

COMPANY

6

6.1

6.2

6.3

6.4

6.5

6.6

6.7

6.8

6.9

Battery/Charger/Inverter Installation

Location / Level / Foundation Support /Welding/Anchoring/Bolting

Number of Cells Inter-connected

Polarity of Interconnections between Cells

Bolts, Nuts Washer Assembly Tighting

Physical Damage

Earthing / Bonding

Cleaning Electrical Test

Related DWG

RP 5561V 999 1630 007

RP 5561V 999 1630 025 RP 5561V 999 1630 026

Vendor Spec

SP-COM-511

CPX16/17

TPX16/17

W

W

W

W

W

W

W

W

H

SW

SW

W

W

SW

SW

SW

SW

W

W

SW

W

W

SW

SW

W

SW

W

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

FORM NO. QP 545 002 2

Page 18: Electrical ITP

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Equipment Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 17 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BY

REMARKSUBCON

HDEC/TPA

COMPANY

7

7.1

7.2

7.3

7.4

7.5

7.6

7.7

Miscellaneous Equipment Installation (LV DB, Control Station, NER, Control Panel, etc)

Name Plate

Location / Level / Foundation Support /Welding/Anchoring/Bolting

Bolts, Nuts Washer Assembly Tighting

MCB’s rating

Physical Damage Electrical Test

Related DWG

RP 5561V 999 1630 007

RP 5561V 999 1630 008 Vendor Spec

SP-COM-511

CPX06/15/21/ 23/24/32

W

W

W

W

W

W

H

SW

SW

SW

SW

SW

SW

W

SW

SW

SW

SW

SW

SW

W

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

FORM NO. QP 545 002 2

Page 19: Electrical ITP

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Lighting and Small Power Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 18 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BY

REMARKSUBCON

HDEC/TPA

COMPANY

E

1

1.1

1.2

1.3

2

2.1

2.2

LIGHTING AND SMALL POWER INSTALLATION

Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity

Check the Physical Damage

Review the Related Document

Lighting and Small Power Installation Lighting Distribution Board Installation

Lighting Fixture / Power Socket / Welding Socket Installation - Raceway installation

RP 5561V 999 1640 001

Related DWG

RP 5561V 999 1640 001

RP 5561V 999 1630 029

QP 550 002

CPX 15

CPX18/19/25

-

-

-

W

W

SW

SW

R

W

SW

SW

SW

-

W

SW

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

FORM NO. QP 545 002 2

Page 20: Electrical ITP

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Lighting and Small Power Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 19 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BY

REMARKSUBCON

HDEC/TPA

COMPANY

3

- Cable / Wire installation - Lighting Fixture / Power Socket / Welding Socket Installation

- Final inspection

Test

Continuity Test

Insulation Resistance Test

RP 5561V 999 1640 001

SP-COM-511

RP 5561V 999 1630 029

RP 5561V 999 1640 001

TPX18/19/25

W

W

W

H

H

SW

SW

W

W

W

SW

SW

W

W

W

Page 21: Electrical ITP

3.1

3.2

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Heat Tracing Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 20 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BY

REMARKSUBCON

HDEC/TPA

COMPANY

F

1

1.1

1.2

1.3

2

2.1

HEAT TRACING INSTALLATION

Material Verification(Receiving Inspection) Verify the Material Type/Size/Quantity

Check the Physical Damage

Review the Related Document

Heat Tracing Installation Heating Cable Installation

RP 5561V 999 1630 007

Vendor spec

RP 5561V 999 1630 007

QP 550 002

CPX22

-

-

-

SW

SW

R

-

SW

-

Page 22: Electrical ITP

- Cable Type / Size / Route - Cable Tie or Tape Binding

Related DWG

Vendor spec

W SW SW

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Heat Tracing Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 21 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BY

REMARKSUBCON

HDEC/TPA

COMPANY

2.2

3

Accessory(Junction Box, Thermostats, Sensor)

Test

Insulation Resistance Test ( Before insulation )

Insulation Resistance Test ( After insulation)

Related DWG

Vendor spec

SP-COM-511

RP 5561V 999 1630 007

TPX22

W

H

H

SW

W

W

SW

W

W

Page 23: Electrical ITP

3.1

3.2

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Cathodic Protection Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 22 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BYREMARK

SUBCONHDEC/

TPACOMPANY

G

1

1.1

1.2

1.3

2

2.1

2.2

CATHODIC PROTECTION INSTALLATION

Material Verification(Receiving Inspection)

Verify the Material Type/Size/Quantity

Check the Physical Damage

Review the Related Document

Cathodic Protection Installation Anode / Anode Cable Installation

Cable connection/bonding

RP 5561V 9991630 017, 1300 082

Vendor spec

RP 5561V 9991630 007,1300 082

QP 550 002

CPX33

-

-

-

W

W

SW

SW

R

SW

W

SW

SW

-

W

W

Page 24: Electrical ITP

2.3

3

Test Box, Reference Electrode, etc

Electrical test - Loop resistance for anode cable - Potential test for reference cell

Related DWG

Vendor spec

SP-COM-511 TPX33

W

W

SW

W

W

W

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold

FORM NO. QP 545 002 2

SOUTH PARS FIELD DEVELOPMENT (PHASE TWO AND THREE)EPSCC3-CONTRACT NO. TSP/PJ/013

ONSHORE FACILITIES

INSPECTION & TEST PLAN FOR SITE

DISCIPLINE : ELECTRICAL

SUBCON :

DESCRIPTION OF WORK :

Telecommunication Installation

ITP No. INSP 99012 999 8700 0004

Rev. No. 4 PAGE 23 OF 23

NO. DESCRIPTION OF INSPECTION / TESTAPPLICABLE SPEC.

OR PROCEDUREREPORTING

FORMAT

PARTICIPATION BY

REMARKSUBCON

HDEC/TPA

COMPANY

Page 25: Electrical ITP

H TELECOMMUNICATION INSTALLATION

Above item is separated from ITP for electrical.

ITP for telecommunication will be issued later.

LEGEND : R : Review SW : Spot Witness W : Witness H : Hold