  • Pearl GTL Project

    LINDE ENGINEERING

    Shell Project No: HP-3000-QAT Contractor Project No: 5887

    Project Document Number: T- 4.250.918 Project Rev.: A Page 2 of 10

    Purchase Order Number:

    2MH127

    Tag/Item Number(s): N/A

    Unit(s): ASU

    PCWBS: Z

  • QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION

    D A 27.07.08 Ready for Construction AB EO AG RFC

    C O 23.12.07 Issued for Company comments BR AU/MC ZG ICC

    B 15.12.07 Issued for Review BR AU/MC ZG IFR

    A 02.12.07 Issued for Internal Review BR AU/MC ZG IIR

    GAMA Rev.

    Project Rev

    Date Description Prepared

    By Checked

    By

    Approved By

    Status

    No. No. ORIGINATOR

    LINDEGINEERING AG

    Document Title:

    INSPECTION TEST PLAN FOR PIPING INSTALLATION A/G AND U/G

    Contractor

    Gama Qatar Co. W. L. L.

    Document No. LOC470

    GAM ITP QAC GTL 033 D

    Org.

    Code

    Doc.

    Type

    Disc. Code

    Geogr. Area

    Seq.

    No

    Rev. No

    Vendor Code

    Project Document Number: T-4.250.918

    Rev No: A

  • QSGTL PEARL PROJECT Document No.: GAM-ITP-QAC-GTL-033

    C2 ASU Construction Works

    ITP FOR PIPING INSTALLATION -AG/UG (FSI) DATE: 27.07.08 REV. D

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test

    Frequency Reference Document Acceptance Criteria

    Responsible Party

    Verifying Documents S X C A

    T-4.250.918 Rev.A Page 4 of 10

    1.0

    DOCUMENTATION

    1.1 Contractor isometric drawings / Spool drawings

    100%

    T.4.234.542;T.4.250.935; T.4.250.936

    RFC QCI RFC H R R

    1.2 Approved W.P.S.

    100%

    T.4.251.025; T.4.250.938

    DEP 30.10.60.18;ASME SEC IX;ASME B31.3;

    T.13.377.441;T.13.377.433E;

    WI GAM-QCR-QAC-GTL-106 H H R

    1.3 Approved PQRs 100% T.4.251.025; T.4.250.938 WI GAM-QCR-QAC-GTL-105 H H S H

    1.4

    Welder Performance Qualifications

    100%

    T.4. T.4.250.939 WI

    GAM-QCR-QAC-GTL-100 WSD-QC 2

    WSD-QC 3

    H H W

    1.5 Verify calibration of inspection, measuring and test equipment

    100%

    T.4.250.915 DEP 30.10.60.18; T.13.377.433E;

    T.13.377.441; T.13.377.437E QCI Calibration certificate H I / R R

    2.0 MATERIALS

    2.1 Receiving inspection / Verification of Material

    100% T.4.250.927;T.4.250.928; T.13.376.797E; T.13.377.438E QCI LINDE MRCR SYSTEM H I R

    2.2 Storage & Segregation of Material

    100%

    T.4.250.927;T.4.250.928; T.4.250.932

    T.13.377.454E; T.13.377.438E QCI H I R

    2.3 Welding consumable control & storage procedure

    100%

    WPSs / PQRs; T.4.250.931

    ASME SEC II PART C

    DEP 30.10.60.18; T.13.377.433E; T.13.377.437E

    T.13.377.441;T.4.096.687

    WI Test certificate 3.1 B H I I / R

  • QSGTL PEARL PROJECT Document No.: GAM-ITP-QAC-GTL-033

    C2 ASU Construction Works

    ITP FOR PIPING INSTALLATION -AG/UG (FSI) DATE: 27.07.08 REV. D

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test

    Frequency Reference Document Acceptance Criteria

    Responsible Party

    Verifying Documents S X C A

    T-4.250.918 Rev. A Page 5 of 10

    2.4 Cutting /Transfer of heat No.s

    100% Drawings;T.4.250.928

    DEP 30.10.60.18; ASME B 31.3 T.13.377.433E; T.13.376.815E

    DEP 31.38.01.11; DEP 31.38.01.31; T.13.376.796E;

    QCI GAM-QCR-QAC-GTL-072 H I S

    2.5 PAMI 100% T.4.250.934;T.4.250.938 WI WSD-QC 4 H I S

    3.0 WELDING

    3.1 Welder identification and

    performance verification 100% T.4.250.938;T.4.250.939

    DEP 30.10.60.18; T.13.377.433E ; T.13.377.441 ASME B 31.3

    WI WSD-QC 2 H I I / R

    3.2 Issue of welding consumable to welder

    100% T.4.250.931: T.4.250.938 WI GAM-QCR-QAC-GTL-060 H I S

    3.3 Fit-up and tack welding 100% T.4.250.938;T.4.250.936

    WPSs / PQRs

    DEP 30.10.60.18;ASME B 31.3 T.13.377.433E; DEP 31.38.01.31;

    T.13.376.796E; T.13.377.441 WI

    GAM-QCR-QAC-GTL-098

    H I S

    3.4 Root pass visual inspection

    100% T.4.250.938;T.4.250.935; T.4.250.937

    DEP 30.10.60.18; ASME B31.3 T.13.377.433E; T.13.377.441

    WI I I S

    3.5

    Root pass magnetic check for

    Stainless steel materials

    100%

    T.4.250.938

    DEP 30.10.60.18 T.13.377.433E

    WI GAM-QCR-QAC-GTL-098 H I S

    3.6

    Dissimilar joint welding

    100% WI GAM-QCR-QAC-GTL-107 H H H

  • QSGTL PEARL PROJECT Document No.: GAM-ITP-QAC-GTL-033

    C2 ASU Construction Works

    ITP FOR PIPING INSTALLATION -AG/UG (FSI) DATE: 27.07.08 REV. D

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test

    Frequency Reference Document Acceptance Criteria

    Responsible Party

    Verifying Documents S X C A

    T-4.250.918 Rev. A Page 6 of 10

    3.7

    Inter pass temp controlling /

    cleaning

    100%

    T.4.250.938 DEP 31.38.01.31;ASME B31.3

    T.13.376.796E; WI AS PER WPS I I S

    3.8

    Arc strike control and repair 100% T.4.250.938 DEP 30.10.60.18;ASME B 31.3

    T.13.377.433E; T.13.377.441

    WI GAM-QCR-QAC-GTL-042 GAM-QCR-QAC-GTL-043

    I I S

    3.9 Weld identification and marking

    100% T.4.250.938;T.4.250.935 WI GAM-QCR-QAC-GTL-098 I I S

    3.10

    Welding, purge log (St-steel), process parameter monitoring

    100%

    T.4.250.938; T.4.250.901 WPSs / PQRs

    DEP 30.10.60.18;ASME B31.3 T.13.377.433E; T.13.377.441 DEP

    31.38.01.31; T.13.376.796E; WI GAM-QCR-QAC-GTL-090 I I S

    3.11 Visual Inspection of Welds 100% T.4.250.931 DEP 30.10.60.18; ASME B31.3 T.13.377.433E; T.13.377.441

    WI GAM-QCR-QAC-GTL-098 H H S

    4.0 POST WELD HEAT TREATMENT

    4.1 PWHT 100%

    T.4.250.913;T.4.250.938 DEP 30.10.60.18;ASME B31.3

    T.13.377.433E DEP 31.38.01.31; T.13.376.796E; T.13.377.441

    WI GAM-QCR-QAC-GTL-083 I I I

    4.2

    HARDNESS Test (if required)

    100% WI WSD-QC 5 S/R S/R S/R

    5.0 NON DESTRUCTIVE EXAMINATION

    5.1 Radiographic Film Interpretation/

    ultrasonic examination 100% T.4.250.914;T.4.250.938

    DEP 31.38.01.31; ASME B31.3 T.13.376.796E;

    WI WSD-QC 6 WSD-QC 7

    H I / R I / R

  • QSGTL PEARL PROJECT Document No.: GAM-ITP-QAC-GTL-033

    C2 ASU Construction Works

    ITP FOR PIPING INSTALLATION -AG/UG (FSI) DATE: 27.07.08 REV. D

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test

    Frequency Reference Document Acceptance Criteria

    Responsible Party

    Verifying Documents S X C A

    T-4.250.918 Rev. A Page 7 of 10

    5.2

    Liquid Penetrant 100%

    T.4.250.909;T.4.250.938 WI WSD-QC 9 H I / R I / R

    5.3 Magnetic particle 100% T.4.250.911;T.4.250.938 WI WSD-QC 8 H I / R I / R

    5.4 FERRITE CHECK 100% T.4.250.933 DEP 30.10.60.18; T.13.377.433E

    ;T.13.377.441 WI WSD-QC 10 H I / R I / R

    6.0 REPAIR CONTROL

    6.1 Repair authorization 100% T.4.250.940 DEP 30.10.60.18; T.13.377.433E WI

    GAM-QCR-QAC-GTL-097

    H H I / R

    6.2

    Removal of defects 100% T.4.250.940 ASME B31.3 WI H I I

    6.3 Repair welding 100% T.4.250.940; T.4.250.901 DEP 30.10.60.18;ASME B31.3 T.13.377.433E;T.13.377.441

    WI H W I

    6.4

    PWHT control 100% T.4.250.913 DEP 30.10.60.18;ASME B31.3

    T.13.377.433E; T.13.377.441 DEP 31.38.01.31; T.13.376.796E;

    WI GAM-QCR-QAC-GTL-083 S/R S/R S/R

    6.5 Hardness test (if required) 100% T.4.250.912 WI WSD-QC 5 H I / R I / R

    6.6 NDE of repaired weld 100% T.4.250.940;T.4.250.938 DEP 31.38.01.31;ASME B 31.3

    T.13.376.796E; WI SAME AS ACTIVITY 5.0 H I / R I / R

    6.7 NDE (TRACERS) 100% T.4.250.940;T.4.250.938 ASME B 31.3 WI WSD-QC 11 H I / R I / R

    7.-0 FINAL INSPECTION

    7.1 Dimensional check 100% T.4.250.936;

    Spool Drawings

    ASME B 31.3;DEP 31.38.01.31; T.13.376.796E;DEP 31.38.01.11;

    T.13.376.815E QCI GAM-QCR-QAC-GTL-091 H I W

    7.2 Flanges Alignment 100% T.4.250.936 DEP 31.38.01.11; T.13.376.815E; ASME B 31.3;DEP 31.38.01.31; T.13.376.796E;DEP 61.10.08.11

    QCI GAM-QCR-QAC-GTL-058 H W I

  • QSGTL PEARL PROJECT Document No.: GAM-ITP-QAC-GTL-033

    C2 ASU Construction Works

    ITP FOR PIPING INSTALLATION -AG/UG (FSI) DATE: 27.07.08 REV. D

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test

    Frequency Reference Document Acceptance Criteria

    Responsible Party

    Verifying Documents S X C A

    T-4.250.918 Rev. A Page 8 of 10

    7.3 Torquing of bolts 100% T.4.250.936 DEP 31.38.01.11; T.13.376.815E QCI GAM-QCR-QAC-GTL-041 H W W

    7.4 Hydraulic Tensioning of bolting in special flanges/components

    100% T.4.250.936 DEP 31.38.01.11; T.13.376.815E QCI GAM-QCR-QAC-GTL-041 H H W

    7.5 Piping properly supported

    100% T.4.250.936

    DEP 31.38.01.11;ASME B 31.3 T.13.376.815E;DEP

    31.38.01.29:T.13.376.807E QCI GAM-QCR-QAC-GTL-091 H H W

    7.6 Installation of spring supports

    100% T.4.250.936

    DEP 31.38.01.11; T.13.376.815E; DEP 31.38.01.29; T.13.376.807E

    QCI GAM-QCR-QAC-GTL-093 H H W

    7.7 Installation of cold/special supports

    100% T.4.250.936 QCI GAM-QCR-QAC-GTL-092 H W W

    7.8 Support base grouting (if required)

    100%

    T.4.250.935 DEP 34.19.20.31;

    T.13.376.815E;ASME B 31.3 QCI GAM-QCR-QAC-GTL-086 H W I

    7.9 Painting of support

    100% T.4.250.916 DEP 30.48.00.31; T.13.376.799 QCI/WI GAM-QCR-QAC-GTL-055 H W S

    7.10 Inspection and verification of

    orifice meter run installation 100% T.4.250.936

    DEP 31.38.01.11; T.13.376.815E DEP 61.38.10.10;T.13.375.791E

    QCI GAM-QCR-QAC-GTL-095 H W W

    7.11 Valve installation (direction of

    flow) 100% T.4.250.936

    DEP 31.38.01.11; T.13.376.815E ASME B 31.3

    QCI GAM-QCR-QAC-GTL-091 H W / R I

    7.12 Installation of bellows 100% T.4.250.936 QCI GAM-QCR-QAC-GTL-094 H W W

    7.13 Installation of inline items 100% T.4.250.936 QCI GAM-QCR-QAC-GTL-091 H I / R I

    7.14 Test pack preparation and

    submission 100%

    T.4.250.908;Test Pack

    DEP 31.40.40.38;DEP 61.10.08.11

    QCI H H I

    7.15 Preparation of pre-test punch

    list 100% QCI GAM-QCR-QAC-GTL-066 H H H

  • QSGTL PEARL PROJECT Document No.: GAM-ITP-QAC-GTL-033

    C2 ASU Construction Works

    ITP FOR PIPING INSTALLATION -AG/UG (FSI) DATE: 27.07.08 REV. D

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test

    Frequency Reference Document Acceptance Criteria

    Responsible Party

    Verifying Documents S X C A

    T-4.250.918 Rev. A Page 9 of 10

    7.16 Clearance of pre-test punch

    list 100% QCI H H H

    7.17 As-built documentation 100% T.4.250.908;T.4.250.936 DEP 31.40.40.38;T.13.377.441 QCI H H I / R

    7.18 Material traceability records 100% T.4.250.928 T.13.377.438E QCI GAM-QCR-QAC-GTL-072 H W I

    7.19 Check of welding / NDE

    records 100% T.4.250.908; T.4.250.938 DEP 31.40.40.38 WI

    GAM-QCR-QAC-GTL-087 NDE REPORTS

    H H R

    7.20 Calibration verification and Installation of safety / Relief valves

    100%

    T.4.250.936; T.4.250.915 DEP 31.38.01.11; T.13.376.815E QCI GAM-QCR-QAC-GTL-111 H H W

    7.21 Pressure test 100%

    T.4.250.908 DEP 31.38.01.11; T.13.376.815E; ASME B 31.3;DEP 31.38.01.31;

    T.13.376.796E QCI

    GAM-QCR-QAC-GTL-065 GAM-QCR-QAC-GTL-112

    H H H

    7.22 Preparation of post test punch list

    100%

    T.4.250.908 DEP 61.10.08.11 QCI GAM-QCR-QAC-GTL-067 H H I

    7.23 Post test punch list clearance 100%

    T.4.250.908 QCI GAM-QCR-QAC-GTL-067 H H W

    7.24 Flawless Start-up Initiative (FSI) - Cleanliness

    Internal

    Cleaning

    T.13.377.360 Rev E

    &T.4.096.688

    No external materials inside the pipe & Internal Cleaning shall be

    done before erection the pipe

    Site Eng

    Visual I H I

    7.25 Flawless Start-up Initiative (FSI) - Tightness

    a) Loose Bolt

    b) Wrong Type of

    Bolt c) Bolt

    tightening

    T.13.377.360 Rev E,

    DEP 31.38.01.11- Gen Full Tight without leak Site Eng

    Joint Integrity Control Procedure T.13.377.453 , T.13.376.815 & Flaw

    List

    I H I

  • QSGTL PEARL PROJECT Document No.: GAM-ITP-QAC-GTL-033

    C2 ASU Construction Works

    ITP FOR PIPING INSTALLATION -AG/UG (FSI) DATE: 27.07.08 REV. D

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. THIRD PARTY (TPI)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test

    Frequency Reference Document Acceptance Criteria

    Responsible Party

    Verifying Documents S X C A

    T-4.250.918 Rev. A Page 10 of 10

    7.26 Turn over of quality documents 100%

    T.4.250.908: T.4.251.035 QCI QC DOSSIER H I / R